ML20141G140
| ML20141G140 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 01/06/1986 |
| From: | Donohew J Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| TAC-M55885, TAC-M59009, NUDOCS 8601090789 | |
| Download: ML20141G140 (19) | |
Text
- h UNITED STATES
.+
P NUCLEAR REGULATORY COMMISSION o
t a
wassmaTom, o. c.zossa January 6,1986 Docket No. 50-219 LICENSEES:
GPU Nuclear Corporation Jersey Central Power and Light Company FACILITY:
Oyster Creek Nuclear Generating Station
SUBJECT:
OCTOBER / NOVEMBER 1985 PROGRESS REVIEW MEETING ON LICENSING ACTIONS On Wednesday, December 11, 1985, at the facility site a meeting was held with GPU Nuclear (the licensee) to discuss the status of station licensing actions. Attachment 1 is the list of the individuals attending the meeting. Attachment 2 is a copy of the material presented by the Staff at this meeting. The following is a summary of the significant items discussed and the actions taken or proposed. is a marked up copy of the staff's Licensing Actions Report (LAR) for Oyster Creek. The markup, to update the LAR, resulted from.the discussion on each item in this meeting. The status of each item is given in the column "SCT0ADTE" on the right-hand side of the LAR sheet. The status in that column is the following: "01" means licensee, "02" means staff's reviewer, "03" means staff's project manager, "04" means action completed and "05" means staff's project manager has action in concurrence.
1.0 TAC M55885, Diesel Generator Reliability Technical Specifications The licensee stated that a Technical Specification Change Request (TSCR) will be submitted soon to reduce the requirement on loading existing systems on the emergency diesel during surveillance testing.
2.0 TAC M59009, Backup Thermocouple To The Relief Valve Position Indication In its letter dated June 28, 1985, the licensee stated that it recognized the need for more permanent changes in the area of backup indication to the relief valve position indication in the Oyster Creek Technical Specifications (TS). The licensee stated it intended to submit a request for additional changes to the TS.
This was part of Amendment No. 88 dated July 1, 1985 to the TS.
The licensee stated that it has not submitted such a TSCR and, based on its review of Amendment No. 88, it has concluded that additional TS are not warranted.
It will not submit additional TS in this area.
D 9
JAN 061986 3.0 Licensee Impact Date The staff requested that, in future TSCR, the licensee should include a date when the licensee will be impacted if the issue is not resolved and why. An example would be additional surveillance which would not have to be done if the TSCR is accepted.
4.0 High Priority Licensing Actions is a list of the high priority licensing actions. These were taken from the overall list of licensing actions in Attachment 2.
5.0 Next Meeting The December Progress Review Meeting was tentatively set to be held at NRR/NRC headquarters in Bethesda, Maryland, on January 22, 1986.
- s. sh;aed by h 2w.bhdA Jack h. Donohew, Jr., Project Manager BWR Project Directorate #1 Division of BWR Licensing Attachments:
1.
List of Attendees 2.
Staff's Handouts cc:
R. Bernero R. Houston J. Zwolinski G. Lainas B.D. Liaw W. Hodges G. Hulman M. Srinivasan D. Vassallo C. Grimes DISTRISUTION C; N A7/
NRC PDR Local PDR BWD#1 Rdg JZwolinski JDonohew OELD EJordan BGrimes ACRS(10)
NRC Participants T
DBL:PD#1 L:PD#1 DBL:PDf1 CJamerso
,pdDonohew:tm JZwolinski p /3\\/85 t /2 /8s i/.t,/85
4 January 6,1986 3.0 Licensee Impact Date The staff requested that, in future TSCR, the licensee should include a date when the licensee will be impacted if the issue is not resolved and why. An example would be additional surveillance which would not have to be done if the TSCR is accepted.
4.0 High Priority Licensing Actions is a list of the high priority licensing actions. These were taken from the overall list of licensing actions in Attachment 2.
5.0 Next Meeting The December Progress Review Meeting was tentatively set to be held at NRR/NRC headquarters in Bethesda, Maryland, on Janua 22, 1986.
1
~
Jack N. Donohew, Jr., Pro ect Manager BWR roject Directorate 1 Division of BWR Licens g Attachments:
1.
List of Attendees 2.
Staff's Handouts cc:
R. Bernero R. Houston J. Zwolinski G. Lainas B.D. Liaw W. Hodges G. Hulman M. Srinivasan D. Vassallo C. Grimes l
cc:
G. F. Trowbridge, Esquire Resident Inspector Shaw~, Pittman, Potts and Trowbridge c/o U.S. NRC 1800 M Street, N.W.
Post Office Box 445 Washington, D.C.
