ML17346A307: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/20/1984
| issue date = 04/20/1984
| title = Recommends Meeting to Discuss Current Status & Direction of Proposed Bus C Design Changes.Interim Electrical Configurations Detailed in 840221 Confirmation of Action Ltr in Effect Until Review of Final Bus C Mods Complete
| title = Recommends Meeting to Discuss Current Status & Direction of Proposed Bus C Design Changes.Interim Electrical Configurations Detailed in 840221 Confirmation of Action Ltr in Effect Until Review of Final Bus C Mods Complete
| author name = WILLIAMS J W
| author name = Williams J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = VARGA S A
| addressee name = Varga S
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000250, 05000251
| docket = 05000250, 05000251
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGUlATORY iNFORMATION DISTRIBUTION S TEM (RIDS)ACCESSION NBR:8404240237 DOC~DATE: S4/04/20 NOTARIZED:
{{#Wiki_filter:REGUlATORY iNFORMATION DISTRIBUTION             S   TEM (RIDS)
NO DOCKET FACIL:50-250 Turkey Point PlantE Unit 3E Florida'Power and Light C 05000250 50-25:1 Turkey Point Planti Unit 4E Flori,da Power and Light C 05000251 AUTH BYNAME, AUTHOR AFFILIATION l'/ILLIAMS<
ACCESSION NBR:8404240237             DOC ~ DATE: S4/04/20       NOTARIZED:   NO         DOCKET FACIL:50-250 Turkey Point PlantE Unit 3E Florida 'Power and Light                   C   05000250 50-25:1 Turkey Point Planti Unit 4E Flori,da Power and Light BYNAME,                                                                      C   05000251 AUTH                 AUTHOR AFFILIATION l'/ILLIAMS<J N ~ ~     Fl or i de Power 8 Light Co, RECIP ~ NAME         RECIPIENT AFFILIATION VARGArS ~ AD               Operating. Reactors Branch       1 S UBJECT:   Recommends meet,ing to discuss current status 8 direction of proposed Bus C design changes'nterim electrical       completely configurations detailed in 840221 confirmation of action                   ltr i'n effect unti'1 review of final       Bus C   mods DISTRIBUTION CODE: A001S COPIES RECEIVED:,LTR                 J'NCL         SIZE:
J~N~Fl or i de Power 8 Light Co, RECIP~NAME RECIPIENT AFFILIATION VARGArS~AD Operating.
TI'TLE: OR Submittal: General Distribution NOTES RECIPIENT-           COPIES                                    COPIES ID'ODE/NAME ID CODE/NAME NRR ORB1   BC   01     1-'ECIPIENT LTTR ENCL                                LTTR ENCL INTERNAL'LD/HDS4                       1           NRR/DE/MTEB NRR/DL DIR                1            NRR/DL/DRAB lETB          1            NRR/DSI/RA 8 REG  FILE        04                  RGN2 EXTERNAL; ACRS                 09'2 L'P DR             03 NRC PDR                                NSIC               05 NT I' TOTAL NUIASER OF COPIES         REQUIRED: LTTR     25     ENCL
Reactors Branch 1 S UBJECT: Recommends meet,ing to discuss current status 8 direction of proposed Bus C design changes'nterim electrical configurations detailed in 840221 confirmation of action ltr i'n effect unti'1 review of final Bus C mods completely DISTRIBUTION CODE: A001S COPIES RECEIVED:,LTR J'NCL SIZE: TI'TLE: OR Submittal:
General Distribution NOTES 04 RECIPIENT-ID CODE/NAME NRR ORB1 BC 01 INTERNAL'LD/HDS4 NRR/DL DIR lETB REG FILE COPIES LTTR ENCL 1 1 1 1-'ECIPIENT ID'ODE/NAME NRR/DE/MTEB NRR/DL/DRAB NRR/DSI/RA 8 RGN2 COPIES LTTR ENCL EXTERNAL;ACRS NRC PDR NT I'09'2 L'P DR NSIC 03 05 TOTAL NUIASER OF COPIES REQUIRED: LTTR 25 ENCL l kldli)c'-))4>>',)4>JJ gf'i)>>>>I hf~i i II y+>>'.')Il)g~>>lC" A>>w~~>>4)444)44>>4) 0 C I 4 t P.O.BOX 529100 MIAMI, F L 33152>>QIO>>A'6u~A FLORIDA POWER&LIGHT COMPANY April 20, 1984 L-84-107 Office of Nuclear Reactor Regulation Attention:
Mr.S.A.Varga, Chief Operating Reactors Branch II1 Division of Operating Reactors U.S.Nuclear Regulatory Commission Washington, D.C.20555 I


