ML111870305: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CPNPP June 2011 NRC Written Examination Senior Reactor Operator Page 2 of 105 Rev f  
{{#Wiki_filter:CPNPP June 2011 NRC Written Examination Senior Reactor Operator Page 2 of 105                 Rev f


CPNPP June 2011 NRC Written Examination Senior Reactor Operator Page 3 of 105 Rev f CPNPP NRC 2011 Written Exam Reference List
CPNPP June 2011 NRC Written Examination Senior Reactor Operator Page 3 of 105                 Rev f
: 1. NRC Generic Fundament als Equation Sheet
: 2. Steam Tables WPumpmPGENERIC FUNDAMENTALS EXAMINATION EQUATIONS AND CONVERSIONS HANDOUT SHEET EQUATIONS---------------------------------------------------------------------------------------------------------------------Qmc pTQmhQUATQm 3NatCircTm 2NatCirc  K eff = 1/(1 - ) = (K eff - 1)/K eff  SUR = 26.06/effeffeff 1eff* = 1 x 10-4 seceff = 0.1 sec
-1(for small positive )DRW 2 tip/ 2 avg  P = P o 10 SUR(t)  P = P o e (t/)  A = A o e-t  CR S/D = S/(1 - K eff)  CR 1 (1 - K eff1) = CR 2 (1 - K eff2)  1/M = CR 1/CR X  A = r 2  F = PAm = Av  E = IR  Thermal Efficiency = Net Work Out/Energy In


g(z 2 - z 1)  +  (v 2 2 - v 1 2)  + (P 2 - P 1) + (u 2- u 1) + (q - w) = 0
CPNPP NRC 2011 Written Exam Reference List
________      _______
: 1. NRC Generic Fundamentals Equation Sheet
g c                2g c
: 2. Steam Tables
g c = 32.2 lbm-ft/lbf-sec 2 CONVERSIONS
---------------------------------------------------------------------------------------------------------------------
1 Mw=  3.41 x 10 6 Btu/hr        1 Curie=  3.7 x 10 10 dps  1 hp=  2.54 x 10 3 Btu/hr        1 kg=  2.21 lbm  1 Btu=  778 ft-lbf        1 gal water=  8.35 lbmC=  (5/9)(F - 32)        1 ft 3 water=  7.48 galF =  (9/5)(C) + 32 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 1 of 53 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2   Group # 1    K/A # 003 A3.0 1  Importance Rating


===3.3 Reactor===
GENERIC FUNDAMENTALS EXAMINATION EQUATIONS AND CONVERSIONS HANDOUT SHEET EQUATIONS
Coolant Pump SystemProposed Question:
  
: Ability to monitor automatic operation of the RCPs including:
Q       pT mc                                        P = Po10SUR(t)
Seal injection flow Common 1   Given the following condition
  
Unit 2 is in MODE 1.
Q      
Which of the following indications would you expect to observe if the #1 seal on Reactor Coolant Pump 2
mh                                        P = Poe(t/)
-01 failed? A. Seal #1 differential pressure rising.
                                                  A = Aoe-t Q    UAT CRS/D = S/(1 - Keff)
    m Q
3
           Nat  Circ CR1(1 - Keff1) = CR2(1 - Keff2) 2 T  m     Nat  Circ                          1/M = CR1/CRX Keff = 1/(1 - )                                  A = r 2
  = (Keff - 1)/Keff                              F = PA SUR = 26.06/                                    m = Av eff                                      W          
mP Pump eff E = IR 5              eff
                                                Thermal Efficiency = Net Work Out/Energy In 1  eff g(z2 - z1) + (v22 - v12) + (P2 - P1) + (u2 - u1) + (q - w) = 0 5* = 1 x 10-4 sec                                      gc            2gc eff = 0.1 sec-1 (for small positive )            gc = 32.2 lbm-ft/lbf-sec2 2      2 DRW  tip / avg CONVERSIONS 1 Mw = 3.41 x 106 Btu/hr                          1 Curie = 3.7 x 1010 dps 1 hp      = 2.54 x 103 Btu/hr                    1 kg        = 2.21 lbm 1 Btu = 778 ft-lbf                                1 galwater = 8.35 lbm (C        = (5/9)((F - 32)                        1 ft3water = 7.48 gal (F        = (9/5)((C) + 32 ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                              Level                          RO            SRO Tier #                          2 Group #                          1 K/A #                                003 A3.01 Importance Rating              3.3 Reactor Coolant Pump System: Ability to monitor automatic operation of the RCPs including: Seal injection flow Proposed Question:            Common 1 Given the following condition:
* Unit 2 is in MODE 1.
Which of the following indications would you expect to observe if the #1 seal on Reactor Coolant Pump 2-01 failed?
A. Seal #1 differential pressure rising.
Seal leak off flow rising.
Seal leak off flow rising.
B. Seal injection flow rising.
B. Seal injection flow rising.
Line 44: Line 45:
C. Seal #1 differential pressure rising.
C. Seal #1 differential pressure rising.
Seal leak off flow lowering.
Seal leak off flow lowering.
D. Seal injection flow lowering. Seal leak off flow rising.
D. Seal injection flow lowering.
Proposed Answer:
Seal leak off flow rising.
B Explanation: A. Incorrect. Plausible because seal leak off flow could be rising B. Correct. With seal injection and seal leak off flows both , however, seal #1 differential pressure would be lowering.
Proposed Answer:               B Explanation:
Seal #1 differential pressure rising is plausible because leak rate rises as differential pressure rises (referred to SOP
A. Incorrect. Plausible because seal leak off flow could be rising, however, seal #1 differential pressure would be lowering. Seal #1 differential pressure rising is plausible because leak rate rises as differential pressure rises (referred to SOP-108A reference drawing).
-108A reference drawing).
B. Correct. With seal injection and seal leak off flows both rising, the RCP #1 seal has failed.
rising C. Incorrect. Plausible because seal leak off flow could be , the RCP #1 seal has failed.
C. Incorrect. Plausible because seal leak off flow could be lowering, however, seal #1 differential pressure would be lowering. Seal #1 differential pressure rising is plausible because leak rate rises as differential pressure rises (referred to SOP-108A reference drawing).
lowering D. Incorrect. Plausible because seal leak off flow can be , however, seal #1 differential pressure would be lowering.
D. Incorrect. Plausible because seal leak off flow can be rising or lowering, however, seal injection flow would be rising.
Seal #1 differential pressure rising is plausible because leak rate rises as differential pressure rises (referred to SOP
Technical Reference(s)       ABN-101, Section 4.1                                     Attached w/ Revision # See SOP-108A, Step 5.1.G, Figure 1                           Comments / Reference Proposed references to be provided during examination: None Page 1 of 53                                                Rev f
-108A reference drawing).
 
rising or lowering , however, seal injection flow would be rising.
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Learning Objective: STATE the function and operation of the following Reactor Coolant System components, flowpaths and features:
Technical Reference(s)
* Reactor Coolant Pump seal package (OP51.SYS.RC1.OB03)
ABN-101, Section 4.1 Attached w/ Revision # See Comments / Reference SOP-108A, Step 5.1.G, Figure 1 Proposed references to be provided during examination:
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 2 of 53 Rev f  Learning Objective:
STATE the function and operation of the following Reactor Coolant System components, flowpaths and features: Reactor Coolant Pump seal package (OP51.SYS.RC1.OB03)
ANALYZE the relationship between a Reactor Coolant Pump malfunction and the following:
ANALYZE the relationship between a Reactor Coolant Pump malfunction and the following:
RCP Seals (LO21.ABN.101.OB02)
* RCP Seals (LO21.ABN.101.OB02)
Question Source:
Question Source:         Bank #
Bank #   Modified Bank #
Modified Bank #                           (Note changes or attach parent)
  (Note changes or attach parent) New X   Question History:
New                         X Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:     55.41 3, 10 55.43 Page 2 of 53                                       Rev f
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 3, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 3 of 53 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 004 K1.05  Importance Rating


===2.7 Chemical===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                            Level                          RO              SRO Tier #                            2 Group #                          1 K/A #                                004 K1.05 Importance Rating              2.7 Chemical and Volume Control System: Knowledge of the physical connections and/or cause-effect relationships between the CVCS and the following systems: CRDS operation in automatic mode control Proposed Question:              Common 2 Given the following conditions:
and Volume Control SystemProposed Question:
* Unit 1 is at 100% power.
: Knowledge of the physical connections and/or cause
* Rod Control is in AUTO.
-effect relationships between the CVCS and the following systems: CRDS operation in automatic mode control Common 2 Given the following conditions:
* Latest Reactor Coolant System boron sample was 1203 ppm.
Unit 1 is at 100% power.
* An unsaturated mixed bed demineralizer was just placed in service without aligning Letdown to the Recycle Holdup Tank (HUT).
Rod Control is in AUT O. Latest Reactor Coolant System boron sample was 1203 ppm.
Which of the following is the expected plant response for the conditions listed?
An unsaturated mixed bed demineralizer was just placed in service without aligning Letdown to the Recycle Holdup Tank (HUT). Which of the following is the expected plant response for the conditions listed?
Control Rods will start to...
Control Rods will start to...
A. withdraw as boron is absorbed by the demineralizer.
A. withdraw as boron is absorbed by the demineralizer.
Line 81: Line 73:
C. withdraw as boron is released from the demineralizer.
C. withdraw as boron is released from the demineralizer.
D. insert as boron is absorbed by the demineralizer.
D. insert as boron is absorbed by the demineralizer.
Proposed Answer:
Proposed Answer:               D Explanation:
D Explanation:
A. Incorrect. Plausible because boron is being absorbed by the demineralizer, however, this will cause Control Rods to insert.
A. Incorrect. Plausible because boron is being absorbed by the demineralizer, however, this will cause Control Rods to insert.
B. Incorrect. Plausible because Control Rods will insert, however, the reason is due to boron being absorbed by the demineralizer with beginning-of-cycle conditions.
B. Incorrect. Plausible because Control Rods will insert, however, the reason is due to boron being absorbed by the demineralizer with beginning-of-cycle conditions.
C. Incorrect. Plausible if thought that a fresh mixed bed demineralizer was already borated.
C. Incorrect. Plausible if thought that a fresh mixed bed demineralizer was already borated.
D. Correct. With beginning-of-cycle conditions, a fresh mixed to bed demineralizer will absorb boron from the system and cause Control Rods to insert.
D. Correct. With beginning-of-cycle conditions, a fresh mixed to bed demineralizer will absorb boron from the system and cause Control Rods to insert.
Technical Reference(s)
Technical Reference(s)       SOP-103A, Section 3.0                                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 3 of 53                                                Rev f
SOP-103A, Section 3.0 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
 
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 4 of 53 Rev f  Learning Objective:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationships between the CVCS and the following systems, components or events:
STATE the physical connections and EVALUATE the cause-effect relationships between the CVCS and the following systems, components or events:
* Expected reactivity changes after valving in a new mixed-bed demineralizer that has not been pre-borated (OP51.SYS.CS1.OB9)
Expected reactivity changes after valving in a new mixed
Question Source:         Bank #
-bed demineralizer that has not been pre
Modified Bank #                         (Note changes or attach parent)
-borated (OP51.SYS.CS1.OB9)
New                         X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:   55.41   1, 5, 55.43 Page 4 of 53                                     Rev f
Question Source: Bank #   Modified Bank #
  (Note changes or attach parent)
New X   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 1, 5, 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 5 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 005 K3.07  Importance Rating


===3.2 Residual===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                              Level                          RO              SRO Tier #                          2 Group #                          1 K/A #                              005 K3.07 Importance Rating              3.2 Residual Heat Removal System: Knowledge of the effect that a loss or malfunction of the RHRs will have on the following:
Heat Removal SystemProposed Question:
Refueling operations Proposed Question:            Common 3 Given the following conditions:
: Knowledge of the effect that a loss or malfunction of the RHRs will have on the following: Refueling operations Common 3   Given the following condition s:   The Reactor Vessel Head and Upper Internals are removed
* The Reactor Vessel Head and Upper Internals are removed.
. Core offload is in progress per RFO
* Core offload is in progress per RFO-102, Refueling Operation.
-102, Refueling Operation. One Train of Residual Heat Removal (RHR) is OPERABLE and in service.
* One Train of Residual Heat Removal (RHR) is OPERABLE and in service.
The other Train of RHR is AVAILABLE.
* The other Train of RHR is AVAILABLE.
Refueling Cavity level is 858 feet. Which of the following actions is taken per RFO
* Refueling Cavity level is 858 feet.
-102, Refueling Operations
Which of the following actions is taken per RFO-102, Refueling Operations, to preclude the water above the core from boiling if a running RHR Pump trips?
, to preclude the water above the core from boiling if a running RHR Pump trips?
A.       Maintaining greater than 23 feet of water above the Reactor vessel flange.
A. Maintaining greater than 23 feet of water above the Reactor vessel flange.
B.       Requiring both trains of RHR to be OPERABLE during Refueling.
B. Requiring both trains of RHR to be OPERABLE during Refueling.
C.       Waiting to begin core offload for at least 75 hours after shutdown.
C. Waiting to begin core offload for at least 75 hours after shutdown.
D.       Starting an additional train of RHR prior to the start of Core offload.
D. Starting an additional train of RHR prior to the start of Core offload.
Proposed Answer:               A Explanation:
Proposed Answer:
A. Correct. Per RFO-102, the basis for requiring one RHR loop >23 feet is to prevent the water above the core from boiling in the event of a loss of RHR cooling.
A Explanation:
B. Incorrect. Plausible because this is a requirement if level is less than 23 feet.
A. Correct. Per RFO-102, the basis for requiring one RHR loop >23 feet is to prevent the water above the core from boiling in the event of a loss of RHR cooling
C. Incorrect. Plausible because this is a Spent Fuel Pool limitation.
. B. Incorrect. Plausible because this is a requirement if level is less than 23 feet
. C. Incorrect. Plausible because this is a Spent Fuel Pool limitation.
D. Incorrect. Plausible if thought that this were required, however, it is not.
D. Incorrect. Plausible if thought that this were required, however, it is not.
Technical Reference(s) RFO-102, Steps 4.1.8 through 4.1.11 Attached w/ Revision # See Comments / Reference RFO-102, Step 4.1.3 Proposed references to be provided during examination:
Technical Reference(s)       RFO-102, Steps 4.1.8 through 4.1.11                       Attached w/ Revision # See RFO-102, Step 4.1.3                                       Comments / Reference Proposed references to be provided during examination: None Page 5 of 53                                                    Rev f
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 6 of 53 Rev f  Learning Objective:
 
DESCRIBE or STATE how the following concepts or conditions apply to the Residual Heat Removal System:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                 Form ES-401-5 Learning Objective: DESCRIBE or STATE how the following concepts or conditions apply to the Residual Heat Removal System:
Loss of RHR cooling capability (OP51.SYS.RH1.OB14)
* Loss of RHR cooling capability (OP51.SYS.RH1.OB14)
Question Source:
Question Source:         Bank #               CPNPP LXR Modified Bank #                       (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   10 55.43 Page 6 of 53                                   Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 7 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 006 K5.06  Importance Rating


===3.5 Emergency===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                            Level                          RO                SRO Tier #                            2 Group #                          1 K/A #                                006 K5.06 Importance Rating              3.5 Emergency Core Cooling System: Knowledge of the operational implications of the following concepts as they apply to ECCS: Relationship between ECCS flow and RCS pressure Proposed Question:            Common 4 Given the following conditions:
Core Cooling SystemProposed Question:
* During a Small Break Loss of Coolant Accident with normal Emergency Core Cooling System (ECCS) availability, the Reactor Coolant System (RCS) pressure stabilizes so that the ECCS flow remains restricted.
: Knowledge of the operational implications of the following concepts as they apply to ECCS: Relationship between ECCS flow and RCS pressure Common 4   Given the following conditions:   During a Small Break Loss of Coolant Accident with normal Emergency Core Cooling System (ECCS) availability, the Reactor Coolant System (RCS) pressure stabilizes so that the ECCS flow remains restricted.
* The break is in one of the RCS Cold Legs.
The break is in one of the RCS Cold Legs.
* RCS inventory decreases, leading to partial core uncovery.
RCS inventory decreases, leading to partial core uncovery.
Assuming NO operator actions, which of the following is the event that initiates the RCS pressure decrease, allowing higher ECCS flow and re-covering the core?
Assuming NO operator actions, which of the following is the event that initiates the RCS pressure decrease, allowing higher ECCS flow and re
-covering the core?
A. Clearing of the RCS Intermediate Leg (loop seal).
A. Clearing of the RCS Intermediate Leg (loop seal).
B. Hot leg level drops below mid
B. Hot leg level drops below mid-loop level.
-loop level
C. Opening of any Main Steam Safety Valve.
. C. Opening of any Main Steam Safety Valve.
D. Uncovering of the Guide Tube flow holes.
D. Uncovering of the Guide Tube flow holes.
Proposed Answer:
Proposed Answer:               A Explanation:
A Explanation:
A. Correct. As outlined in the WOG E-1 Background Guideline.
A. Correct. As outlined in the WOG E-1 Background Guideline
B. Incorrect. Plausible if thought that this helped RCS pressure to decrease, however, core uncovery must occur for clearing of the loop seal to be accomplished.
. B. Incorrect. Plausible if thought that this helped RCS pressure to decrease, however, core uncovery must occur for clearing of the loop seal to be accomplished.
C. Incorrect. Plausible because heat removal by the secondary system is required during a Small Break LOCA, however, this is not the event that allows the core recover with fluid.
C. Incorrect. Plausible because heat removal by the secondary system is required during a Small Break LOCA, however, this is not the event that allows the core recover with fluid
D. Incorrect. Plausible if thought that this mechanism would help, however, it is clearing of the loop seal that allows pressure to decrease.
. D. Incorrect. Plausible if thought that this mechanism would help, however, it is clearing of the loop seal that allows pressure to decrease.
Technical Reference(s)       WOG E-1 Background Guideline, Page 21                     Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 7 of 53                                                    Rev f
Technical Reference(s)
 
WOG E-1 Background Guideline , Page 21 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Learning Objective: DESCRIBE the events that create pressure equilibrium during a small break loss of coolant accident. (LO21.MCO.MI2.OB02)
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 8 of 53 Rev f  Learning Objective:
SUMMARIZE the normal sequence of events which would occur during a small break loss of coolant accident with normal Emergency Core Cooling Systems.
DESCRIBE the events that create pressure equilibrium during a small break loss of coolant accident. (LO21.MCO.MI2.OB02) SUMMARIZE the normal sequence of events which would occur during a small break loss of coolant accident with normal Emergency Core Cooling Systems. (LO21.MCO.MI2.OB03)
(LO21.MCO.MI2.OB03)
Question Source:
Question Source:         Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   5 55.43 Page 8 of 53                                     Rev f
  (Note changes or attach parent) New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 5 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 9 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 006 K4.01  Importance Rating


===2.6 Emergency===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                              Form ES-401-5 Examination Outline Cross-reference:                          Level                            RO                SRO Tier #                            2 Group #                          1 K/A #                                006 K4.01 Importance Rating                2.6 Emergency Core Cooling System: Knowledge of ECCS design feature(s) and/or interlock(s) which provide for the following:
Core Cooling SystemProposed Question:
Cooling of centrifugal pump bearings Proposed Question:                Common 5 Given the following condition:
: Knowledge of ECCS design feature(s) and/or interlock(s) which provide for the following: Cooling of centrifugal pump bearings Common 5   Given the following condition:
* A Small Break Loss of Coolant Accident has occurred on Unit 1 and Safety Injection has properly actuated.
A Small Break Loss of Coolant Accident has occurred on Unit 1 and Safety Injection has properly actuated.
Which of the following describes how the Centrifugal Charging Pump (CCP) Bearings are cooled in this situation?
Which of the following describes how the Centrifugal Charging Pump (CCP) Bearings are cooled in this situation?
A. Component Cooling Water flow through the CCP Lube Oil Cooler.
A. Component Cooling Water flow through the CCP Lube Oil Cooler.
B. Station Service Water flow through the CCP Lube Oil Cooler.
B. Station Service Water flow through the CCP Lube Oil Cooler.
C. Pump recirculation via the Refueling Water Storage Tank.
C. Pump recirculation via the Refueling Water Storage Tank.
D. Pump recirculation via the RHR Heat Exchanger outlet. Proposed Answer:
D. Pump recirculation via the RHR Heat Exchanger outlet.
B Explanation:
Proposed Answer:                 B Explanation:
A. Incorrect. Plausible if thought that the CCP lube oil cooler is cooled by CCW.
A. Incorrect. Plausible if thought that the CCP lube oil cooler is cooled by CCW.
B. Correct. The CCP lube oil cooler is cooled by SSW and lube oil cools the bearings.
B. Correct. The CCP lube oil cooler is cooled by SSW and lube oil cools the bearings.
C. Incorrect. Plausible if thought that cool water from RWST keeps bearings cool during ECCS injection and an additional cooling source for lube oil is not required.
C. Incorrect. Plausible if thought that cool water from RWST keeps bearings cool during ECCS injection and an additional cooling source for lube oil is not required.
D. Incorrect. Plausible if thought that cool water from the outlet of the RHR Heat Exchanger keeps bearings cool during ECCS recirculation and an additional cooling source for lube oil is not required. Technical Reference(s)
D. Incorrect. Plausible if thought that cool water from the outlet of the RHR Heat Exchanger keeps bearings cool during ECCS recirculation and an additional cooling source for lube oil is not required.
OP51.SYS.SI1.LN, Page 27 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:
Technical Reference(s)           OP51.SYS.SI1.LN, Page 27                           Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationships between the Emergency Core Cooling System and the following systems, components or events:
STATE the physical connections and EVALUATE the cause-effect relationships between the Emergency Core Cooling System and the following systems, components or events:
Page 9 of 53                                                      Rev f


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 10 of 53 Rev f  Chemical and Volume Control System (OP51.SYS.SI1.OB09)
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                 Form ES-401-5
Question Source:
* Chemical and Volume Control System (OP51.SYS.SI1.OB09)
Bank # CPNPP LXR   Modified Bank #
Question Source:         Bank #               CPNPP LXR Modified Bank #                       (Note changes or attach parent)
  (Note changes or attach parent)
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   7, 8 55.43 Page 10 of 53                                   Rev f
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7, 8 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 11 of 53 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 007 A1.0 1  Importance Rating


===2.9 Pressurizer===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO                SRO Tier #                          2 Group #                        1 K/A #                              007 A1.01 Importance Rating              2.9 Pressurizer Relief / Quench Tank System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS controls including: Maintaining quench tank water level within limits Proposed Question:                Common 6 Given the following conditions on Unit 2:
Relief / Quench Tank SystemProposed Question:
* Annunciator 2-ALB-5B, Window 4.3 - PRT LVL HI / LO has just gone into alarm.
: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS controls including: Maintaining quench tank water level within limits Common 6 Given the following conditions on Unit 2:
* Volume Control Tank (VCT) level is being maintained in automatic.
Annunciator 2
* The following Primary System parameters are observed:
-ALB-5B, Window 4.3  
Time:     1000 hours         1100 hours Pressurizer Relief Tank Level:                 86%               88%
- PRT LVL HI / LO has just gone into alarm.
Pressurizer Relief Tank Temperature:                       96ºF               96ºF Pressurizer Level:             45%               45%
Volume Control Tank (VCT) level is being maintained in automatic.
Tavg:         570ºF             570ºF Containment Temperature:                   102ºF             100ºF Which of the following caused the Pressurizer Relief Tank level increase?
The following Primary System parameters are observed:
Time: 1000 hours 1100 hours Pressurizer Relief Tank Level: 86% 88% Pressurizer Relief Tank Temperature:
96ºF 96ºF Pressurizer Level:
45% 45% Tavg: 570ºF 570ºF Containment Temperature:
10 2ºF 10 0ºF Which of the following caused the Pressurizer Relief Tank level increase?
A. Pressurizer PORV leakage.
A. Pressurizer PORV leakage.
B. Containment temperature change.
B. Containment temperature change.
C. Letdown Relief Valve (inside Containment) leakage.
C. Letdown Relief Valve (inside Containment) leakage.
D. Seal Return Relief Valve (inside Containment) leakage.
D. Seal Return Relief Valve (inside Containment) leakage.
Proposed Answer:
Proposed Answer:                   D Explanation:
D Explanation:
A. Incorrect. Plausible because the PORVs are directed to the PRT, however, one would expect PRT temperature to also rise.
A. Incorrect. Plausible because the PORVs are directed to the PRT, however, one would expect PRT temperature to also rise.
B. Incorrect. Plausible because Containment temperature is changing , however, there is not a corresponding change in PRT temperature and this would be expected.
B. Incorrect. Plausible because Containment temperature is changing, however, there is not a corresponding change in PRT temperature and this would be expected.
C. Incorrect. Plausible because the Letdown Relief Valve is directed to the PRT, however, given the temperature of Letdown an expected temperature increase in the PRT would occur.
C. Incorrect. Plausible because the Letdown Relief Valve is directed to the PRT, however, given the temperature of Letdown an expected temperature increase in the PRT would occur.
D. Correct. Given the temperature of the seal return water and the corresponding increase in PRT level without an increase in temperature; this is the source of the water.
D. Correct. Given the temperature of the seal return water and the corresponding increase in PRT level without an increase in temperature; this is the source of the water.
Page 11 of 53                                                    Rev f


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 12 of 53 Rev f  Technical Reference(s)
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                 Form ES-401-5 Technical Reference(s)   ALM-0052B, 2-ALB-5B, Window 4.3           Attached w/ Revision # See OP51.SYS.RC1, Figure 17                   Comments / Reference OP51.SYS.RC1.LN. Page 28 Proposed references to be provided during examination: None Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationship between the Reactor Coolant System and the following systems, components or events:
ALM-0052B, 2-ALB-5B, Window 4.3 Attached w/ Revision # See Comments / Reference OP51.SYS.RC1, Figure 17 OP51.SYS.RC1.LN. Page 28 Proposed references to be provided during examination:
* Pressurizer Relief Tank (OP51.SYS.RC1.OB11)
None Learning Objective:
Question Source:         Bank #               CPNPP LXR Modified Bank #                       (Note changes or attach parent)
STATE the physical connections and EVALUATE the cause-effect relationship between the Reactor Coolant System and the following systems, components or events: Pressurizer Relief Tank (OP51.SYS.RC1.OB11)
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41   3, 5 55.43 Page 12 of 53                                   Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exa m  Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 3, 5 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 13 of 53 Rev f     Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 008 K1.02  Importance Rating


===3.3 Component===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                Form ES-401-5 Examination Outline Cross-reference:                          Level                            RO              SRO Tier #                            2 Group #                          1 K/A #                                008 K1.02 Importance Rating                3.3 Component Cooling Water System: Knowledge of the physical connections and/or cause-effect relationships between the CCWS and the following systems: Loads cooled by CCWS Proposed Question:              Common 7 Given the following conditions:
Cooling Water SystemProposed Question:
* Unit 1 is at full power, with a normal Component Cooling Water (CCW) System alignment.
: Knowledge of the physical connections and/or cause
* Subsequently, 1-HV-4701, RCP CLR CCW RET ISOL VLV, is observed with the following indication:
-effect relationships between the CCWS and the following systems: Loads cooled by CCWS Common 7 Given the following conditions:
* 1-HS-4701, green light LIT and red light DARK.
Unit 1 is at full power, with a normal Component Cooling Water (CCW) System alignment.
Subsequently, 1
-HV-4701, RCP CLR CCW RET ISOL VLV, is observed with the following indication:
1-HS-4701, green light LIT and red light DARK.
Which of the following describes the effect on CCW flow indications as a result of this condition?
Which of the following describes the effect on CCW flow indications as a result of this condition?
Loss of ALL Reactor Coolant Pump-A. Lower Bearing Lube Oil Cooler CCW Return flows.
Loss of ALL Reactor Coolant Pump A. Lower Bearing Lube Oil Cooler CCW Return flows.
Motor Air Cooler CCW Return flows.
Motor Air Cooler CCW Return flows.
Thermal Barrier Cooler CCW Return flows
Thermal Barrier Cooler CCW Return flows.
. B. Upper Bearing Lube Oil Cooler CCW Return flows.
B. Upper Bearing Lube Oil Cooler CCW Return flows.
Lower Bearing Lube Oil Cooler CCW Return flows.
Lower Bearing Lube Oil Cooler CCW Return flows.
Motor Air Cooler CCW Return flows
Motor Air Cooler CCW Return flows.
. C. Upper Bearing Lube Oil Cooler CCW Return flows.
C. Upper Bearing Lube Oil Cooler CCW Return flows.
Motor Air Cooler CCW Return flows.
Motor Air Cooler CCW Return flows.
Thermal Barrier Cooler CCW Return flows.
Thermal Barrier Cooler CCW Return flows.
Line 253: Line 193:
Lower Bearing Lube Oil Cooler CCW Return flows.
Lower Bearing Lube Oil Cooler CCW Return flows.
Thermal Barrier Cooler CCW Return flows.
Thermal Barrier Cooler CCW Return flows.
Proposed Answer:
Proposed Answer:               B Page 13 of 53                                                Rev f
B ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 14 of 53 Rev f  Explanation:
 
A. Incorrect. Plausible because Lower Bearing Lube Oil Cooler and Motor Air Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Explanation:
. B. Correct. The common return for Upper Bearing Lube Oil Cooler, Lower Bearing Lube Oil Cooler, and Motor Air Coolers is isolated.
A. Incorrect. Plausible because Lower Bearing Lube Oil Cooler and Motor Air Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply.
C. Incorrect. Plausible because Upper Bearing Lube Oil Cooler and Motor Air Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply
B. Correct. The common return for Upper Bearing Lube Oil Cooler, Lower Bearing Lube Oil Cooler, and Motor Air Coolers is isolated.
. D. Incorrect. Plausible because Upper and Lower Bearing Lube Oil Cooler s are correct, however, the Thermal Barrier Cooler has a separate return via a common supply
C. Incorrect. Plausible because Upper Bearing Lube Oil Cooler and Motor Air Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply.
. Technical Reference(s)
D. Incorrect. Plausible because Upper and Lower Bearing Lube Oil Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply.
OP51.SYS.CC1.LP, Figure 4 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)     OP51.SYS.CC1.LP, Figure 4                   Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the functions, operation and interlocks of the following Component Cooling Water System components:
None Learning Objective:
* u-HV-4701 and u-HV-4708, RCP Cooler CCW Return Isolation Valves (OP51.SYS.CC1.OB02)
STATE the functions, operation and interlocks of the following Component Cooling Water System components:
Question Source:           Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
u-HV-4701 and u-HV-4708, RCP Cooler CCW Return Isolation Valves (OP51.SYS.CC1.OB02)
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:     55.41   4, 7 55.43 Page 14 of 53                                     Rev f
Question Source
: Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 4, 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 16 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 008 K2.02  Importance Rating


===3.0 Component===
ES-401                  CPNPP NRC 2011 RO Written Exam Worksheet                                Form ES-401-5 Examination Outline Cross-reference:                          Level                          RO            SRO Tier #                          2 Group #                        1 K/A #                              008 K2.02 Importance Rating              3.0 Component Cooling Water System: Knowledge of bus power supplies to the following: CCW pump, including emergency backup Proposed Question:            Common 8 Given the following conditions:
Cooling Water SystemProposed Question:
* Unit 2 is in MODE 1.
: Knowledge of bus power supplies to the following: CCW pump, including emergency backup Common 8   Given the following conditions:
* An XST 1 Transformer fault has just occurred.
Unit 2 is in MODE 1
* Component Cooling Water (CCW) Pump 2-01 was running.
. An XST 1 Transformer fault has just occurred.
* CCW Pump 2-02 is in standby.
Component Cooling Water (CCW) Pump 2
If Safeguards Bus 2EA2 receives an 86-2 Lockout, which of the following identifies when CCW Pump 2-02 is started?
-01 was running.
A. After the 86-2 Lockout on Bus 2EA2 is reset, due to low pressure on Train A CCW.
CCW Pump 2-02 is in standby.
If Safeguards Bus 2EA2 receives an 86
-2 Lockout, which of the following identifies when CCW Pump 2
-02 is started
A. After the 86
-2 Lockout on Bus 2EA2 is reset, due to low pressure on Train A CCW.
B. When directed by procedure, the pump is manually started.
B. When directed by procedure, the pump is manually started.
C. At the appropriate step on the Blackout Sequencer, the pump is started
C. At the appropriate step on the Blackout Sequencer, the pump is started.
. D. Immediately after Bus 2EA2 is reenergized, due to low pressure on Train A CCW.
D. Immediately after Bus 2EA2 is reenergized, due to low pressure on Train A CCW.
Proposed Answer:
Proposed Answer:             C Page 16 of 53                                              Rev f
C ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 17 of 53 Rev f  Explanation:
 
A. Incorrect. Plausible if thought that the Lockout must be reset, however, the EDG will load the Bus with an 86
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                         Form ES-401-5 Explanation:
-2 Lockout present.
A. Incorrect. Plausible if thought that the Lockout must be reset, however, the EDG will load the Bus with an 86-2 Lockout present.
B. Incorrect.
B. Incorrect. Plausible if thought it would not start automatically as the pump was not previously running, however, the BOS will start the pump.
Plausible if thought it would not start automatically as the pump was not previously running, however, the BOS will start the pump.
C. Correct. The Blackout Sequencer will start the CCW Pump 2-02 at Step 2.
C. Correct. The Blackout Sequencer will start the CCW Pump 2
D. Incorrect. Plausible if thought the pump would AUTO start immediately upon reenergizing the bus, however, the BOS Auto Lockout is present and prevent the pump from starting.
-02 at Step 2
Technical Reference(s)       OP51.SYS.ES3.LN, Pages 10 & 20                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: COMPARE and CONTRAST the function and operation of the BOS and SIS Operator Lockouts and Automatic Lockouts. (OP51.SYS.ES3.OB10)
. D. Incorrect. Plausible if thought the pump would AUTO start immediately upon reenergizing the bus, however, the BOS Auto Lockout is present and prevent the pump from starting.
Question Source:             Bank #                   CPNPP LXR Modified Bank #                             (Note changes or attach parent)
Technical Reference(s)
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:       55.41   4, 7, 8 55.43 Page 17 of 53                                       Rev f
OP51.SYS.ES3.LN , Page s 10 & 20 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
None Learning Objective:
COMPARE and CONTRAST the function and operation of the BOS and SIS Operator Lockouts and Automatic Lockouts. (OP51.SYS.ES3.OB10)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 4, 7, 8 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 18 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 010 A3.02  Importance Rating


===3.6 Pressurizer===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                          2 Group #                        1 K/A #                              010 A3.02 Importance Rating              3.6 Pressurizer Pressure Control System: Ability to monitor automatic operation of the PZR PCS including: PZR pressure Proposed Question:              Common 9 Given the following conditions on Unit 2:
Pressure Control SystemProposed Question:
* 2-PK-455A, Pressurizer Master Pressure Controller will NOT control in AUTO.
: Ability to monitor automatic operation of the PZR PCS including: PZR pressure Commo n 9 Given the following conditions on Unit 2:   2-PK-455A, Pressurizer Master Pressure Controller will NOT control in AUTO.
* 2-PK-455A was placed in MANUAL and the demand lowered to 0%.
2-PK-455A was placed in MANUAL and the demand lowered to 0%.
With NO further operator action, which of the following will be the response of the plant?
With NO further operator action, which of the following will be the response of the plant?
Pressurizer pressure will...
Pressurizer pressure will...
A. INCREASE until 2-PCV-456 opens.
A. INCREASE until 2-PCV-456 opens. 2-PCV-455A will remain CLOSED.
2-PCV-455A will remain CLOSED.
B. INCREASE until 2-PCV-455A opens. 2-PCV-456 will remain CLOSED.
B. INCREASE until 2
-PCV-455A opens. 2
-PCV-456 will remain CLOSED.
C. DECREASE due to all Control and Backup Heaters remaining OFF. The Spray Valves remain CLOSED.
C. DECREASE due to all Control and Backup Heaters remaining OFF. The Spray Valves remain CLOSED.
D. DECREASE due to all Control and Backup Heaters remaining OFF. The Spray Valves will OPEN.
D. DECREASE due to all Control and Backup Heaters remaining OFF. The Spray Valves will OPEN.
Proposed Answer:
Proposed Answer:                 A Explanation:
A Explanation:
A. Correct. This is the controller response when placed in MANUAL with 0% demand. Heaters turn on and Spray Valves remain closed, PCV-456 will open at 2335 PSIG and PCV-455A will remain closed.
A. Correct. This is the controller response when placed in MANUAL with 0% demand.
B. Incorrect. Plausible if thought that PCV-455A will open, however with PK-455A in manual at 0%
Heaters turn on and Spray Valves remain closed, P C V-456 will open at 2335 PSIG and P C V-455A will remain closed. B. Incorrect. Plausible if thought that PCV
demand the PZR heaters will energize and Sprays will not open and pressure will rise to 2335 PSIG but only PV-456 will open and PV-455A will remain closed.
-455A will open, however with PK
C. Incorrect. Plausible if thought that the Control and Backup Heaters remain OFF when PK-455A is taken to 0% demand, however the Heaters will actually come on.
-455A in manual at 0% demand the PZR heaters will energize and Sprays will not open and pressure will rise to 2335 PSIG but only PV
D. Incorrect. Plausible if thought that the Control and Backup Heaters remain OFF when PK-455A is taken to 0% demand, however the Heaters will actually come on. The Spray Valves will remain closed with PK-455A taken to 0% demand.
-456 will open and PV-455A will remain closed
Technical Reference(s)         OP51.SYS.PP1.LN, Pages 12 & 13                         Attached w/ Revision # See Page 18 of 53                                                Rev f
. C. Incorrect. Plausible if thought that the Control and Backup Heaters remain OFF when PK-455A is taken to 0% demand, however the Heaters will actually come on.
 
D. Incorrect. Plausible if thought that the Control and Backup Heaters remain OFF when PK
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                         Form ES-401-5 OP51.SYS.PP1.LN, Figure 4                     Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the Pressurizer Pressure and Level Control System design features which provide for the trips, permissives and interlocks associated with the following:
-455A is taken to 0% demand, however the Heaters will actually come on. The Spray Valves will remain closed with PK
* PRZR PORVS Open Interlock in AUTO (OP51.SYS.PP1.OB07)
-455A taken to 0% demand
Question Source:           Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
. Technical Reference(s)
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41   7 55.43 Page 19 of 53                                       Rev f
OP51.SYS.PP1.LN, Page s 12 & 13 Attached w/ Revision # See ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 19 of 53 Rev f  OP51.SYS.PP1.LN, Figure 4 Comments / Reference Proposed references to be provided during examination:
None Learning Objective:
LIST and EXPLAIN the Pressurizer Pressure and Level Control System design features which provide for the trips, permissives and interlocks associated with the following:
PRZR PORVS Open Interlock in AUTO (OP51.SYS.PP1.OB07)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 20 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 010 A1.07  Importance Rating


===3.7 Pressurizer===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                          2 Group #                          1 K/A #                              010 A1.07 Importance Rating              3.7 Pressurizer Pressure Control System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR PCS controls including: RCS pressure Proposed Question:                  Common 10 Given the following conditions:
Pressure Control SystemProposed Question:
* Unit 1 is in MODE 4
: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR PCS controls including: RCS pressure Common 10 Given the following conditions:
* Reactor Coolant System (RCS) temperature is 250ºF.
Unit 1 is in MODE 4 Reactor Coolant System (RCS) temperature is 250ºF.
* 1-PT-405, RCS Wide Range Pressure Transmitter is out of service.
1-PT-405, RCS Wide Range Pressure Transmitter is out of service.
* The associated train of Low Temperature Overpressure Protection (LTOP) is removed from service.
The associated train of Low Temperature Overpressure Protection (LTOP) is removed from service.
* 1-PT-403, RCS pressure transmitter fails LOW.
1-PT-403, RCS pressure transmitter fails LOW.
Which of the following describes the consequence of the 1-PT-403 failure?
Which of the following describes the consequence of the 1
A.       1-PCV-456, PRZR PORV will open and depressurize the RCS.
-PT-403 failure?
B.       1-PCV-455A, PRZR PORV will open and depressurize the RCS.
A. 1-PCV-456, PRZR PORV will open and depressurize the RCS.
C.       All RCS Low Temperature Overpressure Protection via the PORVs will be lost.
B. 1-PCV-455A, PRZR PORV will open and depressurize the RCS.
D.       RCS LTOP will still be provided by 1-PCV-455A, PRZR PORV.
C. All RCS Low Temperature Overpressure Protection via the PORVs will be lost.
Proposed Answer:                   C Explanation:
D. RCS LTOP will still be provided by 1
A. Incorrect. Plausible if thought that with PT-403 failed low, PCV-456 would still function.
-PCV-455A, PRZR PORV.
B. Incorrect. Plausible if thought that PCV-455A is available with PT-405 being out of service.
Proposed Answer:
C. Correct. LTOP uses wide range RCS temperature, PT-405 for Train A and PT-403 for Train B. When PT-403 fails, no PORVs will automatically open.
C Explanation:
A. Incorrect. Plausible if thought that with PT-403 failed low, PCV
-456 would still function. B. Incorrect. Plausible if thought that PCV
-455A is available with PT
-405 being out of service. C. Correct. LTOP uses wide range RCS temperature, PT
-405 for Train A and PT-403 for Train B. When PT
-403 fails, no PORVs will automatically open.
D. Incorrect. Plausible if thought that PCV-455A is available with PT-405 being out of service.
D. Incorrect. Plausible if thought that PCV-455A is available with PT-405 being out of service.
Technical Reference(s)
Technical Reference(s)             OP51.SYS.PP2.LN, Pages 10 & 11                       Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE how the Low Temperature Overpressure Protection System Main Control Board/Plant Computer controls, alarms and indications are used to Page 20 of 53                                              Rev f
OP51.SYS.PP2.LN, Pages 10  
 
& 11 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 predict, monitor and control changes in the system. (OP51.SYS.PP2.OB11)
None Learning Objective:
Question Source:         Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
DESCRIBE how the Low Temperature Overpressure Protection System Main Control Board/Plant Computer controls, alarms and indications are used to ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 21 of 53 Rev f predict, monitor and control changes in the system. (OP51.SYS.PP2.OB11)
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:   55.41   7 55.43 Page 21 of 53                                       Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question Histor y: Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 22 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 012 K3.02  Importance Rating


===3.2 Reactor===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO                SRO Tier #                            2 Group #                          1 K/A #                                012 K3.02 Importance Rating                3.2 Reactor Protection System: Knowledge of the effect that a loss or malfunction of the RPS will have on the following: Turbine generator Proposed Question:              Common 11 Given the following conditions:
Protection SystemProposed Question:
* The plant is at 20% power with all systems operating normally.
: Knowledge of the effect that a loss or malfunction of the RPS will have on the following: Turbine generator Common 11 Given the following conditions:
* A valid Reactor Trip signal is generated and the Reactor Trip Breakers fail to open.
The plant is at 20% power with a ll systems operating normally. A valid Reactor Trip signal is generated and the Reactor Trip Breakers fail to open. Which of the following identifies the impact on the Main Turbine?
Which of the following identifies the impact on the Main Turbine?
A. P-4 is NOT enabled and the Main Turbine will NOT trip.
A. P-4 is NOT enabled and the Main Turbine will NOT trip.
B. P-9 is NOT enabled and the Main Turbine will trip. C. P-4 is enabled and the Main Turbine will trip
B. P-9 is NOT enabled and the Main Turbine will trip.
. D. P-9 is enabled and the Main Turbine will NOT trip.
C. P-4 is enabled and the Main Turbine will trip.
Proposed Answer:
D. P-9 is enabled and the Main Turbine will NOT trip.
A Explanation:
Proposed Answer:               A Explanation:
A. Correct. If the Reactor Trip Breakers fail to open, P
A. Correct. If the Reactor Trip Breakers fail to open, P-4 is NOT enabled and the Main Turbine will NOT trip.
-4 is NOT enabled and the Main Turbine will NOT trip. B. Incorrect. Plausible because P
B. Incorrect. Plausible because P-9 is not enabled until power is greater than 50%, however, this Permissive generates a Reactor Trip if a Turbine Trip occurs.
-9 is not enabled until power is greater than 50%, however, this Permissive generates a Reactor Trip if a Turbine Trip occurs.
C. Incorrect. Plausible if thought that P-4 is enabled, however, it is not enabled and the Main Turbine will not trip.
C. Incorrect. Plausible if thought that P
D. Incorrect. Plausible because P-9 is not enabled until power is greater than 50%, however, this Permissive generates a Reactor Trip if a Turbine Trip occurs.
-4 is enabled, however, it is not enabled and the Main Turbine will not trip
Technical Reference(s)         OP51.SYS.ES1.LN, Pages 67 & 68                           Attached w/ Revision # See OP51.SYS.ES1.LN, Pages 70 & 71                           Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the coincidence and setpoints associated with the following Permissives and Controls:
. D. Incorrect. Plausible because P-9 is not enabled until power is greater than 50%, however, this Permissive generates a Reactor Trip if a Turbine Trip occurs
* P-4 Reactor Trip & P-9 Turbine Trip (OP51.SYS.ES1.OB06)
. Technical Reference(s)
Page 22 of 53                                                    Rev f
OP51.SYS.ES1.LN, Pages 67 & 68 Attached w/ Revision # See Comments / Reference OP51.SYS.ES1.LN, Pages 70 & 71 Proposed references to be provided during examination:
None Learning Objective:
LIST and EXPLAIN the coincidence and setpoints associated with the following Permissives and Controls:
P-4 Reactor Trip & P
-9 Turbine Trip (OP51.SYS.ES1.OB06)


