ML20195C664: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:M97505
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_
7
[
i
        . Mr. J:m:s Lang:nbach, Vica Prs;sidsnt and Directcr - TMI November 12, 1998 GPU Nuclear, Inc.
Post Office Box 480 Middletown, PA 17057 l.
 
==SUBJECT:==
ISSUANCE OF AMENDMENT NO. 52 TO DPR 73 FOR THREE MILE ISLAND, UNIT 2 (TAC NO. M97505)
 
==Dear Mr. Langenbach:==
i The Commission has issued the enclosed Amendment No. 52 to Possession-Only License
:        No. DPR-73 for Three Mile Island Nuclear Station, Unit 2 (TMI 2). The amendment consists                        1 l        of changes to the Technical Specifications (TS) in rwsponse to your application dated i
D9cember 2,1996.                                                                                                '
l        The amendment relocates the audit frequency requirements from the TMI 2 TS to the TMI-2 Post Defueling Monitored Storage (PDMS) Quality Assurance Plan. The amendment l        also extends the maximum allowed interval between certain audits from 12 months to l
24 months. A copy of the related Safety Evaluation is also enclosed. A notice of issuance will be included in the Comrrirsion biweekly Federal Reaister notice.
Sincerely,
                                                              ' ORIGINAL SIGNED BY:
Lee H. Thonus, Project Manager Non-Power Reactors and Decommissioning Project Directorate                                        l Division of Reactor Program Management                          !
11170192 981112                                  Office of Nuclear Reactor Regulation DR ADOCK 0500 3 0 P
Docket No. 50-320                                                                                              ,!
 
==Enclosures:==
: 1. Amendment No. 52 to DPR-73
: 2. Safety Evaluation cc w/ enclosures:
tr',p            T y,e q1p  ; LL. pw' 9.a,[W ]
See next page                                                                                  _        ,
w --
DISTRIBUTION:                                                                                          5 HARD CO_PY..      ....,
fpocket FW 60-320? EHylton -
E-MAIL COPY RBurrows        RDudley
[b        l I
PUBLIC                    MMasnik              MFairtile        TFredrichs PDND r/f                  ACRS                  PHarris          AMarkley JRoe                      LThonus              JMinns          MWebb                              4 DMatthews                  Region i              DWheeler                                          v SWeiss OGC (015-B-18)
GHill (2) (T5-C3)-
WBeckner (013-H3)                                              C('##"  J\  '.
u/    g P l        P                        PDND:PM                PD        A)SC                        P Ej4y tbn                LThonts g            otM asnik                                S' eiss l
        /0/2]/98              ii /:z/98            , , f 0 /tt98              [0/ej@8        g //198
                                                  ~
OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\THONUS\ AMEND 52
 
_ -    _ .-                .=        _  -
1 l
p w tuq n            *4                          UNITED STATES                                      l NUCLEAR REGULATORY COMMISSION                                    !
f                      WASHINGTON, D.C. 20066 4 101 k,            /                          November 12, 1998 Mr. James Langenbach, Vice President and Director - TMI GPU Nuclear, Inc.
i Post Office Bcx 480                                                                      1 Middletown, PA 17057                                                                      i l
 
==SUBJECT:==
ISSUANCE OF AMENDMENT NO. 52 TO DPR-73 FOR THREE MILE ISLAND, UNIT 2 (TAC NO. M97505)
Dea' Mr. Legenbach:                                                                      l The Commission has issued the enclosed Amendment No. 52 to Possession-Only License No. DPR-73 for Three Mile Island Nuclear Station, Unit 2 (TMI-2). The amendment consists of changes to the Technical Specifications (TS) in response to your application dated December 2,1996.
The amendment relocates the audit frequency requirements from the TMI-2 TS to the TMI-2 Post Defueling Monitored Storage (PDMS) Quality Assurance Plan. The amendment also extends the maximum allowed interval between certain audits from 12 months to 24 months. A copy of the related Safety Evaluation is also enclosed. A notice of issuance will be included in the Commission biweekly Federal Register notice.
Sincerely,
                                                                    )        ),
x Lee H. Thonus, Project Manager Non Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-320 i     
 
