ML17298B730: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/26/1984
| issue date = 12/26/1984
| title = Forwards Revised Final Draft Tech Specs Table 3.3-7 Re Seismic Monitoring Instrumentation.Certifies That Tech Specs Accurately Reflect Plant,Fsar & SER Analysis
| title = Forwards Revised Final Draft Tech Specs Table 3.3-7 Re Seismic Monitoring Instrumentation.Certifies That Tech Specs Accurately Reflect Plant,Fsar & SER Analysis
| author name = VAN BRUNT E E
| author name = Van Brunt E
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name = KNIGHTON G W
| addressee name = Knighton G
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000528
| docket = 05000528
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATORY NFORMATION DISTRIBUTION SALEM (RIDS)ACCESSION NBR:8412280142 DOC,DATE: 84/12/26 NOTARIZED:
{{#Wiki_filter:REGULATORY   NFORMATION DISTRIBUTION SALEM     (RIDS)
YES DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Station~Unit 1~Arizona Publi 05000528 AUTH, NAME AUTHOR AFFILIATION VAN BRUNTiE.E, Arizona Public Service Co, RECIP~NAME RECIPIENT AFFILIATION KNIGHTONg G e ll, Licensing Branch 3  
ACCESSION NBR:8412280142         DOC,DATE: 84/12/26 NOTARIZED: YES             DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Station~ Unit 1~ Arizona Publi             05000528 AUTH, NAME           AUTHOR AFFILIATION VAN BRUNTiE.E,       Arizona Public Service Co, RECIP ~ NAME         RECIPIENT AFFILIATION KNIGHTONg G e ll,       Licensing Branch 3


==SUBJECT:==
==SUBJECT:==
Forwards revised final draft Tech Specs Table 3,3-7 re seismic monitoring instrumentationCertifies that Tech Specs accurately reflect plantiFSAR 8 SER analysis.DISTRIBUTION CODE: 8001D COPIES RECEIVED:LTR f ENCL f.SIZE:~" 4 TITLE;Licensing Submittal:
Forwards revised final draft Tech Specs Table 3,3-7 re seismic monitoring instrumentationCertifies that Tech Specs accurately reflect plantiFSAR 8 SER analysis.
PSAR/FSAR Amdts 8, Related Correspondence NOTES;Standardized plant.05000528 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL;ACRS 41 ELD/HDS3 IE/DEPER/EPB 36 NRR ROEpM~L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/I CSB 16 NRR/DSI/PSB 19 NRR/DSI/RS8 23 RGN5 EXTERNAL: BNL(AMDTS ONLY)FEMA REP DI V 39 NRCPDR 0?NTIS COPIES LTTR ENCL 1 0 1 0 6 6 1 0 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-1 1 1 3 3 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAeE 01 ADM/LFMB IE F ILE IE/DQASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 NRR DSI/RAB 22 04 RM/DAMI/MIB DMB/DSS (AMDTS)LPDR 03 NSIC 05 PNL GRUELgR COPIES LTTR ENCL'0 1 1 1 0 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL'5 I 1 I C-I II ll Eq ll ll jl Arizona Public Service Company Director of Nuclear Reactor Regulation Attention:
DISTRIBUTION CODE: 8001D       COPIES RECEIVED:LTR   f ENCL f. SIZE:   ~"   4 TITLE; Licensing Submittal: PSAR/FSAR Amdts       8, Related Correspondence NOTES;Standardized     plant.                                                 05000528 RECIPIENT         COPIES          RECIPIENT          COPIES ID CODE/NAME        LTTR ENCL    ID CODE/NAME         LTTR ENCL' NRR/DL/ADL             1    0    NRR  LB3  BC                  0 NRR   LB3 LA           1    0    LICITRAeE      01      1    1 INTERNAL; ACRS             41     6    6    ADM/LFMB                1    0 ELD/HDS3               1    0    IE F ILE                1    1 IE/DEPER/EPB 36         1    1    IE/DQASIP/QAB21        1    1 NRR ROEpM ~ L           1          NRR/DE/AEAB            1    0 NRR/DE/CEB      11      1    1    NRR/DE/EHEB            1    1 NRR/DE/EQB      13      2    2    NRR/DE/GB      28      2    2 NRR/DE/MEB      18      1    1    NRR/DE/MTEB    17      1    1 NRR/DE/SAB      24      1    1    NRR/DE/SGEB    25      1    1 NRR/DHFS/HFEB40        1   1     NRR/DHFS/LQB    32      1 NRR/DHFS/PSRB          1    1    NRR/DL/SSPB                  0 NRR/DSI/AEB 26          1    1    NRR/DSI/ASB            1    1 NRR/DSI/CPB    10      1    1    NRR/DS I/CSB 09        1    1 NRR/DSI/I CSB   16      1    1    NRR/DS I/METB 12       1    1 NRR/DSI/PSB    19      1-  1    NRR DSI/RAB     22     1    1 NRR/DSI/RS8    23      1    1                    04     1    1 RGN5                    3    3    RM/ DAMI/MIB           1    0 EXTERNAL: BNL(AMDTS ONLY)                      DMB/DSS (AMDTS)         1    1 FEMA REP  DI V 39                LPDR           03     1     1 NRC PDR        0?                NSIC            05      1     1 NTIS                              PNL GRUELgR            1     1 TOTAL NUMBER OF COPIES     REQUIRED: LTTR   53   ENCL'5
Mr.George W.Knighton, Chief Licensing Branch No.3 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 December 26, 1984 ANPP-31570 WF()/SRF
 
