#REDIRECT [[IR 05000293/1985020]]
{{Adams
| number = ML20133A620
| issue date = 09/17/1985
| title = Notice of Violation from Insp on 850716-0819
| author name =
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name =
| addressee affiliation =
| docket = 05000293
| license number =
| contact person =
| document report number = 50-293-85-20, NUDOCS 8510020249
| package number = ML20133A597
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
 
{{IR-Nav| site = 05000716 | year = 2008 | report number = 019 }}
 
=Text=
{{#Wiki_filter:_- - - . ._- - - - - - - _ . _ _ _ . -  __
,
l t. . ..
.
        ,
*
APPENDIX A NOTICE OF VIOLATION l Boston Edison Company    Docket No. 50-293 Pilgrim Nuclear Power Station  License No. DPR-35 As a result of the inspection conducted on July 16, 1985 - August 19, 1985, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following violation was identified:
l l-  Technical Specification Tables 3.1.1 and 3.2.A require that the trip level l  setting for the main steam line high radiation monitors be maintained less l  than or equal to seven times normal full power background while the reactor is at power or the appropriate reactor protection system (RPS) and primary containment isolation system (PCIS) trip systems shall be trippe Contrary to the above, on the following dates the trip level settings for the
  "B" and "C" main steam line high radiation monitors were not maintained less than or equal to seven times normal full power background while the reactor was at power and the appropriate RPS and PCIS trip systems were not trippe . Between August 10 and 12, 1985, the "B" monitor trip level setting was greater than seven times full power backgroun . Between August 9 and 13, 1985, the "C" monitor trip level setting was j  greater than seven times full power background, i
This is a Severity Level IV Violation (Supplement I).  .
i Pursuant to the provision of 10 CFR 2.201, Boston Edison Company is hereby required to submit to this office within thirty days of the date of the letter which trans-mitted this Notice, a written statement or explanation in reply, including (1) the corrective steps which have been taken and the results achieved; (2) corrective
!
steps which will be taken to avoid further violations; and (3) the date when full
; compliance will be achieved. Where good cause is shown, ctnsideration will be i given to extending this response tim ,
l l
:
l I
l
!
l
$0Mm49eso,27
'
G ADOCK 05000293 PH l
t
}}

Latest revision as of 23:28, 25 September 2020

Notice of Violation from Insp on 850716-0819
ML20133A620
Person / Time
Site: Pilgrim, 05000716
Issue date: 09/17/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20133A597 List:
References
50-293-85-20, NUDOCS 8510020249
Download: ML20133A620 (1)


Text

_- - - . ._- - - - - - - _ . _ _ _ . - __

,

l t. . ..

.

,

APPENDIX A NOTICE OF VIOLATION l Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power Station License No. DPR-35 As a result of the inspection conducted on July 16, 1985 - August 19, 1985, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following violation was identified:

l l- Technical Specification Tables 3.1.1 and 3.2.A require that the trip level l setting for the main steam line high radiation monitors be maintained less l than or equal to seven times normal full power background while the reactor is at power or the appropriate reactor protection system (RPS) and primary containment isolation system (PCIS) trip systems shall be trippe Contrary to the above, on the following dates the trip level settings for the

"B" and "C" main steam line high radiation monitors were not maintained less than or equal to seven times normal full power background while the reactor was at power and the appropriate RPS and PCIS trip systems were not trippe . Between August 10 and 12, 1985, the "B" monitor trip level setting was greater than seven times full power backgroun . Between August 9 and 13, 1985, the "C" monitor trip level setting was j greater than seven times full power background, i

This is a Severity Level IV Violation (Supplement I). .

i Pursuant to the provision of 10 CFR 2.201, Boston Edison Company is hereby required to submit to this office within thirty days of the date of the letter which trans-mitted this Notice, a written statement or explanation in reply, including (1) the corrective steps which have been taken and the results achieved; (2) corrective

!

steps which will be taken to avoid further violations; and (3) the date when full

compliance will be achieved. Where good cause is shown, ctnsideration will be i given to extending this response tim ,

l l