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 23 of 53 Rev f  Question Source:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet           Form ES-401-5 Question Source:         Bank #
Bank #   Modified Bank #
Modified Bank #                 (Note changes or attach parent)
  (Note changes or attach parent)
New                       X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   6, 7 55.43 Page 23 of 53                             Rev f
New X   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 6, 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 24 of 53 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 012 K5.0 1  Importance Rating


===3.3 Reactor===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                              Level                            RO              SRO Tier #                            2 Group #                          1 K/A #                                012 K5.01 Importance Rating                3.3 Reactor Protection System: Knowledge of the operational implications of the following concepts as they apply to the RPS:
Protection SystemProposed Question:
DNB Proposed Question:             Common 12 Which of the following Reactor Protection System Trips is NOT designed to protect against Departure from Nuclear Boiling (DNB)?
: Knowledge of the operational implications of the following concepts as they apply to the RPS
A. Pressurizer Low Pressure.
: DNB Common 12 Which of the following Reactor Protection System Trips is NOT designed to protect against Departure from Nuclear Boiling (DNB)?
B. Overtemperature N-16.
A. Pressurizer Low Pressure
C. Reactor Coolant Pump Undervoltage.
. B. Overtemperature N
-16. C. Reactor Coolant Pump Undervoltage.
D. Intermediate Range High Flux.
D. Intermediate Range High Flux.
Proposed Answer:
Proposed Answer:               D Explanation:
D Explanation:
A. Incorrect. Plausible if thought that the Pressurizer Low Pressure Trip was only concerned with void formation.
A. Incorrect. Plausible if thought that the Pressurizer Low Pressure Trip was only concerned with void formation.
B. Incorrect. Plausible because Overtemperature N
B. Incorrect. Plausible because Overtemperature N-16 could be construed to imply a high flux type of trip which would not protect against DNB.
-16 could be construed to imply a high flux type of trip which would not protect against DNB.
C. Incorrect. Plausible because the RCP Undervoltage Trip may be considered differently from the RCP Under Frequency Trip. With the latter, under frequency implies a loss of speed which converts to a loss of flow.
C. Incorrect. Plausible because the RCP Undervoltage Trip may be considered differently from the RCP Under Frequency Trip. With the latter, under frequency implies a loss of speed which converts to a loss of flow.
D. Correct. There is no credit taken in the Accident Analysis for this trip.
D. Correct. There is no credit taken in the Accident Analysis for this trip.
Technical Reference(s)
Technical Reference(s)         OP51.SYS.ES1.LN, Pages as listed                         Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE or STATE how the following concepts or conditions apply to the Reactor Protection System:
OP51.SYS.ES1.LN, Pages as listed Attached w/ Revision # See Comments / Reference   Proposed references to be provided during examination:
* DNB (OP51.SYS.ES1.OB07)
None Learning Objective:
Question Source:               Bank #                       CPNPP LXR Modified Bank #                                       (Note changes or attach parent)
DESCRIBE or STATE how the following concepts or conditions apply to the Reactor Protection System:
New Page 24 of 53                                                    Rev f
DNB (OP51.SYS.ES1.OB07)
 
Question Source:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet   Form ES-401-5 Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 7 55.43 Page 25 of 53                   Rev f
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 25 of 53 Rev f  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 26 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 013 K4.03  Importance Rating


===3.9 Engineered===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                Form ES-401-5 Examination Outline Cross-reference:                            Level                          RO                SRO Tier #                          2 Group #                          1 K/A #                                013 K4.03 Importance Rating              3.9 Engineered Safety Features Actuation System: Knowledge of the ESFAS design feature(s) and/or interlock(s) that provide for the following: Main Steam Isolation System Proposed Question:                Common 13 Given the following conditions:
Safety Features Actuation SystemProposed Question:
* The plant is at 75% power with power ascension in progress at 8% per hour.
: Knowledge of the ESFAS design feature(s) and/or interlock(s) that provide for the following: Main Steam Isolation System Common 13 Given the following conditions:
* All Steam Generator pressures are slowly lowering.
The plant is at 75% power with power ascension in progress at 8% per hour.
* Containment temperature, pressure, and humidity are slowly rising.
All Steam Generator pressures are slowly lowering.
* TAVE is lowering.
Containment temperature, pressure, and humidity are slowly rising.
T AVE is lowering.
Which of the following Engineered Safety Feature Actuation Signals is designed to prevent exceeding the Containment pressure limit?
Which of the following Engineered Safety Feature Actuation Signals is designed to prevent exceeding the Containment pressure limit?
A. Containment Isolation Phase A.
A. Containment Isolation Phase A.
Line 463: Line 319:
C. Main Steam Line Isolation.
C. Main Steam Line Isolation.
D. Safety Injection Actuation.
D. Safety Injection Actuation.
Proposed Answer:
Proposed Answer:                   C Explanation:
C Explanation: A. Incorrect. Plausible because all non-essential lines in or out of Containment are isolated by Phase A, however, Phase A isolation is designed to prevent radiological release f ro m Containment
A. Incorrect. Plausible because all non-essential lines in or out of Containment are isolated by Phase A, however, Phase A isolation is designed to prevent radiological release from Containment.
. B. Incorrect. Plausible because all CCW support for RCPs in or out of Containment is isolated by Phase B, however, Phase B isolation is designed to prevent radiological release f ro m Containment
B. Incorrect. Plausible because all CCW support for RCPs in or out of Containment is isolated by Phase B, however, Phase B isolation is designed to prevent radiological release from Containment.
. C. Correct. MSLI is designed to minimize excessive cooldown and Containment pressure. D. Incorrect. Plausible because the SI signal starts Containment Spray and initiates Phase A isolation, however, the SI signal starts pumps and positions valves to ensure the core is cooled during an accident.
C. Correct. MSLI is designed to minimize excessive cooldown and Containment pressure.
Technical Reference(s)
D. Incorrect. Plausible because the SI signal starts Containment Spray and initiates Phase A isolation, however, the SI signal starts pumps and positions valves to ensure the core is cooled during an accident.
FSAR Section 7.0, I & C, Page 130 Attached w/ Revision # See Comments / Reference OP51.SYS.ES1.LN, Pages as listed
Technical Reference(s)           FSAR Section 7.0, I & C, Page 130                 Attached w/ Revision # See OP51.SYS.ES1.LN, Pages as listed                   Comments / Reference Page 26 of 53                                                  Rev f


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 27 of 53 Rev f Proposed references to be provided during examination:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: LIST the ESF Systems and STATE their functions. (OP51.SYS.ES1.OB03)
None Learning Objective:
LIST the ESF Systems and STATE their functions. (OP51.SYS.ES1.OB03)
LIST and EXPLAIN the coincidence and setpoints associated with the following ESF actuation signals:
LIST and EXPLAIN the coincidence and setpoints associated with the following ESF actuation signals:
Steamline Isolation (OP51.SYS.ES1.OB05)
* Steamline Isolation (OP51.SYS.ES1.OB05)
Question Source:
Question Source:           Bank #               CPNPP LXR Modified Bank #                     (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:     55.41   7 55.43 Page 27 of 53                                   Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 28 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 022 A2.0 5  Importance Rating


===3.1 Containment===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO              SRO Tier #                          2 Group #                          1 K/A #                              022 A2.05 Importance Rating              3.1 Containment Cooling System: Ability to (a) predict the impacts of the following malfunctions or operations on the CCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Major leak in CCS Proposed Question:                Common 14 Given the following conditions:
Cooling SystemProposed Question:
* Unit 1 is at 50% power.
: Ability to (a) predict the impacts of the following malfunctions or operations on the CCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations
* The following Annunciators are in alarm:
: Major leak in CCS Common 14 Given the following conditions:
* 1-ALB-02B, Window 1.12 - CNTMT FN CLR 3 & 4 CNDS LVL HI.
Unit 1 is at 50% power.
* 1-ALB-02B, Window 3.12 - CNTMT FN CLR 3 & 4 CND FILL RATE HI.
The following Annunciators are in alar m: 1-ALB-02B, Window 1.12  
* X-ALB-11C, Window 1.11 - CH WTR SRG TK LVL HI-HI / LO-LO is alarming intermittently due to a low level.
- CNTMT FN CLR 3 & 4 CNDS LVL HI.
* A Containment Ventilation Chilled Water System leak has been diagnosed.
1-ALB-02B, Window 3.12  
* 1-HS-5413A, CNTMT FN CLR FN 3, and 1-HS-5417A, CNTMT FN CLR FN 4 were stopped.
- CNTMT FN CLR 3 & 4 CND FILL RATE HI
Which of the following describes the impact of securing Containment Fan Coolers 3 and 4?
. X-ALB-11C, Window 1.11  
- CH WTR SRG TK LVL HI
-HI / LO-LO is alarming intermittently due to a low level.
A Containment Ventilation Chilled Water System leak has been diagnosed.
1-HS-5413A, CNTMT FN CLR FN 3, and 1-HS-5417A, CNTMT FN CLR FN 4 were stopped. Which of the following describes the impact of securing Containment Fan Coolers 3 and 4
?
The Ventilation Chilled Water leak will...
The Ventilation Chilled Water leak will...
A. be isolated; the Unit must be tripped and EOP
A. be isolated; the Unit must be tripped and EOP-0.0A, Reactor Trip or Safety Injection, entered.
-0.0A, Reactor Trip or Safety Injection, entered. B. be isolated; continued plant operation per IPO
B. be isolated; continued plant operation per IPO-003A, Power Operation, is permitted.
-003A, Power Operation, is permitted.
C. NOT be isolated; enter Containment per STA-620, Containment Entry, and locally isolate the leak.
C. NOT be isolated; enter Containment per STA
D. NOT be isolated; refer to SOP-814, Ventilation Chilled Water, and isolate leak from Ventilation Panel CV-03.
-620, Containment Entry, and locally isolate the leak.
Page 28 of 53                                                Rev f
D. NOT be isolated; refer to SOP
 
-814, Ventilation Chilled Water, and isolate leak from Ventilation Panel CV
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Proposed Answer:             C Explanation:
-03.
A. Incorrect. Plausible if thought that with 2 Containment Fan Coolers out of service the Unit must be tripped.
ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 29 of 53 Rev f  Proposed Answer:
B. Incorrect. Plausible because continued plant operation is allowed, however, the leak has not been isolated.
C Explanation:
C. Correct. A Containment entry must be made to locally isolate the leak. The Chill Water Outlet Valves automatically close, however, the Chill Water Inlet valves must be manually closed and are NOT shown on Figure 3.
A. Incorrect. Plausible if thought that with 2 Containment Fan Coolers out of service the Unit must be tripped. B. Incorrect. Plausible because continued plant operation is allowed, however, the leak has not been isolated. C. Correct. A Containment entry must be made to locally isolate the leak.
The Chill Water Outlet Valves automatically close, however, the Chill Water Inlet valves must be manually closed and are NOT shown on Figure 3.
D. Incorrect. Plausible because the leak is not isolated, however, leak isolation must be performed inside Containment.
D. Incorrect. Plausible because the leak is not isolated, however, leak isolation must be performed inside Containment.
Technical Reference(s) 1-ALB-02B, Window s 1.12 & 3.12 Attached w/ Revision # See Comments / Reference X-ALB-11C, Window 1.11 OP51.SYS.CY1.LN
Technical Reference(s)       1-ALB-02B, Windows 1.12 & 3.12               Attached w/ Revision # See X-ALB-11C, Window 1.11                       Comments / Reference OP51.SYS.CY1.LN, Pages 31 & 32 M1-0307, Sheet A Proposed references to be provided during examination: None Learning Objective: STATE the functions, operation and interlocks of the following Ventilation Chilled Water System components:
, Pages 31 & 32 M1-0307, Sheet A Proposed references to be provided during examination:
* Containment Air Cooling and Recirculation Units (OP51.SYS.CH2.OB03)
None Learning Objective:
IDENTIFY and DESCRIBE the Main Control Board/Plant Computer controls, alarms and indications associated with the Ventilation Chilled Water System.
STATE the functions, operation and interlocks of the following Ventilation Chilled Water System components:
(OP51.SYS.CH2.OB06)
Containment Air Cooling and Recirculation Units (OP51.SYS.CH2.OB03)
Question Source:             Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
IDENTIFY and DESCRIBE the Main Control Board/Plant Computer controls, alarms and indications associated with the Ventilation Chilled Water System. (OP51.SYS.CH2.OB06)
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41   4, 9, 10 55.43 Page 29 of 53                                     Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 4, 9, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 30 of 53 Rev f   Examination Outline Cross-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 026 G 2.4.21 Importance Rating


===4.0 Containment===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                    Level                          RO                SRO Tier #                          2 Group #                        1 K/A #                            026 G 2.4.21 Importance Rating              4.0 Containment Spray System: Emergency Procedures/Plan: Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.
Spray SystemProposed Question:
Proposed Question:                  Common 15 Given the following conditions:
: Emergency Procedures/Plan:
* A Loss of Coolant Accident has occurred inside Containment.
Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.
* Containment pressure is 20 PSIG.
Common 15   Given the following conditions:
* Containment temperature is 260ºF.
A Loss of Coolant Accident has occurred inside Containment.
* Containment sump level is 814 feet.
Containment pressure is 20 PSIG. Containment temperature is 260
* Containment radiation level is 10R/hr.
ºF. Containment sump level is 814 feet. Containment radiation level is 10R/hr.
* Train A Containment Spray System is in service.
Train A Containment Spray System is in service.
Which of the following procedures should be entered?
Which of the following procedures should be entered? A. A RED path condition exists.
A. A RED path condition exists.
Enter FRZ-0.1A, Response to High Containment Pressure.
Enter FRZ-0.1A, Response to High Containment Pressure.
B. An ORANGE path condition exists.
B. An ORANGE path condition exists.
Line 546: Line 377:
D. A YELLOW path condition exists.
D. A YELLOW path condition exists.
Enter FRZ-0.3A, Response to High Containment Radiation.
Enter FRZ-0.3A, Response to High Containment Radiation.
Proposed Answer:
Proposed Answer:                   B Explanation:
B Explanation:
A. Incorrect. Plausible because the procedure entry is correct, however, Containment pressure would have to be greater than 50 PSIG for a RED path to exist.
A. Incorrect. Plausible because the procedure entry is correct, however, Containment pressure would have to be greater than 50 PSIG for a RED path to exist.
B. Correct. With Containment pressure at 20 PSIG, an ORANGE path condition exists and FRZ
B. Correct. With Containment pressure at 20 PSIG, an ORANGE path condition exists and FRZ-0.1A must be entered.
-0.1A must be entered.
C. Incorrect. Plausible because an ORANGE path condition would exist, however, containment sump level must be greater than 816 feet.
C. Incorrect. Plausible because an ORANGE path condition would exist, however, containment sump level must be greater than 816 feet.
D. Incorrect. Plausible because this is the correct path and procedure for high containment radiation, ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 31 of 53 Rev f however, radiation level must be greater than 20 R/hr. Technical Reference(s)
D. Incorrect. Plausible because this is the correct path and procedure for high containment radiation, Page 30 of 53                                                  Rev f
FRZ-0.1A, CSF Status Tree Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
 
None Learning Objective:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                 Form ES-401-5 however, radiation level must be greater than 20 R/hr.
Given the Containment CSFST (and necessary parameter data or access to the data), DETERMINE whether entry into FRZ
Technical Reference(s)   FRZ-0.1A, CSF Status Tree                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given the Containment CSFST (and necessary parameter data or access to the data), DETERMINE whether entry into FRZ-0.1A/B is applicable, and, if so, STATE the severity of the challenge. (LO21.ERG.FZ1.OB02)
-0.1A/B is applicable, and, if so, STATE the severity of the challenge. (LO21.ERG.FZ1.OB02)
Question Source:         Bank #
Question Source:
Modified Bank #                       (Note changes or attach parent)
Bank #   Modified Bank #
New                         X Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:     55.41 10 55.43 Page 31 of 53                                    Rev f
  (Note changes or attach parent)
 
New X   Question History:
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                                     Form ES-401-5 Examination Outline Cross-reference:                             Level                           RO           SRO Tier #                           2 Group #                         1 K/A #                               039 A4.07 Importance Rating               2.8 Main and Reheat Steam System: Ability to manually operate and/or monitor in the control room: Steam dump valves Proposed Question:            Common 16 Given the following conditions:
Last NRC Exam Question Cognitive Level:
* Reactor Coolant System Tave is 557ºF.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
* 1-PK-507, Steam Dump Pressure Controller is at 50% demand in MANUAL.
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 32 of 53 Rev f  Examination Outline Cross
* Steam Dump Mode Select Switch is in the STEAM PRESSURE Mode.
-reference:
* Steam Dump Interlock Select Switch is in the NEUTRAL position.
Level RO SRO Tier # 2   Group # 1   K/A # 039 A4.07 Importance Rating 2.8   Main and Reheat Steam SystemProposed Question:
Which of the following will be the status of the Steam Dump Cooldown Valves?
: Ability to manually operate and/or monitor in the control room: Steam dump valves Common 16 Given the following conditions:
Reactor Coolant System Tave is 557
ºF. 1-PK-507, Steam Dump Pressure Controller is at 50% demand in MANUAL.
Steam Dump Mode Select Switch is in the STEAM PRESSURE Mode.
Steam Dump Interlock Select Switch is in the NEUTRAL position. Which of the following will be the status of the Steam Dump Cooldown Valves?
The Steam Dump Cooldown Valves are...
The Steam Dump Cooldown Valves are...
A. NOT open. B. open 50%. C. full open.
A. NOT open.
D. throttled to maintain 557
B. open 50%.
ºF. Proposed Answer:
C. full open.
C Explanation:
D. throttled to maintain 557ºF.
Proposed Answer:               C Explanation:
A. Incorrect. Plausible if thought that no demand signal is present with the Steam Dump Pressure Controller in Manual.
A. Incorrect. Plausible if thought that no demand signal is present with the Steam Dump Pressure Controller in Manual.
B. Incorrect. Plausible because the Steam Dump Controller is set at 50%, however, with the conditions listed the valves will go full open.
B. Incorrect. Plausible because the Steam Dump Controller is set at 50%, however, with the conditions listed the valves will go full open.
C. Correct. With the Steam Dump Controller positioned as listed and with temperature above the Bypass Interlock setpoint, the valves will be full open.
C. Correct. With the Steam Dump Controller positioned as listed and with temperature above the Bypass Interlock setpoint, the valves will be full open.
D. Incorrect. Plausible if thought that the Bypass Interlock signal will throttle close the valves to fully closed at 553ºF. Technical Reference(s)
D. Incorrect. Plausible if thought that the Bypass Interlock signal will throttle close the valves to fully closed at 553ºF.
OP51.SYS.SD1.LN, Pages 14 & 26 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)       OP51.SYS.SD1.LN, Pages 14 & 26                             Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 32 of 53                                              Rev f
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 33 of 53 Rev f  Learning Objective:
 
STATE the performance and design attributes of the following Steam Dump System components, flowpaths and features:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Learning Objective: STATE the performance and design attributes of the following Steam Dump System components, flowpaths and features:
Mode Selector Switch and Interlock Selector Switch (OP51.SYS.SD1.OB02)
* Mode Selector Switch and Interlock Selector Switch (OP51.SYS.SD1.OB02)
LIST the input signals to the Steam Dump System, and DESCRIBE how these signals are generated and utilized in controlling RCS/Secondary fluid conditions. Description should include the following:
LIST the input signals to the Steam Dump System, and DESCRIBE how these signals are generated and utilized in controlling RCS/Secondary fluid conditions.
Number of dump valves Number of Banks and number of Dump valves per Bank (OP51.SYS.SD1.OB03
Description should include the following:
Question Source:
* Number of dump valves
Bank # CPNPP LXR   Modified Bank #
* Number of Banks and number of Dump valves per Bank (OP51.SYS.SD1.OB03)
  (Note changes or attach parent)
Question Source:           Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
New   Question History:
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41   7 55.43 Page 33 of 53                                      Rev f
Last NRC Exam Question Cognitive Level:
 
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                                     Form ES-401-5 Examination Outline Cross-reference:                               Level                         RO               SRO Tier #                         2 Group #                       1 K/A #                             059 A4.03 Importance Rating             2.9 Main Feedwater System: Ability to manually operate and/or monitor in the control room: Feedwater control during power increase and decrease Proposed Question:                Common 17 Given the following condition:
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 34 of 53 Rev f  Examination Outline Cross
* A power ascension is in progress on Unit 2.
-reference:
Level RO SRO Tier # 2   Group # 1   K/A # 059 A4.03 Importance Rating 2.9   Main Feedwater SystemProposed Question:
: Ability to manually operate and/or monitor in the control room: Feedwater control during power increase and decrease Common 17   Given the following condition:
A power ascension is in progress on Unit 2.
Which of the following describes the operation of the Unit 2 Feedwater Preheater Bypass Valve?
Which of the following describes the operation of the Unit 2 Feedwater Preheater Bypass Valve?
Unit 2 Feedwater Preheater Bypass Valve...
Unit 2 Feedwater Preheater Bypass Valve...
Line 603: Line 424:
C. automatically OPENS when the Feedwater Isolation Valve is CLOSED due to a Feedwater Isolation Signal.
C. automatically OPENS when the Feedwater Isolation Valve is CLOSED due to a Feedwater Isolation Signal.
D. automatically CLOSES whenever the water hammer permissives are cleared and the Feedwater Isolation Valve is OPENED.
D. automatically CLOSES whenever the water hammer permissives are cleared and the Feedwater Isolation Valve is OPENED.
Proposed Answer:
Proposed Answer:                 D Explanation:
D Explanation:
A. Incorrect. Plausible because the water hammer permissives must be cleared, however, this condition closes the Unit 2 Feedwater Preheater Bypass Valve.
A. Incorrect. Plausible because the water hammer permissives must be cleared, however, this condition closes the Unit 2 Feedwater Preheater Bypass Valve.
B. Incorrect. Plausible if thought that the water hammer permissives must be satisfied.
B. Incorrect. Plausible if thought that the water hammer permissives must be satisfied.
C. Incorrect. Plausible because the 1 st part of the answer is correct, however, a Feedwater Isolation Signal cannot D. Correct. This is the design of the Unit 2 Feedwater Preheater Bypass Valve. Additional information is available in IPO
C. Incorrect. Plausible because the 1st part of the answer is correct, however, a Feedwater Isolation Signal cannot be present.
-003B, Power Operation, Sections 5.2, 5.3, and 5.7.
D. Correct. This is the design of the Unit 2 Feedwater Preheater Bypass Valve. Additional information is available in IPO-003B, Power Operation, Sections 5.2, 5.3, and 5.7.
be present.
Technical Reference(s)         OP51.SYS.MF1.LN, Pages 51 & 72                         Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 34 of 53                                                Rev f
Technical Reference(s)
 
OP51.SYS.MF1.LN, Page s 51 & 72 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                         Form ES-401-5 Learning Objective: LIST and EXPLAIN the Main Feedwater System design features which provide for the trips, permissives, and interlocks associated with the following:
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 35 of 53 Rev f  Learning Objective:
* Main Feedwater System water hammer interlocks (OP51.SYS.MF1.OB11)
LIST and EXPLAIN the Main Feedwater System design features which provide for the trips, permissives, and interlocks associated with the following:
Question Source:           Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
Main Feedwater System water hammer interlocks (OP51.SYS.MF1.OB11)
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge               X Comprehension or Analysis 10 CFR Part 55 Content:     55.41   4, 7 55.43 Page 35 of 53                                      Rev f
Question Source:
 
Bank # CPNPP LXR   Modified Bank #
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                           Level                             RO               SRO Tier #                             2 Group #                           1 K/A #                                 061 K5.01 Importance Rating                 3.6 Auxiliary/Emergency Feedwater System: Knowledge of the operational implications of the following concepts as they apply to the AFW: Relationship between AFW flow and RCS heat transfer Proposed Question:              Common 18 Given the following conditions:
  (Note changes or attach parent)
* Unit 1 is in MODE 1.
New   Question History:
* The running Main Feedwater Pump just tripped on low oil pressure.
Last NRC Exam Question Cognitive Level:
* The crew responded by tripping the Main Turbine which was loaded to 160 MWe.
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
Which of the following identifies the maximum Reactor power level to ensure adequate Auxiliary Feedwater flow?
55.41 4, 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 36 of 53 Rev f  Examination Outline Cro ss-reference:
A. 2%
Level RO SRO Tier # 2   Group # 1   K/A # 061 K5.01 Importance Rating 3.6   Auxiliary/Emergency Feedwater SystemProposed Question:
B. 5%
: Knowledge of the operational implications of the following concepts as they apply to the AFW: Relationship between AFW flow and RCS heat transfer Common 18   Given the following conditions:
C. 6%
Unit 1 is in MODE 1
D. 10%
. The running Main Feedwater Pump just tripped on low oil pressure.
Proposed Answer:               C Explanation:
The crew responded by tripping the Main Turbine which was loaded to 160 MWe. Which of the following identifies the maximum Reactor power level to ensure adequate Auxiliary Feedwater flow?
A. 2% B. 5%   C. 6%   D. 10%   Proposed Answer:
C Explanation:
A. Incorrect. Plausible if thought that POAH could not be achieved with Auxiliary Feedwater flow.
A. Incorrect. Plausible if thought that POAH could not be achieved with Auxiliary Feedwater flow.
B. Incorrect. Plausible if thought that MODE 1 could not be achieved with Auxiliary Feedwater flow.
B. Incorrect. Plausible if thought that MODE 1 could not be achieved with Auxiliary Feedwater flow.
C. Correct. As identified in ABN
C. Correct. As identified in ABN-403 Caution.
-403 Caution.
D. Incorrect. Plausible because AFW must be placed in standby readiness prior to exceeding 10%.
D. Incorrect. Plausible because AFW must be placed in standby readiness prior to exceeding 10%.
Technical Reference(s)
Technical Reference(s)       ABN-403, Step 2 Caution                                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST the maximum reactor power equivalent that can be maintained utilizing AFW System flow Reactor Coolant System. (OP51.SYS.AF1.OB12)
ABN-403, Step 2 Caution Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Page 36 of 53                                                    Rev f
None Learning Objective:
 
LIST the maximum reactor power equivalent that can be maintained utilizing AFW System flow Reactor Coolant System
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet           Form ES-401-5 Question Source:         Bank #               CPNPP LXR Modified Bank #                 (Note changes or attach parent)
. (OP51.SYS.AF1.OB12
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   5 55.43 Page 37 of 53                              Rev f
)
 
ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 37 of 53 Rev f  Question Source:
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                 Form ES-401-5 Examination Outline Cross-reference:                               Level                         RO           SRO Tier #                           2 Group #                         1 K/A #                               061 A3.03 Importance Rating              3.9 Auxiliary/Emergency Feedwater System: Ability to monitor automatic operation of the AFW including: AFW steam generator level control on automatic start Proposed Question:                Common 19 On Unit 2, which of the following describes the response to the AUTO start of the Motor Driven Auxiliary Feedwater Pumps (MDAFWP)?
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 5 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 38 of 53 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 1   K/A # 061 A3.0 3  Importance Rati ng 3.9   Auxiliary/Emergency Feedwater SystemProposed Question:
: Ability to monitor automatic operation of the AFW including:
AFW steam generator level control on automatic start Common 19 On Unit 2, which of the following describes the response to the AUTO start of the Motor Driven Auxiliary Feedwater Pumps (MDAFWP)?
A. Condensate Storage Tank Discharge Valves OPEN.
A. Condensate Storage Tank Discharge Valves OPEN.
B. MDAFWP Flow Control Valves trip to AUTO and fully OPEN.
B. MDAFWP Flow Control Valves trip to AUTO and fully OPEN.
C. Main Feedwater Preheater Bypass Valves CLOSE. D. Main Feedwater Isolation Valves CLOSE. Proposed Answer:
C. Main Feedwater Preheater Bypass Valves CLOSE.
B Explanation:
D. Main Feedwater Isolation Valves CLOSE.
A. Incorrect. Plausible because it could be thought that the Condensate Storage Tank Discharge Valves would open on the AFW actuation signal, however, they close
Proposed Answer:                   B Explanation:
. B. Correct. As described in SOP
A. Incorrect. Plausible because it could be thought that the Condensate Storage Tank Discharge Valves would open on the AFW actuation signal, however, they close.
-304B, Auxiliary Feedwater System
B. Correct. As described in SOP-304B, Auxiliary Feedwater System.
. C. Incorrect. Plausible because it could be thought that the FPBVs receive a close signal to ensure AFW flow into SGs, however, the AFW line enters the Feedwater Preheater Bypass Li ne downstream of the FPBVs and a check valve and there is no closure signal to the FPBVs
C. Incorrect. Plausible because it could be thought that the FPBVs receive a close signal to ensure AFW flow into SGs, however, the AFW line enters the Feedwater Preheater Bypass Line downstream of the FPBVs and a check valve and there is no closure signal to the FPBVs.
. D. Incorrect. Plausible because it could be thought that the FIVs receive a close signal to ensure AFW flow into the SGs, however, AFW enters the Preheater Bypass Line and the closure of the FSBVs ensures AFW flow into the SGs.
D. Incorrect. Plausible because it could be thought that the FIVs receive a close signal to ensure AFW flow into the SGs, however, AFW enters the Preheater Bypass Line and the closure of the FSBVs ensures AFW flow into the SGs.
Technical Reference(s)
Technical Reference(s)           SOP-304B, Step 5.2.1.F.1) Note                       Attached w/ Revision # See SOP-304B, Step 4.2                                   Comments / Reference Proposed references to be provided during examination: None Learning Objective: IDENTIFY and ILLUSTRATE the Auxiliary Feedwater System design features which provide for the automatic starts, trips, permissives and interlocks associated with the following:
SOP-304B, Step 5.2.1.F.1) Note Attached w/ Revision # See Comments / Reference SOP-304B, Step 4.2 Proposed references to be provided during examination:
* Auxiliary feedwater flow control valves (OP51.SYS.AF1.OB08)
None Learning Objective:
Page 38 of 53                                              Rev f
IDENTIFY and ILLUSTRATE the Auxiliary Feedwater System design features which provide for the automatic starts, trips, permissives and interlocks associated with the following:
 
Auxiliary feedwater flow control valve s (OP51.SYS.AF1.OB08)
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet            Form ES-401-5 Question Source:          Bank #              CPNPP LXR Modified Bank #                  (Note changes or attach parent)
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge    X Comprehension or Analysis 10 CFR Part 55 Content:    55.41  4, 7 55.43 Page 39 of 53                              Rev f


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 39 of 53 Rev f  Question Source:
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                             Form ES-401-5 Examination Outline Cross-reference:                               Level                     RO             SRO Tier #                       2 Group #                     1 K/A #                         062 G 2.2.12 Importance Rating           3.7 AC Electrical Distribution System: Equipment Control: Knowledge of surveillance procedures Proposed Question:                Common 20 Given the following conditions:
Bank # CPNPP LXR  Modified Bank #
* Unit 1 is in MODE 3.
  (Note changes or attach parent)
* Train A Emergency Diesel Generator 1-01 is declared INOPERABLE following surveillance testing.
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 4, 7  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 40 of 53 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 1   K/A # 062 G 2.2.12 Importance Rating 3.7   AC Electrical Distribution SystemProposed Question:
: Equipment Control: Knowledge of surveillance procedures Common 20   Given the following conditions:
Unit 1 is in MODE 3
. Train A Emergency Diesel Generator 1
-01 is declared INOPERABLE following surveillance testing.
Which of the following actions are required to be taken within one (1) hour of determining the Emergency Diesel Generator is INOPERABLE?
Which of the following actions are required to be taken within one (1) hour of determining the Emergency Diesel Generator is INOPERABLE?
A. Perform OPT
A. Perform OPT-215, Class 1E Electrical Systems Operability, to verify proper breaker alignments.
-215, Class 1E Electrical Systems Operability, to verify proper breaker alignments.
B. Verify operation of the Turbine Driven Auxiliary Feedwater Pump per OPT-206A, AFW System.
B. Verify operation of the Turbine Driven Auxiliary Feedwater Pump per OPT
-206A, AFW System.
C. Initiate surveillance testing of the Train B Emergency Diesel Generator per OPT-214A, Diesel Generator Operability Test.
C. Initiate surveillance testing of the Train B Emergency Diesel Generator per OPT-214A, Diesel Generator Operability Test.
D. Perform OPT
D. Perform OPT-414A, SI/Blackout Sequencers, to verify operability of the Blackout Sequencer.
-414A, SI/Blackout Sequencers, to verify operability of the Blackout Sequencer. Proposed Answer:
Proposed Answer:                   A Explanation:
A Explanation:
A. Correct. This procedure meets the surveillance testing requirements of Technical Specification LCO 3.8.1, AC Sources-Operating.
A. Correct. This procedure meets the surveillance testing requirements of Technical Specification LCO 3.8.1, AC Sources
-Operating.
B. Incorrect. Plausible because the Turbine Driven Auxiliary Feedwater Pump is considered a redundant feature, however, this only applies when 2 required Offsite Power Sources are INOPERABLE.
B. Incorrect. Plausible because the Turbine Driven Auxiliary Feedwater Pump is considered a redundant feature, however, this only applies when 2 required Offsite Power Sources are INOPERABLE.
C. Incorrect. Plausible because surveillance testing would be required if both Emergency Diesel Generators were declared INOPERABLE, however, this action must be performed within 2 hours.
C. Incorrect. Plausible because surveillance testing would be required if both Emergency Diesel Generators were declared INOPERABLE, however, this action must be performed within 2 hours.
D. Incorrect. Plausible because Blackout Sequencer testing is part of this Technical Specification, however, it is the EDG not the Blackout Sequencer that was declared INOPERABLE.
D. Incorrect. Plausible because Blackout Sequencer testing is part of this Technical Specification, however, it is the EDG not the Blackout Sequencer that was declared INOPERABLE.
Technical Reference(s)
Technical Reference(s)           OPT-215, Section 1.0                                  Attached w/ Revision # See Page 40 of 53                                          Rev f
OPT-215, Section
 
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                        Form ES-401-5 Technical Specification LCO 3.8.1            Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given a Technical Specification or a Technical Specification situation, DIAGNOSE the situation and APPLY the LCO and SR Applicability of Section 3.0 to DETERMINE all corrective actions. (LO21.RLS.SL1.OB12)
Question Source:          Bank #
Modified Bank #                          (Note changes or attach parent)
New                          X Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:    55.41  10 55.43 Page 41 of 53                                    Rev f


===1.0 Attached===
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                     Form ES-401-5 Examination Outline Cross-reference:                                 Level                           RO                 SRO Tier #                           2 Group #                           1 K/A #                               062 A4.04 Importance Rating               2.6 AC Electrical Distribution System: Ability to manually operate and/or monitor in the control room: Local operation of breakers Proposed Question:                Common 21 Given the following condition:
w/ Revision # See ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 41 of 53 Rev f  Technical Specification LCO 3.8.1 Comments / Reference Proposed references to be provided during examination:
* Residual Heat Removal Pump (RHR) 1-01 is operating during a plant heat up when the control power fuses blow.
None  Learning Objective:
Given a Technical Specification or a Technical Specification situation, DIAGNOSE the situation and APPLY the LCO and SR Applicability of Section 3.0 to DETERMINE all corrective actions. (LO21.RLS.SL1.OB12)
Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 10  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 42 of 53 Rev f    Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 1   K/A # 062 A4.0 4  Importance Rating 2.6   AC Electrical Distribution SystemProposed Question:
: Ability to manually operate and/or monitor in the control room: Local operation of breakers Common 21   Given the following condition:
Residual Heat Removal Pump (RHR) 1-01 is operating during a plant heat up when the control power fuses blow.
Which of the following describes how the Main Control Board RHR Pump indication and local breaker control is affected by the loss of control power?
Which of the following describes how the Main Control Board RHR Pump indication and local breaker control is affected by the loss of control power?
Main Control Board RHR Pump red / green running indications will be
Main Control Board RHR Pump red / green running indications will be...
... A. lost. Local OPEN / CLOSE light indication is available, and local breaker control will be lost until control power is restored.
A. lost.
B. lost. Local OPEN / CLOSE mechanical indication is available, and local breaker control is possible without the control power.
Local OPEN / CLOSE light indication is available, and local breaker control will be lost until control power is restored.
B. lost.
Local OPEN / CLOSE mechanical indication is available, and local breaker control is possible without the control power.
C. available.
C. available.
Local OPEN / CLOSE light indication is available, and local breaker control is possible without the control power.
Local OPEN / CLOSE light indication is available, and local breaker control is possible without the control power.
D. available.
D. available.
Local OPEN / CLOSE mechanical indication is available, and local breaker control will be lost until control power is restored.
Local OPEN / CLOSE mechanical indication is available, and local breaker control will be lost until control power is restored.
Proposed Answer:
Proposed Answer:                   B Page 42 of 53                                                    Rev f
B ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 43 of 53 Rev f  Explanation:
 
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Explanation:
A. Incorrect. Plausible because Main Control Board red / green running indications will be lost, however, local breaker control is possible without control power.
A. Incorrect. Plausible because Main Control Board red / green running indications will be lost, however, local breaker control is possible without control power.
B. Correct. With a loss of control power, Main Control Board red / green running indications will be lost. Local breaker control is still possible.
B. Correct. With a loss of control power, Main Control Board red / green running indications will be lost. Local breaker control is still possible.
C. Incorrect. Plausible because local breaker control is possible without control power, however, local OPEN / CLOSE light D. Incorrect. Plausible because local OPEN/CLOSE indication is available, however, Main Control Board indications are lost and local control is available.
C. Incorrect. Plausible because local breaker control is possible without control power, however, local OPEN / CLOSE light indication is NOT available.
indication is NOT available.
D. Incorrect. Plausible because local OPEN/CLOSE indication is available, however, Main Control Board indications are lost and local control is available.
Technical Reference(s)
Technical Reference(s)     STA-694, Attachment 8.B                       Attached w/ Revision # See Electrical Print E1-0031, Sheet 49             Comments / Reference Proposed references to be provided during examination: None Learning Objective: EVALUATE the effect a loss of the following systems has on the Residual Heat Removal System and components:
STA-694, Attachment 8.B Attached w/ Revision # See Comments / Reference Electrical Print E1
* DC Power (OP51.SYS.RH1.OB17)
-0031, Sheet 49 Proposed references to be provided during examination:
Question Source:           Bank #                   CPNPP LXR Modified Bank #                             (Note changes or attach parent)
None Learning Objective:
New Question History:           Last NRC Exam           CPNPP 2009 Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:     55.41       7, 10 55.43 Page 43 of 53                                    Rev f
EVALUATE the effect a loss of the following systems has on the Residual Heat Removal System and components:
 
DC Power (OP51.SYS.RH1.OB17
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                                 Level                           RO               SRO Tier #                           2 Group #                         1 K/A #                               063 K4.01 Importance Rating               2.7 DC Electrical Distribution System: Knowledge of the DC electrical system design feature(s) and/or interlock(s) which provide for the following: Manual/automatic transfers of control Proposed Question:                Common 22 Which of the following identifies the types of trips or protective isolation circuits associated with the DC Distribution Panels?
Question Source:
A. Overcurrent only.
Bank # CPNPP LXR   Modified Bank #
B. Ground fault only.
  (Note changes or attach parent)
C. Overcurrent and undervoltage only.
New   Question History:
D. Overvoltage, ground fault, and undervoltage.
Last NRC Exam CPNPP 2009 Question Cognitive Level:
Proposed Answer:                   A Explanation:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 7, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 46 of 53 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 1   K/A # 063 K4.01 Importance Rating 2.7   DC Electrical Distribution SystemProposed Question:
: Knowledge of the DC electrical system design feature(s) and/or interlock(s) which provide for the following: Manual/automatic transfers of control Common 22   Which of the following identifies the types of trips or protective isolation circuits associated with the DC Distribution Panels?
A. Overcurrent only . B. Ground fault only C. Overcurrent and undervoltage  
. only D. Overvoltage, ground fault, and undervoltage.
  . Proposed Answer
: A Explanation:
A. Correct. This is the only trip associated with the DC Distribution Panels.
A. Correct. This is the only trip associated with the DC Distribution Panels.
B. Incorrect. Plausible because ground fault indication does exist, however, it provides BUS TROUBLE indication only in the Control Room.
B. Incorrect. Plausible because ground fault indication does exist, however, it provides BUS TROUBLE indication only in the Control Room.
C. Incorrect. Plausible because an overcurrent trip does exist, however, an undervoltage condition provides BUS TROUBLE indication only in the Control Room.
C. Incorrect. Plausible because an overcurrent trip does exist, however, an undervoltage condition provides BUS TROUBLE indication only in the Control Room.
D. Incorrect. Plausible because all three of these indications exist, however, they only provide BUS TROUBLE indication in the Control Room. Technical Reference(s)
D. Incorrect. Plausible because all three of these indications exist, however, they only provide BUS TROUBLE indication in the Control Room.
OP51.SYS.DC1.LN, Page 32 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)           OP51.SYS.DC1.LN, Page 32                               Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the DC Electrical System design features which provide for the trips, permissives, and interlocks associated with the following:
None Learning Objective:
* Protective Relay actuations (OP51.SYS.DC1.OB12)
LIST and EXPLAIN the DC Electrical System design features which provide for the trips, permissives, and interlocks associated with the following:
Question Source:                 Bank #                     CPNPP LXR Modified Bank #                                   (Note changes or attach parent)
Protective Relay actuations (OP51.SYS.DC1.OB12)
New Question History:                 Last NRC Exam Page 46 of 53                                                Rev f
Question Source:
 
Bank # CPNPP LXR   Modified Bank #
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet   Form ES-401-5 Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 7 55.43 Page 47 of 53                   Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 47 of 53 Rev f Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 48 of 53 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 064 K1.01  Importance Rating


===4.1 Emergency===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                            Level                          RO              SRO Tier #                          2 Group #                          1 K/A #                                064 K1.01 Importance Rating              4.1 Emergency Diesel Generator System: Knowledge of the physical connections and/or cause-effect relationships between the EDG system and the following systems: AC distribution system Proposed Question:              Common 23 Given the following conditions:
Diesel Generator SystemProposed Question:
* Unit 2 is in a normal operating alignment at 100% power.
: Knowledge of the physical connections and/or cause
* An 86-1/2EA1 Lockout Relay actuation occurs on Safeguards Bus 2EA1.
-effect relationships between the EDG system and the following systems: AC distribution system Common 23   Given the following conditions:
* The Electrical Distribution System responds as expected.
Unit 2 is in a normal operating alignment at 100% power.
* NO operator actions have been performed.
An 86-1/2EA1 Lockout Relay actuation occurs on Safeguards Bus 2EA1.
The Electrical Distribution System responds as expected.
NO operator actions have been performed.
Which of the following identifies the status of Safeguards Bus 2EA1 power supplies?
Which of the following identifies the status of Safeguards Bus 2EA1 power supplies?
Diesel Generator 2
Diesel Generator 2-01 is...
-01 is... A. stopped, Breaker 2EG1 is open, and Safeguards Bus 2EA1 is deenergized.
A. stopped, Breaker 2EG1 is open, and Safeguards Bus 2EA1 is deenergized.
B. running, Breaker 2EG1 is closed, and Safeguards Bus 2EA1 is energized.
B. running, Breaker 2EG1 is closed, and Safeguards Bus 2EA1 is energized.
C. running, Breaker 2EA1
C. running, Breaker 2EA1-1 is open, and Safeguards Bus 2EA1 is deenergized.
-1 is open, and Safeguards Bus 2EA1 is deenergized.
D. stopped, Breaker 2EA1-2 is closed, and Safeguards Bus 2EA1 is energized.
D. stopped, Breaker 2EA1
Proposed Answer:               C Explanation:
-2 is closed, and Safeguards Bus 2EA1 is energized.
Proposed Answer:
C Explanation:
A. Incorrect. Plausible because the Breaker would be open and the Bus would be deenergized, however, the Emergency Diesel Generator would be running.
A. Incorrect. Plausible because the Breaker would be open and the Bus would be deenergized, however, the Emergency Diesel Generator would be running.
B. Incorrect. Plausible because this is the correct status for an 86-2 Lockout Relay actuation, however, an 86-1 lockout relay actuation has occurred.
B. Incorrect. Plausible because this is the correct status for an 86-2 Lockout Relay actuation, however, an 86-1 lockout relay actuation has occurred.
C. Correct. Given that an 86
C. Correct. Given that an 86-1 lockout relay actuation has occurred, this is the correct condition of the Emergency Diesel Generator and its associated bus.
-1 lockout relay actuation has occurred, this is the correct condition of the Emergency Diesel Generator and its associated bus.
D. Incorrect. Plausible if thought that alternate supply would close onto bus with 86-1 lockout, 1 second time delay allows for slow transfer to occur to alternate supply without start of Emergency Diesel Generator if no lockout exists.
D. Incorrect. Plausible if thought that alternate supply would close onto bus with 86
Technical Reference(s)         ABN-602, Step 2.3.3 Note                             Attached w/ Revision # See Comments / Reference Page 48 of 53                                              Rev f
-1 lockout, 1 second time delay allows for slow transfer to occur to alternate supply without start of Emergency Diesel Generator if no lockout exists
. Technical Reference(s)
ABN-602, Step 2.3.3 Note Attached w/ Revision # See Comments / Reference


