|
|
Line 39: |
Line 39: |
| Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed when Mr. Kirkland contacted to determine the method for submission. The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. | | Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed when Mr. Kirkland contacted to determine the method for submission. The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. |
|
| |
|
| Paperwork Reduction Act Statement | | Paperwork Reduction Act Statement |
|
| |
|
| This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150-0018. | | This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150-0018. |
Line 58: |
Line 58: |
| on 10/03/24 | | on 10/03/24 |
|
| |
|
| ML24277A072 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | | ML24277A072 SUNSI Review: |
| By: JCK Yes No Publicly Available Sensitive NRR-079 OFFICE SOE:OB C:OB NAME JKirkland HGepford SIGNATURE /RA/ /RA/ | | ADAMS: |
| | Non-Publicly Available Non-Sensitive Keyword: |
| | By: JCK Yes No Publicly Available Sensitive NRR-079 OFFICE SOE:OB C:OB NAME JKirkland HGepford SIGNATURE |
| | /RA/ |
| | /RA/ |
| DATE 10/03/24 10/03/24 | | DATE 10/03/24 10/03/24 |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24311A1232024-11-14014 November 2024 – Report for the Aging Management Audit Regarding the License Renewal Application Review IR 05000275/20240102024-11-0707 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000275/2024010 and 05000323/2024010 IR 05000275/20244022024-11-0707 November 2024 Security Baseline Inspection Report 05000275/2024402 and 05000323/2024402 IR 07200026/20244012024-11-0606 November 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401 DCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24276A1482024-10-30030 October 2024 NRC to Fws Request for Concurrence with Endangered Species Act Determinations for Diablo Canyon Power Plant, Units 1, 2, ISFSI Proposed License Renewals in San Luis Obispo Co, CA ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis IR 05000275/20240122024-07-31031 July 2024 License Renewal Report 05000275/2024012 and 05000323/2024012 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 2024-09-09
[Table view] Category:License-Operator
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20243012023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A0882021-02-12012 February 2021 DC-2021-01 Final Written Exam ML21075A2252021-02-12012 February 2021 DC-2021-01 Draft Written Exam ML21075A2242021-02-12012 February 2021 DC-2021-01 Draft Written Comments ML21075A2212021-02-12012 February 2021 DC-2021-01 Draft Op Test ML21075A2262021-02-12012 February 2021 DC-2021-01 Final Outlines ML21075A2202021-02-12012 February 2021 DC 2021-01 Draft Op Test Comments DCL-20-073, DC-2021-01 Draft Outlines2021-02-12012 February 2021 DC-2021-01 Draft Outlines ML21075A2222021-02-12012 February 2021 DC-2021-01 Draft Outline Comments ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A0872021-02-12012 February 2021 DC-2021-01 Final Op Test DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments IR 05000275/20203012020-02-19019 February 2020 NRC Initial Operator Licensing Examination Approval 05000275/2020301; 05000323/2020301 DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 2024-08-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20243012023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms ML21075A2242021-02-12012 February 2021 DC-2021-01 Draft Written Comments ML21075A2212021-02-12012 February 2021 DC-2021-01 Draft Op Test ML21075A2202021-02-12012 February 2021 DC 2021-01 Draft Op Test Comments ML21075A2222021-02-12012 February 2021 DC-2021-01 Draft Outline Comments ML21075A2262021-02-12012 February 2021 DC-2021-01 Final Outlines DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A0882021-02-12012 February 2021 DC-2021-01 Final Written Exam ML21075A2252021-02-12012 February 2021 DC-2021-01 Draft Written Exam ML21075A0872021-02-12012 February 2021 DC-2021-01 Final Op Test DCL-20-073, DC-2021-01 Draft Outlines2021-02-12012 February 2021 DC-2021-01 Draft Outlines DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments IR 05000275/20203012020-02-19019 February 2020 NRC Initial Operator Licensing Examination Approval 05000275/2020301; 05000323/2020301 DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines 2024-08-02
[Table view] |
Text
October 03, 2024
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2025301; 05000323/2025301
Dear Mr. Peck:
In a telephone conversation on October 2, 2024, between Mr. Kenneth Smith, Nuclear Operations Instructor - Licensed and Mr. John Kirkland, Chief Examiner, arrangements were made for the administration of operator licensing examinations at Diablo Canyon Nuclear Power Plant during the weeks of October 27, 2025, and November 3, 2025.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by May 26, 2025. The written examination outline was provided to your staff on October 2, 2024. The written examinations, operating tests, and supporting reference materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by August 11, 2025. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. In addition, your support for on-site validation of the examinations is required during the week of September 15, 2025. To conduct the requested written examinations and operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. In accordance with ES 3.5, Administering Operating Tests, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150 0090) at least 60 days before the first examination date (if possible). Contact Mr. Kirkland to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150 0090) and medical certifications (OMB control number 3150 0024)
should be submitted at least 30 days before the first examination date. If the NRC does not receive the preliminary applications at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed when Mr. Kirkland contacted to determine the method for submission. The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the FOIA, Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC 20503; e-mail:
oira_submission@omb.eop.gov. Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be available electronically for public inspection through the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions about the NRCs examination procedures and guidelines, please contact me at 817-200-1159.
Sincerely, Heather J Gepford, Ph.D.
Chief, Operations Branch Division of Operating Reactor Safety Docket Nos. 50-275; 50-323 License Nos. DPR-80; DPR-82 Electronic Distribution via LISTSERV Signed by Gepford, Heather J.
on 10/03/24
ML24277A072 SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: JCK Yes No Publicly Available Sensitive NRR-079 OFFICE SOE:OB C:OB NAME JKirkland HGepford SIGNATURE
/RA/
/RA/
DATE 10/03/24 10/03/24