Comment (1) of Kevin Borton on Behalf of Exelon Generation Co. LLC, on Proposed License Amendment to Increase the Maximum Reactor Power Level
ML13339A807
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/22/2013
From: Borton K
Exelon Generation Co
To: Cindy Bladey
Division of Administrative Services
References
78FR63506 00001, NRC-2013-0232, TAC ME9631, TAC ME9632
Download: ML13339A807 (5)


Text

Page 1 of 1 As of: November 27, 2013 Received: November 22, 2013 Status: PendingPost PUBLIC SUBMISSIONStusPnigot Tracking No. ljx-88vr-49jh Comments Due: November 25, Submission Type: Web Docket: NRC-2013-0232 Draft Environmental Assessment and Draft Finding of No Significant Impact Comment On: NRC-2013-0232-0001 Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Proposed License Amendment to Increase the Maximum Reactor Power Level 2013

/V. ec_-2 '111cze13 Document: NRC-2013-0232-DRAFT-0001 Comment on FR Doc # 2013-24902 Submitter Information Name: Kevin Borton Address:

Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA, 19348 Email: kevin.borton @ exeloncorp.com 71D 0T C5O r-M General Comment See attached file(s)

Attachments 11-22-13 Exelon Review of PBAPS U2&3 Draft Environmental Assessment-Finding of No Significant Impact Related to Proposed EPU SUNSI Review Complete Template = ADM - 013 E-RIDS= ADM-03 Add= 9**6 https ://www.fdms.g~ov/fdms-web-agency/component/contentstreamer?objectld=090000648 1491 6cd&for...

11/27/2013

Exe!Ion Generation-November 22, 2013 Cindy K. Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration Mail Stop: 3WFN,06-44M U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Exelon Generation Company, LLC, Review of the Peach Bottom Atomic Power Station, Units 2 and 3 - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Docket ID NRC-2013-0232 (TAC Nos. ME9631 and ME9632)

References:

1.

Letter from K. F. Borton (Exelon Generation Company, LLC) to the U.S.

Nuclear Regulatory Commission, "License Amendment Request -

Extended Power Uprate," dated September 28, 2012 (ADAMS Accession No. ML122860201)

2.

Letter from R. B. Ennis (U.S. Nuclear Regulatory Commission) to M. J.

Pacilio (Exelon Nuclear), "Peach Bottom Atomic Power Station, Units 2 and 3 - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate (TAC Nos.

ME9631 and ME9632)," dated October 1, 2013

3.

Federal Register: Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Proposed License Amendment To Increase the Maximum Reactor Power Level (Volume 78, No. 206)

Pages 63506 - 63516, October 24,2013 In Reference 1, Exelon Generation Company, LLC, (Exelon) submitted the License Amendment Request for Peach Bottom Atomic Power Station, Units 2 and 3, proposed Extended Power Uprate.

In Reference 2, the U.S. Nuclear Regulatory Commission notified Exelon of the availability of a Draft Environmental Assessment and Finding of No Significant Impact for the Proposed Extended Power Uprate for Peach Bottom Atomic Power Station, Units 2 and 3.

U.S. Nuclear Regulatory Commission Comments Regarding Draft Environmental Report and Finding of No Significant Impact November 22, 2013 Page 2 Exelon appreciates the opportunity to comment on this draft Environmental Assessment and Finding of No Significant Impact made available through the Federal Register (Reference 3) and offers the attached clarifications for consideration by the U.S. Nuclear Regulatory Commission.

There are no new or revised regulatory commitments contained in this letter.

If you have any questions, please contact me at 610-765-5528.