20036 Forked River, New Jersey 08731 J.B. Liberman, Esquire Commissioner Bishop, Liberman, Cook, et al.
New Jersey Department of Energy 1155 Avenue of the Americas 101 Comerce Street New York, New York 10036 Newark, New Jersey 07102 Eugene Fisher, Assistant Director Regional Administrator, Region I Division of Environmental Quality U.S. Nuclear Regulatory Comission Department of Environmental 631 Park Avenue Protection King of Prussia, Pennsylvania 19406 380 Scotch Road Trenton, New Jersey 08628 BWR Licensing Manager GPU Nuclear 100 Interpace Parkway Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731 Mr. P. B. Fiedler Vice President & Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731
r MEETING December 11, 1985 Name Affiliation K. Tosch NJBRP*
W. Cristali NJBRP J. Donohew NRC/NRR/BWR M. Laggart GPUN#
J. Thorpe GPUN G. Busch GPUN J. Zwolinski NRC/NRR/BWR J. Kelly (Part-time)
NRC/NRR/BWR
- State of New Jersey Bureau of Radiation Protection
- GPU Nuclear Corporation
?
l i
4 i
""''+'t,-e
6 ATTACHMENT 2
g lQ l
O i,l i
~
R-12ss473 REOULATSRY INF0RMAT s
TRACKIN9 SYSTEN P,.
.: des.
(f BIVISION OF LICEltSIIIS RUlf BATE: 11/18/85 LICENSING ACTIONS REPORT i
(NEABOUARTERS)
(
i%
l FACILITY: OYSTER CREEK 1 PROJECT MANAGER: J. DONOMEN PLANT LOCATI0ll: 9 MI S OF TDMS RIVER, NJ LICEleSES POWER: 1930 feff
- h 30CKET NuMsER: 858-08219 DESIGN POWER:
8650 pe4E BRANCN CHIEF:
J. 2HOLINSKI
(
ARCN/ ENGINEERS BAR NSSS VENDOR:
GE LIC. ASSISTANT:
C. JAMERSON IE INSPECTOR:
M. BATEMAN i%
T SC MULTI Y
NOTICE R
REV RESP 00tSE SE IIIPUT LIC ACT A3 MINIBER ACTISM 3&IE 1
EXPIRES 1 BRgg REVIEBM'E RAI MTE BATE TER MTE
_ BATE BATE CofWtENTS Ig 1%
NNNN gIng ACT10MS NNNN 4
h
!% ACTISIl ITEM: SYSTER CREEK - APPENDIX I TEC98 SPEC IMPLEMENTATIO11 REVIEN feestes A-02 87/11/7s A 83/3s/85 3 ORB 5 BOIIONEN
- ?t % ^ ^
N 01 84/26/85C "E3""E 01/31/Yf 02/2.9/iiiCT~
4 ACTION ITEste SYSTER CREEK - IEECMANICAL SNUSSERS
^^ -
08/38/85
-40s*50s G99-RE01011 I, a
1883459 3-22 88/38/78 A desseemee8' 2 MER SNAM a%s/n n!! CM
"[t'5/256 c"A/ar "'"'
5 g@
RE01 NAVERKAIF 10/31/85 l
RE01 GREGO jlh RE01 JONIIS006 11/30/85 O
I REE a
.A.CT.I.ct.s ITENs SYSTER C./7.K.- N.YDR.A.UL.IC SIIUSSER.S y
/3.,.5 e-RE010,, I, 5c.
oysi/ar
.-1T
,3
.A 3 Me SNA.
saaur 08
- t CW ipsg 18/31/85 l
REDI HAVERKAfr RE01 GRE00 jD RE01 JOHetS006 11/38/85 j
ACT1011 ITENs WYSTER CREEK - FtfLL TEIWI SPERATIIIS LICEllSE
- 3 ft11268 83/06/72 A.
1 ors 5 seIIGHet 09/01/86T SS LPS2 HICNAELS 96/07/85X j9 n*
CTISIE ITEM: SYST.ER CREEK - INSERVICE TESTIIIS CIST)
,p A
M11270 S /99/76 L 1 NES CNERIff 41/30/84T 02
'l NER PAGE 12/31/45
- i ors 5 s0 NOMEN O
l
,ACTIOII ITEM: SYSTER CRE5K - LOIIS TERM REVIEN COIITAIINEElff PUR9E ANS VENT C3-243 04/25/84C -44/48485-NION PRI F j l,,.4942613 3-24 11/29/7s L 1 CSS SNAPAKER 89/24/85C a/upsr or y
i '#
I ft
{
4 I tre emuges*Ast914p Ameaugusteamppelmesesesas e a==
.. s.
t
- 4. u :li '.i. t J. i/
i..
4
n.-
.... ~..
