ML20204D696
| ML20204D696 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/14/1988 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20204D688 | List: |
| References | |
| 50-293-88-32, NUDOCS 8810210200 | |
| Download: ML20204D696 (1) | |
Text
_ _ _ _ _.
r 8
i APPENDIX A NOTICE OF VIOLATION Boston Edison Company Docket No.53-203 i
Pilgrim Nuclear Power Station License No. DPR-35 i
As a result of the inspection conducted on September 12-16, !W8, and in accordance with the "General Statement of Policy and Procedure for NRC Enforce-l ment Actions," 10 CFR Part 2 Appendix C (Enforcement Policy) (1988), the following violations were identified:
1.
10 CFR 50 Appendix B Criterion VII requires that measures shall be established to assure that purchased equipment conform to procurement documents. These measures shall include provisions for examination of l
products upon delivery.
The Pilgrim Nuclear Power Station Quality Assurance Manudi Section 7 l
requires that a ret.eipt inspection of purchased equipment be performed dCCording to the approved prDCurement documents to assure equipment 3
conformance to specified technical aad QA requirements, i
Contrary to the above, on February 3,1988, NRC inspectors identified an undersized motor contactor in nalled in MCC cubicle B1735 not in l
conformance to the technical requirements specified by drawing E10, Revision 12.
This is a Severity Level IV vielation (Supplement I).
2.
10 CFR 50.49(f) requires that qualification of each component ba based on i
testing or experience with identical equipment or with similar equipment t
with a supporting analysis to show that the equipment to be qualified is j
acceptable.
l t
Contrary to the above, it was observed that on June 20-30, 1988 two
[
l i
unidentifiable wires were present in MOV MO-202-58 and as a result, j
subsequent licensee walkdowns identified environmentally unqualified wires 1
installed in MOVs 220-1, 1001-63, 1301-16, and 2301-4 located inside the i
dryvell.
This is Severity Level IV (Supplement I).
l BEco is not required to respond to these violations as the violations have been corrected and the corrective actions to prevent reoccurrence are i
complete. These actions were reviewed and found to be satisfactory by the NRC in the subject inspection period.
[
{
l t
0FFICIAL RECORD COPY IR 50-293/88 0003.0.0 t
10/12/88 8910210200 881014 PDR ADoCK 05000293 0
.