ML20196F871: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,a. .
!                                                                                        i l
Rev. 28 I7 Effective Date (( [ f, i
l i
I i
l I
l                                ANNUNCIATOR RESPONSE                                    :
AR-305 i
FLORIDA POWER CORPORATION                                  t CRYSTAL RIVER UNIT 3 i
ES E ANNUNCIATOR RESPONSE                                  ,
L I
O l-i l
l l
APPROVED BY:  Procedure Owner (SLGNATURE ON FILE)          /
DATE      // A TMr
}                                  PROCEDURE WRITER:  Michael A. Winship RESPONSIBLE DEPARTMENT:  Operations Support
*\
9812070148 981123 DR  ADOCK O  g2 ';
o l-      .          .                                              . . ,              -
 
      . . _ m  .....  . , _    _ _. _ . . . . . _ . . _ _ . . . m..            _ _ _ _ _ . .          . _ . . . . . _ _ _ . . _ _ - . . , _      . _ _.._ _. ._ _ _ __.
i i
              +
l n
l                                                              TABLE OF CONTENTS
    \
I.
l l                    SECTION                                                                                                                                    PAGE 1
1.0 PURP0SE.................................................................                                                                        1 1
1 LD_REEEBENCE S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 l                            2.1 DEVELOPMENTAL REFERENCES............................................ 1 l
l 1
3.0 PERSONNEL INDOCTRINATION................................................ 1 l
iJLBSTRUCTI0NS............................................................ 1 1
: j.                    5.0 FOLLOW-UP ACTIONS....................................................... 1 l                    ENCLOSURE 1      Annunciator Response ............................................... 2 i
l
    \
I i
                                                                                                                                                                            )
i i
i O
i I
i v                                                                                                                              .
6 AR-305                                          Rev. 28                                                              Page i
 
              .    ~ .....-. .          ~. .-. .  ..-  . . .-.  . _ . . . --    - ..  . _ . - .
i            1.0    PURPOSE                                                      g i
i  [,\
* O          1.1                                                                                      '
Establish a reference document for each Annunciator Window on the ES (B)-JH2 Lampbox.                                                              ;
1.2    Establish operator actions for valid Annunciator alarms on the                  <
ES (B)-JH2 Lampbox.                                                              :
l                                                                                                      i 1.3    Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the ES(B)-JH2 Lampbox.,
l
 
==2.0    REFERENCES==
I                                                                                                      I I
1 l2.1      DEVELOPMENTAL REFERENCES I
l 2.1.1  INPO 90-021, Good Practice OP-217, Alarm Response Procedures l            2.1.2  Annunciator Window Engraving Drawing E-224-048 i
2.1.3  MAR 94-07-07-01 CFT Level Setpoint 2.1.4  REA #930926 regarding operation of the RB Main Fan Assemblies l
l2.1.5    MAR 97-08-01-01, A/B EDG Protective Relaying i O 3.0    PERS00GIEL IMDCCTPINATION 3.1    The Annunciator System is powered from VBDP-5 Breaker 28.
4.0    INSTRUCTIONS l
4.1    Respond to alarms on the ES(B)-JH2 Lampbox as indicated on Enclosure 1, Annunciator Response.
                                                                  ~
5.0    FULLOW-UP ACTIONS None t
i d(*'
n
.            AR-305                              Rev. 28                            Page 1
 
l ENCLOSURE 1                  l (Page 1 of 52)
ESE ANNUNCIATOR RESPONSE                          ESB-JH2-01-01            E-01-01 l
EEEEEE I    I                                                                    RB SPRAY I    I ES B ACTUATION l    l EVENT POINT 0936                                ;
INDICATED CONDITION:
o 30 PSIG REACTOR BUILDING PRESSURE SETPOINT HAS BEEN EXCEEDED AS SENSED BY TWO OUT OF THREE RB PRESSURE SWITCHES (BS-21/22/23-PS)
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o ES STATUS LIGHTS FOR RB SPRAY o BUILDING SPRAY PUMP IS RUNNING IF A RB SPRAY PERMISSIVE IS PRESENT
  *O    o RE PRESSURE CONTROL BOARD INDICATOR BS-91-PI, BS-17-PI o COMPUTER POINT P-254 OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO EOP DISCUSSION:
HPI ACTUATION THROUGH BLOCK 6 WILL GIVE A BUILDING SPRAY PERMIT ACTUAL SETPOINT IS 2 24.5 PSIG 1 1.4 PSIG 1
i
 
==REFERENCES:==
DRAWING 208-028 SHEET ESB-70 SENSING ELEMENT: 63-Z1/RB-4,RB-5,RB-6 ES ACTUATION RELAYS, BS-21-PS, i
BS-22-PS,AND BS-23-PS r
AR-305                                Rev. 28                                                    Page 2
 
ENCLOSURE 1 (Page 2 of 52)
ESE ANNUNCIATOR RESPONSE                  ESB-JH2-01-02            E-01-02 RB SPRAY PP B
                                                                          ,                      TRIP EVENT POINT 0046                                            -
INDICATED CONDITION:
o BSP-1B BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o GREEN LIGHT ON WITH A RED FLAG ON BSP-1B CONTROL STATION o ES STATUS LIGHT
(
l I
OPEPATOR ACTIONS FOR A VALID ALARM:                                                                                      1 l
o HAVE BREAKER CUBICLE CHECKED FOR DROPPED RELAY TARGETS DISCUSSION:
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS i.
I
 
==REFERENCES:==
DRAWING 200-009 SHEET BS-02 l
!                SENSING ELEMENT: CS/SC, CS/O (CONTROL SWITCH CONTACTS) 52S, 52H O
I l
AR-305                                    Rev. 28                                                  Page 3 i
 
s          ,,      .  .t  ..    ~ . . ~ . . ..~ .    .        . . . - . .  - - . -    . .. . . ~ . - . - - ~ - ..
i 1
l I
i l
ENCLOSURE 1                  l (Page 3 of 52) l                                                                                                                        :
l                            ESE ANNUNCIATOR RESPONSE                ESB-JH2-01-03        E-01-03                      ,
I                                                                                                                        i l                                                                                                                        !
i                                                                                                                        ,
RB SPRAY PP B                            l MOTOR                            ;
OVERLOAD                              l I
t I
;                                                                      EVENT POINT 0060                                2 l
l l                INDICATED CONDITION:                                                                                    l 1
l o MOTOR AMPS >115% RATED LOAD
!                                                                                                                        i l                REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                                          l
    .-- /"'N      o HIGH BUILDING SPRAY FLOW AS SEEN ON BS-01-FI2 I I\              o HIGH MOTOR AMPS                                                                                    {
o BSP-1B TRIP                                                                                        l 1
l i                                                                                                                        1 l                OPERATOR ACTIONS FOR A VALID ALARM:                                                                      i I                                                                                                                        l o THROTTLE BSV-4 TO REDUCE LOAD ON BSP-1B                                                            {
                  .o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS o IF LOAD REMAINS HIGH CONSIDER TRIPPING BSP-1B                                                        '
DISCUSSION:
l i
THIS ALARM INDICATES THAT EITHER THE TIMED OVER CURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT l                  PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.
 
==REFERENCES:==
DRAWING 208-009 SHEET BS-02                                                            i SENSING ELEMENT: 51-IOC(INSTANTANEOUS) SI-TOC (TIMED) BREAKER CONTACTS 4
i l              AR-305                                Rev. 28                                            Page 4        i i
 
                                          -- .~    .  ,.      _ _ _ _    . _ . _ . .          . .
ENCLOSURE I (Page 4 c1 52) i Os ESE ANNUNCIATOR RESPONSE            ESB-JH2-01-04      E-01-04 l
l l
RB SPRAY PP B                          <
I l                                                            OUT OF SERVICE i
l EVENT POINT 0045                          ;
I INDICATED CONDITION:                                                                          ;
o ESP-1B BREAKER IS RACKED OU!J l
1 I
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
e  o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION 1
OPERATOR ACTIONS FOR A VALID AIARM                                                            (
o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT i
i l
DISCUSSION:
l REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS
 
==REFERENCES:==
DRAWING 208-009 SHEET BS-02 SENSING ELEMENT: 52-H BREAKER CONTACT                                                          l
  /%
, b l    AR-305                              Rev. 28                                        Page 5
 
I i                                                                                                            ,
i ENCMSURE 1 (Page 5 of 52) l                      ESE ANNUNCIATOR RESPONSE              ESB-JH2-01-04      E-01-04 l
l l                                                                                                            !
l                                                                        RB SPRAY PP B f
OUT OF SERVICE l
EVENT POINT 0062 l
INDICATED CONDITION:
o BSP-1B BREAKER HAS NO DC CONTROL POWER i
i l
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o NO INDICATING LIGHTS ON CONTROL STATION o ES STATUS LIGHTS INDICATE BREAKER POSITION r                                                                                                            :
OPERATOR ACTIONS FOR A VALID ALARM:
o VERIFY CLOSED DPDP-5B SWITCH 10                                                                  j o VERIFY DC KNIFE SWITCH FOR BSP-IB BREAKER CLOSED l
l DISCUSSION:
l THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING.
REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS.
l l          REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
l
 
==REFERENCES:==
DRAWING 208-009 SHEET BS-02 i        SENSING ELEMENT: 27C BREAKER RELAY                                                      l O                                                                -
1 AR-305          '
Rev. 28                                Page 6 1
i I
 
_    - - . -        . ~ . . - - -        .      . . - - - _ . ~ - -.
I i
                                                                                                              )
ENCLQSURE 1 I
(Page 6 of 52) em ESE ANNUNCIATOR RESPONSE                        ESB-JH2-01-05    E-01-05 RB SPRAY B FLOW HIGH/ LOW l                                                                      EVENT POINT 0048 l                                                                                                            l l    INDICATED CONDITION:
l l      o BUILDING SPRAY FLOW IS <1400 GPM AS MEASURED BY BS-1-FS2 FOR 30 SEC.
COINCIDENT WITH AN ES ACTUATION l
i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
l gs  o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM:
o VERIFY PROPER OPERATION OF BSV-4, OPEN BSV-4 AS REQUIRED o VERIFY BSP-1B NOT TRIPPED 1
i l
I DISCUSSION:
f      THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM.
TAKING LOCAL / AUTO CONTROL OF BSV-4 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.
i                                                                                                            l
,                                                                                                            J
 
==REFERENCES:==
DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-1-FS2 O
AR-305                                          Rev. 28                                      Page 7    I
 
ENCLOSURE 1
  /                                                                        (Page 7 of 52) k ESE ANNUNCIATOR RESPONSE                  ESB-JH2-01-05        E-01-05 RB SPRAY B FLOW HIGHILOW EVENT POINT 0050 l
INDICATED CONDITION:
o BUILDING SPRAY FLOW IS >1700 GPM AS MEASURED BY BS-I-FS2.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM o VERIFY PROPER OPERATION OF BSV-4, THROTTLE BSV-4 AS REQUIRED TO REDUCE FLOW l
l l
l DISCUSSION:                                                                                      j THE NORMAL BUILDING SPFAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM.
TAKING LOCAL / AUTO CONTROL OF BSV-4 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.
 
==REFERENCES:==
DRAWING 208-009 SHEET BS-11 l
SENSING ELEMENT: BS-1-FS2 O
  'L) l l      AR-305                                Rev. 28                                      Page 8
 
              ..        ..              _ . _ . .-_.          . . . . _ . . . - - - . -        .    - . . . ~      . . . - . ..
I ENCLOSURE 1                  i (Page 8 of 52)
ESE ANNUNCIATOR RESPONSE                                      ESB-JH2-01-05            E-01-05 RB SPRAY B FLOW HIGH/ LOW i                                                                                                                                      l t                                                                                                                                      ;
EVENT POINT 0064                                  . j F
INDICATED CONDITION:
l
!        o BUILDING SPRAY FLOW IS <1100 GPM AS MEASURED BY BS-82-FIS WITH DHV-43                                                      !
l            OPEN                                                                                                                      j l                                                                                                                                      '
t REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
i        o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER O                                                                                                                                  i l        OPERATOR ACTIONS FOR A VALID ALARM:
l        o VERIFY FROPER OPERATION OF BSV-4, OPEN BSV-4 AS REQUIRED l        o VERIFY BSP-1B NOT TRIPPED I
t DISCUSSION:
THE NORMAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR
!        THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO
}          CONTROL OF BSV-4, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.                                                                                                                    I l
I                                                                                                                                      i'
 
==REFERENCES:==
DRAWING 208-009 SHEET BS-11
(                                                                                                                                        l SENSING ELEMENT: BS-82-FIS I?
:                                                                                                                                      I I
l l      AR-305                                        Rev. 28                                                      Page 9 i
 
l l
ENCLOSURE 1 (Page 9 of 52) l                            ESE ANNUNCIATOR RESPONSE                                                            ESB-JH2-01-05            E-01-05 l
RB SPRAY B FLOW HIGH/ LOW l
EVENT POINT 0066                              <
i l
INDICATED CONDITION:                                                                                                                            )
o BUILDING SPRAY FLOW IS >1300 GPM AS MEASURED BY BS-82-FIS WITH DHV-4 3 OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                                                                                    l t
s      o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER                                                                              l OPERATOR ACTIONS FOR A VALID ALAPN:                                                                                                              ,
J o VERIFY PROPER OPERATION OF BSV-4, THROTTLE BSV-4 AS REQUIRED TO REDUCE FLOW l
DISCUSSION:
THE NOPEAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO. INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF BSV-4, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOU RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.
j-              REFERENCE 3:    DRAWING 208-009 SHEET BS-ll l
;              SENSING ELEMENT: BS FIS l
l I
l
!              AR-305                                                        Rev. 28                                                          Page 10
 
        .- =.          _.    .    ._  .      . . - _ .      - . _ - . - -    -    .. .        . . _ _ _    _    - - . . - .
i
!                                                                                              ENCLOSURE 1
[fs)
V (Page 10 of 52) l                            ESE ANNUNCIATOR RESPONSE                        ESB-JH2-02-01      E-02-01 I    I                                                            RB FAN B l    I                                                          HIGH SPEED I'    I                                                                TRIP I    I EVENT POINT 0352 INDICATED CONDITION:
o AHF-1B CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START, AND HIGH SPEED WINDINGS NOT ENERGIZED.
i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
  .              o GREEN HIGH SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND CONTROL
  ',                HANDLE PUSHED IN.                                                                                            .
OPERATOR ACTIONS FOR A VALID ALARM:
o INVESTIGATE CAUSE OF FAN TRIP                                                                                  1 o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-417                                                              )
o MONITOR RB TEMPERATURE AND PRESSURE                                                                            I DISCUSSION:
THIS ALARM WILL OCCUR IF THE FAN IS RUNNING IN HIGH SPEED AND AN ES ACTUATION OCCURS. THIS WILL TRIP THE FAN IN HIGH SPEED AND START THE FAN IN SLOW SPEED.
SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS.
ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.
l I
DRAWING 208-005 SHEET AH-29
 
==REFERENCES:==
 
SENSING ELEMENT: CS/1N, CS/SC, CS/O, 42/1F RELA l
l l
O AR-305                                    Rev. 28                                            Page 11
 
l l
I ENCLOSURE 1              I l/
I
    \                                                                        (Page 11 of 52)            l ESE ANNUNCIATOR RESPONSE              ESB-JH2-02-02          E-02-02                  l l
l l
l l
l                                                                                                          \
I                                                                                                          l RB FAN B                        l LOW SPEED                          l TRIP                        .
l EVENT POINT 0353 I
INDICATED CONDITION:                                                                                ;
l o AHF-1B CONTROL HANDLE PULLED OUT, IN NORMAL AFTER START, AND SLOW SPEED                          '
WINDINGS NOT ENERGIZED.                                                                        ,
I i
l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                                      l O    o GREEN LOW SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND THE CONTROL HANDLE PULLED OUT.
OPERATOR ACTIONS FOR A VALID ALARM:
o INVESTIGATE CAUSE OF FNi TRIP.
o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION:
I SOME THINGS TO CHECK AFTER A FNi TRIP ARE: FAN AND MOTOR TEMPS AS READ ON                        !
AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS.                            1 ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119'                        l ELEVATION.
 