~- ~
o o
3 R-1208473-00.
REOULAT0RY INF0RCAT TRACKINO
$YSTED PAL _.. l. : 604 DIVISION OF LICEWSING RUN DATE: 11/18/85 l! CENSING ACTIONS REPORT l
(HEADQUARTERS)
FACILITYs OYSTER CREEK 1 T-SC l
MULTI Y
P RAI TO r
TAC PLANT INIT P
NOTICE R
REV
RESPONSE
SE INPUT LIC ACT AD MUMBER ACTION RME E
EXPIRES 1 DREli REVIEMER RAI DATE
__, PAL TER DATE BATE DATE COP 9 TENTS Ig munu ACTIVE ACTIONS NMMN (CONTINUATION) n ors 5 DONOMEM ORB 1 FAIRTILE 04/25/84C g,
ACTION ITEM: SYSTER CREEK - MASONRY MALL DESION. RESPONSE TO IE BULLETIN 80-11 M2914 3-59 05/08/80 L 2 SGER CHOKSHI 08/14/85C m12/st/85m 12/30/85T CYCLE XI O ORE 5 DON 0 HEN UTAGE c
ACTION ITEM SYSTER CREEK - SAFETY CONCE S ASSOCIATED MITM PIPE BREAKS IN THE BNR SCRAM SYSTEM M43717 E-65 06/06/82 L 2 ASB HERMIEL 01/08/82X 12/30/85T SEND OUT O 02
(*
ORES DONOMEN ENERIC SE PMAB ECCLESTON 05/10/85X ASB CHANDRASEKAR 11/02/84C C
ACTI64 ITENs OYSTER CREEK 1 - PROCEDURES OEMERATION PACKAGE REVIEN (NUREO 0737 SUPP/1)
M44324 F-05 L
1 RSS SHERON 37/30/86 10/31/85C 06/30/86 05/03/85X 03/30/87T 02 ORES DON 0 HEN c
PTRE DELISO O2/28/87 ACTION ITEM. SYSTER CREEK - NUREG-0737 III. A.i.2. TECHNICAL SUPPORT CEffTER c
M45967 F-63 L
1 OR85 DON 0 HEN 04/01/86T CONF. ORDE 02 R 6/12/84 ACTION ITEM: OYSTER CREEK'- idNtEG-0737 III. A.1.2, OPERATIONAL SUPPORT CENTER M46038 F-64 l
1 DRD5 DON 0 HEN 04/01e86T CONF. ORDE 02 R 6/12/84 C
MCTIONITEM: SYSTER CREEK - NUREG-0737 !!I.A.1.2, EMERGENCY OPERATIONS FACILITY M46110 F-65 L
1 OR85 DONOMEN 04/01/86T CONF. ORDE 02 R 6/12/84 q
ACTION ITEMS OYSTER CREEK - NUREG-0737 III. A.2.2, METEOROLOGICAL DATA UPORADE C2 M46326 F-68 L
METB SPICKLER ORB 1 NEIGHBORS 06/07/85X b
l m
l 1
s s
l b
O<,1:
3 1200473-001 RESSLATSRY INF0RMAT10N TRACK 1NO
$YSTEN P40E 100.
405 DIVISIGIf OF LICENSINO RUN BATE: 11/18/85 LICENSING ACTIONS REPORT (NEA900ARTERS)
- PACILITYI OYSTER CREEK 1 7
SC MULTI Y
NOTICE R
REW RESPollSE SE INPUT LIC ACT ADIg,ll MINIBER EI13 MIE E
EXPIRES 1 MM REVIERER RAI MTE RATE TER RATE BATE RATE C1N01ENTS 3 usan ACTIVE ACTIONS WWWE (CONTIN 0ATISII)
- I t
ACTION ITEMS SYSTER CREEK - NURE9-0737 !!I.9.3.4, CONTROL ROOM MARITASILITY 3 M6466 F-70 L
1 OROS 30 NOMEN 08/16/8SC
-46*Ses'99P-CYCLE 11/1 02
-l AEB REAR 94/05/8SX y/3 p OUTAGE 3
AES DEMPSEY 11/30/85 I
AEB OUAV 3
SABR CAMPE 07/30/SSC ACTION ITEM: SYSTER CREEK - WINB LSABS
't J Ig49392 10/01/82 L 1 LPS2 MICNAELS 10/31/84C 04/07/8SX 01/30/84T IPSAR 4.3.
92 i
SEPB CNEN 12/30/85 1-7 l
LGB PERSINKO 97/05/85X l
ORBS BONOMEN 97/29/83 l
6 g
ORAB MCKENNA 07/31/85 ACTION ITEM: SYSTER CREEK - TOINIA00 MISSILE SAMAGE g Ig49394 18/81/82 L 1 ORB 5 BONOMEN 07/03/SSC 04/29/83 --44s*40405-IPSAR 4.6.
82 LP32 MICHAELS 96/07/85X Oy BC%T1,2,4 ASS NILSON 84/05/85X P
t ASS 00EL 18/30/85 J
~I ACTISII ITEM: SYSTER CREEK - TSRBilIE NIS$1LE m9393 10/01/82 L 1 Ott$ SONONEW 03/31/83 4440s*699-IPSAR 4.7 02
- J LPBZ MICNAELS 86/07/85X ACTISIB ITEMS SYSTER CREEK - EMElIDEIICY CONSENSER ISOLATION g M49397 10/01/82 L 1 ORBS 30 NOMEN N/A 03/31/83 01/30/847 IPSAR 4.10 02 r
SEPB BOYLE 12/30/85 (2)
ORAB MCKENIIA 94/27/84X LPBZ MICNAELS 06/07/85X g
ACTISII ITEM: SYSTER CREEK - SEISMIC DESIGII i
M49598 to/01/82 L 1 ORSS DOIIONEN 06/11/85C 01/31/84 04/30/84T CABL AY O2 SEPS CNEIIG 85/30/86 IPSA
.11 j
LPS2 MICHAELS 86/07/85X W
J l
l
?
i
g
._,..,.s.
