| {{#Wiki_filter:U.S. Nuclear Regulatory Commission Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report August 20, 2015 Page 2 Should you have any questions concerning this letter, please call me at (610) 765-5528. | | {{#Wiki_filter:U.S. Nuclear Regulatory Commission Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report August 20, 2015 Page 2 Should you have any questions concerning this letter, please call me at (610) 765-5528. |
| Kevin F. Borton Manager, Power Uprate Licensing Exelon Generation | | Kevin F. Borton Manager, Power Uprate Licensing Exelon Generation Company, LLC Attachments: |
| : Company, LLC Attachments:
| |
| : 1. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-P | | : 1. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-P |
| : 2. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWA-ENG-15-076-NP | | : 2. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWA-ENG-15-076-NP |
Line 49: |
Line 48: |
| Appendix B CLTP-based Limit Curves | | Appendix B CLTP-based Limit Curves |
|
| |
|
| in ouse U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry | | in ouse U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA Direct tel: (412) 374-4643 Direct fax: (724) 940-8560 e-mail: greshaja@westinghouse.com CAW-15-4256 August, 18, 2015 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE |
| : Township, Pennsylvania 16066 USA Direct tel: (412) 374-4643 Direct fax: (724) 940-8560 e-mail: greshaja@westinghouse.com CAW-15-4256 August, 18, 2015 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
| |
|
| |
|
| ==Subject:== | | ==Subject:== |
|
| |
| LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions" (Proprietary) | | LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions" (Proprietary) |
| The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), | | The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), pursuant to the provisions of paragraph (b)( 1) of Section 2.390 of the Commission's regulations. |
| pursuant to the provisions of paragraph (b)( 1) of Section 2.390 of the Commission's regulations. | |
| It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence. | | It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence. |
| The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW 4256 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The Affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 of the Commission's regulations. | | The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW 4256 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The Affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 of the Commission's regulations. |
| Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Exelon Generation. | | Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Exelon Generation. |
| Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CAW-15-4256, and should be addressed to James A. Gresham, | | Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CAW-15-4256, and should be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry Township, Pennsylvania 16066. |
| : Manager, Regulatory Compliance, Westinghouse Electric
| |
| : Company, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry
| |
| : Township, Pennsylvania 16066.
| |
| Regulatory Compliance COMMONWEALTH OF PENNSYLVANIA: | | Regulatory Compliance COMMONWEALTH OF PENNSYLVANIA: |
| COUNTY OF BUTLER: AFFIDAVIT ss CAW-15-4256 August, 18, 2015 I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), | | COUNTY OF BUTLER: AFFIDAVIT ss CAW-15-4256 August, 18, 2015 I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief. |
| and that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief. | | A. Gresham, Manager Regulatory Compliance 2 CAW-15-4256 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse. |
| A. Gresham, Manager Regulatory Compliance 2 CAW-15-4256 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse), | |
| and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse. | |
| (2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit. | | (2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit. |
| (3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information. | | (3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information. ( 4) Pursuant to the provisions of paragraph (b)( 4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld. (i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse. (ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. |
| ( 4) Pursuant to the provisions of paragraph (b)( 4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld. | |
| (i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse. | |
| (ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. | |
| The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required. | | The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required. |
| Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: | | Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 3 CAW 4256 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability. (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers. (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse. (f) It contains patentable ideas, for which patent protection may be desirable. (iii) There are sound policy reasons behind the Westinghouse system which include the following: (a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. |
| (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 3 CAW 4256 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. | | It is, therefore, withheld from disclosure to protect the Westinghouse competitive position. (b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information. (c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense. |
| (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability. | |
| (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, | |
| : shipment, installation, assurance of quality, or licensing a similar product.
