IR 05000016/2011013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
[[Issue date::December 30, 2011]]
-4352 December 30, 2011 Mr. Joseph Plona Site Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 481 66


Mr. Joseph Plona Site Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT: NRC INSPECTION REPORT 05000016/11
 
-13(DNMS) - ENRICO FERMI UNIT 1
SUBJECT: NRC INSPECTION REPORT 05000016/11-13(DNMS) - ENRICO FERMI UNIT 1


==Dear Mr. Plona:==
==Dear Mr. Plona:==
Line 30: Line 29:
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection included facility management and control and radiological safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection included facility management and control and radiological safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.


Based on the results of this inspection, the NRC did not identify any violations. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.
Based on the results of this inspection, the NRC did not identify any violations.
 
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
. We will gladly discuss any questions you have concerning this inspection.


Sincerely,/RA/
Sincerely,/RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00016 License No. DPR-9  
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050
-00016 License No. DPR
-9  


===Enclosure:===
===Enclosure:===
Inspection Report No. 05000016/11-13(DNMS) cc w/encl: Distribution via ListServ
Inspection Report No. 05000016/11
-13(DNMS) cc w/encl:
Distribution via ListServ
}}
}}

Revision as of 00:00, 31 July 2018

IR 05000016-11-013; 06/07/2011- 12/11/2011; Enrico Fermi NRC Inspection Report
ML12004A115
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/30/2011
From: Lipa C A
NRC/RGN-III/DNMS/MCID
To: Plona J
Detroit Edison, Co
Lipa C A
References
IR-11-013
Download: ML12004A115 (12)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 December 30, 2011 Mr. Joseph Plona Site Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 481 66

SUBJECT: NRC INSPECTION REPORT 05000016/11

-13(DNMS) - ENRICO FERMI UNIT 1

Dear Mr. Plona:

On December 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Enrico Fermi Unit 1 facility. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. At the conclusion of the inspection on December 11, 2011, the NRC inspector discussed the findings with members of your staff.

The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection included facility management and control and radiological safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

. We will gladly discuss any questions you have concerning this inspection.

Sincerely,/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050

-00016 License No. DPR

-9

Enclosure:

Inspection Report No. 05000016/11

-13(DNMS) cc w/encl:

Distribution via ListServ