Summary of Public Meeting with VEPCO Re Licensee Plan to Submit a License Amendment for Chilled Water Piping Replacement.
ML063530276
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/21/2006
From: Siva Lingam
NRC/NRR/ADRO/DORL/LPLII-1
To:
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML063530299 List:
References
TAC MD2501, TAC MD2502
Download: ML063530276 (6)


Text

December 21, 2006 LICENSEE: Virginia Electric and Power Company (VEPCO)

FACILITY: Surry Power Station, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF DECEMBER 6, 2006, PUBLIC MEETING WITH VEPCO, ON ITS PLAN TO SUBMIT A LICENSE AMENDMENT APPLICATION FOR CHILLED WATER PIPING REPLACEMENT (TAC NOS. MD2501 AND MD2502)

On December 6, 2006, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of VEPCO at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss VEPCOs plans to submit for NRC staff approval a chilled water piping replacement in the main control room (MCR) and the emergency switchgear room (ESGR) air-conditioning system with four 45-day allowable outage time (AOT) entries over a 24-month period. A list of attendees is provided as Enclosure 1.

VEPCO presented its purpose and plans to replace chilled water piping in the MCR and the ESGR air-conditioning system with four 45-day AOT entries over a 24-month period. The concluding remarks provided by VEPCO discussed the chilled water piping replacement, four temporary 45-day AOT entries without shutting both units and the associated Technical Specification (TS) changes supported by risk analysis, operational restrictions and compensatory actions that will be in place during chilled water piping replacement, and a quick turnaround of the license amendment approval from NRC. During discussion, the NRC staff had concerns regarding TS changes and risk analysis. The licensees presentation handout is listed as Enclosure 2 and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML063470432.

The licensee plans to submit the license amendment application for NRC staff review by the end of December 2006. For this submittal date, the NRC stated that its review can be expedited if additional information requests are not required, and if all NRC concerns have been addressed satisfactorily before submitting the application. The normal NRC target date for issuing its approval after reviewing the license amendment is 1 year from the date of the application.

CONTACT: Siva P. Lingam 301-415-1564 NRR/DORL

VEPCO Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov.

Siva P. Lingam, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. List of Attendees
2. Licensees Handout (ADAMS ML063470432) cc w/encls: See next page

VEPCO December 21, 2006 Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1564, or SPL@nrc.gov.

Siva P. Lingam, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

1. List of Attendees
2. Licensees Handout (ADAMS ML063470432) cc w/encls: See next page DISTRIBUTION:

Public RidsOgcRp RidsNrrDirsItsb(PHearn)

LPL 2-1 r/f RidsAcrsAcnwMailCenter RidsNrrDssScvb(EForrest)

RidsNrrDorlLpl2-1(EMarinos) RidsNrrDeEeeb(APal) RidsNrrDraAplb(CDoutt)

RidsNrrPMSLingam RidsNrrDirsItsb(RGrover) RidsNrrDssScvb(DNold)

RidsNrrLAMOBrien RidsNrrDirsItsb(TKobetz) RJasinski, NRR RidsRgn2MailCenter(EGuthrie) SLee, EDO, RGN II Package No. ML063530299 Enclosure 2: ML063470432 ADAMS Accession No. ML063530276 NRC-001 Office NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC Name SLingam MOBrien EMarinos Date 12/18/06 12/21/06 12/21/06 OFFICAL RECORD ONLY

List of Attendees Nuclear Regulatory Commission (NRC) Public Meeting With Virginia Electric and Power Company (VEPCO)

Main Control Room and Emergency Switchgear Room Air-Conditioning System Modifications December 6, 2006 Matt Adams VEPCO William W. Chaisson VEPCO Barry A. Garber VEPCO Thomas G. Hook VEPCO Gary D. Miller VEPCO Roger Riley VEPCO Bernard Sloan VEPCO Dave A. Sommers VEPCO Cliff Doutt NRC Ed Forrest NRC Ravi Grover NRC Pete Hearn NRC Siva P. Lingam NRC E. C. Marinos NRC David Nold NRC Amar Pal NRC Enclosure 1

Licensees Handout for December 6, 2006, Public Meeting Main Control Room and Emergency Switchgear Room Air-Conditioning System Modifications With Virginia Electric and Power Company (VEPCO)

(Agencywide Documents Access and Management System Accession No. ML063470432)

Enclosure 2

Surry Power Station, Units 1 & 2 cc:

Mr. David A. Christian Office of the Attorney General Senior Vice President Commonwealth of Virginia and Chief Nuclear Officer 900 East Main Street Virginia Electrical and Power Company Richmond, Virginia 23219 Innsbrook Technical Center 5000 Dominion Boulevard Mr. Chris L. Funderburk, Director Glen Allen, VA 23060-6711 Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

Ms. Lillian M. Cuoco, Esq. Innsbrook Technical Center Senior Counsel 5000 Dominion Blvd.

Dominion Resources Services, Inc. Glen Allen, Virginia 23060-6711 Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385 Mr. Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218