Letter Sequence RAI |
---|
TAC:ME9631, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) TAC:ME9632, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting
|
MONTHYEARML12286A0122012-09-28028 September 2012 License Amendment Request - Extended Power Uprate Project stage: Request ML12286A0112012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-488 Through End, and Attachments 5 and 7 Through 9 Project stage: Request ML12279A2852012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML12279A2902012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology Project stage: Request ML13051A0322013-02-15015 February 2013 Supplemental Information & Corrections Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 1 Project stage: Supplement ML13056A4822013-03-0808 March 2013 Acceptance Review Regarding Proposed Extended Power Uprate Project stage: Acceptance Review ML13052A8532013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13052A8562013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13081A7052013-03-28028 March 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13106A1262013-04-26026 April 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13129A1432013-05-0707 May 2013 Extended Power Uprate, Supplement 2 - Response to Request for Additional Information Project stage: Supplement ML13149A1452013-05-24024 May 2013 Extended Power Uprate License Amendment Request - Supplement 3 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13156A3682013-06-0404 June 2013 Extended Power Uprate License Amendment Request Supplement 4 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13134A3842013-06-10010 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13161A3972013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13182A0252013-06-27027 June 2013 Supplemental Information Supporting Request for License Amendment Request - Extended Power Uprate - Supplement No. 5 Project stage: Supplement ML13178A3312013-07-0101 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13183A1992013-07-0303 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13203A1142013-07-23023 July 2013 Non-Proprietary - Request for Additional Information Regarding Proposed License Amendment Extended Power Uprate Project stage: RAI ML13203A1002013-07-23023 July 2013 Request for Additional Information Regarding License Amendment Request for Extended Uprate Project stage: RAI ML13211A4032013-07-30030 July 2013 EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - Snpb Project stage: Supplement ML13211A4022013-07-30030 July 2013 Extended Power Uprate License Amendment Request - Supplement 6 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13213A2852013-07-31031 July 2013 Extended Power Uprate License Amendment Request - Supplement 7, Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13217A4312013-08-0505 August 2013 Extended Power Uprate License Amendment Request - Supplement 8 Response to Request for Additional Information - Extended Power Uprate Project stage: Supplement ML13221A0642013-08-15015 August 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13240A0022013-08-22022 August 2013 Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional Information Project stage: Supplement ML13232A2772013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13232A2902013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13241A4182013-08-29029 August 2013 Extended Power Uprate License Amendment Request - Supplement 10 Response to Request for Additional Information Project stage: Supplement ML13253A4162013-09-11011 September 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13260A0762013-09-13013 September 2013 Extended Power Uprate License Amendment Request - Supplement 11 Response to Request for Additional Information Project stage: Supplement ML13247A7692013-09-18018 September 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13261A0432013-09-18018 September 2013 Requesty for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: Other ML13242A0902013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13242A1082013-10-0101 October 2013 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML13268A4002013-10-0101 October 2013 Enclosure 2 - Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13268A2632013-10-0101 October 2013 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI ML13289A1912013-10-11011 October 2013 Extended Power Uprate License Amendment Request - Supplement 12, Response to Request for Additional Information Project stage: Supplement ML13289A3002013-10-15015 October 2013 Extended Power Uprate License Amendment Request - Supplement 13 Response to Request for Additional Information Project stage: Supplement ML13308A3312013-10-31031 October 2013 Extended Power Uprate License Amendment Request - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML13291A1222013-11-0606 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13339A8072013-11-22022 November 2013 Comment (1) of Kevin Borton on Behalf of Exelon Generation Co. LLC, on Proposed License Amendment to Increase the Maximum Reactor Power Level Project stage: Other ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 Project stage: Request ML13345A6872013-12-0606 December 2013 Supplement 15 Response to Request for Additional Information Extended