/,i R-1208673-L REoULAT0RY INF0RMAT
, N TRACKINO SYSTEM F.. c. NO.s 606 3
DIVISION OF LICENSING RUN DATE: 11/18/85 LICENSING ACTIONS REPORT (HEAD 9UARTERS)
FACILITYe OYSTER CREEK 1 T
SC 7
MULTI Y
NOTICE R
REV
RESPONSE
' NUMBER ACTION RAIK g
EXPIRES 1 REQH REVIENER RAI BATE DATE TER. TATE DATE DATE C0fffEMIX IE 3
N"J'N ACTIVE ACTIONS numM (CONTINUATION) i i
ACTION ITEM: OYSTER CREEK - DESION CODES AND STANDARDS M49399 10/01/82 L 1 LGB PERSINRO 04/28/84C G6/07/85 07/85/85X -44#,4467-IPSAR 4.12 et l7 LGB CHALINA 06/22/84X g l gyp * -
07/29/85 DRB5 DONOHEN 04/27/84X ORAB MCKENNA LPB2 MICHAELS 06/07/85%
I NN NO L
5 DON 0 HEN 98/23/85U O!/31/8s
.4se43439. IPSAR 4,1g 3
l ORAB MCKENNA J4/27/gaX gjgjpgp
,a LP32 MICHAELS 06/07/55X UW&
N ACTION ITEM: OYSTER CREEK - NATER PURITY SPECIFICATION M49404 11/01/82 L 03/30/85 1 ORB 5 DON 0 HEN 09/18/84C 01/31/84 M,.e99-SAR 4.20 as-ORAB MCKENNA 04/27/84X A f *>4r k7 3
)
LPBZ MICHAELS 06/07/85X ACTION ITEMS OYSTER CREEK - NEUTRON MONITORING ISOLATION 3 M49408 12/01/83 L 1 OR35 DON 0 HEN
!? - J ^--
02/28/85
.44/44457-IPSAR 4.27 01 O
8!X Wlh i '
LS ACf!ON ITEM: OYSTER CREEK - BATTERY STATUS ALARMS
^J^--
02/28/83
'""'""? -IPSAR 4.32 81
^'
M49410 12/01/83 L 1 ORB 5 DONOMEN
- @ g[h 05[*5 MET-ORA 3 SCHOLL 06/22/83C i
ACTION ITEM: OYSTER CREER - PRIMARY COOLANT ACTIVITY
^ "M49412 12/01/83 L 03/30/85 1 ORB 5 DONOMEN N
01/31/84
- '*"*""* IPSAR 4.34 p
og/zg/gh 06/07/85X 7 g g
LP32 MICHAELS ACTION ITEM: ' OYSTER CREEK - MAIN STEAM ISOLATION VALVE MAINT.
A M49413 12/01/83 L 1 ORB 5 DON 0 HEN 09/12/05C 01/31/84 44444457-IPSAR. 4.38 82 g-, g g ' g LPS2 MICHAELS 06/07/85X "s
a 11
......_.._..E.;.._..
_~..6 R-1208673-001 REOULAT0RY 2NF0RMATION TAACKINO SYSTEN PAGE NO.s
'6 85 DIVISION OF LICENSING RUN DATE8 11/18/85 LICENSING ACTIONS REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 i
SC Q
MULTI Y
NOTICE R
REV
RESPONSE
NUMBER ACTION R&IE g
EXPIRES 1 DjtQli REVIEMER RAI_DATE DATE TER.DATE
__DATE_.,
')
CNwN ACTIVE ACTIONS NNNN (CONTINUATION)
ACTION ITEM OYSTER CREEK 1 - INSTRUMENTATION TO FOLLOM THE COURSE OF AN ACCIDENT (RO 1.97) i 1 ~M51115 A-17 04/04/83 L ORB 5 DONOMEH t'""'0"
$5/01/86T REV.1 COM 01 ORB 5 SHEA 01/ 30/M3 ING ICB JOYCE 04/01/86 O2 ACTION ITEM OYSTERCREEK1-I.D.2.SAhETYPARAMETERDISPLAYSYSTEM M51265 F-09 04/04/83 L ADSA MILLER
??.' t ",."" "-
N/A
??'!"'*5T ISOLATOR D S(
ATA NEEDED /
HFEB LAPIMSKY N12/30/85N PTRE MCC0Y ICS JOYCE 11/17/85
+
ACTION ITEM OYSTER CREEK - REVIEN FINAL ENVIRONMENTAL STATEMENT (FES) FOR POL /FTL CONVERSION M52336 03/21/83 L ORB 5 DON 0 HEN 01/15/86T RETS COMP. 83 EHEB LAROCHE 10/19/84C NEEDED D
EHEB HICKEY EHER SAMHORTH i
