{{#Wiki_filter:July 19, 2021
{{#Wiki_filter:
 
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT - TRIENNIAL FIRE PROTECTION TEAM INSPECTION (FPTI) REPORT 05000348/2021012 AND 05000364/2021012
 
==Dear Mr. Kharrl:==
On July 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant and discussed the results of this inspection with Robert Norris and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers: 05000348 and 05000364 License Numbers: NPF-2 and NPF-8 Report Numbers: 05000348/2021012 and 05000364/2021012 Enterprise Identifier: I-2021-012-0007 Licensee: Southern Nuclear Operating Co., Inc.
 
Facility: Joseph M. Farley Nuclear Plant Location: Columbia, AL Inspection Dates: June 14, 2021 to July 02, 2021 Inspectors: J. Dymek, Reactor Inspector W. Monk, Senior Reactor Inspector (Team Lead)
J. Montgomery, Senior Reactor Inspector D. Strickland, Reactor Inspector Approved By: Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection team inspection at Joseph M. Farley Nuclear Plant, in accordance with the Reactor Oversight Process (ROP). The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=INSPECTION SCOPES=
 
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and industry standards.
 
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin tele-work. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
 
==REACTOR SAFETY==
 
===71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01) ===
{{IP sample|IP=IP 71111.21|count=4}}
The inspectors verified that components and systems will function as required to support the credited functions stated for each sample. Additional inspection considerations were located in the fire hazards analysis (FHA) or nuclear safety capability assessment (NSCA).
 
      *
: (1) SSC #1 (Fire Prevention) - Combustible Controls and Hot Work Administrative Programs
      *
: (2) SSC #2 (Detection/Suppression) - Deluge Fixed Spray Water Suppression Systems (Switchyard and Turbine Building)
      *
: (3) SSC #3 (SSD) - Comprehensive Non-Power Operations Review of the RHR System
      *
: (4) SSC #4 (SSD) - Comprehensive Safe and Stable Condition Review of the CCW System a. Review deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.
 
b. Verify that operator actions can be accomplished as assumed in the licensees FHA, or as assumed in the licensees fire probabilistic risk assessment (FPRA)analysis and SSA.
 
c. Review repetitive or similar maintenance work requests which could be an indicator of a design deficiency and could affect the ability of the components to perform their functions, when needed.
 
d. Ensure that post maintenance and/or surveillance activities are performed as scheduled.
 
e. Perform a walkdown inspection to identify equipment alignment discrepancies.
 
Inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.
 
f. Ensure the selected SSCs that are subject to aging management review (AMR)pursuant to 10 CFR Part 54 are being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verify that the licensees aging management program activities (such as, Fuel Oil Analysis or Selective Leaching Aging Management Program) associated with FP equipment are being implemented.
 
g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dispositioned the operating experience in accordance with their processes.
 
===Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)===
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis (CLB). If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
: (1) Fire Protection Administrative Program #1 - NFPA 805 Monitoring Program
: (2) Fire Protection Administrative Program #2 - Fire Brigade Drills and Training
 
===Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)===
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
 
b. The adequacy of the design modification, if applicable.
 
c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
 
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
 
e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
: (1) FPP Changes / Modification #1 - Design Change Package (DCPs) SNC 1054443/1054444/1054445/1054446 Unit 2 AUX & Turbine Building Class B Fire Protection Modifications
: (2) FPP Changes / Modification #2 - DCP SNC 968080 Fire Protection Change Evaluation for DECP Install Line Stops on the Fire Pump Discharge Lines
 
==INSPECTION RESULTS==
No findings of more than minor significance were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained nor documented in this report.
* On July 1, 2021, the inspectors presented the Fire Protection Team Inspection (FPTI)results to Robert Norris, Plant Manager and other members of the licensee staff during the Exit Meeting.
 
THIRD PARTY REVIEWS Inspectors reviewed ATC-Combustion Engineering Solutions Investigation of the Failure of a Section of Fire Protection Piping at Farley Nuclear Plant during the inspection period. No other third-party documentation was reviewed during the inspection.
 
=DOCUMENTS REVIEWED=
 
Inspection  Type              Designation      Description or Title                              Revision or
Procedure                                                                                          Date
71111.21N.05 Calculations      2380-1102-PGK-01  Evaluation of MOV Pressure Boundaries for IN 92-  0
Hot-Short Events
SE-C051326701    Farley Nuclear Power Plant Units 1 and 2 NFPA    06/09/2020
805 Non-Power Operations
SE-C051326701-003 FNP NSEL and Safe and Stable Fault Trees          06/09/2020
SE-C051326701-011 FNP Recovery Action Feasibility Evaluation        07/27/2012
SE-C051326701-012 NFPA 805 Defense in Depth (DID) Recovery          09/05/2012
Actions Credited in Calculation SE-C051326701-
008
Corrective Action CAR 266711        Attach manufacturer documentation with regards to 09/15/2016
Documents                          3-hour fire door rating
Corrective Action CR 10805916      2T-12A SGFP Deluge Nozzles Partially Blocked by  06/15/2021
Documents                          Installed Tarp/Catch Bag
Resulting from    CR 10806250      System 2A-27 Indicating Light Non-Functional      06/16/2021
Inspection        CR 10806253      Fire Brigade Ready Room Trash Can with Self-      06/16/2021
Extinguishing Lid was Full
CR 10806280      Lumber on U2 Turbine Deck with No Transient      06/16/2021
Combustible Permit
CR 10806305      FNP-1-AOP-28.1 Attachment 9 has Numbering and    06/16/2021
Formatting Issues with Response Obtained and
RNO Steps
CR 10806350      Procedure Enhancement Suggestions - Hot Work      06/16/2021
Procedure
CR 10806359      Unsecured Ladder Found in Turbine Building        06/16/2021
                                                (Personal Safety)
CR 10806366      Pressure Indicator Gauge Broken on Motor Driven  06/16/2021
Fire Pump
CR 10806369      #2 Fire Water Storage Tank Level Control Valve    06/16/2021
Cycling
CR 10806591      U2 TB Battery RM Louver Found Closed (H2 B/U      06/17/2021
Concern)
CR 10806623      Corrosion Found on Pre-action Header in the U2    06/17/2021
Inspection Type        Designation      Description or Title                              Revision or
Procedure                                                                                  Date
CCW Room
CR 10806654      U2 Turbine Building Damper out of Normal Position  06/17/2021
CR 10806685      Fire Extinguishers in Equipment Room 115          06/17/2021
CR 10807352      NRC Inspection Lessons Learned - Walkdowns /      06/21/2021
Assessments
CR 10809299      AOP-28.1 Version Update Needed                    06/29/2021
CR 10809409      Light Out on Cardox Panel                          06/29/2021
CR 10809789      Unsecured Nitrogen Dewars Found on U1 155          06/30/2021
CR 10809791      Evaluate and revise FNP-ACP-35.3 Attachment 2      06/30/2021
CR 10809794      (NRC Identified) Sound Powered Phone Jacks        06/30/2021
Degraded
CR 10809936      DDFP Overspeed Test Enhancement                    07/01/2021
Drawings    D 170347          Farley NPP Unit 1 Fire Protection Piping-Auxiliary Revision 16
Building Below El. 121'.
D-200184          P&ID Fire Protection Main Transformers & Valve    12/29/1978
House
D-205002          P&ID for Component Cooling Water System            31.0
D170345          Fire Protection Piping Diesel Engine Driven Pumps  Revision 1
Fuel & Exhaust Piping
D170366          Fire Protection P & ID Pump House & Yard Mains    Version 1.0
D200-201 Sheet #1 Joseph M. Farley Nuclear Plant Unit #2 Cooling    Version 5.0
Tower Layout
D200-201 Sheet #2 Joseph M. Farley Nuclear Plant Cooling Tower      Version 1.0
Layout
D205041          P&ID for Residual Heat Removal System              20.0