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 49 of 53 Rev f  Proposed references to be provided during examination:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: COMPARE and CONTRAST the 6.9Kv bus 86-1 and 86-2 relay operation to include the effect on the preferred, alternate and emergency power supplies.
None Learning Objective:
(OP51.SYS.AC2.OB11)
COMPARE and CONTRAST the 6.9Kv bus 86
Question Source:         Bank #                   CPNPP LXR Modified Bank #                             (Note changes or attach parent)
-1 and 86-2 relay operation to include the effect on the preferred, alternate and emergency power supplies. (OP51.SYS.AC2.OB11)
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:   55.41   7 55.43 Page 49 of 53                                       Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledg e    Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 50 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 064 A 3.0 5  Importance Rating


===2.8 Emergency===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                Form ES-401-5 Examination Outline Cross-reference:                                  Level                      RO              SRO Tier #                      2 Group #                    1 K/A #                          064 A3.05 Importance Rating          2.8 Emergency Diesel Generator System: Ability to monitor automatic operation of the EDG system including: Operation of the governor control of frequency and voltage control during parallel operation Proposed Question:                Common 24 Given the following conditions:
Diesel Generator SystemProposed Question:
* Emergency Diesel Generator (EDG) 1-01 is being paralleled to Safeguards Bus 1EA1.
: Ability to monitor automatic operation of the EDG system including: Operation of the governor control of frequency and voltage control during parallel operation Common 24   Given the following conditions:
* EDG Breaker 1EG1 is closed with EDG voltage (INCOMING) slightly greater than Safeguards Bus 1EA1 voltage (RUNNING).
Emergency Diesel Generator (EDG) 1
* The Unit Supervisor has directed that zero (0) KVARs OUT be maintained following paralleling the EDG with the Safeguards Bus.
-01 is being paralleled to Safeguards Bus 1EA1.
EDG Breaker 1EG1 is closed with EDG voltage (INCOMING) slightly greater than Safeguards Bus 1EA1 voltage (RUNNING).
The Unit Supervisor has directed that zero (0) KVAR s OUT be maintained following paralleling the EDG with the Safeguards Bus.
Based on the above conditions, which of the following identifies the response of the Emergency Diesel output voltage and what action should be taken?
Based on the above conditions, which of the following identifies the response of the Emergency Diesel output voltage and what action should be taken?
A. 1.) EDG VAR meter will move in the positive (+) VAR (LAG
A. 1.) EDG VAR meter will move in the positive (+) VAR (LAG-OUT) direction.
-OUT) direction.
2.) Place the EDG Voltage Control Switch in the LOWER position to adjust VAR load.
2.) Place the EDG Voltage Control Switch in the LOWER position to adjust VAR load. B. 1.) EDG VAR meter will move in the positive (+) VAR (LAG
B. 1.) EDG VAR meter will move in the positive (+) VAR (LAG-OUT) direction.
-OUT) direction.
2.) Place the EDG Voltage Control Switch in the RAISE position to adjust VAR load.
2.) Place the EDG Voltage Control Switch in the RAISE position to adjust VAR load. C. 1.) EDG VAR meter will move in the negative (-) VAR (LEAD
C. 1.) EDG VAR meter will move in the negative (-) VAR (LEAD-IN) direction.
-IN) direction.
2.) Place the EDG Voltage Control Switch in the RAISE position to adjust VAR load.
2.) Place the EDG Voltage Control Switch in the RAISE position to adjust VAR load. D. 1.) EDG VAR meter will move in the negative (-) VAR (LEAD
D. 1.) EDG VAR meter will move in the negative (-) VAR (LEAD-IN) direction.
-IN) direction.
2.) Place the EDG Voltage Control Switch in the LOWER position to adjust VAR load.
2.) Place the EDG Voltage Control Switch in the LOWER position to adjust VAR load. Proposed Answer:
Proposed Answer:                 A Page 50 of 53                                              Rev f
A ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 51 of 53 Rev f  Explanation:
 
A. Correct. With EDG voltage greater than bus voltage when the breaker is closed, a positive VAR load will be "supplied by" the Emergency Diesel Generator. The Voltage Control Switch is placed in LOWER to decrease generator terminal voltage and zero out the VAR load.
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Explanation:
B. Incorrect. Plausible because the VAR response is correct, however, this action would only serve to increase the VAR load
A. Correct. With EDG voltage greater than bus voltage when the breaker is closed, a positive VAR load will be supplied by the Emergency Diesel Generator. The Voltage Control Switch is placed in LOWER to decrease generator terminal voltage and zero out the VAR load.
. C. Incorrect. Plausible because this would be the correct action if generator voltage were lower than Safeguards Bus voltage when the breaker was closed and it was desired to zero out the VAR load.
B. Incorrect. Plausible because the VAR response is correct, however, this action would only serve to increase the VAR load.
D. Incorrect. Plausible because the action is correct, however, this VAR response would occur if generator voltage were less than Safeguards Bus voltage
C. Incorrect. Plausible because this would be the correct action if generator voltage were lower than Safeguards Bus voltage when the breaker was closed and it was desired to zero out the VAR load.
. Technical Reference(s)
D. Incorrect. Plausible because the action is correct, however, this VAR response would occur if generator voltage were less than Safeguards Bus voltage.
SOP-609A, Step 5.2.X Note Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)     SOP-609A, Step 5.2.X Note                     Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Emergency Diesel Generator System:
None Learning Objective:
* Voltage Regulator Raise/Lower Switch (OP51.SYS.ED1.OB04)
STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Emergency Diesel Generator Syste m: Voltage Regulator Raise/Lower Switch (OP51.SYS.ED1.OB04
STATE the physical connections and EVALUATE the cause-effect relationships between the Emergency Diesel Generator System and the following systems, components or events:
) STATE the physical connections and EVALUATE the cause-effect relationships between the Emergency Diesel Generator System and the following systems, components or events:
* AC Distribution System (OP51.SYS.ED1.OB08)
AC Distribution System (OP51.SYS.ED1.OB08) Question Source:
Question Source:           Bank #
Bank #   Modified Bank #
Modified Bank #         CPNPP LXR           (Note changes or attach parent)
CPNPP LXR (Note changes or attach parent)
New Question History:           Last NRC Exam       CPNPP 2009 Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41 5 55.43 Page 51 of 53                                       Rev f
New   Question History:
Last NRC Exam CPNPP 2009 Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 5 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 52 of 53 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 073 A2.01  Importance Rating


===2.5 Process===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO                SRO Tier #                            2 Group #                          1 K/A #                                073 A2.01 Importance Rating                2.5 Process Radiation Monitoring System: Ability to (a) predict the impacts of the following malfunctions or operations on the PRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Erratic or failed power supply Proposed Question:                Common 25 Given the following condition:
Radiation Monitoring SystemProposed Question:
* The power supply to the RM-80 portion of X-RE-5895A, Control Room North Intake Radiation Monitor, has just failed.
: Ability to (a) predict the impacts of the following malfunctions or operations on the PRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Erratic or failed power supply Common 25   Given the following condition:
Which of the following identifies the affect of this failure and action required to remove the Control Room Emergency Filtration from Emergency Recirculation per SOP-706, Digital Radiation Monitoring System?
The power supply to the RM
A. A high radiation signal is generated.
-80 portion of X
-RE-5895A, Control Room North Intake Radiation Monitor, has just failed.
Which of the following identifies the affect of this failure and action required to remove the Control Room Emergency Filtration from Emergency Recirculation per SOP-706, Digital Radiation Monitoring System
A. A high radiation signal is generated.
Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in BLOCK.
Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in BLOCK.
B. A low radiation signal is generated.
B. A low radiation signal is generated.
Line 856: Line 596:
D. A low radiation signal is generated.
D. A low radiation signal is generated.
Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in ON.
Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in ON.
Proposed Answer:
Proposed Answer:                   A Page 52 of 53                                                  Rev f
A ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 53 of 53 Rev f  Explanation:
 
A. Correct. When the power supply for the Control Room Intake Radiation Monitor is deenergized for any reason, it will fail safe and generate a high radiation signal. The Control Room Emergency Filtration System (CREFS) can not be taken out of Emergency Recirculation until X
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                         Form ES-401-5 Explanation:
-HS-5895A is taken to BLOCK.
A. Correct. When the power supply for the Control Room Intake Radiation Monitor is deenergized for any reason, it will fail safe and generate a high radiation signal. The Control Room Emergency Filtration System (CREFS) can not be taken out of Emergency Recirculation until X-HS-5895A is taken to BLOCK.
B. Incorrect. Plausible because required action is correct, however, a high radiation signal is generated.
B. Incorrect. Plausible because required action is correct, however, a high radiation signal is generated.
C. Incorrect. Plausible because a high radiation signal is generated, however, placing X
C. Incorrect. Plausible because a high radiation signal is generated, however, placing X-HS-5895A in ON does not allow the CREFS to be taken out of Emergency Recirculation.
-HS-5895A in ON does not allow the CREFS to be taken out of Emergency Recirculation.
D. Incorrect. Plausible if it is believed that loss of power generates a loss of signal, however, a high radiation signal is generated and placing X-HS-5895A in ON does not allow the CREFS to be taken out of Emergency Recirculation.
D. Incorrect. Plausible if it is believed that loss of power generates a loss of signal, however, a high radiation signal is generated and placing X
Technical Reference(s)       SOP-706, Sections 5.6 & 5.11                   Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Digital Radiation Monitoring System:
-HS-5895A in ON does not allow the CREFS to be taken out of Emergency Recirculation.
* RM-80 Microprocessor Block Handswitches (OP51.SYS.RM1.OB04)
Technical Reference(s)
Question Source:             Bank #
SOP-706, Sections 5.6 & 5.11 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New                           X Question History:               Last NRC Exam Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:         55.41   11 55.43 Page 53 of 53                                      Rev f
STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Digital Radiation Monitoring System:
RM-80 Microprocessor Block Handswitches (OP51.SYS.RM1.OB04)
Question Source:
Bank #   Modified Bank #
  (Note changes or attach parent)
New X   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 11 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 1 of 51 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 076 K2.08  Importance Rating


===3.1 Service===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                            Form ES-401-5 Examination Outline Cross-reference:                              Level                  RO          SRO Tier #                  2 Group #                  1 K/A #                      076 K2.08 Importance Rating      3.1 Service Water System: Knowledge of bus power supplies to the following: ESF actuated MOVs Proposed Question:             Common 26 Given the following conditions:
Water System: Knowledge of bus power supplies to the following: ESF actuated MOVs Proposed Question:
* A Loss of Station Service Water has occurred on Unit 1.
Common 2 6  Given the following conditions:
* Unit 1 Train A Station Service Water will be supplied from Station Service Water Pump 2-01.
A Loss of Station Service Water has occurred on Unit 1.
* Station Service Water Pump 2-01 Discharge Valve was closed using the Control Room handswitch.
Unit 1 Train A Station Service Water will be supplied from Station Service Water Pump 2-01. Station Service Water Pump 2-01 Discharge Valve was closed using the Control Room handswitch.
Which of the following identifies the condition of the Station Service Water Pump 2-01 Discharge Valve and the appropriate action to be taken per SOP-501A, Station Service Water System?
Which of the following identifies the condition of the Station Service Water Pump 2-01 Discharge Valve and the appropriate action to be taken per SOP-501A, Station Service Water System? Station Service Water Pump 2-01 Discharge Valve is...
Station Service Water Pump 2-01 Discharge Valve is...
A. fully closed. Hold the Control Room Hand Switch in the CLOSE position for an additional 10 seconds to ensure valve closure.
A. fully closed. Hold the Control Room Hand Switch in the CLOSE position for an additional 10 seconds to ensure valve closure.
B. 10% open. Open the breaker on Motor Control Center 2EB3
B. 10% open. Open the breaker on Motor Control Center 2EB3-3 and locally CLOSE the valve the last 10%.
-3 and locally CLOSE the valve the last 10%.
C. fully closed. Hold the Control Room Hand Switch in the CLOSE position for an additional 10 seconds until the breaker trips on thermal overload.
C. fully closed. Hold the Control Room Hand Switch in the CLOSE position for an additional 10 seconds until the breaker trips on thermal overload
D. 10% open. Open the breaker on Motor Control Center 2EB4-3 and locally CLOSE the valve the last 10%.
. D. 10% open. Open the breaker on Motor Control Center 2EB4
Proposed Answer:               B Explanation:
-3 and locally CLOSE the valve the last 10%.
A. Incorrect. Plausible if thought that this condition would fully close the valve.
Proposed Answer:
B. Correct. Per the guidance in the SOP-501A, the valve remains 10% open when closed from the Control Room and must be closed locally once the valve is deenergized. The power supply for this ESF operated valve is MCC 2EB3-3.
B Explanation: A. Incorrect. Plausible if thought that this condition would fully close the valve.
C. Incorrect. Plausible if thought that this was the action necessary to fully close the valve.
B. Correct. Per the guidance in the SOP
D. Incorrect. Plausible because the valve does remain 10% open and the valve must be locally close the last 10%, however, the power supply for this ESF operated valve is MCC 2EB3-3.
-501A, the valve remains 10% open when closed from the Control Room and must be closed locally once the valve is deenergized.
Page 1 of 51                                       Rev f
The power supply for this ESF operated valve is MCC 2EB3
-3. C. Incorrect. Plausible if thought that this was the action necessary to fully close the valve.
D. Incorrect. Plausible because the valve does remain 10% open and the valve must be locally close the last 10%, however, the power supply for this ESF operated valve is MCC 2EB3
-3.
ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 2 of 51 Rev f  Technical Reference(s)
SOP-501A, Step 5.7.1
.D, & Note Attached w/ Revision # See Comments / Reference OP51.SYS.SW1.LN, Page 28 Proposed references to be provided during examination:
None  Learning Objective:
DESCRIBE the function and operating characteristics for the following Station Service Water System components:
SSW Pump Discharge Valve (OP51.SYS.SW1.OB05)
Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 7, 8  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 3 of 51 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 07 8 G 2.1.30  Importance Rating


===4.4 Instrument===
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                    Form ES-401-5 Technical Reference(s)   SOP-501A, Step 5.7.1.D, & Note            Attached w/ Revision # See OP51.SYS.SW1.LN, Page 28                  Comments / Reference Proposed references to be provided during examination: None Learning Objective:   DESCRIBE the function and operating characteristics for the following Station Service Water System components:
Air System: Conduct of Operations: Ability to locate and operate components, including local controls Proposed Question:
* SSW Pump Discharge Valve (OP51.SYS.SW1.OB05)
Common 2 7  Given the following conditions:
Question Source:           Bank #
HV-2452-1 and HV-2452-2, Turbine Driven Auxiliary Feedwater Pump (TDAFW) Steam Supply Valves, failed opened during a Loss of Instrument Air. After two hours, Instrument Air pressure has been restored and TDAFW Pump shutdown is required.
Modified Bank #                       (Note changes or attach parent)
Which of the following identifies where the valves will be operated from per ABN-301, Instrument Air System Malfunction
New                         X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41   7, 8 55.43 Page 2 of 51                                     Rev f
?  HV-2452-1 and HV-2452-2, TDAFW Pump Steam Supply Valves, will be operated...
A. locally in the TDAFW Pump Room. B. remotely from the Control Room
. C. remotely from the TDAFW Pump Room
. D. locally in the Main Steam Header Room. Proposed Answer:
B  Explanation:
A. Incorrect. Plausible because AFW flow to the Steam Generators would be locally controlled from the TDAFW Pump room. B. Correct. Because restoration of TDAFWP is directed per SOP
-304A by ABN
-301. C. Incorrect. Plausible because it could be thought that the local control panel in the TDAFW Pump Room has remote controls that are functional for the Main Steam Supply Valve
: s. D. Incorrect. Plausible if thought that the valves were AOVs or MOVs which could be locally controlled.
Technical Reference(s)
ABN-301, Step 3.3.7.b Attached w/ Revision # See Comments / Reference SOP-304A, Step 5.2.2.A Proposed references to be provided during examination:
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 4 of 51 Rev f Learning Objective:
IDENTIFY and ILLUSTRATE the Auxiliary Feedwater System design features which provide for the automatic starts, trips, permissives and interlocks associated with the following:
Auxiliary feedwater pump turbine steam supply valves (OP51.SYS.AF1.OB08)
Question Source:
Bank # CPNPP L XR  Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 10 CFR Part 55 Content:
55.41 8, 10  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 5 of 51 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 103 K3.02  Importance Rating


===3.8 Containment===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO            SRO Tier #                          2 Group #                        1 K/A #                            078 G 2.1.30 Importance Rating              4.4 Instrument Air System: Conduct of Operations: Ability to locate and operate components, including local controls Proposed Question:              Common 27 Given the following conditions:
System: Knowledge of the effect that a loss or malfunction of the Containment System will have on the following: Loss of containment integrity under normal conditions Proposed Question:
* HV-2452-1 and HV-2452-2, Turbine Driven Auxiliary Feedwater Pump (TDAFW)
Common 2 8  Which of the following would cause entry into the Limiting Condition for Operation for Containment Isolation Valves while in MODE 1?
Steam Supply Valves, failed opened during a Loss of Instrument Air.
A. Damage to the operator for 1
* After two hours, Instrument Air pressure has been restored and TDAFW Pump shutdown is required.
-LCV-459, LTDN ISOL VLV which prohibits closure of the valve.
Which of the following identifies where the valves will be operated from per ABN-301, Instrument Air System Malfunction?
B. A galled stem on 1MS
HV-2452-1 and HV-2452-2, TDAFW Pump Steam Supply Valves, will be operated...
-0357, SG 1
A. locally in the TDAFW Pump Room.
-03 BLDN DNSTRM ISOL VLV which will not allow the valve to be closed.
B. remotely from the Control Room.
C. A large leak from the supply side of 1
C. remotely from the TDAFW Pump Room.
-8875B , ACCUM 2 N2 SPLY/VENT VLV which prohibits closure of the valve.
D. locally in the Main Steam Header Room.
D. Damage to the stem for 1
Proposed Answer:                B Explanation:
-HV-3487 , CNTMT INST AIR ISOL which will not allow the valve to be closed.
A. Incorrect. Plausible because AFW flow to the Steam Generators would be locally controlled from the TDAFW Pump room.
Proposed Answer:
B. Correct. Because restoration of TDAFWP is directed per SOP-304A by ABN-301.
D Explanation:
C. Incorrect. Plausible because it could be thought that the local control panel in the TDAFW Pump Room has remote controls that are functional for the Main Steam Supply Valves.
D. Incorrect. Plausible if thought that the valves were AOVs or MOVs which could be locally controlled.
Technical Reference(s)        ABN-301, Step 3.3.7.b                                    Attached w/ Revision # See SOP-304A, Step 5.2.2.A                                  Comments / Reference Proposed references to be provided during examination: None Page 3 of 51                                              Rev f
 
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                        Form ES-401-5 Learning Objective:  IDENTIFY and ILLUSTRATE the Auxiliary Feedwater System design features which provide for the automatic starts, trips, permissives and interlocks associated with the following:
* Auxiliary feedwater pump turbine steam supply valves (OP51.SYS.AF1.OB08)
Question Source:          Bank #                  CPNPP LXR Modified Bank #                            (Note changes or attach parent)
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge                X Comprehension or Analysis 10 CFR Part 55 Content:    55.41  8, 10 55.43 Page 4 of 51                                        Rev f
 
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                                Level                        RO              SRO Tier #                        2 Group #                        1 K/A #                              103 K3.02 Importance Rating            3.8 Containment System: Knowledge of the effect that a loss or malfunction of the Containment System will have on the following: Loss of containment integrity under normal conditions Proposed Question:                 Common 28 Which of the following would cause entry into the Limiting Condition for Operation for Containment Isolation Valves while in MODE 1?
A. Damage to the operator for 1-LCV-459, LTDN ISOL VLV which prohibits closure of the valve.
B. A galled stem on 1MS-0357, SG 1-03 BLDN DNSTRM ISOL VLV which will not allow the valve to be closed.
C. A large leak from the supply side of 1-8875B, ACCUM 2 N2 SPLY/VENT VLV which prohibits closure of the valve.
D. Damage to the stem for 1-HV-3487, CNTMT INST AIR ISOL which will not allow the valve to be closed.
Proposed Answer:                   D Explanation:
A. Incorrect. Plausible because valve will not close and is part of the Letdown System, however, it is not a Containment Isolation Valve.
A. Incorrect. Plausible because valve will not close and is part of the Letdown System, however, it is not a Containment Isolation Valve.
B. Incorrect. Plausible because valve will not close and is part of the SG Blowdown System, however, it is not a Containment Isolation Valve.
B. Incorrect. Plausible because valve will not close and is part of the SG Blowdown System, however, it is not a Containment Isolation Valve.
C. Incorrect. Plausible because the leak exists on an Accumulator Nitrogen Supply Valve, however, it is not a Containment Isolation Valve.
C. Incorrect. Plausible because the leak exists on an Accumulator Nitrogen Supply Valve, however, it is not a Containment Isolation Valve.
D. Correct. This is a Containment Isolation Valve that closes on a Phase A signal.
D. Correct. This is a Containment Isolation Valve that closes on a Phase A signal.
Technical Reference(s)
Technical Reference(s)           Technical Specification LCO 3.6.3                     Attached w/ Revision # See OP51.SYS.IA1.LN, Page 27                             Comments / Reference Proposed references to be provided during examination: None Page 5 of 51                                              Rev f
Technical Specification LCO 3.6.3 Attached w/ Revision # See Comments / Reference OP51.SYS.IA1.LN, Page 27 Proposed references to be provided during examination:
 
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 6 of 51 Rev f  Learning Objective:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Learning Objective:   COMPARE and CONTRAST Phase A and Phase B isolation signals including types of valves utilized to perform each function and expected system and operator response following an actuation signal which provides incomplete isolation (OP51.SYS.CY1.OB20)
COMPARE and CONTRAST Phase A and Phase B isolation signals including types of valves utilized to perform each function and expected system and operator response following an actuation signal which provides incomplete isolation (OP51.SYS.CY1.OB20)
LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems:
LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems:
Containment Isolation Valves 3.6.3 (OP51.SYS.CY1.OB32)
* Containment Isolation Valves 3.6.3 (OP51.SYS.CY1.OB32)
Question Source:
Question Source:           Bank #                   CPNPP LXR Modified Bank #                           (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge               X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   9, 10 55.43 Page 6 of 51                                     Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 9, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 7 of 51 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 071 K5.04  Importance Rating


===2.5 Waste===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                              Level                          RO                SRO Tier #                            2 Group #                          2 K/A #                                071 K5.04 Importance Rating              2.5 Waste Gas Disposal System: Knowledge of the operational implications of the following concepts as they apply to the Waste Gas Disposal System: Relationship of hydrogen/oxygen concentration to flammability Proposed Question:             Common 29 In accordance with RWS-201, Waste Gas Processing System, which of the following combinations of Oxygen and Hydrogen concentration (by volume) in the Waste Gas Holdup System would require immediate action to suspend all Waste Gas additions to the system?
Gas Disposal System: Knowledge of the operational implications of the following concepts as they apply to the Waste Gas Disposal System: Relationship of hydrogen/oxygen concentration to flammability Proposed Question:
O2%           H2%
Common 2 9  In accordance with RWS
A.           2.7         3.2 B.           3.3         3.6 C.           3.5         3.8 D.           4.1         4.2 Proposed Answer:               D Explanation:
-201, Waste Gas Processing System, which of the following combinations of Oxygen and Hydrogen concentration (by volume) in the Waste Gas Holdup System would require immediate action to suspend all Waste Gas additions to the system
A. Incorrect. Plausible because H2 exceeds 3%, however, O2 does not exceed 3%.
?  O 2% H 2% A. 2.7 3.2   B. 3.3 3.6   C. 3.5 3.8   D. 4.1 4.2     Proposed Answer:
B. Incorrect. Plausible because O2 exceeds 3%, however, H2 does not exceed 4%.
D Explanation:
C. Incorrect. Plausible because O2 exceeds 3%, however, H2 does not exceed 4%.
A. Incorrect. Plausible because H 2 exceeds 3%, however, O 2 does not exceed 3%. B. Incorrect. Plausible because O 2 exceeds 3%, however, H 2 does not exceed 4%.
D. Correct. When O2 is equal to or greater than 3%, H2 cannot be greater than 4%.
C. Incorrect. Plausible because O 2 exceeds 3%, however, H 2 does not exceed 4%.
Technical Reference(s)         RWS-201, Section 4.1                                   Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:       DESCRIBE the basis for the precautions, limitations for following procedures associated with the Gaseous Waste Processing System:
D. Correct. When O 2 is equal to or greater than 3%, H 2 cannot be greater than 4%. Technical Reference(s)
* RWS-201, Gaseous Waste Processing System (OP51.SYS.GH1.OB07)
RWS-201, Section 4.1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
ANALYZE the risk significance of any major component being out of service.
None Learning Objective:
(OP51.SYS.GH1.OB11)
DESCRIBE the basis for the precautions, limitations for following procedures associated with the Gaseous Waste Processing System: RWS-201, Gaseous Waste Processing System (OP51.SYS.GH1.OB07)
Page 7 of 51                                                    Rev f
ANALYZE the risk significance of any major component being out of service. (OP51.SYS.GH1.OB1
 
: 1)
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet           Form ES-401-5 Question Source:         Bank #               CPNPP LXR Modified Bank #                 (Note changes or attach parent)
ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 8 of 51 Rev f  Question Source:
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   10, 12 55.43 Page 8 of 51                              Rev f
Bank # CPNPP LXR   Modified Bank #
 
  (Note changes or attach parent)
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                 Form ES-401-5 Examination Outline Cross-reference:                             Level                           RO               SRO Tier #                           2 Group #                           2 K/A #                               016 K1.02 Importance Rating               3.4 Non-Nuclear Instrumentation System: Knowledge of the physical connections and/or cause-effect relationships between the NNIS and the following systems: PZR LCS Proposed Question:               Common 30 Given the following conditions:
New   Question History:
* A Reactor Startup is in progress.
Last NRC Exam Question Cognitive Level:
* As Reactor power enters the Power Range, Pressurizer Level and Level Setpoint begin to rise with no apparent change in Charging or Letdown flow.
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10, 12 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 9 of 51 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 2   K/A # 016 K1.02 Importance Rating 3.4   Non-Nuclear Instrumentation System: Knowledge of the physical connections and/or cause
-effect relationships between the NNIS and the following systems: PZR LCS Proposed Question:
Common 3 0  Given the following conditions:
A Reactor Startup is in progress
. As Reactor power enters the Power Range, Pressurizer Level and Level Setpoint begin to rise with no apparent change in Charging or Letdown flow.
Which of the following would cause this change to occur?
Which of the following would cause this change to occur?
A. Input to the Pressurizer Level Control System from the Power Range Nuclear Instruments.
A. Input to the Pressurizer Level Control System from the Power Range Nuclear Instruments.
B. Main Steam header pressure lowering when the Point of Adding Heat is reached. C. Increased Reactor Coolant System TAVE when the Point of Adding Heat is reached.
B. Main Steam header pressure lowering when the Point of Adding Heat is reached.
D. Pressurizer Heaters energizing when Steam Dumps throttle further open. Proposed Answer:
C. Increased Reactor Coolant System TAVE when the Point of Adding Heat is reached.
C Explanation:
D. Pressurizer Heaters energizing when Steam Dumps throttle further open.
Proposed Answer:                 C Explanation:
A. Incorrect. Plausible if thought that Level Setpoint originated from a nuclear instrument as opposed to a temperature instrument.
A. Incorrect. Plausible if thought that Level Setpoint originated from a nuclear instrument as opposed to a temperature instrument.
B. Incorrect. Plausible because steam pressure does change, however, it rises not lowers
B. Incorrect. Plausible because steam pressure does change, however, it rises not lowers.
. C. Correct. When the Point of Adding Heat is reached, the RCS heats up and cause s an expansion of liquid into the Pressurizer. Because the Level Setpoint is derived from temperature, it will also rise.
C. Correct. When the Point of Adding Heat is reached, the RCS heats up and causes an expansion of liquid into the Pressurizer. Because the Level Setpoint is derived from temperature, it will also rise.
D. Incorrect. Plausible because Steam Dumps do open but not to the point were RCS pressure lowers far enough to cause PRZR Heaters to energize.
D. Incorrect. Plausible because Steam Dumps do open but not to the point were RCS pressure lowers far enough to cause PRZR Heaters to energize.
Technical Reference(s)
Technical Reference(s)         OP51.SYS.PP1.LN, Pages 22 & 24                       Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:         DESCRIBE how the Pressurizer Pressure and Level Control System Main Control Board/Plant Computer controls, alarms and indications are used to predict, monitor and control changes in the system. (OP51.SYS.PP1.OB16)
OP51.SYS.PP1.LN, Pages 22 & 24 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Page 9 of 51                                                Rev f
None Learning Objective:
DESCRIBE how the Pressurizer Pressure and Level Control System Main Control Board/Plant Computer controls, alarms and indications are used to predict, monitor and control changes in the system. (OP51.SYS.PP1.OB16)


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 10 of 51 Rev f Question Source:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet           Form ES-401-5 Question Source:         Bank #               CPNPP LXR Modified Bank #                 (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis           X 10 CFR Part 55 Content:   55.41   5, 7 55.43 Page 10 of 51                             Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 5, 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 11 of 51 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 035 G 2.1.7  Importance Rating


===4.4 Steam===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                                  Level                    RO              SRO Tier #                    2 Group #                    2 K/A #                        035 G 2.1.7 Importance Rating        4.4 Steam Generator System: Conduct of Operations: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation Proposed Question:               Common 31 Given the following conditions:
Generator System: Conduct of Operations: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation Proposed Question:
* Unit 1 is at 28% power with all systems in normal alignment.
Common 3 1  Given the following conditions:   Unit 1 is at 28% power with all systems in normal alignment
* The Main Generator is synchronized to the grid.
. The Main Generator is synchronized to the grid.
* Main Steam Isolation Valve 1-01 closed on a spurious signal.
Main Steam Isolation Valve 1
Which of the following describes the response of Loop T, Steam Generator (SG) steam pressure in Loop 1 and the expected operator action?
-01 closed on a spurious signal.
Loop T A. rises and SG steam pressure rises; Turbine trip is required.
Which of the following describes the response of Loop T , Steam Generator (S G) steam pressure in Loop 1 and the expected operator action
Loop TA. rises and SG steam pressure rises; Turbine trip is required.
B. lowers and SG steam pressure rises; Reactor trip is required.
B. lowers and SG steam pressure rises; Reactor trip is required.
C. rises and SG steam pressure lowers; Turbine trip is required.
C. rises and SG steam pressure lowers; Turbine trip is required.
D. lowers and SG steam pressure lowers; Reactor trip is required.
D. lowers and SG steam pressure lowers; Reactor trip is required.
Proposed Answer:
Proposed Answer:                 B Explanation:
B Explanation:
A. Incorrect. Plausible because SG steam pressure rises, however, Loop T will lower.
A. Incorrect. Plausible because SG steam pressure rises, however, Loop T will lower
B. Correct. In the affected loop, RCS T lowers to zero and SG steam pressure rises because heat removal is minimal. 1-ALB-7A, Window 1-12 requires a Reactor trip if an MSIV closes and power is
. B. Correct. to zero and SG steam pressure rises because heat removal is minimal.
    >5%.
1-ALB-7A, Window 1
C. Incorrect. Plausible because SG steam pressure could lower if the affected loop RCP had stopped, however, Loop T will lower.
-12 requires a Reactor trip if an MSIV closes and power is >5%. C. Incorrect. Plausible because SG steam pressure could lower if the affected loop RCP had stopped, however, Loop T will lower.
D. Incorrect. Plausible because Loop T will lower and a Reactor trip is required, however, SG steam pressure will rise.
D. Incorrect. Plausible because Loop T will lower and a Reactor trip is required, however, SG steam pressure will rise.
Technical Reference(s)
Technical Reference(s)           LO21.MCO.TA9.LN, Page 11                             Attached w/ Revision # See ALM-0071A, 1-ALB-7A, Window 1-12                     Comments / Reference Proposed references to be provided during examination: None Page 11 of 51                                            Rev f
LO21.MCO.TA9.LN, Page 11 Attached w/ Revision # See Comments / Reference ALM-0071A, 1-ALB-7A, Window 1-12 Proposed references to be provided during examination:
 
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 12 of 51 Rev f  Learning Objective:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Learning Objective:   DISCUSS a design loss of load accident and STATE the major concern following a Loss of Load accident and DESCRIBE the conclusions with respect to DNB and system integrity (LO21.MC0.TA9.OB01)
DISCUSS a design loss of load accident and STATE the major concern following a Loss of Load accident and DESCRIBE the conclusions with respect to DNB and system integrity (LO21.MC0.TA9.OB01)
Question Source:           Bank #                 CPNPP LXR Modified Bank #                       (Note changes or attach parent)
Question Source:
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:     55.41   3, 4, 5 55.43 Page 12 of 51                                   Rev f
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 3, 4, 5 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 13 of 51 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 033 K3.0 1  Importance Rating


===2.6 Spent===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                          2 Group #                          2 K/A #                              033 K3.01 Importance Rating              2.6 Spent Fuel Pool Cooling System: Knowledge of the effect that a loss or malfunction of the Spent Fuel Pool Cooling System will have on the following: Area ventilation systems Proposed Question:                 Common 32 Given the following conditions:
Fuel Pool Cooling System: Knowledge of the effect that a loss or malfunction of the Spent Fuel Pool Cooling System will have on the following: Area ventilation systems Proposed Question:
* A loss of Spent Fuel Cooling in Spent Fuel Pool #2 is in progress.
Common 3 2  Given the following conditions:
* The following PC-11, Digital Radiation Monitoring System monitors are in alarm:
A loss of Spent Fuel Cooling in Spent Fuel Pool #2 is in progress.
* SFP-002 LRAM SFP 2 N. WALL (X-RE-6273).
The following PC
* SFP-001 LRAM SFP 2 E. WALL (X-RE-6272).
-11, Digital Radiation Monitoring System monitors are in alarm:
* ABN-908, Fuel Handling Accident, has been entered and all automatic and operator actions have been completed.
SFP-002 LRAM SFP 2 N. WALL (X
-RE-6273). SFP-001 LRAM SFP 2 E. WALL (X
-RE-6272). ABN-908, Fuel Handling Accident
, has been entered and all automatic and operator actions have been completed.
Which of the following identifies the ventilation alignment in the Fuel Building?
Which of the following identifies the ventilation alignment in the Fuel Building?
A. All Spent Fuel Pool ventilation is automatically stopped.
A. All Spent Fuel Pool ventilation is automatically stopped.
B. All Spent Fuel Pool ventilation is manually stopped
B. All Spent Fuel Pool ventilation is manually stopped.
. C. One supply fan in Spent Fuel Pool X-02 is runnin g. D. One exhaust fan in Spent Fuel Pool X-02 is running.
C. One supply fan in Spent Fuel Pool X-02 is running.
Proposed Answer:
D. One exhaust fan in Spent Fuel Pool X-02 is running.
D Explanation:
Proposed Answer:                   D Explanation:
A. Incorrect. Plausible if thought that the Area Radiation Monitors automatically isolated ventilation.
A. Incorrect. Plausible if thought that the Area Radiation Monitors automatically isolated ventilation.
B. Incorrect. Plausible if thought that all ventilation is left running to clean the air, however, only one exhaust fan is kept running to maintain a negative pressure in the Fuel Building.
B. Incorrect. Plausible if thought that all ventilation is left running to clean the air, however, only one exhaust fan is kept running to maintain a negative pressure in the Fuel Building.
C. Incorrect. Plausible if thought that this would maintain the correct pressure within the Fuel Building, however, it would tend to pressurize the Fuel Building and release radiation.
C. Incorrect. Plausible if thought that this would maintain the correct pressure within the Fuel Building, however, it would tend to pressurize the Fuel Building and release radiation.
D. Correct. Leaving one exhaust fan running in the Spent Fuel Pool area is required per ABN
D. Correct. Leaving one exhaust fan running in the Spent Fuel Pool area is required per ABN-908.
-908. Technical Reference(s)
Technical Reference(s)           ABN-908, Step 3.3.3                                   Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 13 of 51                                                  Rev f
ABN-908, Step 3.3.3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
 
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 14 of 51 Rev f  Learning Objective:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Learning Objective:   STATE the physical connections and EVALUATE the cause-effect relationship between the Digital Radiation Monitoring System and the following systems, components or events:
STATE the physical connections and EVALUATE the cause-effect relationship between the Digital Radiation Monitoring System and the following systems, components or events:
* Plant Ventilation (OP51.SYS.RM1.OB10)
Plant Ventilation (OP51.SYS.RM1.OB10)
EVALUATE the effect a loss of the Spent Fuel Pool Cooling and Cleanup System has on the following:
EVALUATE the effect a loss of the Spent Fuel Pool Cooling and Cleanup System has on the following
* Area and ventilation radiation monitoring systems (OP51.SYS.SF1.OB17)
Area and ventilation radiation monitoring systems (OP51.SYS.SF1.OB17
Question Source:           Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Question Source:
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41   10, 12 55.43 Page 14 of 51                                   Rev f
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 10, 12 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 15 of 51 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 011 A1.0 2  Importance Rating


===3.3 Pressurizer===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO              SRO Tier #                          2 Group #                        2 K/A #                              011 A1.02 Importance Rating              3.3 Pressurizer Level Control System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR LCS controls including: Charging and letdown flows Proposed Question:                 Common 33 Given the following conditions:
Level Control System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR LCS controls including: Charging and letdown flows Proposed Question:
* Unit 1 is at 48% power.
Common 3 3  Given the following conditions
* Pressurizer Level Control System is in AUTO.
Unit 1 is at 48% power.
* 1-8106, Charging Pump to RCS Isolation Valve, fails closed due to a control switch circuit malfunction and cannot be reopened.
Pressurizer Level Control System is in AUTO.
* Letdown has been isolated.
1-8106, Charging Pump to RCS Isolation Valve, fails closed due to a control switch circuit malfunction and cannot be reopened.
Letdown has been isolated.
Which of the following describes the response of Pressurizer level to this event?
Which of the following describes the response of Pressurizer level to this event?
Pressurizer level will-.
Pressurizer level will.
A. stabilize when letdown is isolated.
A.       stabilize when letdown is isolated.
B. lower at a rate equal to seal leakoff flow.
B.       lower at a rate equal to seal leakoff flow.
C. rise at a rate equal to seal injection flow.
C.       rise at a rate equal to seal injection flow.
D. rise at a rate equal to seal injection minus seal leakoff flow.
D.       rise at a rate equal to seal injection minus seal leakoff flow.
Proposed Answer:
Proposed Answer:                   D Explanation:
D Explanation:
A. Incorrect. Plausible because seal injection is upstream of the isolation valves and seal leakoff is not isolated on this event, so the Pressurizer is NOT bottled up.
A. Incorrect. Plausible because seal injection is upstream of the isolation valves and seal leakoff is not isolated on this event, so the Pressurizer is NOT bottled up
B. Incorrect. Plausible because seal leakoff is not isolated, however, neither is seal injection.
. B. Incorrect. Plausible because seal leakoff is not isolated, however, neither is seal injection.
C. Incorrect. Plausible because seal injection flow is available with this failure, however, leak off flow must be included.
C. Incorrect. Plausible becaus e seal injection flow is available with this failure, however, leak off flow must be included
D. Correct. Seal Injection will provide makeup. Seal leakoff will be the only source of letdown for this event prior to any other actions.
. D. Correct. Seal Injection will provide makeup. Seal leakoff will be the only source of letdown for this event prior to any other actions.
Technical Reference(s)             OP51.SYS.CS1.LN, Pages 58 & 88                       Attached w/ Revision # See Comments / Reference Page 15 of 51                                                Rev f
Technical Reference(s)
 
OP51.SYS.CS1.LN, Pages 58 & 88 Attached w/ Revision # See Comments / Reference
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                      Form ES-401-5 Proposed references to be provided during examination: None Learning Objective:  STATE the physical connections and EVALUATE the cause-effect relationships between the CVCS and the following systems, components or events:
* Interface between charging flow path and seal return flowpath (OP51.SYS.CS1.OB10)
Question Source:            Bank #                CPNPP LXR Modified Bank #                        (Note changes or attach parent)
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:    55.41  7 55.43 Page 16 of 51                                    Rev f


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 16 of 51 Rev f  Proposed references to be provided during examination:
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                     Form ES-401-5 Examination Outline Cross-reference:                               Level                           RO           SRO Tier #                           2 Group #                           2 K/A #                                 017 K6.01 Importance Rating               2.7 In-Core Temperature Monitor System: Knowledge of the effect of a loss or malfunction of the following ITM system components: Sensors and detectors Proposed Question:             Common 34 Given the following conditions:
None  Learning Objective:
* Several Core Exit Thermocouples (CETs) have failed.
STATE the physical connections and EVALUATE the cause-effect relationships between the CVCS and the following systems, components or events:  Interface between charging flow path and seal return flowpath (OP51.SYS.CS1.OB10
* All failed CETs have been removed from active input to the Plant Computer.
)  Question Source:
Which of the following combinations of CETs meets the minimum requirements per OPT-112A-1, Accident Monitoring Instrumentation Check?
Bank # CPNPP LXR  Modified Bank #
A. Two (2) Train A and two (2) Train B CETs per core quadrant.
  (Note changes or attach parent)
New    Question History:
Last NRC Exam  Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 7  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 17 of 51 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 2   K/A # 017 K6.0 1  Importance Rating 2.7   In-Core Temperature Monitor System: Knowledge of the effect of a loss or malfunction of the following ITM system components: Sensors and detectors Proposed Question:
Common 3 4  Given the following conditions:
Several Core Exit Thermocouples (CETs) have failed.
All failed CETs have been removed from active input to the Plant Computer.
Which of the following combinations of CETs meets the minimum requirements per OPT-112A-1, Accident Monitoring Instrumentation Check
?    A. Two (2) Train A and two (2) Train B CETs per core quadrant.
B. Two (2) Train A or two (2) Train B CETs per core quadrant.
B. Two (2) Train A or two (2) Train B CETs per core quadrant.
C. Four (4) Train A and four (4) Train B CETs per core quadrant.
C. Four (4) Train A and four (4) Train B CETs per core quadrant.
D. Four (4) Train A or four (4) Train B CETs per core quadrant.
D. Four (4) Train A or four (4) Train B CETs per core quadrant.
Proposed Answer: A Explanation:
Proposed Answer:               A Explanation:
A. Correct. OPT-112A-1 surveillance requires 2 CHANNELS with 2 CETs per quadrant
A. Correct. OPT-112A-1 surveillance requires 2 CHANNELS with 2 CETs per quadrant.
. B. Incorrect. Plausible because the CHANNEL S required is correct, however, both Trains must be in service. C. Incorrect. Plausible because both Trains must be in service , however, only 2 CETs each per quadrant a re required
B. Incorrect. Plausible because the CHANNELS required is correct, however, both Trains must be in service.
. D. Incorrect. Plausible if thought that this was the required number of CHANNELS on either Train
C. Incorrect. Plausible because both Trains must be in service, however, only 2 CETs each per quadrant are required.
. Technical Reference(s)
D. Incorrect. Plausible if thought that this was the required number of CHANNELS on either Train.
OPT-112A-1, Page 6 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)       OPT-112A-1, Page 6                                       Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:       STATE the performance and design attributes of the following Core Cooling Monitor System/RVLIS components, flowpaths and features:
None Learning Objective:
* Core Exit Thermocouples (OP51.SYS.RC3.OB02)
STATE the performance and design attributes of the following Core Cooling Monitor System/RVLIS components, flowpaths and features
Page 17 of 51                                                 Rev f
Core Exit Thermocouples (OP51.SYS.RC3.OB0
: 2)
ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 18 of 51 Rev f Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 2, 10  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 19 of 51 Rev f  Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 002 K6.02  Importance Rating


===3.6 Reactor===
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet            Form ES-401-5 Question Source:          Bank #
Coolant System: Knowledge of the effect that a loss or malfunction of the following will have on the RCS: RCP Proposed Question:
Modified Bank #                  (Note changes or attach parent)
Common 3 5  Given the following conditions:
New                        X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis            X 10 CFR Part 55 Content:   55.41  2, 10 55.43 Page 18 of 51                              Rev f
A Small Break Loss of Coolant Accident has occurred on Unit 1. Reactor Coolant System pressure is 1000 PSIG and steady.
Reactor Coolant System TCOLD is 540ºF and lowering.
Containment pressure is 12 PSIG. Steam Generator pressures are 1000 PSIG. Which of the following is the reason for stopping the Reactor Coolant Pumps for these plant conditions?


ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                        Form ES-401-5 Examination Outline Cross-reference:                                Level                            RO            SRO Tier #                            2 Group #                            2 K/A #                                  002 K6.02 Importance Rating                3.6 Reactor Coolant System: Knowledge of the effect that a loss or malfunction of the following will have on the RCS: RCP Proposed Question:            Common 35 Given the following conditions:
* A Small Break Loss of Coolant Accident has occurred on Unit 1.
* Reactor Coolant System pressure is 1000 PSIG and steady.
* Reactor Coolant System TCOLD is 540ºF and lowering.
* Containment pressure is 12 PSIG.
* Steam Generator pressures are 1000 PSIG.
Which of the following is the reason for stopping the Reactor Coolant Pumps for these plant conditions?
To prevent...
To prevent...
A. core damage resulting from pump operation under forced two
A. core damage resulting from pump operation under forced two-phase flow conditions.
-phase flow conditions.
B. core damage resulting from phase separation upon subsequent loss of forced flow.
B. core damage resulting from phase separation upon subsequent loss of forced flow. C. pump damage resulting from a loss of Component Cooling Water to the motor.
C. pump damage resulting from a loss of Component Cooling Water to the motor.
D. pump damage resulting from the adverse Containment environment.
D. pump damage resulting from the adverse Containment environment.
Proposed Answer:
Proposed Answer:               B Explanation:
B Explanation:
A. Incorrect. Plausible because two-phase flow conditions will occur, however, it is the separation of phases when the Reactor Coolant Pumps are secured that is the concern.
A. Incorrect. Plausible because two
-phase flow conditions will occur, however, it is the separation of phases when the Reactor Coolant Pumps are secured that is the concern.
B. Correct. Given the conditions listed, this is the reason the Reactor Coolant Pumps are stopped.
B. Correct. Given the conditions listed, this is the reason the Reactor Coolant Pumps are stopped.
C. Incorrect. Plausible if thought that CCW would be lost for the conditions listed.
C. Incorrect. Plausible if thought that CCW would be lost for the conditions listed.
D. Incorrect. Plausible because an adverse Containment does exist, however, the concern is separation of phases upon subsequent loss of flow.
D. Incorrect. Plausible because an adverse Containment does exist, however, the concern is separation of phases upon subsequent loss of flow.
Technical Reference(s)
Technical Reference(s)       EOP-1.0A, Attachment 4 Bases                               Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 19 of 51                                                  Rev f
EOP-1.0A, Attachment 4 Bases Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
 
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 20 of 51 Rev f Learning Objective:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Learning Objective:   DISCUSS the bases for all steps, Cautions and Notes included in EOP-1.0.
DISCUSS the bases for all steps, Cautions and Notes included in EOP
(LO21.ERG.E1A.OB105)
-1.0. (LO21.ERG.E1A.OB105)
Question Source:         Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Question Source:
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41   10 55.43 Page 20 of 51                                    Rev f
Bank # CPNPP LXR   Modified Bank #
 
  (Note changes or attach parent)
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                               Level                           RO               SRO Tier #                           2 Group #                           2 K/A #                                 086 K4.02 Importance Rating               3.0 Fire Protection System: Knowledge of Fire Protection System design feature(s) and/or interlock(s) which provide for the following: Maintenance of fire header pressure Proposed Question:                 Common 36 Given the following conditions:
New   Question History:
* A fire has been reported in the Auxiliary Building.
Last NRC Exam Question Cognitive Level:
* The Fire Brigade is using Hose Stations to fight the fire.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
Which of the following describes the response of the Fire Pumps to decreasing fire header pressure?
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 21 of 51 Rev f    Examination Outline Cross
A. Both Diesel Fire Pumps start 3 seconds after pressure drops below 142 PSIG, then the Electric Fire Pump starts 10 seconds after pressure drops below 140 PSIG.
-reference:
B. The Electric Fire Pump starts 3 seconds after pressure drops below 142 PSIG, then one Diesel Fire Pump starts 10 seconds after pressure drops below 140 PSIG.
Level RO SRO Tier # 2   Group # 2   K/A # 086 K4.02 Importance Rating 3.0   Fire Protection System: Knowledge of Fire Protection System design feature(s) and/or interlock(s) which provide for the following: Maintenance of fire header pressure Proposed Question:
C. Both Diesel Fire Pumps start after pressure drops below 148 PSIG, then the Electric Fire Pump starts immediately at 142 PSIG.
Common 3 6  Given the following conditions:
D. The Electric Fire Pump starts after pressure drops below 148 PSIG, then one Diesel Fire Pump starts immediately at 142 PSIG.
A fire has been reported in the Auxiliary Building.
Proposed Answer:                   B Explanation:
The Fire Brigade is using Hose Stations to fight the fire.
A. Incorrect. Plausible because both Diesel Fire Pumps will start, however, not consistent with the times listed.
Which of the following describes the response of the Fire Pumps to decreasing fire header pressure? A. Both Diesel Fire Pumps start 3 seconds after pressure drops below 142 PSIG, then the Electric Fire Pump start s 10 seconds after pressure drops below 140 PSIG. B. The Electric Fire Pump starts 3 seconds after pressure drops below 142 PSIG, then one Diesel Fire Pump start s 10 seconds after pressure drops below 140 PSIG.
B. Correct. Per the guidance provided in SOP-904, this is the response of the Electric and Diesel Fire Pumps.
C. Both Diesel Fire Pump s start after pressure drops below 148 PSIG, then the Electric Fire Pump starts immediately at 142 PSIG. D. The Electric Fire Pump starts after pressure drops below 148 PSIG, then one Diesel Fire Pump starts immediately at 142 PSIG.
C. Incorrect. Plausible because both the Electric and Diesel Fire Pumps will start, however, not for the setpoints and sequence listed.
Proposed Answer:
D. Incorrect. Plausible if thought that the Electric Fire Pump will start without delay after pressure drops below setpoint, however, the setpoint is incorrect and the Diesel Fire Pumps do not start until 140 PSIG.
B Explanation:
Technical Reference(s)           SOP-904, Section 4.2                                   Attached w/ Revision # See Page 21 of 51                                                   Rev f
A. Incorrect. Plausible because both Diesel Fire Pumps will start, however, not consistent with the times liste
: d. B. Correct. Per the guidance provided in SOP
-904, this is the response of the Electric and Diesel Fire Pumps. C. Incorrect. Plausible because both the Electric and Diesel Fire Pumps will start, however, not for the setpoints and sequence listed. D. Incorrect. Plausible if thought that the Electric Fire Pump will start without delay after pressure drops below setpoint, however, the setpoint is incorrect and the Diesel Fire Pumps do not start until 140 PSIG. Technical Reference(s)
SOP-904, Section 4.2 Attached w/
Revision # See ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 22 of 51 Rev f  Comments / Reference Proposed references to be provided during examination:
None  Learning Objective:
STATE the functions, operation and interlocks of the following Fire Suppression components:
Electric Fire Pump & Diesel Fire Pumps (OP51.SYS.FP1.OB05
)  Question Source:
Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 8  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 23 of 51 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 041 A3.02 Importance Rating


===3.3 Steam===
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Comments / Reference Proposed references to be provided during examination: None Learning Objective:   STATE the functions, operation and interlocks of the following Fire Suppression components:
Dump/Turbine Bypass Control System: Ability to monitor automatic operation of the SDS, including: RCS pressure, RCS temperature, and reactor power Proposed Question:
* Electric Fire Pump & Diesel Fire Pumps (OP51.SYS.FP1.OB05)
Common 3 7  Given the following conditions:
Question Source:           Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Unit 2 is operating at 60% power during ascension to 100% power.
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge             X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   8 55.43 Page 22 of 51                                   Rev f
The following parameters are observed:
T AVE = 5 75ºF. Pressurizer Level = 4 4%. Reactor Coolant System Pressure = 22 35 PSIG. 2-PT-505, Turbine Impulse Pressure =
55%. Main Generator load = 700 MWe.
Subsequently, PT
-505 fails to 0% which equates to a TREF of 5 57ºF. Given the above conditions, which of the following identifies the status of the Steam Dump Valves and the indication on 2
-UI-500 , STM DMP DEMAND?
A. All valves CLOSED; 2
-UI-500 indicates 100% demand.
B. All valves CLOSED; 2
-UI-500 indicates 0% demand. C. Group 1 valves full OPEN; 2
-UI-500 indicates 50% demand. D. Groups 1 and 2 valves full OPEN; 2
-UI-500 indicates 100% demand.
Proposed Answer:
A  Explanation:
A. Correct. The Steam Dump Valves remain closed because the arming signal comes from PT
-506. B. Incorrect. Plausible if thought that the reference signal (TREF) lowering armed the dumps; however, PT-506 is the arming signal for C
-7. C. Incorrect. Plausible if thought that both groups only open on a plant trip vice a load rejection , however, no valves open as there is no arming signal
. D. Incorrect. Plausible if thought that the Steam Dumps are armed , the valves would be 100% open.
Technical Reference(s)
ABN-709, Section 4.2 Attached w/ Revision # See ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 24 of 51 Rev f  LO21.SYS.SD1.LN, Page 16 Comments / Reference Proposed references to be provided during examination:
None Learning Objective:
EVALUATE the affect a loss of the following systems has on the Steam Dump system: Tref (Turbine Impulse Pressure) OP51.SYS.SD1.OB15
Question Source:
Bank #   Modified Bank  
# CPNPP LXR (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7, 8 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 25 of 51 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 068 A4.04  Importance Rating


===3.8 Liquid===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                            Level                          RO              SRO Tier #                            2 Group #                          2 K/A #                                041 A3.02 Importance Rating                3.3 Steam Dump/Turbine Bypass Control System: Ability to monitor automatic operation of the SDS, including: RCS pressure, RCS temperature, and reactor power Proposed Question:              Common 37 Given the following conditions:
Radwaste System: Ability to manually operate and/or monitor in the control room: Automatic isolation Proposed Question: Common 3 8  Which of the following will cause an AUTO closure of X-RV-5253, Liquid Waste Processing System Discharge Isolation Valve while a release is in progress?
* Unit 2 is operating at 60% power during ascension to 100% power.
* The following parameters are observed:
* TAVE = 575ºF.
* Pressurizer Level = 44%.
* Reactor Coolant System Pressure = 2235 PSIG.
* 2-PT-505, Turbine Impulse Pressure = 55%.
* Main Generator load = 700 MWe.
* Subsequently, PT-505 fails to 0% which equates to a TREF of 557ºF.
Given the above conditions, which of the following identifies the status of the Steam Dump Valves and the indication on 2-UI-500, STM DMP DEMAND?
A. All valves CLOSED; 2-UI-500 indicates 100% demand.
B. All valves CLOSED; 2-UI-500 indicates 0% demand.
C. Group 1 valves full OPEN; 2-UI-500 indicates 50% demand.
D. Groups 1 and 2 valves full OPEN; 2-UI-500 indicates 100% demand.
Proposed Answer:                A Explanation:
A. Correct. The Steam Dump Valves remain closed because the arming signal comes from PT-506.
B. Incorrect. Plausible if thought that the reference signal (TREF) lowering armed the dumps; however, PT-506 is the arming signal for C-7.
C. Incorrect. Plausible if thought that both groups only open on a plant trip vice a load rejection, however, no valves open as there is no arming signal.
D. Incorrect. Plausible if thought that the Steam Dumps are armed, the valves would be 100% open.
Technical Reference(s)        ABN-709, Section 4.2                                  Attached w/ Revision # See Page 23 of 51                                                Rev f
 
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                    Form ES-401-5 LO21.SYS.SD1.LN, Page 16                    Comments / Reference Proposed references to be provided during examination: None Learning Objective:  EVALUATE the affect a loss of the following systems has on the Steam Dump system:
* Tref (Turbine Impulse Pressure) OP51.SYS.SD1.OB15)
Question Source:          Bank #
Modified Bank #      CPNPP LXR        (Note changes or attach parent)
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:    55.41  7, 8 55.43 Page 24 of 51                                    Rev f
 
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO            SRO Tier #                          2 Group #                          2 K/A #                                068 A4.04 Importance Rating              3.8 Liquid Radwaste System: Ability to manually operate and/or monitor in the control room: Automatic isolation Proposed Question:               Common 38 Which of the following will cause an AUTO closure of X-RV-5253, Liquid Waste Processing System Discharge Isolation Valve while a release is in progress?
A. PC-11 channel not responding to POLL (MAGENTA).
A. PC-11 channel not responding to POLL (MAGENTA).
B. Only 2 of 4 Circulating Water Pumps running on associated Unit.
B. Only 2 of 4 Circulating Water Pumps running on associated Unit.
C. PC-11 channel in ALERT alarm (YELLOW).
C. PC-11 channel in ALERT alarm (YELLOW).
D. Loss of counts on X-RE-5253, Liquid Effluent Radiation Monitor.
D. Loss of counts on X-RE-5253, Liquid Effluent Radiation Monitor.
Proposed Answer:
Proposed Answer:                 D Explanation:
D Explanation:
A. Incorrect. Plausible because it could be thought that a monitor not responding to POLL would be INOPERABLE.
A. Incorrect. Plausible because it could be thought that a monitor not responding to POLL would be INOPERABLE. B. Incorrect. Plausible because Circulating Water Pumps must be running for the valve to remain open, however, a 2 of 4 coincidence allows release to Unit aligned for discharge
B. Incorrect. Plausible because Circulating Water Pumps must be running for the valve to remain open, however, a 2 of 4 coincidence allows release to Unit aligned for discharge.
. C. Incorrect. Plausible because radiation level has increased, however, it requires a high radiation level alarm to close X
C. Incorrect. Plausible because radiation level has increased, however, it requires a high radiation level alarm to close X-RV-5253.
-RV-5253. D. Correct. A loss of counts on the Liquid Effluent Radiation Monitor will trip X
D. Correct. A loss of counts on the Liquid Effluent Radiation Monitor will trip X-RV-5253 (OPERATE FAILURE).
-RV-5253 (OPERATE FAILURE). Technical Reference(s)
Technical Reference(s)         OP51.SYS.RM1.LN, Page 39                                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:       STATE the functions, operation and interlocks of the following Liquid Waste Processing System components:
OP51.SYS.RM1.LN, Page 39 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
* X-RE-5253 (OP51. SYS.WP1.OB02)
None Learning Objective:
Question Source:                 Bank #                     CPNPP LXR Modified Bank #                                   (Note changes or attach parent)
STATE the functions, operation and interlocks of the following Liquid Waste Processing System components:
New Page 25 of 51                                                Rev f
X-RE-5253 (OP51.
 
SYS.WP1.OB02
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet   Form ES-401-5 Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 11, 13 55.43 Page 26 of 51                   Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 26 of 51 Rev f Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 11, 13 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 27 of 51 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 008 AK2.02 Importance Rating


===2.7 Pressurizer===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                Form ES-401-5 Examination Outline Cross-reference:                              Level                        RO              SRO Tier #                        1 Group #                        1 K/A #                            008 AK2.02 Importance Rating            2.7 Pressurizer Vapor Space Accident: Knowledge of the interrelations between the Pressurizer Vapor Space Accident and the following: Sensors and detectors Proposed Question:               Common 39 Given the following conditions:
Vapor Space Accident
* A Loss of Coolant Accident is in progress.
: Knowledge of the interrelations between the Pressurizer Vapor Space Accident and the following: Sensors and detectors Proposed Question:
* Reactor Coolant System pressure is 1580 PSIG and slowly lowering.
Common 3 9  Given the following conditions:
* Subcooled Margin is 2ºF superheat and becoming more superheated.
A Loss of Coolant Accident is in progress.
* A cooldown is in progress using the Steam Dump System.
Reactor Coolant System pressure is 1580 PSIG and slowly lowering.
* Containment pressure is 4 PSIG and slowly rising.
Subcooled Margin is 2ºF superheat and becoming more superheated.
* Pressurizer level is 12% and rising.
A cooldown is in progress using the Steam Dump System.
* All Safety Systems have actuated properly.
Containment pressure is 4 PSIG and slowly rising.
* One Control Rod failed to insert on the trip.
Pressurizer level is 12% and rising.
* Reactor Vessel Level Indication System Indication: Top 2 lights are DARK and bottom 6 lights are LIT.
All Safety Systems have actuated properly.
One Control Rod failed to insert on the trip.
Reactor Vessel Level Indication System Indication: Top 2 lights are DARK and bottom 6 lights are LIT.
Which of the following describes the location of the Reactor Coolant System leak and the status of Reactor Coolant System Inventory?
Which of the following describes the location of the Reactor Coolant System leak and the status of Reactor Coolant System Inventory?
A. The leak is on the Upper Reactor Head.
A. The leak is on the Upper Reactor Head.
Reactor Coolant System Inventory is lowering. B. The leak is on a Reactor Coolant System Hot Leg.
Reactor Coolant System Inventory is lowering.
B. The leak is on a Reactor Coolant System Hot Leg.
Reactor Coolant System Inventory is rising.
Reactor Coolant System Inventory is rising.
C. The leak is on the bottom of the Reactor Vessel
C. The leak is on the bottom of the Reactor Vessel.
. Reactor Coolant System Inventory is rising. D. The leak is on the steam space of the Pressurizer.
Reactor Coolant System Inventory is rising.
Reactor Coolant System Inventory is lowering. Proposed Answer:
D. The leak is on the steam space of the Pressurizer.
D ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 28 of 51 Rev f  Explanation:
Reactor Coolant System Inventory is lowering.
Proposed Answer:                 D Page 27 of 51                                                Rev f
 
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Explanation:
A. Incorrect. Plausible because it could be thought that the leak on the upper head would cause voiding in the head and lead to increasing level and inventory is decreasing, however, as the inventory leaves the head the Pressurizer level will drop and saturated water in the Pressurizer will flash to steam to try and maintain pressure.
A. Incorrect. Plausible because it could be thought that the leak on the upper head would cause voiding in the head and lead to increasing level and inventory is decreasing, however, as the inventory leaves the head the Pressurizer level will drop and saturated water in the Pressurizer will flash to steam to try and maintain pressure.
B. Incorrect. Plausible because it could be thought that rising Pressurizer level was indicating that Reactor Coolant Inventory was increasing, however, as the water leaves the Hot Leg it is replaced by a loss of level in the Pressurizer and saturated water in the Pressurizer will flash to steam to try and maintain pressure. Also with pressure and subcooling still dropping then inventory is still lowering. C. Incorrect. Plausible because it could be thought that the leak on the lower head could lower inventory in the vessel and reach saturation and cause voiding under the head, however, as the inventory leaves the head the Pressurizer level will drop and saturated water in the Pressurizer will flash to steam to try and maintain pressure. Also with pressure and subcooling still dropping then inventory is still decreasing.
B. Incorrect. Plausible because it could be thought that rising Pressurizer level was indicating that Reactor Coolant Inventory was increasing, however, as the water leaves the Hot Leg it is replaced by a loss of level in the Pressurizer and saturated water in the Pressurizer will flash to steam to try and maintain pressure. Also with pressure and subcooling still dropping then inventory is still lowering.
D. Correct. A leak in the Pressurizer steam space results in a loss of subcooling in the Pressurizer and when pressure drops to the saturation temperature in the upper head then a void will start forming and Pressurizer level will increase. With subcooling and pressure continuing to lower, inventory is lowering. Technical Reference(s)
C. Incorrect. Plausible because it could be thought that the leak on the lower head could lower inventory in the vessel and reach saturation and cause voiding under the head, however, as the inventory leaves the head the Pressurizer level will drop and saturated water in the Pressurizer will flash to steam to try and maintain pressure. Also with pressure and subcooling still dropping then inventory is still decreasing.
LO21.MCO.TAA.LN, Pages 11 & 12 Attached w/ Revision # See Comments / Reference LO21.MCO.TAA.LN, Pages 21 & 22 EOP-1.0A, Attachment 4, Step 6 Proposed references to be provided during examination:
D. Correct. A leak in the Pressurizer steam space results in a loss of subcooling in the Pressurizer and when pressure drops to the saturation temperature in the upper head then a void will start forming and Pressurizer level will increase. With subcooling and pressure continuing to lower, inventory is lowering.
None Learning Objective:
Technical Reference(s)       LO21.MCO.TAA.LN, Pages 11 & 12               Attached w/ Revision # See LO21.MCO.TAA.LN, Pages 21 & 22               Comments / Reference EOP-1.0A, Attachment 4, Step 6 Proposed references to be provided during examination: None Learning Objective:     DISCUSS the bases for all Steps, Cautions, and Notes included in EOP-1.0.
DISCUSS the bases for all Steps, Cautions
(LO21.ERG.E1A.OB105)
, and Notes included in EOP
Question Source:             Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
-1.0. (LO21.ERG.E1A.OB105)
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41   3, 5 55.43 Page 28 of 51                                         Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
N ew    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 3, 5 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 29 of 51 Rev f     Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 009 G 2.1.27  Importance Rating


===3.9 Small===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                      Form ES-401-5 Examination Outline Cross-reference:                            Level                RO            SRO Tier #                1 Group #              1 K/A #                  009 G 2.1.27 Importance Rating    3.9 Small Break LOCA: Conduct of Operations: Knowledge of system purpose and/or function Proposed Question:             Common 40 Given the following conditions:
Break LOCA
* A Loss of Coolant Accident has occurred.
: Conduct of Operations: Knowledge of system purpose and/or function Proposed Question: Common 4 0  Given the following conditions
* Reactor Coolant System pressure is 1300 PSIG and slowly lowering.
A Loss of Coolant Accident has occurred.
Which of the following describes the status of operating Emergency Core Cooling System equipment?
Reactor Coolant System pressure is 1300 PSIG and slowly lowering.
A. Centrifugal Charging Pump Safety Injection flow is stable.
Which of the following describes the status of operating Emergency Core Cooling System equipment? A. Centrifugal Charging Pump Safety Injection flow is stable.
Safety Injection Pump discharge flow is rising.
Safety Injection Accumulator level is stable.
Residual Heat Removal injection flow is rising.
B. Centrifugal Charging Pump Safety Injection flow is rising.
Safety Injection Pump discharge flow is rising.
Safety Injection Pump discharge flow is rising.
Safety Injection Accumulator level is stable.
Safety Injection Accumulator level is stable.
Residual Heat Removal injection flow is rising. B. Centrifugal Charging Pump Safety Injection flo w is rising. Safety Injection Pump discharge flow is rising. Safety Injection Accumulator level is stable.
Residual Heat Removal injection flow is zero.
Residual Heat Removal injection flow is zero. C. Centrifugal Charging Pump Safety Injection flow is stable.
C. Centrifugal Charging Pump Safety Injection flow is stable.
Safety Injection Pump discharge flow is zer o. Safety Injection Accumulator level is lowering. Residual Heat Removal injection flow is zero. D. Centrifugal Charging Pump Safety Injection flow is rising. Safety Injection Pump discharge flow is zero. Safety Injection Accumulator level is lowering. Residual Heat Removal injection flow is rising. Proposed Answer:
Safety Injection Pump discharge flow is zero.
B ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 30 of 51 Rev f  Explanation:
Safety Injection Accumulator level is lowering.
Residual Heat Removal injection flow is zero.
D. Centrifugal Charging Pump Safety Injection flow is rising.
Safety Injection Pump discharge flow is zero.
Safety Injection Accumulator level is lowering.
Residual Heat Removal injection flow is rising.
Proposed Answer:               B Page 29 of 51                                    Rev f
 
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Explanation:
A. Incorrect. Plausible because there is CCP SI flow and SI Pump flow is rising, however, RCS pressure is lowering which will cause CCP Pump flow to rise while still above the shutoff head of the RHR Pumps.
A. Incorrect. Plausible because there is CCP SI flow and SI Pump flow is rising, however, RCS pressure is lowering which will cause CCP Pump flow to rise while still above the shutoff head of the RHR Pumps.
B. Correct. Given the pressure of the Reactor Coolant System, this is the operating condition of the ECCS Pumps and Accumulator
B. Correct. Given the pressure of the Reactor Coolant System, this is the operating condition of the ECCS Pumps and Accumulator.
. C. Incorrect. Plausible because there is CCP SI flow however, RCS pressure is below the shutoff head of the SI Pumps and above that of the RHR Pumps and the SI Accumulator would not be injecting at this pressure.
C. Incorrect. Plausible because there is CCP SI flow however, RCS pressure is below the shutoff head of the SI Pumps and above that of the RHR Pumps and the SI Accumulator would not be injecting at this pressure.
D. Incorrect. Plausible because CCP SI flow is rising, however, RCS pressure is below the shutoff head of the SI Pumps and the SI Accumulator and RHR Pumps would not be injecting.
D. Incorrect. Plausible because CCP SI flow is rising, however, RCS pressure is below the shutoff head of the SI Pumps and the SI Accumulator and RHR Pumps would not be injecting.
Technical Reference(s)
Technical Reference(s)       OP51.SYS.SI1.LN, Pages 27, 30, 35 & 41     Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     DESCRIBE the normal capacities, the sources of water, and the approximate flow rates of emergency core cooling components as RCS pressure decreases following a LOCA, include shutoff head values. (OP51.SYS.SI1.OB13)
OP51.SYS.SI1.LN , Pages 27 , 30 , 35 & 41 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Question Source:               Bank #
None Learning Objective:
Modified Bank #       CPNPP LXR       (Note changes or attach parent)
DESCRIBE the normal capacities, the sources of water, and the approximate flow rates of emergency core cooling components as RCS pressure decreases following a LOCA, include shutoff head values. (OP51.SYS.SI1.OB13)
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41   7, 14 55.43 Page 30 of 51                                    Rev f
Question Source:
 
Bank #   Modified Bank #
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                               Form ES-401-5 Examination Outline Cross-reference:                             Level                         RO             SRO Tier #                         1 Group #                       1 K/A #                             015 AK2.10 Importance Rating             2.8 RCP Malfunctions: Knowledge of the interrelations between the Reactor Coolant Pump Malfunctions (Loss of RC Flow) and the following: RCP indicators and controls Proposed Question:                 Common 41 Given the following conditions:
CPNPP LXR (Note changes or attach parent)
* Unit 1 is at 70% power.
New   Question History:
* Annunciator 1-ALB-5B, Window 1.5 - RCP 1 VIBR HI, has just alarmed.
Last NRC Exam Question Cognitive Level:
* The following trend of Reactor Coolant Pump (RCP) 1-01 vibration is available:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
Time                     Shaft                     Frame 0130                     14.7 mils                 3.25 mils 0200                     15.0 mils                 3.30 mils 0230                     15.2 mils                 3.52 mils 0300                     15.5 mils                 3.73 mils 0330                     15.9 mils                 3.75 mils 0400                     17.7 mils                 3.85 mils Which of the following states the earliest time that RCP trip criteria were exceeded?
55.41 7, 14 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 31 of 51 Rev f    Examination Outline Cross
A. 0200 B. 0230 C. 0300 D. 0330 Proposed Answer:                   B Page 31 of 51                                              Rev f
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 015 AK2.10 Importance Rating 2.8   RCP Malfunctions
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Explanation:
: Knowledge of the interrelations between the Reactor Coolant Pump Malfunctions (Loss of RC Flow) and the following: RCP indicators and controls Proposed Question:
A. Incorrect. Plausible because shaft is greater than 15 mils and frame is greater than 3 mils, however, shaft vibration must be increasing at greater than 1 mil/hr and frame vibration must be increasing at greater than 0.2 mils/hr.
Common 4 1  Given the following conditions:
B. Correct. Frame vibration was greater than 3 mils/hr and has risen greater than 0.2 mils/hour.
Unit 1 is at 70% power.
C. Incorrect. Plausible because shaft vibration is greater than 15 mils, frame vibration is greater than 3 and rate is greater than 0.2 mils/hr, however, it is not the earliest time.
Annunciator 1
D. Incorrect. Plausible because the shaft and frame rates have been excessive for 1 hour, however, it is not the earliest time.
-ALB-5B, Window 1.5  
Technical Reference(s)       ABN-101, Step 6.3.1                             Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Reactor Coolant System for:
- RCP 1 VIBR HI, has just alarmed.
* ABN-101, Reactor Coolant Pump Trip/Malfunction (OP51.SYS.RC1.OB17)
The following trend of Reactor Coolant Pump (RCP) 1-01 vibration is available:
Question Source:             Bank #
Time   Shaft   Frame   0130   14.7 mils 3.25 mils   0200   15.0 mils 3.30 mils   0230   15.2 mils 3.52 mils   0300   15.5 mils 3.73 mils   0330   15.9 mils 3.75 mils   0400   17.7 mils 3.85 mils Which of the following states the earliest time that RCP trip criteria were exceeded?
Modified Bank #         CPNPP LXR         (Note changes or attach parent)
A. 020 0  B. 023 0  C. 030 0  D. 033 0  Proposed Answer:
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                       X 10 CFR Part 55 Content:       55.41   3, 10 55.43 Page 32 of 51                                      Rev f
B ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 32 of 51 Rev f  Explanation:
 
A. Incorrect. Plausible because shaft is greater than 15 mils and frame is greater than 3 mils , however, shaft vibration must be increasing at greater than 1 mil/hr and frame vibration must be increasing at greater than 0.2 mils/hr
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                         Form ES-401-5 Comments /  
. B. Correct. Frame vibration was greater than 3 mils/hr and has risen greater than 0.2 mil s/hour. C. Incorrect. Plausible because shaft vibration is greater than 15 mils, frame vibration is greater than 3 and rate is greater than 0.2 mils/hr, however, it is not the earliest time
. D. Incorrect. Plausible because the shaft and frame rates have been excessive for 1 hour, however, it is not the earliest time
. Technical Reference(s)
AB N-101, Step 6.3.1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
None Learning Objective:
ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Reactor Coolant System for:
ABN-101, Reactor Coolant Pump Trip/Malfunction (OP51.SYS.RC1.OB17)
Question Source:
Bank #   Modified Bank #
CPNPP LXR (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 3, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 33 of 51 Rev f  Comments /  


==Reference:==
==Reference:==
From CPNPP LXR Exam Bank Revision # 03/22/07 Given the following conditions:
From CPNPP LXR Exam Bank                                   Revision # 03/22/07 Given the following conditions:
Unit 1 is at 85% power.
* Unit 1 is at 85% power.
Annunciator 1
* Annunciator 1-ALB-5B, Window 1.5 - RCP 1 VIBR HI, has just alarmed.
-ALB-5B, Window 1.5  
* The following trend of Reactor Coolant Pump (RCP) 1-01 vibration is available:
- RCP 1 VIBR HI, has just alarmed.
Time                   Shaft                   Frame 0330                   14.7 mils               2.65 mils 0400                   15.0 mils               2.70 mils 0430                   15.2 mils               2.72 mils 0500                   15.5 mils               2.73 mils 0530                   16.9 mils               3.05 mils 0600                   17.7 mils               3.15 mils Which of the following states the earliest time that RCP trip criteria were exceeded?
The following trend of Reactor Coolant Pump (RCP) 1
A. 0430 B. 0500 C. 0530 D. 0600 Page 33 of 51                                       Rev f
-01 vibration is available:
Time   Shaft   Frame   0330   14.7 mils 2.65 mils   0400   15.0 mils 2.70 mils   0430   15.2 mils 2.72 mils   0500   15.5 mils 2.73 mils   0530   16.9 mils 3.05 mils   0600   17.7 mils 3.15 mils Which of the following states the earliest time that RCP trip criteria were exceeded?
A. 0430 B. 0500 C. 0530 D. 0600 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 34 of 51 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 022 AA2.01 Importance Rating 3.2    Loss of Reactor Coolant Makeup
: Ability to determine and interpret the following as they apply to the Loss of Reactor Coolant Makeup: Whether charging line leak exists Proposed Question:
Common 4 2  Given the following conditions:
Unit 1 is at 100% power and all system alignments are normal.
The following Annunciators have just gone into alarm:
1-ALB-5C, Window 1.2
- PRZR LVL DEV LO.
1-A LB-6A, Window 1.4
- REGEN HX LTDN OUT TEMP HI.
1-ALB-2A, Window 2.8
- ANY CNTMT SMP PUMP RUN.
Pressurizer level is 56% and slowly lowering.
TCV-129, Letdown Demineralizer Bypass Valve, is in the VCT position.
FCV-121, Charging Pump Control Valve, is full open. FI-121A, Charging Flow Meter, indicates 175 GPM and slowly rising.
All Reactor Coolant Pump seal injection flows are between 8.0 and 8.5 GPM.
All Reactor Coolant Pump seal return flows are between 2.8 and 3.2 GPM.
Which of the following identifies the location of the leak?
(Drawing attached)


ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                Level                            RO              SRO Tier #                            1 Group #                          1 K/A #                              022 AA2.01 Importance Rating                3.2 Loss of Reactor Coolant Makeup: Ability to determine and interpret the following as they apply to the Loss of Reactor Coolant Makeup: Whether charging line leak exists Proposed Question:                      Common 42 Given the following conditions:
* Unit 1 is at 100% power and all system alignments are normal.
* The following Annunciators have just gone into alarm:
* 1-ALB-5C, Window 1.2 - PRZR LVL DEV LO.
* 1-ALB-6A, Window 1.4 - REGEN HX LTDN OUT TEMP HI.
* 1-ALB-2A, Window 2.8 - ANY CNTMT SMP PUMP RUN.
* Pressurizer level is 56% and slowly lowering.
* TCV-129, Letdown Demineralizer Bypass Valve, is in the VCT position.
* FCV-121, Charging Pump Control Valve, is full open.
* FI-121A, Charging Flow Meter, indicates 175 GPM and slowly rising.
* All Reactor Coolant Pump seal injection flows are between 8.0 and 8.5 GPM.
* All Reactor Coolant Pump seal return flows are between 2.8 and 3.2 GPM.
Which of the following identifies the location of the leak? (Drawing attached)
The leak is located in the...
The leak is located in the...
A. Charging line between 1/1-8105, Containment Isolation Valve and Regenerative Heat Exchanger.
A. Charging line between 1/1-8105, Containment Isolation Valve and Regenerative Heat Exchanger.
B. Letdown line between 1/1-8117, Letdown Relief Valve and Regenerative Heat Exchanger. C. Charging line between 1/1-8106, Charging Line Isolation Valve and 1/1
B. Letdown line between 1/1-8117, Letdown Relief Valve and Regenerative Heat Exchanger.
-HCV-182 , Charging Line Flow Control Valve.
C. Charging line between 1/1-8106, Charging Line Isolation Valve and 1/1-HCV-182, Charging Line Flow Control Valve.
D. Letdown line between 1/1-8152, Containment Isolation Valve and Letdown Heat Exchanger. Proposed Answer:
D. Letdown line between 1/1-8152, Containment Isolation Valve and Letdown Heat Exchanger.
A ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 35 of 51 Rev f Explanation:
Proposed Answer:                 A Page 34 of 51                                                  Rev f
 
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                         Form ES-401-5 Explanation:
A. Correct. With Pressurizer level lowering, a Containment Sump Pump running, and a Letdown Heat Exchanger outlet high temperature alarm the leak is located between the Charging Line Isolation Valve and the Regenerative Heat Exchanger.
A. Correct. With Pressurizer level lowering, a Containment Sump Pump running, and a Letdown Heat Exchanger outlet high temperature alarm the leak is located between the Charging Line Isolation Valve and the Regenerative Heat Exchanger.
B. Incorrect. Plausible because a Containment Sump Pump is running and Letdown Heat Exchanger outlet temperature is high which is indicative of a high flow rate, however, if this were the location of the leak Charging flow would exceed Letdown flow and a Pressurizer level deviation HI alarm would be received.
B. Incorrect. Plausible because a Containment Sump Pump is running and Letdown Heat Exchanger outlet temperature is high which is indicative of a high flow rate, however, if this were the location of the leak Charging flow would exceed Letdown flow and a Pressurizer level deviation HI alarm would be received.
C. Incorrect. Plausible because Pressurizer level is lowering and Letdown Heat Exchanger outlet temperature is rising, however, a Containment Sump Pump is running which is indicative of a leak inside Containment.
C. Incorrect. Plausible because Pressurizer level is lowering and Letdown Heat Exchanger outlet temperature is rising, however, a Containment Sump Pump is running which is indicative of a leak inside Containment.
D. Incorrect. Plausible because Letdown Heat Exchanger outlet temperature is high, however, if this were the location of the leak Pressurizer level deviation would be high and a Containment Sump Pump would not be running.
D. Incorrect. Plausible because Letdown Heat Exchanger outlet temperature is high, however, if this were the location of the leak Pressurizer level deviation would be high and a Containment Sump Pump would not be running.
Technical Reference(s)
Technical Reference(s)     ABN-105, Section 2.0                           Attached w/ Revision # See OP51.SYS.CS1.FG02                               Comments / Reference Proposed references to be provided during examination: OP51.SYS.CS1.FG02 Learning Objective:     ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Chemical and Volume Control System, both initial and subsequent, for:
ABN-105, Section 2.0 Attached w/ Revision #
* ABN-105, Chemical and Volume Control System Malfunctions (OP51.SYS.CS1.OB20)
See Comments / Reference OP51.SYS.CS1.FG02 Proposed references to be provided during examination:
Question Source:             Bank #                   CPNPP LXR Modified Bank #                             (Note changes or attach parent)
OP51.SYS.CS1.FG02 Learning Objective:
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:     55.41   3, 5, 7 55.43 Page 35 of 51                                        Rev f
ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Chemical and Volume Control System, both initial and subsequent, for:
 
ABN-105, Chemical and Volume Control System Malfunctions (OP51.SYS.CS1.OB20)
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                           Form ES-401-5 Examination Outline Cross-reference:                                   Level                 RO                 SRO Tier #                 1 Group #               1 K/A #                     025 G 2.4.9 Importance Rating     3.8 Loss of RHR System: Emergency Procedures/Plan: Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies Proposed Question:                 Common 43 Given the following conditions:
Question Source:
* Unit 1 is operating in Reduced Inventory.
Bank # CPNPP LXR   Modified Bank #
* A large Hot Leg vent path has been aligned due to a Cold Leg opening in the Reactor Coolant System.
  (Note changes or attach parent)
Which of the following describes the role of a Hot Leg vent path in mitigating the consequences of a loss of Residual Heat Removal cooling?
New   Question History:
A. WITH the Hot Leg vent path, the core heatup and pressurization of the Reactor Coolant will force water out of the Hot Leg and cool the core.
Last NRC Exam   Question Cognitive Level:
B. WITHOUT the Hot Leg vent path, the core heatup could pressurize the Reactor Coolant causing core uncovery by forcing water out the Cold Leg.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
C. WITH the Hot Leg vent path, the time required for the Reactor Coolant to reach saturation conditions in the Reactor Vessel is extended.
55.41 3, 5, 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 36 of 51 Rev f    Examination Outline Cross
D. WITHOUT the Hot Leg vent path, the core heatup could pressurize the Reactor Coolant applying excessive stress at the Reactor Vessel Flange.
-reference:
Proposed Answer:                   B Explanation:
Level RO SRO Tier # 1   Group # 1   K/A # 025 G 2.4.9 Importance Rating 3.8   Loss of RHR System
A. Incorrect. Plausible because a loss of RHR will cause a heatup, but the RCS should not pressurize with a Hot Leg vent path.
: Emergency Procedures/Plan: Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies Proposed Question:
B. Correct. When a Cold Leg opening exists without an adequate Hot Leg vent path, subsequent pressurization of the RCS following a loss of RHR could force water from the core and out the Cold Leg opening. Once water level is below the fuel, the risk of sustaining core damage is substantially increased.
Common 4 3  Given the following conditions:
C. Incorrect. Plausible because a major concern when in Reduced Inventory Operations is time to reach saturation conditions, however, providing a Hot Leg vent path will maintain a lower pressure in the RCS and therefore result in a lower saturation temperature and shorter time to core boiling.
Unit 1 is operating in Reduced Inventory.
D. Incorrect. Plausible because the RCS would pressurize without a Hot Leg vent path, however, Page 36 of 51                                          Rev f
A large Hot Leg vent path has been aligned due to a Cold Leg opening in the Reactor Coolant System.
 
Which of the following describes the role of a Hot Leg vent path in mitigating the consequences of a loss of Residual Heat Removal cooling? A. WITH the Hot Leg vent path
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 stresses on the Vessel Flange due to the pressure are minimal compared to full pressure conditions.
, the core heatup and pressurization of the Reactor Coolant will force water out of the Hot Leg and cool the core.
Technical Reference(s)     IPO-010A, Step 3.1.4                       Attached w/ Revision # See IPO-010A, Step 5.1.26 Caution               Comments / Reference IPO-010A, Attachment 15 Proposed references to be provided during examination: None Learning Objective:   Given a specific set of system conditions, PREDICT system and instrumentation response. (OPD1.IPO.XO0.OB09)
B. WITHOUT the Hot Leg vent path
SUMMARIZE the major action steps for each of the sections of IPO-010 considering the following:
, the core heatup could pressurize the Reactor Coolant causing core uncovery by forcing water out the Cold Leg.
* RHR support system requirements (OPD1.IPO.XO0.OB06)
C. WITH the Hot Leg vent path
Question Source:           Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
, the time required for the Reactor Coolant to reach saturation conditions in the Reactor Vessel is extended.
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:     55.41   5, 10 55.43 Page 37 of 51                                    Rev f
D. WITHOUT the Hot Leg vent path
 
, the core heatup could pressurize the Reactor Coola nt applying excessive stress at the Reactor Vessel Flange.
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                     Form ES-401-5 Examination Outline Cross-reference:                               Level                           RO             SRO Tier #                           1 Group #                           1 K/A #                               026 AA2.02 Importance Rating               2.9 Loss of Component Cooling Water: Ability to determine and interpret the following as they apply to the Loss of Component Cooling Water: The cause of possible CCW loss Proposed Question:               Common 44 Given the following conditions on Unit 2:
Proposed Answer:
* Component Cooling Water Pumps 2-01 and 2-02 are in service.
B Explanation:
* Component Cooling Water Surge Tank Level is lowering with the following Annunciators in alarm:
A. Incorrect. Plausible because a loss of RHR will cause a heatup, but the RCS should not pressurize with a Hot Leg vent path. B. Correct. When a Cold Leg opening exists without an adequate Hot Leg vent path, subsequent pressurization of the RCS following a loss of RHR could force water from the core and out the Cold Leg opening. Once water level is below the fuel, the risk of sustaining core damage is substantially increased. C. Incorrect. Plausible because a major concern when in Reduced Inventory Operations is time to reach saturation conditions, however, providing a Hot Leg vent path will maintain a lower pressure in the RCS and therefore result in a lower saturation temperature and shorter time to core boiling.
* 2-ALB-3B, Window 2.4 - CCW SRG TK TRN A LVL HI-HI/LO.
D. Incorrect. Plausible because the RCS would pressurize without a Hot Leg vent path, however, ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 37 of 51 Rev f stresses on the Vessel Flange due to the pressure are minimal compared to full pressure conditions.
* 2-ALB-3B, Window 1.3 - CCW SRG TK TRN A/B LVL LO-LO.
Technical Reference(s) IPO-010A, Step 3.1.4 Attached w/ Revision # See Comments / Reference IPO-010A, Step 5.1.26 Caution IPO-010A, Attachment 15 Proposed references to be provided during examination:
* Component Cooling Water Surge Tank levels are slowly lowering on each compartment.
None Learning Objective:
Given a specific set of system conditions, PREDICT system and instrumentation response. (OPD1.IPO.XO0.OB09)
SUMMARIZE the major action steps for each of the sections of IPO
-010 considering the following:
RHR support system requirements (OPD1.IPO.XO0.OB06)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 5, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 38 of 51 Rev f    Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 1   K/A # 026 AA2.02 Importance Rating 2.9   Loss of Component Cooling Water
: Ability to determine and interpret the following as they apply to the Loss of Component Cooling Water
: The cause of possible CCW loss Proposed Question:
Common 4 4  Given the following conditions on Unit 2:   Component Cooling Water Pumps 2-01 and 2-02 are in service. Component Cooling Water Surge Tank Level is lowering with the following Annunciators in alarm:
2-ALB-3B, Window 2.
4 - CCW SRG TK TRN A LVL HI
-HI/LO. 2-ALB-3B, Window 1.
3 - CCW SRG TK TRN A/B LVL LO
-LO. Component Cooling Water Surge Tank levels are slowly lowering on each compartment.
Per ABN-502, Component Cooling Water System Malfunctions, which of the following describes the operator actions that would identify the leak source?
Per ABN-502, Component Cooling Water System Malfunctions, which of the following describes the operator actions that would identify the leak source?
CLOSE the... A. Non-Safeguards Loop Isolation Valves and monitor Tank compartment levels. Leak is on the side that continues to fall below 37% with the other side stable.
CLOSE the...
B. Non-Safeguards Loop Isolation Valves and monitor Tank compartment levels
A. Non-Safeguards Loop Isolation Valves and monitor Tank compartment levels.
. Leak is on the side that continues to fall below 58% with the other side stable.
Leak is on the side that continues to fall below 37% with the other side stable.
C. Safeguards Loop Supply and Return Isolation Valves one Train at a time and monitor Tank compartment levels. Leak is on the side that continues to fall below 37% with the other side stable.
B. Non-Safeguards Loop Isolation Valves and monitor Tank compartment levels.
D. Safeguards Loop Supply and Return Isolation Valves one Train at a time and monitor Tank compartment levels. Leak is on the side that continues to fall below 58% with the other side stable.
Leak is on the side that continues to fall below 58% with the other side stable.
Proposed Answer:
C. Safeguards Loop Supply and Return Isolation Valves one Train at a time and monitor Tank compartment levels.
C ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 39 of 51 Rev f  Explanation:
Leak is on the side that continues to fall below 37% with the other side stable.
A. Incorrect. Plausible if thought that with both compartments lowering, the source must be the common piping and the methodology would identify a leak on the Non
D. Safeguards Loop Supply and Return Isolation Valves one Train at a time and monitor Tank compartment levels.
-Safeguards header, however, the isolation of Reactor Coolant Pump cooling should not be performed if other procedurally specified lineups are available.
Leak is on the side that continues to fall below 58% with the other side stable.
B. Incorrect. Plausible because it could be thought that with both compartments lowering, the source must be the common piping and the methodology would identify a leak on the Non
Proposed Answer:                 C Page 38 of 51                                                  Rev f
-Safeguards header, however, the tanks are common until 37% level on Unit 2 which is where the partition plate starts. C. Correct. The tank is common above 37% on Unit 2 and the leak cannot be identified using this methodology until level reaches 37%. This is the procedurally specified method.
 