==REFERENCES:==
DRAWING 208-005 SHEET AH-29                                                            l SENSING ELEMENT: CS/OUT, CS/SC, CS/O, CONTROL SWITCH CONTACTS 42/15 l                                                                                                          l
'O i
1.
:l 4
l      AR-305        ,
Rev. 28                                  Page 12
 
_ .-        .              ..  . . - . . . . ~ - . - - . . . . - . .- --.-          - . . . -      . . . .
l l
g                                                                                    ENCLOSURE 1 (Page 12 of 52)
ESE ANNUNCIATOR RESPONSE                    ESB-JH2-02-03        E-02-03                  )
l l
i RB FAN B
;                                                                                AIR FLOW
!                                                                                    LOW EVENT POINT 0354 INDICATED CONDITION:
o AHF-1B CONTROL HANDLE PUSHED IN AND IN NORMAL AFTER START AND LOW AIR FLOW IS SENSED BY AH-19-DPS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o REACTOR BUILDING TEMPS ARE INCREASING AS SEEN ON AH-536-TIR G
OPERATOR ACTIONS FOR A VALID ALARM:
o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-4I7 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION:
THIS ALARM MAY BE PRESENT WHEN AN ES ACTUATION HAS STARTED A PREVIOUSLY                                l RUNNING FAN IN SLOW SPEED. PLACING THE CONTROL HANDLE IN THE PULL OUT                                  l l            NORMAL AFTER START POSITION SHOULD CLEAR THE ALARM. ALSO IF THE FAN TRIPS THIS ALARM SHOULD ACTUATE.                                                                            j I
i l
REEERENCES: DRAWING 208-005 SHEET AH-29                                                                  ,
i          SENSING ELEMENT: AH-19-DPS r
[
  \
l l
t AR-305                                        Rev. 28                                      Page 13
 
          .          ._    _ ._    . _ . _ _ . . _ .        _ _ . ..      . . _ . . _-- . . _ _ _ .        -__ ._.m ENCLOSURE 1              [
(Page 13 of 52)
ESE ANNUNCIATOR RESPONSE                          ESB-JH2-02-04                    E-02-04 f
t RB FAN B l                                                                                    VIBRATION HIGH                            i l
EVENT POINT 0355 i
INDICATED CONDITION:
o AHF-1B HIGH VIBRATION CONDITION AS SENSED BY AH-20-ME1/2.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
I m  o FAN AND MOTOR TEMPS INCREASING ON AH-1003-TIR ON BACK OF CONTROL BOARD l l    o IF FAN IS RUNNING IN SLOW SPEED THEN CURRENT ON THE FAN MAY BE
  \        OSCILLATING.
l 1
OPERATOR ACTIONS FOR A VALID ALARM:
l o ALlEMPT TO RESET ALARM BY DEPRESSING RESET PUSHBUTTON ON CONTROL BOARD.
o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO l          SECURE THE FAN.
o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-417 l
DISCUSSION:
ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.
l l
l l
l
 
==REFERENCES:==
DRAWING 208-005 SHEET AH-137 l
SENSING ELEMENT: AH-20-MEl, AH-20-ME O
AR-305                                          Rev. 28                                              Page 14 l
 
i i    -
ENCLOSURE 1~
(Page 14 of 52)
ESE ANNUNCIATOR RESPONSE                        ESB-JH2-02-05      E-02-05 l
l I
l RB FAN B CONDENSATE HIGH E
EVENT POINT 1698              .
INDICATED CONDITION:
o AHF-1B CONDENSATE FLOW IS >1133 CC PER MINUTE AS SENSED BY AH-657-FIS.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o REACTOR BUILDING SUMP RATE OF RISE IS INCREASING AS SEEN ON BS-93-PIR.
k)
OPERATOR ACTIONS FOR A VALID ALARM:
o INVESTIGATE SOURCE OF CONDENSATE.
DISCUSSION:
SOME SOURCES OF HIGH CONDENSATION ARE:
RCS LEAK IN CONTAINMENT - CHECK PZR LEVEL AND MAKE UP TANK LEVEL TRENDS; FEEDWATER/ MAIN STEAM LEAK IN CONTAINMENT - CHECK FEEDWATER FLOWPATES; RB FAN COOLER SW LEAKS - CHECK SW SURGE TANK LEVEL IF ON SW, OR CI SURGE TANK LEVELS IF ON CI.
j         
 
==REFERENCES:==
DRAWING 208-005 SHEET AH-131 l
SENSING ELEMENT:AH-657-FIS r
I v
i l        AR-305                                  Rev. 28                                        Page 15
 
ENCLOSURE 1
[.                                                                    (Page 15 of 52)
ESB ANNUNCIATOR RESPONSE                ESB-JH2-02-05      E-02-05 THIS AR IS ONLY USED WHEN COLD LEG NOZZLE DAMS ARE INSTALLED PER MP-110C RCSG-1 B              >
NOZZLE DAM PROBLEM EVENT POINT 1698 INDICATED CONDITION:
o "B" SIDE NOZZLE DAM CONTROL CONSOLE IS IN ALARM REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o NOZZLE DAM PRESSURE 29 PSIG ON EITHER SEAL o NOZZLE DAM PRESSURE <6.5 PSIG ON EITHER SEAL o NOZZLE DAM AIR FLOW 29 SCFH o LOSS OF POWER TO THE CONTROL PANEL OPERATOR ACTIONS FOR A VALID ALARM:
o IMMEDIATELY INVESTIGATE SOURCE OF ALARM o REFER TO EOP-11 DISCUSSION:
THIS ALARM INDICATES POSSIBLE NOZZLE DAM SEAL DEGRADATION. IF THE SEAL FAILS, A REACTOR COOLANT LEAK WOULD DEVELOP, FLOODING THE PRIMARY SIDE OF THE STEAM GENERATORS WHERE PERSONNEL MAY BE AT WORK.
THIS EVENT POINT IS ONLY IN USE ON A TEMPORARY BASIS WHEN NOZZLE DAMS ARE INSTALLED. THE WINDOW "RB FAN B CONDENSATE HIGH" IS REMOVED FROM THE ANNUNCIATOR PANEL WHEN THIS EVENT POINT IS IN EFFECT.
 
==REFERENCES:==
MP-110C
,    SENSING ELEMENT: INTERNAL ALARM CIRCUITS INSIDE NOZZLE DAM CONTROL CONSOLE O
AR-305                                Rev. 28                                Page 16 ,
i
 
l ENCLOSURE 1 (Page 16 of 52)
ESE ANNUNCIATOR RESPONSE                ESB-JH2-02-06    E-02-06 t
I l                                                      ES B I                                                  ACTUATION
                      ------                                        TROUBLE I
EVENT POINT 1231              ,
j l
INDICATED CONDITION:                                                              l 1
o "B" ES ACTUATION SIGNAL ON ONE OR MORE ES CHANNELS REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o ES STATUS LIGHTS l      o ES BISTABLE TRIP INDICATORS OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO EOP DISCUSSION:
THIS ALARM INDICATES THAT AT LEAST ONE OF THREE CHANNELS OF "B" ES HAS l
ACTUATED, ANY HPI OR LPI BISTABLE TRIPPED WITH ES NOT BYPASSED, OR ANY 4 l      PSIG ES PRESSURE SWITCH ACTUATED WILL GIVE THIS ALARM. PLACING THE RC PRESSURE TEST MODULE IN " TEST" DEFEATS THIS ALARM FROM LPI OR HPI. WHEN l-      THE 4 PSIG TEST SWITCHES ARE IN THE " TEST" POSITION THIS ALARM IS DEFEATED l      FROM A 4 PSIG ACTUATION.
 
==REFERENCES:==
DRAWING 208-028 SHEET ES-AB-05
)    SENSING ELEMENT: VARIOUS ES ACTUATION CONTACTS O
i l
i t
;    AR-305                                Rev. 28                              Page 17
 
l l
ENCLOSURE 1 Q                                                                                            (Page 17 of 52) b                ESE ANNUNCIATOR RESPONSE                              ESB-JH2-03-01              E-03-01 l    l                                                        REACTOR BLDG l    l PRESS
                    ;    l HIGH (2 PSIG) l    I EVENT POINT 0067 INDICATED CONDITION:
o REACTOR BUILDING PRESSURE IS >2 PSIG AS SENSED BY BS-93-PS REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o CONTROL BOARD RB PRESSURE INDICATORS, BS-17-PI, BS-93-PIR o RB TEMP INDICATION AH-536-TIR o COMPUTER POINT P254
(/  OPERATOR ACTIONS FOR A VALID ALARM:
PROMPTLY TAKE ACTION TO REDUCE REACTOR BUILDING PRESSURE AND PREVENT A 4 PSIG ES ACTUATION. CONSIDER ONE OR MORE OF THE FOLLOWING ACTIONS:
o START SWP-1A AND/OR SWP-1B AND PLACE RB FAN ON SW COOLING.
o START RWP-2A AND/OR RWP-2B o ENSURE ONLY ONE RB FAN IS RUNNING DURING AN ES ACTUATION.
DISCUSSION:
POSSIBLE SOURCES OF HIGH RB PRESSURE ARE:
o LOSS OF RB FAN AND/OR COOLING WATER o STEAM AND/OR FEEDWATER LEAK INSIDE CONTAINMENT o RCS LEAK INSIDE CONTAINMENT o COMPRESSED AIR SYSTEM LEAKS INSIDE CONTAINMENT o INCREASED RB TEMP DUE TO RCS HEATUP, OR HIGH OUTDOOR TEMPS o HIGH RB FLOOD LEVEL IT IS RECOMMENDED TO RUN FAN IN SLOW SPEED SO AS TO PRECLUDE MOTOR
,        OVERLOAD IN A DENSE STEAM ATMOSPHERE AND RENDERING IT UNAVAILABLE. RUNNING l        SWP-1A AND SWP-1B SIMULTANEOUSLY FOR INCREASED SW FLOW TO FAN IS i        ACCEPTABLE AND WILL YIELD THE BEST RB COOLING PERFORMANCE.                                                            l i
 
==REFERENCES:==
DRAWING 208-009 SHEET BS-11                                                                                !
SENSING ELEMENT: BS-93-PS AR-305                                Rev. 28                                                        Page 18 1
 
I I
n                                                                                ENCLOSURE 1 (Page 18 of 52)        j ESE ANNUNCIATOR RESPONSE                    ESB-JH2-03-02    E-03-02              i l
I i
REACTOR BLDG TEMP                      i HIGH                  .I 1
l l                                                                  EVENT POINT 1700                      !
1                                                                                                        l l
INDICATED CONDITION:                                                                          ,
o REACTOR BUILDING TEMPERATURE IS >123.6*F AS SENSED BY AH-536-TY4 1
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o RB TEMP INDICATION AH-536-TIR                                                                1 o THE AVERAGE OF COMPUTER POINTS: S358, S359, S382, S383                                      :
o COMPUTER POINT S837 I
OPERATOR ACTIONS FOR A VALID ALARM:
TO REDUCE THE REACTOR BUILDING TEMPERATURE CONSIDER ONE OF THE FOLLOWING                      l ACTIONS:
o START SWP-1A AND/OR SWP-1B AND PLACE RB FAN ON SW COOLING                                  l o START RWP-2A AND/OR RWP-2B                                                                !
o ENSURE ONLY ONE RB FAN IS RUNNING DURING AN ES ACTUATION                                  '
l                                                                                                  1 DISCUSSION:                                          -
POSSIBLE SOURCES OF HIGH RB TEMPERATURE ARE:
o LOSS OF RB FAN AND/OR COOLING WATER o STEAM AND/OR FEEDWATER LEAK INSIDE CONTAINMENT o RCS LEAK INSIDE CONTAINMENT o RCS HEATUP OR HIGH OUTDOOR TEMPS RUNNING SWP-1A AND SWP-1B SIMULTANEOUSLY FOR INCREASED SW FLOW TO FAN IS ACCEPTABLE AND WILL YIELD THE BEST RB COOLING PERFORMANCE.
REFER TO TS FOR ADMINISTPATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-005 SHEET AH-131 SENSING ELEMENT: AH-536-TY4 AR-305                                Rev. 28                                  Page 19          I l
1
 
1 i
! e                                                                    ENCLOSURE 1 (Page 19 of 52)  i l
                              ~
I ESE ANNUNCIATOR RESPONSE              ESB-JH2-04-01      E-04-01    l l
    --                          ---                                                  1 I
I    l
!                    I    I                                    MAKEUP PP C I    I                                          TRIP I    I l
EVENT POINT 1047 INDICATED CONDITION:
o MUP-1C BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o GREEN LIGHT ON WITH A RED FLAG ON MUP-lC CONTROL STATION I
o ES STATUS LIGHT OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO OP-402 FOR RESTORATION OF RCP SERVICES PRIOR TO STARTING ANOTHER MUP o CONSIDER MINIMIZING LETDOWN FLOW o INVESTIGATE MUP-lC BREAKER FOR DROPPED RELAY TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP DISCUSSION:                                                                      l EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 200-041 SHEET MU-04 l
SENSING ELEMENT: CS/SC, CS/O, 52H/A, 52S/B O
l f
i  AR-305                                Rev. 28                            Page 20
 
1 I
ENCLOSURE 1
, .O j                                                                        (Page 20 of 52) l '%)
ESE ANNUNCIATOR RESPONSE              ESA-JH2-04-02            E-04-02 I
MAKEUP PP C
!                                                                  GEAR OlL PRESS l                                                                        Low l
EVENT POINT 1059                                  .
i INDICATED CONDITION:
o MUP-1C BREAKER CLOSED >2 SECONDS WITH GEAR OIL PRESS <7 PSIG AS SENSED BY MU-90-PS.                                                                                      ,
l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o MUP-SC BACK UP GEAR OIL PUMP AUTO STARTS l[          o COMPUTER POINT XO69
    \,
OPERATOR ACTIONS FOR A VALID ALARM:
o VERIFY MUP-5C DC BACK UP GEAR OIL PUMP STARTED o MONITOR MUP-1C VIA COMPUTER GROUP 72                                                              !
I I
DISCUSSION:
CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE UP PUMPS PER OP-402 l
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-51 SENSING ELEMENT: 2MUP-SC, MU-90-PS, 52S/A m)
AR-305                              Rev. 28                                  Page 21
 
ENCLOSURE 1 4
(Page 21 of 52)
ESE ANNUNCIATOR RESPONSE                                ESB-JH2-04-03                      E-04-03 MAKEUP PP C MOTOR OVERLOAD EVENT POINT 1045 INDICATED CONDITION:
o MUP-1C MOTOR AMPS >1156 RATED LOAD REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
4  o HIGH MOTOR AMPS                        .
o MUP-1C TRIP o HIGH FLOWRATES THROUGH MUP-1C OPERATOR ACTIONS FOR A VALID ALARM:
o TRIP MUP-1C o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS DISCUSSION:
THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.
IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-49 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE O
AR-305                                  Rev. 28                                                              Page 22
 
ENCLOSURE 1
[d                ESE ANNUNCIATOR RESPONSE                          ESB-JH2-04-04 (Page 22 of 52)
E-04-04 I
l                                                                                  MAKEUP PP C l                                                                                  LUBE OlL PUMP i                                                                                      TRIP l
!                                                                                                              1 l                                                                        EVENT POINT 1050                      i l                                                                                                              l t                                                                                                              i
!                                                                                                              l INDICATED CONDITION:
o MUP-2C CONTROL HANDLE IN NORMAL AFTER START POSITION WITH THE MOTOR NOT ENERGIZED.
I j
I REDUNDANT INDICATION WHICH WILL VERITY ALARM:
o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION l        o LOW LUBE OIL PRESSURE ALARM                                                                        l o MUP-3C, BACK-UP LUBE OIL PUMP, AUTO START
!        OPERATOR ACTIONS FOR A VALID ALARM:
o ENSURE MUP-3C, BACK-UP LUBE OIL PUMP, STARTED l
t l
DISCUSSION:
THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.
MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 72.              CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-07 SENSING ELEMENT: CS/SC, CS/O, 42B i
i O
AR-305                                    Rev. 28                                        Page 23
 
        . -      - -                          -  --    .      . - . .        -. - ~ -              .
l l
i l  g                                                                                  ENCLOSURE 1
      )                                                                        (Page 23 of 52) a ESE ANNUNCIATOR RESPONSE              ESB-JH2-04-04                E-04-04 l
MAKEUP PP C LUBE OlL PUMP TRIP EVENT POINT 1056 l
l l            INDICATED CONDITION:
l o MUP-3C CONTROL HANDLE IN THE NORMAL AFTER START POSITION WITH THE MOTOR NOT ENERGIZED.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o MAKEUP PUMP OIL PRESSURE LOW ALARM o COMPUTER POINT X069 l
l OPERATOR ACTIONS FOR A VALID ALARM:
l              o MONITOR MUP-1C BEARING TEMPS DISCUSSION:
THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.
l              MONITOR THE MAKEUP PUMP VIA COMPUTER GROUP 72. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKEUP PUMPS.
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-32
'            SENSING ELEMENT: CS/SC, CS/O, CR1 O                                                                      .
l AR-305                                Rev. 28                                      Page 24
 