Respectfully, Kevin F. Borton Manger - Licensing Power Uprate Exelon Generation Company, LLC

Enclosure:

Comments Related to Peach Bottom Atomic Power Station Units 2 and 3 -

Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate.

cc:

USNRC Region I, Regional Administrator w/enclosure USNRC Senior Resident Inspector, PBAPS w/enclosure USNRC Project Manager, PBAPS w/enclosure R. R. Janati, Commonwealth of Pennsylvania w/enclosure S. T. Gray, State of Maryland w/enclosure

Enclosure Comments Related to Peach Bottom Atomic Power Station, Units 2 and 3 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Page 1 of 2 The table below contains comments and suggestions for U.S. Nuclear Regulatory Commission Staff's consideration, based upon Exelon's review of the Peach Bottom Atomic Power Station, Units 2 and 3, - Draft Environmental Assessment and Finding of No Significant Impact Related to the Extended Power Uprate. The clarifications do not change the information contained in the Peach Bottom EPU License Amendment Request dated September 28, 2012, Attachment 8 "Supplemental Environmental Report."

Item #

Page #

Section Title Exelon Comment 1

Federal Register Page Plant Site and The discharge basin adjustable discharge gates are currently fixed in 63507 (column 3)

Environs position. Suggest clarifying the sentence reading "Three adjustable discharge gates at the end of the discharge canal control the flow to Conowingo Pond and maintain a discharge velocity between 5 and 8ft/second." to state "Three discharge gates at the end of the discharge canal control the flow to Conowingo Pond and maintain discharge velocity between 5 and 8 ft/second."

2 Federal Register Page Land Use and The following provides clarification regarding new site construction. No new 63508 (column 1)

Aesthetic Impacts construction is required to support operation at EPU power levels. A new permanent warehouse was constructed on the cooling tower peninsula which is within the existing facility footprint. The new warehouse may be used to temporally house EPU equipment; however, the warehouse ultimately will be used to house non-EPU related equipment. Also temporary office trailers will support modification outages. Suggest clarifying the sentence reading "No new construction will occur outside of existing plant areas, and no expansion of buildings, roads, parking lots, equipment lay-down areas, or storage areas will be required to support the proposed EPU," to state "No new permanent expansion of buildings, roads, parking lots, equipment storage areas, or transmission facilities on site will be required to either complete the proposed EPU modifications or operate PBAPS at EPU conditions."

3 Federal Register Page Non-Radioactive Suggest clarifying the sentence reading "The PBAPS site is a small quantity 63508 (column 2)

Waste Impacts hazardous material generator," to state "The PBAPS site is a small I _quantity generator of hazardous waste."

Enclosure Comments Related to Peach Bottom Atomic Power Station, Units 2 and 3 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Page 2 of 2 Item #

Page #

Section Title Exelon Comment 4

Federal. Register Page Air Quality Impacts Peach Bottom's air quality permit is a Pennsylvania State Only Permit not a 63508 (column2)

'"itle V permit." In the first paragraph, suggest clarifying the sentence "Emissions from these sources are regulated by Pennsylvania's Permit Operating Program under Title V State permit number 67-05020," to state "Emissions from these sources are regulated by Pennsylvania's Permit Operating Program State Only Permit number 67-05020."

5 Federal Register Page Aquatic Resource Suggest clarifying the sentence reading: 'The current NPDES permit 63509 (column 3)

Impacts requires PBAPS to operate one to three of its cooling towers from June 15 to September 15 as part of the permit's thermal and biological sampling requirements," to state "The current NPDES permit requires PBAPS to operate one to three of its cooling towers from June 15 to September 15 as part of the permit's thermal and biological study."

6 Federal Register Page Socioeconomics Suggest clarifying the sentence reading "Exelon EPU-related plant 63511 (column 2) modifications would occur during normally scheduled refueling outages and are estimated to last between 30 to 40 days for each reactor," to state "Exelon EPU-related plant modifications would occur during the regularly scheduled refueling outages."

7 Federal Register Page Historic and The two electrical transformer replacements were completed in 2012.

63512 (column 3)

Cultural Suggest clarifying the sentence reading "As previously discussed, all EPU-Resources related plant modifications would take place within existing buildings and Impacts facilities at PBAPS, including replacing two electrical transformers on an existing pad," to state "As previously discussed, all EPU-related plant modifications would take place within existing buildings and facilities at PBAPS, including the replacement of two electrical transformers on 1 the existing pads."