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Explanation:
A. Incorrect. Plausible if thought that with both compartments lowering, the source must be the common piping and the methodology would identify a leak on the Non-Safeguards header, however, the isolation of Reactor Coolant Pump cooling should not be performed if other procedurally specified lineups are available.
B. Incorrect. Plausible because it could be thought that with both compartments lowering, the source must be the common piping and the methodology would identify a leak on the Non-Safeguards header, however, the tanks are common until 37% level on Unit 2 which is where the partition plate starts.
C. Correct. The tank is common above 37% on Unit 2 and the leak cannot be identified using this methodology until level reaches 37%. This is the procedurally specified method.
D. Incorrect. Plausible because the tank is common above 58% on Unit 1 and the leak cannot be identified using this methodology until level reaches 58%. This is the procedurally specified method but the wrong Unit.
D. Incorrect. Plausible because the tank is common above 58% on Unit 1 and the leak cannot be identified using this methodology until level reaches 58%. This is the procedurally specified method but the wrong Unit.
Technical Reference(s)
Technical Reference(s)       ABN-502, Steps 3.3.1 Note & 3.3.5           Attached w/ Revision # See OP5.1.SYS.CC1.LN, Figure 1                   Comments / Reference ALM-0032B, 2-ALB-3B, Windows 1.3 & 2.4 Proposed references to be provided during examination: None Learning Objective:     ANALYZE the indications and DESCRIBE the mitigation strategy for the following procedures as they affect the Component Cooling Water system:
ABN-502, Step s 3.3.1 Note
* ABN-502, Component Cooling Water System Malfunctions (OP51.SYS.CC1.OB21)
& 3.3.5 Attached w/ Revision # See Comments / Reference OP5.1.SYS.CC1.LN, Figure 1 ALM-0032B, 2-ALB-3B, Window s 1.3 & 2.4 Proposed references to be provided during examination:
None Learning Objective:
ANALYZE the indications and DESCRIBE the mitigation strategy for the following procedures as they affect the Component Cooling Water system:
ABN-502, Component Cooling Water System Malfunctions (OP51.SYS.CC1.OB21)
DESCRIBE any unit differences between the Unit 1 and Unit 2 Component Cooling Water System or components. (OP51.SYS.CC1.OB15)
DESCRIBE any unit differences between the Unit 1 and Unit 2 Component Cooling Water System or components. (OP51.SYS.CC1.OB15)
Question Source:
Question Source:               Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:             Last NRC Exam       CPNPP 2010 Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41   7, 8, 10 55.43 Page 39 of 51                                   Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam CPNPP 2010 Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 7, 8, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 40 of 51 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 027 AA1.01  Importance Rating


===4.0 Pressurizer===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                        Form ES-401-5 Examination Outline Cross-reference:                                Level                            RO                SRO Tier #                            1 Group #                            1 K/A #                                027 AA1.01 Importance Rating                4.0 Pressurizer Pressure Control Malfunction: Ability to operate and/or monitor the following as they apply to the Pressurizer Pressure Control Malfunction: PZR heaters, sprays, and PORVs Proposed Question:               Common 45 Given the following conditions:
Pressure Control Malfunction
* The Unit is at 100% power.
: Ability to operate and/or monitor the following as they apply to the Pressurizer Pressure Control Malfunction:
* Pressurizer Pressure is 2235 PSIG and stable.
PZR heaters, sprays, and PORVs Proposed Question:
* Handswitch PS-455F, PRZR PRESS CTRL CHAN SELECT is in the 455/456 position.
Common 4 5  Given the following conditions:
* PT-455A, Pressurizer Pressure Control Channel fails high.
The Unit is at 100% power
Assuming NO operator action, which of the following would be the PROGRESSION of events in the primary system (including Pressurizer Pressure Control System response), following the instrument failure?
. Pressurizer Pressure is 2235 PSIG and stable.
: 1. Both PRZR Spray Valves (PCV-455B and PCV-455C) CLOSE.
Handswitch PS-455F, PRZR PRESS CTRL CHAN SELECT is in the 455/456 position
: 2. Both PRZR Spray Valves (PCV-455B and PCV-455C) OPEN.
. PT-455A, Pressurizer Pressure Control Channel fails high. Assuming NO operator action, which of the following would be the PROGRESSION of events in the primary system (including Pressurizer Pressure Control System response), following the instrument failure?
: 3. PORV PCV-455A OPENS.
: 1. Both PRZR Spray Valves (PCV
: 4. PORV PCV-456 OPENS.
-455B and PCV
: 5. PORVs PCV-455A CLOSES.
-455C) CLOSE.
: 6. PORVs PCV-456 CLOSES.
: 2. Both PRZR Spray Valves (PCV
: 7. Reactor Trip on low Pressurizer pressure.
-455B and PCV
-455C) OPEN.
: 3. PORV PCV-455A OPENS. 4. PORV PCV-456 OPENS. 5. PORVs PCV-455A CLOSES. 6. PORVs PCV-456 CLOSES. 7. Reactor Trip on low Pressurizer pressure.
: 8. Reactor Trip on high Pressurizer pressure.
: 8. Reactor Trip on high Pressurizer pressure.
A. 1, 3, 4, 8 B. 2, 3, 5, 7 C. 3, 1 , 6 , 8 D. 4, 2, 5, 7   Proposed Answer:
A. 1, 3, 4, 8 B. 2, 3, 5, 7 C. 3, 1, 6, 8 D. 4, 2, 5, 7 Proposed Answer:                 B Page 40 of 51                                                    Rev f
B ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 41 of 51 Rev f  Explanation:
 
A. Incorrect. Plausible because PORV PCV-455A will open, however, the Spray Valves will open and only PORV P CV-456 would remain closed
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Explanation:
. B. Correct. Given Pressurizer pressure setpoint prior to the Control Channel failing high, the sequence of events is as listed.
A. Incorrect. Plausible because PORV PCV-455A will open, however, the Spray Valves will open and only PORV PCV-456 would remain closed.
C. Incorrect. Plausible because PORV PCV-455A will open, however, the Spray Valves will open not close , the Reactor will trip on low pressure not high pressure
B. Correct. Given Pressurizer pressure setpoint prior to the Control Channel failing high, the sequence of events is as listed.
. D. Incorrect. Plausible because the spray valves open , the Reactor trips on low pressure and PORV PCV-455A will close
C. Incorrect. Plausible because PORV PCV-455A will open, however, the Spray Valves will open not close, the Reactor will trip on low pressure not high pressure.
, however, not in the order listed and PORV PCV-456 remains close
D. Incorrect. Plausible because the spray valves open, the Reactor trips on low pressure and PORV PCV-455A will close, however, not in the order listed and PORV PCV-456 remains closed.
: d. Technical Reference(s)
Technical Reference(s)       ABN-705, Step 2.2.a                           Attached w/ Revision # See OP51.SYS.PP1, Figure 5 & Slide 58             Comments / Reference Proposed references to be provided during examination: None Learning Objective:     LIST and EXPLAIN the Pressurizer Pressure and Level Control System design features which provide for the trips, permissives and interlocks associated with the following:
ABN-705, Step 2.2.a Attached w/ Revision # See Comments / Reference OP 51.SYS.PP1, Figure 5 & Slide 58 Proposed references to be provided during examination:
* PRZR PORVS Open Interlock in AUTO.
None Learning Objective:
* PRZR High Pressure Reactor Trip.
LIST and EXPLAIN the Pressurizer Pressure and Level Control System design features which provide for the trips, permissives and interlocks associated with the following:
* PRZR Low Pressure Reactor Trip (OP51.SYS.PP1.OB07)
PRZR PORVS Open Interlock in AUTO
ANALYZE the indications and DESCRIBE the mitigation strategy for the following procedures as they affect the Pressurizer Pressure and Level Control system:
. PRZR High Pressure Reactor Trip
* ABN-705, Pressurizer Pressure Malfunction (OP51.SYS.PP1.OB14)
. PRZR Low Pressure Reactor Trip (OP51.SYS.PP1.OB
Question Source:             Bank #
: 07) ANALYZE the indications and DESCRIBE the mitigation strategy for the following procedures as they affect the Pressurizer Pressure and Level Control system: ABN-705, Pressurizer Pressure Malfunction (OP51.SYS.PP1.OB14)
Modified Bank #                           (Note changes or attach parent)
Question Source:
New                           X Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41   7 55.43 Page 41 of 51                                        Rev f
Bank #   Modified Bank #
 
  (Note changes or attach parent)
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                 Form ES-401-5 Examination Outline Cross-reference:                               Level                         RO         SRO Tier #                         1 Group #                       1 K/A #                           029 EK2.06 Importance Rating             2.9 ATWS: Knowledge of the interrelations between the following and an ATWS: Breakers, relays, and disconnects Proposed Question:               Common 46 Given the following conditions:
New X   Question History:
* Reactor Trip Breaker testing is in progress on Train "A".
Last NRC Exam Question Cognitive Level:
* Reactor Trip Breaker "A" is open.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
* Reactor Trip Bypass Breaker "A" is closed.
55.41 7 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 42 of 51 Rev f    Examination Outline Cross
* A transient occurs initiating an AUTOMATIC Reactor Trip signal.
-reference:
* The Reactor does NOT trip from the AUTOMATIC signal.
Level RO SRO Tier # 1   Group # 1   K/A # 029 EK2.0 6  Importance Rating 2.9   ATWS: Knowledge of the interrelations between the following and an ATWS: Breakers, relays, and disconnects Proposed Question:
Which of the following describes the condition that has contributed to the Reactor Trip failure?
Common 4 6  Given the following conditions:
Reactor Trip...
Reactor Trip Breaker testing is in progress on Train "A".
A. Breaker "B" Undervoltage Trip coil failed to energize.
Reactor Trip Breaker "A" is open. Reactor Trip Bypass Breaker "A" is closed.
A transient occurs initiating an AUTOMATIC Reactor Trip signal.
The Reactor does NOT trip from the AUTOMATIC signal. Which of the following describes the condition that has contributed to the Reactor Trip failure? Reactor Trip
... A. Breaker "B" Undervoltage Trip coil failed to energize.
B. Bypass Breaker "A" Undervoltage Trip coil failed to deenergize.
B. Bypass Breaker "A" Undervoltage Trip coil failed to deenergize.
C. Bypass Breaker "A" Shunt Trip coil failed to energize.
C. Bypass Breaker "A" Shunt Trip coil failed to energize.
D. Breaker "B" Shunt Trip coil failed to deenergize.
D. Breaker "B" Shunt Trip coil failed to deenergize.
Proposed Answer:
Proposed Answer:                 B Explanation:
B Explanation:
A. Incorrect. Plausible because Breaker "B" is equipped with an undervoltage trip coil, however, trip coils are normally energized and deenergize on a trip signal.
A. Incorrect. Plausible because Breaker "B" is equipped with an undervoltage trip coil, however, trip coils are normally energized and deenergize on a trip signal.
B. Correct. Given the conditions listed, the Bypass Breaker Undervoltage Trip coil failed to deenergize.
B. Correct. Given the conditions listed, the Bypass Breaker Undervoltage Trip coil failed to deenergize.
C. Incorrect. Plausible because the Shunt Trip coil is designed to energize and trip open the breaker, however, Bypass Breaker "A" is not equipped with a Shunt Trip
C. Incorrect. Plausible because the Shunt Trip coil is designed to energize and trip open the breaker, however, Bypass Breaker "A" is not equipped with a Shunt Trip.
. D. Incorrect. Plausible because Breaker "B" is equipped with a Shunt Trip coil, however, it energizes to trip. Technical Reference(s)
D. Incorrect. Plausible because Breaker B is equipped with a Shunt Trip coil, however, it energizes to trip.
OP51.SYS.ES1.LN, Page 35 & Figure 1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)         OP51.SYS.ES1.LN, Page 35 & Figure 1                   Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 42 of 51                                          Rev f
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 43 of 51 Rev f  Learning Objective:
 
STATE the performance and design attributes of the following Solid State Protection System components, flow paths, and features:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                           Form ES-401-5 Learning Objective:   STATE the performance and design attributes of the following Solid State Protection System components, flow paths, and features:
Reactor Trip Breakers and Reactor Trip Bypass Breakers (OP51.SYS.ES2.OB02)
* Reactor Trip Breakers and Reactor Trip Bypass Breakers (OP51.SYS.ES2.OB02)
DRAW a basic one line diagram of the reactor trip and bypass breaker configuration and EXPLAIN the operation of the reactor trip and bypass breakers, the undervoltage trip coil, the shunt trip coil, and the auto shunt trip coil and DESCRIBE switchgear response to a manual or automatic reactor trip signal. (OP51.SYS.ES2.OB05)
DRAW a basic one line diagram of the reactor trip and bypass breaker configuration and EXPLAIN the operation of the reactor trip and bypass breakers, the undervoltage trip coil, the shunt trip coil, and the auto shunt trip coil and DESCRIBE switchgear response to a manual or automatic reactor trip signal. (OP51.SYS.ES2.OB05)
Question Source:
Question Source:           Bank #               CPNPP LXR Modified Bank #                           (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge               X Comprehension or Analysis 10 CFR Part 55 Content:     55.41   6 55.43 Page 43 of 51                                         Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 6 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 44 of 51 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 038 EA1.01 Importance Rating


===4.5 Steam===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                              Level                            RO            SRO Tier #                            1 Group #                          1 K/A #                              038 EA1.01 Importance Rating                4.5 Steam Generator Tube Rupture: Ability to operate and/or monitor the following as they apply to a Steam Generator Tube Rupture: SG levels, for abnormal increase in any SG Proposed Question:               Common 47 Given the following condition:
Generator Tube Rupture
* After entering EOP-3.0A, Steam Generator Tube Rupture, the crew is unable to identify the ruptured Steam Generator (SG) in Step 2, Identify Ruptured SG(s).
: Ability to operate and/or monitor the following as they apply to a Steam Generator Tube Rupture: SG levels, for abnormal increase in any SG Proposed Question:
Which of the following guidance is provided for this situation?
Common 4 7  Given the following condition:
After entering EOP
-3.0A, Steam Generator Tube Rupture, the crew is unable to identify the ruptured Steam Generator (SG) in Step 2, Identify Ruptured SG(s). Which of the following guidance is provided for this situation?
A. Close Blowdown Isolation Valves from all Steam Generators.
A. Close Blowdown Isolation Valves from all Steam Generators.
B. Isolate all Steam Generators prior to identifying the ruptured SG.
B. Isolate all Steam Generators prior to identifying the ruptured SG.
C. Do NOT isolate any Steam Generator until ruptured SG identified
C. Do NOT isolate any Steam Generator until ruptured SG identified.
. D. Close Auxiliary Feedwater Flow Control Valves to all Steam Generators.
D. Close Auxiliary Feedwater Flow Control Valves to all Steam Generators.
Proposed Answer:
Proposed Answer:                 C Explanation:
C Explanation:
A. Incorrect. Plausible because this action would be performed if the ruptured Steam Generator was identified at Step 3.
A. Incorrect. Plausible because this action would be performed if the ruptured Steam Generator was identified at Step 3.
B. Incorrect. Plausible because this action would be performed if the ruptured Steam Generator was identified at Step 3 and its associated MSIV could not be closed per the RNO column.
B. Incorrect. Plausible because this action would be performed if the ruptured Steam Generator was identified at Step 3 and its associated MSIV could not be closed per the RNO column.
C. Correct. In this condition, the RNO column directs performance of Steps 7 through 15 in an attempt to identify the ruptured Steam Generator.
C. Correct. In this condition, the RNO column directs performance of Steps 7 through 15 in an attempt to identify the ruptured Steam Generator.
D. Incorrect. Plausible if thought that isolating Auxiliary Feedwater flow would help identify the ruptured Steam Generator, however, this action violates minimum feedwater requirements.
D. Incorrect. Plausible if thought that isolating Auxiliary Feedwater flow would help identify the ruptured Steam Generator, however, this action violates minimum feedwater requirements.
Technical Reference(s)
Technical Reference(s)         EOP-3.0A, Steps 2, 3, & 7                               Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:         Given a procedural step, or sequence of steps from EOP-3.0, STATE the purpose/bases for the step(s). (LO21.ERG.E3A.OB103)
EOP-3.0A, Steps 2, 3, & 7 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Page 44 of 51                                                Rev f
None Learning Objective:
Given a procedural step, or sequence of steps from EOP
-3.0, STATE the purpose/bases for the step(s). (LO21.ERG.E3A.OB103)


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 45 of 51 Rev f  Question Source:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet           Form ES-401-5 Question Source:         Bank #               CPNPP LXR Modified Bank #                 (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   10 55.43 Page 45 of 51                             Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 46 of 51 Rev f     Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 040 AK1.06 Importance Rating


===3.7 Steam===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                          1 Group #                          1 K/A #                              040 AK1.06 Importance Rating              3.7 Steam Line Rupture: Knowledge of the operational implications of the following concepts as they apply to the Steam Line Rupture: High energy steam line break considerations Proposed Question:               Common 48 How would the accuracy of the Steam Generator narrow range level indication be affected following a high energy line break inside Containment?
Line Rupture
: Knowledge of the operational implications of the following concepts as they apply to the Steam Line Rupture: High energy steam line break considerations Proposed Question:
Common 4 8  How would the accuracy of the Steam Generator narrow range level indication be affected following a high energy line break inside Containment?
A. Expected to consistently indicate higher than actual.
A. Expected to consistently indicate higher than actual.
B. Environmental conditions do not affect indicated level.
B. Environmental conditions do not affect indicated level.
C. Expected to consistently indicate lower than actual.
C. Expected to consistently indicate lower than actual.
D. Indicated level is erratic, but accuracy is not affected. Proposed Answer:
D. Indicated level is erratic, but accuracy is not affected.
A Explanation:
Proposed Answer:                 A Explanation:
A. Correct. When the reference leg flashes indicated level will be consistently higher than actual level.
A. Correct. When the reference leg flashes indicated level will be consistently higher than actual level.
B. Incorrect. Plausible if thought that there were no significant effects on Steam Generator level during a high energy line break.
B. Incorrect. Plausible if thought that there were no significant effects on Steam Generator level during a high energy line break.
C. Incorrect. Plausible because reference leg flashing doesn't lower level in the reference leg, however, this results in indicated level being higher than actual level.
C. Incorrect. Plausible because reference leg flashing doesn't lower level in the reference leg, however, this results in indicated level being higher than actual level.
D. Incorrect. Plausible because the Note prior to Step 1 reminds the operator to use the correct level indication due to temperature induced errors. Additionally, not only does reference leg flashing create an indicated level that is erratic but also impacts Steam Generator level accuracy.
D. Incorrect. Plausible because the Note prior to Step 1 reminds the operator to use the correct level indication due to temperature induced errors. Additionally, not only does reference leg flashing create an indicated level that is erratic but also impacts Steam Generator level accuracy.
Technical Reference(s)
Technical Reference(s)         EOP-1.0A, Step 1 Caution                               Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:       DISCUSS the bases for all steps, Cautions and Notes included in EOP-1.0.
EOP-1.0A, Step 1 Caution Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
(LO21.ERG.E1A.OB105)
None Learning Objective:
Question Source:                 Bank #                     CPNPP LXR Modified Bank #                                   (Note changes or attach parent)
DISCUSS the bases for all steps, Cautions and Notes included in EOP
New Page 46 of 51                                                 Rev f
-1.0. (LO21.ERG.E1A.OB105)
Question Source: Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 47 of 51 Rev f  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 5  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 48 of 51 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # W/E12 EK3.1 Importance Rating


===3.5 Uncontrolled===
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet  Form ES-401-5 Question History:        Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge      X Comprehension or Analysis 10 CFR Part 55 Content:  55.41  5 55.43 Page 47 of 51                    Rev f
Depressurization of All Steam Generators
 
: Knowledge of the reasons for the following responses as they apply to the Uncontrolled Depressurization of All Steam Generators: Facility operating characteristics during transient conditions, including coolant chemistry and the effects of temperature, pressure, and reactivity changes and operating limitations and reasons for these operating characteristics Proposed Question:
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO                SRO Tier #                            1 Group #                          1 K/A #                              W/E12 EK3.1 Importance Rating              3.5 Uncontrolled Depressurization of All Steam Generators: Knowledge of the reasons for the following responses as they apply to the Uncontrolled Depressurization of All Steam Generators: Facility operating characteristics during transient conditions, including coolant chemistry and the effects of temperature, pressure, and reactivity changes and operating limitations and reasons for these operating characteristics Proposed Question:               Common 49 Given the following conditions:
Common 4 9  Given the following conditions:
* ECA-2.1A, Uncontrolled Depressurization of All Steam Generators, is in progress on Unit 1 following a Loss of Offsite Power.
ECA-2.1A, Uncontrolled Depressurization of All Steam Generators, is in progress on Unit 1 following a Loss of Offsite Power
* Auxiliary Feedwater (AFW) flow has been reduced to 100 GPM on each Steam Generator (SG).
. Auxiliary Feedwater (AFW) flow has been reduced to 100 GPM on each Steam Generator (SG).
Which of the following describes the expected plant response to the AFW flow reduction and what actions are to be taken as SG pressures decrease?
Which of the following describes the expected plant response to the AFW flow reduction and what actions are to be taken as SG pressures decrease?
A. RCS Hot Leg temperatures will eventually increase as a result of a loss of Natural Circulation. Raise AFW flow while continuing in ECA
A. RCS Hot Leg temperatures will eventually increase as a result of a loss of Natural Circulation. Raise AFW flow while continuing in ECA-2.1A, Uncontrolled Depressurization of All Steam Generators.
-2.1A, Uncontrolled Depressurization of All Steam Generators.
B. RCS Hot Leg temperatures will eventually increase as a result of a loss of Natural Circulation, Raise AFW flow and transition to FRH-0.1A, Response to Loss of Secondary Heat Sink.
B. RCS Hot Leg temperatures will eventually increase as a result of a loss of Natural Circulation , Raise AFW flow and transition to FRH
C. The SGs will eventually become completely depressurized due to inadequate secondary heat sink. A transition to EOP-2.0A, Faulted Steam Generator Isolation, is required.
-0.1A, Response to Loss of Secondary Heat Sink.
D. The SGs will eventually become completely depressurized due to inadequate secondary heat sink. A transition to FRH-0.1A, Response to Loss of Secondary Heat Sink, is required.
C. The SGs will eventually become completely depressurized due to inadequate secondary heat sink. A transition to E OP-2.0A, Faulted Steam Generator Isolation, is required
Proposed Answer:                 A Page 48 of 51                                                    Rev f
. D. The SGs will eventually become completely depressurized due to inadequate secondary heat sink
 
. A transition to FRH
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Explanation:
-0.1A, Response to Loss of Secondary Heat Sink, is required
. Proposed Answer:
A ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 49 of 51 Rev f  Explanation:
A. Correct. When AFW flow is reduced to 100 GPM, eventually Hot Leg temperatures will rise when SG inventory is depleted. AFW flow is raised to restore Natural Circulation.
A. Correct. When AFW flow is reduced to 100 GPM, eventually Hot Leg temperatures will rise when SG inventory is depleted. AFW flow is raised to restore Natural Circulation.
B. Incorrect. Plausible because Hot Leg temperatures will begin to increase as SG inventory lowers, however, FRH-0.1A conditions are not met because the AFW flow reduction was controlled by the crew. C. Incorrect. Plausible because the SGs depressurize as long as they are faulted, however, transition to EOP-2.0A is only performed when one Steam Generator re
B. Incorrect. Plausible because Hot Leg temperatures will begin to increase as SG inventory lowers, however, FRH-0.1A conditions are not met because the AFW flow reduction was controlled by the crew.
-pressurizes.
C. Incorrect. Plausible because the SGs depressurize as long as they are faulted, however, transition to EOP-2.0A is only performed when one Steam Generator re-pressurizes.
D. Incorrect. Plausible because the SGs depressurize as long as they are faulted, however, ECA
D. Incorrect. Plausible because the SGs depressurize as long as they are faulted, however, ECA-2.1 must be performed to completion unless a SG is isolated or tubes rupture.
-2.1 must be performed to completion unless a SG is isolated or tubes rupture.
Technical Reference(s)     ECA-2.1A, Step 2                             Attached w/ Revision # See ECA-2.1A, Attachment 4, Step 33 Bases         Comments / Reference Proposed references to be provided during examination: None Learning Objective:     Given a major action step of ECA-2.1, STATE the basis for all actions taken.
Technical Reference(s)
(LO21.ERG.C21.OB03)
ECA-2.1A, Step 2 Attached w/ Revision # See Comments / Reference ECA-2.1A, Attachment 4, Step 33 Bases Proposed references to be provided during examination:
Question Source:           Bank #                   CPNPP LXR Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41   5, 10 55.43 Page 49 of 51                                      Rev f
Given a major action step of ECA
 
-2.1, STATE the basis for all actions taken. (LO21.ERG.C21.OB03)
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                     Form ES-401-5 Examination Outline Cross-reference:                                 Level                           RO             SRO Tier #                           1 Group #                           1 K/A #                               054 AA2.02 Importance Rating               4.1 Loss of Main Feedwater: Ability to determine and interpret the following as they apply to the Loss of Main Feedwater:
Question Source:
Differentiation between loss of all MFW and trip of one MFW pump Proposed Question:                 Common 50 Given the following condition:
Bank # CPNPP LXR   Modified Bank #
* Unit 2 is at 100% power.
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content: 55.41 5, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 50 of 51 Rev f    Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 1   K/A # 054 AA2.02 Importance Rating 4.1   Loss of Main Feedwater
: Ability to determine and interpret the following as they apply to the Loss of Main Feedwater
: Differentiation between loss of all MFW and trip of one MFW pump Proposed Question:
Common 5 0  Given the following condition:
Unit 2 is at 100% power.
What effect would actuation of Train A Safety Injection have on the Main Feedwater Pumps?
What effect would actuation of Train A Safety Injection have on the Main Feedwater Pumps?
A. Both Main Feedwater Pumps run until tripped by P-4, Reactor Trip.
B. Both Main Feedwater Pumps trip when the Safety Injection occurs.
C. Main Feedwater Pump 2-01 trips due to the Safety Injection Signal.
Main Feedwater Pump 2-02 is tripped by P-4, Reactor Trip.
D. Main Feedwater Pump 2-01 trips due to the Safety Injection Signal.
Main Feedwater Pump 2-02 continues to run.
Proposed Answer:                    B Explanation:
A. Incorrect. Plausible because P-4 will generate a Feedwater Isolation Signal if TAVE is below the low TAVE setpoint of 564ºF.
B. Correct. Either Train of Safety Injection will trip both Main Feedwater Pumps.
C. Incorrect. Plausible because the Train A related Main Feedwater Pump trip and the Train B related Main Feedwater Pump trips when the interlocks associated with P-4 actuated.
D. Incorrect. Plausible if thought that Train separation existed to trip each of the Main Feedwater Pumps.
Technical Reference(s)            OP51.SYS.MF1.LN, Pages 43 & 46                          Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:          LIST and EXPLAIN the Main Feedwater System design features which provide for the trips, permissives, and interlocks associated with the following:
Page 50 of 51                                                Rev f


A. Both Main Feedwater Pumps run until tripped by P
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                  Form ES-401-5
-4, Reactor Trip.
* Safety Injection (OP51.SYS.MF1.OB11)
B. Both Main Feedwater Pumps trip when the Safety Injection occurs.
Question Source:           Bank #
C. Main Feedwater Pump 2
Modified Bank #       CPNPP LXR    (Note changes or attach parent)
-01 trips due to the Safety Injection Signal.
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge        X Comprehension or Analysis 10 CFR Part 55 Content:    55.41  4, 7 55.43 Page 51 of 51                                Rev f
Main Feedwater Pump 2
-02 is tripped by P
-4, Reactor Trip.
D. Main Feedwater Pump 2
-01 trips due to the Safety Injection Signal.
Main Feedwater Pump 2
-02 continues to run.
Proposed Answer:
B  Explanation:
A. Incorrect. Plausible because P-4 will generate a Feedwater Isolation Signal if T AVE is below the low T AVE setpoint of 564ºF.
B. Correct. Either Train of Safety Injection will trip both Main Feedwater Pumps. C. Incorrect. Plausible because the Train A related Main Feedwater Pump trip and the Train B related Main Feedwater Pump trips when the interlocks associated with P
-4 actuated.
D. Incorrect. Plausible if thought that Train separation existed to trip each of the Main Feedwater Pumps. Technical Reference(s)
OP51.SYS.MF1.LN, Page s 43 & 46 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
None  Learning Objective:
LIST and EXPLAIN the Main Feedwater System design features which provide for the trips, permissives, and interlocks associated with the following:


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 51 of 51 Rev f  Safety Injection (OP51.SYS.MF1.OB11
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                                Level                            RO              SRO Tier #                            1 Group #                          1 K/A #                              055 EK3.02 Importance Rating                4.3 Station Blackout: Knowledge of the reasons for the following responses as they apply to the Station Blackout: Actions contained in EOP for loss of offsite and onsite power Proposed Question:                  Common 51 Which of the following describes the reasons for depressurizing the Steam Generators to 270 PSIG in accordance with ECA-0.0A, Loss of All AC Power?
)  Question Source:
A. Initiates Safety Injection System Accumulator discharge and minimize Reactor Coolant Pump seal leakage.
Bank #    Modified Bank #
B. Establishes Natural Circulation conditions and initiates Safety Injection System Accumulator discharge.
CPNPP LXR (Note changes or attach parent)
C. Establishes Natural Circulation conditions and minimizes secondary heat sink requirements if Auxiliary Feedwater inventory is limited.
New    Question History:
D. Minimizes secondary heat sink requirements if Auxiliary Feed inventory is limited and minimizes RCP seal leakage.
Last NRC Exam Question Cognitive Level:
Proposed Answer:                    A Explanation:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
A. Correct. Lowering RCS pressure and restoring lost inventory is the reason for depressurizing.
55.41 4, 7  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 1 of 50 Rev f Examination Outline Cross
B. Incorrect. Plausible because RCS depressurization will assist Natural Circulation, but is not the reason for depressurization to 270 PSIG.
-reference:
C. Incorrect. Plausible because Natural Circulation will be established as a byproduct of rapid depressurization. Rapid cooldown and depressurization due to limited AFW is an action that could be taken in E-3 series procedures.
Level RO  SRO  Tier # 1    Group # 1    K/A # 055 EK3.02  Importance Rating
D. Incorrect. Plausible because in E-3 series procedures, rapid secondary depressurizations may be performed when there is limited makeup availability.
Technical Reference(s)           ECA-0.0A, Step 18                                      Attached w/ Revision # See ECA-0.0A, Attachment 7, Step 18 & Bases                Comments / Reference Proposed references to be provided during examination: None Learning Objective:         DESCRIBE the major action taken by the operator during a loss of all AC power to increase the time to core uncovery. (LO21.ERG.C00.OB05)
Given a procedural step, or sequence of steps from ECA-0.1, STATE the purpose/basis for the step(s). (LO21.ERG.C00.OB15)
Page 1 of 50                                                 Rev f


===4.3 Station===
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet            Form ES-401-5 Question Source:          Bank #              CPNPP LXR Modified Bank #                  (Note changes or attach parent)
BlackoutProposed Question:
New Question History:          Last NRC Exam Question Cognitive LevelMemory or Fundamental Knowledge Comprehension or Analysis          X 10 CFR Part 55 Content:   55.41  5, 10 55.43 Page 2 of 50                              Rev f
: Knowledge of the reasons for the following responses as they apply to the Station Blackout: Actions contained in EOP for loss of offsite and onsite power Common 51  Which of the following describes the reasons for depressurizing the Steam Generators to 27 0 PSIG in accordance with ECA
-0.0 A , Loss of All AC Power
?  A. Initiate s Safety Injection Syste m Accumulator discharge and minimize Reactor Coolant Pump seal leakage.
B. Establish es Natural Circulation conditions and initiate s Safety Injection System Accumulator discharge. C. Establish es Natural Circulation conditions and minimize s secondary heat sink requirements if Auxiliary Feedwater inventory is limited.
D. Minimize s secondary heat sink requirements if Auxiliary Feed inventory is limited and minimize s RCP seal leakage.
Proposed Answer:
A  Explanation: A. Correct. Lowering RCS pressure and restoring lost inventory is the reason for depressurizing.
B. Incorrect. Plausible because RCS depressurization will assist Natural Circulation, but is not the reason for depressurization to 2 7 0 PSIG. C. Incorrect. Plausible because Natural Circulation will be established as a byproduct of rapid depressurization. Rapid cooldown and depressurization due to limited AFW is an action that could be taken in E
-3 series procedures
. D. Incorrect. Plausible because i n E-3 series procedures, rapid secondary depressurizations may be performed when there is limited makeup availability.
Technical Reference(s)
ECA-0.0A, Step 18 Attached w/ Revision # See Comments / Reference ECA-0.0A, Attachment 7, Step 18 & Bases Proposed references to be provided during examination:
None Learning Objective:
DESCRIBE the major action taken by the operator during a loss of all AC power to increase the time to core uncovery. (LO21.ERG.C00.OB05)
Given a procedural step, or sequence of steps from ECA
-0.1, STATE the purpose/basis for the step(s). (LO21.ERG.C00.OB15)


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 2 of 50 Rev f  Question Source:
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                       Form ES-401-5 Examination Outline Cross-reference:                                   Level                           RO             SRO Tier #                           1 Group #                           1 K/A #                               057 AA1.03 Importance Rating               3.6 Loss of Vital AC Instrument Bus: Ability to determine and interpret the following as they apply to the Loss of Vital AC Instrument Bus: Feedwater pump speed to control pressure and level in SG Proposed Question:                Common 52 Given the following conditions:
Bank # CPNPP LXR  Modified Bank #
* Unit 2 is at 80% power with all controls in AUTO.
  (Note changes or attach parent)
* Main Feedwater Pump speeds are lowering.
New    Question History:
* All Feedwater Flow Control Valves are opening.
Last NRC Exam Question Cognitive Level:
* NO operator actions have occurred.
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 5, 10  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 3 of 50 Rev f    Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 1   K/A # 057 AA1.03 Importance Rating 3.6   Loss of Vital AC Instrument BusProposed Question:
: Ability to determine and interpret the following as they apply to the Loss of Vital AC Instrument Bus: Feedwater pump speed to control pressure and level in SG Common 52 Given the following conditions:
Unit 2 is at 80% power with all controls in AUTO.
Main Feedwater Pump speeds are lowering.
All Feedwater Flow Control Valves are opening.
NO operator actions have occurred.
Which of the following has occurred?
Which of the following has occurred?
A. 2-FT-512A, SG 1 STM FLO failed high.
A. 2-FT-512A, SG 1 STM FLO failed high.
Line 1,743: Line 1,218:
C. 2-PT-507, MS HDR PRESS failed low.
C. 2-PT-507, MS HDR PRESS failed low.
D. 2-PT-508, FWP DISCH HDR PRESS failed low.
D. 2-PT-508, FWP DISCH HDR PRESS failed low.
Proposed Answer:
Proposed Answer:                 C Explanation:
C Explanation:
A. Incorrect. Plausible because if SG 1 STM FLO failed low Main Feedwater Pump speed would lower and the conditions listed would be the same.
A. Incorrect. Plausible because if SG 1 STM FLO failed low B. Incorrect. Plausible because when SG 1 LVL CHAN 1 fails Main Feedwater Pump speed would lower and the conditions listed would be the same.
B. Incorrect. Plausible because when SG 1 LVL CHAN 1 fails high, the Steam Generator 1-01 Feedwater Flow Control Valve would open, however, for the conditions listed each Steam Generator would have to have a level channel failure. Additionally, opening of the FWCV would cause P to lower which would increase Main Feedwater Pump speed.
high C. Correct. When Main Steam Header pressure fails , the Steam Generator 1
C. Correct. When Main Steam Header pressure fails low due to a Loss of Vital Instrument Bus supplied power, the Feedwater System would sense a high P and would lower Main Feedwater Pump speed. Feedwater Flow Control Valves open in an attempt to maintain level consistent with the conditions listed.
-01 Feedwater Flow Control Valve would open, however, for the conditions listed each Steam Generator would have to have a level channel failure.
D. Incorrect. Plausible because if Feedwater Pump Discharge Header Pressure failed high Main Feedwater Pump speed would lower and the conditions listed would be the same.
Additionally, opening of the FWCV would cause P to lower which would increase Main Feedwater Pump speed.
Page 3 of 50                                                    Rev f
low D. Incorrect. Plausible because if Feedwater Pump Discharge Header Pressure failed due to a Loss of Vital Instrument Bus supplied power, the Feedwater System would sense a high P and would lower Main Feedwater Pump speed. Feedwater Flow Control Valves open in an attempt to maintain level consistent with the conditions listed.
 
high Main Feedwater Pump speed would lower and the conditions listed would be the same.
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                  Form ES-401-5 Technical Reference(s)    ABN-603, Attachments 1 & 2                Attached w/ Revision # See ABN-709, Steps 3.1 & 3.2                  Comments / Reference ABN-709, Steps 5.1 & 5.2 ABN-707, Steps 2.1 & 2.2 ABN-710, Steps 2.1 & 2.2 Proposed references to be provided during examination: None Learning Objective:  DESCRIBE the impact of the following malfunctions on operation of the Steam Generator Water Level Control System:
* Steam pressure transmitter (OP51.SYS.SN1.OB10)
Question Source:          Bank #              CPNPP LXR Modified Bank #                        (Note changes or attach parent)
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:    55.41  5, 7 55.43 Page 4 of 50                                    Rev f


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 4 of 50 Rev f  Technical Reference(s)
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                         Form ES-401-5 Examination Outline Cross-reference:                                   Level                           RO               SRO Tier #                           1 Group #                         1 K/A #                               062 AA2.04 Importance Rating               2.5 Loss of Nuclear Service Water: Ability to determine and interpret the following as they apply to the Loss of Nuclear Service Water: The normal values and upper limits for the temperatures of the components cooled by SWS Proposed Question:              Common 53 Given the following conditions:
ABN-603, Attachments 1 & 2 Attached w/ Revision # See Comments / Reference ABN-709, Steps 3.1 & 3.2  ABN-709, Steps 5.1 & 5.2 ABN-707, Steps 2.1 & 2.2 ABN-710, Steps 2.1 & 2.2 Proposed references to be provided during examination:
* Unit 1 is at 100% power.
None  Learning Objective:
* Station Service Water (SSW) Pump 1-01 has tripped.
DESCRIBE the impact of the following malfunctions on operation of the Steam Generator Water Level Control System:
* ABN-501, Station Service Water Malfunction, is in progress.
Steam pressure transmitter (OP51.SYS.SN1.OB10)
* SSW Pump 1-02 discharge flow lowers to zero (0) GPM.
Question Source:
* Train A and Train B Component Cooling Water (CCW) Heat Exchanger outlet temperatures are 125ºF and rising.
Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 5, 7  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 5 of 50 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 1   K/A # 062 AA2.0 4  Importance Rating 2.5   Loss of Nuclear Service WaterProposed Question:
: Ability to determine and interpret the following as they apply to the Loss of Nuclear Service Water: The normal values and upper limits for the temperatures of the components cooled by SWS Common 53   Given the following conditions:
Unit 1 is at 100% power.
Station Service Water (SSW) Pump 1
-01 has tripped.
ABN-501, Station Service Water Malfunction, is in progress.
SSW Pump 1
-02 discharge flow lowers to zero (0) GPM.
Train A and Train B Component Cooling Water (CCW) Heat Exchanger outlet temperatures are 125ºF and rising.
Which of the following describes the actions required per ABN-501, Station Service Water Malfunction?
Which of the following describes the actions required per ABN-501, Station Service Water Malfunction?
Trip the...
Trip the...
A. CCW Pumps only . B. Reactor and CCW Pumps only C. Reactor and Reactor Coolant Pumps . only D. CCW Pumps, Reactor, and Reactor Coolant Pumps.  
A. CCW Pumps only.
  . Proposed Answer:
B. Reactor and CCW Pumps only.
D Explanation:
C. Reactor and Reactor Coolant Pumps only.
D. CCW Pumps, Reactor, and Reactor Coolant Pumps.
Proposed Answer:                 D Explanation:
A. Incorrect. Plausible because the CCW Pumps are stopped, however, the Reactor would be tripped and RCPs are secured.
A. Incorrect. Plausible because the CCW Pumps are stopped, however, the Reactor would be tripped and RCPs are secured.
B. Incorrect. Plausible because the Reactor is tripped and the RCPs are stopped, however, the CCW Pumps would also be secured.
B. Incorrect. Plausible because the Reactor is tripped and the RCPs are stopped, however, the CCW Pumps would also be secured.
C. Incorrect. Plausible because the Reactor and RCPs are tripped, however, the CCW Pumps would also be secured.
C. Incorrect. Plausible because the Reactor and RCPs are tripped, however, the CCW Pumps would also be secured.
D. Correct. When CCW Heat Exchanger outlet temperatures exceed 122ºF, the CCW Pumps are stopped, Reactor tripped, and RCPs secured per the RNO action of ABN
D. Correct. When CCW Heat Exchanger outlet temperatures exceed 122ºF, the CCW Pumps are stopped, Reactor tripped, and RCPs secured per the RNO action of ABN-501.
-501.
Page 5 of 50                                                    Rev f
ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 6 of 50 Rev f  Technical Reference(s)
 
ABN-501, Step 5.3.6 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Technical Reference(s)   ABN-501, Step 5.3.6                         Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:   EXPLAIN the reasons for the following responses as they apply to a SSW /
None Learning Objective:
CCW malfunction:
EXPLAIN the reasons for the following responses as they apply to a SSW / CCW malfunction:
* Reactor and/or Turbine trip, manual and automatic (LO21.ABN.501.OB03)
Reactor and/or Turbine trip, manual and automatic (LO21.ABN.501.OB03)
DESCRIBE the function and operation of systems, components, and controls required to be operated in response to a SSW / CCW malfunction.
DESCRIBE the function and operation of systems, components, and controls required to be operated in response to a SSW / CCW malfunction. (LO21.ABN.501.OB05)
(LO21.ABN.501.OB05)
Question Source:
Question Source:         Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41   8, 10 55.43 Page 6 of 50                                    Rev f
  (Note changes or attach parent)
 
New   Question History:
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                                 Level                           RO             SRO Tier #                           1 Group #                         1 K/A #                             065 G 2.4.4 Importance Rating               4.5 Loss of Instrument Air: Emergency Procedures / Plan: Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures Proposed Question:                Common 54 Given the following conditions:
Last NRC Exam Question Cognitive Level:
* Unit 1 is at 100% power.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
* A major break in the Instrument Air System has occurred.
55.41 8, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 7 of 50 Rev f  Examination Outline Cross
* ABN-301, Instrument Air System Malfunction, is being implemented.
-reference:
* All available Air Compressors are running.
Level RO SRO Tier # 1   Group # 1   K/A # 065 G 2.4.4 Importance Rating 4.5   Loss of Instrument AirProposed Question: : Emergency Procedures / Plan: Ability to recognize abnormal indications for system operating parameters that are entry
* Instrument Air header pressure is 33 PSIG.
-level conditions for emergency and abnormal operating procedures Common 54   Given the following conditions:
Which of the following describes required actions for this condition?
Unit 1 is at 100% power.
A. Continue efforts to restore Instrument Air pressure and simultaneously initiate a Manual Turbine Runback per ABN-302, Feedwater, Condensate, Heater Drain System Malfunction.
A major break in the Instrument Air System has occurred.
B. Trip the Reactor and enter EOP-0.0A, Reactor Trip or Safety Injection. Continue in ABN-301, Instrument Air System Malfunction, and take actions to control Charging flow locally.
ABN-301, Instrument Air System Malfunction
C. Align the Unit Instrument Air Cross-tie to assist in pressure recovery. If loss of air operated valve control is observed, trip the Reactor and enter EOP-0.0A, Reactor Trip or Safety Injection.
, is being implemented.
D. Continue efforts to restore Instrument Air pressure per ABN-301, Instrument Air System Malfunction, and when pressure reaches 25 PSIG, trip the Reactor and enter EOP-0.0A, Reactor Trip or Safety Injection.
All available Air Compressors are running.
Proposed Answer:                   B Page 7 of 50                                                Rev f
Instrument Air header pressure is 33 PSIG. Which of the following describes required actions for this condition?
 
