| number = ML17082A076
| number = ML17082A076
| issue date = 03/27/2017
| issue date = 03/27/2017
| title = Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9360 and MF9361)
| title = Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
| author name = Dietrich A W
| author name = Dietrich A
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Weber L J
| addressee name = Weber L
| addressee affiliation = Indiana Michigan Power Co
| addressee affiliation = Indiana Michigan Power Co
| docket = 05000315, 05000316
| docket = 05000315, 05000316
| license number = DPR-058, DPR-074
| license number = DPR-058, DPR-074
| contact person = Dietrich A P
| contact person = Dietrich A
| case reference number = CAC MF9360, CAC MF9361
| case reference number = CAC MF9360, CAC MF9361
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 4
| page count = 4
| project = CAC:MF9360, CAC:MF9361
| project = CAC:MF9360, CAC:MF9361
| stage = Other
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:LICENSEE: FACILITY:  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2017 LICENSEE:       Indiana Michigan Power Company, LLC FACILITY:       Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2017 Indiana Michigan Power Company, LLC Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 SUMMARY OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1AND2 (CAC NOS. MF9360 and MF9361) On March 20, 2017, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (l&M, the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting. The purpose of the meeting was to discuss planned license amendment requests (LARs) for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The licensee intends to submit requests for approval for minor changes to its fire protection plan. The meeting notice and agenda, dated March 8, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17067A515. A list of attendees is provided as Enclosure 1. The licensee presented information regarding its plan to submit two LARs in May 2017, and to request approval within the normal NRC review timeline. l&M briefly discussed the purpose of the LARs. l&M's fire protection plan is based on the requirements of National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The first LAR would request approval for wiring above suspended ceilings in several locations throughout CNP. The requirements for wiring above suspended ceilings are located in NFPA 805, Seeton 3.3.5.1. The second LAR would request approval for the use of thin wall metallic tubing (EMT) throughout the plant power block. The requirements for the use of EMT are located in NFPA 805, Section 3.3.5.2. The NRC staff stated that several other licensees have requested, and the NRC has recently approved, several similar requests related to Sections 3.3.5.1 and 3.3.5.2 of NFPA 805. The NRC staff recommended that the licensee review these example requests and the associated NRC safety evaluations (SEs). The NRC staff suggested that in the LARs, the licensee should focus on the discussions of defense-in-depth. The licensee indicated that it would submit two separate LARs for the two requests. The NRC staff suggested that the two requests could be combined into one LAR, which would make the NRC review more efficient. The licensee stated that it would submit one LAR containing the two requests.
 
Members of the public were in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-2846, or Allison.Dietrich@nrc.gov. Docket Nos. 50-315 and 50-316  
==SUMMARY==
OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1AND2 (CAC NOS. MF9360 and MF9361)
On March 20, 2017, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (l&M, the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting.
The purpose of the meeting was to discuss planned license amendment requests (LARs) for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The licensee intends to submit requests for approval for minor changes to its fire protection plan. The meeting notice and agenda, dated March 8, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17067A515. A list of attendees is provided as Enclosure 1.
The licensee presented information regarding its plan to submit two LARs in May 2017, and to request approval within the normal NRC review timeline. l&M briefly discussed the purpose of the LARs. l&M's fire protection plan is based on the requirements of National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The first LAR would request approval for wiring above suspended ceilings in several locations throughout CNP. The requirements for wiring above suspended ceilings are located in NFPA 805, Seeton 3.3.5.1. The second LAR would request approval for the use of thin wall metallic tubing (EMT) throughout the plant power block. The requirements for the use of EMT are located in NFPA 805, Section 3.3.5.2.
The NRC staff stated that several other licensees have requested, and the NRC has recently approved, several similar requests related to Sections 3.3.5.1 and 3.3.5.2 of NFPA 805. The NRC staff recommended that the licensee review these example requests and the associated NRC safety evaluations (SEs). The NRC staff suggested that in the LARs, the licensee should focus on the discussions of defense-in-depth.
The licensee indicated that it would submit two separate LARs for the two requests. The NRC staff suggested that the two requests could be combined into one LAR, which would make the NRC review more efficient. The licensee stated that it would submit one LAR containing the two requests.
 