O ACTION ITEM SYSTER CREtt - SEP ACTION ITEMS - IPSAR SUPPLEMENT TIA M52482 T007 X
ORES DONOMEN 04/30/86T IPSAR TIA 03 LPB2 MICHAELS 06/07/85X l
1 ACTION ITEM: OYSTER CREEK 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS
.M52863 3-77 11/01/83 L ORB 5 DON 0 HEN 04/05/85 10/23/85C 11/30/867 02 l
ICS LASHER 10/30/86
!D l
J CTION ITEM OYSTER CREEK 1 - ITEMS 3.1.1 A 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONENTS l
M52944 3-78 11/01/83 L DRB5 DONOMEN 12/30/85T REGION I 02 O
RE01 HAVERKAMP 11/30/85 RE01 SILK 0 09/30/85 RE01 JOHNSON 11/30/85 RE01 SCHUMACHER O
ACTION ITEMS OYSTER CREEK 1-ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS
,,M53025 3-79 11/01/83 A ORB 5 DON 0 HEN 04/05/85 10/23/85C 07/30/86T 02 D
D s
p
=. _ _. _
..,_,..._,,,,c R-1208473-l REOULATORY INF0RMAT TRACKINo SYSTEM
_ h.s c 8
DIVISION OF LICENSING RUN BATE: 11/18/
l LICENSING ACTIONS REPORT e
(HEADOUARTERS)
FACILITYs OTSTER CREEK 1 j
Y l
4' MULTI Y
NOTICE R
REV
RESPONSE
SE INPUT LIC ACT l
NUMBER ACTION 3&T,g g
EXPIRES 1 gggg REVIEMER RAI DATE DATE TER BATE BATE DATE C0f0EENTS I
(CONTINUATION) l i tNNN ACTIVE ACTIONS NNNN ICS LASMER 96/30/86 i
l ACTION ITEMS OYSTER CREEK 1 - ITSI 1.2 - POST TRIP REVIEN-DATA AND INFORMATION CAPA31LITY l
M53615 3-85 11/01/g4 L ORBS DON 0 HEN 04/15/84T C
j HFEB KRAMER 95/15/84 i
i 4
i ACTISN ITEMS OYSTER CREEK 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR. COMPONENTS M53698 B-86 11/01/84 L ORB 5 DONOMEN 04/05/85 10/23/85C 01/30/877
(
i ICS LASHER 12/30/86 i.4 1
ACTION ITENs OTSTER CREEK 1-ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR REC 0f00ENDATIONS - ALL SR COMPONENTS I
M53781 3-87 11/01/84 L ORBS DON 0 HEN 12/30/85T C
! )
RE01 MAVERKAfr 11/30/85 i
RE01 SILKO 09/30/85 l
RE01 JOHNSON 11/30/85 RE01 SCHUMACHER j
{)
i ACTION ITEM: OYSTER CREEK 1 - ITEM 3.2.3 - POST-MAINTENANCE TESTING -CHA900ES TO TECH. SPEC. - ALL SR COMPONENTS M53864 B-88 11/01/84 A ORB 5 DONOMEN 04/05/85 10/23/85C 12/30/86T C
)
ICB LASHER 86/30/86 l
ACTION ITEMS OYSTER CREEK 1 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUIICTIONAL TESTIIIS - ALTERNATIVES 8 TEST INTERVALS
) M54008 B-93 11/01/84 L ORB 5 DONOMEN 04/05/85C 10/23/85C 04/30/86T C
l ICS LASHER 93/31/84 l ')
ACTION ITENs OYSTER CREEK 1.- ITEM 4.5.1 - REACTOR SYSTEM FUllCTIONAL TESTIIIO - BIVERSE TRIP FEATURES i
l M54091 3-92 11/01/84 L ORB 5 DONDHEN 08/09/85C 12/30/837 RES I
(
j i
RE01 MAVERKAOF 11/30/85-RE01 SILKO 09/30/85
's RE01 JOHNSON 11/30/85 i
RE01 SCHUMACHER
! 's ACTI0lt ITEMS OTSTER CREEK 1 - TECHNICAL SPECIFICATI0ltS COVERES BY GENERIC LETTERS 83-34, 83-37 FOR leUREG-0737 t
3-83 05/28/84 L 05/30/85 SSPB PATEL 01/15/85X -ter+545T-ll"M54554 ORB 5 DONOMEN o
