Surry Power Station Annual Assessment Meeting Reactor Oversight Program - CY 2007 U.S. Nuclear Regulatory Commission - Region II Surry, Virginia April 15, 2008

Purpose of Todays Meeting To provide NRCs annual assessment of licensee performance at Surry for CY 2007 To discuss performance issues identified during the annual assessment To provide the Licensee an opportunity to respond to the annual assessment and to inform the NRC of new or existing initiatives to maintain or improve performance

Agenda z Introductions z Review Reactor Oversight Process z National Summary of Plant Performance z Surrys Plant Performance Results z Licensee Response z NRC Closing Remarks z Break z NRC available to address public questions

Region II Organization Victor McCree Acting Regional Administrator Charles Casto Acting Deputy Regional Administrator Joseph Shea Kriss Kennedy Acting Director Division of Reactor Projects Director Division of Reactor Safety Harold Christensen David Ayres Deputy Director Deputy Director Eugene F. Guthrie Regional Specialists Branch Chief Chris Welch Jim Dodson Sr. Resident Inspector Sr. Project Engineer Vacant Dan Arnett Resident Inspector Project Engineer

NRC Strategic Goals z Safety: Ensure adequate protection of public health and safety and the environment z Security: Ensure adequate protection in the secure use and management of radioactive materials

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

National Summary of Plant Performance Status at End of CY 2007 Licensee Response 87 Regulatory Response 8 Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104

National Summary z Performance Indicator Results (at end of CY 2007)

Green 1942 White 8 Yellow 2 Red 0 z Total Inspection Findings (CY 2007)

Green 759 White 9 Yellow 5 Red 0

Surry Power Station Inspection Activities (Jan 1 - Dec 31, 2007) 7,810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br /> of inspection related activities

  • Operator Licensing Requalification Inspection
  • Independent Spent Fuel Storage Installation Inspections
  • Radiation Protection Inspections
  • Problem Identification and Resolution Inspection
  • Unit 1 In-Service Inspections
  • Resident Inspector daily Inspections

Surry Power Station Assessment Results (Jan 1-Dec 31, 2007)

  • Surrys performance was within the Licensee Response Column of the Action Matrix for all four quarters.
  • No safety significant findings or PIs were identified
  • All inspection findings were classified as very low safety significance (Green).
  • During the assessment period there were fourteen violations of regulatory requirements.
  • All performance indicators were Green.

Surry Power Station Annual Assessment Summary (Jan 1- Dec 31, 2007)

  • Virginia Electric and Power Company operated the Surry Power Station in a manner that preserved public health and safety.
  • All cornerstone objectives were met.
  • NRC plans baseline inspections at North Anna for the remainder of CY 2008.

Licensee Response and Remarks Questions?

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs

NRC Representatives z Chris Welch, Senior Resident Inspector

- (757) 357-2101 z Jim Dodson, Senior Project Engineer

- (404) 562-4655 z Gene Guthrie, Branch Chief

- (404) 562-4662

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)