ENCLOSURE 1
: e.                                                                        (Page 24 of 52)
ESE ANNUNCIATOR RESPONSE              ESB-JH2-04-06      E-04-06 I    I I    I I    I                                  AUX STEAM ISO I    I                                      (ASV-196)
                                          ---                            BYPASSED                ,
l EVENT POINT 1961                i INDICATED CONDITION:                                                                ;
I o . CONTROL SWITCH FOR ASV-196 AUX STEAM SOLENOID VALVE IS IN THE OPEN/ BYPASS POSITION.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                      )
o ASV-196 SELECTOR SWITCH POSITION l
OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO OP-608                                                                  l I
I DISCUSSION:                                      .
THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-196 ON HIGH l
TEMPERATURE OR LOW AUX STEAM PRESSURE IS DISABLED. THIS IS A HIGH ENERGY LINE BREAK CONCERN.
i l
[           
 
==REFERENCES:==
DRAWING 208-008 SHEET AS-05 SENSING ELEMENT: CS/NC
: v i
i          AR-305'                                Rev. 28                                Page 25
 
ENCLOSURE 1 (N                                                                    (Page 25 of 52)
ESE ANNUNCIATOR RESPONSE              ESB-JH2-05-02      E-05-02 MAKEUP PP C LUBE OIL PRESS LOW EVENT POINT 1043 INDICATED CONDITION:
o LUBE OIL PRESS AS SENSED BY MU-48-PS3 IS <3 PSIG.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
1
  /\    o MUP-3C, BACK UP LUBE OIL PUMP, AUTO STARTS
                                                                                        )
OPERATOR ACTIONS FOR A VALID ALARM:
o ENSURE MUP-3C HAS STARTED l
l DISCUSSION:
THIS ALARM INDICATES INADEQUATE LUBRICATION FOR MUP-lC. IF THE PUMP IS RUNNING, IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP PLACED IN SERVICE. REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.
l l     
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: 43/3C, MU-42-PS3                                                l l
L' )
i l                                                                                        l l      AR-305                                Rev. 28                            Page 26
 
I
!                                                                                  ENCLOSURE 1 (Page 26 of 52)
ESE ANNUNCIATOR RESPONSE                ESB-JH2-05-03          E-05-03 i
i                                                                            MAKEUP PP C LUBE OIL PUMP AUTO START EVENT POINT 1055                                  . j INDICATED CONDITION:
o MUP-3C CONTROL HANDLE IN THE NORMAL AFTER STOP POSITION AND MOTOR IS                                    I ENERGIZED REDUNDANT INDICATION WHICH WILL VERITY AIARM:                                                              !
o RED LIGHT ON WITH A GREEN FLAG ON MUP-3C CONTROL STATION o COMPUTER POINT XO69 v                                                                                                                    l l
t i
OPERATOR ACTIONS FOR A VALID ALARM:
o ENSURE MUP-3C IS RUNNING l
DISCUSSION:
THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.
MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 72. CONSIDERATION SHOULD BE GIVING TO SWAPPING MAKE-UP PUMPS.
l l           
 
==REFERENCES:==
DRAWING 200-041 SHEET MU-32 l
SENSING ELEMENT:    CS/ST, CS/ST, CS/O, CR1 l
  .CT
(,)
AR-305                                Rev. 28                                  Page 27
 
_.                        _  _. ._m - - _ _ _ _  _ . _ _ _ . . _ . . ,  ___  _ _ _ _ . _          .. ....m l
l t
l
[      ~                                                                              ENCLOSURE I (Page 27 of 52)
ESE ANNUNCIATOR RESPONSE                        ESB-JH2-05-04                E-05-04 l
l MAKEUP PP C OUT OF SERVICE EVENT POINT 1044 INDICATED CONDITION:
i          o MUP-1C BRFAKER HAS NO DC CONTROL POWER I
l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o NO INDICATING LIGHTS ON CONTROL STATION.
  '7        o ES STATUS LIGHTS INDICATE BREAKER POSITION.
i
,  (
OPERATOR ACTIONS FOR A VALID AIARM o VERIFY CLOSED DPDP-5B SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MUP-1C BREAKER CLOSED l
DISCUSSION:
THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING.
REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-04I SHEET MU-04 SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MUP-1C
;        AR-305                                      Rev. 28                                        Page 28 i
 
    ,  ..              ._ . .  . _  . ~ . .      - - .  -      _        ._ . . _ .        - ~ . . -
l i
l l
p i.,
ENCLOSURE 1 (Page 28 of 52)
,                                                                                                            i ESE ANNUNCIATOR RESPONSE              ESB-JH2-05-04      E-05-04 l
l                                                                    l l                                                                    MAKEUP PP C OUT OF SERVICE EVENT POINT 1046                              '
INDICATED CONDITION.
o MUP-1C BREAKER IS RACKED OUT AND MUP-lc IS SELECTED FOR ES START                                l l
j l
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o NO INDICATING LIGHTS ON CONTROL STATION O      o NO ES STATUS INDICATION OPERATOR ACTIONS FOR A VALID ALARM:
o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT DISCUSSION:
TWO PUMPS SHOULD BE SELECTED FOR ES START.                                                      ,
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: 43/3C CUBICLE 3B5, 52H/b CUBICLE 3B5 FOR MUP-1C 1
l                                                                                                          I l
i AR-305                                  Rev. 28                                  Page 29
 
l j                                                                                                    ENCLOSURE 1        !
(Page 29 of 52) l ESE ANNUNCIATOR RESPONSE                                ESB-JH2-05-06                  E-05-06 l
I i
l      l                                                                                      :
I      I l                        l      I                                                    AUX STEAM ISO.
I      I                                                        (ASV-196)
          --                                      -                                    AUTO CLOSED EVENT POINT 1817 INDICATED CONDITION:
l o CONTROL SWITCH FOR ASV-196 AUX STEAM SOLENOID VALVE IS IN THE AUTO POSITION AND THE VALVE IS CLOSED.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
g  o ASV-196 SELECTOR SWITCH IN AUTO i  o GREEN INDICATOR LIGHT ON SELECTOR SWITCH OPERATOR ACTIONS FOR A VALID AIARM:
o REFER TO OP-608 l
l l
DISCUSSION:                                                                                                        j i
THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-196 ON EITHER LOW AUX STEAM PRESSURE OR HIGH AUX STEAM PRESSURE HAS OCCURRED. A LOW PRESSURE ACTUATION OCCURS AT <100 PSIG AND A HIGH PRESSURE ISOLATION OCCURS AT >250 PSIG AUX STEAM HEADER PRESSURE IN THE AUX BUILDING.                                                              I l
l
 
==REFERENCES:==
DRAWING 208-008 SHEET AS-05 I
SENSING ELEMENT: 3ASV-196-SV1, 33C/ASV-196-SV, AS-36-PS1,AS-36-PS3 if 2 t                                                                                .
I i
l  AR-305        ,                                  Rev. 28                                              Page 30 i
n                          .              _      .                            _      _
 
ENCLOSURE 1          ;
(Page 30 of 52)        ;
w ESE ANNUNCIATOR RESPONSE                    ESB-JH2-06-Ol            E-06-01 2          EE I I                      MAKEUP PP B                          I I l                                TRIP                      ,
I I                                                            ,
I I                                                            !
1 EVENT POINT 1101                          i INDICATED CONDITION:
o MUP-1B BREAKER OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION.
l l
l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
3      o GREEN LIGHT ON WITH A RED FIAG ON MUP-1B CONTROL STATION.                                          j o ES STATUS LIGHT.                                                                                    i OPEPATOR ACTIONS FOR A VALID ALARM:
o REFER TO OP-402 FOR RESTORATION OF RCP SERVICES PRIOR TO STARTING ANOTHER MUP o CONSIDER MINIMIZING LETDOWN FLOW                                                                    l o INVESTIGATE MUP-1B BREAKER FOR DROPPED TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP DISCUSSION:
EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-13
/      SENSING ELEMENT: CS/SC, CS/O, 52H/A, 52S/B I
l AR-305                                      Rev. 28                                    Page 31
 
i i
rg                                                                          ENCLOSURE 1                          *
(Page 31 of $2)
ESE ANNUNCIATOR RESPONSE              ESB-JH2-06-02                  E-06-02 l
l l
MAKEUP PP B i                                                                LUBE OlL PRESS LOW EVENT POINT 1097 INDICATED CONDITION:
j      o LUBE OIL PRESSURE AS SENSED BY MU-45-PS3 IS <3 PSIG.
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o MUP-3B BACK UP LUBE OIL PUMP AUTO STARTS i
OPERATOR ACTIONS FOR A VALID ALARM:
o ENSURE MUP-3B HAS STARTED DISCUSSION:
THIS AL'-GM INDICATES INADEQUATE LUBRICATION FOR MUP-1B. IF THE PUMP IS RUNNING, IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP PLACED IN SERVICE. REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.
i i   
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-02 l
l    SENSING ELEMENT: 43CS/3B7-3B, MU-45-PS3 O
AR-305                                Rev. 28                                          Page 32
 
          .-        . . - - .          . . .    .  . . . .        ..  ~.. - ~      . - -        . . - .        - . - . . -
l ENCLOSURE 1
['                                                                                  (Page 32 of 52)
  \
ESE ANNUNCIATOR RESPONSE                ESB-JH2-06-03          E-06-03 MAXEUP PP B MOTOR OVERLOAD EVENT POINT 1099                                      . i l
INDICATED CONDITION:
o MUP-1B MOTOR AMPS >115% RATED LOAD.
REDUNDANT INDICATION WHICH WILL VERIFY AIARM o HIGH MOTOR AMPS O          o MUP-1B TRIP h          o HIGH FLOWRATES THROUGH MUP-1B OPERATOR ACTIONS FOR A VALID ALARM:
o TRIP MUP-1B o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS DISCUSSION:
THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.
IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-13 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE l
;O i
AR-305                                            Rev. 28                              Page 33
 
    ,  . - - . -      .          . ~ . - ..- --          -
l
!                                                                                      ENCLOSURE 1
!                                                                                    (Page 33 of 52)
! U ESE ANNUNCIATOR RESPONSE                        ESB-JH2-06-04        E-06-04 l
MAKEUP PP B OUT OF SERVICE EVENT POINT 1098 I
i i
INDICATED CONDITION:
o MUP-1B BREAKER HAS NO DC CONTROL POWER l
l l
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
f-    o NO INDICATING LIGHTS ON CONTROL STATION                                                    j
(      o ES STATUS LIGHTS INDICATE BREAKER POSITION V
i OPERATOR ACTIONS FOP A VALID ALARM:
o VERIFY CLOSED DPDP-5B SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MUP-1B BREAKER CLOSED 1
l DISCUSSION:
THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING REFER TO OP-703 FOR LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
l
 
==REFERENCES:==
DRAWING 208-041 SHEET MU-02 l
l      SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MUP-1B O
f AR-305                                      Rev. 28                                    Page 34
 
i I%
ENCLOSURE 1 (Page 34 of 52)
ESE ANNUNCIATOR RESPONSE              ESB-JH2-06-04          E-06-04        .;
I
;                                                                  MAKEUP PP B l
l                                                                OUT OF SERVICE EVENT POINT 1100 l
l INDICATED CONDITION:
l i        o MUP-1B BREAKER IS RACKED OUT AND MUP-1B IS SELECTED FOR ES START.
l
                                                                                                  )
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                            )
j        o NO INDICATING LIGHTS ON CONTROL STATION                                                l o NO ES STATUS INDICATION                                                                !
l-l                                                                                                l I      OPERATOR ACTIONS FOR A VALID ALARM:
I        e INVESTIGATE THE CAUSE FOR THE BREAKER BEING RACKED OUT l
DISCUSSION:
TWO PUMPS SHOULD BE SELECTED FOR ES START.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
RO 4RENCES:      DRAWING 208-041 SHEET MU-13 SENSING ELEMENT: 43/3B ON CUBICLE 3B5, 52H/B IN CUBICLE 3B4 O
AR-305                                    Rev. 28                            Page 35 i
 
                              ..            -          - .=.  .        -        -    _  _ . . . - . _ .
  -s                                                                          ENCLOSURE 1 (Page 35 of 52)
ESE ANNUNCIATOR RESPONSE                ESB-JH2-07-06      E-07-06 H2 SAMPLING PANEL B
        ------                                  -                        TROUBLE l
l EVENT POINT 0256 l
INDICATED CONDITION:
l o PASS RB H2 ANALYZER "B" MALFUNCTION o HIGH RB H2 CONCENTRATION                                                                      i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o LOSS OF POWER TO PANEL
. '\j b        o OVERPRESSURE TO PANEL AT >4 PSIG o LOW FLOW TO PANEL AT <1 SCFH o THERMO ELECTRIC COOLER <0.1 AMPS o RB H2 CONCENTRATION >3%
OPERATOR ACTIONS FOR A VALID ALARM:
o NOTIFY NSS/NSM AND EC OF HYDROGEN CONCENTRATION o I_F RB H2 2 3%
THEN GO TO EM-225A o OR NOTIFY I&C SUPERVISION OF H2 ANALYZER MALFUNCTION 3  DISCUSSION:
THIS ALARM INDICATES EITHER THE POST ACCIDENT H2 CONCENTRATION INSIDE THE
          'RB IS HIGH, OR THE PASS H2 ANALYZER IS MALFUNCTIONING. EOP-14 PROVIDES GUIDANCE FOR PLACING THE HYDROGEN MONITORS IN SERVICE AND FOR TRENDING HYDROGEN LEVELS DURING A LOCA. EM-225A PROVIDES GUIDANCE TO TREND THIS DATA AND HOW TO PURGE THE REACTOR BUILDING.
 
==REFERENCES:==
DRAWING 208-062 SHEET WS-06 i        SENSING ELEMENT: VARIOUS FLOW / PRESSURE / CURRENT SWITCHES INSIDE THE SAMPLER A
  ~V                                                                '
AR-305          ,
Rev. 28                              Page 36
 
I                                                                              F.NCLOSURE 1 (P' age 36 of 52) i                    ESE ANNUNCIATOR RESPONSE                ESB-JH2-08-01      E-08-01 l
EEEEEE I    I                DIESEL GEN B l                                              l    l                    FAILED I    I                  TO START I    I EVENT POINT 1208 l
INDICATED CONDITION:
l        o  "B" EGDG HAS A START COMMAND AND LUBE OIL PRESSURE AS SENSED BY l          DL-10-PS IS <6 PSIG AFTER 7 SECONDS OR o  "B" EGDG HAS A START COMMAND AND ENGINE SPEED AS SENSED BY EG-20-SS IS <250 RPM AFTER 7 SECONDS REDUNDANT INDICATION WHICH WILL VERIF'.? ALARM:
o EGDG-1B TRIPS                                                                        j o CONTROL BOARD " CRANK" LIGHT GOES OUT AND WHITE " READY" LIGHT DOES NOT              1 COME ON o EGDG-1B STARTING AIR PRESSURE LOW ALARM ANNUNCIATES OPERATOR ACTIONS FOR A VALID ALARM:
i o INSPECT EGDG-1B FOR CAUSE OF FAIL' IRE TO START o RESET PUSHBUTTON MUST BE DEPRESSED ON EGDG GAUGE BOARD PRIOR TO EGDG RESTART.                                        ,
DISCUSSION:
l        THIS ALARM INDICATES THE DIESEL TRIED TO START AND DID NOT. SOME POSSIBLE i
CAUSES OF THIS ARE: PROBLEMS WITH DIESEL FUEL SYSTEM, LUBE OIL SYSTEM PROBLEMS OR DIESEL SPEED SENSOR PROBLEMS. THIS ALARM IS STILL ACTIVE WITH AN ES SIGNAL PRESENT BUT WILL NOT DE-ENERGIZE THE STARTING AIR SOLENOIDS, SO THE DIESEL WILL CRANK UNTIL IT EITHER STARTS OR RUNS OUT OF AIR.
(     
 
==REFERENCES:==
DRAWING 208-027 SHEET EG-16, EG-02, EG-04, EG-06 SENSING ELEMENT: DL-10-PS, DL-20-SS, START FAIL REIAY l
AR-305                                    Rev. 28                            Page 37
 
i ENCLOSURE 1 (Page 37 of 52)
ESE ANNUNCIATOR RESPONSE              ESB-JH2-08-01      E-08-01    t i
t EEEEEE                                                                            l l    l                  DIESEL GEN B l    I                    FAILED            !
I    I                  TO START I    I                                        ,
1 EVENT POINT 1215                i l
INDICATED CONDITION:
o "B" EGDG HAS TRIPPED IT'S PHASE DIFFERENTIAL CURRENT RELAY o "B" EGDG TRIPS AND BREAKER 3210 OPENS o "B" EGDG 86 DG LOCKOUT RELAY HAS ACTUATED l
1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                      l O            o "B" ES 4160V BUS DE-ENERGIZES o CONTROL BOARD "RUN" LIGHT GOES OUT OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO AP-770 o INSPECT EGDG-1B FOR CAUSE OF DIFFERENTIAL CURRENT CONDITION o LOCKOUT RELAY MUST BE MANUALLY RESET ONCE PROBLEM IS RESOLVED.
DISCUSSION:
THIS ALARM INDICATES THE DIESEL GENERATOR HAS EITHER, A PHASE TO PHASE SHORT OR A PHASE TO GROUND SHORT. THIS CONDITION WILL TRIP THE DIESEL AND PREVENT IT FROM STARTING. THE CAUSE OF THIS PROBLEM MUST BE RESOLVED PRIOR TO ANY ATTEMPT BEING MADE TO RESTART AND RELOAD THE DIESEL GENERATOR.
l
 
