ML20155K630: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20155K630
| number = ML20155K630
| issue date = 10/31/1998
| issue date = 10/31/1998
| title = Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With 981105 Ltr
| title = Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With
| author name = Dugstad D, Sorensen J
| author name = Dugstad D, Sorensen J
| author affiliation = NORTHERN STATES POWER CO.
| author affiliation = NORTHERN STATES POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9811160043
| document report number = NUDOCS 9811160043
| title reference date = 11-05-1998
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 7
| page count = 7
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:-                      -.                    .-        . - .
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East
          ,      ,                                          Welch, Minnesota 55089 i
November 5,1998                                      Technical Specifications 6.7.A.3 1
i US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306                DPR-60 Monthly Operating Report October 1998 Attached is the Monthly Operating Report for October 1998 for the Prairie Island Nuclear Generating Plant.
(.        W 1
Joel P. Sorensen Plant Manager                                                                        j Prairie Island Nuclear Generating Plant                                            /
l c:    Regional Administrator-Ill, NRC NRR Project Manager, NRC NRC Resident inspector Id
                                                                        'g2/
State of Minnesota - Kris Sanda Attachment 9811160043 981031 PDR    ADOCK 05000282 R                  PDR    y
                      , C C O 1. 0
 
n  . . - - -              . - ._  .                      .    . . , . _ _
l
* NRC MONTHLY REPORT                                                                                PRINTED 11/3/199 Page1 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 NARRATIVE
 
==SUMMARY==
OF OPERATING EXPERIENCE l
MONTH: OCTOBER 1998 During the month of October, Unit 1 was base loaded. The unit operated routinely until near the end of the month.
On the 29th at 2350, a reactor trip occurred due to a short in one of the control                                        l rod cables. The unit was brought to cold shutdown to allow repairs. All of the l
control rod drive and the control rod position indication cables will be replaced.                                      '
l The service hours for this month wero 745 due to daylight savings time change.
l l
The trip ended a continuous operating run of approximately 133 days.
CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS i
 
NRC MONTHLY REPORT                                                                  PRINTED 11/3/199 Page 2 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1
* DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651388-1121-4376 OPERATING DATA REPORT OPERATING STATUS
: 1. UNIT NAME:            PRAIRIE ISLAND NO.1
: 2. REPORTING PERIOD:          OCTOBER        1998
: 3. LICENSED THERMAL POWER (MWT): 1650
: 4. NAMEPLATE RATING (GROSS MWE): 593
: 5. DESIGN ELECTRICAL RATING (NET MWE): 543
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):              558
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                526
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
: 10. REASONS FOR RESTRICTIONS,IF ANY:    NONE THIS MONTH    YR TO-DATE      CUMULATIVE
: 11. HOURS IN REPORTING PERIOD                                    745          7296          218064
: 12. NUM. 'R QF HOU"G REACTOR CRITICAL                          696.8        6954.7        187731.7
: 13. REAM OR RESERVE SHUTDOWN HOURS                              0.0          0.00          5571.1
: 14. HOURS GENERATOR ON-LINE                                    696.8        6918.0        185906.5
: 15. UNIT RESERVE SHUTDOWN HOURS                                  0.0          0.00            0.00
: 16. GROSS THERMAL ENERGY GENFRATED (MWH)                    1143108      11274462      295552305
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                  399090      3865080        97683790
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                    378354      3655882        91890203
: 19. UNIT SERVICE FACTOR                                        93.5          94.8            85.3
: 20. UNIT AVAILABILITY FACTOR                                    93.5          94.8            85.3
: 21. UNIT CAPACITY FACTOR ( MDC NET)                            96.6          94.6            83.2
: 22. UNIT CAPACITY FACTOR ( DER NET)                            95.8          91.6            79.2
: 23. UNIT FORCED OUTAGE RATE                                      6.5            4.9            4.6 e-
: 24. FORCED OUTAGE HOURS                                        48.2        354.7          8895.4
 
:        NRC MONTHLY REPORT                                                                            PRINTED 11/3/199      I Page 3 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1
                        '                                                                  DATE 11/3/1998 3
* COMPLETEO BY DALE DUGSTAD PHONE 651-388-11214376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: OCTOBER 1998 l
DATE    UNIT TYPE            HOURS          REASON      METHOD LER NUMBER SYSTEM COMPONENT 10/29/1998    1    F                48.2      A              3        1-98-16        N/A        N/A NOTES:  Reactor trip caused by control rod cable short.
i TYPE                          , REASON                          METHOD              SYSTEM CODE F-FORCED                      A-EQUIPMENT FAILURE              1-MANUAL            DRAFT IEEE STD S-SCHEDULED                    B-MAINTENANCE OR TEST            2-MANUAL TRIP C-REFUELING                      3-AUTO TRIP l
D-REGULATORY RESTRICTION          4-CONTINUED E-OPERATOR TRAINING AND          5-REDUCED LOAD      COMPONENT CODE LICENSE EXAMINATION 0-OTHER            IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR l                                  H-OTHER
 
