Letter Sequence Supplement |
---|
TAC:ME9631, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) TAC:ME9632, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting
|
MONTHYEARML12286A0122012-09-28028 September 2012 License Amendment Request - Extended Power Uprate Project stage: Request ML12286A0112012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-488 Through End, and Attachments 5 and 7 Through 9 Project stage: Request ML12279A2852012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML12279A2902012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology Project stage: Request ML13051A0322013-02-15015 February 2013 Supplemental Information & Corrections Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 1 Project stage: Supplement ML13056A4822013-03-0808 March 2013 Acceptance Review Regarding Proposed Extended Power Uprate Project stage: Acceptance Review ML13052A8532013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13052A8562013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13081A7052013-03-28028 March 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13106A1262013-04-26026 April 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13129A1432013-05-0707 May 2013 Extended Power Uprate, Supplement 2 - Response to Request for Additional Information Project stage: Supplement ML13149A1452013-05-24024 May 2013 Extended Power Uprate License Amendment Request - Supplement 3 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13156A3682013-06-0404 June 2013 Extended Power Uprate License Amendment Request Supplement 4 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13134A3842013-06-10010 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13161A3972013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13182A0252013-06-27027 June 2013 Supplemental Information Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 5 Project stage: Supplement ML13178A3312013-07-0101 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13183A1992013-07-0303 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13203A1142013-07-23023 July 2013 Non-Proprietary - Request for Additional Information Regarding Proposed License Amendment Extended Power Uprate Project stage: RAI ML13203A1002013-07-23023 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Uprate Project stage: RAI ML13211A4032013-07-30030 July 2013 EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - Snpb Project stage: Supplement ML13211A4022013-07-30030 July 2013 Extended Power Uprate License Amendment Request - Supplement 6 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13213A2852013-07-31031 July 2013 Extended Power Uprate License Amendment Request - Supplement 7, Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13217A4312013-08-0505 August 2013 Extended Power Uprate License Amendment Request - Supplement 8 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13221A0642013-08-15015 August 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13240A0022013-08-22022 August 2013 Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional Information Project stage: Supplement ML13232A2772013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13232A2902013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13241A4182013-08-29029 August 2013 Extended Power Uprate License Amendment Request - Supplement 10 Response to Request for Additional Information Project stage: Supplement ML13253A4162013-09-11011 September 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13260A0762013-09-13013 September 2013 Extended Power Uprate License Amendment Request - Supplement 11 Response to Request for Additional Information Project stage: Supplement ML13247A7692013-09-18018 September 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13261A0432013-09-18018 September 2013 Requesty for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: Other ML13242A0902013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13242A1082013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13268A4002013-10-0101 October 2013 Enclosure 2 - Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13268A2632013-10-0101 October 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13289A1912013-10-11011 October 2013 Extended Power Uprate License Amendment Request - Supplement 12, Response to Request for Additional Information Project stage: Supplement ML13289A3002013-10-15015 October 2013 Extended Power Uprate License Amendment Request - Supplement 13 Response to Request for Additional Information Project stage: Supplement ML13308A3312013-10-31031 October 2013 Extended Power Uprate License Amendment Request - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML13291A1222013-11-0606 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13339A8072013-11-22022 November 2013 Comment (1) of Kevin Borton on Behalf of Exelon Generation Co. LLC, on Proposed License Amendment to Increase the Maximum Reactor Power Level Project stage: Other ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 Project stage: Request ML13345A6872013-12-0606 December 2013 Supplement 15 Response to Request for Additional Information Extended Power Uprate License Amendment Request Project stage: Supplement ML13308C4412013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13351A3902013-12-19019 December 2013 Summary of Closed Meeting with Exelon Generation Company, LLC, to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Meeting ML13358A0832013-12-20020 December 2013 Extended Power Uprate License Amendment Request- Supplement 16 Corrections, Clarifications and Additional Information - Extended Power Uprate Project stage: Supplement ML13345B3102014-01-0808 January 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML14002A1762014-01-15015 January 2014 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI 2013-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] |
Text
.17 ...
A)l~;.:"'l;'~" 93L
.41,~,,.,. "'
10 CFR 50.90 10 CFR 2.390 August 29, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
Subject:
Extended Power Uprate License Amendment Request - Supplement 10 Response to Request for Additional Information
References:
- 1. Exelon letter to the NRC, "License Amendment Request- Extended Power Uprate," dated September 28, 2012 (ADAMS Accession No. ML122860201)
- 2. NRC letter to Exelon, "Request for Additional Information Regarding License Amendment Request for Extended Power Up rate (TAC Nos.
ME9631 AND ME9632)," dated July 1, 2013 (ADAMS Accession No. ML13178A331)
- 3. Exelon letter to the NRC, "Extended Power Up rate License Amendment Request- Supplement 7, dated July 31, 2013 In accordance with 10 CFR 50.90, Exelon Generation Company, LLC (EGC) requested amendments to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, respectively (Reference 1).
