|
|
(11 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17082A076 | | | number = ML17082A076 |
| | issue date = 03/27/2017 | | | issue date = 03/27/2017 |
| | title = Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9360 and MF9361) | | | title = Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 |
| | author name = Dietrich A W | | | author name = Dietrich A |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Weber L J | | | addressee name = Weber L |
| | addressee affiliation = Indiana Michigan Power Co | | | addressee affiliation = Indiana Michigan Power Co |
| | docket = 05000315, 05000316 | | | docket = 05000315, 05000316 |
| | license number = DPR-058, DPR-074 | | | license number = DPR-058, DPR-074 |
| | contact person = Dietrich A P | | | contact person = Dietrich A |
| | case reference number = CAC MF9360, CAC MF9361 | | | case reference number = CAC MF9360, CAC MF9361 |
| | document type = Meeting Summary | | | document type = Meeting Summary |
| | page count = 4 | | | page count = 4 |
| | project = CAC:MF9360, CAC:MF9361 | | | project = CAC:MF9360, CAC:MF9361 |
| | stage = Other | | | stage = Meeting |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:LICENSEE: FACILITY: SUBJECT: UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2017 Indiana Michigan Power Company, LLC Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 SUMMARY OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1AND2 (CAC NOS. MF9360 and MF9361) On March 20, 2017, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (l&M, the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting. The purpose of the meeting was to discuss planned license amendment requests (LARs) for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The licensee intends to submit requests for approval for minor changes to its fire protection plan. The meeting notice and agenda, dated March 8, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17067A515. A list of attendees is provided as Enclosure 1. The licensee presented information regarding its plan to submit two LARs in May 2017, and to request approval within the normal NRC review timeline. l&M briefly discussed the purpose of the LARs. l&M's fire protection plan is based on the requirements of National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The first LAR would request approval for wiring above suspended ceilings in several locations throughout CNP. The requirements for wiring above suspended ceilings are located in NFPA 805, Seeton 3.3.5.1. The second LAR would request approval for the use of thin wall metallic tubing (EMT) throughout the plant power block. The requirements for the use of EMT are located in NFPA 805, Section 3.3.5.2. The NRC staff stated that several other licensees have requested, and the NRC has recently approved, several similar requests related to Sections 3.3.5.1 and 3.3.5.2 of NFPA 805. The NRC staff recommended that the licensee review these example requests and the associated NRC safety evaluations (SEs). The NRC staff suggested that in the LARs, the licensee should focus on the discussions of defense-in-depth. The licensee indicated that it would submit two separate LARs for the two requests. The NRC staff suggested that the two requests could be combined into one LAR, which would make the NRC review more efficient. The licensee stated that it would submit one LAR containing the two requests. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2017 LICENSEE: Indiana Michigan Power Company, LLC FACILITY: Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 |
| -2 -Members of the public were in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-2846, or Allison.Dietrich@nrc.gov. Docket Nos. 50-315 and 50-316 Enclosure: List of Attendees cc w/encl: Distribution via Listserv Sincerely, {vv--Json W. Dietrich, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
| | |
| -3 -SUBJECT: SUMMARY OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF9360 and MF9361) DISTRIBUTION PUBLIC LPL3 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorllpl3-1 Resource RidsOpaMail Resource PMNS Resource ADAMS Accession No.: ML 17082A076 OFFICE DORL/LPL3/PM DORL/LPL3/LA NAME ADietrich SRohrer (JRankin for) DATE 3/27/17 3/23/17 RidsNrrLASRohrer Resource RidsRgn3mailCenter Resource RidsNrrPmDCCook Resource RidsNrrDorl Resource RidsNrrDra Resource DRA/AFPB/BC DORL/LPL3/BC GCasto DWrona (JRobinson for) (RKuntz for) 3/27/17 3/27/17 OFFICIAL RECORD COPY DORL/LPL3/PM ADietrich (JRankin for) 3/27/17 | | ==SUBJECT:== |
| }} | | |
| | ==SUMMARY== |
| | OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1AND2 (CAC NOS. MF9360 and MF9361) |
| | On March 20, 2017, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (l&M, the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting. |
| | The purpose of the meeting was to discuss planned license amendment requests (LARs) for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The licensee intends to submit requests for approval for minor changes to its fire protection plan. The meeting notice and agenda, dated March 8, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17067A515. A list of attendees is provided as Enclosure 1. |
| | The licensee presented information regarding its plan to submit two LARs in May 2017, and to request approval within the normal NRC review timeline. l&M briefly discussed the purpose of the LARs. l&M's fire protection plan is based on the requirements of National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The first LAR would request approval for wiring above suspended ceilings in several locations throughout CNP. The requirements for wiring above suspended ceilings are located in NFPA 805, Seeton 3.3.5.1. The second LAR would request approval for the use of thin wall metallic tubing (EMT) throughout the plant power block. The requirements for the use of EMT are located in NFPA 805, Section 3.3.5.2. |
| | The NRC staff stated that several other licensees have requested, and the NRC has recently approved, several similar requests related to Sections 3.3.5.1 and 3.3.5.2 of NFPA 805. The NRC staff recommended that the licensee review these example requests and the associated NRC safety evaluations (SEs). The NRC staff suggested that in the LARs, the licensee should focus on the discussions of defense-in-depth. |
| | The licensee indicated that it would submit two separate LARs for the two requests. The NRC staff suggested that the two requests could be combined into one LAR, which would make the NRC review more efficient. The licensee stated that it would submit one LAR containing the two requests. |
| | |
| | Members of the public were in attendance. Public Meeting Feedback forms were not received. |
| | Please direct any inquiries to me at 301-415-2846, or Allison.Dietrich@nrc.gov. |
| | Sincerely, |
| | \(vv-~ {vv-- |
| | Json W. Dietrich, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316 |
| | |
| | ==Enclosure:== |
| | List of Attendees cc w/encl: Distribution via Listserv |
| | |
| | ML17082A076 OFFICE DORL/LPL3/PM DORL/LPL3/LA DRA/AFPB/BC DORL/LPL3/BC DORL/LPL3/PM NAME ADietrich SRohrer GCasto DWrona ADietrich (JRankin for) (JRobinson for) (RKuntz for) (JRankin for) |
| | DATE 3/27/17 3/23/17 3/27/17 3/27/17 3/27/17}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML17082A0762017-03-27027 March 2017 Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 Project stage: Meeting 2017-03-27
[Table View] |
Similar Documents at Cook |
---|
Category:Meeting Summary
MONTHYEARML24183A2292024-07-0101 July 2024 Summary of Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML24103A1872024-04-16016 April 2024 Summary of Meeting with Indiana Michigan Power Co., Regarding Surveillance Capsule Program for DC Cook Nuclear Plant, Unit 2 ML24031A5872024-02-0202 February 2024 Summary of Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23215A1662023-08-17017 August 2023 Summary of July 31, 2023, Meeting with Indiana Michigan Power Company Regarding Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23199A2402023-07-19019 July 2023 Summary of the July 13, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML22355A6022023-01-0303 January 2023 Summary of December 14, 2022, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22318A1992022-11-21021 November 2022 Summary of November 7, 2022, Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22154A5342022-06-0909 June 2022 Summary of the June 1, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML22011A2732022-01-13013 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Planned Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21349B3092022-01-0303 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Quality Assurance Program for Donald C. Cook Nuclear Plant, Units 1 and 2 ML21202A1072021-07-23023 July 2021 Summary of July 20, 2021, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21196A5182021-07-15015 July 2021 July 8, 2021, Summary of Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant ML21082A0052021-03-24024 March 2021 Summary of March 19, 2021, with Indiana Michigan Power Company Regarding Containment Water Level Channels for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20349A0152020-12-17017 December 2020 Summary of November 30, 2020, Teleconference with Indiana Michigan Power Company Regarding a Planned License Amendment Request to Extend the Containment Integrated Leak Rate Testing Interval for Donald C. Cook Nuclear Plant, Unit No. 2 ML20282A2712020-10-14014 October 2020 Summary of October 2, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML20248H4752020-09-10010 September 2020 Summary of August 6, 2020, Teleconference with Indian Michigan Power Company Related to Steam Generator Eddy Current Testing License Amendment Request ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 ML20133K1282020-05-21021 May 2020 Summary of May 4, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20121A0692020-05-0404 May 2020 Summary of Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20041C9492020-02-13013 February 2020 Summary of February 6, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19350A0552019-12-30030 December 2019 Summary of 12/12/2019 Meeting with Indiana Michigan Power Company, License Amendment Request for D.C. Cook Nuclear Plant, Units 1 and 2 to Delete Surveillance Requirement Related to Diesel Generator Load Test Resistor Banks ML19212A5652019-07-30030 July 2019 Summary of Public Open House to Discuss NRC Activities and the 2018 End-Of-Cycle Performance Assessment of Donald C. Cook Nuclear Generating Plant, Units 1 and 2 ML19141A0622019-06-0606 June 2019 Summary of November 19, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19099A3262019-04-16016 April 2019 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19067A0482019-03-12012 March 2019 Summary of Public Teleconference with Indiana Michigan Power Co. (I&M) Review of LAR for Approval of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (EPID-2019-LLA-0054) ML18334A0402018-12-13013 December 2018 Summary of Meeting with Indian Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML18109A0692018-04-26026 April 2018 Summary of April 10, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML18052B0542018-02-26026 February 2018 Summary