  '. NRC MONTHLY REPORT                                                                          PRINTED 11/3/199 Prge 4 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 5      i COMPLETED BY DALE DUGSTAD PHONE 651-3881121-4378 NARRATIVE
 
==SUMMARY==
OF OPERATING EXPERIENCE MONTH: OCTOBER 1998 During the month of October, Unit 2 was base loaded. There were no shutdowns or power reductions.
The service hours for this month were 745 due to daylight savings time change.
1 1
l CURRENT CONTINUOUS OPERATING RUN OF 241 DAYS l                                                                                                                        \
l                                                                                                                        l
 
i
* NRC MONTHLY REPORT                                                                        PRINTED 11/3/199 Page 5
!                                                                              DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651-3881121-4370 l
OPERATING DATA REPORT l
OPERATING STATUS
: 1. UNIT NAME:        PRAIRIE ISLAND NO. 2
: 2. REPORTING PERIOD:            OCTOBER      1998
: 3. LICENSED THERMAL POWER (MWT): 165P
: 4. NAMEPLATE RATING (GROSS MWE):      593 5 DESIGN ELECTRICAL RATING (NET MWE): 530
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):            544
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):              512
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
: 10. REASONS FOR RESTRICTIONS, IF ANY:    NONE THIS MONTH      YR.,TO-DATE        CUMULATIVE
: 11. HOURS IN REPORTING PERIOD                                    745          7296              209182
: 12. NUMBER OF HOURS REACTOR CRITICAL                          745.0        6373.1            185099.3
: 13. REACTOR RESERVE SHUTDOWN HOURS                              0.0            0.0              1516.1
: 14. HOURS GENERATOR ON-LINE                                    745.0        6364.3            183591.4
: 15. UNIT RESERVE SHUTDOWN HOURS                                  0.0            0.0                  0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                    1224621    10368661            292833248
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                  414960      3431540            95928950
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                    393938      3238401            90689571
: 19. UNIT SERVICE FACTOR                                        100.0          87.2                  87.8
: 20. UNIT AVAILABILITY FACTOR                                  100.0          87.2                87.8
: 21. UNIT CAPACITY FACTOR ( MDC NET)                            103.3          86.7                86.3
: 22. UNIT CAPACITY FACTOR ( DER NET)                            99.8          83.7                81.8
: 23. UNIT FORCED OUTAGE RATE                                      0.0          12.8                  3.0
: 24. FORCED OUTAGE HOURS                                          0.0        931.7              5662.8 l
 
NRC MONTHLY REPORT                                                                    PRINTED 11/3/199 Prge 6 DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 T
* COMPLETED BY DALE DUGSTAD PHONE 651-38811214376 UN_IT SHUTDOWNS AND POWER REDUCTIONS MONTH: OCTOBER 1998 DATE      UNIT    TYPE      HOURS      REASON METHOD LER NUMBER SYSTEM                COMPONENT 10/31/1998    2                    0 NOTES: None.
TYPE                      REASON                    METHOD              SYSTEM CODE F-FORCED                  A-EQUIPMENT FAILURE      1-MANUAL            DRAFT IEEE STD S-SCHEDULED                B-MAINTENANCE OR TEST    2-MANUAL TRIP C-REFUELING              3-AUTO TRIP D-REGULATORY RESTRICTION  4-CONTINUED E-OPERATOR TRAINING AND  5-REDUCED LOAD      COMPONENT CODE LICENSE EXAMINATION 9-OTHER              IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER
!}}

Latest revision as of 18:50, 9 December 2021

Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With
ML20155K630
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/31/1998
From: Dugstad D, Sorensen J
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811160043
Download: ML20155K630 (7)


Text

- -. .- . - .

Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East

, , Welch, Minnesota 55089 i

November 5,1998 Technical Specifications 6.7.A.3 1

i US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report October 1998 Attached is the Monthly Operating Report for October 1998 for the Prairie Island Nuclear Generating Plant.

(. W 1

Joel P. Sorensen Plant Manager j Prairie Island Nuclear Generating Plant /

l c: Regional Administrator-Ill, NRC NRR Project Manager, NRC NRC Resident inspector Id

'g2/

State of Minnesota - Kris Sanda Attachment 9811160043 981031 PDR ADOCK 05000282 R PDR y

, C C O 1. 0

n . . - - - . - ._ . . . . , . _ _

l

  • NRC MONTHLY REPORT PRINTED 11/3/199 Page1 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651-388-1121-4376 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE l

MONTH: OCTOBER 1998 During the month of October, Unit 1 was base loaded. The unit operated routinely until near the end of the month.

