SEP 171985
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN:
Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No. 50-293/85-20
This refers to the safety inspection conducted by Dr. M. McBride of this office
on July 16,.1985 to August 19, 1985 at the Pilgrim Nuclear Power Station, Plymouth,
Massachusetts, of activities authorized by NRC License No. DPR-35 and to the dis-
cussions of our findings held with your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter.
Within these areas, the inspection
consisted of selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements,-as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the revised NRC Enforcement Policy
(10 CFR 2, Appendix C) published in the Federal Register Notice'(49 FR 8583) dated
March 8, 1984.
You are required to respond to this letter and in preparing your
{
response, you should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required by
j
i
the Paperwork Reduction Act of'1980, PL 96-511.
Your co' operation with us in this matter is appreciated.
Sincerely,
i
.
prisical Signed ByI'
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
t
2.
NRC Region I Inspection Report No. 50-293/85-20
8510020242 850917
gDR
ADOCM 0
3
d
g
__________
.
.-
Boston Edison Company M/C Nuclear
2
SEP 171985
cc w/ encl:
A. V. Morisi, Manager, Nuclear Management Services Department
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
W. J. Nolan, Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
!
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/ encl:
Region I Docket Roon (with concurrences)
Section Chief, DRP
-
W. Raymond, SRI, Vermont Y4nkee
T. Shediosky, SRI, Millstone 1&2
H. Eichenholz, SRI, Yankee
P. Leech, LPM, NRR
i
!
R
P
RI
Rj
- Bride /meo
Thipp
W nz ng9r
,
9/12/85
(
q
g
0FF CI L RECORD COPY
.