Members of the public were in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-2846, or Allison.Dietrich@nrc.gov.
Sincerely,
                                            \(vv-~ {vv--
Json W. Dietrich, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv Sincerely, {vv--Json W. Dietrich, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 
List of Attendees cc w/encl: Distribution via Listserv


==SUBJECT:==
ML17082A076 OFFICE     DORL/LPL3/PM     DORL/LPL3/LA   DRA/AFPB/BC       DORL/LPL3/BC   DORL/LPL3/PM NAME      ADietrich      SRohrer          GCasto           DWrona         ADietrich (JRankin for)                    (JRobinson for)   (RKuntz for)   (JRankin for)
SUMMARY OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF9360 and MF9361) DISTRIBUTION PUBLIC LPL3 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorllpl3-1 Resource RidsOpaMail Resource PMNS Resource ADAMS Accession No.: ML 17082A076 OFFICE DORL/LPL3/PM DORL/LPL3/LA NAME ADietrich SRohrer (JRankin for) DATE 3/27/17 3/23/17 RidsNrrLASRohrer Resource RidsRgn3mailCenter Resource RidsNrrPmDCCook Resource RidsNrrDorl Resource RidsNrrDra Resource DRA/AFPB/BC DORL/LPL3/BC GCasto DWrona (JRobinson for) (RKuntz for) 3/27/17 3/27/17 OFFICIAL RECORD COPY DORL/LPL3/PM ADietrich (JRankin for) 3/27/17
DATE      3/27/17         3/23/17          3/27/17           3/27/17        3/27/17}}
}}

Latest revision as of 18:47, 18 March 2020

Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
ML17082A076
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/27/2017
From: Dietrich A
Plant Licensing Branch III
To: Weber L
Indiana Michigan Power Co
Dietrich A
References
CAC MF9360, CAC MF9361
Download: ML17082A076 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2017 LICENSEE: Indiana Michigan Power Company, LLC FACILITY: Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1AND2 (CAC NOS. MF9360 and MF9361)

On March 20, 2017, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (l&M, the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting.

The purpose of the meeting was to discuss planned license amendment requests (LARs) for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The licensee intends to submit requests for approval for minor changes to its fire protection plan. The meeting notice and agenda, dated March 8, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17067A515. A list of attendees is provided as Enclosure 1.

The licensee presented information regarding its plan to submit two LARs in May 2017, and to request approval within the normal NRC review timeline. l&M briefly discussed the purpose of the LARs. l&M's fire protection plan is based on the requirements of National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The first LAR would request approval for wiring above suspended ceilings in several locations throughout CNP. The requirements for wiring above suspended ceilings are located in NFPA 805, Seeton 3.3.5.1. The second LAR would request approval for the use of thin wall metallic tubing (EMT) throughout the plant power block. The requirements for the use of EMT are located in NFPA 805, Section 3.3.5.2.

The NRC staff stated that several other licensees have requested, and the NRC has recently approved, several similar requests related to Sections 3.3.5.1 and 3.3.5.2 of NFPA 805. The NRC staff recommended that the licensee review these example requests and the associated NRC safety evaluations (SEs). The NRC staff suggested that in the LARs, the licensee should focus on the discussions of defense-in-depth.

The licensee indicated that it would submit two separate LARs for the two requests. The NRC staff suggested that the two requests could be combined into one LAR, which would make the NRC review more efficient. The licensee stated that it would submit one LAR containing the two requests.

Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-2846, or Allison.Dietrich@nrc.gov.

Sincerely,

\(vv-~ {vv--

Json W. Dietrich, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

ML17082A076 OFFICE DORL/LPL3/PM DORL/LPL3/LA DRA/AFPB/BC DORL/LPL3/BC DORL/LPL3/PM NAME ADietrich SRohrer GCasto DWrona ADietrich (JRankin for) (JRobinson for) (RKuntz for) (JRankin for)

DATE 3/27/17 3/23/17 3/27/17 3/27/17 3/27/17