U160130          Fire Protection-Fuel System for Diesel Driven Fire Revision 2
Pumps
U162363          Fire Protection-Sprinkler System for Main Power    Version 1.0
Transformer 1TR66
U262255          Fan Data-Turbine Building Battery room            12/29/1975
Engineering SNC 1054445      U2 Auxiliary & Turbine Building Class B Fire      Revision 0
Changes                      Protection Modifications
SNC 1054444      U2 Auxiliary & Turbine Building Class B Fire      Revision 0
Protection Modifications
Inspection Type          Designation          Description or Title                            Revision or
Procedure                                                                                      Date
SNC 1054446          U2 Auxiliary & Turbine Building Class B Fire    Revision 0
Protection Modifications
SNC-1150857          1B RCP Seal Leak-Off Line Modification          4/6/2021
SNC471156            NFPA 805: IN 92-18 U1 MOV Hot Short Failure    03/19/2015
MOD
SNC471157            NFPA 805: IN 92-18 U2 MOV Hot Short Failure    11/06/2014
MOD
Engineering  CAR 278955LOE        Cause Determination Report Summary - Fire      Revision 1
Evaluations                        Protection Main Rupture
DCP SNC1054443        Unit 2 AUX & TB Class B Fire Protection        08/06/2020
Modifications
SNC 1151384          Reactor Make-Up Water Storage Tank (RMWST)      4/30/2021
Cover Replacement
SNC 1154174          Modification for Leading Edge Flow Meter (LEFM) 4/30/2021
Transmitters
TE 1051647            Technical Evaluation-Focused Area Self          10/5/2020
Assessment-Fire Protection
Miscellaneous A-181805              NFPA Fire Protection Program Design Basis      Version 8.0
Document-Joseph M. Farley Nuclear Plant
EPRI                  Update Non-Suppression Curves 2015
30020222936/NUREG2169
F-021-2020            Fire Drill Package-Unit #1 Turbine Building    3/05/2020
Elevation 137'
F-022-2020            Fire Drill Package-Service Building Annex      3/12/2020
F-2021-03            Fire Drill Package Unit #1 NRSAB Room 191/192  2/19/2021
GN 500                Detail Specification for Fire Protection System 05/03/1971
Section System 1 Header and Riser System
NEIL                  Nuclear Electric Insurance Limited-Joseph M. 9/12/2019
Farley Nuclear Plant Boiler and Machinery and
Property Loss Control Evaluation
NFPA 10-1973          PORTABLE FIRE EXTINGUISHERS                    Code of
Record
1973
NFPA 20-1974          Installation of Centrifugal Fire Pumps          Code of
Inspection Type      Designation        Description or Title                            Revision or
Procedure                                                                                Date
Record
1974
NFPA 80-1973      Fire Doors and Fire Windows                      Code of
Record
1973
S-FP-115          NFP-SNC-Course Completion Record Table Top      6/25/2020
Simulation Fire Drill
SM-C051326701-016  Master Scoping List Equipment Type-Extinguisher
Procedures FNP--AOP-29.0      AOP for Plant Fire                              53.0
FNP-0-ACP-35.3    ADMINISTRATIVE CONTROL OF TOOLS AND              Version 7.0
EQUIPMENT LEFT UNATTENDED IN THE PLANT
FNP-0-EIP-16.0-F22 Checklist X Hot Shutdown Panels, Unit 1 (EP)    04/16/2021
FNP-0-EIP-16.0-F22 Checklist X Hot Shutdown Panels, Unit 1 (EP)    01/13/2021
FNP-0-EIP-16.0-F23 Checklist Y Hot Shutdown Panels, Unit 2 (EP)    04/16/2021
FNP-0-EIP16.0-F23  Checklist Y Hot Shutdown Panels, Unit 2 (EP)    01/13/2021
FNP-0-FSP 201.2    Diesel Driven Fire Pump #2 Functional Test      Version 20
FNP-0-FSP-201.1    Diesel Driven Fire Pump #1 Functional Test      Version 22
FNP-0-FSP-201.1    No. 1 Diesel Driven Fire Pump Functionality Test Version 23.0
