Attachment 10 Peach Bottom Atomic Power Station Units 2 and 3 NRC Docket Nos. 50-277 and 50-278 WCAP-17626, Rev 1, MSL Strain Gauge Data and Computation of Predicted EPU Signature
Westinghouse Non-Proprietary Class 3 WCAP-17626-NP February 201 Revision 1 Processing of Peach Bottom Unit 2 and Unit 3 MSL Strain Gauge Data and Computation of Predicted EPU Signature Westinghouse 4
WESTINGHOUSE NON-PROPRIETARY CLASS 3 WCAP-17626-NP Revision 1 Processing of Peach Bottom Unit 2 and Unit 3 MSL Strain Gauge Data and Computation of Predicted EPU Signature AnnMarie Rowland*
U.S. BWR Engineering February 2014 Reviewers:
Inessa E. Berman*
U.S. BWR Engineering Approved:
David R. Forsyth*, Manager BWR Plant & Stress Analysis
- Electronically approved records are authenticated in the electronic document management system.
Westinghouse Electric Company LLC 1000 Westinghouse Drive Cranberry Township, PA 16066, USA
© 2014 Westinghouse Electric Company LLC All Rights Reserved WCAP-17626-NP.docx
WESTINGHOUSE NON-PROPRIETARY CLASS 3 ii TABLE OF CONTENTS LIST OF TABLES.......................................................................................................................................
iii LIST OF FIG URES.....................................................................................................................................
iv EX ECUTIV E SUM M A RY..........................................................................................................................
vi LIST OF ACRON YM S AN D A BBREVIATION S.................................................................................
vii I
BA CKGROUN D AN D INTRODUCTION..................................................................................
1-1 2
SUM M A RY OF PREVIOU S W ORK..........................................................................................
2-1 2.1 A COU STIC SCREEN IN G..............................................................................................
2-1 2.2 SUB SCALE TESTIN G...................................................................................................
2-1 2.3 PLAN T DATA RECORD IN G S.......................................................................................
2-1 2.4 DATA A CQUISITION.....................................................................................................
2-3 3
DATA PROCESSIN G PLAN AN D RESULTS............................................................................
3-1 3.1 RAW DATA.....................................................................................................................
3-2 3.2 STRA IN-TO-PRESSURE CONV ERSION.....................................................................
3-2 3.3 N ARRO W -BAN D FILTERING......................................................................................
3-4 3.4 W AV ELET DEN OISIN G................................................................................................
3-4 3.5 COMPUTATION OF THE PREDICTED EPU* 1.02 SIGNAL......................................
3-6 4
INPUTS TO SIGNAL PROCESSING AND ASSUMPTIONS....................................................
4-1 4.1 IN PUTS...........................................................................................................................
4-1 4.2 A SSUM PTION S..............................................................................................................
4-1 5
DISCU SSION OF RESULTS.......................................................................................................
5-1 5.1 RAW DATA EVA LUATION...........................................................................................
5-1 5.1.1 Unit 2...............................................................................................................
5-1 5.1.2 Unit 3...............................................................................................................
5-2 5.2 STRA IN -TO -PRESSURE CON VERSION.....................................................................
5-3 5.2.1 Unit 2...............................................................................................................
5-3 5.2.2 Unit 3...............................................................................................................
5-3 5.3 FILTERIN G.....................................................................................................................
5-4 5.3.1 Unit 2...............................................................................................................
5-4 5.3.2 Unit 3...............................................................................................................
5-5 5.4 W AVELET DEN OISIN G................................................................................................
5-6 5.4.1 Unit 2...............................................................................................................
5-6 5.4.2 Unit 3.............................................................................................................
5-13 5.5 EPU
- 1.02 SIGNA L COM PUTATION..........................................................................
5-21 5.5.1 Unit 2.............................................................................................................
5-21 5.5.2 Unit 3.............................................................................................................
5-25 6
CON CLU SION S..........................................................................................................................
6-1 7
RE FERE N CES.............................................................................................................................