==REFERENCES:==
DRAWING 208-027 SHEET EG-16
,              SENSING ELEMENT: 86-DG-3B, 87A, 87B, 87C DIFFERENTIAL CURRENT RELAYS i
AR-305                                Rev. 28                              Page 38
 
I i
ENCLOSURE 1      j
().
(Page 38 of 52) j ESE ANNUNCIATOR RESPONSE          ESB-JH2-08-02        E-08-02 i
l i
i DIESEL GEN B                i l
TROUBLE              ,
l EVENT POINT 1203                . j l
INDICATED CONDITION:
o "B" EGDG LUBE OIL TEMP AS SENSED BY DL-12-TS IS <115'T OR o "B" EGDG JACKET COOLANT TEMP AS SENSED BY DJ-29-TS $130'r g          REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                        ,
t                                                                                                  i L          o LOCAL TEMP INDICATION FOR LUBE OIL OR JACKET COOLANT TEMPS LOW o DIESEL GENERATOR ALARM PANEL DROP TARGET FOR LOW LUBE OIL / JACKET COOLANT TEMP.
OPERATOR ACTIONS FOR A VALID ALARM:
o ENSURE PROPER OPERATION OF LUBE OIL HEATERS DLHE-4 o ENSURE PROPER OPERATION OF JACKET COOLANT HEATER DJHE-2 o REFER TO OP-707 DISCUSSION:
EGDG LUBE OIL TEMP MUST BE MAINTAINED >110' F FOR OPERABILITY
!              REQUIREMENTS.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
l l
 
==REFERENCES:==
DRAWING 208-027 SHEET EG-08
; A          SENSING ELEMENT: DL-12-TS DJ-29-TS i
l AR-305                                  Rev. 28                              Page 39
 
ENCLOSURE 1 (Page 39 of 52)
ESE ANNUNCIATOR RESPONSE          ESB-JH2-08-02      E-08-02      i i
DIESEL GEN B TROUBLE EVENT POINT 1209                :
I 1
INDICATED CONDITION:
o "B" EGDG LOCAL ALARM PANEL HAS A DROPPED TARGET REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o INFORMED BY THE AUX BUILDING OPERATOR OF EGDG-1B LOCAL ALARM PANEL DROP TARGET.
OPERATOR ACTIONS FOR A VALID ALARM:
o REFER TO AR-902 DISCUSSION:
THIS ALARM INDICATES A DIESEL GENERATOR LOCAL ANNUNCIATOR DROP TARGET HAS DROPPED. IMMEDIATE INVESTIGATION OF ALARM CAUSE SHOULD BE INITIATED.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-027 SHEET EG-IB SENSING ELEMENT: VARIOUS SENSORS ASSOCIATED WITH LOCAL ALARM PANEL
  . D
,  V AR-305                                    Rev. 28                            Page 40 l
l t
 
i l g)
ENCLOSURE 1 (Page 40 of 52)
ESE ANNUNCIATOR RESPONSE              ESB-JH2-08-03      E-08-03 i
i                                                                                                        1 l                                                                                                        1 l
DIESEL GEN B OUT OF SERVICE EVENT POINT 1197                      :
1 I
INDICATED CONDITION:
o "B" EGDG HAS HAD A LOSS OF DC CONTROL POWER l
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o EGDG-1B STARTS WITH NO AUTO START SIGNAL                                                I l              o EGDG-1B CONTROL CIRCUIT INDICATOR LIGHTS ON MAIN CONTROL BOARD OR INSIDE THE DIESEL GENERATOR ROOM ARE OFF I
OPERATOR ACTIONS FOR A VALID ALARM:
o VERIFY DPDP-6B SWITCHES 12 AND 14 ARE CLOSED o CHECK EGDG-1B CONTROL POWER FUSES o REFER TO OP-707 i-l          DISCUSSION:
A LOSS OF DC CONTROL POWER WILL AFFECT THE DIESEL DIFFERENTLY DEPENDING ON                j WHICH CIRCUIT LOSES POWER. IF ALL DC POWER IS LOST THE DIESEL WILL START                  l l              AND YOU WILL ONLY BE ABLE TO SHUT IT DOWN LOCALLY BY TRIPPING THE FUEL                    l RACKS. IF OTHER FUSES ARE BLOWN THE EFFECT WILL VARY FROM LOSS OF GOVERNOR CONTROL TO A LOSS OF PROTECTIVE RELAYING ASSOCIATED WITH THE DIESEL. THE                I CAU3E OF THIS ALARM SHOULD BE INVESTIGATED IMMEDIATELY.                                  1 i
l              REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
I I
 
==REFERENCES:==
DRAWING 208-027 SHEET EG-18, EG-04, EG-10, EG-06, EG-16 l          SENSING ELEMENT: A,B,C,D,E, LOSS OF POWER RELAYS                                            .
A                                                                                                  i i
l        AR-305                                  Rev. 28                                    Page 41 l
l
 
                                                                                                                        )
    .                                                                                      ENCLOSURE 1 (Page 41 of 52)
  %.)                                                                                                                  l ESE ANNUNCIATOR RESPONSE                            ESB-JH2-08-03      E-08-03                  ;
1 l
I i
l
_                                  DIESEL GEN B                        l OUT OF SERVICE 1
EVENT POINT 1210                          l INDICATED CONDITION:
o  "B" EGDG START AIR AS SENSED BY EG-12-PS IS <225 PSIG f    REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
OPERATOR ACTIONS FOR A VALID ALARM o INVESTIGATE CAUSE OF LOW AIR PRESSURE ALARM.
o VERIFY EGDG-1B AIR COMPRESSOR, EGP-1B RUNNING o CHECK EGDG-1B FOR AIR LEAKS DISCUSSION:
A LOSS OF STARTING AIR WILL EVENTUALLY CAUSE THE DIESEL TO START WHEN PRESSURE IS NO LONGER HIGH ENOUGH TO HOLD THE AUTO START VALVES CLOSED. IF                                  i EGP-1B IS OUT OF SERVICE THEN CONSIDERATION SHOULD BE GIVEN TO CROSS                                        I l          CONNECTING THE DIESEL START AIR SYSTEMS BY OPENING EGV-25 AND EGV-26.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
4 f
 
==REFERENCES:==
DRAWING 208-027 SHEET EG-18, EG-08 p      SENSING ELEMENT: EG-12-PS
. O                                                                              '
!                                                                                                                        I AR-305      ,
Rev. 28                                            Page 42                l l
 
l ENCLOSURE 1 (Page 42 of 52)
ESE ANNUNCIATOR RESPONSE                    ESB-JH2-08-03      E-08-03 l
l I
l DIESEL GEN B OUT OF SERVICE EVENT POINT 1211 INDICATED CONDITION:
o ANY "B" EGDG AUTO / MANUAL CONTROL SWITCH NOT IN THE AUTO POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o NOTIFIED BY PRIMARY PLANT OPERATOR EGDG-IB CONTROL SWITCH NOT IN AUTO
, U  OPERATOR ACTIONS FOR A VALID ALARM:
o NOTIFY PRIMARY PLANT OPERATOR TO RETURN CONTROL SWITCH TO AUTO DISCUSSION:
THE FOLLOWING SWITCHES NOT IN AUTO WILL GIVE YOU THIS ALARM:
JACKET COOLING PUMP    JACKET COOLANT HEATER        STANDBY LUBE OIL PUMP DC FUEL OIL PUMP        DC FUEL OIL XFER FUMP        AC FUEL OIL XPER PUMP AC AIR COMPRESSOR      DIESEL AUTO / MAN (MCB)
NORMAL /AT ENGINE SWITCH ON DIESEL GAUGE BOARD IN "AT ENGINE" REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
i l
 
==REFERENCES:==
DRAWING 208-027 SHEET EG-18, EG-08 SENSING ELEMENT: VARIOUS EGDG-1B CONTROL SWITCH CONTACTS                                                j I
A l
l' l
AR-305                              Rev. 28                                    Page 43 1
 
          ._                                          _  _ _ _ . _ _ . _      . _ , . ~ . - . _ .            . _ . - - . __ _
l t
!                                                                                                      ENCLOSURE 1
    -                                                                                                (Page 43 of 52) l V                                                                                                                              1 ESE ANNUNCIATOR RESPONSE                        ESB-JH2-08-04                  E-08-04 i
l CF TANK B                          i
!                                                                                                  LEVEL
:::dH/ LOW l
EVENT POINT 0117 I
j            INDICATED CONDITION:
o CFT-1B LEVEL AS SENSED BY CF-2-LS3 IS >13'4" REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 s        o COMPUTER POINT P201 1
V OPERATOR ACTIONS FOR A VALID ALARM:
o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:
A HIGH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES LEAKING                                          ;
BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. ALSO CORE                                          l FLOOD ADDITION VALVES MAY BE LEAKING BY.
l REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 l
SENSING ELEMENT: CF-2-LS3
,                                                                                                                                l
        )
i AR-305                              Rev. 28                                                    Page 44
 
I i
l 3                                                                                            ENCLOSURE I
!/    i                                                                                    (Page 44 of 52) l O ESE ANNUNCIATOR RESPONSE                        ESB-JH2-08-04              E-08-04 F
r i
l      ,
* CF TANK B LEVEL HIGH/ LOW EVENT POINT 0118                                      .
i l            INDICATED CONDITION:
o CFT-1B LEVEL AS SENSED BY CF-2-LS4 IS >13'4" REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                                                          '
!            o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 o COMPUTER POINT P201 4
J OPERATOR ACTIONS FOR A VALID ALARM:
o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:
I            A HIGH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. ALSO CORE FLOOD ADDITION VALVES MAY BE LEAKING BY.
t              REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
t.
l           
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS4                                                                                              l l
C
()\
l AR-305                                      Rev. 28                                        Page 45                      .
1
 
                                - . ..  -      . - .  ~ - .  .    -. . . _ _      .      . -
i l
l
!                                                                              ENCLOSURE I (Page 45 of 52) l %
l                ESE ANNUNCIATOR RESPONSE              ESB-JH2-08-04              E-08-04 l                    .
CF TANK B LEVEL HIGH/ LOW EVENT POINT 0119 INDICATED CONDITION:
o CFT-1B LEVEL AS SENSED BY CF-2-LS3 IS <12'3" REDUNDANT INDICATION WHICH WILL VERIFY A1 ARM:
o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 o COMPUTER POINT P201 ik OPERATOR ACTIONS FOR A VALID ALARM:
o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:
A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY.
ALSO CORE FLOOD SAMPLE VALVES MAY BE LEAKING BY.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS3 l
l O
i l
l AR-305                                Rev. 28                                    Page 46
 
l                                                                            ENCLOSURE 1
(                                                                      (Page 46 of 52)
  \
t ESE ANNUNCIATOR RESPONSE            ESB-JH2-08-04      E-08-04 i
l l
CF TANK B LEVEL HIGH/ LOW l
;                                                          EVENT POINT 0120 l        INDICATED CONDITION:
o CFT-1B LEVEL AS SENSED BY CF-2-LS4 IS <12'3" l
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 l        o COMPUTER POINT P201
, I l(
OPERATOR ACTIONS FOR A VALID ALARM:
o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:
1 A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY.
ALSO CORE FLOOD SAMPLE VALVES MAY BE LEAKING BY.
REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS4 A
L)-
AR-305                                Rev. 28                            Page 47
 
l l
l ENCLOSURE I (Page 47 of 52)
!  O ESE ANNUNCIATOR RESPONSE                  ESB-JH2-08-05    E-08-05 CF TANK B PRESS i                                                                    HIGH/ LOW EVENT POINT 0113 INDICATED CONDITION:
o CFT-1B PRESSURE AS SENSED BY CF-1-PS3 IS >615 PSIG REDUNDANT INDICATION WHICH WILL VERIFY AIARM:
o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4 1 fh OPERATOR ACTIONS FOR A VALID ALARM:
l      o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE l      o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:
INCREASING REACTOR BUILDING TEMPEPATURES, NITROGEN VALVE LEAKBY FROM N2 l
BOTTLES, OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE.
PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE l      REQUIREMENTS.
l l
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 l-l SENSING ELEMENT: CF-1-PS3 AR-305                              Rev. 28                                  Page 48
 
l l
l l (g                                                                        ENCLOSURE 1
, 4  4                                                                    (Page 48 of 52) 1
  %/
ESE ANNUNCIATOR RESPONSE                ESB-JH2-08-05    E-08-05 l
CF TANK B PHESS HIGH/ LOW EVENT POINT 0114 l                                                                                        l INDICATED CONDITION:
o CFT-1B PRESSURE AS SENSED BY CF-1-PS4 IS >615 PSIG l
REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4 v
OPERATOR ACTIONS FOR A VALID ALARM:                                              I o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION l
DISCUSSION:
INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES, OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE.                                        ,
PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS4 U.m i
l l
AR-305                              Rev. 28                              Page 49
 
l  ,q                                                                        ENCLOSURE 1 (Page 49 of 52)
      ).
ESE ANNUNCIATOR RESPONSE                ESB-JH2-08-05      E-08-05 CF TANK B PRESS HIGHILOW              l I
EVENT POINT 0115 I
INDICATED CONDITION:
o CFT-1B PRESSURE AS SENSED BY CF-1-PS3 IS <585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:                                      ,
i o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4
(
  %./
OPERATOR ACTIONS FOR A VALID ALARM:
o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:
DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE.
PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS3 l
l
;  I  )
  = \J I
AR-305                              Rev. 28                                Page 50
 
  ,,- .                                                                            ENCLOSURE 1
  !                                                                            (Page 50 of 52)
(.
ESE ANNUNCIATOR RESPONSE              ESB-JH2-08-05            E-08-05 l
1 CF TANK B PRESS                      !
HIGH/ LOW EVENT POINT 0116                    .
i 1
INDICATED CONDITION:
o CFT-1B PRESSURE AS SENSED BY CF-1-PS4 IS $585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
I o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4                                          ,
f OPERATOR ACTICNS FOR A VALID ALARM:
o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:
DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE.
PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13
:        SENSING ELEMENT: CF-1-PS4 l
l rm t%)>
l l
l        AR-305                              Rev. 28                                    Page 51
 
l                                                                                                l l
ENCLOSURE 1
                                                                            <P ge SI or s23-l/]
ESE ANNUNCIATOR RESPONSE            ESB-JH2-08-06          E-08-06 1
i
!                                            I    I                                            ;
l i    I I    I                CF TANK B                  j l    I              DISCH VALVE                  l I    I              OPEN/ CLOSED l
1                                                                                                :
I l                                                          EVENT POINT 0103                    ,
l l                                                                                                I
                                                                                                \
1 INDICATED CONDITION:
o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS <690 PSIG AND CW-6 IS NOT FULL                !
,          CLOSED l
l I      REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
1 o CONTROL BOARD INDICATOR RC-158-PI2 AND CW-6 POSITION INDICATION                      i OPERATOR ACTIONS FOR A VALID ALARM o CLOSE CW-6 OR STOP RCS PRESSURE DECRFASE i
DISCUSSION:
CW-6 IS A NORMALLY DE-ENERGIZED VALVE. THE BREAKER WILL HAVE TO BE l        CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION.
l l
l
 
==REFERENCES:==
DRAWING 208-013 SHEET CF-13 l
l      SENSING ELEMENT: RC-3A-PS3, 33C VALVE CLOSED CONTACT l
1 O
AR-305                                  Rev. 28                              Page 52
 
ENCLOSURE 1 (Page 52 of 52)
  %/
ESE ANNUNCIATOR RESPONSE            ESB-JH2-08-06      E-08-06 I
I l                CF TANK B I                DISCH VALVE
    -------                                                      OPEN/ CLOSED EVENT POINT 0104 INDICATED CONDITION:
o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS >702.5 PSIG AND CW-6 IS NOT FULL OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM:
o CONTROL BOARD INDICATOR RC-158-PI2 AND CFV-6 POSITION INDICATION OPERATOR ACTIONS FOR A VALID ALARM:
o OPEN CFV-6 OR STOP RCS PRESSURE INCREASE DISCUSSION:
CFV-6 IS A NORMALLY DE-ENERGIZED VALVE. THE BREAKER WILL HAVE TO BE CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION.
l
[
l SENSING ELEMENT: RC-3A-PS3, 33 VALVE OPEN CONTACT
: Vo 4
AR-305                                  Rev. 28              Page 53 (LAST PACE) i
 
l                                                                                                                                            l 1
l      PROCEDURE DEVELOPMENT AND REVISION RECORD l
l[
;k      Procedure: AR0306                            New Rev:          28                              PRR#:        16983 l
 