==Enclosures:==
 
l
: 1. Amendment No. 52 to DPR-73
: 2. Safety Evaluation cc w/ enclosures:
See next page i
 
i l
p I    James Langenbach                          Three Mile Island Nuclear Station l    GPU Nuclear, Inc.                          Unit No. 2 l                                                Docket No. 50-320 I
cc:
Regional Administrator, Region i          Mr. T. Gary Broughton U.S. Nuclear Regulatory Commission        GPU Nuclear, Inc.
l 475 Allendale Road                        Post Office Box 480 l    King of Prussie, Pennsylvania 19406        Middletown, Pennsylvania 17057 l
l    Dr. Judith H. Johnsrud                    Mr. David J. McGoff l    Environmental Coalition on Nuclear        Office of LWR Safety and Technology Power                                    NE-23 433 Orlando Avenue                        U.S. Department of Energy State College, Pennsylvania 16801          Washington, D.C. 20545 Ernest L. Blake, Jr., Esq.                Mr. Wythe Keever Shaw, Pittman, Potts, and Trowbridge      The Patriot 2300 N Street, N.W.                        812 Market Street l    Washington, D.C. 20037                    Harrisburg, Pennsylvania 17105 Secretary                                  Mr. Robert B. Borsum U.S. Nuclear Regulatory Commission        B & W Nuclear Technologies
!    Washington, D.C. 20555                    Suite 525 i
1700 Rockville Pike Mr. Russell Schaeffer, Chairperson        Rockville, Maryland 20852 l    Dauphin County Board of Commissioners
;    Dauphin County Courthouse                  Ms. Jane Lee Front and Market Streets                  183 Valley Road Harrisburg, Pennsylvania 17120            Etters, Pennsylvania 17319 Mr. William P. Dornsife, Director          Mr. Walter W. Cohen, Consumer Bureau of Radiation Protection              Advocate
    - Department of Environmental Protection    Department of Justice 13th Floor, Rachel Carson State Office    Strawberry Square,14th Floor Building                                Harrisburg, Pennsylvania 17127 P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469      U.S. Environmental Prot. Agency Region 111 Office l      Mr. Ad Crable                            ATTN: EIS Coordinator l      Lancaster New Era                        841 Chestnut Street l-    8 West King Street                        Philadelphia, Pennsylvania 19107 Lancaster, Pennsylvania 17601 Mr. B. A. Mehler i
Ms. Michele G. Evans                      GPU Nuclear, Inc.
Senior Resident inspector (TMI-1)        P. O. Box 480
  ~
U.S. Nuclear Regulatory Comm;ssion        Middletown, Pennsylvania 17057 P. O. Box 311 Middletown, Pennsylvania 17057 L
i
<}}

Latest revision as of 14:30, 9 December 2021

Forwards Amend 52 to License DPR-73 & Se.Amend Relocates Audit Frequency Requirements from TMI-2 to TMI-2 Post Defueling Monitored Storage QA Plan & Extends Max Allowed Interval Between Certain Audits from 12 Months to 24 Months
ML20195C664
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/12/1998
From: Thonus L
NRC (Affiliation Not Assigned)
To: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20195C670 List:
References
TAC-M97505, NUDOCS 9811170192
Download: ML20195C664 (3)


Text

_

7

[

i

. Mr. J:m:s Lang:nbach, Vica Prs;sidsnt and Directcr - TMI November 12, 1998 GPU Nuclear, Inc.

Post Office Box 480 Middletown, PA 17057 l.

SUBJECT:

ISSUANCE OF AMENDMENT NO. 52 TO DPR 73 FOR THREE MILE ISLAND, UNIT 2 (TAC NO. M97505)

Dear Mr. Langenbach:

i The Commission has issued the enclosed Amendment No. 52 to Possession-Only License

No. DPR-73 for Three Mile Island Nuclear Station, Unit 2 (TMI 2). The amendment consists 1 l of changes to the Technical Specifications (TS) in rwsponse to your application dated i

D9cember 2,1996. '

l The amendment relocates the audit frequency requirements from the TMI 2 TS to the TMI-2 Post Defueling Monitored Storage (PDMS) Quality Assurance Plan. The amendment l also extends the maximum allowed interval between certain audits from 12 months to l

24 months. A copy of the related Safety Evaluation is also enclosed. A notice of issuance will be included in the Comrrirsion biweekly Federal Reaister notice.

Sincerely,

' ORIGINAL SIGNED BY:

Lee H. Thonus, Project Manager Non-Power Reactors and Decommissioning Project Directorate l Division of Reactor Program Management  !

11170192 981112 Office of Nuclear Reactor Regulation DR ADOCK 0500 3 0 P

Docket No. 50-320 ,!