Power Uprate License Amendment Request Project stage: Supplement ML13308C4412013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML13351A3902013-12-19019 December 2013 Summary of Closed Meeting with Exelon Generation Company, LLC, to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Meeting ML13358A0832013-12-20020 December 2013 Extended Power Uprate License Amendment Request- Supplement 16 Corrections, Clarifications and Additional Information - Extended Power Uprate Project stage: Supplement ML13345B3102014-01-0808 January 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 Project stage: Withholding Request Acceptance ML14002A1762014-01-15015 January 2014 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI 2013-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 IR 05000277/20224032022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test 2024-07-03
[Table view] |
Text
OFFICIAl USE ONlY PROPRI&TARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 15, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTIOM ATOMIC POWER STATION, UNITS 2 AND 3- REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR EXTENDED POWER UPRATE (TAC NOS. ME9631 AND ME9632)
Dear Mr. Pacilio:
By letter dated September 28, 2012, as supplemented by letters dated February 15, 2013, May 7, 2013, May 24,2013, June 4, 2013, June 27,2013, July 30,2013, July 31,2013, August 5, 2013, August 22, 2013, August 29, 2013, September 13, 2013, October 11, 2013, October 15, 2013, October 31, 2013, December 6, 2013, and December 20, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML122860201, ML13051A032, ML13129A143, ML13149A145, ML13156A368, ML13182A025, ML13211A457, ML13213A285, ML13217A431, ML13240A002, ML13241A418, ML13260A076, ML13289A191, ML13289A300, ML13308A331, ML13345A687, and ML13358A083, respectively), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would authorize an increase in the maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt.
The requested change, referred to as an extended power uprate, represents an increase of approximately 12.4 percent above the current licensed thermal power level.
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The RAI questions were provided in draft form to Mr. Kevin Borton of your staff on December 3, 2013. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. A revision to the draft RAis were provided to Mr. Borton on December 31, 2013.
On January 10, 2014, Mr. Borton stated that Exelon would provide a response to the RAI questions by February 28, 2014. Please note that if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may reject your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.1 08.
Enclosure 1 transmitted herewith contains sensitive unclassified information.
When separated from Enclosure 1, this document is decontrolled.
OFFICIAl USE ONlY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION The NRC staff has determined that Enclosure 1 contains proprietary information pursuant to 10 CFR 2.390. Accordingly, the staff has prepared a redacted, publicly available, non-proprietary version (i.e., Enclosure 2).
If you have any questions, please contact me at (301) 415-1420.
Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosures:
- 1. Request for Additional Information (non-publicly available)
- 2. Request for Additional Information (publicly available) cc w/encl 2: Distribution via Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAl USE ONlY PROPRIETARY INFORMATION REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT EXTENDED POWER UPRATE EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 Proprietary information pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390 has been redacted from this document.
Redacted information is identified by blank space enclosed within double brackets as shown here (( )).
Enclosure 2 OFFICIAl USE ONlY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT EXTENDED POWER UPRATE EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter dated September 28, 2012, as supplemented by letters dated February 15, 2013, May 7, 2013, May 24, 2013, June 4, 2013, June 27, 2013, July 30, 2013, July 31, 2013, August 5, 2013, August 22, 2013, August 29, 2013, September 13, 2013, October 11, 2013, October 15, 2013, October 31, 2013, December 6, 2013, and December 20, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML122860201, ML13051A032, ML13129A143, ML13149A145, ML13156A368, ML13182A025, ML13211A457, ML13213A285, ML13217A431, ML13240A002, ML13241A418, ML13260A076, ML13289A191, ML13289A300, ML13308A331, ML13345A687, and ML13358A083, respectively), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would authorize an increase in the maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt. The requested change, referred to as an extended power uprate (EPU), represents an increase of approximately 12.4 percent above the current licensed thermal power level (CL TP).
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAJ) is addressed below.
Mechanical and Civil Engineering Branch (EMCB)
Reviewer: Chakrapani Basavaraju EMCB-SD-RAI-16 A Westinghouse octagonal shaped three ring vane bank replacement steam dryer (RSD) was recently installed at the Monticello Nuclear Generating Plant (Monticello) to support an EPU.
