ML20196F849

From kanterella
Jump to navigation Jump to search
Forwards Rev 28 to AR-305, Es E Annunciator Response & Revised Epips,Including Rev 39 to EM-102, Operation of TSC, Rev 12 to EM-103, Operation & Staffing of CR-3 CR During Emergency Classifications
ML20196F849
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/23/1998
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196F853 List:
References
NUDOCS 9812070142
Download: ML20196F849 (1)


Text

i i

Document Transmittal #i 107948 Date: 11/23/98 Tc:

NRC (DC DESK)

MAC: N/A Holder #: 1242 Destination:

==

Description:==

9 Copy Totals Document:

Revision:

Comment:

INFO CNTL MSTR AR0305 28 1

0 0

l EM0102 39 1

0 0

EM0103 12 1

0 0

EM0202 61 1

0 0

EM0225 05 1

0 0

l l

i l

l

%d l

I i

t.

l Instructions to the Addressee: Please verify the document (s) received agrees with the above information.

l Engineering managers are required by NEP-121 to determine if new, revised, or temporary changes to 1

l procedures affect job functions of their personnel. Managers will communicate change information appropriately and provide documentation of any training conducted to the Engineering Training Coordinator.

D Operations department must attach old document (s) or portions of document (s) superseded by the above 7

to this transmittal.

l The signature indicates acknowledgment of receipt of the above document (s) and that documents have been L

updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal

[f dite to mail code:

/

/

NA1C Florida Power Corporation Document Control, NA1C Crystal River Energy Complex 15760 'N. Power Line St.

, y plt',qgs jg.

Crystal River. FL 34428-67o8 Signature of Addressee:

Date:

9812070142 981123 Q

PDR-ADOCK 05000302W F

PDR b

,