A. Continue efforts to restore Instrument Air pressure and simultaneously initiate a Manual Turbine Runback per ABN-302, Feedwater, Condensate, Heater Drain System Malfunction
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                           Form ES-401-5 Explanation:
. B. Trip the Reactor and enter EOP
A. Incorrect. Plausible because loss of Instrument Air has a significant impact on the secondary plant and it could be thought that rapidly reducing power would minimize the effects, however, ABN-301 requires a Unit trip when pressure reaches 35 PSIG.
-0.0A, Reactor Trip or Safety Injection. Continue in ABN-301, Instrument Air System Malfunction
B. Correct. ABN-301, Instrument Air Malfunction, requires a Unit trip when pressure reaches 35 PSIG. The EOP is entered but the actions of ABN-301, Instrument Air Malfunction are still performed which includes local control of Charging flow due to failed open valves.
, and take actions to control Charging flow locally.
C. Incorrect. Plausible if thought that the only trip criteria was loss of air operated valve control and that would be the proper actions until loss of control was observed, however, ABN-301 requires a Unit trip when pressure reaches 35 PSIG.
C. Align the Unit Instrument Air Cross
D. Incorrect. Plausible if thought that the pressure criteria for tripping was 25 PSIG and the actions to trip at that point would be correct.
-tie to assist in pressure recovery. If loss of air operated valve control is observed, trip the Reactor and enter EOP
Technical Reference(s)       ABN-301, Steps 5, 7, & 14                         Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     EVALUATE all system limitations and precautions associated with responding to Instrument Air System malfunctions. (LO21.ABN.301.OB06)
-0.0A, Reactor Trip or Safety Injection.
Question Source:             Bank #                   CPNPP LXR Modified Bank #                               (Note changes or attach parent)
D. Continue efforts to restore Instrument Air pressure per ABN-301, Instrument Air System Malfunction
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                       X 10 CFR Part 55 Content:       55.41   5, 10 55.43 Page 8 of 50                                           Rev f
, and when pressure reaches 25 PSIG, trip the Reactor and enter EOP-0.0A, Reactor Trip or Safety Injection.
Proposed Answer:
B ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 8 of 50 Rev f  Explanation:
A. Incorrect. Plausible because loss of Instrument Air has a significant impact on the secondary plant and it could be thought that rapidly reducing power would minimize the effects, however, ABN
-301 requires a Unit trip when pressure reaches 35 PSIG. B. Correct. ABN
-301, Instrument Air Malfunction
, requires a Unit trip when pressure reaches 35 PSIG. The EOP is entered but the actions of ABN-301, Instrument Air Malfunction are still performed which includes local control of Charging flow due to failed open valves.
C. Incorrect. Plausible if thought that the only trip criteria was loss of air operated valve control and that would be the proper actions until loss of control was observed, however, ABN
-301 requires a Unit trip when pressure reaches 35 PSIG. D. Incorrect. Plausible if thought that the pressure criteria for tripping was 25 PSIG and the actions to trip at that point would be correct. Technical Reference(s)
ABN-301, Steps 5, 7, & 14 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
None Learning Objective:
EVALUATE all system limitations and precautions associated with responding to Instrument Air System malfunctions. (LO21.ABN.301.OB06)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge   Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 5, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 9 of 50 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # W/E04 EK1.1 Importance Rating 3.5    LOCA Outside ContainmentProposed Question:
: Knowledge of the operational implications of the following concepts as they apply to the LOCA Outside Containment: Components, capacity, and function of emergency systems Common 55  Given the following conditions:
A Loss of Coolant Accident has occurred on Unit 2.
Actions of ECA
-1.2B, LOCA Outside Containment, are being performed.
The break was not isolated by the actions of ECA
-1.2B, and a transition to ECA
-1.1 B , Loss of Emergency Coolant Recirculation
, is required.
Which of the following identifies the effect that a transition to ECA
-1.1 B , Loss of Emergency Coolant Recirculation
, has on mitigating the accident?


ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                            Level                            RO                SRO Tier #                            1 Group #                          1 K/A #                              W/E04 EK1.1 Importance Rating                3.5 LOCA Outside Containment: Knowledge of the operational implications of the following concepts as they apply to the LOCA Outside Containment: Components, capacity, and function of emergency systems Proposed Question:            Common 55 Given the following conditions:
* A Loss of Coolant Accident has occurred on Unit 2.
* Actions of ECA-1.2B, LOCA Outside Containment, are being performed.
* The break was not isolated by the actions of ECA-1.2B, and a transition to ECA-1.1B, Loss of Emergency Coolant Recirculation, is required.
Which of the following identifies the effect that a transition to ECA-1.1B, Loss of Emergency Coolant Recirculation, has on mitigating the accident?
Actions are taken to...
Actions are taken to...
A. ensure all Containment Isolation Phase A and Containment Isolation Phase B valves are closed.
A. ensure all Containment Isolation Phase A and Containment Isolation Phase B valves are closed.
Line 1,853: Line 1,289:
C. increase the injection flow rate to restore Reactor Coolant System pressure.
C. increase the injection flow rate to restore Reactor Coolant System pressure.
D. stabilize RCS pressure to prevent the Safety Injection Accumulators from dumping out the break.
D. stabilize RCS pressure to prevent the Safety Injection Accumulators from dumping out the break.
Proposed Answer:
Proposed Answer:             B Explanation:
B Explanation:
A. Incorrect. Plausible because this action is performed, however, it is done during EOP-1.0B entry.
A. Incorrect. Plausible because this action is performed, however, it is done during EOP
B. Correct. Reducing injection flow will minimize RWST depletion and pumps would be stopped in the event the RWST is emptied.
-1.0 B entry. B. Correct. Reducing injection flow will minimize RWST depletion and pumps would be stopped in the event the RWST is emptied.
C. Incorrect. Plausible if thought that this would help mitigate the problem, however, actions contained in ECA-1.1B are taken to restore Reactor Coolant System mass.
C. Incorrect. Plausible if thought that this would help mitigate the problem, however, actions contained in ECA
D. Incorrect. Plausible because for certain events this action is performed, however, the ECA-1.1B Flowchart dumps the accumulators if there is no other source of water.
-1.1 B are taken to restore Reactor Coolant System mass.
Technical Reference(s)       ECA-1.1B, Flowchart                                       Attached w/ Revision # See Page 9 of 50                                                  Rev f
D. Incorrect. Plausible because for certain events this action is performed, however, the ECA
 
-1.1 B Flowchart dumps the accumulators if there is no other source of water.
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 ECA-1.2B, Step 3                             Comments / Reference Proposed references to be provided during examination: None Learning Objective:   Given a procedural Step, Note or Caution from ECA-1.1, DISCUSS the reason or basis for the Step, Note or Caution (LO21.ERG.C11.104)
Technical Reference(s)
Give a procedural Step, Note or Caution, from ECA-1.2, DISCUSS the reason or bases for the Step, Note, or Caution. (LO21.ERG.C12.OB04)
ECA-1.1B, Flowchart Attached w/ Revision # See ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 10 of 5 0 Rev f  ECA-1.2B, Step 3 Comments / Reference Proposed references to be provided during examination:
Question Source:         Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:   55.41   8, 10 55.43 Page 10 of 50                                   Rev f
Given a procedural Step, Note or Caution from ECA
-1.1, DISCUSS the reason or basis for the Step, Note or Caution   (LO21.ERG.C11.104)
Give a procedural Step, Note or Caution, from ECA
-1.2, DISCUSS the reason or bases for the Step, Note, or Caution. (LO21.ERG.C12.OB04)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content: 55.41 8, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 11 of 50 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 077 AK3.02  Importance Rating


===3.6 Generator===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                          1 Group #                        1 K/A #                            077 AK3.02 Importance Rating              3.6 Generator Voltage and Electric Grid Disturbances: Knowledge of the reasons for the following responses as they apply to the Generator Voltage and Electric Grid Disturbances: Actions contained in the abnormal operating procedure for voltage and grid disturbances Proposed Question:                Common 56 Given the following conditions:
Voltage and Electric Grid DisturbancesProposed Question:
* Unit 2 Turbine load was at 1265 MWe prior to a degradation of Grid frequency.
: Knowledge of the reasons for the following responses as they apply to the Generator Voltage and Electric Grid Disturbances: Actions contained in the abnormal operating procedure for voltage and grid disturbances Common 56 Given the following conditions
* ABN-601, Response to a 138/345 KV System Malfunction, Section 9.0, Grid Frequency Fluctuations/Loss of QSE Generation Controller Communications, is in progress.
Unit 2 Turbine load was at 1265 MWe prior to a degradation of Grid frequency.
* All four High Pressure Turbine Control Valves have fully opened.
ABN-601, Response to a 138/345 KV System Malfunction, Section 9.0, Grid Frequency Fluctuations/Loss of QSE Generation Controller Communications, is in progress. All four High Pressure Turbine Control Valves have fully opened.
* Grid frequency has lowered to 57.0 HZ.
Grid frequency has lowered to 57.0 HZ.
* QSE Generation Controller is unable to raise Grid frequency.
QSE Generation Controller is unable to raise Grid frequency.
Which of the following identifies the action required by ABN-601, Response to a 138/345 KV System Malfunction?
Which of the following identifies the action required by ABN
A. Ensure the Reactor is tripped and go to EOP-0.0B, Reactor Trip and Safety Injection.
-601 , Response to a 138/345 KV System Malfunction
B. Perform a Normal Start of both Diesel Generators and attempt to stabilize frequency on Safeguards Buses.
A. Ensure the Reactor is tripped and go to EOP
C. Take actions to stabilize plant power level for a load reduction.
-0.0B, Reactor Trip and Safety Injection.
B. Perform a Normal Start of both Diesel Generators and attempt to stabilize frequency on Safeguards Buses
. C. Take actions to stabilize plant power level for a load reduction.
D. Coordinate with QSE Generation Controller to trip the Reactor.
D. Coordinate with QSE Generation Controller to trip the Reactor.
Proposed Answer:
Proposed Answer:                 A Page 11 of 50                                                Rev f
A ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 12 of 50 Rev f  Explanation:
 
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Explanation:
A. Correct. Main Turbine load has increased in response to decreasing grid frequency with the Turbine not in LOAD CONTROL. Grid frequency is less than 57.2 Hz which is the setpoint for the RCP under frequency trip.
A. Correct. Main Turbine load has increased in response to decreasing grid frequency with the Turbine not in LOAD CONTROL. Grid frequency is less than 57.2 Hz which is the setpoint for the RCP under frequency trip.
B. Incorrect. Plausible because this action is correct a s Grid Frequency lowers, however, less than 57.5 Hz requires a Reactor Trip
B. Incorrect. Plausible because this action is correct as Grid Frequency lowers, however, less than 57.5 Hz requires a Reactor Trip.
. C. Incorrect. Plausible because Main Turbine load will change, however, this action is required on a high Grid frequency.
C. Incorrect. Plausible because Main Turbine load will change, however, this action is required on a high Grid frequency.
D. Incorrect. Plausible because notification of the QSE Generation Controller is desirable, however, not when a Reactor Trip is required
D. Incorrect. Plausible because notification of the QSE Generation Controller is desirable, however, not when a Reactor Trip is required.
. Technical Reference(s)
Technical Reference(s)     ABN-601, Section 9.2                         Attached w/ Revision # See ABN-601, Steps 9.3,.1 & 9.3.3 RNO             Comments / Reference ABN-601, Steps 9.3.4 RNO & 9.3.7 RNO Proposed references to be provided during examination: None Learning Objective:     DIAGNOSE plant conditions and IDENTIFY the indications which are entry-level conditions for ABNs required to be implemented in response to a Station Electrical malfunction. (LO21.ABN.601.OB04)
ABN-601, Section 9.2 Attached w/ Revision # See Comments / Reference ABN-601, Steps 9.3,.1 & 9.3.3 RNO ABN-601, Steps 9.3.4 RNO &
EVALUATE all system limitations and precautions associated with responding to a Station Electrical malfunction. (LO21.ABN.601.OB12)
9.3.7 RNO Proposed references to be provided during examination:
Question Source:           Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41   5, 10 55.43 Page 12 of 50                                    Rev f
DIAGNOSE plant conditions and IDENTIFY the indications which are entry
 
-level conditions for ABNs required to be implemented in response to a Station Electrical malfunction. (LO21.ABN.601.OB04)
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                                 Level                         RO             SRO Tier #                           1 Group #                         2 K/A #                               051 AA2.02 Importance Rating               3.9 Loss of Condenser Vacuum: Ability to determine and interpret the following as they apply to the Loss of Condenser Vacuum:
EVALUATE all system limitations and precautions associated with responding to a Station Electrical malfunction. (LO21.ABN.601.OB12)
Conditions requiring reactor and/or turbine trip Proposed Question:                Common 57 Given the following conditions:
Question Source:
* Main Condenser vacuum has been degrading on Unit 1.
Bank # CPNPP LXR   Modified Bank #
* ABN-304, Main Condenser and Circulating Water System Malfunction, is in progress.
  (Note changes or attach parent)
* Condenser vacuum indicates 23.5 inches Hg and is degrading by 0.25 inches Hg per minute.
New   Question History:
* The crew is reducing load at approximately 2% per minute.
Last NRC Exam Question Cognitive Level:
* Power is currently at 40%.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
Assuming the current trends continue, which of the following describes the action that must be taken, and the LATEST time the action must be taken, in accordance with ABN-304, Main Condenser and Circulating Water System Malfunction?
55.41 5, 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 13 of 50 Rev f    Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 2   K/A # 051 AA2.02 Importance Rating 3.9   Loss of Condenser VacuumProposed Question:
: Ability to determine and interpret the following as they apply to the Loss of Condenser Vacuum: Conditions requiring reactor and/or turbine trip Common 57 Given the following conditions
Main Condenser vacuum has been degrading on Unit 1. ABN-304, Main Condenser and Circulating Water System Malfunction, is in progress
. Condenser vacuum indicates 23.5 inches Hg and is degrading by 0.25 inches Hg per minute. The crew is reducing load at approximately 2% per minute.
Power is currently at 40%. Assuming the current trends continue, which of the following describes the action that must be taken, and the LATEST time the action must be taken, in accordance with ABN
-304, Main Condenser and Circulating Water System Malfunction?
Trip the...
Trip the...
A. Reactor within 10 minutes.
A. Reactor within 10 minutes.
B. Turbine within 10 minutes.
B. Turbine within 10 minutes.
C. Reactor within 15 minutes
C. Reactor within 15 minutes.
. D. Turbine within 15 minutes
D. Turbine within 15 minutes.
. Proposed Answer:
Proposed Answer:                   A Explanation:
A Explanation:
A. Correct. In 10 minutes vacuum would not be greater than 21 inches Hg, and power is > 10%,
A. Correct. In 10 minutes vacuum would not be greater than 21 inches Hg, and power is > 10%, therefore, trip the Reactor.
therefore, trip the Reactor.
B. Incorrect. Plausible because tripping the Turbine is the correct action if power level is less than 10%, however, in 10 minutes power would still exceed 10%.
B. Incorrect. Plausible because tripping the Turbine is the correct action if power level is less than 10%, however, in 10 minutes power would still exceed 10%.
C. Incorrect. Plausible because power would be at 10% in 15 minutes but vacuum will be 21" in 10 minutes, requiring a Reactor Trip in 10 minutes.
C. Incorrect. Plausible because power would be at 10% in 15 minutes but vacuum will be 21 in 10 minutes, requiring a Reactor Trip in 10 minutes.
Page 13 of 50                                                  Rev f


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 14 of 50 Rev f D. Incorrect. Plausible because power would be at 10% in 15 minutes but vacuum will be 21" in 10 minutes, requiring a Reactor Trip in 10 minutes.
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                 Form ES-401-5 D. Incorrect. Plausible because power would be at 10% in 15 minutes but vacuum will be 21 in 10 minutes, requiring a Reactor Trip in 10 minutes.
Technical Reference(s)
Technical Reference(s)     ABN-304, Step 3.3.3                       Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     EVALUATE all system limitations and precautions associated with responding to a Main Condenser, Circ Water, and TPCW malfunction.
ABN-304, Step 3.3.3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
(LO21.ABN.304.OB12)
None Learning Objective:
Question Source:           Bank #               CPNPP LXR Modified Bank #                       (Note changes or attach parent)
EVALUATE all system limitations and precautions associated with responding to a Main Condenser, Circ Water, and TPCW malfunction. (LO21.ABN.304.OB12)
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:     55.41   10 55.43 Page 14 of 50                                     Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 15 of 50 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 2    K/A # 060 AK2.02 Importance Rating


===2.7 Accidental===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                            Form ES-401-5 Examination Outline Cross-reference:                                Level                    RO            SRO Tier #                    1 Group #                    2 K/A #                        060 AK2.02 Importance Rating        2.7 Accidental Gaseous Radwaste Release: Knowledge of the interrelations between Accidental Gaseous Radwaste Release and the following: Auxiliary building ventilation system Proposed Question:                  Common 58 Given the following conditions:
Gaseous Radwaste ReleaseProposed Question:
* X-HCV-0014, Waste Gas Discharge Control Valve, was inadvertently opened while transferring Waste Gas Decay Tanks.
: Knowledge of the interrelations between Accidental Gaseous Radwaste Release and the following: Auxiliary building ventilation system Common 58   Given the following conditions:
* Radiation levels in the Ventilation System are rapidly rising.
X-HCV-0014, Waste Gas Discharge Control Valve, was inadvertently opened while transferring Waste Gas Decay Tanks.
Radiation levels in the Ventilation System are rapidly rising.
Which of the following Radiation Monitors will cause an automatic closure of X-HCV-0014, Waste Gas Discharge Control Valve?
Which of the following Radiation Monitors will cause an automatic closure of X-HCV-0014, Waste Gas Discharge Control Valve?
: 1. X-RE-5250, Waste Gas. 2. X-RE-5567A/B , South/North Vent Stack Discharge Noble Gas
: 1. X-RE-5250, Waste Gas.
. 3. X-RE-5570A/B , South/North Wide Range Gas Monitor Effluent
: 2. X-RE-5567A/B, South/North Vent Stack Discharge Noble Gas.
. 4. X-RE-5701, Auxiliary Building Vent Duct
: 3. X-RE-5570A/B, South/North Wide Range Gas Monitor Effluent.
. A. 1 and 2. B. 1 and 3. C. 2 and 4. D. 3 and 4. Proposed Answer:
: 4. X-RE-5701, Auxiliary Building Vent Duct.
D Explanation:
A. 1 and 2.
A. Incorrect. Plausible if thought that X-RE-5250 Radiation Monitor provides an input to close the Waste Gas Discharge Control Valve, however, it is used to monitor gaseous activity at the Waste Gas Compressor suction. Additionally, noble gases would be released and end in the Vent Stack flow path, however, this function is not provided by X-RE-5567A/B. B. Incorrect. Plausible because X-RE-5570A/B will close X
B. 1 and 3.
-HCV-0014, however, X-RE-5250 does not.
C. 2 and 4.
C. Incorrect. Plausible because X-RE-5701 will clos e X-HCV-0014, however, X-RE-5567A/B does not.
D. 3 and 4.
D. Correct. Per ABN-902, both of these Radiation Monitors will close X
Proposed Answer:                   D Explanation:
-HCV-0014. Technical Reference(s)
A. Incorrect. Plausible if thought that X-RE-5250 Radiation Monitor provides an input to close the Waste Gas Discharge Control Valve, however, it is used to monitor gaseous activity at the Waste Gas Compressor suction. Additionally, noble gases would be released and end in the Vent Stack flow path, however, this function is not provided by X-RE-5567A/B.
ABN-902, Steps 2.1.b & 2.2 Attached w/ Revision # See ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 16 of 50 Rev f OP51.SYS.GH1.LN, Page 33 Comments / Reference Proposed references to be provided during examination:
B. Incorrect. Plausible because X-RE-5570A/B will close X-HCV-0014, however, X-RE-5250 does not.
None  Learning Objective:
C. Incorrect. Plausible because X-RE-5701 will close X-HCV-0014, however, X-RE-5567A/B does not.
STATE the functions, operation and interlocks of the following Gaseous Waste Processing System components:
D. Correct. Per ABN-902, both of these Radiation Monitors will close X-HCV-0014.
X-HCV-0014, GWPS Discharge to Plant Vent Stacks (OP51.SYS.GH1.OB02)  Question Source:
Technical Reference(s)             ABN-902, Steps 2.1.b & 2.2                       Attached w/ Revision # See Page 15 of 50                                       Rev f
Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 11, 1 4  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 17 of 50 Rev f    Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 2    K/A # 037 AK1.02  Importance Rating


===3.5 Steam===
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                      Form ES-401-5 OP51.SYS.GH1.LN, Page 33                      Comments / Reference Proposed references to be provided during examination: None Learning Objective:   STATE the functions, operation and interlocks of the following Gaseous Waste Processing System components:
Generator Tube LeakProposed Question:
* X-HCV-0014, GWPS Discharge to Plant Vent Stacks (OP51.SYS.GH1.OB02)
: Knowledge of the operational implications of the following concepts as they apply to the Steam Generator Tube Leak: Leakrate versus pressure drop Common 59  Given the following conditions with Steam Generator Tube Leakage of 200 gallons per day (GPD):  Reactor Coolant System pressure is 2200 PSIG and lowering.
Question Source:          Bank #              CPNPP LXR Modified Bank #                          (Note changes or attach parent)
Steam Generator pressure is
New Question History:          Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                    X 10 CFR Part 55 Content:    55.41  11, 14 55.43 Page 16 of 50                                    Rev f
~900 PSIG. The Unit is tripped and plant parameters following the trip are:
Reactor Coolant System pressure is 1700 PSIG and lowering.
Steam Generator pressure is
  ~110 0 PSIG. Based on the two sets of data, which of the following describes the effect on primary-to-secondary leakage? 


ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                              Level                          RO                SRO Tier #                            1 Group #                          2 K/A #                              037 AK1.02 Importance Rating              3.5 Steam Generator Tube Leak: Knowledge of the operational implications of the following concepts as they apply to the Steam Generator Tube Leak: Leakrate versus pressure drop Proposed Question:              Common 59 Given the following conditions with Steam Generator Tube Leakage of 200 gallons per day (GPD):
* Reactor Coolant System pressure is 2200 PSIG and lowering.
* Steam Generator pressure is ~900 PSIG.
The Unit is tripped and plant parameters following the trip are:
* Reactor Coolant System pressure is 1700 PSIG and lowering.
* Steam Generator pressure is ~1100 PSIG.
Based on the two sets of data, which of the following describes the effect on primary-to-secondary leakage?
Leakage following the trip is approximately...
Leakage following the trip is approximately...
A. 50% of the initial leak rate or about 1 00 GPD. B. 67% of the initial leak rate or about 1 3 3 GPD. C. 100% of the initial leak rate or about 2 0 0 GPD. D. 150% of the initial leak rate or about 3 0 0 GPD. Proposed Answer:
A. 50% of the initial leak rate or about 100 GPD.
B Explanation:
B. 67% of the initial leak rate or about 133 GPD.
C. 100% of the initial leak rate or about 200 GPD.
D. 150% of the initial leak rate or about 300 GPD.
Proposed Answer:               B Explanation:
A. Incorrect. Plausible if thought that half the pressure drop yielded half the flow rate.
A. Incorrect. Plausible if thought that half the pressure drop yielded half the flow rate.
B. Correct. Flow is proportional to the square root of the differential pressure; therefore, leakage following the trip is approximately 67% of the initial leak rate.
B. Correct. Flow is proportional to the square root of the differential pressure; therefore, leakage following the trip is approximately 67% of the initial leak rate.
C. Incorrect. Plausible if thought that leakage was not going to change.
C. Incorrect. Plausible if thought that leakage was not going to change.
D. Incorrect. Plausible if a math error is made when calculating square root of the differential pressure.
D. Incorrect. Plausible if a math error is made when calculating square root of the differential pressure.
ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 18 of 50 Rev f  Technical Reference(s)
Page 17 of 50                                                    Rev f
LO21.GFT. FSD, Page 26 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
 
NRC Generic Fundamentals Equation Sheet Learning Objective:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Technical Reference(s)   LO21.GFT. FSD, Page 26                       Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: NRC Generic Fundamentals Equation Sheet Learning Objective:   SOLVE problems using the continuity of fluid flow equation.
SOLVE problems using the continuity of fluid flow equation. (OP51.GFT.FSD.OB13)
(OP51.GFT.FSD.OB13)
Question Source:
Question Source:         Bank #
Bank #   Modified Bank #
Modified Bank #                           (Note changes or attach parent)
  (Note changes or attach parent) New X   Question History:
New                       X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:   55.41   14 55.43 Page 18 of 50                                      Rev f
Last NRC Exam Question Cognitive Level:
 
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                       Form ES-401-5 Examination Outline Cross-reference:                                     Level                         RO           SRO Tier #                           1 Group #                         2 K/A #                             076 AK3.05 Importance Rating               2.9 High Reactor Coolant Activity: Knowledge of the reasons for the following responses as they apply to the High Reactor Coolant Activity: Corrective actions as a result of high fission product radioactivity level in the RCS Proposed Question:                  Common 60 Given the following conditions:
55.41 14 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 19 of 50 Rev f  Examination Outline Cross
* Unit 1 is at 70% power following a Turbine Runback due to Heater Drain Pump 1-01 trip.
-reference:
* 1-RE-0406, Gross Failed Fuel Monitor (FFL-160), indication has been rising for the past hour, and is now in alarm.
Level RO SRO Tier # 1   Group # 2   K/A # 076 AK3.05 Importance Rating 2.9   High Reactor Coolant ActivityProposed Question:
Which of the following describes the action required and reason per ABN-102, High Reactor Coolant Activity?
: Knowledge of the reasons for the following responses as they apply to the High Reactor Coolant Activity: Corrective actions as a result of high fission product radioactivity level in the RCS Common 60 Given the following conditions
A. Ensure Letdown flow is 120-140 GPM to reduce Reactor Coolant System contamination.
Unit 1 is at 70% power following a Turbine Runback due to Heater Drain Pump 1
-01 trip. 1-RE-0406, Gross Failed Fuel Monitor (FFL-160), indication has been rising for the past hour, and is now in alarm.
Which of the following describes the action required and reason per ABN-102, High Reactor Coolant Activity
A. Ensure Letdown flow is 120-140 GPM to reduce Reactor Coolant System contamination.
B. Isolate Letdown to minimize radiation levels in the Auxiliary Building.
B. Isolate Letdown to minimize radiation levels in the Auxiliary Building.
C. Bypass the mixed bed demineralizer to allow the Letdown filter to remove CRUD
C. Bypass the mixed bed demineralizer to allow the Letdown filter to remove CRUD.
. D. Alternate mixed bed demineralizers to minimize radiation levels in the Auxiliary Building. Proposed Answer:
D. Alternate mixed bed demineralizers to minimize radiation levels in the Auxiliary Building.
A Explanation:
Proposed Answer:                   A Explanation:
A. Correct. Letdown flow is raised to increase purification of the Reactor Coolant System.
A. Correct. Letdown flow is raised to increase purification of the Reactor Coolant System.
B. Incorrect. Plausible because it is desirable to minimize radiation levels in the Auxiliary Building , however, personnel would be informed and the RCS must be cleaned up.
B. Incorrect. Plausible because it is desirable to minimize radiation levels in the Auxiliary Building, however, personnel would be informed and the RCS must be cleaned up.
C. Incorrect. Plausible because CRUD release may have occurred, however, bypassing the mixed bed demineralizer is not an appropriate action.
C. Incorrect. Plausible because CRUD release may have occurred, however, bypassing the mixed bed demineralizer is not an appropriate action.
D. Incorrect. Plausible because it is always desirable to minimize radiation levels, however, when this occurs personnel are notified and entry into the Auxiliary Building would be minimized.
D. Incorrect. Plausible because it is always desirable to minimize radiation levels, however, when this occurs personnel are notified and entry into the Auxiliary Building would be minimized.
Technical Reference(s)
Technical Reference(s)           ABN-102, Steps 2.1.b & Section 2.3                           Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 19 of 50                                              Rev f
ABN-102, Steps 2.1.b & Section 2.3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
 
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 20 of 50 Rev f Learning Objective:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Learning Objective:   EXPLAIN the reasons for the following responses as they apply to a high reactor coolant activity and excessive reactor coolant leakage:
EXPLAIN the reasons for the following responses as they apply to a high reactor coolant activity and excessive reactor coolant leakage:
* Corrective actions as a result of high fission-product radioactivity level in the RCS. (LO21.ABN.103.OB03)
Corrective actions as a result of high fission
Question Source:         Bank #
-product radioactivity level in the RCS. (LO21.ABN.103.OB03)
Modified Bank #                           (Note changes or attach parent)
Question Source: Bank #   Modified Bank #
New                         X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge               X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   12, 13 55.43 Page 20 of 50                                        Rev f
  (Note changes or attach parent)
 
New X   Question History:
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                               Level                         RO             SRO Tier #                           1 Group #                         2 K/A #                             W/E08 EA1.3 Importance Rating               3.6 RCS Overcooling-PTS: Ability to operate and/or monitor the following as they apply to Pressurized Thermal Shock: Desired operating results during abnormal and emergency situations Proposed Question:                Common 61 FRP-0.1A, Response to Imminent Pressurized Thermal Shock (PTS) Condition directs the operator to check if Emergency Core Cooling System (ECCS) flow can be terminated.
Last NRC Exam Question Cognitive Level:
Which of the following conditions is required with respect to this step?
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
A. ECCS flow should not be terminated until adequate Pressurizer level is established to support restarting a Reactor Coolant Pump.
55.41 12, 13 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 21 of 50 Rev f    Examination Outline Cross
B. Emergency Core Cooling System flow must be terminated to stabilize Reactor Coolant System Hot Leg temperature.
-reference:
Level RO SRO Tier # 1   Group # 2   K/A # W/E08 EA1.3 Importance Rating 3.6   RCS Overcooling
-PTSProposed Question:
: Ability to operate and/or monitor the following as they apply to Pressurized Thermal Shock: Desired operating results during abnormal and emergency situations Common 61 FRP-0.1A, Response to Imminent Pressurized Thermal Shock (PTS) Condition directs the operator to check if Emergency Core Cooling System (ECCS) flow can be terminated.
Which of the following conditions is required with respect to this step? A. ECCS flow should not be terminated until adequate Pressurizer level is established to support restarting a Reactor Coolant Pump
. B. Emergency Core Cooling System flow must be terminated to stabilize Reactor Coolant System Hot Leg temperature.
C. Monitor RVLIS and Core Exit Thermocouples to determine if adequate Reactor Coolant System inventory exists such that core cooling can be verified.
C. Monitor RVLIS and Core Exit Thermocouples to determine if adequate Reactor Coolant System inventory exists such that core cooling can be verified.
D. Subcooling and Pressurizer level must be closely monitored because Safety Injection termination criteria are more restrictive in this procedure
D. Subcooling and Pressurizer level must be closely monitored because Safety Injection termination criteria are more restrictive in this procedure.
. Proposed Answer:
Proposed Answer:                 C Explanation:
C Explanation:
A. Incorrect. Plausible because starting an RCP could be a desired action, however, the concerns are adequate inventory and subcooling.
A. Incorrect. Plausible because starting an RCP could be a desired action, however, the concerns are adequate inventory and subcooling. B. Incorrect. Plausible because flow may need to be terminated, however, the reason is not that listed. C. Correct. Core inventory and adequate subcooling are requirements that must be met prior to Safety Injection (SI) termination.
B. Incorrect. Plausible because flow may need to be terminated, however, the reason is not that listed.
D. Incorrect. Plausible because these are the two criteria that must be met for SI flow to be terminated, however, they are less restrictive than other Functional Recovery Procedures.
C. Correct. Core inventory and adequate subcooling are requirements that must be met prior to Safety Injection (SI) termination.
Technical Reference(s)
D. Incorrect. Plausible because these are the two criteria that must be met for SI flow to be terminated, however, they are less restrictive than other Functional Recovery Procedures.
FRP-0.1A, Attachment 4, Step 7 Bases Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)         FRP-0.1A, Attachment 4, Step 7 Bases                     Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 21 of 50                                                Rev f
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 22 of 50 Rev f Learning Objective:
 
Given a major action step of FRP
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Learning Objective:   Given a major action step of FRP-0.2A/B, STATE the basis for all actions taken. (LO21.ERG.FP2.OB03)
-0.2A/B, STATE the basis for all actions taken. (LO21.ERG.FP2.OB03)
Question Source:         Bank #               CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Question Source:
New Question History:         Last NRC Exam       CPNPP 2009 Question Cognitive Level: Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   10 55.43 Page 22 of 50                                      Rev f
Bank # CPNPP LXR   Modified Bank #
 
  (Note changes or attach parent)
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                       Form ES-401-5 Examination Outline Cross-reference:                                 Level                           RO               SRO Tier #                           1 Group #                           2 K/A #                               033 AA2.07 Importance Rating               3.9 Loss of Intermediate Range NI: Ability to determine and interpret the following as they apply to the Loss of Intermediate Range Nuclear Instrumentation: Confirmation of reactor trip Proposed Question:              Common 62 Given the following conditions:
New   Question History: Last NRC Exam CPNPP 2009 Question Cognitive Level:
* Unit 1 is operating at 3% power.
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
* First Out Panel annunciator 1-ALB-6C, Window 2.5 - IR FLUX HI, goes into alarm.
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 23 of 50 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 2   K/A # 033 AA2.07 Importance Rating 3.9   Loss of Intermediate Range NIProposed Question:
: Ability to determine and interpret the following as they apply to the Loss of Intermediate Range Nuclear Instrumentation
: Confirmation of reactor trip Common 62 Given the following conditions:
Unit 1 is operating at 3% power. First Out Panel annunciator 1-ALB-6C, Window 2.5  
- IR FLUX HI, goes into alarm.
Which of the following describes the immediate response to this alarm?
Which of the following describes the immediate response to this alarm?
Enter...
A. ABN-107, Emergency Boration, and immediately commence a boration greater than 30 GPM.
B. ABN-702, Intermediate Range Instrument Malfunction, and verify Reactor power greater than P-6 setpoint.
C. EOP-0.0A, Reactor Trip or Safety Injection, and verify the Reactor is tripped.
D. Technical Specification LCO 3.3.1, Reactor Trip System Instrumentation, and perform actions for a loss of an Intermediate Range Nuclear Instrument.
Proposed Answer:                C Explanation:
A. Incorrect. Plausible because one of the probable causes of this alarm is an inadvertent dilution, however, this first-out indication requires an immediate Reactor Trip.
B. Incorrect. Plausible because this is an entry condition into ABN-702, however, receipt of this alarm indicates one channel of Intermediate Range Nuclear Instrument amps is greater than 25%. This action is correct unless the Reactor is tripped.
C. Correct. One channel of Intermediate Range Nuclear Instrument amps is greater than 25%. An immediate Reactor Trip and entry into EOP-0.0A is required.
D. Incorrect. Plausible because Technical Specifications would be entered if one channel has failed, however, the channel indicates high and a Reactor Trip is required.
Page 23 of 50                                                    Rev f


Enter... A. ABN-107 , Emergency Boration, and immediately commence a boration greater than 30 GPM
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                        Form ES-401-5 Technical Reference(s)    ABN-702, Step 2.1.a, 2.2.a, 2.3.1 & 2.3.2        Attached w/ Revision # See ABN-107, Steps 2.1.b                            Comments / Reference Technical Specification LCO 3.3.1 Proposed references to be provided during examination: None Learning Objective:  EVALUATE the following as they apply to a Reactor Trip or Safety Injection:
. B. ABN-702, Intermediate Range Instrument Malfunction, and verify Reactor power greater than P
* Reactor trip first-out panel indicator (LO21. ERG.E0A.OB03)
-6 setpoint
Question Source:          Bank #
. C. EOP-0.0A, Reactor Trip or Safety Injection, and verify the Reactor is tripped. D. Technical Specification LCO 3.3.1, Reactor Trip System Instrumentation, and perform actions for a loss of an Intermediate Range Nuclear Instrument.
Modified Bank #                              (Note changes or attach parent)
Proposed Answer:
New                            X Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                      X 10 CFR Part 55 Content:    55.41 55.43  5 Page 24 of 50                                      Rev f
C  Explanation:
A. Incorrect. Plausible because one of the probable causes of this alarm is an inadvertent dilution, however, this first
-out indication requires an immediate Reactor Trip.
B. Incorrect. Plausible because this is an entry condition into ABN
-702, however, receipt of this alarm indicates one channel of Intermediate Range Nuclear Instrument amps is greater than 25%. This action is correct unless the Reactor is tripped.
C. Correct. One channel of Intermediate Range Nuclear Instrument amps is greater than 25%. An immediate Reactor Trip and entry into EOP
-0.0A is required.
D. Incorrect. Plausible because Technical Specifications would be entered if one channel has failed, however, the channel indicates high and a Reactor Trip is required.


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 24 of 50 Rev f  Technical Reference(s)
ES-401                       CPNPP NRC 2011 RO Written Exam Worksheet                                 Form ES-401-5 Examination Outline Cross-reference:                                 Level                       RO               SRO Tier #                         1 Group #                       2 K/A #                           W/E02 EK3.3 Importance Rating           3.9 SI Termination: Knowledge of the reasons for the following responses as they apply to the SI Termination: Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations Proposed Question:                Common 63 Given the following conditions:
ABN-702, Step 2.1.a, 2.2.a, 2.3.1 & 2.3.2 Attached w/ Revision # See Comments / Reference ABN-107, Steps 2.1.b Technical Specification LCO 3.3.1 Proposed references to be provided during examination:
* A Reactor Trip and Safety Injection have occurred as a result of a Faulted Steam Generator outside Containment.
None  Learning Objective:
* EOS-1.1A, Safety Injection Termination, is in progress.
EVALUATE the following as they apply to a Reactor Trip or Safety Injection:
* Centrifugal Charging Pump 1-01 is running and aligned to the normal Charging flow path.
Reactor trip first
* Centrifugal Charging Pump 1-02 is OFF and in AUTO.
-out panel indicator (LO21.
* Safety Injection Pumps 1-01 and 1-02 are OFF and in AUTO.
ERG.E0A.OB03)  Question Source:
* Residual Heat Removal Pumps 1-01 and 1-02 are OFF and in AUTO.
Bank #    Modified Bank #
* FRI-0.1A, Response to High Pressurizer Level, was started due to a YELLOW path Critical Safety Function Status Tree (CSFST) for Inventory.
  (Note changes or attach parent)
* While performing FRI-0.1A, subcooling approaches 20ºF.
New X  Question History:
Which of the following action is required and reason for the action per EOS-1.1A, Safety Injection Termination?
Last NRC Exam Question Cognitive Level:
A. Reestablish a Pressurizer bubble per FRI-0.1A to restore subcooling.
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
B. Close FCV-121, Charging Flow Control Valve to minimize Charging flow.
55.41  55.43 5 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 25 of 50 Rev f    Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 2   K/A # W/E02 EK3.3 Importance Rating 3.9   SI TerminationProposed Question:
: Knowledge of the reasons for the following responses as they apply to the SI Termination: Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations Common 63 Given the following conditions:
A Reactor Trip and Safety Injection have occurred as a result of a Faulted Steam Generator outside Containment
. EOS-1.1A , Safety Injection Termination, is in progress
. Centrifugal Charging Pump 1-01 is running and aligned to the normal Charging flow path. Centrifugal Charging Pump 1-02 is OFF and in AUTO. Safety Injection Pumps 1-01 and 1-02 are OFF and in AUTO. Residual Heat Removal Pumps 1-01 and 1-02 are OFF and in AUTO. FRI-0.1A, Response to High Pressurizer Level, was started due to a YELLOW path Critical Safety Function Status Tree (CSFST) for Inventory.
While performing FRI
-0.1A, subcooling approaches 2 0ºF. Which of the following action is required and reason for the action per EOS-1.1A, Safety Injection Termination
A. Reestablish a Pressurizer bubble per FRI-0.1A to restore subcooling.
B. Close FCV-121, Ch arging Flow Control Valve to minimize Charging flow.
C. Manually start ECCS Pumps to restore subcooled margin.
C. Manually start ECCS Pumps to restore subcooled margin.
D. Manually initiate Safety Injection to immediately start all ECCS Pumps.
D. Manually initiate Safety Injection to immediately start all ECCS Pumps.
Proposed Answer:
Proposed Answer:                   C Explanation:
C Explanation:
A. Incorrect. Plausible because this action is performed here, however, subcooling has been lost and EOS-1.1A Foldout Page requires starting ECCS Pumps.
A. Incorrect. Plausible because this action is performed here, however, subcooling has been lost and EOS-1.1A Foldout Page requires starting ECCS Pumps.
B. Incorrect. Plausible if thought that correcting high Pressurizer level was the desired action.
B. Incorrect. Plausible if thought that correcting high Pressurizer level was the desired action.
C. Correct. Per the EOS-1.1A , Attachment 1.A, Foldout Page. D. Incorrect. Plausible because SI has been reset, however, not per EOS-1.1A Foldout Page ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 26 of 50 Rev f guidance. Technical Reference(s)
C. Correct. Per the EOS-1.1A, Attachment 1.A, Foldout Page.
EOS-1.1A , Attachment 1.A , Foldout Page Attached w/ Revision # See Comments / Reference ODA-407 , Attachment 8
D. Incorrect. Plausible because SI has been reset, however, not per EOS-1.1A Foldout Page Page 25 of 50                                                Rev f
.A, Steps 4 &
 
10 Proposed references to be provided during examination:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 guidance.
None Learning Objective:
Technical Reference(s)   EOS-1.1A, Attachment 1.A, Foldout Page     Attached w/ Revision # See ODA-407, Attachment 8.A, Steps 4 & 10       Comments / Reference Proposed references to be provided during examination: None Learning Objective:   IDENTIFY the items on EOS-1.1 Foldout page including any equipment, parameter, set point or condition. (LO21.ERG.E11.OB107)
IDENTIFY the items on EOS
Question Source:         Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
-1.1 Foldout page including any equipment, parameter, set point or condition. (LO21.ERG.E11.OB107)
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41   10 55.43 Page 26 of 50                                    Rev f
Question Source:
 
Bank # CPNPP LXR   Modified Bank #
ES-401                   CPNPP NRC 2011 RO Written Exam Worksheet                                 Form ES-401-5 Examination Outline Cross-reference:                           Level                          RO             SRO Tier #                           1 Group #                         2 K/A #                             061 G 2.1.28 Importance Rating               4.1 ARM System Alarms: Conduct of Operations: Knowledge of the purpose and function of major system components and controls Proposed Question:            Common 64 Which of the following identifies the status of an Area Radiation Monitor channel with a dark blue background on the PC-11, Digital Radiation Monitoring System?
  (Note changes or attach parent)
A. PC-11 POLL STATUS.
New   Question History:
B. OPERATE FAILURE.
Last NRC Exam Question Cognitive Level:
C. Channel ALERT alarm.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
D. Channel HIGH alarm.
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 27 of 50 Rev f    Examination Outline Cross
Proposed Answer:             B Explanation:
-reference:
A. Incorrect. Plausible because there is an alarm associated with PC-11 POLL STATUS, however, it is a white indication.
Leve l RO SRO Tier # 1   Group # 2   K/A # 061 G 2.1.28 Importance Rating 4.1   ARM System AlarmsProposed Question:
B. Correct. Designated in the Stem as a dark blue background because an EQUIPMENT FAILURE alarm is a light blue background.
: Conduct of Operations: Knowledge of the purpose and function of major system components and controls Common 64 Which of the following identifies the status of an Area Radiation Monitor channel with a dark blue background on the PC
C. Incorrect. Plausible because there is an alarm associated with Channel ALERT, however, it is a yellow indication.
-11, Digital Radiation Monitoring System?
A. PC-11 POLL STATUS
. B. OPERATE FAILURE.
C. Channel ALERT alarm
. D. Channel HIGH alarm.
Proposed Answer:
B Explanation: A. Incorrect. Plausible because there is an alarm associated with PC
-11 POLL STATUS, however, it is a white indication.
B. Correct. Designated in the Stem as a dark blue background because an EQUIPMENT FAILURE alarm is a light blue C. Incorrect. Plausible because there is an alarm associated with Channel ALERT, however, it is a yellow indication.
background.
D. Incorrect. Plausible because there is an alarm associated with Channel HIGH, however, it is a red indication.
D. Incorrect. Plausible because there is an alarm associated with Channel HIGH, however, it is a red indication.
Technical Reference(s)
Technical Reference(s)       ALM-3200, Attachment 8                                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Digital Radiation Monitoring System:
ALM-3200, Attachment 8 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
* PC-11 Color/Intensity Status Cues (OP51.SYS.RM1.OB04)
None Learning Objective:
Question Source:             Bank #
STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Digital Radiation Monitoring System:
Modified Bank #                                   (Note changes or attach parent)
PC-11 Color/Intensity Status Cues (OP51.SYS.RM1.OB04)
Page 27 of 50                                              Rev f
Question Source:
Bank #   Modified Bank #
  (Note changes or attach parent)


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 28 of 50 Rev f  New X   Question History:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet   Form ES-401-5 New                       X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 11 55.43 Page 28 of 50                   Rev f
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 11 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 29 of 50 Rev f Examination Outline Cross
-reference: Level RO  SRO  Tier # 1    Group # 2    K/A # 059 AK1.02 Importance Rating