Specifically, the proposed changes would revise the Renewed Operating Licenses to implement an increase in rated thermal power from 3514 megawatts thermal (MWt) to 3951 MWt. During their technical review of the application, the NRC Staff identified the need for additional information. Reference 2 provided the Request for Additional Information (RAI).
The EGG responses to those RAis, with the exception of SCVB RAI-21 and SCVB RAI-25, were provided in Reference 3. This letter provides responses to SCVB RAI-21 and SCVB RAI-25.
EGG has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the U.S. Nuclear Regulatory Commission in Reference 1. The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Further, the additional information provided in this
U.S. Nuclear Regulatory Commission License Amendment Request - Extended Power Up rate Supplement 10 August 29, 2013 Page 2 submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
In accordance with 10 CFR 50.91, ~~Notice for public comment; State consultation/'
paragraph (b), EGC is notifying the Commonwealth of Pennsylvania and the State of Maryland of this application by transmitting a copy of this letter to the designated State Officials.
There are no regulatory commitments contained in this letter.
Should you have any questions concerning this letter, please contact Mr. David Neff at (61 0) 765-5631.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 29th day of August 2013.
Kevin F. Borton Manager, Licensing - Power Uprate Exelon Generation Company, LLC Attachments:
- 1. Response to Request for Additional Information - SCVB RAI-21 and RAI-25
- 2. Revisions to PUSAR Sections 2.5.3.3 and 2.6.1.5 cc: USNRC Region I, Regional Administrator w/attachments USNRC Senior Resident Inspector, PBAPS w/attachments USNRC Project Manager, PBAPS w/attachments A. A. Janati, Commonwealth of Pennsylvania w/attach ments S. T. Gray, State of Maryland w/attachments
Attachment 1 Peach Bottom Atomic Power Station Units 2 and 3 Supplement 10 to Extended Power Uprate License Amendment Request NRC Docket Nos. 50-277 and 50-278 Response to Request for Additional Information - SCVB RAI-21 and RAI-25
PBAPS EPU LAR Supplement 10 Attachment 1 Responses to SCVB RAI-21 and RAI-25 Page 1 Response to Request for Additional Information Containment and Ventilation Branch By letter dated September 28, 2012, Exelon Generation Company, LLC (Exelon) submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.
The proposed amendment would authorize an increase in the maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt. The requested change, referred to as an extended power uprate (EPU), represents an increase of approximately 12.4 percent above the current licensed thermal power level.
The NRC staff has reviewed the information supporting the proposed amendment and by letter dated July 1, 2013 (ADAMS Accession No. ML13178A331) has requested information to clarify the submittal. The responses to all questions in that request, except SCVB RAI-21 and SCVB RAI-25, were submitted on July 31, 2013. During conference calls between Mr. Borton of EGC and Mr. Ennis of the NRC, conducted on June 27 and July 15, 2013, it was agreed that EGC would provide responses to SCVB RAI-21 and SCVB RAI-25 by August 30, 2013. The responses to those questions are provided below.
SCVB RAI-21 Section 2.6.1.5 of the PUSAR states:
Under EPU conditions, sufficient overpressure in the cooling water lines is maintained, thereby preventing water hammer under [design-basis accident] DBA conditions.
Please describe in more detail what kind of water hammer could potentially occur in the cooling water lines and how it is prevented.
RESPONSE
The potential exists for a water hammer event in the drywall chilled water system (DCWS) piping in containment when the post DBA containment conditions result in heating of the water in the containment air coolers to saturation temperature prior to water flow being re-established.
An EPU evaluation determined that the water in the containment air coolers will not reach saturation temperature in the short time before the fluid pressure is increased and flow re-established to the containment air coolers. Since steam voids are avoided, a water hammer event is prevented.
During this EPU evaluation, an issue with the original Generic Letter 96-06 response was identified which affects PUSAR Sections 2.5.3.3 and 2.6.1.5. The original analysis did not utilize the peak drywell temperature under all DBA conditions. The identified issue is documented in the corrective action process. The revised PUSAR sections are provided in to this submittal.
PBAPS EPU LAR Supplement 10 Attachment 1 Responses to SCVB RAI-21 and RAI-25 Page 2 SCVB RAI-25 For an .. Appendix R Fireu event, Regulatory Guide (AG) 1.189 Revision 2 provides guidance regarding consideration of spurious equipment actuation due to fire-induced failure of associated circuits to prevent the loss of safe shutdown capability including the loss of containment cooling function. This RG endorses the approach outlined in Chapter 4 of NEI 00 01 Revision 2 which relies on the Expert Panel Process and the Generic List of Multiple Spurious Operations (MSOs) contained in Appendix G to that document. It provides an acceptable methodology for the identification of multiple spurious actuations that may affect safe shutdown success path systems, structures, and components, when applied in conjunction with RG 1.189.
Consistent with the guidance in RG 1.189 and NEI 00-01 Appendix G, Revision 2, please provide a discussion of the EPU evaluation of fire-induced MSOs and prevention of the loss of safe shutdown and containment cooling capability during an Appendix R Fire event. Also address the PBAPS applicable plant-specific scenarios listed in Table G-1 of NEI 00-01 Revision 2.