| |
| (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers. | |
| (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse. | |
| (f) It contains patentable ideas, for which patent protection may be desirable. | |
| (iii) There are sound policy reasons behind the Westinghouse system which include the following: | |
| (a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. | |
| It is, therefore, withheld from disclosure to protect the Westinghouse competitive position. | |
| (b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information. | |
| (c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense. | |
| 4 CAW-15-4256 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. | | 4 CAW-15-4256 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. |
| If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage. | | If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage. (e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries. (f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage. (iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission. (v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief. (vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Stearn Dryer Report at Predicted EPU Conditions" (Proprietary), for submittal to the Commission, being transmitted by Exelon Generation letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 at predicted extended power uprate (EPU) conditions, and may be used only for that purpose. |
| (e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries. | | 5 CAW-15-4256 (a) This information is part of that which will enable Westinghouse to: (i) Assist Exelon Generation in fulfilling the requirements specified in the PBAPS Unit 3 Renewed Facility Operating License. (b) Further this information has substantial commercial value as follows: (i) Westinghouse plans to sell the use of similar information to its customers for the purpose of plant specific replacement steam dryer analysis for licensing basis applications. (ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications. (iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse. |
| (f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage. | |
| (iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission. | |
| (v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief. (vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Stearn Dryer Report at Predicted EPU Conditions" (Proprietary), | |
| for submittal to the Commission, being transmitted by Exelon Generation letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 at predicted extended power uprate (EPU) conditions, and may be used only for that purpose. | |
| 5 CAW-15-4256 (a) This information is part of that which will enable Westinghouse to: (i) Assist Exelon Generation in fulfilling the requirements specified in the PBAPS Unit 3 Renewed Facility Operating License. | |
| (b) Further this information has substantial commercial value as follows: | |
| (i) Westinghouse plans to sell the use of similar information to its customers for the purpose of plant specific replacement steam dryer analysis for licensing basis applications. | |
| (ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications. | |
| (iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse. | |
| Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation and licensing defense services for commercial power reactors without commensurate expenses. | | Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation and licensing defense services for commercial power reactors without commensurate expenses. |
| Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information. | | Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information. |
| The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money. In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended. | | The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money. In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended. |
| Further the deponent sayeth not. | | Further the deponent sayeth not. |
| PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of documents furnished to the NRC associated with the high-cycle fatigue assessment of the replacement steam dryer at predicted extended power uprate (EPU) conditions for PBAPS Unit 3 with regards to the PBAPS Unit 3 license condition, and may be used only for that purpose. | | PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of documents furnished to the NRC associated with the high-cycle fatigue assessment of the replacement steam dryer at predicted extended power uprate (EPU) conditions for PBAPS Unit 3 with regards to the PBAPS Unit 3 license condition, and may be used only for that purpose. In order to conform to the requirements of 10 CPR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). |
| In order to conform to the requirements of 10 CPR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary | |
| : versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted).
| |
| The justification for claiming the information so designated as proprietary that Westinghouse customarily holds in confidence is identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CPR 2.390(b)(l). | | The justification for claiming the information so designated as proprietary that Westinghouse customarily holds in confidence is identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CPR 2.390(b)(l). |
| COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, | | COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CPR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. |
| : transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CPR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding.
| | With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.}} |
| With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. | |
| Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.}} | |
Letter Sequence Other |
---|
TAC:ME9631, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) TAC:ME9632, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting
|
MONTHYEARML12286A0122012-09-28028 September 2012 License Amendment Request - Extended Power Uprate Project stage: Request ML12286A0112012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-488 Through End, and Attachments 5 and 7 Through 9 Project stage: Request ML12279A2852012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML12279A2902012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology Project stage: Request ML13051A0322013-02-15015 February 2013 Supplemental Information & Corrections Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 1 Project stage: Supplement ML13056A4822013-03-0808 March 2013 Acceptance Review Regarding Proposed Extended Power Uprate Project stage: Acceptance Review ML13052A8532013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13052A8562013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13081A7052013-03-28028 March 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13106A1262013-04-26026 April 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13129A1432013-05-0707 May 2013 Extended Power Uprate, Supplement 2 - Response to Request for Additional Information Project stage: Supplement ML13149A1452013-05-24024 May 2013 Extended Power Uprate License Amendment Request - Supplement 3 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13156A3682013-06-0404 June 2013 Extended Power Uprate License Amendment Request Supplement 4 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13134A3842013-06-10010 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13161A3972013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13182A0252013-06-27027 June 2013 Supplemental Information Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 5 Project stage: Supplement ML13178A3312013-07-0101 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13183A1992013-07-0303 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13203A1142013-07-23023 July 2013 Non-Proprietary - Request for Additional Information Regarding Proposed License Amendment Extended Power Uprate Project stage: RAI ML13203A1002013-07-23023 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Uprate Project stage: RAI ML13211A4032013-07-30030 July 2013 EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - Snpb Project stage: Supplement ML13211A4022013-07-30030 July 2013 Extended Power Uprate License Amendment Request - Supplement 6 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13213A2852013-07-31031 July 2013 Extended Power Uprate License Amendment Request - Supplement 7, Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13217A4312013-08-0505 August 2013 Extended Power Uprate License Amendment Request - Supplement 8 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13221A0642013-08-15015 August 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13240A0022013-08-22022 August 2013 Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional Information Project stage: Supplement ML13232A2772013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13232A2902013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13241A4182013-08-29029 August 2013 Extended Power Uprate License Amendment Request - Supplement 10 Response to Request for Additional Information Project stage: Supplement ML13253A4162013-09-11011 September 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13260A0762013-09-13013 September 2013 Extended Power Uprate License Amendment Request - Supplement 11 Response to Request for Additional Information Project stage: Supplement ML13247A7692013-09-18018 September 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13261A0432013-09-18018 September 2013 Requesty for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: Other ML13242A0902013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13242A1082013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13268A4002013-10-0101 October 2013 Enclosure 2 - Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13268A2632013-10-0101 October 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13289A1912013-10-11011 October 2013 Extended Power Uprate License Amendment Request - Supplement 12, Response to Request for Additional Information Project stage: Supplement ML13289A3002013-10-15015 October 2013 Extended Power Uprate License Amendment Request - Supplement 13 Response to Request for Additional Information Project stage: Supplement ML13308A3312013-10-31031 October 2013 Extended Power Uprate License Amendment Request - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML13291A1222013-11-0606 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13339A8072013-11-22022 November 2013 Comment (1) of Kevin Borton on Behalf of Exelon Generation Co. LLC, on Proposed License Amendment to Increase the Maximum Reactor Power Level Project stage: Other ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 Project stage: Request ML13345A6872013-12-0606 December 2013 Supplement 15 Response to Request for Additional Information Extended Power Uprate License Amendment Request Project stage: Supplement ML13308C4412013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13351A3902013-12-19019 December 2013 Summary of Closed Meeting with Exelon Generation Company, LLC, to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Meeting ML13358A0832013-12-20020 December 2013 Extended Power Uprate License Amendment Request- Supplement 16 Corrections, Clarifications and Additional Information - Extended Power Uprate Project stage: Supplement ML13345B3102014-01-0808 January 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML14002A1762014-01-15015 January 2014 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI 2013-05-24
[Table View] |
|
---|