==Title:==
ES E ANNUNCIATOR RESPONSE i
l        MINOR CHANGES l                                                                                                                                            l If Minor Changes are included, check the applicable box (es) and provide a list of affected steps.                                  I The following corrections are incorporated throughout
_  Sentence Structure                                          _ Redundant words or phrases                      e j                    _ Punctuaton                                                    _ Abtwevatons
_ Capitehrsten                                                  _ Obviously incorrect units of measure
_ Spelhng                                                      _      inadvertently omitted symbols (#, %, etc.)
                                                                                                                                            )
Organizatonal Changes: position titles,                    _ Obvous step numbenng discrepances
_ department names, or teisphone numbers
(                                                                                    _ Format The following corrections are incorporated in the step (s) indicated: "Throughout"is used in lieu of Step # if a specific change affects a large number of steps.
i l
I Correcting equipment nomenclature that does not agree                    i with field labels or balance of procedure                                j i
Changing information that is obviously incorrect and referenced correctly elsewhere Misplaced decimals that are neither setpoint values nor tolerances Reference to a procedure when an approved ptocedure has taken the place of another procedure I
l Fixing branching points when it is clear the branching                    i l                                                                  steps were originally intended but were overlooked or incorrectly stated due to step number changes l
Adding clarifying information such as NOTES and CAUTIONS I
I l
,                                                                  Adding words to clarify steps, NOTES, or C AUTIONS which clearly do not change the methodology or intent of its s                                                              steps I
 
l l
PROCEDURE DEVELOPMENT AND REVISION RECORD
  /~] Procedure: AR0306                            New Rev:          28                          PRR#:        15983 l
N~)
 
==Title:==
ES E ANNUNCIATOR RESPONSE MINOR CHANGES If Minor Changes are included, check the applicable box (es) and provide a list of affected steps.
The following corrections are incorporated throughout:
_ Sentence Structure                                            _ Redundant words or phrases l
l                  _ Punctuat on                                                  _ Abbreviations
_ Capitalizaten                                                _ Obviously incorrect units of measure i
_ Spelkng                                                      _ inadvertently omitted symbols (#, %, etc.)
X Organizatonal Changes: posit on titles,                      _    Obvious step numbenng discrepances department names, or telephone numbers
_ Format The following corrections are incorporated in the step (s) indicated: "Throughout" is used in lieu of Step # if a specific change affects a large number of steps.
Correcting equipment nomenclature that does not agree with field labels or balance of procedure L)
Changing information that is obviously incorrect and referenced correctly elsewhere Misplaced decimals that are neither setpoint values nor tolerances Reference to a procedure when an approved procedure has taken the place of another procedure Fixing branching points when it is clear the branching steps were originally intended but were overlooked or incorrectly stated due to step number changes l
Adding clarifying information such as NOTES and CAUTIONS l
t I
  /*                                                            Addmg words to clarify steps, NOTES, or CAUTIONS which j
(%-                                                            clearly do not change the methodology or intent of the
                                                                . steps i
 
                  . . _ .        .      .-      . ~ - -                        . - . . . -        -      .                      - - -
PROCEDURE DEVELOPMENT AND REVISION RECORD Procedure: AR0306                                  New Rev:    28                              PRR#:        16983
 
==Title:==
ES E ANNUNCIATOR RESPONSE NON-INTENT CHANGES Changes are incorporated for the reasons provided. "Throughout"is used in leu of Step # if a specife change affects a large number of steps. For new or cancelled procedures the reason is provided Pagei                                  Deleted Section 2.1 as implementing References are no longer required by Al-4028 Page1                                  Deleted Section 2.1 as implementing references are no longer required by Al-402B Page1                                  Added new Developmental Reference,2.1.5, MAR 97-08-01-01,A/B EDG Protective Relaying, as this MAR drove the change to Window E-08-01. Event point 1215 O
v CHANGE OF INTENT, CANCELLATION, OR NEW PROCEDURE Changes are incorporated for the reasons provided. "Throughout"is used in lieu of Step # If a specife change affects a large number of steps. For new or cancehed procedures the reason is provided Window E 08-01, Event Point            MAR 97-0841-01, EGD Protectrve Relays 1215 i
O b
i}}

Latest revision as of 00:11, 13 November 2020

Rev 28 to AR-305, Es E Annunciator Response
ML20196F871
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/23/1998
From: Winship M
FLORIDA POWER CORP.
To:
Shared Package
ML20196F853 List:
References
AR-305, NUDOCS 9812070148
Download: ML20196F871 (58)


Text

,a. .

! i l

Rev. 28 I7 Effective Date (( [ f, i

l i

I i

l I

l ANNUNCIATOR RESPONSE  :

AR-305 i

FLORIDA POWER CORPORATION t CRYSTAL RIVER UNIT 3 i

ES E ANNUNCIATOR RESPONSE ,

L I

O l-i l

l l

APPROVED BY: Procedure Owner (SLGNATURE ON FILE) /

DATE // A TMr

} PROCEDURE WRITER: Michael A. Winship RESPONSIBLE DEPARTMENT: Operations Support

  • \

9812070148 981123 DR ADOCK O g2 ';

o l- . . . . , -

. . _ m ..... . , _ _ _. _ . . . . . _ . . _ _ . . . m.. _ _ _ _ _ . . . _ . . . . . _ _ _ . . _ _ - . . , _ . _ _.._ _. ._ _ _ __.

i i

+

l n

l TABLE OF CONTENTS

\

I.

l l SECTION PAGE 1

1.0 PURP0SE................................................................. 1 1

1 LD_REEEBENCE S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 l 2.1 DEVELOPMENTAL REFERENCES............................................ 1 l

l 1

3.0 PERSONNEL INDOCTRINATION................................................ 1 l

iJLBSTRUCTI0NS............................................................ 1 1

j. 5.0 FOLLOW-UP ACTIONS....................................................... 1 l ENCLOSURE 1 Annunciator Response ............................................... 2 i

l

\

I i

)

i i

i O

i I

i v .

6 AR-305 Rev. 28 Page i

. ~ .....-. . ~. .-. . ..- . . .-. . _ . . . -- - .. . _ . - .

i 1.0 PURPOSE g i

i [,\

  • O 1.1 '

Establish a reference document for each Annunciator Window on the ES (B)-JH2 Lampbox.  ;

1.2 Establish operator actions for valid Annunciator alarms on the <

ES (B)-JH2 Lampbox.  :

l i 1.3 Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the ES(B)-JH2 Lampbox.,

l

2.0 REFERENCES

I I I

1 l2.1 DEVELOPMENTAL REFERENCES I

l 2.1.1 INPO 90-021, Good Practice OP-217, Alarm Response Procedures l 2.1.2 Annunciator Window Engraving Drawing E-224-048 i

2.1.3 MAR 94-07-07-01 CFT Level Setpoint 2.1.4 REA #930926 regarding operation of the RB Main Fan Assemblies l

l2.1.5 MAR 97-08-01-01, A/B EDG Protective Relaying i O 3.0 PERS00GIEL IMDCCTPINATION 3.1 The Annunciator System is powered from VBDP-5 Breaker 28.

4.0 INSTRUCTIONS l

4.1 Respond to alarms on the ES(B)-JH2 Lampbox as indicated on Enclosure 1, Annunciator Response.

~

5.0 FULLOW-UP ACTIONS None t

i d(*'

n

. AR-305 Rev. 28 Page 1

l ENCLOSURE 1 l (Page 1 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-01 E-01-01 l

EEEEEE I I RB SPRAY I I ES B ACTUATION l l EVENT POINT 0936  ;

INDICATED CONDITION:

o 30 PSIG REACTOR BUILDING PRESSURE SETPOINT HAS BEEN EXCEEDED AS SENSED BY TWO OUT OF THREE RB PRESSURE SWITCHES (BS-21/22/23-PS)

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHTS FOR RB SPRAY o BUILDING SPRAY PUMP IS RUNNING IF A RB SPRAY PERMISSIVE IS PRESENT

  • O o RE PRESSURE CONTROL BOARD INDICATOR BS-91-PI, BS-17-PI o COMPUTER POINT P-254 OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO EOP DISCUSSION:

HPI ACTUATION THROUGH BLOCK 6 WILL GIVE A BUILDING SPRAY PERMIT ACTUAL SETPOINT IS 2 24.5 PSIG 1 1.4 PSIG 1

i

REFERENCES:

DRAWING 208-028 SHEET ESB-70 SENSING ELEMENT: 63-Z1/RB-4,RB-5,RB-6 ES ACTUATION RELAYS, BS-21-PS, i

BS-22-PS,AND BS-23-PS r

AR-305 Rev. 28 Page 2

ENCLOSURE 1 (Page 2 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-02 E-01-02 RB SPRAY PP B

, TRIP EVENT POINT 0046 -

INDICATED CONDITION:

o BSP-1B BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT ON WITH A RED FLAG ON BSP-1B CONTROL STATION o ES STATUS LIGHT

(

l I

OPEPATOR ACTIONS FOR A VALID ALARM: 1 l

o HAVE BREAKER CUBICLE CHECKED FOR DROPPED RELAY TARGETS DISCUSSION:

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS i.

I

REFERENCES:

DRAWING 200-009 SHEET BS-02 l

! SENSING ELEMENT: CS/SC, CS/O (CONTROL SWITCH CONTACTS) 52S, 52H O

I l

AR-305 Rev. 28 Page 3 i

s ,, . .t .. ~ . . ~ . . ..~ . . . . . - . . - - . - . .. . . ~ . - . - - ~ - ..

i 1

l I

i l

ENCLOSURE 1 l (Page 3 of 52) l  :

l ESE ANNUNCIATOR RESPONSE ESB-JH2-01-03 E-01-03 ,

I i l  !

i ,

RB SPRAY PP B l MOTOR  ;

OVERLOAD l I

t I

EVENT POINT 0060 2 l

l l INDICATED CONDITION: l 1

l o MOTOR AMPS >115% RATED LOAD

! i l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l

.-- /"'N o HIGH BUILDING SPRAY FLOW AS SEEN ON BS-01-FI2 I I\ o HIGH MOTOR AMPS {

o BSP-1B TRIP l 1

l i 1 l OPERATOR ACTIONS FOR A VALID ALARM: i I l o THROTTLE BSV-4 TO REDUCE LOAD ON BSP-1B {

.o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS o IF LOAD REMAINS HIGH CONSIDER TRIPPING BSP-1B '

DISCUSSION:

l i

THIS ALARM INDICATES THAT EITHER THE TIMED OVER CURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT l PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.

REFERENCES:

DRAWING 208-009 SHEET BS-02 i SENSING ELEMENT: 51-IOC(INSTANTANEOUS) SI-TOC (TIMED) BREAKER CONTACTS 4

i l AR-305 Rev. 28 Page 4 i i

-- .~ . ,. _ _ _ _ . _ . _ . . . .

ENCLOSURE I (Page 4 c1 52) i Os ESE ANNUNCIATOR RESPONSE ESB-JH2-01-04 E-01-04 l

l l

RB SPRAY PP B <

I l OUT OF SERVICE i

l EVENT POINT 0045  ;

I INDICATED CONDITION:  ;

o ESP-1B BREAKER IS RACKED OU!J l

1 I

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

e o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION 1

OPERATOR ACTIONS FOR A VALID AIARM (

o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT i

i l

DISCUSSION:

l REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS

REFERENCES:

DRAWING 208-009 SHEET BS-02 SENSING ELEMENT: 52-H BREAKER CONTACT l

/%

, b l AR-305 Rev. 28 Page 5

I i ,

i ENCMSURE 1 (Page 5 of 52) l ESE ANNUNCIATOR RESPONSE ESB-JH2-01-04 E-01-04 l

l l  !

l RB SPRAY PP B f

OUT OF SERVICE l

EVENT POINT 0062 l

INDICATED CONDITION:

o BSP-1B BREAKER HAS NO DC CONTROL POWER i

i l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o NO INDICATING LIGHTS ON CONTROL STATION o ES STATUS LIGHTS INDICATE BREAKER POSITION r  :

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY CLOSED DPDP-5B SWITCH 10 j o VERIFY DC KNIFE SWITCH FOR BSP-IB BREAKER CLOSED l

l DISCUSSION:

l THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING.

REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS.

l l REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

l

REFERENCES:

DRAWING 208-009 SHEET BS-02 i SENSING ELEMENT: 27C BREAKER RELAY l O -

1 AR-305 '

Rev. 28 Page 6 1

i I

_ - - . - . ~ . . - - - . . . - - - _ . ~ - -.

I i

)

ENCLQSURE 1 I

(Page 6 of 52) em ESE ANNUNCIATOR RESPONSE ESB-JH2-01-05 E-01-05 RB SPRAY B FLOW HIGH/ LOW l EVENT POINT 0048 l l l INDICATED CONDITION:

l l o BUILDING SPRAY FLOW IS <1400 GPM AS MEASURED BY BS-1-FS2 FOR 30 SEC.

COINCIDENT WITH AN ES ACTUATION l

i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

l gs o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF BSV-4, OPEN BSV-4 AS REQUIRED o VERIFY BSP-1B NOT TRIPPED 1

i l

I DISCUSSION:

f THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM.

TAKING LOCAL / AUTO CONTROL OF BSV-4 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.

i l

, J

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-1-FS2 O

AR-305 Rev. 28 Page 7 I

ENCLOSURE 1

/ (Page 7 of 52) k ESE ANNUNCIATOR RESPONSE ESB-JH2-01-05 E-01-05 RB SPRAY B FLOW HIGHILOW EVENT POINT 0050 l

INDICATED CONDITION:

o BUILDING SPRAY FLOW IS >1700 GPM AS MEASURED BY BS-I-FS2.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM o VERIFY PROPER OPERATION OF BSV-4, THROTTLE BSV-4 AS REQUIRED TO REDUCE FLOW l

l l

l DISCUSSION: j THE NORMAL BUILDING SPFAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM.

TAKING LOCAL / AUTO CONTROL OF BSV-4 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.

REFERENCES:

DRAWING 208-009 SHEET BS-11 l

SENSING ELEMENT: BS-1-FS2 O

'L) l l AR-305 Rev. 28 Page 8

.. .. _ . _ . .-_. . . . . _ . . . - - - . - . - . . . ~ . . . - . ..

I ENCLOSURE 1 i (Page 8 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-05 E-01-05 RB SPRAY B FLOW HIGH/ LOW i l t  ;

EVENT POINT 0064 . j F

INDICATED CONDITION:

l

! o BUILDING SPRAY FLOW IS <1100 GPM AS MEASURED BY BS-82-FIS WITH DHV-43  !

l OPEN j l '

t REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

i o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER O i l OPERATOR ACTIONS FOR A VALID ALARM:

l o VERIFY FROPER OPERATION OF BSV-4, OPEN BSV-4 AS REQUIRED l o VERIFY BSP-1B NOT TRIPPED I

t DISCUSSION:

THE NORMAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR

! THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO

} CONTROL OF BSV-4, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION. I l

I i'

REFERENCES:

DRAWING 208-009 SHEET BS-11

( l SENSING ELEMENT: BS-82-FIS I?

I I

l l AR-305 Rev. 28 Page 9 i

l l

ENCLOSURE 1 (Page 9 of 52) l ESE ANNUNCIATOR RESPONSE ESB-JH2-01-05 E-01-05 l

RB SPRAY B FLOW HIGH/ LOW l

EVENT POINT 0066 <

i l

INDICATED CONDITION: )

o BUILDING SPRAY FLOW IS >1300 GPM AS MEASURED BY BS-82-FIS WITH DHV-4 3 OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l t

s o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER l OPERATOR ACTIONS FOR A VALID ALAPN: ,

J o VERIFY PROPER OPERATION OF BSV-4, THROTTLE BSV-4 AS REQUIRED TO REDUCE FLOW l

DISCUSSION:

THE NOPEAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO. INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF BSV-4, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOU RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION.

j- REFERENCE 3: DRAWING 208-009 SHEET BS-ll l

SENSING ELEMENT
BS FIS l

l I

l

! AR-305 Rev. 28 Page 10

.- =. _. . ._ . . . - _ . - . _ - . - - - .. . . . _ _ _ _ - - . . - .

i

! ENCLOSURE 1

[fs)

V (Page 10 of 52) l ESE ANNUNCIATOR RESPONSE ESB-JH2-02-01 E-02-01 I I RB FAN B l I HIGH SPEED I' I TRIP I I EVENT POINT 0352 INDICATED CONDITION:

o AHF-1B CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START, AND HIGH SPEED WINDINGS NOT ENERGIZED.

i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

. o GREEN HIGH SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND CONTROL

', HANDLE PUSHED IN. .