Several boiling-water reactors (BWRs) in Europe have also installed this Westinghouse steam dryer. Exelon plans to install the same type RSD at the PBAPS to support the proposed EPU, and is using the Monticello data as a benchmark for their dryer analysis procedure. The NRC staff has noted that the azimuthal orientation of the PBAPS RSD (Figure 2-1 of Reference 1) is
(( )) relative to the orientation of the Monticello RSD. ((
)) Please provide the following:
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAl USE ONlY PROPRIETARY INFORMATION a) Explain why the PBAPS RSD is oriented ((
))
compared to the Monticello RSD.
b) Provide any known operating experience data regarding the BWRs in Europe with Westinghouse steam dryers that are oriented similar to the PBAPS RSDs.
c) Since the PBAPS RSD and Monticello dryer orientations are different, the associated steam flow velocities, vorticities, and turbulence within the vessels and the dipole sources at the main steam line (MSL) entrances may be different. Therefore, the dipole sources developed based on the Monticello RSD benchmark data may not be applicable for the analysis of the PBAPS RSD design. Provide any fluid dynamic information related to the MSL inlet flow, vorticity, and resulting dipole sources for the PBAPS RSD orientation as compared to the benchmark Monticello orientation. Explain what steps will be taken to ensure that the dipole strengths used for the PBAPS RSD evaluations are conservative.
d) Please provide a quantitative analysis of the impact of the pressure loads on the outer hoods of the PBAPS RSD for the following two orientations: (1) Monticello RSD orientation; and (2) proposed PBAPS RSD orientation (( )).
EMCB-SD-RAI-17 In Reference 2, the pressure spectra recorded during the scale model tests (SMTs) show
(( )) at the safety relief valve (SRV) resonance frequencies. Since the transient conditions (( )) used in the SMTs may affect the bump-up factor results, please provide the following:
a) Perform a sensitivity analysis, using the test samples ((
)) Provide the results of this analysis including any impacts on resonance amplitude and bump-up factors.
b) This RAI question has been deleted.
EMCB-SD-RAI-18 This RAI question has been deleted.
EMCB-SD-RAI-19 Reference 2 notes that one of the blind-flanged standpipes on the dead-ended leg of MSL C will be replaced with a Dresser SRV. Please provide the standpipe dimensions for the new Dresser SRV in comparison to the existing SRV standpipes.
EMCB-SD-RAI-20 This RAI question has been deleted.
OFFICIAl USE ONlY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION EMCB-SD-RAI-21 In Section 5.3 of Reference 3, it appears that some peaks other than those caused by the
((
)) were filtered. Please provide information about any peaks, other than those due to
(( )), which have been filtered from the signals of the MSL strain gages.
EMCB-SD-RAI-22 Figures 3-2 to 3-5 of Reference 1 show ((
)) Please provide the following:
a) The averaging of pressure spectra over large dryer areas (e.g., quadrants) does not provide an accurate description of the load distribution on the dryer. Explain whether these pressure spectra are averaged over the respective quadrants or they represent local spectra at selected points on the quadrants.
b) Explain the nature of the (( )) which appears in the estimated EPU load on the RSD for PBAPS Unit 3.
EMCB-SD-RAI 23 Explain how the acoustic pressure field in the ((
)), as presented in Reference 1, is mapped to the curved continuous structural surfaces of the PBAPS RSD structural finite element model mesh. Discuss any bias errors associated with this mapping and how are they accounted for in the dryer stress analyses.
EMCB-SD-RAI-24 The dryer skirt is partially submerged in boiling or saturated water, which imparts random fluctuating pressure pulsations to the bottom of the structure. These loads were not accounted for in the Acoustic Circuit Model (ACM), or in the Quad Cities Unit 2 based bias errors and uncertainties. Please provide details on how you will account for the effects of these loads in:
(a) the dryer stress analysis prior to EPU approval; and (b) the instrumented dryer test plan.
EMCB-SD-RAI-25 The NRC staff experience indicates that minor changes in vessel conditions (static pressure, core flow, and MSL inlet flow rates) can lead to modest (>10%) changes in dryer alternating stresses. Please provide the allowable range of operating conditions at EPU power for the remaining life of the PBAPS Units 2 and 3 (including the historical plant data at CLTP, the methodology for determining the worst-case alternating stresses for all dryer regions over these operating conditions, and the effects of these operating conditions on the remaining fatigue life).