7-1 WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 iii LIST OF TABLES T ab le 2 -1 [c
......................................................................................... 2-1 Table 2-2 Dates and Times of Peach Bottom Unit 2 Data Recording.......................................................
2-4 Table 2-3 Dates and Times of Peach Bottom Unit 3 Data Recording.......................................................
2-5 Table 5-1 Summary of [
]a,c......................................................................
5-3 Table 5-2 Summary of [
pa.c.................................................................
5-4 Table 5-3 Peach Bottom Unit 2, Notch Filters, [
]b....................................................
5-5 Table 5-4 Peach Bottom Unit 3, Notch Filters, [
]b.............................................
5-5 WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 iv LIST OF FIGURES Figure 2-1 Schem atic of M SL [
]ab.c......................................................... 2-2 Figure 3-1 Signal Processing Methodology Flowchart for [
]ac................................................... 3-1 Figure 3-2 Pipe M ode D iagram, N = [0, 4]................................................................................................
3-3 Figure 5-1 [
]b.....................................
5-2 Figure 5-2 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL A Upstream..................................
5-6 Figure 5-3 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL A Downstream.............................
5-7 Figure 5-4 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL B Upstream.................................
5-8 Figure 5-5 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL B Downstream.............................
5-9 Figure 5-6 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL C Upstream...............................
5-10 Figure 5-7 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL C Downstream........................... 5-11 Figure 5-8 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL D Upstream...............................
5-12 Figure 5-9 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL D Downstream......................
5-13 Figure 5-10 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL A Upstream................................
5-14 Figure 5-11 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL A Downstream........................... 5-15 Figure 5-12 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL B Upstream...............................
5-16 Figure 5-13 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL B Downstream...........................
5-17 Figure 5-14 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL C Upstream...............................
5-18 Figure 5-15 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL C Downstream...........................
5-19 Figure 5-16 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL D Upstream...............................
5-20 Figure 5-17 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL D Downstream.......................... 5-21 Figure 5-18 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL A US.................................................
5-22 Figure 5-19 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL ADS.................................................
5-22 Figure 5-20 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL B US.................................................
5-23 Figure 5-21 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL B DS.................................................
5-23 Figure 5-22 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL C US.................................................
5-24 Figure 5-23 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL C DS.................................................
5-24 Figure 5-24 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL D US.................................................
5-25 Figure 5-25 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL D DS.................................................
5-25 Figure 5-26 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL A US.................................................
5-26 Figure 5-27 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL A DS.................................................
5-26 Figure 5-28 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL B US.................................................
5-27 WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 V
Figure 5-29 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL B DS.................................................
5-27 Figure 5-30 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL C US.................................................
5-28 Figure 5-31 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL C DS.................................................
5-28 Figure 5-32 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL D US.................................................
5-29 Figure 5-33 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSL D DS.................................................
5-29 WCAP-1 7626-NP February 2014 WCAP-I17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 vi EXECUTIVE
SUMMARY
Peach Bottom Atomic Power Stations (PBAPS2 and PBAPS3, herein referred to as "Peach Bottom Unit 2 and Peach Bottom Unit 3") are implementing an extended power uprate (EPU) to increase plant power to I
]ac To satisfy the requirements of the United States Nuclear Regulatory Commission (NRC) Regulatory Guide 1.20, Revision 3 (Reference 2), an analysis must be performed to demonstrate the structural integrity of the steam dryer at EPU conditions.[
I]
] ax I
]ac
[
] a WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 vii AC ACE ASCII BWR CLTP DAS DS DWT EIC EPU EPU* 1.02 FFT HPCI MSL NRC OEM PCF PBAPS PSD RRP RSD SIA SNR SRV SSV US VPF LIST OF ACRONYMS AND ABBREVIATIONS alternating current I
]a American Standard Code for Infonnation Interchange boiling water reactor current licensed thermal power data acquisition system downstream (for Figures only) discrete wavelet transform electrical interference check extended power uprate 102 percent of extended power uprate fast Fourier transform high-pressure coolant injection main steam line Nuclear Regulatory Commission original equipment manufacturer
[
]a Peach Bottom Atomic Power Stations power spectral density reactor recirculation pump replacement steam dryer Structural Integrity Associates, Inc.
signal-to-noise ratio safety relief valve safety spring valve upstream (for Figures only) vane passing frequency Trademark Note:
MATLAB is a registered trademark of The MathWorks, Inc.
WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 1-1 1
BACKGROUND AND INTRODUCTION a.c Previous industry experience with boiling water reactors (BWRs) has shown that increasing the steam flow through the MSLs to implement an EPU may lead to amplified acoustic loads on the steam dryer, which may negatively affect the structural integrity of the component. [
NRC Regulatory Guide 1.20, Revision 3 (Reference 2), contains requirements for demonstrating the structural integrity of the steam dryer at power levels higher than CLTP.
]a~c I
]a,b,c I
]a,b,c I
]a.b.c WCAP-1 7626-NP February 2014 WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 1-2
]ac WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-1 2
SUMMARY
OF PREVIOUS WORK 2.1 ACOUSTIC SCREENING I
]ab~c Table 2-1 [
]a,c 2.2 SUBSCALE TESTING
[
a.b 2.3 PLANT DATA RECORDINGS I
]a~c WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-2 WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-2 I
]
a,c axac (2-1)
(2-2)
E
- Where,
[
]a,c a,c Figure 2-1 Schematic of MSL [
]a,b,c WCAP-1 7626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-3 WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-3
[
ac IC 2.4 DATA ACQUISITION pac pac Table 2-2 summarizes the data collected during Table 2-3 summarizes the data collected during [
[
]ab,c WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-4 WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-4 Table 2-2 Dates and Times of Peach Bottom Unit 2 Data Recording Recording CLTP Filename Date Time b
WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 2-5 WCAP-17626-NP February 2014 Revision I
3
[
WESTINGHOUSE NON-PROPRIETARY CLASS 3 DATA PROCESSING PLAN AND RESULTS Figure 3-1 Signal Processing Methodology Flowchart for 3-1
] a,c a,c I a,c WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 3-2 3.1 RAW DATA I:
]a.c 3.2 STRAIN-TO-PRESSURE CONVERSION The strain to pressure conversion is shown in Box 4 of Figure 3-1.
]a,c I
]
a.c (3-1)
- where, I
]a,c WCAP-1 7626-NP February 2014 WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 3-3 WESTINGHOUSE NON-PROPRIETARY CLASS 3 3-3 a,c Figure 3-2 Pipe Mode Diagram, N= [0, 41 I
]a,c I
]ac WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 3-4 E
]
a,c (3-2)
- where,
[
a,c I
ac 3.3 NARROW-BAND FILTERING Narrow-band filtering is shown in Boxes 7-10 of Figure 3-1. [
] a,c I
]a.c 1
3.4
[
a,c WAVELET DENOISING a,c WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 3-5 II
]f.C I
IC 1.
2.
3.
[
I C
]c le
[
I C
I IC
[
IC (3-3)
- where,
((
I c I c I
]a.x I
I C WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 COMPUTATION OF THE PREDICTED EPU*l.02 SIGNAL 3-6 3.5
[
1ac I
WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 4-1 4
INPUTS TO SIGNAL PROCESSING AND ASSUMPTIONS 4.1 INPUTS
[
]ac I
I a.c 4.2 1.
ASSUMPTIONS II
]a,c
- 2.
1
]a.c 3.
4.
- 5.
[
]a.,c
]a~c
]a,c
- 6.
The acoustic speed in steam is assumed to be 1484.3 ft/s.
WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-1 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-1 5
DISCUSSION OF RESULTS 5.1 RAW DATA EVALUATION In fall 2010, In fall 2011,
]a,b
]a,c 5.1.1 Unit 2
[
]b WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-2 Figure 5-1 5.1.2 Unit 3
[
WCAP-17626-NP February 2014 WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-3 5.2 STRAIN-TO-PRESSURE CONVERSION
[
]a.c 5.2.1 Unit 2
[
]a.b~c Table 5-1 Summary of I la,c MSL LOC Channel Mean b
5.2.2 Unit 3
[
pac I
]ab WCAP-1 7626-NP February 2014 WCAP-I17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-4 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-4 Table 5-2 Summary of [
]a~c MSL LOC Channel Mean b
5.3 FILTERING I
I axc I
]a.b 5.3.1 Unit 2
]b WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-5 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-5 Table 5-3 Peach Bottom Unit 2, Notch Filters, [
]b Low High Filter Order Freq Freq Filter Type Reason I
I I ___
I b
t I
+
+
I F
-f I
5.3.2 Unit 3 I
Table 5-4 Peach Bottom Unit 3, Notch Filters, [b Low High Filter Order Freq Freq Filter Type Reason b
I
_ I
_ I _
_ I _
_ I _
WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-6 5.4 WAVELET DENOISING I
I a,c 5.4.1 Unit 2 Figure 5-2 through Figure 5-9 show the derived MSL pressures at CLTP before and after iC Figure 5-2 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL A Upstream b
WCAP-1 7626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-7 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-7 b
Figure 5-3 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL A Downstream WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-8 b
Figure 5-4 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL B Upstream WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-9 b
Figure 5-5 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL B Downstream WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-10 b
Figure 5-6 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL C Upstream WCAP-1 7626-NP February 2014 WCAP-I 7626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-11 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-11 b
Figure 5-7 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL C Downstream WCAP-1 7626-NP February 2014 WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-12 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-12 b
Figure 5-8 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL D Upstream WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-13 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-13 b
Figure 5-9 Unit 2 Raw, Filtered, and Denoised Pressure Data, MSL D Downstream 5.4.2 Unit 3 Figure 5-10 though Figure 5-17 show the derived MSL pressures at CLTP before and after
]° WCAP-1 7626-NP February 2014 WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-14 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-14 b
Figure 5-10 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL A Upstream WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-15 b
Figure 5-11 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL A Downstream WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-16 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-16 b
Figure 5-12 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL B Upstream WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-17 b
Figure 5-13 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL B Downstream WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-18 b
Figure 5-14 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL C Upstream WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-19 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-19 b
Figure 5-15 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL C Downstream WCAP-1 7626-NP February 2014 WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-20 b
Figure 5-16 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL D Upstream WCAP-1 7626-NP February 2014 WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-21 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-21 b
Figure 5-17 Unit 3 Raw, Filtered, and Denoised Pressure Data, MSL D Downstream 5.5 EPU*1.02 SIGNAL COMPUTATION I
]axc 5.5.1 Unit 2 Figure 5-18 through Figure 5-25 show the
]a.b WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-22 b
Figure 5-18 Unit 2 CLTP and Predicted EPU*1.02 Signal, MSLA US Figure 5-19 Unit 2 CLTP and Predicted EPU*1.02 Signal, MSLA DS b
WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-23 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-23 b
Figure 5-20 Unit 2 CLTP and Predicted EPU*1.02 Signal, MSL B US b
Figure 5-21 Unit 2 CLTP and Predicted EPU*1.02 Signal, MSL B DS WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-24 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-24 b
Figure 5-22 Unit 2 CLTP and Predicted EPU*1.02 Signal, MSL C US b
Figure 5-23 Unit 2 CLTP and Predicted EPU* 1.02 Signal, MSL C DS WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-25 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-25 b
Figure 5-24 Unit 2 CLTP and Predicted EPU*1.02 Signal, MSL D US b
Figure 5-25 Unit 2 CLTP and Predicted EPU*1.02 Signal, MSL D DS 5.5.2 Unit 3 I Figure 5-26 through Figure 5-33 show the Unit [
]a,b WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-26 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-26 b
Figure 5-26 Unit 3 CLTP and Predicted EPU*1.02 Signal, MSLA US b
Figure 5-27 Unit 3 CLTP and Predicted EPU* 1.02 Signal, MSLA DS WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-27 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-27 b
Figure 5-28 Unit 3 CLTP and Predicted EPU*1.02 Signal, MSL B US b
Figure 5-29 Unit 3 CLTP and Predicted EPU*1.02 Signal, MSL B DS WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-28 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-28 b
Figure 5-30 Unit 3 CLTP and Predicted EPU*1.02 Signal, MSL C US b
Figure 5-31 Unit 3 CLTP and Predicted EPU*1.02 Signal, MSL C DS WCAP-17626-NP February 2014 Revision I
WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-29 WESTINGHOUSE NON-PROPRIETARY CLASS 3 5-29 b
Figure 5-32 Unit 3 CLTP and Predicted EPU*1.02 Signal, MSL D US b
Figure 5-33 Unit 3 CLTP and Predicted EPU*1.02 Signal, MSL D DS WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 6-1 6
CONCLUSIONS
[
The processing steps that define this methodology and that are described in this document can be summarized as follows:
- 1.
