ML20128L689: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:M95070
| stage = Approval
}}
}}



Latest revision as of 20:24, 21 August 2022

Forwards Issuance of Amend 158 to Facility Operating License DPR-13.Amend Revises Section 2.D of San Onofre Nuclear Generating Station Operating License to Remove Reporting Requirement That Is Redundant to Reporting Requirements
ML20128L689
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/03/1996
From: Michael Webb
NRC (Affiliation Not Assigned)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20128L692 List:
References
TAC-M95070, NUDOCS 9610150165
Download: ML20128L689 (3)


Text

- _ - . - . - .- . --

  • \

i l

, October 3, 1996 Mr. Harold B. Ray Executive Vice President )

l Southern California Edison Co.

San Onofre Nuclear Generating Station l P.O. Box 128 l San Clemente, California 92674-0128 l

Dear Mr. Ray:

SUBJECT:

ISSUANCE OF AMENDMENT FOR THE SAN ON0FRE NUCLEAR GENERATING STATION, l UNIT N0. 1 (TAC NO. M95070)

The Commission has issued the enclosed Amendment No. 158 to Facility Operating License No. DPR-13 for San Onofre Nuclear Generating Station, Unit No. 1. The i amendment consists of changes to the license conditions in response to your  !

application dated March 13, 1996.

]

The amendment revises Section 2.D of the San Onofre Nuclear Generating  !

Station, Unit 1 (SONGS 1) Operating License to remove a reporting requirement I that is redundant to reporting requirements in 10 CFR 50.72 and 50.73.

Additionally, the amendment makes administrative and editorial changes to the Permanently Defueled Technical Specifications.

A copy of our related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission biweekly Federal Register notice.

Sincerely, ORIGINAL SIGNED BY Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management .

Office of Nuclear Reactor Regulation Docket No. 50-206

Enclosures:

1. Amendment No.158 to DPR-13
2. Safety Evaluation cc w/ enclosures:

See next page g N

DISTRIBUTION:

Docket file 50-206 PUBLIC PDND r/f GHill (2)

BGrimes EHylton MWebb CGrimes SWeiss OGC (0-15 B18) SBajwa Region IV g PD D PDND:PM PDND:SC PD D l hon MWebb:nul SBajwa4 OGC W @ r0 SWeiss l/96 'l/it/96 '7/ff /96 g/ g96 p /* /96 l ICIAL RECORD COPY Sg i DOCUMENT NAME: G:\SECY\S095070.AMD DFk DbbkOIob 6 g((N b i

, [jeung t

"~

UNITED STATES NUCLEAR REGULATORY COMMISSION f WASHINGTON, D.C. 20066 4001 i

%, + + * * * # October 3, 1996 Mr. Harold B. Ray Executive Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

Dear Mr. Ray:

SUBJECT:

ISSUANCE OF AMENDMENT FOR THE SAN ON0FRE NUCLEAR GENERATING STATION, i UNIT NO. 1 (TAC N0. M95070) l The Commission has issued the enclosed Amendment No.158 to Facility Operating  !

License No. DPR-13 for San Onofre Nuclear Generating Station, Unit No. 1. The l amendment consists of changes to the license conditions in response to your  ;

application dated March 13, 1996. l The amendment revises Section 2.0 of the San Onofre Nuclear Generating Station, Unit 1 (SONGS 1) Operating License to remove a reporting requirement that is redundant to reporting requirements in 10 CFR 50.72 and 50.73.

Additionally, the amendment makes administrative and editorial changes to the Permanently Defueled Technical Specifications.

A copy of our related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission biweekly federal Register notice.

Sincerely, .

pd4 K'idb" L

Michael K. Webb, Project Manager l Non-Power Reactors and Decommissioning l Project Directorate l Division of Reactor Program Management  ;

Office of Nuclear Reactor Regulation  !

locket No. 50-206 )

End osures: 1. Amendment No.158 to DPR-13

2. Safety Evaluation cc w/ enclosures:

See next page l

l I

- - . - - . - . . . - - - _ - .= - _ - . . . . _ - . - . - - _ _ ~ . - - . - - . - .- -_ .

I

~

Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit I nocket No. 50-206 cc:

Mr. R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, California 92674-0128 Mr. Robert G. Lacy Manager, Nuclear Department San Diego Gas & Electric Company P. O. Box 1831 San Diego, California 92112 Resident Inspector / San Oncire NPS c/o U.S. Nuclear Regulatory Commission P. O. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Regulatory Commission i 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Steve Shu Radiologic Health Branch State Department of Health Services P. O. Box 942732 Sacramento, California 94234 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management P. O. Box 942732 Sacramento, California 94234-7320 Mr. Richard J. Kosiba, Project Manager Bechtel Power Corporation 12440 E. Imperial Highway Norwalk, California 90650