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION EMCB-SD-RAI-26 Tables 5-3 and 5-4 of Reference 3 show ((
)) However, Table 5-5 of Reference 3 shows(( )]
whereas Table 5-6 of Reference 3 shows ((
)) Please provide the frequencies of the (( )] in both PBAPS Units. Also provide the motor and pump design specifications, along with any formulas explaining how the (( )) are computed based on the pump and motor design parameters.
EMCB-SD-RAI-27 This RAI question has been deleted.
EMCB-SD-RAI-28 of Reference 4 contains estimates of the PBAPS RSD alternating stresses induced by (( )) Please include these stress components in your proposed revision of Reference 4. Also, include the consideration of peak (( )]
stresses in this forthcoming submission, describing on-dryer instrumentation locations, such that you ensure that a few of the on-dryer strain gages will measure the (( )] Provide the spectra of the motor bearing vibration measurements referred to in Reference 4 and discuss the impact on the dryer stresses of any (( )) frequency peaks which may be present in the data contained in Reference 4, Attachment 9.
EMCB-SD-RAI-29 Provide the bias errors and uncertainties for all on-dryer instrumentation, including the effects of cabling and data acquisition systems.
EMCB-SD-RAI-30 The NRC performed an audit of the PBAPS RSD data at the Westinghouse office in Rockville, Maryland on September 12, 2013. Please provide an update to Reference 5 which contains all information requested during this audit. Also provide detailed descriptions of the sensor locations, projected and measured spectra, and the correlation of these spectra against the stress regions on the lower and upper dryer, including cumulative strain and pressure plots.
Explain what steps will be taken to ensure that the integrity of the sensor/wiring connections is maintained to prevent moisture intrusion and corrupted measurements, particularly for the pressure sensors.
EMCB-SD-RAI-31 Explain how end-to-end benchmarking will be performed using the on-dryer upper and lower strain gages on PBAPS Unit 2.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAl USE ONlY PROPRIETARY INFORMATION EMCB-SD-RAI-32 Please provide the limit curves for the on-dryer strain gages for PBAPS Unit 2. Base the curves on the CL TP (not the projected EPU calculations).
EMCB-SD-RAI-33 Please provide details on how you will project dryer minimum alternating stress ratios at higher power levels during power ascension. Also, provide details of how you will address projections that reveal stresses that violate acceptable limits.
EMCB-SD-RAI-34 Provide comparisons of the MSL spectra in PBAPS Unit 2 with those from Quad Cities Unit 2 at comparable EPU power levels. This information should be provided for MSLs with resonances (not all MSLs).
EMCB-SD-RAI-35 The PBAPS RSDs (( )) With respect to the fatigue assessment, please provide information showing whether the section properties of the fillet welds are as good as or better than the section properties of the plates being welded. If the fillet weld properties are not equal to or better than that of the plates, provide the following information:
a) Identify which fillet welds are one-sided and which are two-sided.
b) Provide sketches of the different types of fillet welds along with the dimensions.
c) Explain what steps will be taken to estimate the fatigue stress.
EMCB-SD-RAI-36 Since stress convergence errors depend upon the mesh density, the stress gradient, and the local geometry of the RSDs, the stress convergence errors will be different at various locations in the RSDs. According to Section 3 of Reference 6, the finite element model for the PBAPS RSDs (( )) Therefore, the stress convergence errors at different locations are likely to be different. Please provide the stress convergence errors for the following locations on the RSDs: (1) locations having high-stress gradients; (2) locations having high stresses at EPU power levels; and (3) at the on-dryer strain gage and accelerometer locations. Additionally, please explain how the stress convergence errors will be accounted for in estimating the stresses in the RSDs at EPU power levels.
EMCB-SD-RAI-37 Please explain whether the speed of the reactor recirculation pumps for PBAPS Units 2 and 3 would change when power is increased from CL TP to the EPU power level during power ascension. Please provide the speeds of the reactor recirculation pumps at CLTP and EPU for each of the PBAPS Units.