I 1
I C-I II ll Eq ll ll jl
 
Arizona Public Service Company Director of Nuclear Reactor Regulation                           December 26, 1984 Attention: Mr. George W. Knighton, Chief                         ANPP-31570 WF()/SRF Licensing Branch No.       3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 1 Docket No.STN-50-528 PVNGS Unit 1 Final Draft Technical Specifications File: 005-419.05
Palo Verde Nuclear Generating Station (PVNGS)
Unit   1 Docket No. STN-50-528 PVNGS   Unit 1 Final Draft Technical Specifications File:   005-419.05


==References:==
==References:==
(A)NRC letter dated August 14, 1984, from G.W.Knighton, NRC, to E.E.Van Brunt, Jr., APS.(B)APS l.etter dated September 14, 1984, from E.E.Van Brunt, Jr., APS, to G.W.Knighton, NRC.(C)NRC letter dated November 28, 1984, from G.W.Knighton, NRC, to E.E.Van Brunt, Jr., APS.(D)APS letter dated December 3, 1984, from E.E.Van Brunt, Jr., APS, to G.W.Knighton, NRC.
(A)   NRC letter   dated August 14, 1984, from G.W. Knighton,       NRC, to E.E. Van Brunt, Jr., APS.
(B) APS l.etter dated September 14, 1984, from E.E.           Van Brunt, Jr.,
APS, to G.W. Knighton, NRC.
(C)   NRC letter   dated November 28, 1984, from G.W. Knighton,       NRC, to E.E. Van Brunt, Jr., APS.
(D) APS   letter   dated December 3, 1984, from E.E. Van Brunt,       Jr.,
APS, to G.W. Knighton, NRC.
 
==Dear Mr. Knighton:==
 
The purpose    of this letter is to provide our certification of the            PVNGS "Final Draft" Technical Specifications dated December 21, 1984.
The above    referenced    letters provide the documentation of the process, proposed changes      and  negotiated changes as agreed upon by the NRC and          APS in developing the      PVNGS  Technical Specifications.
In performing our final review using the December 21, 1984 "Final Draft" Technical Specifications, we found one item that needs to be changed. On Page 3/4 3-43 Item 3a and b, setpoints are reversed and need to be changed.
(See  attached).
Upon completion of this change, I certify that to the best of my knowledge, the December 21, 1984 "Final Draft" Technical Specifications accurately reflect the plant, the FSAR and the SER analysis.
Hosea 841226 Very  truly your  ,
ADOcz osooosa8 pDR A
pDR  ~
F. $ Qcu~                nLLA E. E. Van Brunt,    Jr.
APS  Vice President EEVBJr/SRF/no                                        Nuclear Production Attachments                                          ANPP  Project Director cc:    E.A. Licitra G. Fiorelli                                        gol J.B. Martin A.C. Gehr R.P. Zimmerman
 
