ML20080G224: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:M51115, TAC:M74973, TAC:M85931, TAC:M86904, TAC:M89348
| stage = Other
}}
}}



Latest revision as of 19:44, 26 September 2022

Provides Confirmation That Licensing Activities Listed in Encl Completed on or Before End of 15R Outage
ML20080G224
Person / Time
Site: Oyster Creek
Issue date: 02/01/1995
From: Keaten R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 5000-95-0061, 5000-95-61, C321-95-2049, GL-89-19, GL-92-04, GL-92-4, IEB-93-003, IEB-93-3, TAC-M51115, TAC-M74973, TAC-M85931, TAC-M86904, TAC-M89348, NUDOCS 9502060337
Download: ML20080G224 (2)


Text

4 GPU Nuclear Corporation yn a gs One Upper Pond Road GE Parsippany, New Jersey 07054 201-316-7000 TELEX 136-482 Writers Direct Dial Numbet February 1, 1995 C321-95-2049 5000-95-0061 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (0CNGS)

Docket No. 50-219 Facility Operating License No. DPR-16 15R Outage Licensing Activities In response to your verbal request, this letter provides confirmation that the licensing activities listed in Attachment I were completed on or before the end of the 15R Outage.

If you have any questions or comments on this submittal, please contact Mr.

Michael Laggart, Manager, Corporate Nuclear Licensing at (201) 316-7968.

Very truly yours, h

R. W. Keaten Vice President and Director Technical Functions c: Administrator, Regica 1 Senior Resident Inspector Oyster Creek NRC Project Manager a s e r. r~ c ' 00 L

9502060337 950201 9 i i

PDR ADOCK 0500 P

GPU Nuclear Corporation is a subsidtary of General Public Utilities Corporation

J ,.

ATTACHMENT I 15R Outaae - Completed Licensing Activities TAC No. ACTIVITY M51115 Reg. Guide 1.97, Instrumentation to Follow the Course of an Accident

- Redundant power supplies were implemented during 15R.

M74973 Generic Letter 89-19. Reactor Overfill Protection System (ROPS)

- System installed during 15R.

M85931 TSCR 208, Change Safety Valve Setpoint

- One safety valve was reset to new setpoint and installed during 15R.

M86904 IEB 93-03 / Generic Letter 92-04, RV Water Level Instrumentation

- Installed during 15R.

M89348 TSCR 206, Reactor Pressure Vessel Testing Clarification

- TS implemented during 15R.

t