==Dear Mr.Varga:==
l  kldli
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Pro osed"C" Bus Desi n Chan es Our letter L-84-62, dated March 7, 1984, committed to submit the proposed long term design changes and modifications to the Turkey Point Units 3 5 4"C" Bus by April 20, 1984.We have devoted a significant anount of resources towards the completion of our reviews of the off-site and on-site electrical power supply configurations at Turkey Point.Also during this period, we have identified additional areas of review which are appropriate to assure that our design and evaluation efforts are complete.These increases in scope have caused us to del@our final'ubmittal.
                              )  c '-))4>> ', )4    >JJ gf 'i)>>>>    I hf
As discussed with your staff, we recanmend that our electrical and technical personnel meet with your staff and NRR electrical reviewers in order to discuss the current status and direction of this major effort.We propose that this meeting be held in Mi ani at our General Office.This location would offer the convenience of a Turkey Point plant tour of the related electrical areas.This tour would provide your r eviewers with a firsthand knowledge of the"C" Bus modifications.
                                              ~  i i    II y+>>'.') Il)g
I The interim electrical configurations, as detailed in our Confirmation of Action letter L-84-36 dated February 21, 1984, will remain in effect until your review of our final"C" Bus modifications is complete.8404240237 840420 PDR ADOCK 05000250 ,PDR PEOPLE...SERVING PEOPLE  
  ~>> lC" A >>w  ~~>> 4)444)44>>4) 0 C I 4
>%II A~~I 0 Office of Nuclear Reactor.Regul ation Attenti on: Mr.S.A.Varga, Chi ef Page 2 We will continue to coordinate the time and location for a meeting with the NRR Project Manager for Turkey Point.Very truly yours, J.W.Willies, Jr.Vice President Nuclear Energy JWW/SAV/JEM cc: Harold F.Reis, Esquire J.P..O'Reilly, Regional Administrator, Region II P NS-L 1-84-136  
 
~~}}
t    P.O. BOX 529100 MIAMI,F L 33152
                                                                                        >>QIO>>
A'6u~A FLORIDA POWER & LIGHT COMPANY April 20,    1984 L-84-107 Office of Nuclear Reactor Regulation Attention: Mr. S. A. Varga, Chief Operating Reactors Branch II1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I
 
==Dear Mr. Varga:==
 
Re: Turkey   Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Pro osed "C" Bus Desi n Chan es Our letter L-84-62, dated March 7, 1984, committed to submit the proposed long term design changes and modifications to the Turkey Point Units 3 5 4 "C" Bus by April 20, 1984. We have devoted a significant anount of resources towards the completion of our reviews of the off-site and on-site electrical power supply configurations at Turkey Point. Also during this period, we have identified additional areas of review which are appropriate to assure that our design and evaluation efforts are complete. These increases in scope have caused us to del@ our final'ubmittal.
As discussed with your staff, we recanmend that our electrical and technical personnel meet with your staff and NRR electrical reviewers in order to discuss the current status and direction of this major effort. We propose that this meeting be held in Mi ani at our General Office. This location would offer the convenience of a Turkey Point plant tour of the related electrical areas. This tour would provide your r eviewers with a firsthand knowledge of the "C"   Bus modifications.
I The interim electrical configurations,   as detailed in our Confirmation of Action letter L-84-36 dated February 21, 1984,     will remain in effect until your review of our final "C" Bus modifications     is complete.
8404240237 840420 PDR ADOCK 05000250
                    ,PDR PEOPLE... SERVING PEOPLE
 
>%II A ~
    ~I
 
0 Office of Nuclear Reactor .Regul ation Attenti on: Mr. S. A. Varga, Chi ef Page 2 We will   continue to coordinate the time and location for a meeting with the NRR Project Manager for Turkey Point.
Very   truly yours, J. W. Willies, Jr.
Vice President Nuclear Energy JWW/SAV/JEM cc: Harold F. Reis, Esquire J. P.. O'Reilly, Regional Administrator, Region II P NS-L 1-84-136
 