FNP-0-FSP-201.3    Motor Driven Fire Pump Functional Test          Version 12
FNP-0-FSP-35.0    Portable Extinguisher Monthly Inspection        Version 45.7
FNP-0-FSP-400.0    Diesel Driven Fire Pump Inspection              Version 16.1
FNP-0-FSP-44.0    Inspection of AFFF                              Version 5.1
FNP-0-FSP-62.0    Analysis of "A" Fire Diesel Fuel Storage Tank    Version 10.1
Contents
FNP-0-FSP-62.1    Fire Diesel Fuel Oil Bottom Sample Quality      Version 4.1
Appearance Test
FNP-0-GMP-100.0    Catch Bag Control Program                        VERSION
6.1
FNP-0-SOP-0.4      Fire Protection Program Administration and FP    121.0
LCO Requirements
FNP-0-SOP-61.0    Fire Protection-Pump House and Yard Main        Version 49.3
FNP-0-UOP-4.0      General Outage Operations Guidance              64
FNP-1-AOP-28.1    Farley Nuclear Plant AOP 28.1                    39.0
Inspection Type Designation        Description or Title                              Revision or
Procedure                                                                            Date
FNP-1-AOP-28.2      AOP for Fire in The Control Room                  31.2
FNP-1-ESP-1.1      SI Termination Operating Procedure                27.1
FNP-1-FSP-39.1      Portable CO2 Fire Extinguishers-Annual            Version 4.0
Conductivity Test
FNP-1-FSP-9.0      Portable Extinguishers - Monthly                  VERSION
44.4
FNP-2-FPP-2.0      UNIT 2 TURBINE BUILDING PRE-FIRE PLAN              VERSION
2.0
FNP-2-FSP-39.2    Portable CO2 Fire Extinguisher-Annual Conductivity Version 4.0
Test
FNP-2-FSP-9.0      Portable Fie Extinguishers-Monthly Inspection    Version 27.2
FNP-2-STP-23.1      2A COMPONENT COOLING WATER PUMP                  05/26/2021
QUARTERLY INSERVICE TEST
FNP-2-STP-23.2      2B COMPONENT COOLING WATER PUMP                  03/15/2021
QUARTERLY INSERVICE TEST
FNP-2-STP-23.3    2C COMPONENT COOLING WATER PUMP                    04/17/2021
NMP-ES-035-001    Fire Protection Program Implementation            VERSION
14.0
NMP-ES-035-003    Fleet Hot Work Instruction                        VERSION
10.0
NMP-ES-035-003-F01 Hot Work Permit                                    VERSION
4.0
NMP-ES-035-006    Fire Protection Program Impact Screen and          Version 13.0
Detailed Reviews
NMP-ES-035-007      Fleet Fire Watch Instruction                      Version 10.0
NMP-ES-035-014    Fleet Transient Combustible Controls              VERSION
5.0
NMP-ES-035-018    NFPA 805 Monitoring Program                        VERSION
1.1
NMP-ES-035-018      NFPA 805 Monitoring Program                      05/03/2021
NMP-ES-036-001      Underground Pipe & Tank Monitoring Program        Version 11.1
Implementation
NMP-HP-501-005      Inspection, Repair and Storage of the MSA G1      VERSION
SCBA                                              2.1
Inspection Type        Designation Description or Title                              Revision or
Procedure                                                                            Date
NMP-MA-054  General Plant Housekeeping                        Version 1.2
Work Orders SNC 1122664  Diesel Driven Fire Pump #1 Functional Test        4/25/2021
SNC 1140263  Diesel Driven Fire Pump Inspection                2/11/2021
SNC 553311  Fire Distribution System Flow Test                8/2/2018
SNC 719295  Sprinkler System Piping NDE for Wall Thinning and 9/15/2016
Flow Blockage
SNC 731321  Sprinkler System Piping NDE for Wall Thinning and 4/4/2020
Flow Blockage
11
}}
}}

Revision as of 04:54, 17 January 2022

Triennial Fire Protection Team Inspection (Fpti) Report 05000348/2021012 and 05000364/2021012
ML21203A001
Person / Time
Site: Farley  Southern Nuclear icon.png