C' H
1
 
December 26, 1984 ANPP-31570 STATE OF ARIZONA          )
                            ) ss.
COUNTY OF NARICOPA)
I, Edwin E. Van Brunt,  Jr., represent that I am Vice President, Nuclear Production of Arizona        Public Service Company, that the foregoing document has been signed by me      on behalf of Arizona Public Service Company with full authority to do so,      that  I have read such document and know its contents, and that to the best        of my knowledge and belief, the statements made therein are true.
Edwin E. Van Brunt,  Jr.
Sworn      to before  me    this~  day  of              1984.
iotary Public key.,Commission    Expires:
My Comralssion Expires April 6, 1987
        /
      ~g ~ '
 
I
    ,I ll t
            %O o
o4 I 'W          ~  t)I
                'I o  g    'Pg
                    "  ~'l,y~p'
 
Mr.'eorge    W. Knighton PVNGS  Unit  1  Final Draft Technical Specifications ANPP-31570 Page 2 bcc:  T.G. Woods D.B. Karner A.C. Rogers E.C,. Sterling W.E. Ide B.F. Godwin D.W. Holmes W.F. Quinn S.R. Frost K.W. Gross J.R. Bynum J.E. Kirby J.M. Allen D.B. Fasnacht J.G. Sel f D.R. Canady R.K. Nelson O.J. Zeringue


==Dear Mr.Knighton:==
        't 0 II il Cr I
The purpose of this letter is to provide our certification of the PVNGS"Final Draft" Technical Specifications dated December 21, 1984.The above referenced letters provide the documentation of the process, proposed changes and negotiated changes as agreed upon by the NRC and APS in developing the PVNGS Technical Specifications.
I(}}
In performing our final review using the December 21, 1984"Final Draft" Technical Specifications, we found one item that needs to be changed.On Page 3/4 3-43 Item 3a and b, setpoints are reversed and need to be changed.(See attached).
Upon completion of this change, I certify that to the best of my knowledge, the December 21, 1984"Final Draft" Technical Specifications accurately reflect the plant, the FSAR and the SER analysis.cz osooosa8 Hosea 841226 pDR ADO pDR~A EEVBJr/SRF/no Attachments cc: E.A.Licitra G.Fiorelli J.B.Martin A.C.Gehr R.P.Zimmerman Very truly your , F.$Qcu~nLLA E.E.Van Brunt, Jr.APS Vice President Nuclear Production ANPP Project Director gol C''!H 1 December 26, 1984 ANPP-31570 STATE OF ARIZONA))ss.COUNTY OF NARICOPA)I, Edwin E.Van Brunt, Jr., represent that I am Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.Edwin E.Van Brunt, Jr.Sworn to before me this~day of 1984.iotary Public key.,Commission Expires: My Comralssion Expires April 6, 1987/~g~'
I ,I ll I'W t%O o4 o~t)I o g'I'Pg"~'l,y~p' Mr.'eorge PVNGS Unit ANPP-31570 Page 2 bcc: T.G.D.B.A.C.E.C,.W.E.B.F.D.W.W.F.S.R.K.W.J.R.J.E.J.M.D.B.J.G.D.R.R.K.O.J.W.Knighton 1 Final Draft Technical Specifications Woods Karner Rogers Sterling Ide Godwin Holmes Quinn Frost Gross Bynum Kirby Allen Fasnacht Sel f Canady Nelson Zeringue 0't II il I Cr I(}}

Latest revision as of 06:07, 4 February 2020

Forwards Revised Final Draft Tech Specs Table 3.3-7 Re Seismic Monitoring Instrumentation.Certifies That Tech Specs Accurately Reflect Plant,Fsar & SER Analysis
ML17298B730
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/26/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML17298B731 List:
References
ANPP-31570-WFQ, NUDOCS 8412280142
Download: ML17298B730 (8)


Text

REGULATORY NFORMATION DISTRIBUTION SALEM (RIDS)

ACCESSION NBR:8412280142 DOC,DATE: 84/12/26 NOTARIZED: YES DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Station~ Unit 1~ Arizona Publi 05000528 AUTH, NAME AUTHOR AFFILIATION VAN BRUNTiE.E, Arizona Public Service Co, RECIP ~ NAME RECIPIENT AFFILIATION KNIGHTONg G e ll, Licensing Branch 3

SUBJECT:

Forwards revised final draft Tech Specs Table 3,3-7 re seismic monitoring instrumentationCertifies that Tech Specs accurately reflect plantiFSAR 8 SER analysis.

