_ _ _ _ _ _ _
Document Transmittal #: 94476 Date: 5/4/98 To: NRC (DC DESK) MAC: N/A
, Destination:
Description:
l Copy Copy Totals Document: Revision: Comment: # INFO CNTL MSTR AP0250 10 MINOR CHANGE 7 1 0 0 l
I Instructions to the Addressee:
Please verify the document (s) received agrees with the above information.
Operations department must attach old document (s) or portions of document (s) superseded by the above I to this transmittal.
Q The signature indicates acknowledgment of receipt of the above document (s) and that documents have I been updated. Return signed and dated transmittal to Document Control within 15 working days of g ;
transmittal date to mail code: 0' NA1C j Fionda Power Corporation Document Control, NA1c Crystal River Energy complex l 15760 W. Power Line st.
Crystal River, FL 34428-6708 Signature of Addressee: Date:
9905100411 900430 PDR ADOCK 05000302 P PDR
n- .
RMA REV 10 (MC) AP-250 0 RADIATION MONITOR ACTUATION 1.0 ENTRY CONDITIONS IE any of the following Atmospheric Radiation High alarms are actuated; I
e RM-Al e RM-A2 I
e RM-A3 9 o RM-A4
. RM-A5 ,
ONLY .
THEN use this procedure.
2.0 IMMEDIATE ACTIONS NOTE There are no immediate actions for this procedure.
l I
/2 k e Approved by MNP0 /[M/fdJate 04/30/98
'g "~ ' (SIGNATURE ON FILE)
AP-250 PAGE 1 of 23 RMA
I l
l l
l l
l l i l
l l' BLANK PAGE l t-I l
i l
l l
l l AP-250 REV 10 (MC) PAGE 2 of 23 RMA
l (
. \
l 3.0 FOLLOW UP ACTIONS l
ACTIONS DETAILS 3.1 Ensure auto actions of )
affected radiation monitors occur.
See Table 1 l
l 3.2 Notify personnel of plant
- STA conditions.
l
- Plant Operators
- NSM (evaluate plant conditions for potential entry into the Emergency Plan) 3.3 IF RM-Al Gas is actuated.
TREN stop RB purge fans. __ AHF-7A l (3 AHF-7B AHF-6A AHF-6B l
l CAUTION l With all CC ventilation stopped, the CC may reach its design limit of l 95*F in 30 minutes.
l l
l 3.4 JE RM-A5 is actuated.
_ AHF-17A AHF-17B AND AHD-3 is closed.
i THEN stop CC supply and return fans. __ AHF-18A AHF-18B l AHF-19A AHF-19B l
O'O AP-250 REV 10 (MC) PAGE 3 of 23 RMA
I 1
l l
t l
l l 1 BLANK PAGE O
i l
)
REV 10 (MC) PAGE 4 of 23 RMA AP-250 L _-__ -_________
3.0 FOLLOW UP ACTIONS (CONT'D)
Ih
~.J ACTIONS DETAILS i
3.5 Verify alarm is valid. 1 Depress the affected radiation monitor remote " HORN SILENCE" push button.
2 Ensure radiation monitor is energized.
3 Ensure " ALARM RESET OPERATE CHECK SOURCE" switch is in the "0PERATE" position.
4 Ensure proper alarm setpoints:
RM-Al and RM-A2 per the applicable Release Permit RM-A3. RM-A4. and RM-A5 per the applicable Radiation Monitor Setpoint Log 5 Observe trends on other radiation monitors. if
(~'T applicable.
V IE alarm is NOT valid. 1 Select " ALARM Rr. SET OPERATE THEN determine corrective CHECK SOURCE" to the " ALARM action and GO TO Step 3.23 RESET" position.
in this procedure.
2 Initiate required repair efforts.
3 GO TO Step 3.23 in this procedure.
3.6 IE radiation monitor is off scale high.
THEN ensure " RANGE" switch selected to "1M setting.
l 1
e t
AP-250 REV 10 (MC) PAGE 5 of 23 RMA
d O
BLANK PAGE.
i l
I l
i O
PAGE 6 of 23 RMA AP-250 REV 10 (MC)
3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.7 Notify Health Physics and Chemistry of radiation monitor actuation.