===2.6 Accidental===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO              SRO Tier #                          1 Group #                        2 K/A #                            059 AK1.02 Importance Rating              2.6 Accidental Liquid Radwaste Release: Knowledge of the operational implications of the following concepts as they apply to the Accidental Liquid Radwaste Release: Biological effects on humans of various types of radiation, exposure levels that are acceptable for nuclear power plant personnel, and the units used for radiation intensity measurements and for radiation exposure levels Proposed Question:                Common 65 Given the following conditions:
Liquid Radwaste ReleaseProposed Question:
* A Waste Holdup Tank has ruptured in the Auxiliary Building.
: Knowledge of the operational implications of the following concepts as they apply to the Accidental Liquid Radwaste Release: Biological effects on humans of various types of radiation, exposure levels that are acceptable for nuclear power plant personnel, and the units used for radiation intensity measurements and for radiation exposure levels Common 65   Given the following conditions:
* The event has critically injured an operator.
A Waste Holdup Tank has ruptured in the Auxiliary Building.
* High dose rates exist in the area and the Emergency Coordinator has implemented EPP-305, Emergency Exposure Guidelines and Personnel Dosimetry.
The event has critically injured an operator.
Which of the following describes an eligible volunteers dose limit for this life-saving rescue?
High dose rates exist in the area and the Emergency Coordinator has implemented EPP-305, Emergency Exposure Guidelines and Personnel Dosimetry.
Which of the following describes an eligible volunteer's dose limit for this life
-saving rescue?
A volunteer may receive...
A volunteer may receive...
A. a maximum of 5 REM TEDE.
A. a maximum of 5 REM TEDE.
B. a maximum of 10 REM TEDE.
B. a maximum of 10 REM TEDE.
C. a maximum of 25 REM TEDE.
C. a maximum of 25 REM TEDE.
D. greater than 25 REM TEDE
D. greater than 25 REM TEDE.
. Proposed Answer:
Proposed Answer:                 D Explanation:
D Explanation:
A. Incorrect. Plausible because this is the limit for all activities.
A. Incorrect. Plausible because this is the limit for all activities
B. Incorrect. Plausible because this is the limit for protecting valuable property.
. B. Incorrect. Plausible because this is the limit for protecting valuable property
C. Incorrect. Plausible because this is the limit for life saving or protecting large populations (non-volunteer).
. C. Incorrect. Plausible because this is the limit for life saving or protecting large populations (non
D. Correct. An eligible volunteer is not limited in dose for a life-saving action.
-volunteer)
Technical Reference(s)         EPP-305, Step 4.3.2 and Attachment 1                     Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 29 of 50                                                  Rev f
. D. Correct. An eligible volunteer is not limited in dose for a life
 
-saving action.
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                   Form ES-401-5 Learning Objective:   STATE the effect of radiation on cells. (RWT009)
Technical Reference(s)
STATE the Federal Dose Limits for Total Effective Dose Equivalent (TEDE).
EPP-305, Step 4.3.2 and Attachment 1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
(RWT017)
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 30 of 50 Rev f  Learning Objective:
Question Source:         Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
STATE the effect of radiation on cells. (RWT009)
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge             X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   12 55.43 Page 30 of 50                                    Rev f
STATE the Federal Dose Limits for Total Effective Dose Equivalent (TEDE). (RWT017) Question Source:
 
Bank # CPNPP LXR   Modified Bank #
ES-401                     CPNPP NRC 2011 RO Written Exam Worksheet                                 Form ES-401-5 Examination Outline Cross-reference:                               Level                       RO           SRO Tier #                       3 Category #                   1 K/A #                             G 2.1.38 Importance Rating           3.7 Conduct of Operations: Knowledge of the station's verbal requirements when implementing procedures Proposed Question:              Common 66 Given the following conditions:
  (Note changes or attach parent)
* Unit 2 Reactor tripped from 100% power.
New   Question History:
* The crew transitioned to EOS-0.1B, Reactor Trip Response.
Last NRC Exam Question Cognitive Level:
* The transition brief was completed.
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
* The Continuous Action at Step 1 is being directed.
55.41 12 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 31 of 50 Rev f  Examination Outline Cross
Identify the expected verbal communication based on CPNPP verbal requirements during implementation of Emergency Response Guidelines within the Control Room?
-reference:
A. US: Continuous Action, Joe. Check RCS temperature stable at or trending to five five seven degrees.
Level RO SRO Tier # 3   Category # 1   K/A # G 2.1.38   Importance Rating
RO: Dave, RCS temperature is five six one degrees and slowly lowering.
US: Joe, RCS temperature is five six one degrees and slowly lowering.
RO: That is correct.
B. US: Joe, this next step is a Continuous Action.
RO: Dave, the next step is a Continuous Action.
US: Joe, that is correct. Check RCS temperature stable at or trending to five five seven degrees.
RO: Dave, RCS temperature is five six one degrees and slowly decreasing.
C. US:    Joe, Check RCS temperature stable at or trending to five five seven degrees.
RO:    RCS temperature is five six one degrees and slowly lowering.
US:    Five sixty one and slowly lowering.
RO:    Thats right.
D. US:    Attention in the Control Room, Continuous Action. End of announcement.
US:    Joe, Check RCS temperature stable at or trending to five five seven degrees.
RO:    I understand that this step is a Continuous Action.
RO:    Dave, RCS temperature is five six one degrees and slowly decreasing.
Proposed Answer:                A Page 31 of 50                                          Rev f


===3.7 Conduct===
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Explanation:
of OperationsProposed Question:
: Knowledge of the station's verbal requirements when implementing procedures Common 66  Given the following conditions
:  Unit 2 Reactor tripped from 100% power.
The crew transitioned to EOS
-0.1B, Reactor Trip Response. The transition brief was completed.
The Continuous Action at Step 1 is being directed
. Identify the expected verbal communication based on CPNPP verbal requirements during implementation of Emergency Response Guidelines within the Control Room?
A. US:  "Continuous Action, Joe.
Check RCS temperature stable at or trending to five five seven degrees."
RO: "Dave, RCS temperature is five six one degrees and slowly lowering."
US: "Joe, RCS temperature is five six one degrees and slowly lowering."
RO: "That is correct."
B. US: "Joe, this next step is a Continuous Action."
RO: "Dave, the next step is a Continuous Action."
US: "Joe, that is correct.
Check RCS temperature stable at or trending to five five seven degrees."
RO: "Dave, RCS temperature is five six one degrees and slowly decreasing
."  C. US: "Joe, Check RCS temperature stable at or trending to five five seven degrees."
RO: "RCS temperature is five six one degrees and slowly lowering."  US: "Five sixty one and slowly lowering."
RO: "That's right
."
D. US: "Attention in the Control Room, Continuous Action. End of announcement."
US: "Joe, Check RCS temperature stable at or trending to five five seven degrees."
RO: "I understand that this step is a Continuous Action."
RO: "Dave, RCS temperature is five six one degrees and slowly decreasing
."  Proposed Answer:
A ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 32 of 50 Rev f Explanation:
A. Correct. Per the guidance identified and the Site Communication Guide, Operations Procedure Guideline, and Operations Department Procedure Use and Adherence.
A. Correct. Per the guidance identified and the Site Communication Guide, Operations Procedure Guideline, and Operations Department Procedure Use and Adherence.
B. Incorrect.
B. Incorrect. Plausible because the Continuous Action Step must be identified, first names are used, and value with trend is included in the communication, however, decreasing should not be used and acknowledging a Continuous Action Step is not required.
Plausible because the Continuous Action Step must be identified, first names are used, and value with trend is included in the communication, however, decreasing should not be used and acknowledging a Continuous Action Step is not required.
C. Incorrect. Plausible because the communication listed is correct, however, the Reactor Operator failed to state the Unit Supervisor's first name.
C. Incorrect. Plausible because the communication listed is correct, however, the Reactor Operator failed to state the Unit Supervisor's first name.
D. Incorrect. Plausible because the Continuous Action Step must be identified and value with trend is included in the communication, however, decreasing should not be used, first names are not used consistently, and acknowledging a Continuous Action Step is not required.
D. Incorrect. Plausible because the Continuous Action Step must be identified and value with trend is included in the communication, however, decreasing should not be used, first names are not used consistently, and acknowledging a Continuous Action Step is not required.
Technical Reference(s)
Technical Reference(s)       NMG-114, Pages 1 & 2                       Attached w/ Revision # See NMG-114, Attachment 1                       Comments / Reference OPG-3, Section 2.3 ODA-403, Attachment 8.A Proposed references to be provided during examination: None Learning Objective:     STATE requirements for Conduct of Operations in accordance with ODA-102, ODA-407 and Operations Guideline 3. (LO21.ADM.XA3.OB01)
NMG-114, Pages 1 & 2 Attached w/ Revision # See Comments / Reference NMG-114, Attachmen t 1 OPG-3, Section 2.3 ODA-403, Attachment 8.A Proposed references to be provided during examination:
Question Source:             Bank #
None Learning Objective:
Modified Bank #                         (Note changes or attach parent)
STATE requirements for Conduct of Operations in accordance with ODA
New                         X Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   10 55.43 Page 32 of 50                                   Rev f
-102, ODA-407 and Operations Guideline 3. (LO21.ADM.XA3.OB01)
Question Source:
Bank #   Modified Bank #
  (Note changes or attach parent)
New X   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 33 of 50 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 1    K/A # G 2.1.34  Importance Rating


===2.7 Conduct===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                              Form ES-401-5 Examination Outline Cross-reference:                              Level                    RO            SRO Tier #                      3 Category #                  1 K/A #                          G 2.1.34 Importance Rating          2.7 Conduct of Operations: Knowledge of primary and secondary plant chemistry limits Proposed Question:              Common 67 Which of the following is the setpoint and MODE limitation for Dose Equivalent Iodine-131 (I-131) in the Secondary System?
of OperationsProposed Question:
A. 0.10 Ci/gm for MODES 1 and 2 only.
: Knowledge of primary and secondary plant chemistry limits Common 67   Which of the following is the setpoint and MODE limitation for Dose Equivalent Iodine
B. 1.00 Ci/gm for MODES 1 and 2 only.
-131 (I-131) in the Secondary System?
C. 0.10 Ci/gm for MODES 1, 2, 3, and 4 only.
A. B. C. D. . Proposed Answer:
D. 1.00 Ci/gm for MODES 1, 2, 3, and 4 only.
C Explanation:
Proposed Answer:               C Explanation:
A. Incorrect. Plausible because the setpoint is correct, however, the MODE limitation is not.
A. Incorrect. Plausible because the setpoint is correct, however, the MODE limitation is not.
B. Incorrect. Plausible if thought that secondary system dose equivalent I
B. Incorrect. Plausible if thought that secondary system dose equivalent I-131 was only applicable in MODES 1 and 2.
-131 was only applicable in MODES 1 and 2.
C. Correct. Per Technical Specification LCO 3.7.18.
C. Correct. Per Technical Specification LCO 3.7.18.
D. Incorrect. Plausible because the MODE limitation is correct, however, the setpoint is not.
D. Incorrect. Plausible because the MODE limitation is correct, however, the setpoint is not.
Technical Reference(s)
Technical Reference(s)       Technical Specification LCO 3.7.18                   Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:       IDENTIFY indications for system operating parameters, met as a result of high secondary activity, which are entry level conditions for Technical Specifications, ASSESS the limiting conditions for operations and safety limits which may be entered, and APPLY TS action statements which require response within one hour or less. (LO21.ABN.106.OB07)
Technical Specification LCO 3.7.18 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Question Source:             Bank #
None Learning Objective:
Modified Bank #                                   (Note changes or attach parent)
IDENTIFY indications for system operating parameters, met as a result of high secondary activity, which are entry level conditions for Technical Specifications, ASSESS the limiting conditions for operations and safety limits which may be entered, and APPLY TS action statements which require response within one hour or less. (LO21.ABN.106.OB07)
New                               X Page 33 of 50                                          Rev f
Question Source:
 
Bank #   Modified Bank #
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet   Form ES-401-5 Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis           X 10 CFR Part 55 Content:   55.41 10 55.43 Page 34 of 50                   Rev f
  (Note changes or attach parent)
New X ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 34 of 50 Rev f Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 35 of 50 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 1    K/A # G 2.1.25  Importance Rating


===3.9 Conduct===
ES-401                      CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                  Level                        RO            SRO Tier #                        3 Category #                    1 K/A #                              G 2.1.25 Importance Rating            3.9 Conduct of Operations: Ability to interpret reference materials, such as graphs curves, tables, etc.
of OperationsProposed Question:
Proposed Question:                        Common 68 Given the following conditions:
: Ability to interpret reference materials, such as graphs curves, tables, etc.
* Unit 1 was operating at 85% power with a Main Steam Safety Valve leaking by on Steam Generator 1-02 when a Steam Generator Tube Rupture occurred.
Common 68   Given the following conditions:
* Prior to the Reactor Trip and Safety Injection the Main Steam Line Radiation Monitors read as follows;
Unit 1 was operating at 85% power with a Main Steam Safety Valve leaking by on Steam Generator 1
* Steam Generator 1-01, 4.56E-02 ci/ml.
-02 when a Steam Generator Tube Rupture occurred.
* Steam Generator 1-02, 3.78E-02 ci/ml.
Prior to the Reactor Trip and Safety Injection the Main Steam Line Radiation Monitors read as follows; Steam Generator 1
* Steam Generator 1-03, 3.45E-02 ci/ml.
-01, 4.56E-. Steam Generator 1
* Steam Generator 1-04, 3.05E+02 ci/ml.
-02, 3.78E-. Steam Generator 1
* The ruptured Steam Generator has been isolated per EOP-3.0A, Steam Generator Tube Rupture.
-03, 3.45E-. Steam Generator 1
* The following conditions exist:
-. The ruptured Steam Generator has been isolated per EOP
* Containment pressure is 1.3 PSIG.
-3.0A, Steam Generator Tube Rupture.
* Containment radiation levels are 2.2 REM/hr.
The following conditions exist:
* Steam Generator 1-01 pressure is 795 PSIG.
Containment pressure is 1.3 PSIG. Containment radiation levels are 2.2 REM/hr.
* Steam Generator 1-02 pressure is 790 PSIG.
Steam Generator 1
* Steam Generator 1-03 pressure is 790 PSIG.
-01 pressure is 795 PSIG. Steam Generator 1
* Steam Generator 1-04 pressure is 810 PSIG.
-02 pressure is 790 PSIG. Steam Generator 1
Based on the above plant conditions, which of the following is the required Core Exit Temperature for the cooldown? (Table provided.)
-03 pressure is 790 PSIG. Steam Generator 1
A. 425ºF B. 440ºF C. 445ºF D. 460ºF Page 35 of 50                                             Rev f
-04 pressure is 810 PSIG. Based on the above plant conditions, which of the following is the required Core Exit Temperature for the cooldown?
(Table provided.) A. 425ºF B. 440ºF C. 445ºF D. 460ºF ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 36 of 50 Rev f  Proposed Answer:
C ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 37 of 50 Rev f Explanation:
A. Incorrect. Plausible if thought that the Adverse Containment number should be used or that the RCS should be cooled to the temperature corresponding to 700 PSIG. B. Incorrect. Plausible if thought that the Adverse Containment number should be used.
C. Correct. This is the correct temperature for cooling down Steam Generator 1
-04 with an initial pressure of 88 0 PSIG. D. Incorrect. Plausible because it could be thought that Steam Generator 1
-04 was already less than the required pressure.
Technical Reference(s)
EOP-3.0A, Step 6.b Attached w/ Revision # See Comments / Reference EOP-3.0A, Attachment 6 , Step 6 Bases  Proposed references to be provided during examination:
Steam Tables EOP-3.0A, Step 6.b, Page 8 Learning Objective:
Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOP-3.0. (LO21.ERG.E3A.OB106)
Question Source: Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 10, 14  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 38 of 50 Rev f    Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 2    K/A # G 2.2.13  Importance Rating


===4.1 Equipment===
ES-401          CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Proposed Answer:    C Page 36 of 50                    Rev f
ControlProposed Question:
 
: Knowledge of tagging and clearance procedures Common 69 Given the following condition:
ES-401                  CPNPP NRC 2011 RO Written Exam Worksheet                      Form ES-401-5 Explanation:
During the implementation of a Clearance that requires a manually operated valve to be danger tagged in the CLOSED position, it is noted that the valve is already danger tagged in the OPEN position on another Clearance.
A. Incorrect. Plausible if thought that the Adverse Containment number should be used or that the RCS should be cooled to the temperature corresponding to 700 PSIG.
Which of the following actions is required per OWI-110, Operations Work Control and Clearance and Safety Tagging
B. Incorrect. Plausible if thought that the Adverse Containment number should be used.
A. CLOSE the valve and attach the Danger Tag and note this in the Comment Section of the Clearance.
C. Correct. This is the correct temperature for cooling down Steam Generator 1-04 with an initial pressure of 880 PSIG.
D. Incorrect. Plausible because it could be thought that Steam Generator 1-04 was already less than the required pressure.
Technical Reference(s)      EOP-3.0A, Step 6.b                          Attached w/ Revision # See EOP-3.0A, Attachment 6, Step 6 Bases        Comments / Reference Proposed references to be provided during examination: Steam Tables EOP-3.0A, Step 6.b, Page 8 Learning Objective:    Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOP-3.0. (LO21.ERG.E3A.OB106)
Question Source:            Bank #                CPNPP LXR Modified Bank #                        (Note changes or attach parent)
New Question History:            Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:      55.41  10, 14 55.43 Page 37 of 50                                      Rev f
 
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                            Form ES-401-5 Examination Outline Cross-reference:                            Level                  RO            SRO Tier #                    3 Category #                2 K/A #                        G 2.2.13 Importance Rating        4.1 Equipment Control: Knowledge of tagging and clearance procedures Proposed Question:              Common 69 Given the following condition:
* During the implementation of a Clearance that requires a manually operated valve to be danger tagged in the CLOSED position, it is noted that the valve is already danger tagged in the OPEN position on another Clearance.
Which of the following actions is required per OWI-110, Operations Work Control and Clearance and Safety Tagging?
A. CLOSE the valve and attach the Danger Tag and note this in the Comment Section of the Clearance.
B. STOP the Clearance implementation and immediately notify the Unit Supervisor.
B. STOP the Clearance implementation and immediately notify the Unit Supervisor.
C. ATTACH the Danger Tag leaving the valve in the OPEN position and note this in the Comments Section of the Clearance.
C. ATTACH the Danger Tag leaving the valve in the OPEN position and note this in the Comments Section of the Clearance.
D. CONTINUE with the next tag on the Clearance and report the discrepancy to the Control Room after completion.
D. CONTINUE with the next tag on the Clearance and report the discrepancy to the Control Room after completion.
Proposed Answer:
Proposed Answer:               B Explanation:
B Explanation:
A. Incorrect. Plausible because the valve is positioned per the Clearance, however, the other Danger Tag may still be applicable and could endanger personnel.
A. Incorrect. Plausible because the valve is positioned per the Clearance, however, the other Danger Tag may still be applicable and could endanger personnel.
B. Correct. As outlined in OWI
B. Correct. As outlined in OWI-110.
-110. C. Incorrect. Plausible if thought that hanging two Danger Tags on the same valve in opposite positions is appropriate.
C. Incorrect. Plausible if thought that hanging two Danger Tags on the same valve in opposite positions is appropriate.
D. Incorrect. Plausible because the other Danger Tag may not be applicable, however, the Operations Work Control procedure requires that the Unit Supervisor be immediately notified.
D. Incorrect. Plausible because the other Danger Tag may not be applicable, however, the Operations Work Control procedure requires that the Unit Supervisor be immediately notified.
Technical Reference(s)
Technical Reference(s)       OWI-110, Step 6.2.3.1.C                           Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 38 of 50                                        Rev f
OWI-110, Step 6.2.3.1.C Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
 
None ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 39 of 50 Rev f  Learning Objective:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                       Form ES-401-5 Learning Objective:   At the conclusion of this lesson the Operator will STATE the requirements of STA-605, STA-606 and supporting procedures related to the initiation and processing of Work Orders and Clearances. (OPD1.ADM.XAA.OB00)
At the conclusion of this lesson the Operator will STATE the requirements of STA-605, STA-606 and supporting procedures related to the initiation and processing of Work Orders and Clearances. (OPD1.ADM.XAA.OB00)
Question Source:         Bank #                   CPNPP LXR Modified Bank #                           (Note changes or attach parent)
Question Source:
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge               X Comprehension or Analysis 10 CFR Part 55 Content:   55.41   10 55.43 Page 39 of 50                                     Rev f
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 40 of 50 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 2    K/A # G 2.2.35  Importance Rating


===3.6 Equipment===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                            Form ES-401-5 Examination Outline Cross-reference:                                Level                    RO            SRO Tier #                    3 Category #                2 K/A #                          G 2.2.35 Importance Rating        3.6 Equipment Control: Ability to determine Technical Specification Mode of Operation Proposed Question:                Common 70 Which of the following conditions defines MODE 3 per Technical Specifications?
ControlProposed Question:
A. keff < 0.99               TAVG < 350&#xba;F B. keff 0.99               TAVG  350&#xba;F C. keff 0.99               TAVG < 350&#xba;F D. keff < 0.99               TAVG  350&#xba;F Proposed Answer:                   D Explanation:
: Ability to determine Technical Specification Mode of Operation Common 70   Which of the following conditions defines MODE 3 per Technical Specifications?
A. Incorrect. Plausible because keff is correct, however, temperature is not.
A. keff < 0.99 TAVG < 350&#xba;F B. keff 0.99 TAVG  350&#xba;F C. keff 0.99 TAVG < 350&#xba;F D. keff < 0.99 TAVG  350&#xba;F   Proposed Answer:
B. Incorrect. Plausible because temperature is correct, however, keff is not.
D Explanation:
C. Incorrect. Plausible because keff is correct for MODE 2 and temperature is correct for MODE 4.
A. Incorrect. Plausible because keff is correct, however, temperature is not. B. Incorrect. Plausible because temperature is correct, however, keff is not. C. Incorrect. Plausible because keff is correct for MODE 2 and temperature is correct for MODE 4
D. Correct. When keff is < 0.99 and TAVG is  350&#xba;F the Unit is in MODE 3, HOT STANDBY.
. D. Correct. When keff is < 0.99 and T AVG is  350&#xba;F the Unit is in MODE 3, HOT STANDBY.
Technical Reference(s)           Tech Spec Definitions, Table 1.1.1                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:         DISCUSS the terms defined in Technical Specifications. (LO21.RLS.SL1.OB01)
Technical Reference(s)
Question Source:                 Bank #
Tech Spec Definitions, Table 1.1.1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Modified Bank #                                 (Note changes or attach parent)
None Learning Objective:
New                             X Question History:                 Last NRC Exam Question Cognitive Level:         Memory or Fundamental Knowledge Comprehension or Analysis                         X 10 CFR Part 55 Content:           55.41   10 55.43 Page 40 of 50                                         Rev f
DISCUSS the terms defined in Technical Specifications. (LO21.RLS.SL1.OB01)
Question Source:
Bank #   Modified Bank #
  (Note changes or attach parent)
New X   Question History: Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 41 of 50 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 3    K/A # G 2.3.14  Importance Rating


===3.4 Radiation===
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                          3 Category #                      3 K/A #                              G 2.3.14 Importance Rating              3.4 Radiation Control: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities Proposed Question:                Common 71 Given the following conditions:
ControlProposed Question:
* Unit 2 is in MODE 6 and Containment Fan Coolers are being alternated per SOP-801B, Containment Ventilation System.
: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities Common 71   Given the following conditions:
Unit 2 is in MODE 6 and Containment Fan Coolers are being alternated per SOP-801B, Containment Ventilation System.
Which of the following describes a CAUTION that exists applicable to rotating the Containment Fan Coolers?
Which of the following describes a CAUTION that exists applicable to rotating the Containment Fan Coolers?
 
A. Always stop the running fan prior to starting the standby fan to protect the discharge ductwork.
A. Always stop the running fan prior to starting the standby fan to protect the discharge ductwork. B. Always stop the running fan prior to starting the running fan to protect the suction ductwork. C. Monitor to ensure air flows into Containment from the Equipment Hatch and not from Containment out of the Equipment Hatch.
B. Always stop the running fan prior to starting the running fan to protect the suction ductwork.
C. Monitor to ensure air flows into Containment from the Equipment Hatch and not from Containment out of the Equipment Hatch.
D. Alternating Fan Coolers can cause changes in indicated radiation levels due to noble gases in stagnant pockets of air.
D. Alternating Fan Coolers can cause changes in indicated radiation levels due to noble gases in stagnant pockets of air.
Proposed Answer:
Proposed Answer:                 D Explanation:
D Explanation:
A. Incorrect. Plausible because it could be thought that restrictions on the number of fans discharging into the ductwork existed, however, there is no CAUTION pertaining to this issue.
A. Incorrect. Plausible because it could be thought that restrictions on the number of fans discharging into the ductwork existed, however, there is no CAUTION pertaining to this issue
B. Incorrect. Plausible because it could be thought that restrictions on the number of fans taking suction from a suction ductwork existed, however, there is no common suction ductwork.
. B. Incorrect. Plausible because it could be thought that restrictions on the number of fans taking suction from a suction ductwork existed, however, there is no common suction ductwork.
C. Incorrect. Plausible because this is a concern in ventilation changes that change air flow out of or into Containment, however, these fans recirculate air and alternating these fans does not change the air flow through the Equipment Hatch.
C. Incorrect. Plausible because this is a concern in ventilation changes that change air flow out of or into Containment, however, these fans recirculate air and alternating these fans does not change the air flow through the Equipment Hatch.
D. Correct. The CAUTION is concerned with stagnant pockets of air with noble gases that will be introduced into the Containment atmosphere and the potential to cause automatic Containment Isolation.
D. Correct. The CAUTION is concerned with stagnant pockets of air with noble gases that will be introduced into the Containment atmosphere and the potential to cause automatic Containment Isolation.
Technical Reference(s)
Technical Reference(s)         SOP-801B, Step 5.1.3 Caution                           Attached w/ Revision # See OP51.SYS.CL1.LN, Page 8                                 Comments / Reference Page 41 of 50                                                Rev f
SOP-801B, Step 5.1.3 Caution Attached w/ Revision # See Comments / Reference OP51.SYS.CL1.LN, Page 8


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 42 of 5 0 Rev f  Proposed references to be provided during examination:
ES-401                 CPNPP NRC 2011 RO Written Exam Worksheet                     Form ES-401-5 Proposed references to be provided during examination: None Learning Objective:   DESCRIBE the basis for the precautions and limitations, and given major procedure steps relative to the Containment Ventilation system, PLACE them in the proper sequence for:
None Learning Objective: DESCRIBE the basis for the precautions and limitations, and given major procedure steps relative to the Containment Ventilation system, PLACE them in the proper sequence for:
* SOP-801, Containment Ventilation System (OP51.SYS.CL1.OB13)
SOP-801, Containment Ventilation System (OP51.SYS.CL1.OB13)
Question Source:           Bank #               CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Question Source: Bank # CPNPP LXR   Modified Bank #
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:     55.41   9, 12 55.43 Page 42 of 50                                     Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 9, 12 55.4 3 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 43 of 50 Rev f   Examination Outline Cross-reference:
Level RO  SRO  Tier # 3    Category # 3    K/A # G 2.3.11  Importance Rating


===3.8 Radiation===
ES-401                        CPNPP NRC 2011 RO Written Exam Worksheet                  Form ES-401-5 Examination Outline Cross-reference:                                Level            RO            SRO Tier #            3 Category #        3 K/A #                  G 2.3.11 Importance Rating 3.8 Radiation Control: Ability to control radiation releases Proposed Question:                  Common 72 Given the following conditions with Unit 1 in MODE 6:
ControlProposed Question:
* A Containment Purge is in progress.
: Ability to control radiation releases Common 72   Given the following conditions with Unit 1 in MODE 6:
* Cavity fill per SOP-102A, Residual Heat Removal System Operation, is in progress.
A Containment Purge is in progress.
* 1-RE-5502, Containment Particulate Radiation Monitor is in HI alarm.
Cavity fill per SOP
* 1-RE-5503, Containment Gas Radiation Monitor has a stable trend.
-102A, Residual Heat Removal System Operation
* X-RE-5567A, Plant Vent Gas Monitor shows no increase in activity.
, is in progress.
* X-RE-5570A, Wide Range Gas Monitor Low shows no increase in activity.
1-RE-5502, Containment Particulate Radiation Monitor is in HI alarm. 1-RE-5503, Containment Gas Radiation Monitor has a stable trend.
* 1-RE-6251 and 1-RE-6253, Refueling Cavity Area Radiation Monitors are alarming.
X-RE-5567A, Plant Vent Gas Monitor shows no increase in activity.
Which of the following describes the equipment actions to take first for these conditions per ABN-902, Release of Radioactive/Toxic Gas?
X-RE-5570A, Wide Range Gas Monitor Low shows no increase in activity.
A. Manually secure the Containment Purge and stop the Cavity fill.
1-RE-6251 and 1
B. Slow the Cavity fill and place the Containment Pre-Access Filtration Units in service.
-RE-6253, Refueling Cavity Area Radiation Monitors are alarming
C. Verify Containment Ventilation Isolation has occurred and evacuate Containment.
. Which of the following describes the equipment actions to take first for these conditions per ABN-902, Release of Radioactive/Toxic Gas
A. Manually secure the Containment Purge and stop the Cavity fill.
B. Slow the Cavity fill and place the Containment Pre
-Access Filtration Units in service. C. Verify Containment Ventilation Isolation has occurred and evacuate Containment.
D. Leave Containment Purge in service as long as X-RE-5567A, Plant Vent Gas Monitor is not showing an increasing trend and evacuate Containment.
D. Leave Containment Purge in service as long as X-RE-5567A, Plant Vent Gas Monitor is not showing an increasing trend and evacuate Containment.
Proposed Answer:
Proposed Answer:                     C Page 43 of 50                             Rev f
C ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 44 of 50 Rev f  Explanation:
A. Incorrect. Plausible because it could be thought that Containment Isolation only occurred on the Containment Gas channel because it is the channel required by Technical Specifications and stopping the Containment Purge and cavity fill would be prudent, h owever, automatic Containment Isolation occurs on either channel and Containment Evacuation is required.
B. Incorrect. Plausible because it could be thought that the cause was the cavity fill and reducing the fill rate would reduce the particulate activity seen by the monitor, however, while reducing or stopping the fill would be prudent and starting the Pre
-Access Filtration Units is required later by procedure an automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required.
C. Correct. An automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required per ABN
-902, Release of Radioactive/Toxic Gas
. D. Incorrect. Plausible because if the Containment Radiation Monitors were not in High Alarm then the Purge could stay operating while monitoring the Plant Vent Monitors and Containmen t evacuation, however, an automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required. Technical Reference(s)
ABN-902, Steps 2.3.1 to 2.3.4 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
None  Learning Objective:
Given conditions that warrant a radioactive effluent release, EVALUATE and DETERMINE the proper methodology for review and authorization of the release permit. (OPD1.ADM.XA8.OB106)
Question Source:
Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 11,12  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 45 of 50 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 4    K/A # G 2.4.19  Importance Rating


===3.4 Emergency===
ES-401                  CPNPP NRC 2011 RO Written Exam Worksheet                        Form ES-401-5 Explanation:
Procedures / PlanProposed Question:
A. Incorrect. Plausible because it could be thought that Containment Isolation only occurred on the Containment Gas channel because it is the channel required by Technical Specifications and stopping the Containment Purge and cavity fill would be prudent, however, automatic Containment Isolation occurs on either channel and Containment Evacuation is required.
: Knowledge of EOP layout, symbols, and icons Common 73   Which of the following identifiers is used to alert the operator of an Emergency Response Guideline (ERG) step that, when performed, could create a radiation hazard?
B. Incorrect. Plausible because it could be thought that the cause was the cavity fill and reducing the fill rate would reduce the particulate activity seen by the monitor, however, while reducing or stopping the fill would be prudent and starting the Pre-Access Filtration Units is required later by procedure an automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required.
The procedure step is annotated with a (an
C. Correct. An automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required per ABN-902, Release of Radioactive/Toxic Gas.
)-  A. (*) B. [R] C. [CV] D. (HRA)   Proposed Answer:
D. Incorrect. Plausible because if the Containment Radiation Monitors were not in High Alarm then the Purge could stay operating while monitoring the Plant Vent Monitors and Containment evacuation, however, an automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required.
B Explanation:
Technical Reference(s)      ABN-902, Steps 2.3.1 to 2.3.4                   Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:    Given conditions that warrant a radioactive effluent release, EVALUATE and DETERMINE the proper methodology for review and authorization of the release permit. (OPD1.ADM.XA8.OB106)
Question Source:           Bank #                  CPNPP LXR Modified Bank #                              (Note changes or attach parent)
New Question History:            Last NRC Exam Question Cognitive Level:    Memory or Fundamental Knowledge Comprehension or Analysis                      X 10 CFR Part 55 Content:      55.41    11,12 55.43 Page 44 of 50                                        Rev f
 
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                          Form ES-401-5 Examination Outline Cross-reference:                            Level                  RO            SRO Tier #                    3 Category #                4 K/A #                        G 2.4.19 Importance Rating        3.4 Emergency Procedures / Plan: Knowledge of EOP layout, symbols, and icons Proposed Question:            Common 73 Which of the following identifiers is used to alert the operator of an Emergency Response Guideline (ERG) step that, when performed, could create a radiation hazard?
The procedure step is annotated with a (an)
A. (*)
B. [R]
C. [CV]
D. (HRA)
Proposed Answer:               B Explanation:
A. Incorrect. This is the designator for a Continuous Action Step.
A. Incorrect. This is the designator for a Continuous Action Step.
B. Correct. ERG steps that are performed in an area where radiation hazards are positively identified or which, when performed, create a radiation hazard are annotated as shown.
B. Correct. ERG steps that are performed in an area where radiation hazards are positively identified or which, when performed, create a radiation hazard are annotated as shown.
C. Incorrect. This annotation is used for Concurrent Verification (CV).
C. Incorrect. This annotation is used for Concurrent Verification (CV).
D. Incorrect. This annotation is used for a High Radiation Area (HRA), but is not stated in the ERG Rules of Usage.
D. Incorrect. This annotation is used for a High Radiation Area (HRA), but is not stated in the ERG Rules of Usage. HRA, LHRA, and VHRA are used by Radiation Protection personnel.
HRA, LHRA, and VHRA are used by Radiation Protection personnel. Technical Reference(s)
Technical Reference(s)       STA-660, Steps 4.1, 4.4 & 4.11                   Attached w/ Revision # See ODA-407, Attachment 8.A, Steps 5.A & 5.B         Comments / Reference ODA-407, Step 6.2.J Proposed references to be provided during examination: None Learning Objective:       Upon completion of this lesson, the student should be able to DESCRIBE how to use and comply with station procedures. (OPD1.ADM.XA3.OB300/400)
STA-660, Steps 4.1, 4.4 & 4.11 Attached w/ Revision # See Comments / Reference ODA-407, Attachment 8.A, Steps 5.A & 5.B ODA-407, Step 6.2.J Proposed references to be provided during examination:
Question Source:             Bank #                   CPNPP LXR Modified Bank #                               (Note changes or attach parent)
None Learning Objective: Upon completion of this lesson, the student should be able to DESCRIBE how to use and comply with station procedures. (OPD1.ADM.XA3.OB300/400)
New Page 45 of 50                                       Rev f
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 46 of 50 Rev f Question History: Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10, 12  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 47 of 50 Rev f    Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 4    K/A # G 2.4.49  Importance Rating


===4.6 Emergency===
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet  Form ES-401-5 Question History:        Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge      X Comprehension or Analysis 10 CFR Part 55 Content:  55.41  10, 12 55.43 Page 46 of 50                    Rev f
Procedures / PlanProposed Question:
 
: Ability to perform without reference to procedures those actions that require immediate operation of system components and controls Common 74   Given the following:
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                          3 Category #                      4 K/A #                                G 2.4.49 Importance Rating              4.6 Emergency Procedures / Plan: Ability to perform without reference to procedures those actions that require immediate operation of system components and controls Proposed Question:              Common 74 Given the following:
A Reactor Trip has occurred on Unit 1.
* A Reactor Trip has occurred on Unit 1.
All High Pressure Turbine Stop Valves indicate OPEN after attempting a manual Main Turbine Trip.
* All High Pressure Turbine Stop Valves indicate OPEN after attempting a manual Main Turbine Trip.
Which of the following is the NEXT action required per EOP-0.0A, Reactor Trip or Safety Injection? A. Place all Electro Hydraulic Control Pumps in PULLOUT.
Which of the following is the NEXT action required per EOP-0.0A, Reactor Trip or Safety Injection?
B. Dispatch an operator to locally trip the Main Turbine. C. Manually runback the Main Turbine using Load Control.
A. Place all Electro Hydraulic Control Pumps in PULLOUT.
B. Dispatch an operator to locally trip the Main Turbine.
C. Manually runback the Main Turbine using Load Control.
D. Close Main Steam Isolation Valves and Bypass Valves.
D. Close Main Steam Isolation Valves and Bypass Valves.
Proposed Answer:
Proposed Answer:               A Explanation:
A Explanation:
A. Correct. This is the RNO action outlined in EOP-0.0A, Reactor Trip or Safety Injection.
A. Correct. This is the RNO action outlined in EOP
B. Incorrect. Plausible because this action could be performed, however, time does not meet need to limit steam demand.
-0.0A, Reactor Trip or Safety Injection
C. Incorrect. Plausible because the Main Turbine would eventually be taken off-line, however, Runback time does not meet need to limit steam demand.
. B. Incorrect. Plausible because this action could be performed, however, time does not meet need to limit steam demand.
D. Incorrect. This action is required after the EHC Pumps are stopped and the Main Turbine is not tripped.
C. Incorrect. Plausible because the Main Turbine would eventually be taken off
Technical Reference(s)       EOP-0.0A, Step 2                                         Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:       PERFORM, without reference to procedures, the actions that require Page 47 of 50                                                   Rev f
-line, however, Runback time does not meet need to limit steam demand.
D. Incorrect. This action is required after the EHC Pumps are stopped and the Main Turbine is not tripped. Technical Reference(s)
EOP-0.0A, Step 2 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
None Learning Objective:
PERFORM, without reference to procedures, the actions that require ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 48 of 50 Rev f immediate operation of system components and controls as a result of a Reactor Trip or Safety Injection. (LO21.
ERG.E0A.OB06)  Question Source:
Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10  55.43 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5  Page 49 of 50 Rev f  Examination Outline Cross
-reference:
Level RO  SRO  Tier # 3    Category # 4    K/A # G 2.4.5  Importance Rating


===3.7 Emergency===
ES-401                CPNPP NRC 2011 RO Written Exam Worksheet                    Form ES-401-5 immediate operation of system components and controls as a result of a Reactor Trip or Safety Injection. (LO21. ERG.E0A.OB06)
Procedures / PlanProposed Question:
Question Source:          Bank #                  CPNPP LXR Modified Bank #                          (Note changes or attach parent)
: Knowledge of the organization of the operating procedures network for normal, abnormal, and emergency evolutions
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge            X Comprehension or Analysis 10 CFR Part 55 Content:    55.41  10 55.43 Page 48 of 50                                    Rev f
. Common 75   Which of the following procedures are designed to protect specific fission product barriers?
 
ES-401                    CPNPP NRC 2011 RO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                              Level                          RO              SRO Tier #                          3 Category #                      4 K/A #                                G 2.4.5 Importance Rating              3.7 Emergency Procedures / Plan: Knowledge of the organization of the operating procedures network for normal, abnormal, and emergency evolutions.
Proposed Question:            Common 75 Which of the following procedures are designed to protect specific fission product barriers?
A. Abnormal Conditions Procedures (ABN).
A. Abnormal Conditions Procedures (ABN).
B. Alarm Response Procedures (ALM).
B. Alarm Response Procedures (ALM).
C. Functional Restoration Guidelines (FRG).
C. Functional Restoration Guidelines (FRG).
D. Optimal Recovery Guidelines (ORG).
D. Optimal Recovery Guidelines (ORG).
Proposed Answer:
Proposed Answer:               C Explanation:
C Explanation:
A. Incorrect. Plausible because ABNs address specific radiation and contamination issues, such as, ABN-102, High Reactor Coolant Activity, ABN-106, High Secondary Activity, and ABN-903, Accidental Release of Radioactive Liquid, however, it is the FRG that protects specific fission product barriers.
A. Incorrect. Plausible because ABNs address specific radiation and contamination issues, such as, ABN-102, High Reactor Coolant Activity, ABN
-106, High Secondary Activity, and ABN
-903, Accidental Release of Radioactive Liquid, however, it is the FRG that protects specific fission product barriers.
B. Incorrect. Plausible because numerous ALMs address specific radiation issues, however, it is the FRG that protects specific fission product barriers.
B. Incorrect. Plausible because numerous ALMs address specific radiation issues, however, it is the FRG that protects specific fission product barriers.
C. Correct. FRGs protect specific fission product barriers via the Critical Safety Function Status Trees. D. Incorrect. Plausible because ORGs are part of the Emergency Procedures network, however, they act as a conduit for the F RG s. Technical Reference(s)
C. Correct. FRGs protect specific fission product barriers via the Critical Safety Function Status Trees.
LO21.ERG.XG1.LN, Pages 14 & 15 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
D. Incorrect. Plausible because ORGs are part of the Emergency Procedures network, however, they act as a conduit for the FRGs.
None Learning Objective:
Technical Reference(s)       LO21.ERG.XG1.LN, Pages 14 & 15                         Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     STATE the primary function of the Functional Restoration Guides.
STATE the primary function of the Functional Restoration Guides. (LO21.ERG.XG1.OB07)
(LO21.ERG.XG1.OB07)
Question Source:
Question Source:             Bank #                     CPNPP LXR Modified Bank #                                     (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:             Last NRC Exam Page 49 of 50                                                Rev f
  (Note changes or attach parent)
New   Question History:
Last NRC Exam


ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5   Page 50 of 50 Rev f  Question Cognitive Level:
ES-401               CPNPP NRC 2011 RO Written Exam Worksheet   Form ES-401-5 Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 10 55.43 Page 50 of 50                    Rev f
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
 
55.41 10 55.43 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 1 of 52 Rev f Examination Outline Cross
ES-401                       CPNPP NRC 2011 SRO Written Exam Worksheet                                   Form ES-401-5 Examination Outline Cross-reference:                                 Level                         RO               SRO Tier #                                             1 Group #                                           1 K/A #                             058 AA2.03 Importance Rating                               3.9 Loss of DC Power: Ability to determine and interpret the following as they apply to the Loss of DC Power: DC loads lost; impact on ability to operate and monitor plant systems Proposed Question:                SRO 76 Given the following condition:
-reference:
* Safeguards DC Bus voltage is at 105 VDC during a Loss of All AC Power.
Level RO SRO Tier #   1 Group #   1 K/A # 058 AA2.03 Importance Rating 3.9 Loss of DC PowerProposed Question:
: Ability to determine and interpret the following as they apply to the Loss of DC Power: DC loads lost; impact on ability to operate and monitor plant systems SRO 76 Given the following condition:
Safeguards DC Bus voltage is at 105 VDC during a Loss of All AC Power.
Which of the following should be performed?
Which of the following should be performed?
Conduct actions per-A. ABN-601, Response to a 138/345 KV System Malfunction
Conduct actions per A. ABN-601, Response to a 138/345 KV System Malfunction, because DC power is not required to support AC power restoration.
, because DC power is not required to support AC power restoration.
B. ABN-602, Response to a 6900/480V System Malfunction, because the 480 VAC Battery Charger is an immediate need with voltage at minimum levels on the batteries.
B. ABN-602, Response to a 6900/480V System Malfunction
C. ABN-603, Loss of Protection or Instrument Bus, because Safeguards DC Bus voltage is insufficient to operate Safeguards Bus related breakers.
, because the 480 VAC Battery Charger is an immediate need with voltage at minimum levels on the batteries.
D. ECA-0.0, Loss of All AC Power, in order to determine the necessity for load shedding of additional DC loads.
C. ABN-603, Loss of Protection or Instrument Bus
Proposed Answer:                 D Explanation:
, because Safeguards DC Bus voltage is insufficient to operate Safeguards Bus related breakers
A. Incorrect. Plausible because ABN-601 is referenced when power is not restored to one AC Safeguards Bus, however, DC power is required for control power to Vital AC breakers for restoration activities.
. D. ECA-0.0, Loss of All AC Power
B. Incorrect. Plausible because Battery Chargers are required, however, the immediate need is to reduce load on the Battery per ECA-0.0A.
, in order to determine the necessity for load shedding of additional DC loads. Proposed Answer:
C. Incorrect. Plausible because ABN-603 is referenced in the Load Shedding Attachment of ECA-0.0A, however, 105 VDC is the threshold below which many components fail to work, such as breaker control power which is not addressed in ABN-603.
D Explanation: A. Incorrect. Plausible because ABN-601 is referenced when power is not restored to one AC Safeguards Bus, however, DC power is required for control power to Vital AC breakers for restoration activities
D. Correct. At 105 VDC the DC Bus is below the threshold at which many components fail to work, actions per ECA-0.0, Loss of All AC Power must be performed.
. B. Incorrect. Plausible because Battery Chargers are required, however, the immediate need is to reduce load on the Battery per ECA
Page 1 of 52                                                 Rev f
-0.0A. C. Incorrect. Plausible because ABN-603 is referenced in the Load Shedding Attachment of ECA-0.0A, however, 105 VDC is the threshold below which many components fail to work, such as breaker control power which is not addressed in ABN
-603. D. Correct. At 105 VDC the DC Bus is below the threshold at which many components fail to work, actions per ECA
-0.0, Loss of All AC Power must be performed.
ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 2 of 52 Rev f  Technical Reference(s)
ECA-0.0A, Attachment 2 Attached w/ Revision # See Comments / Reference ECA-0.0A, Flow Chart Proposed references to be provided during examination:
None  Learning Objective:
Given a major action Step, Note or Caution of ECA-0.0, STATE the basis for the Step, Note or Caution. (LO21.ERG.C00.OB11)
Question Source:
Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41  55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 3 of 52 Rev f    Examination Outline Cross
-reference:
Level RO  SRO  Tier #  1  Group #  1  K/A # 056 G 2.2.40  Importance Rating 4.7  Loss of Offsite PowerProposed Question:
: Equipment Control: Ability to apply Technical Specifications for a system SRO 77  Given the following conditions
:  A Loss of Offsite Power has occurred with Unit 2 in MODE 3. All offsite circuits have been declared INOPERABLE.
Both Emergency Diesel Generators are powering their respective Safeguards Buses.
No other equipment was previously out of service.
Per Technical Specification LCO 3.8.1, which of the following COMPLETION TIMES would apply to restore one (1) required offsite circuit to OPERABLE status
?
Restore one (1) required offsite circuit to OPERABLE status within
-  A. 2 hours. B. 12 hours. C. 24 hours. D. 72 hours  Proposed Answer:
C  Explanation:
A. Incorrect. Plausible because this is the COMPLETION TIME when both Emergency Diesel Generators are INOPERABLE per Technical Specification LCO 3.8.1.E
. B. Incorrect. Plausible because this is the COMPLETION TIME when one required offsite circuit and one Emergency Diesel Generator are INOPERABLE per Technical Specification LCO 3.8.1.D
. C. Correct. When two required offsite circuits are INOPERABLE, restore one required offsite circuit to OPERABLE status within 24 hours per Technical Specification LCO 3.8.1.C
. D. Incorrect. Plausible because this is the COMPLETION TIME when one required offsite circuit is INOPERABLE per Technical Specification LCO 3.8.1.A
. Technical Reference(s)
Technical Specification LCO 3.8.1.A & C Attached w/ Revision # See Comments / Reference Technical Specification LCO 3.8.1.D & E ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 4 of 52 Rev f  Proposed references to be provided during examination: None  Learning Objective:
LIST and DESCRIBE the following Technical Specifications (i.e. LCO's, Action Statements and conditional surveillance requirements of one hour or less, if applicable) for the AC Distribution 6.9 Kv and 480 V Systems:
3.8.1, AC Sources
-Operating  (OP51.SYS.AC2.OB16)
Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41  55.43 2 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 5 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  1  Group #  1  K/A # 038 EA2.17  Importance Rating