OFFICIAl USE ONlY PROPRIETARY INFORMATION
OFFICIAl USE ONlY PROPRIETARY INFORMATION EMCB-SD-RAI-38 Please identify if any of the PBAPS RSD WCAP documents will be revised if you to switch from using the Acoustic Circuit Model (ACM) 4.1 Version to the Acoustic Circuit Model Enhanced (ACE) 2.0 Version in the PBAPS RSD load evaluations.
EMCB-SD-RAI-39 Please provide the weights for the PBAPS original equipment manufacturer (OEM) steam dryer and the RSD. Also, address the impact of any increase in weight of the RSD compared to the OEM steam dryer on the reactor pressure vessel (RPV) lugs supporting the RSD and the RPV supports.
EMCB-SD-RAI-40 Please describe how the end-to-end bias and uncertainty for ACE and ACE plus the skirt protection model are determined. Please explain what actions would be taken if the predicted converged peak stresses after being adjusted for the end-to-end bias and uncertainty do not bound the measured stresses at the installed strain gages locations on the RSD.
EMC 8-SD-RAI-41 Please provide a proposed license condition for PBAPS Unit 2 that will provide a requirement to:
(a) submit a comparison of predicted and measured pressures and strains on the PBAPS Unit 2 RSD near 100% CLTP, 104% CLTP, and 108% CLTP during power ascension; and (b) submit a similar comparison at the EPU power level with the 90 day report following the completion of all EPU power ascension testing for PBAPS Unit 2.
OFFICIAl USE ONlY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION REFERENCES
- 1) Attachment 17, Enclosure B.1 to Exelon letter to NRC dated September 28, 2012, Westinghouse Report WCAP-17590-P, Revision 0, "Peach Bottom Units 2 & 3 Replacement Steam Dryer Acoustic Load Definition," dated August 2012. (See Note 1 below)
- 2) Attachment 17, Enclosure B.5 to Exelon letter to NRC dated September 28, 2012, Westinghouse Report WCAP-17611-P, Revision 1, "Peach Bottom Units 2 and 3 Replacement Steam Dryer Four-Line Subscale Acoustics Test Data Evaluation and Derivation of CLTP-to-EPU Scaling Spectra," dated August 2012. (See Note 1 below)
- 3) Attachment 17, Enclosure B.6 to Exelon letter to NRC dated September 28, 2012, Westinghouse Report WCAP-17626-P, Revision 0, "Peach Bottom Units 2 & 3 MSL Strain Gauge Data and Computation of Predicted EPU Signature," dated August 2012. (See Note 1 below)
- 4) Attachment 9 to Exelon letter to NRC dated February 15, 2013, "Response to Request for Supplement Information, Issue 2, Steam Dryer Analysis." (See Note 2 below)
- 5) Attachment 17, Enclosure B. 7 to Exelon letter to NRC dated September 28, 2012, Westinghouse Report WCAP-17639-P, Revision 2, "Instrumentation Description for the Peach Bottom Unit 2 Replacement Steam Dryer," dated September 2012. (See Note 1 below)
- 6) Attachment 17, Enclosure B.2 to Exelon letter dated to NRC dated September 28, 2012, Westinghouse Report WCAP-17609-P, Revision.1, "Peach Bottom Units 2 and 3 Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads," dated September 2012. (See Note 1 below)
NOTES
- 1) Attachment 17 to Exelon's letter to the NRC dated September 28, 2012, and its enclosures, contain proprietary information and are non-publicly available. Attachment 15 to the letter, and its enclosures, provide redacted publicly available versions of this information. The letter dated September 28, 2012, and its Attachments are contained in ADAMS Package Accession No. ML122860201.
- 2) Attachment 9 to Exelon's letter to the NRC dated February 15, 2013, contains proprietary information and is non-publicly available. Attachment 10 to the letter provides a redacted publicly available version of this information. The letter dated February 15, 2013, and its publicly available Attachments are contained in ADAMS Accession No. ML13051A032.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
Package: ML14002A167 Letter: ML14002A176 (publicly available) : ML14002A303 (non-publicly available) : ML14002A307 (publicly available)
- via e-mail OFFICE LPL 1-2/PM LPL 1-2/LA* LPL 1-2/BC(A)
NAME REnnis A Baxter JLamb DATE 01/15/14 01/06/14 01/15/14