3.8 Evacuate affected areas. 1 Determine evacuation requirements of if required. affected area based on the following:
Radiation levels-Location Work being performed Health Physics input 2 IF evacuation is required.
THEN perform the following:
Depress appropriate (n -
evacuation alarm push button.
Notify plant personnel over PA.
Repeat PA announcement.
3.9 Review current Operation.
Maintenance, and Chemistry activities for any actions that may have caused the actuation.
l 3.10 Stop activities suspected of causing increased radiation levels and restore systems as ;
i necessary.
%.)
L AP-250 REV 10 (MC) PAGE 7 of 23 RMA 1
7 O
BLANK PAGE O
O RMA AP-250 REV 10 (MC) PAGE 8 of 23
3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS l
! 3.11 E RM-Al Gas is NOT
! actuated.
l THEN GO TO Step 3.14 in l this procedure.
l l
3.12 E RM-Al Gas indicates or a]proaches off-scale high.
TlEN select RM-Al l "LMH VALVE CONTROLLER" l .
to "AUT0".
1 3.13 E main RB purge was e Notify Health Physics terminated. Supervisor.
t THEN perform compensatory l actions. e Notify NSM to ensure equipment j hatch is closed.
e Notify PP0 to ensure at least
, one personnel air lock door or
! temporary door is closed (Health Physics and Security may be required).
480V HEATING AUX BUS 3-3A
- l. "AHHE-16A A RB Purge Heating Coil" 480V HEATING AUX BUS 3-4A l "AHHE-16B B PB Purge Heating Coil" 3.14 E RM-A2 Gas is NOT actuated.
THEN GO TO Step 3.18 in this procedure.
AP-250 REV 10 (MC) PAGE 9 of 23 RMA
O 1 l l
l l
J l
BLANK PAGE O
l l
1 l
PAGE 10 of 23 RMA AP-250 REV 10 (MC)
3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS l
l 3.15 E AB has NOT been e Notify PP0 to ensure AHF-34A evacuated. " HOT MACH. SHOP WELD. HOOD EXH THEN ensure AHF-34A is FAN" (119 ft AB Hot Machine stopped. Shop) is stopped.
I l
CAUTION If WGDTs are leaking into the AB, hydrogen concentrations may reach explosive levels.
l i 3.16 E AB has NOT been e Ensure WGDT outlet valves are closed i evacuated. (95 ft AB Rad Waste Panel):
THEN notify PPO to isolate WG system. WDV-436 WDV-437 WDV-438 e Ensure WG header to vent valves are closed:
WDV-489 "SW Surge Tank Vent to l
WG Iso" (95 ft AB Sea Water Room above DCT-1B) i WDV-337 "ECST Vent to WG Iso" (143 ft AB behind WDT-10A) l 3.17 E RM-A2 Gas indicates or approaches off-scale high. l THEN select RM-A2 "LMH l VALVE CONTROLLER" to i l "AUT0" O
AP-250 REV 10 (MC) PAGE 11 of 23 RMA
t 1
i l
i i
I' l
I i
BLANK PAGE l
l 1.
i I
t l
-AP-250 REV 10 (MC) PAGE 12 of 23 RMA
3,0 FOLLOW UP ACTIONS (CONT'0)
[)
v ACTIONS DETAILS 3.18 E RM-A3 Gas is actuated.
- Notify PPO to verify closing air AND AB has NOT been pressure > 17 psig on AH-825-PI evacuated. "D 29 D 36 AIR TO CLOSE" THEN verify dampers D 29 (143 ft AB Panel-15AB).
and D 36 are closed.
3.19 E RM-A5 is NOT actuated.
THEN GO TO Step 3.23 in i this procedure.
NOTE Chemistry sample fans can operate while RM-A5 Gas is actuated when AHF-20A or AHF-208 is running in slow speed.
/7 3.20 E AHF-20A and AHF-20B are AHF-44A
() stopped.
THEN ensure chemistry sampling fans are stopped. AHF-30 AHF-44B 3.21 Establish CC ventilation 1 Ensure AHD-3 is open.
in emergency recirc.
2 Ensure only one train of CC ventilation running:
A Train B Train
__ AHF-18A AHF-18B AHF-19A AHF-19B g) l_
AP-250 REV 10 (MC) PAGE 13 of 23 RMA l
I -
l
i 1
1 l
O l
l l
BLANK PAGE O
I l
l O
PAGE 14 of 23 RMA AP-250 REV 10 (MC) l l
l
l l
3.0 FOLLOW UP ACTIONS (CONT'D) l
[}
w; ACTIONS DETAILS j 3.22 WHEN CC air has a nigher 1 Select " DAMPER OVERRIDE" switch activity than outside air. to "0N" THEN override RM-A5 actuation. 2 Adjust "CNTRL COMPLEX RECIRC l DMPR" potentiometer to the "10" ;
(Full Flow) position. l l
l i
3.23 WHEN radiation monitor can
- Select " ALARM RESET" for the l be reset, affected radiation monitor:
THEN reset monitor.
RM-Al l RM-42 l RM-A3 RM-A4 e' RM-A5 f
V) 3.24 IE any of the following
- OP-409. Plant Ventilation radiation monitors have System. Section 4.4 been reset:
- OP-417. Containment Operating RM-Al Procedure, either of the following:
RM-A2 Section 4.5, Reactor Bldg Purge RM-A3 Section 4.7, RB Pressure Equalization / Mini-Purge Under RM-A4 Non-Accident Conditions AND plant ventilation or
THEN see the appropriate plant procedure (s).
'v' AP-250 REV 10 (MC) PAGE 15 of 23 RMA
d l
l l
l L
i i
I i
BLANK PAGE l
4 I
l l
l i
l AP-250 REV 10 (MC) ' PAGE 16 of 23 RMA-w_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.25 IE RM-A5 was reset. 1 Place "CNTRL COMPLEX RECIRC AND " DAMPER OVERRIDE" DMPR" in "0" (Full Recirc) switch is "0N". position.
THEN restore CC Recirc Damper to normal. 2 Select " DAMPER OVERRIDE" switch to "0FF".
O I
l l
l l !
i l
l l
AP-250 REV 10 (MC) PAGE 17 of 23 RMA
BLANK PAGE i
I r O RMA AP-250 REV 10 (MC) PAGE 18 of 23
3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.26 JF RM-A5 was reset. 1 Ensure Only one train of CC THEN restore CC ventilation operating:
ventilation to normal.
A Train B Train AHF-17A AHF-17B AHF-19A AHF-19B 2 Select both " CONTROL COMPLEX HVAC ISOLATE / RESET" switches'to
" RESET".
3 Ensure dampers properly reposition:
Closed AHD-2C Open AHD-2E )
AHD-1C AHD-1E l
l 4 Ensure only one train of ventilation operating:
A Train B Train AHF-20A AHF-20B
- AHF-44A AHF-44B AHF-30 AHF-30 5 Verify AHD-12 open.
6 Verify AHD-12D open.
7 Ensure AH-032-FIR. Channel A indicates = 35.000 cfm.
O AP-250 REV 10 (MC) PAGE 19 c' 23 RMA
l
?
l l
l 1
l i
BLANK PAGE i I
l
' REV 10 (MC) PAGE 20 of 23 RMA AP-250
1 3.0 FOLLOW UP ACTIONS (CONT'D)
ACTIONS DETAILS l
3.27 EXIT this procedure.
l l
l i l
\ l l
I l
l I
i l
~N (O
I AP-250 REV 10 (MC) PAGE 21 of 23 RMA o____________-_
O i
BLANK PAGE lO l
l<
l O
V PAGE 22 of 23 RMA AP-250 REV 10 (MC)
l I
RM Al Gas Closed: AHV 1C AHV 1A l
AHV 1B AHV 1D LRV 70 LRV 73 LRV 72 LRV 71 RM A2 Gas Stopped: AHF 30 AHF-9A AHF-11A AHF 10 l
AHF 11B AHF-98 l
AHV 3 Table 1: RM A3 RM Auto Actions Stopped: AHF 11A __ M 118 I RM A4 Stopped: AHF 10 RM A5 Gas or Iodine Closed: AHD 12 AHD 2E AHD 12D AHD 1C
_ _ AHD 2C AHD 1E Open: AHD 3 Stopped: AHF 17A AHF 17B AHF 19A AHF 19B 1
AP 250 REV 10 (MC) PAGE 23 of 23 (LAST PAGE) RMA l
___________ -