~ ~}}

Latest revision as of 08:44, 22 October 2019

Recommends Meeting to Discuss Current Status & Direction of Proposed Bus C Design Changes.Interim Electrical Configurations Detailed in 840221 Confirmation of Action Ltr in Effect Until Review of Final Bus C Mods Complete
ML17346A307
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/20/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
L-84-107, NUDOCS 8404240237
Download: ML17346A307 (6)


Text

REGUlATORY iNFORMATION DISTRIBUTION S TEM (RIDS)

ACCESSION NBR:8404240237 DOC ~ DATE: S4/04/20 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point PlantE Unit 3E Florida 'Power and Light C 05000250 50-25:1 Turkey Point Planti Unit 4E Flori,da Power and Light BYNAME, C 05000251 AUTH AUTHOR AFFILIATION l'/ILLIAMS<J N ~ ~ Fl or i de Power 8 Light Co, RECIP ~ NAME RECIPIENT AFFILIATION VARGArS ~ AD Operating. Reactors Branch 1 S UBJECT: Recommends meet,ing to discuss current status 8 direction of proposed Bus C design changes'nterim electrical completely configurations detailed in 840221 confirmation of action ltr i'n effect unti'1 review of final Bus C mods DISTRIBUTION CODE: A001S COPIES RECEIVED:,LTR J'NCL SIZE:

TI'TLE: OR Submittal: General Distribution NOTES RECIPIENT- COPIES COPIES ID'ODE/NAME ID CODE/NAME NRR ORB1 BC 01 1-'ECIPIENT LTTR ENCL LTTR ENCL INTERNAL'LD/HDS4 1 NRR/DE/MTEB NRR/DL DIR 1 NRR/DL/DRAB lETB 1 NRR/DSI/RA 8 REG FILE 04 RGN2 EXTERNAL; ACRS 09'2 L'P DR 03 NRC PDR NSIC 05 NT I' TOTAL NUIASER OF COPIES REQUIRED: LTTR 25 ENCL

l kldli

) c '-))4>> ', )4 >JJ gf 'i)>>>> I hf

~ i i II y+>>'.') Il)g

~>> lC" A >>w ~~>> 4)444)44>>4) 0 C I 4

t P.O. BOX 529100 MIAMI,F L 33152

>>QIO>>

A'6u~A FLORIDA POWER & LIGHT COMPANY April 20, 1984 L-84-107 Office of Nuclear Reactor Regulation Attention: Mr. S. A. Varga, Chief Operating Reactors Branch II1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I

Dear Mr. Varga:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Pro osed "C" Bus Desi n Chan es Our letter L-84-62, dated March 7, 1984, committed to submit the proposed long term design changes and modifications to the Turkey Point Units 3 5 4 "C" Bus by April 20, 1984. We have devoted a significant anount of resources towards the completion of our reviews of the off-site and on-site electrical power supply configurations at Turkey Point. Also during this period, we have identified additional areas of review which are appropriate to assure that our design and evaluation efforts are complete. These increases in scope have caused us to del@ our final'ubmittal.

As discussed with your staff, we recanmend that our electrical and technical personnel meet with your staff and NRR electrical reviewers in order to discuss the current status and direction of this major effort. We propose that this meeting be held in Mi ani at our General Office. This location would offer the convenience of a Turkey Point plant tour of the related electrical areas. This tour would provide your r eviewers with a firsthand knowledge of the "C" Bus modifications.

I The interim electrical configurations, as detailed in our Confirmation of Action letter L-84-36 dated February 21, 1984, will remain in effect until your review of our final "C" Bus modifications is complete.

8404240237 840420 PDR ADOCK 05000250

,PDR PEOPLE... SERVING PEOPLE

>%II A ~

~I

0 Office of Nuclear Reactor .Regul ation Attenti on: Mr. S. A. Varga, Chi ef Page 2 We will continue to coordinate the time and location for a meeting with the NRR Project Manager for Turkey Point.

Very truly yours, J. W. Willies, Jr.

Vice President Nuclear Energy JWW/SAV/JEM cc: Harold F. Reis, Esquire J. P.. O'Reilly, Regional Administrator, Region II P NS-L 1-84-136

~ ~