| issue date = 11/16/2015
| issue date = 11/16/2015
| title = IR 05000237/2015406; 05000249/2015406; on 10/13/2015 - 10/14/2015; Dresden Nuclear Power Station, Units 2 and 3; Routine Security Baseline Inspection. (Cover Letter Only)
| title = IR 05000237/2015406; 05000249/2015406; on 10/13/2015 - 10/14/2015; Dresden Nuclear Power Station, Units 2 and 3; Routine Security Baseline Inspection. (Cover Letter Only)
| author name = Orth S K
| author name = Orth S
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 16, 2015
-4352 November 16, 2015 Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road


Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3  
==SUBJECT:==
- NRC SECURITY BASELINE INSPECTION REPORT 05000237/201 5 406; 05000249/
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NRC SECURITY BASELINE INSPECTION REPORT 05000237/2015406; 05000249/2015406
201 5 406


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On October 14, 201 5, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discus s ed on October 14, 201 5 , with Mr. S. Marik and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector s reviewed selected procedures and records, observed activities, and interviewed personnel.
On October 14, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed on October 14, 2015, with Mr. S. Marik and other members of your staff.


No findings were identified during this inspection
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy


of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
No findings were identified during this inspection.
-rm/adams.html (the Public Electronic Reading Room).


However, the material enclosed herewith contains Security
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-Related Information in accordance with 10 CFR 2.390(d)(1)
and its disclosure to unauthorized individuals could present a security vulnerability.


Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
 
-Related Information
Enclosure contains Sensitive Unclassified Non-Safeguards Information.
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
 
When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/
/RA/
Steven K. Orth , Branch Chief Plant Support Branch Division of Reactor Safety Docket Nos.
Steven K. Orth, Branch Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure:
 
IR 05000237/2015406; 05000249/2015406 w/Attachment: Supplemental Information cc w/encl: L. Antos, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV
50-237; 50-249 License Nos. DPR
-19; DPR-25 Nonpublic Enclosure:
IR 05000237/201 5 406; 05000249/
201 5 406 w/Attachment: Supplemental Information cc w/encl:
L. Antos, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl:
Distribution via LISTSERV
}}
}}

Latest revision as of 04:23, 31 October 2019

IR 05000237/2015406; 05000249/2015406; on 10/13/2015 - 10/14/2015; Dresden Nuclear Power Station, Units 2 and 3; Routine Security Baseline Inspection. (Cover Letter Only)
ML15321A029
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/16/2015
From: Steven Orth
Plant Support Branch II
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2015406
Download: ML15321A029 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 16, 2015

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NRC SECURITY BASELINE INSPECTION REPORT 05000237/2015406; 05000249/2015406

Dear Mr. Hanson:

On October 14, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed on October 14, 2015, with Mr. S. Marik and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Branch Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure:

IR 05000237/2015406; 05000249/2015406 w/Attachment: Supplemental Information cc w/encl: L. Antos, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV