ML14077A461

From kanterella
Jump to navigation Jump to search

Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML14077A461
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/16/2014
From: Richard Ennis
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Ennis R
References
TAC ME9631, TAC ME9632
Download: ML14077A461 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April16, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. ME9631 AND ME9632)

Dear Mr. Pacilio:

By letter dated March 10, 2014, Exelon Generation Company, LLC (Exelon) submitted five Westinghouse Electric Company LLC (Westinghouse) affidavits to the Nuclear Regulatory Commission (NRC), each executed by Mr. Bradley F. Maurer (Attachment 3 to Exelon's letter).

Exelon requested that the information contained in Attachments 1, 4, 5, 6, and 7 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390. Specifically, Exelon requested that the documents listed in the following table be withheld:

Attachment Affidavit No. Document Title No. lDate) 1 Response to Request for Additional Information -

CAW-14-3921 EMCB-SD - Proprietary (3/7/14) 4 WCAP-17635-P, Revision 2, Peach Bottom Units 2 & 3 CAW-14-3908 Replacement Steam Dryer Comprehensive Vibration (3/6/14) Assessment Program (CVAP) 5 WCAP-17609-P, Revision 2, Peach Bottom Units 2 CAW-14-3913 and 3 Replacement Steam Dryer Structural Evaluation (3/6/14) for High-Cycle Acoustic Loads 6 WCAP-17654-P, Revision 3, Peach Bottom Unit 2 CAW-14-3911 Replacement Steam Dryer Power Ascension Program (3/6/14) Description for Extended Power Uprate 7 WCAP-17655-P, Revision 3, Peach Bottom Unit 3 CAW-14-3912 Replacement Steam Dryer Power Ascension Program (3/6/14) Description for Extended Power Uprate

M. Pacilio A non-proprietary copy of the documents listed above (Attachments 2, 8, 9, 10, and 11 to Exelon's letter) have been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)(ii)(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(4)(ii)(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

M. Pacilio If you have any questions regarding this matter, I may be reached at 301-415-1420.

Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: Mr. Bradley F. Maurer Principal Engineer Plant Licensing Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Additional Distribution via Listserv

ML14077A461 OFFICE NRR/LPL 1-2/PM NRR/LPL 1-2/LAit NRR/LPL 1-2/LA NRR/LPL 1-2/BC NAME REnnis KBeckford ABaxter MKhanna DATE 3/19/2014 3/27/2014 4/15/2014 4/16/2014