V APPENDIX A i
\\
Boston Edison Company
'i Docket No.
50-293 Pilgrim Nuclear Power Station License No. DPR-35 As a result of the inspection conducted on March 6,-1988 to April 17, 1988, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following violation was identified:
i 10 CFR 50 Appendix B, Criterion III, Design Control, and Baston Edison Company Quality Assurance Manual (BEQAM) Volume II Section 3, Design Cop-trol, require that measures be established for the control of design activities to assure that appropriate quality standards be specified,and design reviews be performed. Further, BEQAM Section 3.3.2.8 requires that i
methods for verifying design changes, such as design reviews and qualifi-cation testing are properly chosen and foll. owed; the most adverse design conditions specified for test programs are used to verify the adequacy of designs.
v Contrary to the above on January 19, 1988, it was' determined that the Field Revision Notice 85-07-62 to the Plant Design / Ctange (PDC) 85-07 for installation of new reactor water level gauger had not been ; properly reviewed and released in that the configuration' drawings were fncorrect.
This resulted in incorrect installation of the gauges. Tne Field Re'/1sion Notice (FRN) 85-07-62 was released on December 12, 1986 and the implemen-tation of the FRN 85-07-62 was completed on April 22, 19P7.
In addition, the design verification testing for the installed reactor
)
water level gauges, Temporary Procedure 87-66, Pre-Operational Test of the New Barton Indicating Units LI 263-59A and LI 263-598, completed on June 10, 1987, did not meet the requirements of the BEQAM, Section 3.3.2.8 in that the testing failed to verify the design adequacyj/ ',
This is a Severity level IV violation (supplement I).
Forsuant to the provisions of 10 CFR 2.201, Boston Edison Company _is hereby required to submit to this office within thirty d1ys from the receipt-of the l
letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which hau' been tak2n and the,,
results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending this response time.
f Ls OFFICIAL RECORD COPY IR PILGRIM 88 0003.0.0 05/18/88 8806100254 880531 PDR ADOCK 05000293 Q
'( i