Category:Legal-Affidavit
MONTHYEARML24121A1852024-04-25025 April 2024 Attachment 2: Curtiss-Wrights Affidavit Withholding Portions of Material Presented to the NRC on May 14, 2024 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML22320A5592022-11-16016 November 2022 2022 Annual Report - Guarantees of Payment of Deferred Premiums ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML22145A0852022-05-25025 May 2022 Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22003A0022021-12-20020 December 2021 Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML21307A0542021-11-0202 November 2021 Annual Report - Guarantees of Payment of Deferred Premiums ML21272A2772021-09-29029 September 2021 Update to Application for Order Approving License Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments NMP1L3371, Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-102021-02-10010 February 2021 Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10 ML20329A3452020-11-24024 November 2020 Relief Request Associated with N-16A Reactor Pressure Vessel Instrument Nozzle Repairs - Submittal of Analyses ML20310A1152020-11-0404 November 2020 Annual Report - Guarantees of Payment of Deferred Premiums ML19318G1702019-11-14014 November 2019 2019 Annual Report - Guarantees of Payment of Deferred Premiums ML18316A0032018-11-0707 November 2018 Submittal of 2018 Annual Report - Guarantees of Payment of Deferred Premiums ML18205A3112018-07-24024 July 2018 Application for Subsequent Renewed Operating Licenses - Update Per 10 CFR 2.390 ML18150A3872018-05-30030 May 2018 License Amendment Request - Revised Technical Specifications to Allow Two Safety Relief Valves / Safety Values to Be Out-of-Service with Increased Reactor Pressure Safety Limit ML17243A0112017-08-30030 August 2017 Measurement Uncertainty Recapture License Amendment Request - Supplement 4 Response to Request for Additional Information ML16048A4412016-02-17017 February 2016 Transmittal of Extended Power Uprate: Results of Replacement Steam Dryer Power Ascension Testing ML16049A2582016-02-11011 February 2016 Transmittal of Exelon Nuclear Radiological Emergency Plan Revision ML16028A1712016-01-14014 January 2016 Transmittal of Exelon Nuclear Radiological Emergency Plan Revision ML15274A4672015-10-0101 October 2015 MELLLA License Amendment Request - Supplement 6 Response to Request for Additional Information ML15247A0882015-09-0404 September 2015 Attachment 2, EPU and Mellla+ Combined Rsd Masrs (Non-Proprietary) and Attachment 3, Affidavit ML15233A0952015-08-20020 August 2015 Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions ML15196A6372015-07-15015 July 2015 Error Identified in Letter from Exelon to NRC Re Predicted Strain Ratios Provided in Response to Request for Additional Information (RAI-11) ML15187A3912015-07-0606 July 2015 Supplement 4 - Response to Request for Additional Information on Mellla+ License Amendment Request, Attachments; 2, 3 and 4 ML15096A0082015-04-0505 April 2015 Extended Power Uprate: Response to Replacement Steam Dryer Requests for Additional Information ML14321A7052014-11-14014 November 2014 2014 Annual Report - Guarantees of Payment of Deferred Premiums ML14247A5032014-09-0404 September 2014 License Amendment Request - Maximum Extended Load Line Limit Analysis Plus ML14204A7092014-07-23023 July 2014 Enclosure 3, Affidavit of Peter M. Yandow RS-14-160, Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package2014-07-0202 July 2014 Co. - Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package ML14105A3842014-04-11011 April 2014 Extended Power Uprate License Amendment Request - Supplement 24 Response to Request for Additional Information ML14035A1582014-01-31031 January 2014 Extended Power Uprate License Amendment Request - Supplement 19 Response to Request for Additional Information ML13240A0022013-08-22022 August 2013 Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional Information ML13109A0522013-04-18018 April 2013 Revised Gnf Response to NRC RAI 44 for License Amendment Request for Use of Neutron Absorbing Spent Fuel Pool Rack Inserts, Attachment 3, Enclosures 2, 3 and 4 RS-12-227, Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package2012-12-19019 December 2012 Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package ML11325A3882011-11-18018 November 2011 Issuance of the Core Operating Limits Report for Reload 18, Cycle 19, Revision 7 ML1127000682011-09-26026 September 2011 Enclosure 3, Mfn 10-245 R4, Affidavit ML1031904262010-11-0808 November 2010 Corp. - 2010 Annual Report - Guarantees of Payment of Deferred Premiums ML1008301582010-03-23023 March 2010 Enclosure 2 to Mfn 10-124, Affidavit of James F. Harrison Response to NRC Request for Information Regarding Appeal of Denial of Request for Withholding Certain Information: Reference 1 Letter from J. Hughey (NRC) to J. Head (GEH) February 2 ML0520003282005-07-14014 July 2005 Surveillance Program for Channel-Control Blade Interference ML0508101932005-03-18018 March 2005 Renewed Facility Operating License No. DPR-56, Incorporation of Lead Use Assemblies 2024-04-25
[Table view] Category:Letter
MONTHYEARIR 05000277/20244012024-10-17017 October 2024 Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24099A0012024-04-0808 April 2024 (PBAPS) Units 2 and 3, Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 05000277/LER-2024-001, Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout2024-03-21021 March 2024 Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) 2024-09-06
[Table view] Category:Report