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF FAN TRIP 1 o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-417 )

o MONITOR RB TEMPERATURE AND PRESSURE I DISCUSSION:

THIS ALARM WILL OCCUR IF THE FAN IS RUNNING IN HIGH SPEED AND AN ES ACTUATION OCCURS. THIS WILL TRIP THE FAN IN HIGH SPEED AND START THE FAN IN SLOW SPEED.

SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS.

ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

l I

DRAWING 208-005 SHEET AH-29

REFERENCES:

SENSING ELEMENT: CS/1N, CS/SC, CS/O, 42/1F RELA l

l l

O AR-305 Rev. 28 Page 11

l l

I ENCLOSURE 1 I l/

I

\ (Page 11 of 52) l ESE ANNUNCIATOR RESPONSE ESB-JH2-02-02 E-02-02 l l

l l

l l

l \

I l RB FAN B l LOW SPEED l TRIP .

l EVENT POINT 0353 I

INDICATED CONDITION:  ;

l o AHF-1B CONTROL HANDLE PULLED OUT, IN NORMAL AFTER START, AND SLOW SPEED '

WINDINGS NOT ENERGIZED. ,

I i

l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l O o GREEN LOW SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND THE CONTROL HANDLE PULLED OUT.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF FNi TRIP.

o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION:

I SOME THINGS TO CHECK AFTER A FNi TRIP ARE: FAN AND MOTOR TEMPS AS READ ON  !

AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS. 1 ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' l ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-29 l SENSING ELEMENT: CS/OUT, CS/SC, CS/O, CONTROL SWITCH CONTACTS 42/15 l l

'O i

1.

l 4

l AR-305 ,

Rev. 28 Page 12

_ .- . .. . . - . . . . ~ - . - - . . . . - . .- --.- - . . . - . . . .

l l

g ENCLOSURE 1 (Page 12 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-02-03 E-02-03 )

l l

i RB FAN B

AIR FLOW

! LOW EVENT POINT 0354 INDICATED CONDITION:

o AHF-1B CONTROL HANDLE PUSHED IN AND IN NORMAL AFTER START AND LOW AIR FLOW IS SENSED BY AH-19-DPS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o REACTOR BUILDING TEMPS ARE INCREASING AS SEEN ON AH-536-TIR G

OPERATOR ACTIONS FOR A VALID ALARM:

o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-4I7 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION:

THIS ALARM MAY BE PRESENT WHEN AN ES ACTUATION HAS STARTED A PREVIOUSLY l RUNNING FAN IN SLOW SPEED. PLACING THE CONTROL HANDLE IN THE PULL OUT l l NORMAL AFTER START POSITION SHOULD CLEAR THE ALARM. ALSO IF THE FAN TRIPS THIS ALARM SHOULD ACTUATE. j I

i l

REEERENCES: DRAWING 208-005 SHEET AH-29 ,

i SENSING ELEMENT: AH-19-DPS r

[

\

l l

t AR-305 Rev. 28 Page 13

. ._ _ ._ . _ . _ _ . . _ . _ _ . .. . . _ . . _-- . . _ _ _ . -__ ._.m ENCLOSURE 1 [

(Page 13 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-02-04 E-02-04 f

t RB FAN B l VIBRATION HIGH i l

EVENT POINT 0355 i

INDICATED CONDITION:

o AHF-1B HIGH VIBRATION CONDITION AS SENSED BY AH-20-ME1/2.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

I m o FAN AND MOTOR TEMPS INCREASING ON AH-1003-TIR ON BACK OF CONTROL BOARD l l o IF FAN IS RUNNING IN SLOW SPEED THEN CURRENT ON THE FAN MAY BE

\ OSCILLATING.

l 1

OPERATOR ACTIONS FOR A VALID ALARM:

l o ALlEMPT TO RESET ALARM BY DEPRESSING RESET PUSHBUTTON ON CONTROL BOARD.

o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO l SECURE THE FAN.

o ENSURE ONE OPERABLE FAN IS ES SELECTED PER OP-417 l

DISCUSSION:

ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

l l

l l

l

REFERENCES:

DRAWING 208-005 SHEET AH-137 l

SENSING ELEMENT: AH-20-MEl, AH-20-ME O

AR-305 Rev. 28 Page 14 l

i i -

ENCLOSURE 1~

(Page 14 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-02-05 E-02-05 l

l I

l RB FAN B CONDENSATE HIGH E

EVENT POINT 1698 .

INDICATED CONDITION:

o AHF-1B CONDENSATE FLOW IS >1133 CC PER MINUTE AS SENSED BY AH-657-FIS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o REACTOR BUILDING SUMP RATE OF RISE IS INCREASING AS SEEN ON BS-93-PIR.

k)

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE SOURCE OF CONDENSATE.

DISCUSSION:

SOME SOURCES OF HIGH CONDENSATION ARE:

RCS LEAK IN CONTAINMENT - CHECK PZR LEVEL AND MAKE UP TANK LEVEL TRENDS; FEEDWATER/ MAIN STEAM LEAK IN CONTAINMENT - CHECK FEEDWATER FLOWPATES; RB FAN COOLER SW LEAKS - CHECK SW SURGE TANK LEVEL IF ON SW, OR CI SURGE TANK LEVELS IF ON CI.

j

REFERENCES:

DRAWING 208-005 SHEET AH-131 l

SENSING ELEMENT:AH-657-FIS r

I v

i l AR-305 Rev. 28 Page 15

ENCLOSURE 1

[. (Page 15 of 52)

ESB ANNUNCIATOR RESPONSE ESB-JH2-02-05 E-02-05 THIS AR IS ONLY USED WHEN COLD LEG NOZZLE DAMS ARE INSTALLED PER MP-110C RCSG-1 B >

NOZZLE DAM PROBLEM EVENT POINT 1698 INDICATED CONDITION:

o "B" SIDE NOZZLE DAM CONTROL CONSOLE IS IN ALARM REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o NOZZLE DAM PRESSURE 29 PSIG ON EITHER SEAL o NOZZLE DAM PRESSURE <6.5 PSIG ON EITHER SEAL o NOZZLE DAM AIR FLOW 29 SCFH o LOSS OF POWER TO THE CONTROL PANEL OPERATOR ACTIONS FOR A VALID ALARM:

o IMMEDIATELY INVESTIGATE SOURCE OF ALARM o REFER TO EOP-11 DISCUSSION:

THIS ALARM INDICATES POSSIBLE NOZZLE DAM SEAL DEGRADATION. IF THE SEAL FAILS, A REACTOR COOLANT LEAK WOULD DEVELOP, FLOODING THE PRIMARY SIDE OF THE STEAM GENERATORS WHERE PERSONNEL MAY BE AT WORK.

THIS EVENT POINT IS ONLY IN USE ON A TEMPORARY BASIS WHEN NOZZLE DAMS ARE INSTALLED. THE WINDOW "RB FAN B CONDENSATE HIGH" IS REMOVED FROM THE ANNUNCIATOR PANEL WHEN THIS EVENT POINT IS IN EFFECT.

REFERENCES:

MP-110C

, SENSING ELEMENT: INTERNAL ALARM CIRCUITS INSIDE NOZZLE DAM CONTROL CONSOLE O

AR-305 Rev. 28 Page 16 ,

i

l ENCLOSURE 1 (Page 16 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-02-06 E-02-06 t

I l ES B I ACTUATION


TROUBLE I

EVENT POINT 1231 ,

j l

INDICATED CONDITION: l 1

o "B" ES ACTUATION SIGNAL ON ONE OR MORE ES CHANNELS REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHTS l o ES BISTABLE TRIP INDICATORS OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO EOP DISCUSSION:

THIS ALARM INDICATES THAT AT LEAST ONE OF THREE CHANNELS OF "B" ES HAS l

ACTUATED, ANY HPI OR LPI BISTABLE TRIPPED WITH ES NOT BYPASSED, OR ANY 4 l PSIG ES PRESSURE SWITCH ACTUATED WILL GIVE THIS ALARM. PLACING THE RC PRESSURE TEST MODULE IN " TEST" DEFEATS THIS ALARM FROM LPI OR HPI. WHEN l- THE 4 PSIG TEST SWITCHES ARE IN THE " TEST" POSITION THIS ALARM IS DEFEATED l FROM A 4 PSIG ACTUATION.

REFERENCES:

DRAWING 208-028 SHEET ES-AB-05

) SENSING ELEMENT: VARIOUS ES ACTUATION CONTACTS O

i l

i t

AR-305 Rev. 28 Page 17

l l

ENCLOSURE 1 Q (Page 17 of 52) b ESE ANNUNCIATOR RESPONSE ESB-JH2-03-01 E-03-01 l l REACTOR BLDG l l PRESS

l HIGH (2 PSIG) l I EVENT POINT 0067 INDICATED CONDITION

o REACTOR BUILDING PRESSURE IS >2 PSIG AS SENSED BY BS-93-PS REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONTROL BOARD RB PRESSURE INDICATORS, BS-17-PI, BS-93-PIR o RB TEMP INDICATION AH-536-TIR o COMPUTER POINT P254

(/ OPERATOR ACTIONS FOR A VALID ALARM:

PROMPTLY TAKE ACTION TO REDUCE REACTOR BUILDING PRESSURE AND PREVENT A 4 PSIG ES ACTUATION. CONSIDER ONE OR MORE OF THE FOLLOWING ACTIONS:

o START SWP-1A AND/OR SWP-1B AND PLACE RB FAN ON SW COOLING.

o START RWP-2A AND/OR RWP-2B o ENSURE ONLY ONE RB FAN IS RUNNING DURING AN ES ACTUATION.

DISCUSSION:

POSSIBLE SOURCES OF HIGH RB PRESSURE ARE:

o LOSS OF RB FAN AND/OR COOLING WATER o STEAM AND/OR FEEDWATER LEAK INSIDE CONTAINMENT o RCS LEAK INSIDE CONTAINMENT o COMPRESSED AIR SYSTEM LEAKS INSIDE CONTAINMENT o INCREASED RB TEMP DUE TO RCS HEATUP, OR HIGH OUTDOOR TEMPS o HIGH RB FLOOD LEVEL IT IS RECOMMENDED TO RUN FAN IN SLOW SPEED SO AS TO PRECLUDE MOTOR

, OVERLOAD IN A DENSE STEAM ATMOSPHERE AND RENDERING IT UNAVAILABLE. RUNNING l SWP-1A AND SWP-1B SIMULTANEOUSLY FOR INCREASED SW FLOW TO FAN IS i ACCEPTABLE AND WILL YIELD THE BEST RB COOLING PERFORMANCE. l i

g

REFERENCES:

DRAWING 208-009 SHEET BS-11  !

SENSING ELEMENT: BS-93-PS AR-305 Rev. 28 Page 18 1

I I

n ENCLOSURE 1 (Page 18 of 52) j ESE ANNUNCIATOR RESPONSE ESB-JH2-03-02 E-03-02 i l

I i

REACTOR BLDG TEMP i HIGH .I 1

l l EVENT POINT 1700  !

1 l l

INDICATED CONDITION: ,

o REACTOR BUILDING TEMPERATURE IS >123.6*F AS SENSED BY AH-536-TY4 1

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RB TEMP INDICATION AH-536-TIR 1 o THE AVERAGE OF COMPUTER POINTS: S358, S359, S382, S383  :

o COMPUTER POINT S837 I

OPERATOR ACTIONS FOR A VALID ALARM:

TO REDUCE THE REACTOR BUILDING TEMPERATURE CONSIDER ONE OF THE FOLLOWING l ACTIONS:

o START SWP-1A AND/OR SWP-1B AND PLACE RB FAN ON SW COOLING l o START RWP-2A AND/OR RWP-2B  !

o ENSURE ONLY ONE RB FAN IS RUNNING DURING AN ES ACTUATION '

l 1 DISCUSSION: -

POSSIBLE SOURCES OF HIGH RB TEMPERATURE ARE:

o LOSS OF RB FAN AND/OR COOLING WATER o STEAM AND/OR FEEDWATER LEAK INSIDE CONTAINMENT o RCS LEAK INSIDE CONTAINMENT o RCS HEATUP OR HIGH OUTDOOR TEMPS RUNNING SWP-1A AND SWP-1B SIMULTANEOUSLY FOR INCREASED SW FLOW TO FAN IS ACCEPTABLE AND WILL YIELD THE BEST RB COOLING PERFORMANCE.

REFER TO TS FOR ADMINISTPATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-005 SHEET AH-131 SENSING ELEMENT: AH-536-TY4 AR-305 Rev. 28 Page 19 I l

1

1 i

! e ENCLOSURE 1 (Page 19 of 52) i l

~

I ESE ANNUNCIATOR RESPONSE ESB-JH2-04-01 E-04-01 l l

-- --- 1 I

I l

! I I MAKEUP PP C I I TRIP I I l

EVENT POINT 1047 INDICATED CONDITION:

o MUP-1C BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT ON WITH A RED FLAG ON MUP-lC CONTROL STATION I

o ES STATUS LIGHT OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-402 FOR RESTORATION OF RCP SERVICES PRIOR TO STARTING ANOTHER MUP o CONSIDER MINIMIZING LETDOWN FLOW o INVESTIGATE MUP-lC BREAKER FOR DROPPED RELAY TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP DISCUSSION: l EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 200-041 SHEET MU-04 l

SENSING ELEMENT: CS/SC, CS/O, 52H/A, 52S/B O

l f

i AR-305 Rev. 28 Page 20

1 I

ENCLOSURE 1

, .O j (Page 20 of 52) l '%)

ESE ANNUNCIATOR RESPONSE ESA-JH2-04-02 E-04-02 I

MAKEUP PP C

! GEAR OlL PRESS l Low l

EVENT POINT 1059 .

i INDICATED CONDITION:

o MUP-1C BREAKER CLOSED >2 SECONDS WITH GEAR OIL PRESS <7 PSIG AS SENSED BY MU-90-PS. ,

l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o MUP-SC BACK UP GEAR OIL PUMP AUTO STARTS l[ o COMPUTER POINT XO69

\,

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY MUP-5C DC BACK UP GEAR OIL PUMP STARTED o MONITOR MUP-1C VIA COMPUTER GROUP 72  !

I I

DISCUSSION:

CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE UP PUMPS PER OP-402 l

REFERENCES:

DRAWING 208-041 SHEET MU-51 SENSING ELEMENT: 2MUP-SC, MU-90-PS, 52S/A m)

AR-305 Rev. 28 Page 21

ENCLOSURE 1 4

(Page 21 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-04-03 E-04-03 MAKEUP PP C MOTOR OVERLOAD EVENT POINT 1045 INDICATED CONDITION:

o MUP-1C MOTOR AMPS >1156 RATED LOAD REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

4 o HIGH MOTOR AMPS .

o MUP-1C TRIP o HIGH FLOWRATES THROUGH MUP-1C OPERATOR ACTIONS FOR A VALID ALARM:

o TRIP MUP-1C o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS DISCUSSION:

THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.

IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-041 SHEET MU-49 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE O

AR-305 Rev. 28 Page 22

ENCLOSURE 1

[d ESE ANNUNCIATOR RESPONSE ESB-JH2-04-04 (Page 22 of 52)

E-04-04 I

l MAKEUP PP C l LUBE OlL PUMP i TRIP l

! 1 l EVENT POINT 1050 i l l t i

! l INDICATED CONDITION:

o MUP-2C CONTROL HANDLE IN NORMAL AFTER START POSITION WITH THE MOTOR NOT ENERGIZED.

I j

I REDUNDANT INDICATION WHICH WILL VERITY ALARM:

o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION l o LOW LUBE OIL PRESSURE ALARM l o MUP-3C, BACK-UP LUBE OIL PUMP, AUTO START

! OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MUP-3C, BACK-UP LUBE OIL PUMP, STARTED l

t l

DISCUSSION:

THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.

MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 72. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-07 SENSING ELEMENT: CS/SC, CS/O, 42B i

i O

AR-305 Rev. 28 Page 23

. - - - - -- . . - . . -. - ~ - .

l l

i l g ENCLOSURE 1

) (Page 23 of 52) a ESE ANNUNCIATOR RESPONSE ESB-JH2-04-04 E-04-04 l

MAKEUP PP C LUBE OlL PUMP TRIP EVENT POINT 1056 l

l l INDICATED CONDITION:

l o MUP-3C CONTROL HANDLE IN THE NORMAL AFTER START POSITION WITH THE MOTOR NOT ENERGIZED.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o MAKEUP PUMP OIL PRESSURE LOW ALARM o COMPUTER POINT X069 l

l OPERATOR ACTIONS FOR A VALID ALARM:

l o MONITOR MUP-1C BEARING TEMPS DISCUSSION:

THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.

l MONITOR THE MAKEUP PUMP VIA COMPUTER GROUP 72. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKEUP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-32

' SENSING ELEMENT: CS/SC, CS/O, CR1 O .

l AR-305 Rev. 28 Page 24

ENCLOSURE 1

e. (Page 24 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-04-06 E-04-06 I I I I I I AUX STEAM ISO I I (ASV-196)

--- BYPASSED ,

l EVENT POINT 1961 i INDICATED CONDITION:  ;

I o . CONTROL SWITCH FOR ASV-196 AUX STEAM SOLENOID VALVE IS IN THE OPEN/ BYPASS POSITION.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM: )

o ASV-196 SELECTOR SWITCH POSITION l

OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-608 l I

I DISCUSSION: .

THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-196 ON HIGH l

TEMPERATURE OR LOW AUX STEAM PRESSURE IS DISABLED. THIS IS A HIGH ENERGY LINE BREAK CONCERN.

i l

[

REFERENCES:

DRAWING 208-008 SHEET AS-05 SENSING ELEMENT: CS/NC

v i

i AR-305' Rev. 28 Page 25

ENCLOSURE 1 (N (Page 25 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-05-02 E-05-02 MAKEUP PP C LUBE OIL PRESS LOW EVENT POINT 1043 INDICATED CONDITION:

o LUBE OIL PRESS AS SENSED BY MU-48-PS3 IS <3 PSIG.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

1

/\ o MUP-3C, BACK UP LUBE OIL PUMP, AUTO STARTS

)

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MUP-3C HAS STARTED l

l DISCUSSION:

THIS ALARM INDICATES INADEQUATE LUBRICATION FOR MUP-lC. IF THE PUMP IS RUNNING, IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP PLACED IN SERVICE. REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.

l l

REFERENCES:

DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: 43/3C, MU-42-PS3 l l

L' )

i l l l AR-305 Rev. 28 Page 26

I

! ENCLOSURE 1 (Page 26 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-05-03 E-05-03 i

i MAKEUP PP C LUBE OIL PUMP AUTO START EVENT POINT 1055 . j INDICATED CONDITION:

o MUP-3C CONTROL HANDLE IN THE NORMAL AFTER STOP POSITION AND MOTOR IS I ENERGIZED REDUNDANT INDICATION WHICH WILL VERITY AIARM:  !

o RED LIGHT ON WITH A GREEN FLAG ON MUP-3C CONTROL STATION o COMPUTER POINT XO69 v l l

t i

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MUP-3C IS RUNNING l

DISCUSSION:

THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.

MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 72. CONSIDERATION SHOULD BE GIVING TO SWAPPING MAKE-UP PUMPS.

l l

REFERENCES:

DRAWING 200-041 SHEET MU-32 l

SENSING ELEMENT: CS/ST, CS/ST, CS/O, CR1 l

.CT

(,)

AR-305 Rev. 28 Page 27

_. _ _. ._m - - _ _ _ _ _ . _ _ _ . . _ . . , ___ _ _ _ _ . _ .. ....m l

l t

l

[ ~ ENCLOSURE I (Page 27 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-05-04 E-05-04 l

l MAKEUP PP C OUT OF SERVICE EVENT POINT 1044 INDICATED CONDITION:

i o MUP-1C BRFAKER HAS NO DC CONTROL POWER I

l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o NO INDICATING LIGHTS ON CONTROL STATION.

'7 o ES STATUS LIGHTS INDICATE BREAKER POSITION.

i

, (

OPERATOR ACTIONS FOR A VALID AIARM o VERIFY CLOSED DPDP-5B SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MUP-1C BREAKER CLOSED l

DISCUSSION:

THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING.

REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-04I SHEET MU-04 SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MUP-1C

AR-305 Rev. 28 Page 28 i

, .. ._ . . . _ . ~ . . - - . - _ ._ . . _ . - ~ . . -

l i

l l

p i.,

ENCLOSURE 1 (Page 28 of 52)

, i ESE ANNUNCIATOR RESPONSE ESB-JH2-05-04 E-05-04 l

l l l MAKEUP PP C OUT OF SERVICE EVENT POINT 1046 '

INDICATED CONDITION.

o MUP-1C BREAKER IS RACKED OUT AND MUP-lc IS SELECTED FOR ES START l l

j l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o NO INDICATING LIGHTS ON CONTROL STATION O o NO ES STATUS INDICATION OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT DISCUSSION:

TWO PUMPS SHOULD BE SELECTED FOR ES START. ,

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: 43/3C CUBICLE 3B5, 52H/b CUBICLE 3B5 FOR MUP-1C 1

l I l

i AR-305 Rev. 28 Page 29

l j ENCLOSURE 1  !

(Page 29 of 52) l ESE ANNUNCIATOR RESPONSE ESB-JH2-05-06 E-05-06 l

I i

l l  :

I I l l I AUX STEAM ISO.

I I (ASV-196)

-- - AUTO CLOSED EVENT POINT 1817 INDICATED CONDITION:

l o CONTROL SWITCH FOR ASV-196 AUX STEAM SOLENOID VALVE IS IN THE AUTO POSITION AND THE VALVE IS CLOSED.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

g o ASV-196 SELECTOR SWITCH IN AUTO i o GREEN INDICATOR LIGHT ON SELECTOR SWITCH OPERATOR ACTIONS FOR A VALID AIARM:

o REFER TO OP-608 l

l l

DISCUSSION: j i

THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-196 ON EITHER LOW AUX STEAM PRESSURE OR HIGH AUX STEAM PRESSURE HAS OCCURRED. A LOW PRESSURE ACTUATION OCCURS AT <100 PSIG AND A HIGH PRESSURE ISOLATION OCCURS AT >250 PSIG AUX STEAM HEADER PRESSURE IN THE AUX BUILDING. I l

l

REFERENCES:

DRAWING 208-008 SHEET AS-05 I

SENSING ELEMENT: 3ASV-196-SV1, 33C/ASV-196-SV, AS-36-PS1,AS-36-PS3 if 2 t .

I i

l AR-305 , Rev. 28 Page 30 i

n . _ . _ _

ENCLOSURE 1  ;

(Page 30 of 52)  ;

w ESE ANNUNCIATOR RESPONSE ESB-JH2-06-Ol E-06-01 2 EE I I MAKEUP PP B I I l TRIP ,

I I ,

I I  !

1 EVENT POINT 1101 i INDICATED CONDITION:

o MUP-1B BREAKER OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION.

l l

l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

3 o GREEN LIGHT ON WITH A RED FIAG ON MUP-1B CONTROL STATION. j o ES STATUS LIGHT. i OPEPATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-402 FOR RESTORATION OF RCP SERVICES PRIOR TO STARTING ANOTHER MUP o CONSIDER MINIMIZING LETDOWN FLOW l o INVESTIGATE MUP-1B BREAKER FOR DROPPED TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP DISCUSSION:

EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-13

/ SENSING ELEMENT: CS/SC, CS/O, 52H/A, 52S/B I

l AR-305 Rev. 28 Page 31

i i

rg ENCLOSURE 1 *

(Page 31 of $2)

ESE ANNUNCIATOR RESPONSE ESB-JH2-06-02 E-06-02 l

l l

MAKEUP PP B i LUBE OlL PRESS LOW EVENT POINT 1097 INDICATED CONDITION:

j o LUBE OIL PRESSURE AS SENSED BY MU-45-PS3 IS <3 PSIG.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o MUP-3B BACK UP LUBE OIL PUMP AUTO STARTS i

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MUP-3B HAS STARTED DISCUSSION:

THIS AL'-GM INDICATES INADEQUATE LUBRICATION FOR MUP-1B. IF THE PUMP IS RUNNING, IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP PLACED IN SERVICE. REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.

i i

REFERENCES:

DRAWING 208-041 SHEET MU-02 l

l SENSING ELEMENT: 43CS/3B7-3B, MU-45-PS3 O

AR-305 Rev. 28 Page 32

.- . . - - . . . . . . . . . .. ~.. - ~ . - - . . - . - . - . . -

l ENCLOSURE 1

[' (Page 32 of 52)

\

ESE ANNUNCIATOR RESPONSE ESB-JH2-06-03 E-06-03 MAXEUP PP B MOTOR OVERLOAD EVENT POINT 1099 . i l

INDICATED CONDITION:

o MUP-1B MOTOR AMPS >115% RATED LOAD.

REDUNDANT INDICATION WHICH WILL VERIFY AIARM o HIGH MOTOR AMPS O o MUP-1B TRIP h o HIGH FLOWRATES THROUGH MUP-1B OPERATOR ACTIONS FOR A VALID ALARM:

o TRIP MUP-1B o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS DISCUSSION:

THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.

IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-041 SHEET MU-13 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE l

O i

AR-305 Rev. 28 Page 33

, . - - . - . . ~ . - ..- -- -

l

! ENCLOSURE 1

! (Page 33 of 52)

! U ESE ANNUNCIATOR RESPONSE ESB-JH2-06-04 E-06-04 l

MAKEUP PP B OUT OF SERVICE EVENT POINT 1098 I

i i

INDICATED CONDITION:

o MUP-1B BREAKER HAS NO DC CONTROL POWER l

l l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

f- o NO INDICATING LIGHTS ON CONTROL STATION j

( o ES STATUS LIGHTS INDICATE BREAKER POSITION V

i OPERATOR ACTIONS FOP A VALID ALARM:

o VERIFY CLOSED DPDP-5B SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MUP-1B BREAKER CLOSED 1

l DISCUSSION:

THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING REFER TO OP-703 FOR LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

l

REFERENCES:

DRAWING 208-041 SHEET MU-02 l

l SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MUP-1B O

f AR-305 Rev. 28 Page 34

i I%

ENCLOSURE 1 (Page 34 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-06-04 E-06-04 .;

I

MAKEUP PP B l

l OUT OF SERVICE EVENT POINT 1100 l

l INDICATED CONDITION:

l i o MUP-1B BREAKER IS RACKED OUT AND MUP-1B IS SELECTED FOR ES START.

l

)

REDUNDANT INDICATION WHICH WILL VERIFY ALARM: )

j o NO INDICATING LIGHTS ON CONTROL STATION l o NO ES STATUS INDICATION  !

l-l l I OPERATOR ACTIONS FOR A VALID ALARM:

I e INVESTIGATE THE CAUSE FOR THE BREAKER BEING RACKED OUT l

DISCUSSION:

TWO PUMPS SHOULD BE SELECTED FOR ES START.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

RO 4RENCES: DRAWING 208-041 SHEET MU-13 SENSING ELEMENT: 43/3B ON CUBICLE 3B5, 52H/B IN CUBICLE 3B4 O

AR-305 Rev. 28 Page 35 i

.. - - .=. . - - _ _ . . . - . _ .

-s ENCLOSURE 1 (Page 35 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-07-06 E-07-06 H2 SAMPLING PANEL B


- TROUBLE l

l EVENT POINT 0256 l

INDICATED CONDITION:

l o PASS RB H2 ANALYZER "B" MALFUNCTION o HIGH RB H2 CONCENTRATION i REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOSS OF POWER TO PANEL

. '\j b o OVERPRESSURE TO PANEL AT >4 PSIG o LOW FLOW TO PANEL AT <1 SCFH o THERMO ELECTRIC COOLER <0.1 AMPS o RB H2 CONCENTRATION >3%

OPERATOR ACTIONS FOR A VALID ALARM:

o NOTIFY NSS/NSM AND EC OF HYDROGEN CONCENTRATION o I_F RB H2 2 3%

THEN GO TO EM-225A o OR NOTIFY I&C SUPERVISION OF H2 ANALYZER MALFUNCTION 3 DISCUSSION:

THIS ALARM INDICATES EITHER THE POST ACCIDENT H2 CONCENTRATION INSIDE THE

'RB IS HIGH, OR THE PASS H2 ANALYZER IS MALFUNCTIONING. EOP-14 PROVIDES GUIDANCE FOR PLACING THE HYDROGEN MONITORS IN SERVICE AND FOR TRENDING HYDROGEN LEVELS DURING A LOCA. EM-225A PROVIDES GUIDANCE TO TREND THIS DATA AND HOW TO PURGE THE REACTOR BUILDING.

REFERENCES:

DRAWING 208-062 SHEET WS-06 i SENSING ELEMENT: VARIOUS FLOW / PRESSURE / CURRENT SWITCHES INSIDE THE SAMPLER A

~V '

AR-305 ,

Rev. 28 Page 36

I F.NCLOSURE 1 (P' age 36 of 52) i ESE ANNUNCIATOR RESPONSE ESB-JH2-08-01 E-08-01 l

EEEEEE I I DIESEL GEN B l l l FAILED I I TO START I I EVENT POINT 1208 l

INDICATED CONDITION:

l o "B" EGDG HAS A START COMMAND AND LUBE OIL PRESSURE AS SENSED BY l DL-10-PS IS <6 PSIG AFTER 7 SECONDS OR o "B" EGDG HAS A START COMMAND AND ENGINE SPEED AS SENSED BY EG-20-SS IS <250 RPM AFTER 7 SECONDS REDUNDANT INDICATION WHICH WILL VERIF'.? ALARM:

o EGDG-1B TRIPS j o CONTROL BOARD " CRANK" LIGHT GOES OUT AND WHITE " READY" LIGHT DOES NOT 1 COME ON o EGDG-1B STARTING AIR PRESSURE LOW ALARM ANNUNCIATES OPERATOR ACTIONS FOR A VALID ALARM:

i o INSPECT EGDG-1B FOR CAUSE OF FAIL' IRE TO START o RESET PUSHBUTTON MUST BE DEPRESSED ON EGDG GAUGE BOARD PRIOR TO EGDG RESTART. ,

DISCUSSION:

l THIS ALARM INDICATES THE DIESEL TRIED TO START AND DID NOT. SOME POSSIBLE i

CAUSES OF THIS ARE: PROBLEMS WITH DIESEL FUEL SYSTEM, LUBE OIL SYSTEM PROBLEMS OR DIESEL SPEED SENSOR PROBLEMS. THIS ALARM IS STILL ACTIVE WITH AN ES SIGNAL PRESENT BUT WILL NOT DE-ENERGIZE THE STARTING AIR SOLENOIDS, SO THE DIESEL WILL CRANK UNTIL IT EITHER STARTS OR RUNS OUT OF AIR.

(

REFERENCES:

DRAWING 208-027 SHEET EG-16, EG-02, EG-04, EG-06 SENSING ELEMENT: DL-10-PS, DL-20-SS, START FAIL REIAY l

AR-305 Rev. 28 Page 37

i ENCLOSURE 1 (Page 37 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-01 E-08-01 t i

t EEEEEE l l l DIESEL GEN B l I FAILED  !

I I TO START I I ,

1 EVENT POINT 1215 i l

INDICATED CONDITION:

o "B" EGDG HAS TRIPPED IT'S PHASE DIFFERENTIAL CURRENT RELAY o "B" EGDG TRIPS AND BREAKER 3210 OPENS o "B" EGDG 86 DG LOCKOUT RELAY HAS ACTUATED l

1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l O o "B" ES 4160V BUS DE-ENERGIZES o CONTROL BOARD "RUN" LIGHT GOES OUT OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO AP-770 o INSPECT EGDG-1B FOR CAUSE OF DIFFERENTIAL CURRENT CONDITION o LOCKOUT RELAY MUST BE MANUALLY RESET ONCE PROBLEM IS RESOLVED.

DISCUSSION:

THIS ALARM INDICATES THE DIESEL GENERATOR HAS EITHER, A PHASE TO PHASE SHORT OR A PHASE TO GROUND SHORT. THIS CONDITION WILL TRIP THE DIESEL AND PREVENT IT FROM STARTING. THE CAUSE OF THIS PROBLEM MUST BE RESOLVED PRIOR TO ANY ATTEMPT BEING MADE TO RESTART AND RELOAD THE DIESEL GENERATOR.

l

REFERENCES:

DRAWING 208-027 SHEET EG-16

, SENSING ELEMENT: 86-DG-3B, 87A, 87B, 87C DIFFERENTIAL CURRENT RELAYS i

AR-305 Rev. 28 Page 38

I i

ENCLOSURE 1 j

().

