ML14171A409
| ML14171A409 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/20/2014 |
| From: | Borton K Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML14171A409 (6) | |
Text
10 50.90 U.
Nuclear Regulatory Commission ATTN: Document Control Washington, DC........,~_,...,...,. """"'
Subject:
Bottom Atomic Power Station, Units 2 and 3 Facility License Nos. DPR-44 and i-vTQn,.,Q,., Power Uprate License Amendment Supplemental Information
- 1.
Exelon letter to the NRC, "License Amendment Request - Extended Power Uprate," dated September 2012 (ADAMS Accession No. ML122860201)
- 2.
Exelon letter to the NRC, "Extended Power Uprate License Amendment Request-Supplement 26, dated May 6, 2014 (ADAMS Accession No. ML14127A480)
- 3.
Exelon letter to the NRC, "Extended Power Uprate License Amendment Request - Supplement "dated June 5, 2014 (ADAMS Accession No. ML14160A699)
In accordance with 10 CFR 50.90, Exelon Generation Company, LLC (EGC) requested amendments to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, respectively (Reference 1 ).
Specifically, the proposed changes would revise the Renewed Facility Operating Licenses (RFOLs) to implement an increase in rated thermal power from 3514 megawatts thermal (MWt) to 3951 MWt. Proposed License Conditions related to the Replacement Steam Dryer were provided In Attachment 3 to Reference 2. Revised Technical Specifications (TS) page markups to reflect the impact of other recently issued amendments were provided in Attachment 2 to Reference 3. This letter provides minor editorial corrections to the Proposed License Conditions and TS markups as described below.
License Condition for Renewed License No. DPR-44 (PBAPS Unit 2)
Paragraph (15)(a)1.g.
Paragraph (15)(a)1.i.
Text "2012, including" is changed to "2012, and Supplement 16 dated December 20, 2013, including" Text "item g above" is changed to "item 1.g above"
1.J~1r~nr~r1h ( 1 1..1~1ronr~r1n ( 1 (1
Paragraph ( 1 to
.... "::>.C-:::1,,r-:>r*r> (1 "item a, above" is changed to "item 3.a above"
{1 Text MWt is changed to
- MWt, 3.1 and relocated the text box for Surveillance Requirement (SR) 3.1.7.10. Revised page markups for both Unit 2 and Unit 3 are provided in Attachment 1.
reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the U. S. Nuclear Regulatory Commission in Reference 1. The supplemental information provided in this submittal does not the for concluding that the proposed license amendment does not involve a significant hazards consideration. Further, the additional information provided in this submittal does not the bases for EGC concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"
paragraph (b ), EGC is notifying the Commonwealth of Pennsylvania and the State of Maryland of this application by transmitting a copy of this letter with attachments to the designated Officials.
There are no regulatory commitments contained in this letter.
Should you have any questions concerning this letter, please contact Mr. David Neff at (610) 765-5631.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 20th day of June 2014.
Kevin F Borton Sr. Manager, Licensing - Power Uprate Exelon Generation Company, LLC - Revised Technical Specifications Page 3.1-23 Markup
cc:
Peach Bottom Atomic Power Station Units 2 and 3 NRC Docket Nos. 50-277 and 50-278 Revised Technical Specifications Page 3.1-23 Markup
u enrichment is 92.0 R
.1..
PBAPS UN IT 2 3.1-23 In accordance with the Surveillance Frequency Control Program Amendment No. 290
R
... 0 PBAPS UNIT i
fl pump n
enrichment is 92.0 ugh on r p u
3.1 23 from In accordance with the Surveillance Frequency Control Program rdan the u r 11 n requency Con rol 0
nee wi hi n 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> a r
ddition t SLC tank Amendment No. 293