On the 29th at 2350, a reactor trip occurred due to a short in one of the control l rod cables. The unit was brought to cold shutdown to allow repairs. All of the l

control rod drive and the control rod position indication cables will be replaced. '

l The service hours for this month wero 745 due to daylight savings time change.

l l

The trip ended a continuous operating run of approximately 133 days.

CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS i

NRC MONTHLY REPORT PRINTED 11/3/199 Page 2 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1

  • DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651388-1121-4376 OPERATING DATA REPORT OPERATING STATUS
1. UNIT NAME: PRAIRIE ISLAND NO.1
2. REPORTING PERIOD: OCTOBER 1998
3. LICENSED THERMAL POWER (MWT): 1650
4. NAMEPLATE RATING (GROSS MWE): 593
5. DESIGN ELECTRICAL RATING (NET MWE): 543
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 558
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 526
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS,IF ANY: NONE THIS MONTH YR TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 745 7296 218064
12. NUM. 'R QF HOU"G REACTOR CRITICAL 696.8 6954.7 187731.7
13. REAM OR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
14. HOURS GENERATOR ON-LINE 696.8 6918.0 185906.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
16. GROSS THERMAL ENERGY GENFRATED (MWH) 1143108 11274462 295552305
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 399090 3865080 97683790
18. NET ELECTRICAL ENERGY GENERATED (MWH) 378354 3655882 91890203
19. UNIT SERVICE FACTOR 93.5 94.8 85.3
20. UNIT AVAILABILITY FACTOR 93.5 94.8 85.3
21. UNIT CAPACITY FACTOR ( MDC NET) 96.6 94.6 83.2
22. UNIT CAPACITY FACTOR ( DER NET) 95.8 91.6 79.2
23. UNIT FORCED OUTAGE RATE 6.5 4.9 4.6 e-
24. FORCED OUTAGE HOURS 48.2 354.7 8895.4
NRC MONTHLY REPORT PRINTED 11/3/199 I Page 3 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1

' DATE 11/3/1998 3

  • COMPLETEO BY DALE DUGSTAD PHONE 651-388-11214376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: OCTOBER 1998 l

DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 10/29/1998 1 F 48.2 A 3 1-98-16 N/A N/A NOTES: Reactor trip caused by control rod cable short.

i TYPE , REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP l

D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 0-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR l H-OTHER

'. NRC MONTHLY REPORT PRINTED 11/3/199 Prge 4 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 5 i COMPLETED BY DALE DUGSTAD PHONE 651-3881121-4378 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MONTH: OCTOBER 1998 During the month of October, Unit 2 was base loaded. There were no shutdowns or power reductions.

The service hours for this month were 745 due to daylight savings time change.

1 1

l CURRENT CONTINUOUS OPERATING RUN OF 241 DAYS l \

l l

i

  • NRC MONTHLY REPORT PRINTED 11/3/199 Page 5

! DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 COMPLETED BY DALE DUGSTAD PHONE 651-3881121-4370 l

OPERATING DATA REPORT l

OPERATING STATUS

1. UNIT NAME: PRAIRIE ISLAND NO. 2
2. REPORTING PERIOD: OCTOBER 1998
3. LICENSED THERMAL POWER (MWT): 165P
4. NAMEPLATE RATING (GROSS MWE): 593 5 DESIGN ELECTRICAL RATING (NET MWE): 530
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 544
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR.,TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 745 7296 209182
12. NUMBER OF HOURS REACTOR CRITICAL 745.0 6373.1 185099.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
14. HOURS GENERATOR ON-LINE 745.0 6364.3 183591.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1224621 10368661 292833248
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 414960 3431540 95928950
18. NET ELECTRICAL ENERGY GENERATED (MWH) 393938 3238401 90689571
19. UNIT SERVICE FACTOR 100.0 87.2 87.8
20. UNIT AVAILABILITY FACTOR 100.0 87.2 87.8
21. UNIT CAPACITY FACTOR ( MDC NET) 103.3 86.7 86.3
22. UNIT CAPACITY FACTOR ( DER NET) 99.8 83.7 81.8
23. UNIT FORCED OUTAGE RATE 0.0 12.8 3.0
24. FORCED OUTAGE HOURS 0.0 931.7 5662.8 l

NRC MONTHLY REPORT PRINTED 11/3/199 Prge 6 DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO. 2 DATE 11/3/1998 T

  • COMPLETED BY DALE DUGSTAD PHONE 651-38811214376 UN_IT SHUTDOWNS AND POWER REDUCTIONS MONTH: OCTOBER 1998 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 10/31/1998 2 0 NOTES: None.

TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER

!