NRR E-mail Capture - Corrected - Acceptance Review of Susquehanna RR 4RR-02
ML20343A371
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/08/2020
From: Sujata Goetz
Plant Licensing Branch 1
To: Jurek S
Susquehanna
References
L-2020-LLR-0152
Download: ML20343A371 (3)


Text

From:

Goetz, Sujata Sent:

Tuesday, December 8, 2020 2:49 PM To:

Jurek, Shane

Subject:

Corrected-Acceptance Review of Susquehanna RR 4RR-02 (EPID L-2020-LLR-0152)

From: Goetz, Sujata Sent: Tuesday, December 08, 2020 2:41 PM To: Jurek, Shane

Subject:

Acceptance Review of Susquehanna RR 4RR-02 (EPID L-2020-LLR-0152)

Dear Mr. Jurek,

By letter dated November 30, 2020 (Agencywide Documents Access and Management System Accession No. ML20335A456), Susquehanna Nuclear, LLC submitted a relief request for Susquehanna Steam Electric Station, Units 1 and 2 which proposes an alternative to the requirements of the American Society of Mechanical Engineers Code for inspection of reactor pressure vessel circumferential welds.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review by the end of November 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information or unanticipated addition to the scope to the review. Additional delay may occur, if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Sujata Goetz Project Manager, Susquehanna Steam Electric Station Nuclear Regulatory Commission 11555 Rockville Pike Office of the Nuclear Reactor Regulation NRC/NRR/DORL/LPL3 Office O8F2 Mailroom O8-B1A Rockville, MD 20852-2738 Washington, DC 20555-0001 (o) 301.415.8004 (f) 301.415.3313

Hearing Identifier:

NRR_DRMA Email Number:

922 Mail Envelope Properties (SA9PR09MB5454CC98055ECE241591234D80CD0)

Subject:

Corrected-Acceptance Review of Susquehanna RR 4RR-02 (EPID L-2020-LLR-0152)

Sent Date:

12/8/2020 2:48:39 PM Received Date:

12/8/2020 2:48:39 PM From:

Goetz, Sujata Created By:

Sujata.Goetz@nrc.gov Recipients:

"Jurek, Shane" <Shane.Jurek@talenenergy.com>

Tracking Status: None Post Office:

SA9PR09MB5454.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3189 12/8/2020 2:48:39 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: