|
|
(One intermediate revision by the same user not shown) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Page 1 of 1 I Monette, Frederick A.From: Metz, William C.Sent: Thursday, October 05, 2006 11:46 AM To: Monette, Frederick A.Cc: Allison, Timothy | | {{#Wiki_filter:Page 1 of 1 I |
| | Monette, Frederick A. |
| | From: Metz, William C. |
| | Sent: Thursday, October 05, 2006 11:46 AM To: Monette, Frederick A. |
| | Cc: Allison, Timothy |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Susquehanna Data Needs Attachments: | | Susquehanna Data Needs Attachments: Susquehanna Data Assessment 10-05-06.doc I have fully proofed this, so check it. |
| Susquehanna Data Assessment 10-05-06.doc I have fully proofed this, so check it.****** * ************ | | William C. Metz, MBA, MISPh.D. |
| **********
| | Director, Center for Integrated Emergency Preparedness Decision & Information Sciences Division Argonne National Laboratory 9700 South Cass Avenue, Bldg 900 Argonne, IL 60439-4832 (630) 252-3271 (voice) (630) 252-5327 (fax) metz4anI.gQ.\{ (e-mail) 1/22/2007 |
| *William C. Metz, MBA, MISPh.D.Director, Center for Integrated Emergency Preparedness Decision & Information Sciences Division Argonne National Laboratory 9700 South Cass Avenue, Bldg 900 Argonne, IL 60439-4832 (630) 252-3271 (voice) (630) 252-5327 (fax) metz4anI.gQ.\{ (e-mail)1/22/2007 INFORMATION NEEDS FOR SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 October 5, 2006 I have reviewed Appendix E, Applicant's Environmental Report -Operating License Renewal Stage, and the two Final Environmental Statements (construction and operation) in advance of the site visit and preparing the Supplemental Environmental Impact Statement.
| | |
| I have found several instances of where additional information is required or where the information contained in the Environmental Report needs to be presented in a more structured format.2.2.1 Land Use" There is confusion in the acreage totals and breakouts. | | INFORMATION NEEDS FOR SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 October 5, 2006 I have reviewed Appendix E, Applicant's Environmental Report - Operating License Renewal Stage, and the two Final Environmental Statements (construction and operation) in advance of the site visit and preparing the Supplemental Environmental Impact Statement. I have found several instances of where additional information is required or where the information contained in the Environmental Report needs to be presented in a more structured format. |
| Mention is made of PPL Susquehanna property and SSES property, is there a difference in the ownership? | | 2.2.1 Land Use |
| For example, in Section 2.4 there is mention of land being leased, is the 65 acre Gould Island in the totals, where does the 88-acre Overlook fit in the totals, and are the "Susquehanna Riverlands" and the "Riverlands Recreation Area" the same, which is the accurate title?" Site land cover/land use percentages are missing -there are no descriptions or percentages for land cover categories, such as, open area (fields, marshes, swamps, beach, cemetary), forests, facilities and structures, parking areas, water (ponds, lakes, canal -whether natural or manmade), and visitor or recreation areas. Reference is made to undeveloped lands, but no actual accounting can be done, while there is mention of developed portions of the land being 487 acres. Developed is assumed to be just the plant structures, cooling towers, and parking areas?* There is no description of the measures or impedinments between the Riverlands Recreation Area and the Protected Area to halt ingress of recreational users, beyond it an assumption that the "security fencing" west of Route II provides that barrier (2. 1-).* There is no description of the railroad and highway that cross the site.* Critical terrain elevations are also not included.2.2.8.3 Offsite Land Use Data should be sufficient. | | " There is confusion in the acreage totals and breakouts. Mention is made of PPL Susquehanna property and SSES property, is there a difference in the ownership? For example, in Section 2.4 there is mention of land being leased, is the 65 acre Gould Island in the totals, where does the 88-acre Overlook fit in the totals, and are the "Susquehanna Riverlands" and the "Riverlands Recreation Area" the same, which is the accurate title? |
| 2.2.8.4 Visual Aesthetics and Noise* No description is provided as the height, color of visibility of the facilities and structures and from what distances and locations they can be seen. Appendix A referenced that a discussion as to Issue 73 (Aesthetic impacts) would be found in Section 4.0, but it could not be found.* No information is provided regarding plant and cooling tower noise and what can be heard at the site boundaries or in the Riverlands Recreation Area. Appendix A}} | | " Site land cover/land use percentages are missing - there are no descriptions or percentages for land cover categories, such as, open area (fields, marshes, swamps, beach, cemetary), forests, facilities and structures, parking areas, water (ponds, lakes, canal - whether natural or manmade), and visitor or recreation areas. Reference is made to undeveloped lands, but no actual accounting can be done, while there is mention of developed portions of the land being 487 acres. Developed is assumed to be just the plant structures, cooling towers, and parking areas? |
| | * There is no description of the measures or impedinments between the Riverlands Recreation Area and the Protected Area to halt ingress of recreational users, beyond it an assumption that the "security fencing" west of Route II provides that barrier (2. 1-). |
| | * There is no description of the railroad and highway that cross the site. |
| | * Critical terrain elevations are also not included. |
| | 2.2.8.3 Offsite Land Use Data should be sufficient. |
| | 2.2.8.4 Visual Aesthetics and Noise |
| | * No description is provided as the height, color of visibility of the facilities and structures and from what distances and locations they can be seen. Appendix A referenced that a discussion as to Issue 73 (Aesthetic impacts) would be found in Section 4.0, but it could not be found. |
| | * No information is provided regarding plant and cooling tower noise and what can be heard at the site boundaries or in the Riverlands Recreation Area. Appendix A}} |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement
Results
Other: ML062960009, ML063040075, ML063050355, ML063050363, ML063050370, ML063050590, ML063050595, ML063050608, ML063100474, ML063470607, ML070320537, ML070320542, ML070320564, ML070320567, ML070320592, ML070320601, ML070320605, ML070320657, ML070320662, ML070320667, ML070320671, ML070320676, ML070320680, ML070320719, ML070320721, ML070320728, ML070320733, ML070320740, ML070320745, ML070320756, ML070320784, ML070320787, ML070320791, ML070320802, ML070320803, ML070320806, ML070570480, ML070590453, ML070590456, ML070610479, ML070710153, ML070710154, ML070710155, ML070710159, ML070710161, ML070720347, ML070800414, ML070800420, ML070800423, ML070800434... further results
|
MONTHYEARML0802302892002-12-31031 December 2002 Pennsylvania Bureau of Radiation Protection, Environmental Radiation in Pennsylvania: 2001-2002 Annual Report Project stage: Other ML0802804772002-12-31031 December 2002 Information on Haliaeetus Leucocephalus - Bald Eagle Project stage: Other ML0802303352003-05-31031 May 2003 Lackawanna-Luzerne Counties, Long Range Transportation Plan for the Lackawanna-Luzeme Transportation Study Area (2003-2025). Project stage: Other ML0802303182004-02-24024 February 2004 Pennsylvania Game Commission, C. Fergus, Wood Warblers. Project stage: Other ML0802204462004-07-22022 July 2004 U.S. Census Bureau. Pennsylvania Quickfacts: Columbia County Project stage: Other ML0802204452004-07-22022 July 2004 U.S. Census Bureau - Pennsylvania Quickfacts Luzerne County Project stage: Other ML0802303142004-07-26026 July 2004 Pennsylvania Department of Transportation, Traffic Volume Maps, Luzerne and Columbia Counties, 2002 Project stage: Other ML0802303242004-07-27027 July 2004 U.S. Environmental Protection Agency, Local Drinking Water Information - Pennsylvania Drinking Water Project stage: Other ML0802204562004-08-18018 August 2004 Riverlands Environmental Preserve - General Information Project stage: Other ML0802302562004-11-10010 November 2004 King'S College, the Pennsylvania Marketing and Planning Center, Excerpts Project stage: Other ML0802303322005-03-31031 March 2005 U.S. Environmental Protection Agency, Brownfields Cleanup and Redevelopment: Brownfields Cleanup Revolving Loan Fund Pilot Fact Sheet on Luzerne County, PA Project stage: Other ML0802303262005-10-12012 October 2005 Centers for Disease Control & Prevention, Legionellosis: Legionnaires' Disease (Ld) and Pontiac Fever. Project stage: Other ML0802303172005-12-0606 December 2005 Pennsylvania Department of Environmental Protection, Standards for Cleanup, Reuse of Hazleton Mine Reclamation Project Project stage: Other ML0802303342005-12-31031 December 2005 River Basin Commission, Susquehanna River Basin Commission Gis Program., Excerpt, Middle Susquehanna Subbasin. Project stage: Other ML0623501472006-08-15015 August 2006 Monthly Operating Reports Project stage: Request ML0626201572006-09-13013 September 2006 Application for Renewed Operating Licenses Project stage: Request ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Request ML0703206572006-10-0303 October 2006 Email from Allison Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208032006-10-0303 October 2006 Email from Nash Regarding Consultation Letters on American Shad in the Susquehanna River Project stage: Other ML0703206012006-10-0505 October 2006 E-mail from Metz Regarding the Susquehanna Steam Electric Station Data Assessment Project stage: Other ML0703206052006-10-0505 October 2006 Email from Moret Regarding the Susquehanna Steam Electric Station Category 1 & 2 Issues Project stage: Other ML0703207982006-10-0505 October 2006 Email from Klementowicz Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703206672006-10-0606 October 2006 E-mail from O'Rourke Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206802006-10-0606 October 2006 Email from Avci Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208002006-10-0606 October 2006 Email from Davis Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703205672006-10-0707 October 2006 E-mail from Vinikour Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205922006-10-0909 October 2006 E-mail from Monette Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206622006-10-0909 October 2006 E-Mail from Lazaro Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206762006-10-0909 October 2006 E-mail from Lagory Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208022006-10-0909 October 2006 Email from Monette to Mullins Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205642006-10-0909 October 2006 Email from Wescott Regarding the Environmental Report (Er) Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other PLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 Project stage: Request ML0703208062006-10-16016 October 2006 Acceptance Review Checklist from Mullins Regarding the Susquehanna Steam Electric Station Environmental Report Project stage: Other ML0629600792006-10-24024 October 2006 Maintenance of Reference Materials at the Mill Memorial Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0629600602006-10-26026 October 2006 Maintenance of Reference Materials at the Berwick Public Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0703206712006-10-31031 October 2006 E-mail from Quinn Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0629600492006-11-0101 November 2006 50 Mile Vicinity Map Project stage: Request ML0629600092006-11-0101 November 2006 License Renewal Application Review (Shpo No. 05-1588-079-A) Project stage: Other PLA-6133, Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-222006-11-0202 November 2006 Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-22 Project stage: Request ML0703207842006-11-0606 November 2006 Email from Franovich Regarding Questions on Consultation Letters Project stage: Other ML0630503632006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Oneida Nation Wisconsin Project stage: Other ML0630503552006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Eastern Shawnee Tribe Oklahoma Project stage: Other ML0630505952006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Project stage: Other ML0630505902006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Onondaga Nation - Gonyea Project stage: Other ML0630506082006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Mohican Nation Project stage: Other ML0630503702006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Oklahoma Project stage: Other ML0633302792006-11-15015 November 2006 (Units 1 & 2) Afternoon Public Meeting Project stage: Meeting ML0633302812006-11-15015 November 2006 Transcript of Susquehanna Steam Electric Station (Units 1 and 2) Evening Public Meeting on November 15, 2006, Pages 1-46 Project stage: Meeting ML0632401502006-11-15015 November 2006 11/15/06 Environmental Scoping Meeting Slide Handouts Project stage: Request ML0630400752006-11-15015 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Tonawanda Band of Seneca Project stage: Other 2006-10-24
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24155A0882024-05-30030 May 2024 Email Summary of Verbal Authorization 1RR06 ML24150A3342024-05-29029 May 2024 Official RCIs for Susquehanna Proposed Alternative 1RR06 ML24087A0672024-04-22022 April 2024 Email to Melisa Krick Regarding Exemption Decision for Susquehanna ML24087A0682024-04-17017 April 2024 Email to Melisa Krick Regarding Availability of Environmental Assessment for the Susquehanna Exemption ML24106A0672024-04-12012 April 2024 State of Pennsylvania Input Review of Draft EA for Exemption Request for Susquehanna, Units 1 and 2 ML24103A0012024-04-11011 April 2024 – Summary of Verbal Authorization of 4RR-11 ML24102A1252024-04-10010 April 2024 Request for Additional Information for Susquehanna, Unit 1 Alternative Request 4RR-11 ML24106A0662024-04-10010 April 2024 Request for State Review of Draft EA for an Exemption Request for Susquehanna, Units 1 and 2 ML24082A0922024-03-21021 March 2024 Confirmation Email 3-21-2024 Regarding Exemption Request for Future Loading Only at Susquehanna ML24047A1232024-02-14014 February 2024 NRC Consultation with Commonwealth of PA Proposed NSHC for Susquehanna LAR TSTF-568 and TSF-563 Email ML24029A2732024-01-29029 January 2024 NRC Consultation with Commonwealth of Pennsylvania Re Proposed NSHC for Susquehanna License Amendment Request ML23352A2542023-12-18018 December 2023 NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Technical Specifications (TS) to Adopt TSTF-568 ML23345A0542023-12-0808 December 2023 Email - NRC LIC-109 Acceptance Review Results for Susquehanna License Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML23334A1682023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-01 ML23334A1502023-11-30030 November 2023 NRC Request for Additional Information Re. Susquehanna Relief Request RR-02 ML23242A2832023-08-30030 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternatives RR01 and RR02 (EPIDs L-2023-LLR-0043 and -0044) ML23230A0712023-08-18018 August 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative for Valve 251130 ML23188A0802023-07-0707 July 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Control Rod Technical Specifications ML23171A4312023-06-20020 June 2023 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, Proposed Alternative 5RR-02 ML23103A4702023-04-12012 April 2023 NRR E-mail Capture - Susquehanna Unit 2 - Verbal Authorization of Relief Request 4RR-10 ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23075A0492023-03-16016 March 2023 NRR E-mail Capture - Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 - Indirect License Transfer and Draft Conforming Amendments ML23073A1202023-03-14014 March 2023 NRR E-mail Capture - Evacuation Time Estimate Review ML23013A2082023-01-13013 January 2023 Request for Additional Information ML23012A0012023-01-11011 January 2023 NRC Notification to the State of Pennsylvania Re. Emergency Amendment – Control Rod Technical Specifications ML22293A0882022-10-20020 October 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna License Transfer ML22257A1942022-09-14014 September 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Relocating Staff Qualification Requirements ML22213A2612022-08-0101 August 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - Instrumentation and Control Technical Specifications ML22179A2902022-06-28028 June 2022 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Re. Susquehanna Steam Electric Station, Units 1 and 2 Amendment - TSTF-505, Risk Informed Completion Times ML22146A0742022-05-25025 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22123A1112022-05-0303 May 2022 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Relocate Staff Qualifications ML22111A3132022-04-21021 April 2022 NRR E-mail Capture - NRC Request for Additional Information - Susquehanna License Amendment Request ML22084A0222022-03-25025 March 2022 NRR E-mail Capture - Susquehanna Atrium-11 LAR Audit Report ML22038A1062022-02-0404 February 2022 NRR E-mail Capture - Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML22005A0712021-12-21021 December 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Susquehanna 1 & 2 ECCS TS LAR ML21190A1702021-06-11011 June 2021 NRR E-mail Capture - NRC Notification to the State of Pennsylvania Regarding a Susquehanna Steam Electric Station, Unit 2 Amendment - Unit 1 Transformer Replacement ML21124A2022021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review for Susquehanna TSTF-505 ML20343A3712020-12-0808 December 2020 NRR E-mail Capture - Corrected - Acceptance Review of Susquehanna RR 4RR-02 ML20343A3702020-12-0808 December 2020 NRR E-mail Capture - Acceptance Review of Susquehanna RR 4RR-02 ML20335A5732020-11-30030 November 2020 NRR E-mail Capture - Susquehanna -Acceptance Review Replacement of Unit 1 Transformers ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20261H4272020-09-17017 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20261H4212020-09-16016 September 2020 NRR E-mail Capture - Corrected Acceptance Review for Susquehanna - Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20195B1282020-07-13013 July 2020 NRR E-mail Capture - Acceptance Review for Susquehanna- Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (EPID L-2020-Lla-0139) ML20178A6502020-06-26026 June 2020 Acceptance Review for Susquehanna - Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit ML20028F6352020-01-28028 January 2020 NRR E-mail Capture - Acceptance Review of LAR to Revise the Dose Consequence Analysis for a Loss of Coolant Accident ML19319A0092019-11-14014 November 2019 NRR E-mail Capture - Draft RAI for SSES Units 1 and 2 LAR to Replace ESW Piping ML19319B1922019-11-14014 November 2019 NRR E-mail Capture - RAI for Susquehanna, 1 and 2 License Amendment Request - Replace the Emergency Service Water System and Residual Heat Removal Service Water System ML19234A0342019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for Advanced Framatome Methodologies for Atrium 11 2024-09-04
[Table view] |
Text
Page 1 of 1 I
Monette, Frederick A.
From: Metz, William C.
Sent: Thursday, October 05, 2006 11:46 AM To: Monette, Frederick A.
Cc: Allison, Timothy
Subject:
Susquehanna Data Needs Attachments: Susquehanna Data Assessment 10-05-06.doc I have fully proofed this, so check it.
William C. Metz, MBA, MISPh.D.
Director, Center for Integrated Emergency Preparedness Decision & Information Sciences Division Argonne National Laboratory 9700 South Cass Avenue, Bldg 900 Argonne, IL 60439-4832 (630) 252-3271 (voice) (630) 252-5327 (fax) metz4anI.gQ.\{ (e-mail) 1/22/2007
INFORMATION NEEDS FOR SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 October 5, 2006 I have reviewed Appendix E, Applicant's Environmental Report - Operating License Renewal Stage, and the two Final Environmental Statements (construction and operation) in advance of the site visit and preparing the Supplemental Environmental Impact Statement. I have found several instances of where additional information is required or where the information contained in the Environmental Report needs to be presented in a more structured format.
2.2.1 Land Use
" There is confusion in the acreage totals and breakouts. Mention is made of PPL Susquehanna property and SSES property, is there a difference in the ownership? For example, in Section 2.4 there is mention of land being leased, is the 65 acre Gould Island in the totals, where does the 88-acre Overlook fit in the totals, and are the "Susquehanna Riverlands" and the "Riverlands Recreation Area" the same, which is the accurate title?
" Site land cover/land use percentages are missing - there are no descriptions or percentages for land cover categories, such as, open area (fields, marshes, swamps, beach, cemetary), forests, facilities and structures, parking areas, water (ponds, lakes, canal - whether natural or manmade), and visitor or recreation areas. Reference is made to undeveloped lands, but no actual accounting can be done, while there is mention of developed portions of the land being 487 acres. Developed is assumed to be just the plant structures, cooling towers, and parking areas?
- There is no description of the measures or impedinments between the Riverlands Recreation Area and the Protected Area to halt ingress of recreational users, beyond it an assumption that the "security fencing" west of Route II provides that barrier (2. 1-).
- There is no description of the railroad and highway that cross the site.
- Critical terrain elevations are also not included.
2.2.8.3 Offsite Land Use Data should be sufficient.
2.2.8.4 Visual Aesthetics and Noise
- No description is provided as the height, color of visibility of the facilities and structures and from what distances and locations they can be seen. Appendix A referenced that a discussion as to Issue 73 (Aesthetic impacts) would be found in Section 4.0, but it could not be found.
- No information is provided regarding plant and cooling tower noise and what can be heard at the site boundaries or in the Riverlands Recreation Area. Appendix A