ML17276B336: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ACCESSION NBR FAC IL: 50"397 AUTH BYNAME BLANCHARDFB
~8 EC IP.NAME SCHWA'IENCER F A~REGULATORY.
FORMATION DISTRIBUTION SY.M (RIDS)W~8203 l07 0269 DOC~DATE 82/03/1 6 NOTAR I ZED'NO DOCKET NPPSS Nuclear Projects Unit 2i Washington Public Pose OS000397 AUTHOR AF F IL I A T ION In t'er i or E Dep t.o f RECIPIENT AFFILIATION Licensing Branch'2
 
==SUBJECT:==
Comments on FES.No objections exist to issuance of Section 400 permit if listed conditions stipulated.
DISTRIBUTIONCODE.:
COOED COPIES RECEIVED:LTR
$ENCL$'SIZE:.-J TITLE: Environ.Comments.NOTES:2 copies all matl:PM.05000397 RECIPIENT ID CODE/NAME LIC BR P2 BC Ob AULUCKgR~Ol INTERNAL: ELD NRR/DE/AEAB 20 NRR/DE/HGEB 21 NRR/DS I/AEB'9 NRR/DSI/RAB 17 RGNS COPIES LTTR ENCL RECIPIENT ID CODE/NAME NL: ANL IE 13 NRR/DE/EEB 16 NRR/DE/SAB 18 NRR.KL/TSB 15 F LE, 0<)COPIES LTTR ENCL 1 1 1 1 EXTERNAL: ACRS NATL LAB NSIC 21 05 1 1 LPDR NRC PDR NTIS 03,, 1 02 1.1 3P TOTAL NUMBER OF COPIES REQUIRED: L'TTR P5 ENCL 4 fl tt)\t , 1))t
~gt4Y Oc~Q F W EA 0 JDUnited States Department of the Interior OFFICE OF THE SECRETARY WASHINGTON, D.C.20240 ER 81/153V Mr.A.Schwencer Chief, Licensing Branch No.2 Division of Licensing Nuclear Regulatory Commission Washington, D.C.20555 MAR 16 1982/RECgj~g tt~R>'r 1982 l'l Mam ngurml elec, AiSQ7 Qgtggp g TIDC
 
==Dear Mr.Schwencer:==
 
We have reviewed the final environmental impact statement related to the operation of WPPSS Nuclear Project No.2, Benton County, Washington.
In the upcoming review of the Corps of Engineers'ublic notice regarding issuance of a Section 404 permit for project-associated work in the Columbia River, the Pish and Wildlife Service will, in all likelihood, not object to issuance of the permit provided that the following conditions are stipulated in the permit: 1.Water intakes will be screened such that the maximum size of openings is 3/8-inch and maximum approach velocity at the screen surface is.5 feet per second, so as to prevent entrainment of salmonid fry and smolts.2.In-river construction activity will be conducted during the timeframe of December through February when construction activities are least likely to impact salmonid spawning and migration.
We hope these comments will be helpful to you.Sincerely, ruce Blanchard, Director Environmental Project Review+co 8 it ssos>7oss9 ssosis PDR ADQCK 05000397~,D,': ',',,',,PDR,,I 0 I~~~A~l'l~~~1 J't~4}}

Revision as of 08:20, 12 July 2018

Comments on Fes.No Objections Exist to Issuance of Section 404 Permit If Listed Conditions Stipulated
ML17276B336
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/16/1982
From: BLANCHARD B
INTERIOR, DEPT. OF
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
NUDOCS 8203170269
Download: ML17276B336 (4)


Text

ACCESSION NBR FAC IL: 50"397 AUTH BYNAME BLANCHARDFB

~8 EC IP.NAME SCHWA'IENCER F A~REGULATORY.

FORMATION DISTRIBUTION SY.M (RIDS)W~8203 l07 0269 DOC~DATE 82/03/1 6 NOTAR I ZED'NO DOCKET NPPSS Nuclear Projects Unit 2i Washington Public Pose OS000397 AUTHOR AF F IL I A T ION In t'er i or E Dep t.o f RECIPIENT AFFILIATION Licensing Branch'2

SUBJECT:

Comments on FES.No objections exist to issuance of Section 400 permit if listed conditions stipulated.

DISTRIBUTIONCODE.:

COOED COPIES RECEIVED:LTR

$ENCL$'SIZE:.-J TITLE: Environ.Comments.NOTES:2 copies all matl:PM.05000397 RECIPIENT ID CODE/NAME LIC BR P2 BC Ob AULUCKgR~Ol INTERNAL: ELD NRR/DE/AEAB 20 NRR/DE/HGEB 21 NRR/DS I/AEB'9 NRR/DSI/RAB 17 RGNS COPIES LTTR ENCL RECIPIENT ID CODE/NAME NL: ANL IE 13 NRR/DE/EEB 16 NRR/DE/SAB 18 NRR.KL/TSB 15 F LE, 0<)COPIES LTTR ENCL 1 1 1 1 EXTERNAL: ACRS NATL LAB NSIC 21 05 1 1 LPDR NRC PDR NTIS 03,, 1 02 1.1 3P TOTAL NUMBER OF COPIES REQUIRED: L'TTR P5 ENCL 4 fl tt)\t , 1))t

~gt4Y Oc~Q F W EA 0 JDUnited States Department of the Interior OFFICE OF THE SECRETARY WASHINGTON, D.C.20240 ER 81/153V Mr.A.Schwencer Chief, Licensing Branch No.2 Division of Licensing Nuclear Regulatory Commission Washington, D.C.20555 MAR 16 1982/RECgj~g tt~R>'r 1982 l'l Mam ngurml elec, AiSQ7 Qgtggp g TIDC

Dear Mr.Schwencer:

We have reviewed the final environmental impact statement related to the operation of WPPSS Nuclear Project No.2, Benton County, Washington.

In the upcoming review of the Corps of Engineers'ublic notice regarding issuance of a Section 404 permit for project-associated work in the Columbia River, the Pish and Wildlife Service will, in all likelihood, not object to issuance of the permit provided that the following conditions are stipulated in the permit: 1.Water intakes will be screened such that the maximum size of openings is 3/8-inch and maximum approach velocity at the screen surface is.5 feet per second, so as to prevent entrainment of salmonid fry and smolts.2.In-river construction activity will be conducted during the timeframe of December through February when construction activities are least likely to impact salmonid spawning and migration.

We hope these comments will be helpful to you.Sincerely, ruce Blanchard, Director Environmental Project Review+co 8 it ssos>7oss9 ssosis PDR ADQCK 05000397~,D,': ',',,',,PDR,,I 0 I~~~A~l'l~~~1 J't~4