MONTHYEARML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML23346A2392024-01-17017 January 2024 Seismic Hazard Report by the Office of Nuclear Reactor Regulation ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits CCN:22-15, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/212022-01-31031 January 2022 (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/21 RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20329A3452020-11-24024 November 2020 Relief Request Associated with N-16A Reactor Pressure Vessel Instrument Nozzle Repairs - Submittal of Analyses ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML19053A4692019-06-10010 June 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluation Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study ML18354B0662018-12-20020 December 2018 Summary of Monitoring Well Installation Details RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...2018-09-28028 September 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... RS-18-098, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2018-08-28028 August 2018 Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... ML18093A3822018-03-30030 March 2018 Decommissioning Status Report - 2017 RS-18-002, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2018-01-0505 January 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML17093A6972017-03-30030 March 2017 Decommissioning Status Report - 2016 ML19064B2232017-02-24024 February 2017 Final Report for Post-EPU Thermal and Biological Monitoring Peach Bottom Atomic Power Station ML17027A0152017-01-27027 January 2017 ISFSI - Biennial 1OCFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2015 Through 12/31/2016 and Annual Commitment Revision Report for the Period 1/1/16 Through 12/31/16 ML16342B6212016-12-0707 December 2016 Results of Visual Inspections of Replacement Steam Dryer RS-16-103, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-06-30030 June 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16048A4412016-02-17017 February 2016 Transmittal of Extended Power Uprate: Results of Replacement Steam Dryer Power Ascension Testing ML19064B2162015-12-31031 December 2015 Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2015 ML15275A1682015-10-0202 October 2015 Attachment 2, LTR-BWR-ENG-15-076-NP, Revision 1, Replacement Steam Dryer Report at Predicted EPU Conditions (Non-Proprietary) and Attachment 3, Affidavit ML15233A0952015-08-20020 August 2015 Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions ML15219A6182015-08-0707 August 2015 Extended Power Uprate: Results of Unit 2 Replacement Steam Dryer Power Ascension Testing ML15051A2622015-04-20020 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Related to Recommendation 2.1 ML15097A0762015-04-0606 April 2015 Soarca Peach Bottom 2005 Site File ML15096A0082015-04-0505 April 2015 Extended Power Uprate: Response to Replacement Steam Dryer Requests for Additional Information ML15026A4692015-02-12012 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents) ML15029A6402015-01-29029 January 2015 Mellla+ License Amendment Request Supplement 1 Supplemental Reload Licensing Report ML15028A3812015-01-28028 January 2015 Independent Spent Fuel Storage Installation (ISFSI) - Biennial 10 CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2013 Through 12/31/2014 and Annual Commitment Revision Report for Period 1/1/14 - 12/31/14 ML19064B2142014-12-31031 December 2014 Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2014 RS-14-300, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1..2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1.. RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14119A0572014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident (Tac Nos. MF0261 and MF0262) ML14086A6242014-04-30030 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0157 and MF0158) ML14105A3872014-04-11011 April 2014 Attachment 10: WCAP-17654-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14105A3862014-04-11011 April 2014 Attachment 9: WCAP-17649-NP, Rev. 2, ASME Code Stress Report (Enclosure B.3) ML14105A3852014-04-11011 April 2014 Attachment 8: WCAP-17635-NP, Rev. 3, Comprehensive Vibration Assessment Program ML14105A3882014-04-11011 April 2014 Attachment 11: WCAP-17655-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14072A0232014-03-31031 March 2014 WCAP-17635-NP, Rev 2, Peach Bottom Atomic Power Station Unit 2 and Unit 3 Replacement Steam Dryer Comprehensive Vibration Assessment Program. ML14072A0242014-03-31031 March 2014 WCAP-17609-NP, Rev 2, Peach Bottom Units 2 and 3 Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads. ML14072A0252014-03-31031 March 2014 WCAP-17654-NP, Rev 3, Peach Bottom Unit 2 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. ML14072A0262014-03-31031 March 2014 WCAP-17655-NP, Rev 3,Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. RS-14-001, Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-0012014-03-25025 March 2014 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-001 ML19064B2202014-02-28028 February 2014 Final Report for the Thermal Study to Support a 316(a) Demonstration: Peach Bottom Atomic Power Station Part 1 of 2 ML14070A1462014-02-28028 February 2014 WCAP-17639-NP, Revision 3, Instrumentation Description for the Peach Bottom Unit 2 Replacement Steam Dryer. ML14070A1452014-02-28028 February 2014 WCAP-17626-NP, Revision 1, Processing of Peach Bottom Unit 2 and Unit 3 MSL Strain Gauge Data and Computation of Predicted EPU Signature. 2024-06-24
[Table view] Category:Technical