[
- 2.
[
- 3.
[
- 4.
[
]ax
]a,c
]a.c
]a,c I
ja.
WCAP-1 7626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 7-1 7
REFERENCES
- 1.
Exelon Technical Requirements Document, "Technical Requirements for the Replacement of Steam Dryers at Peach Bottom Atomic Power Station (PBAPS), LaSalle County Generating Station (LCGS), and Limerick Generating Station (LGS)," Revision 1, February 24, 2012.
- 2.
Regulatory Guide 1.20, Rev. 3, "Comprehensive Vibration Assessment Program for Reactor Intemals During Preoperational and Initial Startup Testing," U.S. Nuclear Regulatory Commission, March 2007.
- 3.
BWR Vessel and Intemals Project, Guidance for Demonstration of Steam Dryer Integrity for Power Uprate. Electric Power Research Institute, Palo Alto, CA: 2008. BWRVIP-182-A.
4.
Westinghouse Report
]ab
- 5.
Westinghouse Letter [
- 6.
Westinghouse Letter [
- 7.
Westinghouse Report
].b
]ab
]a,b
- 8.
TODI EPU-DIR-T0305A-0, "Exelon Transmittal of Design Information" (Design Inputs for Steam Dryer Analysis), March 1, 2010.
- 9.
Westinghouse Test Plan
]a,b
- 10.
Westinghouse Test Plan a,b
- 11.
Westinghouse Letter a.b
- 12.
Westinghouse Letter
]a.b WCAP-17626-NP February 2014 Revision 1
WESTINGHOUSE NON-PROPRIETARY CLASS 3 7-2
- 13.
Calculation Package 1000102.301, Rev. 0, "Peach Bottom Unit 2 Strain Gauge Uncertainty Evaluation and Pressure Conversion Factors," Structural Integrity Associates, Inc., October 26, 2010.
- 14.
Report 1000102.303, Rev. 0, "Peach Bottom Unit 3 Strain Gauge Uncertainty and Pressure Conversion Factors," Structural Integrity Associates, Inc., October 25, 2011.
15.
]a.b
- 16.
Letter AMK-11-005, "Peach Bottom Unit 3 Strain Gauge Data Files Transmittal," Structural Integrity Associates, Inc., October 24, 2011.
- 17.
Specification SIS-10-002, "Peach Bottom Units 2 and 3 Main Steam Dynamic Pressure Monitoring Data Acquisition Interface Specification," Structural Integrity Associates, Inc., June 30, 2010.
- 18.
Calculation Package 1000 102.302, Rev. 0, "Peach Bottom Unit 2 Strain Gauge Data Reduction,"
Structural Integrity Associates, Inc., November 22, 2010.
- 19.
Report 1000102.304, Rev. 0, "Peach Bottom Unit 3 Strain Gauge Date Reduction," Structural Integrity Associates, Inc., November 14, 2011.
WCAP-1 7626-NP February 2014 Revision 1