ML17338A646: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/09/1979
| issue date = 04/09/1979
| title = Forwards LER 79-002/03L-0
| title = Forwards LER 79-002/03L-0
| author name = SCHMIDT A D
| author name = Schmidt A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000251
| docket = 05000251
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:P.O.BOX 530100.tJllAhll, F L 33152~~FLORIOA POWER 6 LIGHT COlAPAi'IY April 9, 1979 P RN-L I-79-110 Mr.James P.O'Reilly, Director, Region II Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303  
{{#Wiki_filter:P.O. BOX 530100. tJllAhll, F L 33152
                                                                                                  ~ ~
FLORIOA POWER 6 LIGHT COlAPAi'IY April 9,     1979 P RN-L I-79-110 Mr. James   P. O'Reilly, Director, Region     II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite     3100 Atlanta, Georgia       30303


==Dear Mr.O'Reilly:==
==Dear Mr. O'Reilly:==
REPORTABLE OCCURRENCE 251-79-2 TURKEY POINT UNIT 4 DATE OF OCCURRENCE:
 
MARCH 10, 1979 TECHNICAL SPECIFICATION 6.9.2 CHARGING PUMP 4B The attached Licensee Event Report is being submitted in accordance with Technical Specification 6.9.2 to provide 30-day notification of the sObject occurrence.
REPORTABLE OCCURRENCE 251-79-2 TURKEY POINT UNIT 4 DATE OF OCCURRENCE:   MARCH 10, 1979 TECHNICAL SPECIFICATION 6.9.2 CHARGING PUMP 4B The attached     Licensee Event Report is being submitted in accordance with Technical Specification 6.9.2 to provide 30-day notification of the sObject occurrence.
Very truly yours,.Vice President Power Resources DKJ/cph Attachment cc: Director, Office of Inspection and EnforceIn.nt (30)Director, Office of Management Information and Program Control (3)Robert Lowenstein, Esquire Fi1 e 933.1TP V 904880 28'W (t I (i}}
Very   truly yours,
.Vice President Power   Resources DKJ/cph Attachment cc:   Director, Office of Inspection and EnforceIn.nt (30)
Director, Office of Management Information and Program Control (3) 28'W Robert Lowenstein, Esquire Fi1 e 933.1TP V 904880
( t
 
I (i}}

Latest revision as of 10:43, 22 October 2019

Forwards LER 79-002/03L-0
ML17338A646
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 04/09/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17338A649 List:
References
NUDOCS 7904230287
Download: ML17338A646 (2)


Text

P.O. BOX 530100. tJllAhll, F L 33152

~ ~

FLORIOA POWER 6 LIGHT COlAPAi'IY April 9, 1979 P RN-L I-79-110 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

REPORTABLE OCCURRENCE 251-79-2 TURKEY POINT UNIT 4 DATE OF OCCURRENCE: MARCH 10, 1979 TECHNICAL SPECIFICATION 6.9.2 CHARGING PUMP 4B The attached Licensee Event Report is being submitted in accordance with Technical Specification 6.9.2 to provide 30-day notification of the sObject occurrence.

Very truly yours,

.Vice President Power Resources DKJ/cph Attachment cc: Director, Office of Inspection and EnforceIn.nt (30)

Director, Office of Management Information and Program Control (3) 28'W Robert Lowenstein, Esquire Fi1 e 933.1TP V 904880

( t

I (i