MONTHYEARML23346A2392024-01-17017 January 2024 Seismic Hazard Report by the Office of Nuclear Reactor Regulation NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20329A3452020-11-24024 November 2020 Relief Request Associated with N-16A Reactor Pressure Vessel Instrument Nozzle Repairs - Submittal of Analyses ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML19053A4692019-06-10010 June 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluation Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study ML18354B0662018-12-20020 December 2018 Summary of Monitoring Well Installation Details RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...2018-09-28028 September 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... RS-18-098, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2018-08-28028 August 2018 Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... RS-18-002, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2018-01-0505 January 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML16048A4412016-02-17017 February 2016 Transmittal of Extended Power Uprate: Results of Replacement Steam Dryer Power Ascension Testing ML15275A1682015-10-0202 October 2015 Attachment 2, LTR-BWR-ENG-15-076-NP, Revision 1, Replacement Steam Dryer Report at Predicted EPU Conditions (Non-Proprietary) and Attachment 3, Affidavit ML15233A0952015-08-20020 August 2015 Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions ML15219A6182015-08-0707 August 2015 Extended Power Uprate: Results of Unit 2 Replacement Steam Dryer Power Ascension Testing ML15029A6402015-01-29029 January 2015 Mellla+ License Amendment Request Supplement 1 Supplemental Reload Licensing Report RS-14-300, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1..2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1.. RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14105A3862014-04-11011 April 2014 Attachment 9: WCAP-17649-NP, Rev. 2, ASME Code Stress Report (Enclosure B.3) ML14105A3852014-04-11011 April 2014 Attachment 8: WCAP-17635-NP, Rev. 3, Comprehensive Vibration Assessment Program ML14105A3872014-04-11011 April 2014 Attachment 10: WCAP-17654-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14105A3882014-04-11011 April 2014 Attachment 11: WCAP-17655-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14072A0262014-03-31031 March 2014 WCAP-17655-NP, Rev 3,Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. ML14072A0232014-03-31031 March 2014 WCAP-17635-NP, Rev 2, Peach Bottom Atomic Power Station Unit 2 and Unit 3 Replacement Steam Dryer Comprehensive Vibration Assessment Program. ML14072A0242014-03-31031 March 2014 WCAP-17609-NP, Rev 2, Peach Bottom Units 2 and 3 Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads. ML14072A0252014-03-31031 March 2014 WCAP-17654-NP, Rev 3, Peach Bottom Unit 2 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. RS-14-001, Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-0012014-03-25025 March 2014 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-001 ML19007A3282014-02-28028 February 2014 Final Report for the Thermal Study to Support a 316(a) Demonstration ML14077A0952014-01-30030 January 2014 BWROG-TP-14-001, Rev. 0, Containment Accident Pressure Committee (344) Task 1 - Cfd Report and Combined Npshr Uncertainty for Browns Ferry/ Peach Bottom Cvic RHR Pumps, Attachment 8 ML14077A0902013-12-31031 December 2013 BWROG-TP-13-021, Rev. 0, Containment Accident Pressure Committee (344) Task 4 - Operation in Maximum Erosion Rate Zone (Cvic Pump), Attachment 11 ML13220A1052013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A9502013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Peach Bottom Atomic Power Station, Units 2 and 3, TAC Nos.: MF0845 and MF0846 ML19186A3832013-07-31031 July 2013 Analysis for the Maryland Department of Natural Resources' Question of the Effect of Peach Bottom Station Uprate on Migratory Fishes. Prepared for Exelon Generation by Normandeau Associates, Inc. and Environmental Resource Management. July ML14077A0912013-06-30030 June 2013 BWROG-TP-13-008, Rev. 0, Containment Accident Pressure Committee (344) Task 2 - Equation for Pump Speed Correction (Cvic Pump), Attachment 9 ML14077A0922013-06-30030 June 2013 BWROG-TP-13-010, Containment Accident Pressure Committee (344) Task 6 - Npshr Test Instrument Accuracy Effect on the Published Results (Cvic Pump), Attachment 13 ML14077A1022013-06-30030 June 2013 BWROG-TP-13-009, Rev. 0, Containment Accident Pressure Committee (344) Task 3 Pump Operation at Reduced Npsha Conditions (Cvic Pump), Attachment 10 ML13175A1102013-05-31031 May 2013 NEDO-33533, Revision 1, Peach Bottom Atomic Power Station Units 2 and 3 Safety Valve Setpoint Tolerance Increase Safety Analysis Report. ML13032A5502013-01-31031 January 2013 NEDO-33808, Revision 0, Peach Bottom Atomic Power Station Units 2 and 3 SIL 636 Evaluation of Small Break Loca. RS-12-174, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12286A0212012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17609-NP, Rev. 1 - Enclosure B2, Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads ML12286A0202012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17590-NP, Rev. 0 - Enclosure B1, Acoustic Lead Definition ML12286A0112012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-488 Through End, and Attachments 5 and 7 Through 9 ML12286A0612012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, WCAP-17639-NP, Revision 2, Instrumentation Description for the Peach Bottom Unit 2 Replacement Steam Dryer ML12286A0582012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, WCAP-17655-NP, Revision 2, Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML12286A0572012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17654-NP, Rev. 2 - Enclosure B.4U2, Replacement Steam Dryer Power Ascension Program Description for Extended Power Update ML12286A0132012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Cover Through Page 2-222 ML12286A0142012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-223 Through Page 2-358 ML12286A0152012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-359 Through Page 2-487 ML12286A0192012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17635-NP - Enclosure 15A, Rev. 1, Replacement Steam Dryer Comprehensive Vibration Assessment Program (Cvap) 2024-01-17
[Table view] |
Text
U.S. Nuclear Regulatory Commission Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report August 20, 2015 Page 2 Should you have any questions concerning this letter, please call me at (610) 765-5528.