i 04/04/85C g ms ORB 5 ERICKSON s e l II 1
3----- I 1 R-1208473-001 REOULAi0RY INF0RMATION TRACKINO SYSTEM PAGE NO.'s DIVISION OF LICENSING RUN DATE: 11/1 I LICENSING ACTIONS REPORT (HEAD 9UARTERS) 9
- FACILITYs OYSTER CREEK 1 7
7 MULTI Y P RAI TAC PLANT INIT P WOTICE R REV
RESPONSE
SE INPUT LIC ACT NUMBER ACTION R&IE E EXPIRES 1 Aggg REVIENER RAI BATE DATE TER DATE DATE DATE CDP 0fENTS 7 nunu ACTIVE ACTIONS NNNN (CONTINUATION) l ORAS SCHOLL M 12/3o g g 04/05/85X _% ;';Q;;.,. - M i 7 ACT!uN ITEM: SYSTER CREEK 1 - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN SIN 0lARY REPORT - F-71 ~ M56147 F-71 10/22/84 ORB 4 NICOLARAS 84/08/85C 05/28/85 HFEB RAMEY-SMITH 05/31/85C
- Scu,
=s i ORBS DONOMEN [ MFEB RAMIREZ 06/07/85X j j f ACTION ITEMS OYSTER CREEK - LICENSEE'S PROPOSED (:NANGES TO THE APPROVED ALTERNATE SAFE SHUTDOWN 12 4 N[3o/259-NION PRIOR 1 i ) M56740 01/22/85 ORB 5 DONOMEN 10/09/85C i ASB MILSON 04/05/85X ITY / { ASE 00EL 07/11/85C ACTION ITEM: OYSTER CREEK - RESPONSE TO It BULLETIN 82 REACTOR COOLANT SYSTEM' LEAKAGE 12/$0,/&69 i M56754 10/22/84 11/15/85 ORBS DON 0 HEN 08/23/85C ORAB CARUSO 07/12/85X i U I j ACTION ITEMS OYSTER CREEK - EXEMPTIONS TO APPENDIX R - FIRE PROTECTION PROGRAM \\7/gp 3 M56746 01/22/85 CMEB KUBICRI 10/09/85C 08/28/85C __ __. NION PRIOR ' ) ORB 5 DON 0 HEN ITY / I ACTION ITEM: SYSTER CREEK - CHANGES FOR CLARIFICATION ANS CONSISTENCY AMONO ACCIDENT MONITORING INSTRUMENTATION 4 { ) M56918 02/11/85 05/30/85 ORB 5 DONOMEM d i ACTION ITEM: OYSTER CREEK - REMOTE MANUAL VALVES (VI-4) 1 ' ) M56951 10/01/82 ORB 5 DONOMEN 08/27/85C -6343485--IPSAR 4.22 g g .2 1 ORAB MCKENNA ) ' ACTION ITEM: OYSTER CREEE 1 - MARC 1 BRYNELL VACUUM BREAKERS, LICENSEE RESPONSE TO OENERIC LETTER 83-08 M57161 D-20 05/20/85 ORB 5 DONOMEN 04/11/85 -- *:^^^-0" 4840459-- RAI i alz imMIt, 2/'n/g6 +/sojaT zs'a5x I l JM57758 CTION ITEMS OYSTER CREEK - EXTENSION TO 10CFR50.44(C)(3)(II)(3) - TMI ITEM II.E.4.1 l 8 12/24/81 ORB 5 DONOMEN 08/14/85C .=t**383855:-SEE M58018 l ) 02/z.7/iLT 1
i O __-..._g..._,......,... (^i.._,y t t" R-12846T3-Obr REOULAT0RY INF0RMAT TRACKINO SY$7EM Pk;- No.: 610 DIVISION OF LICENSING RUN DATE: 11/18/85 l LICENSING ACTIONS REPORT I (HEAD 90ARTERS) f FACILITYs OYSTER CREEK 1 l T' SC i MULTI Y P RAI TO i TAC PLANT INIT P NOTICE R REV
RESPONSE
SE INPUT LIC ACT AD
- pfUMBER ACTION DAIE E
EXEJRES 1 910l[ REVIENER RAI RATE DATE TER BATE DATE DATE C0fWlENTS Ig b urum ACTIVE ACTIONS unum (CONTINUATION) N 1 ACTION ITEM: OYSTER CREEK - EXTENSION TO CONF. ORDER BATED 3/14/83 - CONTROL ROON HABITABILITY OMMT j n M57995 06/04/85 g g ORBS DONOMEN
- 1 : _ _.