of February 15, 2018, Meeting with Indian Michigan Power Company Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (EPID L-2018-LRM-0008 ML18018B1382018-01-22022 January 2018 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML17265A4922017-10-0404 October 2017 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 2 ML17235B1232017-08-23023 August 2017 Summary of the July 27, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML17082A0762017-03-27027 March 2017 Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML16308A1132016-11-16016 November 2016 Summary of October 27, 2016, Public Meeting with Indiana Michigan Power Company Regarding the Donald C. Cook Nuclear Plant, Units 1 and 2 ML16244A7062016-08-30030 August 2016 Summary of the August 22, 2016, Donald C. Cook Public Meeting ML16193A5912016-07-15015 July 2016 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15271A0462015-10-0505 October 2015 Summary of Public Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15107A0982015-04-24024 April 2015 April 14, 2015, Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML14311A3182014-11-14014 November 2014 Summary of Conference Call with Donald C. Cook Nuclear Plant, Unit 1 Regarding the Fall 2014 Steam Generator Inspections ML14231A0752014-08-27027 August 2014 Summary of the August 8, 2014, Pre-Application Meeting with American Electric Power Company to Discuss a Future License Amendment Request for Alternative Source Term and TSTF-490 ML14209A9422014-07-30030 July 2014 July 9, 2014, Summary of Category 1, Public Meeting with Indiana Michigan Power Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14199A0802014-07-18018 July 2014 Summary of July 8, 2014 Donald C. Cook Public Annual Assessment Meeting ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13210A2272013-08-0202 August 2013 6/26/13, Summary of Pre-Application Meeting to Discuss Pending License Amendment Request to Modify the CNP Unit 1 Normal Operating Pressure and Temperature ML13189A2322013-07-15015 July 2013 Summary of Conference Telephone Call Regarding the 2013 Steam Generator Tube Inspections ML13154A4062013-06-0303 June 2013 5/30/2013 - Summary of the D.C. Cook Public Meeting ML12159A4022012-06-0707 June 2012 May 31, 2012 Summary of Public Meeting to Discuss the 2011 Annual Assessment Results for D.C. Cook ML1133307782011-11-29029 November 2011 Record of Discussion by Phone on 10/5/11 Regarding Steam Generator Inspection ML11129A2422011-06-0808 June 2011 Summary of Meeting with Indiana Michigan Power Company to Discuss Issues Related to a Future Submittal Using NFPA 805 ML0931305572009-11-0909 November 2009 Summary of Public Meeting with Staff from the D.C. Cook Nuclear Power Plant Regarding the September 2008 Unit 1 Turbine Vibration Event 2024-07-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2017 LICENSEE: Indiana Michigan Power Company, LLC FACILITY: Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF MARCH 20, 2017, MEETING WITH INDIANA MICHIGAN POWER COMPANY REGARDING DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1AND2 (CAC NOS. MF9360 and MF9361)
On March 20, 2017, a Category I public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Indiana Michigan Power Company (l&M, the licensee) via teleconference. This meeting was open to members of the public. No regulatory decisions were made at this meeting.
The purpose of the meeting was to discuss planned license amendment requests (LARs) for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The licensee intends to submit requests for approval for minor changes to its fire protection plan. The meeting notice and agenda, dated March 8, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17067A515. A list of attendees is provided as Enclosure 1.
The licensee presented information regarding its plan to submit two LARs in May 2017, and to request approval within the normal NRC review timeline. l&M briefly discussed the purpose of the LARs. l&M's fire protection plan is based on the requirements of National Fire Protection Association (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants." The first LAR would request approval for wiring above suspended ceilings in several locations throughout CNP. The requirements for wiring above suspended ceilings are located in NFPA 805, Seeton 3.3.5.1. The second LAR would request approval for the use of thin wall metallic tubing (EMT) throughout the plant power block. The requirements for the use of EMT are located in NFPA 805, Section 3.3.5.2.
The NRC staff stated that several other licensees have requested, and the NRC has recently approved, several similar requests related to Sections 3.3.5.1 and 3.3.5.2 of NFPA 805. The NRC staff recommended that the licensee review these example requests and the associated NRC safety evaluations (SEs). The NRC staff suggested that in the LARs, the licensee should focus on the discussions of defense-in-depth.
The licensee indicated that it would submit two separate LARs for the two requests. The NRC staff suggested that the two requests could be combined into one LAR, which would make the NRC review more efficient. The licensee stated that it would submit one LAR containing the two requests.
Members of the public were in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-2846, or Allison.Dietrich@nrc.gov.
Sincerely,
\(vv-~ {vv--
Json W. Dietrich, Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
ML17082A076 OFFICE DORL/LPL3/PM DORL/LPL3/LA DRA/AFPB/BC DORL/LPL3/BC DORL/LPL3/PM NAME ADietrich SRohrer GCasto DWrona ADietrich (JRankin for) (JRobinson for) (RKuntz for) (JRankin for)
DATE 3/27/17 3/23/17 3/27/17 3/27/17 3/27/17