RESPONSE
Current Licensed Thermal Power (CLTP) MSO scenarios at PBAPS were evaluated as part of a voluntary industry initiative in accordance with NEI-00-01, Chapter 4 and Table G-1. The evaluation included PBAPS applicable plant-specific scenarios consistent with the guidance within NEI-00-01. For EPU the fire areas and Fire Safe Shut-Down (FSSD) Methods (A, B, C and D) remain unchanged from those considered in the CLTP MSO evaluations and described in the PBAPS Fire Protection Program (FPP).
Evaluation of the CLTP MSO scenarios was performed for EPU to ensure that fire-induced MSOs will not result in loss of safe shutdown and loss of containment cooling capability during an Appendix R fire event. This evaluation concluded that MSO scenario coping capability will be maintained at EPU conditions because either, (1) the MSO scenario conclusions are not affected by EPU; or (2) the MSO scenarios affected by EPU and/or EPU modifications have been identified and the necessary associated hardware and/or procedure changes to ensure coping capability will be implemented as part of EPU implementation. If there are any additional EPU impacts, the EGC configuration control process will ensure that the MSO coping capability will be maintained, including any new MSO scenarios introduced by the EPU and/or EPU modification(s).
Attachment 2 Peach Bottom Atomic Power Station Units 2 and 3 Supplement 10 to Extended Power Uprate License Amendment Request NRC Docket Nos. 50-277 and 50-278 Revisions to PUSAR Sections 2.5.3.3 and 2.6.1.5
EPU LAR Supplement 10 Attachment 2 Page 1 Revisions to PUSAR Sections 2.5.3.3 and 2.6.1.5 PBAPS EPU LAR dated September 28, 2012 Attachments 4 and 6 (Changes are denoted by bold and strikethrough) 2.5.3.3 Reactor Auxiliary Cooling Water System Reactor Building Closed Cooling Water System The RBCCW heat loads are mainly dependent on the reactor vessel temperature and/or flow rates in the systems cooled by the RBCCW. The flow rates in the systems cooled by the RBCCW (e.g., Reactor Recirculation and RWCU pumps cooling) do not change due to power uprate and therefore, are not affected by power uprate. The only significant increase in heat load due to EPU is an increase in SFP Cooling heat load. The normal cooling water supply for the SFP is provided by the SW system and not the RBCCW system. The RBCCW heat load during SFP cooling for normal refueling is 17.5 MBTU/hr at CLTP. This load would increase to 27.0 MBTU/hr at EPU, which remains below the RBCCW system heat exchanger capacity of 51.0 MBTU/hr for two heat exchanger operation for SFP Cooling. This SFP Cooling heat load occurs during refueling when other RBCCW loads are offline or significantly reduced.
Therefore, the increase in SFP Cooling heat load does not increase RBCCW system heat loads beyond system design. The operation of the remaining equipment cooled by the RBCCW (e.g.,
sample coolers and drain coolers) is not power dependent and is not affected by power uprate.
There are negligible changes to system operating temperatures and pressures as a result of EPU. There are no changes to RBCCW system operation. The RBCCW system contains sufficient redundancy in pumps and heat exchangers to ensure that adequate heat removal capability is available during normal operation. Sufficient heat removal capacity is available to accommodate the small increase in heat load due to EPU.
The PBAPS response to GL 96 06 credited the RBCCVV head tanl< 'Nith maintaining an O!o'erpressure on the containment air coolers to prevent vvater hammer under DBA conditions.
Evaluation of the impact of EPU on the RBCCW system, the OW ventilation system, and the reactor building ventilation system indicates that an overpressure in the cooling water lines will still be maintained, thereby preventffi.§- water hammer under DBA conditions.
Therefore, the RBCCW system meets all CLTP dispositions.
2.6.1.5 Generic Letter 96-06 GL 96-06 identified potential problems with equipment operability and containment integrity during DBA conditions as a result of (1) water hammer and/or two-phase flow conditions in cooling water systems serving the containment air coolers and (2) thermally induced overpressurization of isolated piping sections in containment.
The PBAPS response to GL 96-06 credited the maintenance of sufficient overpressure in the cooling water lines with preventing steam from forming during the design-basis scenarios of interest. Under EPU conditions, sufficient ovefpressure in the cooling water lines is maintained, thereby exists to prevent~water hammer under DBA conditions.
The PBAPS response to GL 96-06 also included the installation of relief valves on lines penetrating primary containment that were susceptible to thermally induced over-pressurization during DBA conditions. The relief valve sizing was based on a OW temperature that is the
EPU LAR Supplement 10 Attachment 2 Revisions to PUSAR Sections 2.5.3.3 and 2.6.1.5 Page 2 same as significantly higher than that expected under EPU conditions. In addition, the relief valve installed capacity was much greater than the required capacity. As a result, the slight increase in OW temperature with EPU does not affect the adequacy of the previous corrective action.
Therefore, tho existing PBAPS response to has addressed the concerns of GL 96-06 remains vaHd for EPU, and all CLTR dispositions are met.