September 29, 1993 Mr. Robert L. Long Distribution:
Vice President and Director Docket File ADromerick GPU Nuclear Corporation NRC & Local PDRs OGC Services Division PD I-4 Plant ACRS (10)
One Upper Pond Road SVarga JFRogge, RI Parsippany, New Jersey 07054 JCalvo JClifford JPartlow RJones
Dear Mr. Long:
SNorris AThadani
SUBJECT:
MODIFICATION TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION -
GENERIC LETTER 92-04, " RESOLUTION OF THE ISSUES RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION IN BWRs PURSUANT TO 10 CFR 50.54(F), DATED AUGUST 19,1992" AND NRC BULLETIN 93-03, " RESOLUTION OF ISSUES RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION IN BWRs" (TAC NO. M86904)
In response to the staff's letter of September 20, 1993, regarding the implementation schedule related to the modification of the reactor vessel water level instrumentation, GPU Nuclear Corporation (GPUN) by letter dated September 22, 1993, provided a revised schedule for installing this modification.
4 GPUN stated that in order to meet NRC concerns, steps will be taken to accelerate the readiness of the modification and installation.
GPUN also committed to install the proposed modification during any unplanned cold shutdown after January 7, 1994, with an anticipated duration which exceeds the minimum installation time of 14 days.
GPUN further indicated that in any event, GPUN will make the modification during its planned outage scheduled to begin in September 1994.
The staff has considered GPUN's commitment and finds it acceptable.
Sincerely, Original signed by:
9310070057 930929 James G. Partlow PDR ADOCK 0500 9
Associate Director for Projects G
Office of Nuclear Reactor Regulation cc: See next page
- See previous concurrence OFFICE LA:PDI-4*
PM:PDI-4 DdDI-4 PDV:4RR SRXB:DSSA mE SNorris ADho[(rYekIcn JS'thfL._.
JCliYford RJones/L[
DATE 9/23/93 G /) 793 h [ff93 3 /1A/93 y /25/93 I g
'DSSA:NRh AD:DRPE fl.f/
D;DITP'E ADPRkA
]
0FFICE NAME AThadani JCalvo S'V/rgdo JPartlob s
DATE
/ /93 "I ////93 W/M/b3
/M/93
//
OFFICIAL RECORD COPY i'
/
W. N,.
6,,
QfQft
([h O d')
J) ? d ////
f' yn-n,.
tidh ; m:l in e...u in, 3
' W $ '#
'd A
~
$ (dtjla f%w :
st O L
^;+
i t
g
)
f f"%
4k UNITED STATES i
,, t k,i
)W E
NUCLEAR REGULATORY COMMISSION g /j WASHINGTON, D.C. 2066Tc0001 September 29, 1993 Mr. Robert L. Long Vice President and Director GPU Nuclear Corporation Services Division One Upper Pond Road Parsippany, New Jersey 0705-4
Dear Mr. Long:
SUBJECT:
MODIFICATION TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION -
GENERIC LETTER 92-04, " RESOLUTION OF THE ISSUES RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION IN BWRs PURSUANT TO 10 CFR 50.54(F), DATED AUGUST 19,1992" AND NRC BULLETIN 93-03, " RESOLUTION OF ISSUES RELATED TO REACTOR VESSEL WATER LEVEL INSTRUMENTATION IN BWRs" (TAC N0. M86904)
In response to the staff's letter of September 20, 1993, regarding the implementation schedule relatd to the modification of the reactor vessel water level instrumentation, GPU Nuclear Corporation (GPUN) by letter dated September 22, 1993, provided a revised schedule for installing this modification.
GPUN stated that in order to meet NRC concerns, steps will be taken to accelerate the readiness of the modification and installation.
GPUN also committed to install the proposed modification during any unplanned cold shutdown after January 7, 1994, with an anticipated duration which exceeds the minimum installation time of 14 days. GPUN further indicated that in any event, GPUN will make the modification during its planned outage scheduled to begin in September 1994.
The staff has considered GPUN's commitment and finds it acceptable.
Sincerely, f
James G. Partlow Associate Director for Projects Office of Nuclear Reactor Regulation cc: See next page
i f
'43
\\
Mr. Robert L. Long Oyster Creek Nuclear Generating Station cc:
Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Nuclear Regulatory Commission 2300 N Street, NW.
Post Office Box 445 Washington, DC 20037 Forked River, New Jersey 08731 Regional Administrator, Region I Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 BWR Licensing Manager Trenton, New Jersey 08625 GPU Nuclear Corporation i Upper Pond Road Mr. John J. Barton Parsippany, New Jersey 07054 Vice President and Director GPU Nuclear Corporation Mayor Oyster Creek Nuclear Generating Station Lacey Township Post Office Box 388 818 West Lacey Road Forked River, New Jersey 08731 Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop:
Site Emergency 81dg.
Post Office Box 388 Forked River, New Jersey 08731 r
1
-