Enclosures:

1. Amendment No. 52 to DPR-73
2. Safety Evaluation cc w/ enclosures:

tr',p T y,e q1p  ; LL. pw' 9.a,[W ]

See next page _ ,

w --

DISTRIBUTION: 5 HARD CO_PY.. ....,

fpocket FW 60-320? EHylton -

E-MAIL COPY RBurrows RDudley

[b l I

PUBLIC MMasnik MFairtile TFredrichs PDND r/f ACRS PHarris AMarkley JRoe LThonus JMinns MWebb 4 DMatthews Region i DWheeler v SWeiss OGC (015-B-18)

GHill (2) (T5-C3)-

WBeckner (013-H3) C('##" J\ '.

u/ g P l P PDND:PM PD A)SC P Ej4y tbn LThonts g otM asnik S' eiss l

/0/2]/98 ii /:z/98 , , f 0 /tt98 [0/ej@8 g //198

~

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\THONUS\ AMEND 52

_ - _ .- .= _ -

1 l

p w tuq n *4 UNITED STATES l NUCLEAR REGULATORY COMMISSION  !

f WASHINGTON, D.C. 20066 4 101 k, / November 12, 1998 Mr. James Langenbach, Vice President and Director - TMI GPU Nuclear, Inc.

i Post Office Bcx 480 1 Middletown, PA 17057 i l

SUBJECT:

ISSUANCE OF AMENDMENT NO. 52 TO DPR-73 FOR THREE MILE ISLAND, UNIT 2 (TAC NO. M97505)

Dea' Mr. Legenbach: l The Commission has issued the enclosed Amendment No. 52 to Possession-Only License No. DPR-73 for Three Mile Island Nuclear Station, Unit 2 (TMI-2). The amendment consists of changes to the Technical Specifications (TS) in response to your application dated December 2,1996.

The amendment relocates the audit frequency requirements from the TMI-2 TS to the TMI-2 Post Defueling Monitored Storage (PDMS) Quality Assurance Plan. The amendment also extends the maximum allowed interval between certain audits from 12 months to 24 months. A copy of the related Safety Evaluation is also enclosed. A notice of issuance will be included in the Commission biweekly Federal Register notice.

Sincerely,

) ),

x Lee H. Thonus, Project Manager Non Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-320 i

Enclosures:

l

1. Amendment No. 52 to DPR-73
2. Safety Evaluation cc w/ enclosures:

See next page i

i l

p I James Langenbach Three Mile Island Nuclear Station l GPU Nuclear, Inc. Unit No. 2 l Docket No. 50-320 I

cc:

Regional Administrator, Region i Mr. T. Gary Broughton U.S. Nuclear Regulatory Commission GPU Nuclear, Inc.

l 475 Allendale Road Post Office Box 480 l King of Prussie, Pennsylvania 19406 Middletown, Pennsylvania 17057 l

l Dr. Judith H. Johnsrud Mr. David J. McGoff l Environmental Coalition on Nuclear Office of LWR Safety and Technology Power NE-23 433 Orlando Avenue U.S. Department of Energy State College, Pennsylvania 16801 Washington, D.C. 20545 Ernest L. Blake, Jr., Esq. Mr. Wythe Keever Shaw, Pittman, Potts, and Trowbridge The Patriot 2300 N Street, N.W. 812 Market Street l Washington, D.C. 20037 Harrisburg, Pennsylvania 17105 Secretary Mr. Robert B. Borsum U.S. Nuclear Regulatory Commission B & W Nuclear Technologies

! Washington, D.C. 20555 Suite 525 i

1700 Rockville Pike Mr. Russell Schaeffer, Chairperson Rockville, Maryland 20852 l Dauphin County Board of Commissioners

Dauphin County Courthouse Ms. Jane Lee Front and Market Streets 183 Valley Road Harrisburg, Pennsylvania 17120 Etters, Pennsylvania 17319 Mr. William P. Dornsife, Director Mr. Walter W. Cohen, Consumer Bureau of Radiation Protection Advocate

- Department of Environmental Protection Department of Justice 13th Floor, Rachel Carson State Office Strawberry Square,14th Floor Building Harrisburg, Pennsylvania 17127 P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469 U.S. Environmental Prot. Agency Region 111 Office l Mr. Ad Crable ATTN: EIS Coordinator l Lancaster New Era 841 Chestnut Street l- 8 West King Street Philadelphia, Pennsylvania 19107 Lancaster, Pennsylvania 17601 Mr. B. A. Mehler i

Ms. Michele G. Evans GPU Nuclear, Inc.

Senior Resident inspector (TMI-1) P. O. Box 480

~

U.S. Nuclear Regulatory Comm;ssion Middletown, Pennsylvania 17057 P. O. Box 311 Middletown, Pennsylvania 17057 L

i

<