DISTRIBUTION CODE: 8001D COPIES RECEIVED:LTR f ENCL f. SIZE: ~" 4 TITLE; Licensing Submittal: PSAR/FSAR Amdts 8, Related Correspondence NOTES;Standardized plant. 05000528 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL' NRR/DL/ADL 1 0 NRR LB3 BC 0 NRR LB3 LA 1 0 LICITRAeE 01 1 1 INTERNAL; ACRS 41 6 6 ADM/LFMB 1 0 ELD/HDS3 1 0 IE F ILE 1 1 IE/DEPER/EPB 36 1 1 IE/DQASIP/QAB21 1 1 NRR ROEpM ~ L 1 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13 2 2 NRR/DE/GB 28 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SGEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 0 NRR/DSI/AEB 26 1 1 NRR/DSI/ASB 1 1 NRR/DSI/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DSI/I CSB 16 1 1 NRR/DS I/METB 12 1 1 NRR/DSI/PSB 19 1- 1 NRR DSI/RAB 22 1 1 NRR/DSI/RS8 23 1 1 04 1 1 RGN5 3 3 RM/ DAMI/MIB 1 0 EXTERNAL: BNL(AMDTS ONLY) DMB/DSS (AMDTS) 1 1 FEMA REP DI V 39 LPDR 03 1 1 NRC PDR 0? NSIC 05 1 1 NTIS PNL GRUELgR 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL'5

I 1

I C-I II ll Eq ll ll jl

Arizona Public Service Company Director of Nuclear Reactor Regulation December 26, 1984 Attention: Mr. George W. Knighton, Chief ANPP-31570 WF()/SRF Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN-50-528 PVNGS Unit 1 Final Draft Technical Specifications File: 005-419.05

References:

(A) NRC letter dated August 14, 1984, from G.W. Knighton, NRC, to E.E. Van Brunt, Jr., APS.

(B) APS l.etter dated September 14, 1984, from E.E. Van Brunt, Jr.,

APS, to G.W. Knighton, NRC.

(C) NRC letter dated November 28, 1984, from G.W. Knighton, NRC, to E.E. Van Brunt, Jr., APS.

(D) APS letter dated December 3, 1984, from E.E. Van Brunt, Jr.,

APS, to G.W. Knighton, NRC.

Dear Mr. Knighton:

The purpose of this letter is to provide our certification of the PVNGS "Final Draft" Technical Specifications dated December 21, 1984.

The above referenced letters provide the documentation of the process, proposed changes and negotiated changes as agreed upon by the NRC and APS in developing the PVNGS Technical Specifications.

In performing our final review using the December 21, 1984 "Final Draft" Technical Specifications, we found one item that needs to be changed. On Page 3/4 3-43 Item 3a and b, setpoints are reversed and need to be changed.

(See attached).

Upon completion of this change, I certify that to the best of my knowledge, the December 21, 1984 "Final Draft" Technical Specifications accurately reflect the plant, the FSAR and the SER analysis.

Hosea 841226 Very truly your ,

ADOcz osooosa8 pDR A

pDR ~

F. $ Qcu~ nLLA E. E. Van Brunt, Jr.

APS Vice President EEVBJr/SRF/no Nuclear Production Attachments ANPP Project Director cc: E.A. Licitra G. Fiorelli gol J.B. Martin A.C. Gehr R.P. Zimmerman

C' H

1

December 26, 1984 ANPP-31570 STATE OF ARIZONA )

) ss.

COUNTY OF NARICOPA)

I, Edwin E. Van Brunt, Jr., represent that I am Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E. Van Brunt, Jr.

Sworn to before me this~ day of 1984.

iotary Public key.,Commission Expires:

My Comralssion Expires April 6, 1987

/

~g ~ '

I

,I ll t

%O o

o4 I 'W ~ t)I

'I o g 'Pg

" ~'l,y~p'

Mr.'eorge W. Knighton PVNGS Unit 1 Final Draft Technical Specifications ANPP-31570 Page 2 bcc: T.G. Woods D.B. Karner A.C. Rogers E.C,. Sterling W.E. Ide B.F. Godwin D.W. Holmes W.F. Quinn S.R. Frost K.W. Gross J.R. Bynum J.E. Kirby J.M. Allen D.B. Fasnacht J.G. Sel f D.R. Canady R.K. Nelson O.J. Zeringue

't 0 II il Cr I

I(