93 Clhlh_.7 l ACTION ITEM: SYSTER CREEK - DISCREPA10CY IN BRAN 1100$ USED IN SEP REVIEN DUTSIDE DR 92 i M58ee4 96/13/85 ORB 5 DONOMEN 07/01/85C 88/30/85 SEPB CHENG YNELL ORAB MCKENilA $\\ YWhT 1 ACTION ITEMS OYSTER CREEK - OL 84 EXEMPTION REGUEST TO 50.44(C)(31-RECOMBINER RULE 82 SEE M57734 M58018 87/13/84 ORB 5 DON 0 HEN 08/14/85C CSB KUDRICK uO2/15/86u i j ACT1006 ITEMS OYSTER CREEK - NEN ANALYSIS OF MAXIMUM DRYMELL TEfrERATURE PRIOR TO LOCA N21/ E M59052 97/02/85 ORB 5 DONOMEN 08/01/8$C 40.aSer099= b CSB NOTAFRANCESC 08/14/85C l . ACTION ITEM: OYSTER CREEK 1 - 10 CFR 50.42 OPERATING REACTOR REVIENS i s
- M59122 A-20 96/28/84 ORS 5 DONOMEN 10/04/85C 04/15/867 ATHS SA RE 02 ICS KENDALL SPONSE 1
ORAS KARSCH 11/01/85X l t~2/3o O l -;;,;^^/f5T-ACTION ITEM SYSTER CREEK - POST ACCIDENT SAMPLIlle SYSTEM TECHilICAL SPECIFICATIONS .;7 -- l M59281 86/14/85 99/28/85 ORB 5 DON 0 HEN I f ' ACTION ITEM 8 SYSTER CREEK - itEVIEN OF DELAMINATIDIl 0F COATIles FROM PIPIIIe IN EMER0ENCY SERVICE HATER
- J 59282 CMEB HITT 09/20/85X 12/30/857 ORB 5 DONOMEN l
ASB 00EL 11/30/85 l i e CMES KIRSLIS 1 I.b MC. M i ~ ACTION ITEM: OYSTER CREEK - LIMITATION 001 OVERTIME AS IDENTIFIED IN GL85-02 a M59340 87/22/85 09/28/85 LPB4 HOOD 08/92/85X N + OR55 DONOMEN ) l = 1 8 j It j ll s
.. ~.... R-1298675-991 R E O U L A T'O R Y INF0RMATION TRACKINO SYSTEM PAGE NO. 411 t DIVISION OF LICENSING 'RUN DATE: 11/18/85 I LICENSING ACTIONS REPORT (HEAD 9UAitTERS) FACILITY 8 OYSTER CREEK 1 T SC MULTI Y P RAI TO TAC PLANT INIT P NOTICE R REW
RESPONSE
SE INPUT LIC ACT AD l.HUMBER ACTION R&IE E EXPIRES 1 gggg REVIENER RAI BATE DATE TER BATE DATE DATE C0f9 TENTS IE l tr::a ACTIVE ACTIONS NNNN (CONTINUAT1000) ACTISH ITEM: OYSTER CREEK - EXEMPTION OF 19CFR$9.44(C)(3)(!!!) - ISOLATION CONDENSER VENT .3/16/8_6T* i
- M59542 07/25/85 ORB 5 DON 0 HEN
' ' ^ ^ ';, ;; n 31 RSS HODGES ggg" l l t d &/,,'tT/86T ACTI0ll ITEM OYSTER CREEK - DEFERMENT OF pitC RE9UIRED MODIFIC FROM CYCLE R TO CYCLE 12ft Of;- - HION PRIOR
- ,M594st 07/26/85 ORS 5 DONOMEN gg 31 M ITY i
EMER NESCOTT CSB ELTANILA i l lM59665 i ACTION ITEM OYSTER CREEK - EXPANDED SAFETY SYSTEM FACILITY STATUS O2[lE[6-09/5e/867 et i 05/11/85 C ACTION ITEMS OYSTER CREEK - SCOPE CHANGE FOR RECIRCULATION LOOP INTERLOCK, II.K.3.19 yyg!T* M59758 09/19/85 ORBS DON 0 HEN -' ' ' Oc;, -- _a ' ' _A 31 i RSB H0DGES ogjgojpg i 1 ACTION ITEM SYSTER CREEK ~ MAIN SEctNt!TY BUILD!lle POST ACCIDEMt $NIELDING 11.8.2 Ol/30/EloT M59778 09/09/85 ORB 5 DONOMEN -+3s*50e099-02 i ACTION ITEMS OYSTER CREEK - DELETE DAILY CNAlelEL CNECK FOR INSTRUMENTATION TO SE INSTA i M59814 99/30/85 11/25/85 ORB 5 DON 0 HEN es i ' ACTION ITEM 8 OYSTER CREER - CAllCELLATION OF VENT AND PtNt0E VALVES kEPLACEMENT 1 ' M59828 89/24/85 CSB ELTANILA ' a = _-'J 32 l' ORBS DON 0 HEN 3[l/$']~ ESB HitIGHT l ' ACTION ITEM SYSTER CitEEK - CAllCELLATION OF UPoltADE OF NITROGEN VENT AND PURGE SYSTEM ~ l M59829 09/24/85 CSB ELTANILA 43.a04.seSY-02 4 ORBS DONOMEN kl%[b7 j AEB BELL l ~ t j
,.,.k, R-1208673 REOULAT0RY INF0RMAT TRACKINO SYSTEM Pk...O. s 60 h DIVISION OF LICENSING RUN DATE: 11/f8/8 LICENSING ACTIONS REPORT (HEADQUARTERS) n FACILITY: OYSTER CREEK 1 'i y 7 h MULTI Y P
RESPONSE