(Page 38 of 52) j ESE ANNUNCIATOR RESPONSE ESB-JH2-08-02 E-08-02 i

l i

i DIESEL GEN B i l

TROUBLE ,

l EVENT POINT 1203 . j l

INDICATED CONDITION:

o "B" EGDG LUBE OIL TEMP AS SENSED BY DL-12-TS IS <115'T OR o "B" EGDG JACKET COOLANT TEMP AS SENSED BY DJ-29-TS $130'r g REDUNDANT INDICATION WHICH WILL VERIFY ALARM: ,

t i L o LOCAL TEMP INDICATION FOR LUBE OIL OR JACKET COOLANT TEMPS LOW o DIESEL GENERATOR ALARM PANEL DROP TARGET FOR LOW LUBE OIL / JACKET COOLANT TEMP.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE PROPER OPERATION OF LUBE OIL HEATERS DLHE-4 o ENSURE PROPER OPERATION OF JACKET COOLANT HEATER DJHE-2 o REFER TO OP-707 DISCUSSION:

EGDG LUBE OIL TEMP MUST BE MAINTAINED >110' F FOR OPERABILITY

! REQUIREMENTS.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

l l

REFERENCES:

DRAWING 208-027 SHEET EG-08

A SENSING ELEMENT
DL-12-TS DJ-29-TS i

l AR-305 Rev. 28 Page 39

ENCLOSURE 1 (Page 39 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-02 E-08-02 i i

DIESEL GEN B TROUBLE EVENT POINT 1209  :

I 1

INDICATED CONDITION:

o "B" EGDG LOCAL ALARM PANEL HAS A DROPPED TARGET REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INFORMED BY THE AUX BUILDING OPERATOR OF EGDG-1B LOCAL ALARM PANEL DROP TARGET.

OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO AR-902 DISCUSSION:

THIS ALARM INDICATES A DIESEL GENERATOR LOCAL ANNUNCIATOR DROP TARGET HAS DROPPED. IMMEDIATE INVESTIGATION OF ALARM CAUSE SHOULD BE INITIATED.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-IB SENSING ELEMENT: VARIOUS SENSORS ASSOCIATED WITH LOCAL ALARM PANEL

. D

, V AR-305 Rev. 28 Page 40 l

l t

i l g)

ENCLOSURE 1 (Page 40 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-03 E-08-03 i

i 1 l 1 l

DIESEL GEN B OUT OF SERVICE EVENT POINT 1197  :

1 I

INDICATED CONDITION:

o "B" EGDG HAS HAD A LOSS OF DC CONTROL POWER l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o EGDG-1B STARTS WITH NO AUTO START SIGNAL I l o EGDG-1B CONTROL CIRCUIT INDICATOR LIGHTS ON MAIN CONTROL BOARD OR INSIDE THE DIESEL GENERATOR ROOM ARE OFF I

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY DPDP-6B SWITCHES 12 AND 14 ARE CLOSED o CHECK EGDG-1B CONTROL POWER FUSES o REFER TO OP-707 i-l DISCUSSION:

A LOSS OF DC CONTROL POWER WILL AFFECT THE DIESEL DIFFERENTLY DEPENDING ON j WHICH CIRCUIT LOSES POWER. IF ALL DC POWER IS LOST THE DIESEL WILL START l l AND YOU WILL ONLY BE ABLE TO SHUT IT DOWN LOCALLY BY TRIPPING THE FUEL l RACKS. IF OTHER FUSES ARE BLOWN THE EFFECT WILL VARY FROM LOSS OF GOVERNOR CONTROL TO A LOSS OF PROTECTIVE RELAYING ASSOCIATED WITH THE DIESEL. THE I CAU3E OF THIS ALARM SHOULD BE INVESTIGATED IMMEDIATELY. 1 i

l REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

I I

REFERENCES:

DRAWING 208-027 SHEET EG-18, EG-04, EG-10, EG-06, EG-16 l SENSING ELEMENT: A,B,C,D,E, LOSS OF POWER RELAYS .

A i i

l AR-305 Rev. 28 Page 41 l

l

)

. ENCLOSURE 1 (Page 41 of 52)

%.) l ESE ANNUNCIATOR RESPONSE ESB-JH2-08-03 E-08-03  ;

1 l

I i

l

_ DIESEL GEN B l OUT OF SERVICE 1

EVENT POINT 1210 l INDICATED CONDITION:

o "B" EGDG START AIR AS SENSED BY EG-12-PS IS <225 PSIG f REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

OPERATOR ACTIONS FOR A VALID ALARM o INVESTIGATE CAUSE OF LOW AIR PRESSURE ALARM.

o VERIFY EGDG-1B AIR COMPRESSOR, EGP-1B RUNNING o CHECK EGDG-1B FOR AIR LEAKS DISCUSSION:

A LOSS OF STARTING AIR WILL EVENTUALLY CAUSE THE DIESEL TO START WHEN PRESSURE IS NO LONGER HIGH ENOUGH TO HOLD THE AUTO START VALVES CLOSED. IF i EGP-1B IS OUT OF SERVICE THEN CONSIDERATION SHOULD BE GIVEN TO CROSS I l CONNECTING THE DIESEL START AIR SYSTEMS BY OPENING EGV-25 AND EGV-26.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

4 f

REFERENCES:

DRAWING 208-027 SHEET EG-18, EG-08 p SENSING ELEMENT: EG-12-PS

. O '

! I AR-305 ,

Rev. 28 Page 42 l l

l ENCLOSURE 1 (Page 42 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-03 E-08-03 l

l I

l DIESEL GEN B OUT OF SERVICE EVENT POINT 1211 INDICATED CONDITION:

o ANY "B" EGDG AUTO / MANUAL CONTROL SWITCH NOT IN THE AUTO POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o NOTIFIED BY PRIMARY PLANT OPERATOR EGDG-IB CONTROL SWITCH NOT IN AUTO

, U OPERATOR ACTIONS FOR A VALID ALARM:

o NOTIFY PRIMARY PLANT OPERATOR TO RETURN CONTROL SWITCH TO AUTO DISCUSSION:

THE FOLLOWING SWITCHES NOT IN AUTO WILL GIVE YOU THIS ALARM:

JACKET COOLING PUMP JACKET COOLANT HEATER STANDBY LUBE OIL PUMP DC FUEL OIL PUMP DC FUEL OIL XFER FUMP AC FUEL OIL XPER PUMP AC AIR COMPRESSOR DIESEL AUTO / MAN (MCB)

NORMAL /AT ENGINE SWITCH ON DIESEL GAUGE BOARD IN "AT ENGINE" REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

i l

REFERENCES:

DRAWING 208-027 SHEET EG-18, EG-08 SENSING ELEMENT: VARIOUS EGDG-1B CONTROL SWITCH CONTACTS j I

A l

l' l

AR-305 Rev. 28 Page 43 1

._ _ _ _ _ . _ _ . _ . _ , . ~ . - . _ . . _ . - - . __ _

l t

! ENCLOSURE 1

- (Page 43 of 52) l V 1 ESE ANNUNCIATOR RESPONSE ESB-JH2-08-04 E-08-04 i

l CF TANK B i

! LEVEL

dH/ LOW l

EVENT POINT 0117 I

j INDICATED CONDITION:

o CFT-1B LEVEL AS SENSED BY CF-2-LS3 IS >13'4" REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 s o COMPUTER POINT P201 1

V OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

A HIGH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES LEAKING  ;

BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. ALSO CORE l FLOOD ADDITION VALVES MAY BE LEAKING BY.

l REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 l

SENSING ELEMENT: CF-2-LS3

, l

)

i AR-305 Rev. 28 Page 44

I i

l 3 ENCLOSURE I

!/ i (Page 44 of 52) l O ESE ANNUNCIATOR RESPONSE ESB-JH2-08-04 E-08-04 F

r i

l ,

  • CF TANK B LEVEL HIGH/ LOW EVENT POINT 0118 .

i l INDICATED CONDITION:

o CFT-1B LEVEL AS SENSED BY CF-2-LS4 IS >13'4" REDUNDANT INDICATION WHICH WILL VERIFY ALARM: '

! o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 o COMPUTER POINT P201 4

J OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

I A HIGH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. ALSO CORE FLOOD ADDITION VALVES MAY BE LEAKING BY.

t REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

t.

l

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS4 l l

C

()\

l AR-305 Rev. 28 Page 45 .

1

- . .. - . - . ~ - . . -. . . _ _ . . -

i l

l

! ENCLOSURE I (Page 45 of 52) l %

l ESE ANNUNCIATOR RESPONSE ESB-JH2-08-04 E-08-04 l .

CF TANK B LEVEL HIGH/ LOW EVENT POINT 0119 INDICATED CONDITION:

o CFT-1B LEVEL AS SENSED BY CF-2-LS3 IS <12'3" REDUNDANT INDICATION WHICH WILL VERIFY A1 ARM:

o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 o COMPUTER POINT P201 ik OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY.

ALSO CORE FLOOD SAMPLE VALVES MAY BE LEAKING BY.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS3 l

l O

i l

l AR-305 Rev. 28 Page 46

l ENCLOSURE 1

( (Page 46 of 52)

\

t ESE ANNUNCIATOR RESPONSE ESB-JH2-08-04 E-08-04 i

l l

CF TANK B LEVEL HIGH/ LOW l

EVENT POINT 0120 l INDICATED CONDITION

o CFT-1B LEVEL AS SENSED BY CF-2-LS4 IS <12'3" l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 l o COMPUTER POINT P201

, I l(

OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

1 A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY.

ALSO CORE FLOOD SAMPLE VALVES MAY BE LEAKING BY.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS4 A

L)-

AR-305 Rev. 28 Page 47

l l

l ENCLOSURE I (Page 47 of 52)

! O ESE ANNUNCIATOR RESPONSE ESB-JH2-08-05 E-08-05 CF TANK B PRESS i HIGH/ LOW EVENT POINT 0113 INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS3 IS >615 PSIG REDUNDANT INDICATION WHICH WILL VERIFY AIARM:

o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4 1 fh OPERATOR ACTIONS FOR A VALID ALARM:

l o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE l o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

INCREASING REACTOR BUILDING TEMPEPATURES, NITROGEN VALVE LEAKBY FROM N2 l

BOTTLES, OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE.

PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE l REQUIREMENTS.

l l

REFERENCES:

DRAWING 208-013 SHEET CF-13 l-l SENSING ELEMENT: CF-1-PS3 AR-305 Rev. 28 Page 48

l l

l l (g ENCLOSURE 1

, 4 4 (Page 48 of 52) 1

%/

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-05 E-08-05 l

CF TANK B PHESS HIGH/ LOW EVENT POINT 0114 l l INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS4 IS >615 PSIG l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4 v

OPERATOR ACTIONS FOR A VALID ALARM: I o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION l

DISCUSSION:

INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES, OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE. ,

PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS4 U.m i

l l

AR-305 Rev. 28 Page 49

l ,q ENCLOSURE 1 (Page 49 of 52)

).

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-05 E-08-05 CF TANK B PRESS HIGHILOW l I

EVENT POINT 0115 I

INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS3 IS <585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: ,

i o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4

(

%./

OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE.

PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS3 l

l

I )

= \J I

AR-305 Rev. 28 Page 50

,,- . ENCLOSURE 1

! (Page 50 of 52)

(.

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-05 E-08-05 l

1 CF TANK B PRESS  !

HIGH/ LOW EVENT POINT 0116 .

i 1

INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS4 IS $585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

I o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4 ,

f OPERATOR ACTICNS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE.

PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13

SENSING ELEMENT: CF-1-PS4 l

l rm t%)>

l l

l AR-305 Rev. 28 Page 51

l l l

ENCLOSURE 1

<P ge SI or s23-l/]

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-06 E-08-06 1

i

! I I  ;

l i I I I CF TANK B j l I DISCH VALVE l I I OPEN/ CLOSED l

1  :

I l EVENT POINT 0103 ,

l l I

\

1 INDICATED CONDITION:

o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS <690 PSIG AND CW-6 IS NOT FULL  !

, CLOSED l

l I REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

1 o CONTROL BOARD INDICATOR RC-158-PI2 AND CW-6 POSITION INDICATION i OPERATOR ACTIONS FOR A VALID ALARM o CLOSE CW-6 OR STOP RCS PRESSURE DECRFASE i

DISCUSSION:

CW-6 IS A NORMALLY DE-ENERGIZED VALVE. THE BREAKER WILL HAVE TO BE l CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION.

l l

l

REFERENCES:

DRAWING 208-013 SHEET CF-13 l

l SENSING ELEMENT: RC-3A-PS3, 33C VALVE CLOSED CONTACT l

1 O

AR-305 Rev. 28 Page 52

ENCLOSURE 1 (Page 52 of 52)

%/

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-06 E-08-06 I

I l CF TANK B I DISCH VALVE


OPEN/ CLOSED EVENT POINT 0104 INDICATED CONDITION:

o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS >702.5 PSIG AND CW-6 IS NOT FULL OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONTROL BOARD INDICATOR RC-158-PI2 AND CFV-6 POSITION INDICATION OPERATOR ACTIONS FOR A VALID ALARM:

o OPEN CFV-6 OR STOP RCS PRESSURE INCREASE DISCUSSION:

CFV-6 IS A NORMALLY DE-ENERGIZED VALVE. THE BREAKER WILL HAVE TO BE CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION.

l

[

l SENSING ELEMENT: RC-3A-PS3, 33 VALVE OPEN CONTACT

Vo 4

AR-305 Rev. 28 Page 53 (LAST PACE) i

l l 1

l PROCEDURE DEVELOPMENT AND REVISION RECORD l

l[

k Procedure
AR0306 New Rev: 28 PRR#: 16983 l

Title:

ES E ANNUNCIATOR RESPONSE i

l MINOR CHANGES l l If Minor Changes are included, check the applicable box (es) and provide a list of affected steps. I The following corrections are incorporated throughout

_ Sentence Structure _ Redundant words or phrases e j _ Punctuaton _ Abtwevatons

_ Capitehrsten _ Obviously incorrect units of measure

_ Spelhng _ inadvertently omitted symbols (#, %, etc.)

)

Organizatonal Changes: position titles, _ Obvous step numbenng discrepances

_ department names, or teisphone numbers

( _ Format The following corrections are incorporated in the step (s) indicated: "Throughout"is used in lieu of Step # if a specific change affects a large number of steps.

i l

I Correcting equipment nomenclature that does not agree i with field labels or balance of procedure j i

Changing information that is obviously incorrect and referenced correctly elsewhere Misplaced decimals that are neither setpoint values nor tolerances Reference to a procedure when an approved ptocedure has taken the place of another procedure I

l Fixing branching points when it is clear the branching i l steps were originally intended but were overlooked or incorrectly stated due to step number changes l

Adding clarifying information such as NOTES and CAUTIONS I

I l

, Adding words to clarify steps, NOTES, or C AUTIONS which clearly do not change the methodology or intent of its s steps I

l l

PROCEDURE DEVELOPMENT AND REVISION RECORD

/~] Procedure: AR0306 New Rev: 28 PRR#: 15983 l

N~)

Title:

ES E ANNUNCIATOR RESPONSE MINOR CHANGES If Minor Changes are included, check the applicable box (es) and provide a list of affected steps.

The following corrections are incorporated throughout:

_ Sentence Structure _ Redundant words or phrases l

l _ Punctuat on _ Abbreviations

_ Capitalizaten _ Obviously incorrect units of measure i

_ Spelkng _ inadvertently omitted symbols (#, %, etc.)

X Organizatonal Changes: posit on titles, _ Obvious step numbenng discrepances department names, or telephone numbers

_ Format The following corrections are incorporated in the step (s) indicated: "Throughout" is used in lieu of Step # if a specific change affects a large number of steps.

Correcting equipment nomenclature that does not agree with field labels or balance of procedure L)

Changing information that is obviously incorrect and referenced correctly elsewhere Misplaced decimals that are neither setpoint values nor tolerances Reference to a procedure when an approved procedure has taken the place of another procedure Fixing branching points when it is clear the branching steps were originally intended but were overlooked or incorrectly stated due to step number changes l

Adding clarifying information such as NOTES and CAUTIONS l

t I

/* Addmg words to clarify steps, NOTES, or CAUTIONS which j

(%- clearly do not change the methodology or intent of the

. steps i

. . _ . . .- . ~ - - . - . . . - - . - - -

PROCEDURE DEVELOPMENT AND REVISION RECORD Procedure: AR0306 New Rev: 28 PRR#: 16983

Title:

ES E ANNUNCIATOR RESPONSE NON-INTENT CHANGES Changes are incorporated for the reasons provided. "Throughout"is used in leu of Step # if a specife change affects a large number of steps. For new or cancelled procedures the reason is provided Pagei Deleted Section 2.1 as implementing References are no longer required by Al-4028 Page1 Deleted Section 2.1 as implementing references are no longer required by Al-402B Page1 Added new Developmental Reference,2.1.5, MAR 97-08-01-01,A/B EDG Protective Relaying, as this MAR drove the change to Window E-08-01. Event point 1215 O

v CHANGE OF INTENT, CANCELLATION, OR NEW PROCEDURE Changes are incorporated for the reasons provided. "Throughout"is used in lieu of Step # If a specife change affects a large number of steps. For new or cancehed procedures the reason is provided Window E 08-01, Event Point MAR 97-0841-01, EGD Protectrve Relays 1215 i

O b

i