Kevin F. Borton Manager, Power Uprate Licensing Exelon Generation Company, LLC Attachments:
- 1. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-P
- 2. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWA-ENG-15-076-NP
- 3. Affidavit cc: USNRC Region J, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS A. A. Janati, Commonwealth of Pennsylvania S. T. Gray, State of Maryland w/attachments w/attachments w/attachme nts w/o proprietary attachment w/o proprietary attachment
© 2015 Westinghouse Electric Company LLC All Rights Reserved Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions Revision 0
5.1 NMSLA Limit Curves 5.1.1 Correlation for defining NMSLA Limit Curves
Equation 5
-1 Equation 5
-2 5.1.2 NMSLA Limits
Equation 5
-3 Equation 5
-4 Equation 5-5 Equation 5-6
Equation 5
-7 Equation 5
-8
5.2 ACE Limits
Appendix A Additional Correlation Plots for NMSLA Limit Curve Development
Appendix B CLTP-based Limit Curves
in ouse U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA Direct tel: (412) 374-4643 Direct fax: (724) 940-8560 e-mail: greshaja@westinghouse.com CAW-15-4256 August, 18, 2015 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions" (Proprietary)
The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), pursuant to the provisions of paragraph (b)( 1) of Section 2.390 of the Commission's regulations.
It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence.
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW 4256 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The Affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Exelon Generation.
Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CAW-15-4256, and should be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry Township, Pennsylvania 16066.
Regulatory Compliance COMMONWEALTH OF PENNSYLVANIA:
COUNTY OF BUTLER: AFFIDAVIT ss CAW-15-4256 August, 18, 2015 I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief.
A. Gresham, Manager Regulatory Compliance 2 CAW-15-4256 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information. ( 4) Pursuant to the provisions of paragraph (b)( 4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld. (i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse. (ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 3 CAW 4256 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability. (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers. (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse. (f) It contains patentable ideas, for which patent protection may be desirable. (iii) There are sound policy reasons behind the Westinghouse system which include the following: (a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors.
It is, therefore, withheld from disclosure to protect the Westinghouse competitive position. (b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information. (c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
4 CAW-15-4256 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage. (e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries. (f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage. (iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission. (v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief. (vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Stearn Dryer Report at Predicted EPU Conditions" (Proprietary), for submittal to the Commission, being transmitted by Exelon Generation letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 at predicted extended power uprate (EPU) conditions, and may be used only for that purpose.
5 CAW-15-4256 (a) This information is part of that which will enable Westinghouse to: (i) Assist Exelon Generation in fulfilling the requirements specified in the PBAPS Unit 3 Renewed Facility Operating License. (b) Further this information has substantial commercial value as follows: (i) Westinghouse plans to sell the use of similar information to its customers for the purpose of plant specific replacement steam dryer analysis for licensing basis applications. (ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications. (iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation and licensing defense services for commercial power reactors without commensurate expenses.
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money. In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of documents furnished to the NRC associated with the high-cycle fatigue assessment of the replacement steam dryer at predicted extended power uprate (EPU) conditions for PBAPS Unit 3 with regards to the PBAPS Unit 3 license condition, and may be used only for that purpose. In order to conform to the requirements of 10 CPR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted).
The justification for claiming the information so designated as proprietary that Westinghouse customarily holds in confidence is identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CPR 2.390(b)(l).
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CPR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding.
With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.