SE INPUT LIC ACT At RAI TO TAC PLANT INIT P NOTICE R REV NUMBER ACTION DAIK E EXPIRES 1 D805 REVIEMER RAI.DATE DATE TER DATE DATE DATE C0fG1ENTS y i CN:sm ACTIVE ACTIONS MNuM (CONTINUATION) ~3/6/%T ACTION ITEM: OYSTER CREEK - CANCELLATION OF MODIFICATION TO INSTALL PRESSURE RCLIEF IN PURGE ANO VENT EXHAUST DUCT 4/ 02 l l M59830 09/24/85 ORB 5 DON 0 HEN -.4G b ;;37 ADPS KAPO Il[t3/if6c_ l 1 ACTION ITEMS OYSTER CREEK - REVISE ACTION STATEMENT FOR LON-LON REACTOR'NATER LEVEL CNANNEL INOPERASILITY-CYCLE 10 MONTAGE OL l i M59895 18/11/85 ORB 5 DON 0 HEN /O' /On-a b. i ACTION ITEM: OYSTER CREEK - REVISE OPER' ABILITY OF LON-LON REACTOR NATER LEVEL INSTRUMENTATION FOR REACTOR VESSEL ISOLATION O C/,;/O,- p M59955 10/11/85 ORB 5 DONOMEN Olk% g RSB HODGES 0 3/ 31 % f i NNM COMPLETED ACTIONS nun ACTION ITEM: OYSTER CREEK 1 - DIESEL SENERATOR RELIABILITY TECH. SPECS. (0L 84-15) J l l l M55885 D-19 09/20/84 OR55 DON 0 HEN 10/07/85P 10/07/85C 0, t I OYSTER CREtX - FEBRUARY 11, 1985 CHANGES TO ISI/IST > ACTION ITEM: M56800 02/11/85 04/27/85 ORB 5 DON 0 HEN 10/18/85C 10/18/85C REGION 1 0: 1 RE01 CAPHTON 10/18/85P RE01 MAVERKAMP 08/09/85C RE01 KUCHARSKI 10/18/85P t RE01 JOHNSON 08/17/85C l i i i ACTION ITEM: OYSTER CREEK - SALP MEETING FOR SEPTEMBER 1985 I M57492 04/25/85 ORB 5 DON 0 HEN i 10/28/85C 10/28/85C O' i ORAB MCKENNA 08/09/85C 1 = l l I 4 I 3.... a i.ai.+wma puneuppswespesussupsamiswam. a*w 4 ...V... ,,, :.f ilI' 6 3.I.: / et
? Csrnrywits/ g [ LN._ RC.s 5 dM TL y (#sas ) O h = i c ivb R5) / y uTns bimtwn Vukun aval. Ot/\\2] Ele of 6 00 % A % (nh/ar) 3 L hp wch 6 ~' (?ag ' Cs oil w /a6 s L. h 10 FA 50.5% f ~ G ) r Mucidfuth jV1 ho n.w ob [ So.12/h=, Ts ') ts) i - wa s. rust 9 anal &% oWvs; t. + [ ~ Coma d Q W) isms 4 ~ ~ i U vnw.ag. colspg ~ O2 ge zes e +.a.2 q wsj D m = w he m -e= m um que e e+e e e e '4m-eee&a e-ee -.-.-e .) w.,-,,,-,----.--,-.,,,.--,-.----y-_m ,,,,v--. -e,----e-w a.ww-.y.,----- - - - - -,wm .--e.
High Priority Actions dated December 11, 1985 Staff 1986 SE TAC Title Branch Target Date Status 60156 Deferment of Feedweter Engineering February
- 02 Nozzle Inspections 60153 Cancel Modification Plant System February
- 02 Torus Pool Temperature Monitoring 60152 Cancel Modifications Torus Plant System February
- 02 Pool Thermal Mixing 59935 Revise Operability of Reactor System Fet mary
- 02 low-low RCS Water Level 59830 Cancel Modification to Plant System February
- 02 Install Pressure Relief 59829 Cancel Modification to Plant System February
- 02 Upgrade N2 Purge / Vent System 59828 Cancel of Purge / Vent Valve Plant System February
- 02' Replacement Engineering February
- 59758 Scope Change For Reactor System February
- 01 Recirculation Loop Interlock, II.K.3.19 59400 Deferments from Cycle 11R BPD#1 January 01 Outage 59342 Exemption To RCS Vent Reactor System February
- 01 58018 Generic Letter 84-09 Plant System February
- 02 58004 Discrepancy In SEP**
Integrated Safety January 02 Drawings Assess Directorate 49394 Tornado Missile Damage Plant Systems March *** 49397 Emergency Condenser Integrated Safety March *** Isolation Assess Directorate 49398 Seismic Design - SEP** Integrated Safety December 1985 02 Assess Directorate 49392 Wind Loads - SEP** Integrated Safety December 1985 02 Assess Directorate
Staff 1986 SE-TAC Title Branch Target Date Status 46466 Control Room Habitability Reactor System December 1985* 02 08100 _ Appendix I TS BPDf1 February 01
- Action involved with Cycle 11R outage which begins April 1986.
- Involved with licensees work on IE Bulletins 79-14/02 and/or package is at Director's desk.
- Old SEP reviews with licensee's submittals with reviewer and needed for FTOL conversion.
- Involved with licensees work on IE Bulletins 79-14/02 and/or package is at Director's desk.
i o a--- r wr--r, w- ,-,e,mn--,n.. ,4. ,--re- --wa-}}