===4.4 Steam===
ES-401                CPNPP NRC 2011 SRO Written Exam Worksheet                    Form ES-401-5 Technical Reference(s)    ECA-0.0A, Attachment 2                      Attached w/ Revision # See ECA-0.0A, Flow Chart                        Comments / Reference Proposed references to be provided during examination: None Learning Objective:  Given a major action Step, Note or Caution of ECA-0.0, STATE the basis for the Step, Note or Caution. (LO21.ERG.C00.OB11)
Generator Tube RuptureProposed Question:
Question Source:          Bank #                  CPNPP LXR Modified Bank #                          (Note changes or attach parent)
  : Ability to determine or interpret the following as they apply to the SGTR
New Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:    55.41 55.43  5 Page 2 of 52                                      Rev f
: RCP restart criteria SRO 78   Given the following conditions
 
:    A Steam Generator Tube Rupture (SGTR) has occurred on Unit 1. Reactor Coolant Pumps (RCP s) were secured due to RCP trip criteria being met.
ES-401                      CPNPP NRC 2011 SRO Written Exam Worksheet                                  Form ES-401-5 Examination Outline Cross-reference:                                  Level                        RO            SRO Tier #                                      1 Group #                                      1 K/A #                          056 G 2.2.40 Importance Rating                          4.7 Loss of Offsite Power: Equipment Control: Ability to apply Technical Specifications for a system Proposed Question:              SRO 77 Given the following conditions:
The ruptured Steam Generator (SG) has been identified and isolated.
* A Loss of Offsite Power has occurred with Unit 2 in MODE 3.
Reactor Coolant System (RCS) cooldown to target temperature is complete.
* All offsite circuits have been declared INOPERABLE.
RCS depressurization is complete.
* Both Emergency Diesel Generators are powering their respective Safeguards Buses.
Normal Charging and Letdown are in service.
* No other equipment was previously out of service.
RCP seal cooling has been maintained throughout the event.
Per Technical Specification LCO 3.8.1, which of the following COMPLETION TIMES would apply to restore one (1) required offsite circuit to OPERABLE status?
Pressurizer level is 35%.
Restore one (1) required offsite circuit to OPERABLE status within A. 2 hours.
Reactor Vessel Level Indication System 49 in. above flange light is LIT. RCS subcooling is 43&#xba;F
B. 12 hours.
. Ruptured SG narrow range level is 56% and stable.
C. 24 hours.
What action(s) is (are) required regarding RCP status per EOP-3.0A, Steam Generator Tube Rupture (SGTR)
D. 72 hours Proposed Answer:                C Explanation:
RCP start is... A. desired for the subsequent cooldown.
A. Incorrect. Plausible because this is the COMPLETION TIME when both Emergency Diesel Generators are INOPERABLE per Technical Specification LCO 3.8.1.E.
Determine if RCP s may be started per SOP-108A, Reactor Coolant Pump.
B. Incorrect. Plausible because this is the COMPLETION TIME when one required offsite circuit and one Emergency Diesel Generator are INOPERABLE per Technical Specification LCO 3.8.1.D.
B. NOT desired once they have been stopped in EOP
C. Correct. When two required offsite circuits are INOPERABLE, restore one required offsite circuit to OPERABLE status within 24 hours per Technical Specification LCO 3.8.1.C.
-3.0 A , SGTR. Engineering guidance must be obtained prior to any subsequent RCP restart.
D. Incorrect. Plausible because this is the COMPLETION TIME when one required offsite circuit is INOPERABLE per Technical Specification LCO 3.8.1.A.
Technical Reference(s)        Technical Specification LCO 3.8.1.A & C                    Attached w/ Revision # See Technical Specification LCO 3.8.1.D & E                    Comments / Reference Page 3 of 52                                            Rev f
 
ES-401                CPNPP NRC 2011 SRO Written Exam Worksheet                    Form ES-401-5 Proposed references to be provided during examination: None Learning Objective:  LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, Action Statements and conditional surveillance requirements of one hour or less, if applicable) for the AC Distribution 6.9 Kv and 480 V Systems:
* 3.8.1, AC Sources-Operating (OP51.SYS.AC2.OB16)
Question Source:         Bank #
Modified Bank #                            (Note changes or attach parent)
New                          X Question History:          Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge              X Comprehension or Analysis 10 CFR Part 55 Content:    55.41 55.43    2 Page 4 of 52                                      Rev f
 
ES-401                  CPNPP NRC 2011 SRO Written Exam Worksheet                                        Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                                            1 Group #                                            1 K/A #                              038 EA2.17 Importance Rating                                4.4 Steam Generator Tube Rupture: Ability to determine or interpret the following as they apply to the SGTR: RCP restart criteria Proposed Question:            SRO 78 Given the following conditions:
* A Steam Generator Tube Rupture (SGTR) has occurred on Unit 1.
* Reactor Coolant Pumps (RCPs) were secured due to RCP trip criteria being met.
* The ruptured Steam Generator (SG) has been identified and isolated.
* Reactor Coolant System (RCS) cooldown to target temperature is complete.
* RCS depressurization is complete.
* Normal Charging and Letdown are in service.
* RCP seal cooling has been maintained throughout the event.
* Pressurizer level is 35%.
* Reactor Vessel Level Indication System 49 in. above flange light is LIT.
* RCS subcooling is 43&#xba;F.
* Ruptured SG narrow range level is 56% and stable.
What action(s) is (are) required regarding RCP status per EOP-3.0A, Steam Generator Tube Rupture (SGTR)?
RCP start is...
A. desired for the subsequent cooldown.
Determine if RCPs may be started per SOP-108A, Reactor Coolant Pump.
B. NOT desired once they have been stopped in EOP-3.0A, SGTR.
Engineering guidance must be obtained prior to any subsequent RCP restart.
C. desired for the subsequent cooldown.
C. desired for the subsequent cooldown.
Determine if RCP s may be started per EOP-3.0A, SGTR.
Determine if RCPs may be started per EOP-3.0A, SGTR.
D. NOT desired once they have been stopped in EOP
D. NOT desired once they have been stopped in EOP-3.0A, SGTR.
-3.0 A , SGTR. Verify Natural Circulation exists per EOP-3.0 A , SGTR. Proposed Answer:
Verify Natural Circulation exists per EOP-3.0A, SGTR.
C ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 6 of 52 Rev f  Explanation:
Proposed Answer:               C Page 5 of 52                                                  Rev f
A. Incorrect. Plausible because RCP restart is desired, however, guidance for the restart is contained in EOP-3.0A, Step 38, RNO
 
. B. Incorrect. Plausible because in most EOPs engineering guidance is required prior to restarting R CP s if seal cooling is lost, however, given the conditions listed this is not required
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                         Form ES-401-5 Explanation:
. C. Correct. Reactor Coolant Pump operation is desired during the subsequent cooldown per EOP-3.0A. This information is contained in Attachment 2, Starting An RCP
A. Incorrect. Plausible because RCP restart is desired, however, guidance for the restart is contained in EOP-3.0A, Step 38, RNO.
. D. Incorrect. Plausible because EOP-3.0A, Attachment 3
B. Incorrect. Plausible because in most EOPs engineering guidance is required prior to restarting RCPs if seal cooling is lost, however, given the conditions listed this is not required.
, addresses Natural Circulation Verification, however, RCP restart is desirable for the subsequent cooldown
C. Correct. Reactor Coolant Pump operation is desired during the subsequent cooldown per EOP-3.0A. This information is contained in Attachment 2, Starting An RCP.
. Technical Reference(s)
D. Incorrect. Plausible because EOP-3.0A, Attachment 3, addresses Natural Circulation Verification, however, RCP restart is desirable for the subsequent cooldown.
EOP-3.0A, Step 38 RNO and Caution Attached w/ Revision # See Comments / Reference  EOP-3.0A, Attachments 2 & 3 Proposed references to be provided during examination:
Technical Reference(s)     EOP-3.0A, Step 38 RNO and Caution                 Attached w/ Revision # See EOP-3.0A, Attachments 2 & 3                       Comments / Reference Proposed references to be provided during examination: None Learning Objective:     Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOP-3.0. (LO21.ERG.E3A.OB106)
None Learning Objective:
Question Source:           Bank #                   CPNPP LXR Modified Bank #                             (Note changes or attach parent)
Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOP-3.0. (LO21.ERG.E3A.OB106)
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:     55.41 55.43   5 Page 6 of 52                                        Rev f
Question Source:
 
Bank # CPNPP LXR   Modified Bank #
ES-401                   CPNPP NRC 2011 SRO Written Exam Worksheet                                       Form ES-401-5 Examination Outline Cross-reference:                                 Level                           RO               SRO Tier #                                             1 Group #                                             1 K/A #                               W/E11 EA2.2 Importance Rating                                 4.2 Loss of Emergency Coolant Recirculation: Ability to determine and interpret the following as they apply to the Loss of Emergency Coolant Recirculation: Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments Proposed Question:              SRO 79 Given the following conditions:
  (Note changes or attach parent)
* A Loss of Coolant Accident is in progress on Unit 1.
New   Question History:
* EOS-1.3A, Transfer to Cold Leg Recirculation was entered.
Last NRC Exam Question Cognitive Level:
* Containment Emergency Sump blockage has prevented an Emergency Core Cooling System flowpath from being established.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
* A transition to ECA-1.1A, Loss of Emergency Coolant Recirculation is in effect.
55.41   55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 7 of 52 Rev f  Examination Outline Cross
* Refueling Water Storage Tank level is 25%.
-reference:
* Containment pressure has increased to 20 PSIG.
Level RO SRO Tier #   1 Group #   1 K/A # W/E11 EA2.2 Importance Rating 4.2 Loss of Emergency Coolant RecirculationProposed Question:
Which of the following procedures would be used, per the ERG Rules of Usage, and what action should be taken in response to the High Containment Pressure?
: Ability to determine and interpret the following as they apply to the Loss of Emergency Coolant Recirculation: Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments SRO 79   Given the following conditions
A. Transition to FRZ-0.1A, Response to High Containment Pressure, and remain in FRZ-0.1A and operate all Containment Spray Pumps until Containment pressure is
A Loss of Coolant Accident is in progress on Unit 1. EOS-1.3A, Transfer to Cold Leg Recirculation was entered.
            < 3 PSIG, then stop the Containment Spray Pumps.
Containment Emergency Sump blockage has prevented an Emergency Core Cooling System flowpath from being established.
B. Transition to FRZ-0.1A, Response to High Containment Pressure, and operate two (2) Containment Spray Pumps to conserve RWST inventory per ECA-1.1A, Loss of Emergency Coolant Recirculation.
A transition to ECA
C. Remain in ECA-1.1A, Loss of Emergency Coolant Recirculation. Operate all Containment Spray Pumps until Containment pressure is <18 PSIG, then stop and start Containment Spray Pumps as required to maintain pressure less than 18 PSIG.
-1.1A, Loss of Emergency Coolant Recirculation is in effect.
D. Remain in ECA-1.1A, Loss of Emergency Coolant Recirculation. Do not run the Containment Spray Pumps due to a loss of emergency coolant recirculation capability unless Containment pressure reaches 50 PSIG.
Refueling Water Storage Tank level is 25%.
Proposed Answer:               B Page 7 of 52                                                    Rev f
Containment pressure has increased to 20 PSIG. Which of the following procedures would be used, per the ERG Rules of Usage, and what action should be taken in response to the High Containment Pressure? A. Transition to FRZ
 
-0.1A, Response to High Containment Pressure
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Explanation:
, and remain in FRZ-0.1A and operate all Containment Spray Pumps until Containment pressure is < 3 PSIG, then stop the Containment Spray Pumps.
A. Incorrect. Plausible because the transition to FRZ-0.1A is correct, however, this procedure sends you to ECA-1.1A when it is determined that a Loss of Emergency Coolant Recirculation has occurred.
B. Transition to FRZ
B. Correct. Enter FRZ-0.1A and exit at Step 4d when it is determined that ECA-1.1A entry is required.
-0.1A, Response to High Containment Pressure
Containment Spray Pumps are operated per ECA-1.1 until sump blockage is overcome.
, and operate two (2) Containment Spray Pumps to conserve RWST inventory per ECA
-1.1A, Loss of Emergency Coolant Recirculation.
C. Remain in ECA
-1.1A, Loss of Emergency Coolant Recirculation. Operate all Containment Spray Pumps until Containment pressure is <18 PSIG , then stop and start Containment Spray Pumps as required to maintain pressure less than 18 PSIG. D. Remain in ECA
-1.1A, Loss of Emergency Coolant Recirculation. Do not run the Containment Spray Pumps due to a loss of emergency coolant recirculation capability unless Containment pressure reaches 50 PSIG. Proposed Answer:
B ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 8 of 52 Rev f  Explanation:
A. Incorrect. Plausible because the transition to FRZ
-0.1A is correct, however, this procedure sends you to ECA
-1.1A when it is determined that a Loss of Emergency Coolant Recirculation has occurred. B. Correct. Enter FRZ
-0.1A and exit at Step 4d when it is determined that ECA
-1.1A entry is required. Containment Spray Pumps are operated per ECA
-1.1 until sump blockage is overcome.
C. Incorrect. Plausible if thought that remaining in ECA-1.1A is correct, however, only two Containment Spray Pumps would be operated due to emergency sump blockage.
C. Incorrect. Plausible if thought that remaining in ECA-1.1A is correct, however, only two Containment Spray Pumps would be operated due to emergency sump blockage.
D. Incorrect. Plausible if thought that remaining in ECA
D. Incorrect. Plausible if thought that remaining in ECA-1.1A is correct, however, two Containment Spray Pumps must be operated when Containment pressure is greater than 18 PSIG.
-1.1A is correct, however, two Containment Spray Pumps must be operated when Containment pressure is greater than 18 PSIG. Technical Reference(s)
Technical Reference(s)       ECA-1.1A, Symptoms or Entry Conditions       Attached w/ Revision # See ECA-1.1A, Step 10                             Comments / Reference EOS-1.3A, Step 3 FRZ-0.1A, Step 4.d and CSF Status Tree Proposed references to be provided during examination: None Learning Objective:     DISCUSS the applicability of ECA-1.1 to include: Modes, RHR/SI Status, and the required action of ECA-1.1 as otherwise used. (LO21.ERG.C11.102)
ECA-1.1A, Symptoms or Entry Conditions Attached w/ Revision # See Comments / Reference ECA-1.1A, Step 10 EOS-1.3A, Step 3 FRZ-0.1A, Step 4
Question Source:             Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
.d and CSF Status Tree Proposed references to be provided during examination:
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41 55.43   5 Page 8 of 52                                     Rev f
None Learning Objective:
DISCUSS the applicability of ECA
-1.1 to include: Modes, RHR/SI Status, and the required action of ECA
-1.1 as otherwise used. (LO21.ERG.C11.102)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 9 of 52 Rev f   Examination Outline Cross
-reference:
Lev el RO  SRO  Tier #  1  Group #  1  K/A # 011 EA2.0 1  Importance Rating


===4.7 Large===
ES-401                    CPNPP NRC 2011 SRO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                                            1 Group #                                          1 K/A #                            011 EA2.01 Importance Rating                                4.7 Large Break LOCA: Ability to determine and interpret the following as they apply to a Large Break LOCA: Actions to be taken, based on RCS temperature and pressure - saturated or superheated Proposed Question:                SRO 80 The Critical Safety Function Status Trees are being reviewed in order to verify the CORE COOLING Critical Safety Function during a Large Break Loss of Coolant Accident. Plant conditions are as follows:
Break LOCAProposed Question:
* Containment pressure is 10 PSIG and stable.
: Ability to determine and interpret the following as they apply to a Large Break LOCA: Actions to be taken, based on RCS temperature and pressure  
* Reactor Coolant System (RCS) Saturation Margin indicates 5&#xba;F SUPERHEAT.
- saturated or superheated SRO 80   The Critical Safety Function Status Trees are being reviewed in order to verify the CORE COOLING Critical Safety Function during a Large Break Loss of Coolant Accident. Plant conditions are as follows:
* Reactor Vessel Level Indication System (RVLIS) indication: 11 inches above the Core Plate light is LIT all other RVLIS lights are DARK.
Con tainment pressure is 10 PSIG and stable.
* Core Exit Thermocouples are 500&#xba;F and stable.
Reactor Coolant System (RCS) Saturation Margin indicates 5
&#xba;F SUPERHEAT.
Reactor Vessel Level Indication System (RVLIS) indication: 11 inches above the Core Plate light is LIT all other RVLIS lights are DARK.
Core Exit Thermocouples are 50 0&#xba;F and stable.
Which of the following procedures would be used to mitigate the CORE COOLING Critical Safety Function and what is the basis for that action?
Which of the following procedures would be used to mitigate the CORE COOLING Critical Safety Function and what is the basis for that action?
Enter procedure...
Enter procedure...
A. FRC-0.2, Response to Degraded Core Cooling
A. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 25&#xba;F and Core Exit Thermocouples less than 750&#xba;F.
, due to RCS subcooling less than 2 5&#xba;F and Core Exit Thermocouples less than 750&#xba;F. B. FRC-0.3, Response to Saturated Core Cooling
B. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling less than 25&#xba;F and Core Exit Thermocouples less than 750&#xba;F.
, due to RCS subcooling less than 2 5&#xba;F and Core Exit Thermocouples less than 750
C. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 55&#xba;F and RVLIS indication at 11 inches above the Core Plate LIT.
&#xba;F. C. FRC-0.2, Response to Degraded Core Cooling
D. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling less than 55&#xba;F and RVLIS indication at 11 inches above the Core Plate LIT.
, due to RCS subcooling less than 5 5&#xba;F and RVLIS indication at 11 inches above the Core Plate LIT. D. FRC-0.3, Response to Saturated Core Cooling
Proposed Answer:                 D Page 9 of 52                                                Rev f
, due to RCS subcooling less than 5 5&#xba;F and RVLIS indication at 11 inches above the Core Plate LIT. Proposed Answer:
 
D ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 10 of 52 Rev f  Explanation:
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                     Form ES-401-5 Explanation:
A. Incorrect. Plausible if thought that both RCS subcooling and Core Exit Thermocouples temperatures were being met.
A. Incorrect. Plausible if thought that both RCS subcooling and Core Exit Thermocouples temperatures were being met.
B. Incorrect. Plausible because procedure entry is correct and Core Exit Thermocouples temperatures are being met, however, RCS subcooling does not meet Adverse Containment conditions
B. Incorrect. Plausible because procedure entry is correct and Core Exit Thermocouples temperatures are being met, however, RCS subcooling does not meet Adverse Containment conditions.
. C. Incorrect. Plausible because RCS subcooling does not meet Adverse Containment conditions, however, with RVLIS indication at 11 inches above the Core Plate LIT and subcooling not met, entry into FRC-0.3A , Response to Saturated Core Cooling is required
C. Incorrect. Plausible because RCS subcooling does not meet Adverse Containment conditions, however, with RVLIS indication at 11 inches above the Core Plate LIT and subcooling not met, entry into FRC-0.3A, Response to Saturated Core Cooling is required.
. D. Correct. Given that Adverse Containment conditions exist then RCS subcooling must be >55
D. Correct. Given that Adverse Containment conditions exist then RCS subcooling must be >55&#xba;F.
&#xba;F. With CET temperature less than 750&#xba;F and RVLIS indication at 11 inches above the Core Plate LIT, entry into FRC
With CET temperature less than 750&#xba;F and RVLIS indication at 11 inches above the Core Plate LIT, entry into FRC-0.3A, Response to Saturated Core Cooling is correct.
-0.3A, Response to Saturated Core Cooling is correct.
Technical Reference(s)       FRC-0.3A, CSFST                             Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Core Cooling Monitor System/RVLIS, both initial and subsequent, for:
Technical Reference(s)
* FRC-0.3, Response to Saturated Core Cooling (OP51.SYS.RC3.OB13)
FRC-0.3A, CSFST Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Question Source:             Bank #
None Learning Objective:
Modified Bank #       CPNPP LXR         (Note changes or attach parent)
ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Core Cooling Monitor System/RVLIS, both initial and subsequent, for:
New Question History:             Last NRC Exam         CPNPP 2010 Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41 55.43   5 Page 10 of 52                                    Rev f
FRC-0.3, Response to Saturated Core Cooling (OP51.SYS.RC3.OB13)
 
Question Source:
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                     Form ES-401-5 Comments /  
Bank #   Modified Bank #
CPNPP LXR (Note changes or attach parent)
New   Question History:
Last NRC Exam CPNPP 2010 Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 11 of 52 Rev f  Comments /  


==Reference:==
==Reference:==
Fro m CPNPP LXR Exam Bank Revision # 03/22/10 The Critical Safety Function Status Trees are being reviewed in order to verify the CORE COOLING Critical Safety Function during a Large Break Loss of Coolant Accident. Plant conditions are as follows:
From CPNPP LXR Exam Bank                               Revision # 03/22/10 The Critical Safety Function Status Trees are being reviewed in order to verify the CORE COOLING Critical Safety Function during a Large Break Loss of Coolant Accident. Plant conditions are as follows:
Containment pressure is 16 PSIG and stable.
* Containment pressure is 16 PSIG and stable.
Reactor Coolant System Saturation Margin indicates 300&#xba;F SUPERHEAT.
* Reactor Coolant System Saturation Margin indicates 300&#xba;F SUPERHEAT.
RVLIS indication 11 inches above the Core Plate is NOT lit.
* RVLIS indication 11 inches above the Core Plate is NOT lit.
Core Exit Thermocouples are 770&#xba;F and stable.
* Core Exit Thermocouples are 770&#xba;F and stable.
Which of the following procedures would be used to mitigate the CORE COOLING Critical Safety Function and what is the basis for that action?
Which of the following procedures would be used to mitigate the CORE COOLING Critical Safety Function and what is the basis for that action?
Enter procedure...
Enter procedure...
A. B. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling less than 55&#xba;F and Core Exit Thermocouples less than 1200&#xba;F.
A. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 55&#xba;F and Core Exit Thermocouples greater than 750&#xba;F.
FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 55&#xba;F and Core Exit Thermocouples greater than 750&#xba;F.
B. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling less than 55&#xba;F and Core Exit Thermocouples less than 1200&#xba;F.
C. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 25&#xba;F and RVLIS indication at 11 inches above the Core Plate NOT lit
C. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 25&#xba;F and RVLIS indication at 11 inches above the Core Plate NOT lit.
. D. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling greater than 25&#xba;F and RVLIS indication at 11 inches above the Core Plate NOT lit
D. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling greater than 25&#xba;F and RVLIS indication at 11 inches above the Core Plate NOT lit.
.
Page 11 of 52                                     Rev f
ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 12 of 52 Rev f Examination Outline Cross
-reference:
Level RO  SRO  Tier #  1  Group #  1  K/A # W/E05 G 2.1.32 Importance Rating


===4.0 Inadequate===
ES-401                    CPNPP NRC 2011 SRO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                              Level                            RO              SRO Tier #                                              1 Group #                                              1 K/A #                            W/E05 G 2.1.32 Importance Rating                                  4.0 Inadequate Heat Transfer - Loss of Secondary Heat Sink: Conduct of Operations: Ability to explain and apply system limits and precautions Proposed Question:              SRO 81 Given the following conditions:
Heat Transfer - Loss of Secondary Heat SinkProposed Question:
* A Reactor Trip and Safety Injection have occurred on Unit 1.
: Conduct of Operations: Ability to explain and apply system limits and precautions SRO 81 Given the following conditions:
* EOP-0.0A, Reactor Trip or Safety Injection, actions have been performed.
A Reactor Trip and Safety Injection have occurred on Unit 1. EOP-0.0A, Reactor Trip or Safety Injection, actions have been performed
* Auxiliary Feedwater (AFW) flow cannot be established.
. Auxiliary Feedwater (AFW) flow cannot be established.
* Containment pressure is 6 PSIG.
Containment pressure is 6 PSIG. All Steam Generator narrow range levels are off
* All Steam Generator narrow range levels are off-scale low.
-scale low.
* All Steam Generator wide range levels are at approximately 60%.
All Steam Generator wide range levels are at approximately 60%.
* FRH-0.1A, Response to Loss of Secondary Heat Sink, has been entered.
FRH-0.1A, Response to Loss of Secondary Heat Sink, has been entered
* Reactor Coolant System (RCS) pressure is 1175 PSIG and stable.
. Reactor Coolant System (RCS) pressure is 1175 PSIG and stable.
* Highest reading Core Exit Thermocouple is 568&#xba;F and stable.
Highest reading Core Exit Thermocouple is 568&#xba;F and stable.
* Intact Steam Generator (SG) pressures are 975 PSIG and slowly trending down.
Intact Steam Generator (SG) pressures are 975 PSIG and slowly trending down.
* Reactor Vessel Level Indication System (RVLIS) indication: All lights are DARK.
Reactor Vessel Level Indication System (RVLIS) indication: All lights are DARK.
Which of the following describes the plant conditions and action required?
Which of the following describes the plant conditions and action required?
Steam Generators are...
Steam Generators are...
A. required for RCS heat removal. Continue in FRH-0.1A , Response to Loss of Secondary Heat Sink
A. required for RCS heat removal. Continue in FRH-0.1A, Response to Loss of Secondary Heat Sink, and initiate Bleed and Feed.
, and initiate Bleed and Feed.
B. NOT required for RCS heat removal. Transition to EOP-1.0A, Loss of Reactor or Secondary Coolant, and ensure correct diagnosis of the event prior to continuing.
B. NOT required for RCS heat removal. Transition to EOP
C. required for RCS heat removal. Continue in FRH-0.1A, Response to Loss of Secondary Heat Sink, and attempt to restore feedwater to the Steam Generators.
-1.0A, Loss of Reactor or Secondary Coolant, and ensure correct diagnosis of the event prior to continuing.
D. NOT required for RCS heat removal. Transition to FRC-0.2A, Response to Degraded Core Cooling, due to current RVLIS indication and loss of AFW flow.
C. required for RCS heat removal. Continue in FRH-0.1A , Response to Loss of Secondary Heat Sink, and attempt to restore feedwater to the Steam Generators
Proposed Answer:                 C Page 12 of 52                                                   Rev f
. D. NOT required for RCS heat removal. Transition to FRC-0.2A, Response to Degraded Core Cooling, due to current RVLIS indication and loss of AFW flow
. Proposed Answer:
C ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 13 of 52 Rev f Explanation:
A. Incorrect. Plausible because Steam Generators are required for RCS heat removal, however, bleed and feed criteria is not met because SG wide range level is not less than 40% (in at least 3 SGs), per FRH
-0.1A, Step 3
. B. Incorrect. Plausible because a LOCA is occurring and entry into EOP-1.0A would be made, however, current RCS pressure requires a heat sink
. C. Correct. SGs are required for RCS heat removal because RCS pressure is higher than intact SG pressure. Bleed and Feed criteria is not met because SG wide range level is not less than 40%
(in at least 3 SGs), therefore
, the procedure should continue with attempts to establish feedwater to any Steam Generator
. D. Incorrect. Plausible because when RVLIS 11 inch core plate light is NOT lit, one of the criteria for FRC-0.2A entry has been met, however, Core Exit Thermocouple temperature is only high enough to warrant FRC
-0.3C, Response to Saturated Core Cooling, entry which is a YELLOW Path Critical Safety Function. Technical Reference(s)
FRH-0.1A, Steps 1, 3, & 4 Attached w/ Revision # See Comments / Reference FRC-0.2A, CSFST EOP-1.0A, Entry Conditions Proposed references to be provided during examination:
None  Learning Objective:
DESCRIBE the Symptoms or Entry Conditions for FRH
-0.1. (LO21.ERG.FH1.OB03)
Question Source:
Bank # CPNPP LXR  Modified Bank #
  (Note changes or attach parent)
New    Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41  55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 14 of 52 Rev f  Examination Outline Cross
-reference:
Level RO  SRO  Tier #  1  Group #  2  K/A # W/E15 EA2.2 Importance Rating


===3.3 Containment===
ES-401                CPNPP NRC 2011 SRO Written Exam Worksheet                      Form ES-401-5 Explanation:
FloodingProposed Question:
A. Incorrect. Plausible because Steam Generators are required for RCS heat removal, however, bleed and feed criteria is not met because SG wide range level is not less than 40% (in at least 3 SGs), per FRH-0.1A, Step 3.
: Ability to determine and interpret the following as they apply to the Containment Flooding: Adherence to appropriate procedures and operation within limitations in the facility's license and amendments SRO 82 Given the following conditions:
B. Incorrect. Plausible because a LOCA is occurring and entry into EOP-1.0A would be made, however, current RCS pressure requires a heat sink.
A Main Steam Line Break with fuel failure has occurred on Unit 2.
C. Correct. SGs are required for RCS heat removal because RCS pressure is higher than intact SG pressure. Bleed and Feed criteria is not met because SG wide range level is not less than 40% (in at least 3 SGs), therefore, the procedure should continue with attempts to establish feedwater to any Steam Generator.
EOP-1.0B, Loss of Reactor or Secondary Coolant
D. Incorrect. Plausible because when RVLIS 11 inch core plate light is NOT lit, one of the criteria for FRC-0.2A entry has been met, however, Core Exit Thermocouple temperature is only high enough to warrant FRC-0.3C, Response to Saturated Core Cooling, entry which is a YELLOW Path Critical Safety Function.
, is in progress.
Technical Reference(s)      FRH-0.1A, Steps 1, 3, & 4                    Attached w/ Revision # See FRC-0.2A, CSFST                              Comments / Reference EOP-1.0A, Entry Conditions Proposed references to be provided during examination: None Learning Objective:    DESCRIBE the Symptoms or Entry Conditions for FRH-0.1.
The initial scan of the Critical Safety Function Status Tree parameters indicate the following: Pressurizer level is 0%.
(LO21.ERG.FH1.OB03)
Containment water level indicates 817 feet and slowly rising.
Question Source:            Bank #                CPNPP LXR Modified Bank #                          (Note changes or attach parent)
Containment Spray has automatically actuated and was verified in EOP
New Question History:           Last NRC Exam Question Cognitive Level:    Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:      55.41 55.43  5 Page 13 of 52                                        Rev f
-0.0B, Reactor Trip or Safety Injection.
 
Containment pressure is 14 PSIG and slowly lowering.
ES-401                      CPNPP NRC 2011 SRO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                    Level                      RO              SRO Tier #                                        1 Group #                                        2 K/A #                          W/E15 EA2.2 Importance Rating                            3.3 Containment Flooding: Ability to determine and interpret the following as they apply to the Containment Flooding: Adherence to appropriate procedures and operation within limitations in the facility's license and amendments Proposed Question:                SRO 82 Given the following conditions:
Containment Radiation Monitors are in ALARM at 25 REM/hr.
* A Main Steam Line Break with fuel failure has occurred on Unit 2.
Reactor Vessel Level Indication System has no lights LIT.
* EOP-1.0B, Loss of Reactor or Secondary Coolant, is in progress.
Core Exit Thermocouples are 292
* The initial scan of the Critical Safety Function Status Tree parameters indicate the following:
&#xba;F. Loop Cold Leg temperatures are 270&#xba;F.
* Pressurizer level is 0%.
* Containment water level indicates 817 feet and slowly rising.
* Containment Spray has automatically actuated and was verified in EOP-0.0B, Reactor Trip or Safety Injection.
* Containment pressure is 14 PSIG and slowly lowering.
* Containment Radiation Monitors are in ALARM at 25 REM/hr.
* Reactor Vessel Level Indication System has no lights LIT.
* Core Exit Thermocouples are 292&#xba;F.
* Loop Cold Leg temperatures are 270&#xba;F.
Which of the following procedures must be entered to address the above conditions?
Which of the following procedures must be entered to address the above conditions?
A. FRZ-0.2B, Response to Containment Flooding.
A. FRZ-0.2B, Response to Containment Flooding.
B. FRP-0.2B, Response to Anticipated Pressurized Thermal Shock Condition
B. FRP-0.2B, Response to Anticipated Pressurized Thermal Shock Condition.
. C. FRI-0.2B, Response to Low Pressurizer Level.
C. FRI-0.2B, Response to Low Pressurizer Level.
D. FRZ-0.3B, Response to High Containment Radiation Level.
D. FRZ-0.3B, Response to High Containment Radiation Level.
Proposed Answer:
Proposed Answer:                   A Page 14 of 52                                                Rev f
A ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 15 of 52 Rev f  Explanation:
 
A. Correct. Given the conditions listed, entry into FRZ
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Explanation:
-0.2B is correct due to a Containment Flooding condition existing.
A. Correct. Given the conditions listed, entry into FRZ-0.2B is correct due to a Containment Flooding condition existing.
B. Incorrect. Plausible because the cooldown rate exceeded 100&#xba;F per hour and Loop Cold Le g temperatures are less than 350&#xba;F, however, it is a Yellow Path condition in the CSFST hierarchy.
B. Incorrect. Plausible because the cooldown rate exceeded 100&#xba;F per hour and Loop Cold Leg temperatures are less than 350&#xba;F, however, it is a Yellow Path condition in the CSFST hierarchy.
C. Incorrect. Plausible because Pressurizer level is low and the requirements to enter FRI
C. Incorrect. Plausible because Pressurizer level is low and the requirements to enter FRI-0.2B are met, however, it is a Yellow Path condition in the CSFST hierarchy.
-0.2B are met, however, it is a Yellow Path condition in the CSFST hierarchy.
D. Incorrect. Plausible because Containment radiation level is high and entry conditions for FRZ-0.3B are met, however, it is a Yellow Path condition in the CSFST hierarchy.
D. Incorrect. Plausible because Containment radiation level is high and entry conditions for FRZ
Technical Reference(s)     FRZ-0.2B, CSFST                               Attached w/ Revision # See FRI-0.2B, CSFST                               Comments / Reference FRP-0.2B, CSFST Proposed references to be provided during examination: None Learning Objective:     Given the Containment CSF Status Tree and a description of applicable plant conditions, DETERMINE if entry into FRZ-0.2A/B is indicated, and STATE the severity of the challenge, if any. (LO21.ERG.FZ2.OB03)
-0.3B are met, however, it is a Yellow Path condition in the CSFST hierarchy.
Question Source:           Bank #
Technical Reference(s)
Modified Bank #           CPNPP LXR         (Note changes or attach parent)
FRZ-0.2B , CSFST Attached w/ Revision # See Comments / Reference FRI-0.2B, CSFST FRP-0.2B , CSFST Proposed references to be provided during examination:
New Question History:           Last NRC Exam         CPNPP 2010 Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41 55.43   5 Page 15 of 52                                    Rev f
None Learning Objective:
 
Given the Containment CSF Status Tree and a description of applicable plant conditions, DETERMINE if entry into FRZ
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                     Form ES-401-5 Comments /  
-0.2A/B is indicated, and STATE the severity of the challenge, if any. (LO21.ERG.FZ2.OB03)
Question Source:
Bank #   Modified Bank #
CPNPP LXR (Note changes or attach parent)
New   Question History:
Last NRC Exam CPNPP 2010 Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 16 of 52 Rev f  Comments /  


==Reference:==
==Reference:==
From CPNPP LXR Exam Bank Revision # 03/22/10 Given the following conditions:
From CPNPP LXR Exam Bank                             Revision # 03/22/10 Given the following conditions:
A Large Break Loss of Coolant Accident has occurred on Unit 2.
* A Large Break Loss of Coolant Accident has occurred on Unit 2.
EOP-1.0B, Loss of Reactor or Secondary Coolant, is in progress.
* EOP-1.0B, Loss of Reactor or Secondary Coolant, is in progress.
The initial scan of the Critical Safety Function Status Tree parameters indicate the following:
* The initial scan of the Critical Safety Function Status Tree parameters indicate the following:
Pressurizer level is 0%.
* Pressurizer level is 0%.
Containment water level indicates 817 feet and slowly rising.
* Containment water level indicates 817 feet and slowly rising.
Containment Spray has automatically actuated and was verified in EOP
* Containment Spray has automatically actuated and was verified in EOP-0.0B, Reactor Trip or Safety Injection.
-0.0B, Reactor Trip or Safety Injection.
* Containment pressure is 14 PSIG and slowly lowering.
Containment pressure is 14 PSIG and slowly lowering.
* Containment Radiation Monitors are in ALARM at 25 REM/hr.
Containment Radiation Monitors are in ALARM at 25 REM/hr.
* Reactor Vessel Level Indication System has no lights LIT.
Reactor Vessel Level Indication System has no lights LIT. Core Exit Thermocouples are 292&#xba;F.
* Core Exit Thermocouples are 292&#xba;F.
Which of the following procedures must be entered to address the above conditions?
Which of the following procedures must be entered to address the above conditions?
A. B. FRZ-0.1B, Response to High Containment Pressure.
A. FRZ-0.2B, Response to Containment Flooding.
FRZ-0.2B, Response to Containment Flooding.
B. FRZ-0.1B, Response to High Containment Pressure.
C. FRI-0.2B, Response to Low Pressurizer Level. D. FRZ-0.3B, Response to High Containment Radiation Level.
C. FRI-0.2B, Response to Low Pressurizer Level.
D. FRZ-0.3B, Response to High Containment Radiation Level.
Page 16 of 52                                      Rev f


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 17 of 52 Rev f  Examination Outline Cross
ES-401                   CPNPP NRC 2011 SRO Written Exam Worksheet                                     Form ES-401-5 Examination Outline Cross-reference:                               Level                         RO                 SRO Tier #                                             1 Group #                                           2 K/A #                           W/E16 G 2.2.42 Importance Rating                                 4.6 High Containment Radiation: Equipment Control: Ability to recognize system parameters that are entry level conditions for Technical Specifications Proposed Question:              SRO 83 Given the following conditions:
-reference:
* Unit 1 is in MODE 3.
Level RO SRO Tier #   1 Group #   2 K/A # W/E16 G 2.2.42 Importance Rating 4.6 High Containment RadiationProposed Question:
* 1-RE-6290A, Containment High Range Radiation Monitor, has failed.
: Equipment Control: Ability to recognize system parameters that are entry level conditions for Technical Specifications SRO 83   Given the following conditions:
Unit 1 is in MODE 3.
1-RE-6290A, Containment High Range Radiation Monitor, has failed.
Which of the following is the Technical Specification (TS) impact?
Which of the following is the Technical Specification (TS) impact?
A. Enter a Tracking LCOAR for TS LCO 3.3.3, Post Accident Monitoring (PAM) Instrumentation
A. Enter a Tracking LCOAR for TS LCO 3.3.3, Post Accident Monitoring (PAM)
, for 1 of 3 Channels INOPERABLE.
Instrumentation, for 1 of 3 Channels INOPERABLE.
B. Enter a Tracking LCOAR for TS LCO 3.3.4, Remote Shutdown System
B. Enter a Tracking LCOAR for TS LCO 3.3.4, Remote Shutdown System, for 1 of 3 Channels INOPERABLE.
, for 1 of 3 Channels INOPERABLE.
C. Enter an Active LCOAR for TS LCO 3.3.3, Post Accident Monitoring (PAM)
C. Enter an Active LCOAR for TS LCO 3.3.3, Post Accident Monitoring (PAM) Instrumentation
Instrumentation, for 1 of 2 Required Channels INOPERABLE.
, for 1 of 2 Required Channels INOPERABLE.
D. Enter an Active LCOAR for TS LCO 3.3.4, Remote Shutdown System, for 1 of 2 Required Channels INOPERABLE.
D. Enter an Active LCOAR for TS LCO 3.3.4, Remote Shutdown System
Proposed Answer:               C Explanation:
, for 1 of 2 Required Channels INOPERABLE.
A. Incorrect. Plausible because the Technical Specification is correct, however, an Active LCOAR must be initiated and only one of 2 channels is INOPERABLE.
Proposed Answer:
B. Incorrect. Plausible if thought that Containment High Range Radiation was a Technical Specification LCO 3.3.4 entry.
C Explanation:
C. Correct. An Active LCOAR must be initiated and only one of 2 channels is INOPERABLE for Technical Specification LCO 3.3.3.
A. Incorrect. Plausible because the Technical Specification is correct, however, an Active LCOAR must be initiated and only one of 2 channels is INOPERABLE
. B. Incorrect. Plausible if thought that Containment High Range Radiation was a Technical Specification LCO 3.3.4 entry
. C. Correct. An Active LCOAR must be initiated and only one of 2 channels is INOPERABLE for Technical Specification LCO 3.3.3.
D. Incorrect. Plausible because an Active LCOAR must be initiated and only one of 2 channels is INOPERABLE, however, the Technical Specification entry is incorrect.
D. Incorrect. Plausible because an Active LCOAR must be initiated and only one of 2 channels is INOPERABLE, however, the Technical Specification entry is incorrect.
Page 17 of 52                                                  Rev f


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 18 of 52 Rev f  Technical Reference(s)
ES-401               CPNPP NRC 2011 SRO Written Exam Worksheet                     Form ES-401-5 Technical Reference(s)   Technical Specification Table 3.3.3-1, #10   Attached w/ Revision # See Technical Specification LCO 3.3.3.A & F       Comments / Reference ODA-308, Steps 6.2.1.A & 6.2.2.A Proposed references to be provided during examination: None Learning Objective:   LIST and DESCRIBE the following Technical Specifications (i.e., LCOs, action statements and conditional surveillance requirement of one hour and less, if applicable) for the Reactor Coolant System:
Technical Specification Table 3.3.3
* 3.3.3, Post Accident Monitoring Instrumentation (OP51.SYS.RC1.OB18)
-1, #10 Attached w/ Revision # See Comments / Reference Technical Specification LCO 3.3.3.A & F ODA-308, Steps 6.2.1.A & 6.2.2.A Proposed references to be provided during examination:
Question Source:         Bank #
None Learning Objective:
Modified Bank #                           (Note changes or attach parent)
LIST and DESCRIBE the following Technical Specifications (i.e., LCOs, action statements and conditional surveillance requirement of one hour and less, if applicable) for the Reactor Coolant System:
New                         X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:   55.41 55.43   2 Page 18 of 52                                     Rev f
3.3.3, Post Accident Monitoring Instrumentation (OP51.SYS.RC1.OB18)
Question Source:
Bank #   Modified Bank #
  (Note changes or attach parent)
New X   Question History:
Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 2 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 19 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  1  Group #  2  K/A # W/E06 & E07 G 2.4.20 Importance Rating


===4.7 Inadequate===
ES-401                    CPNPP NRC 2011 SRO Written Exam Worksheet                            Form ES-401-5 Examination Outline Cross-reference:                          Level                        RO          SRO Tier #                                      1 Group #                                    2 K/A #                      W/E06 & E07 G 2.4.20 Importance Rating                          4.7 Inadequate Core Cooling: Emergency Procedures/Plan: Knowledge of EOP mitigation strategies Proposed Question:            SRO 84 Given the following conditions:
Core CoolingProposed Question:
* A Small Break Loss of Coolant Accident has occurred on Unit 2.
: Emergency Procedures/Plan: Knowledge of EOP mitigation strategies SRO 84 Given the following conditions:
* The highest reading Core Exit Thermocouple (CET) temperature is 775&#xba;F and rising.
A Small Break Loss of Coolant Accident has occurred on Unit 2.
* Reactor Vessel Level Indication System (RVLIS) Indication: All lights are DARK.
The highest reading Core Exit Thermocouple (CET) temperature is 775&#xba;F and rising.
* Reactor Coolant System pressure is 1020 PSIG and lowering.
Reactor Vessel Level Indication System (RVLIS) Indication: All lights are DARK.
* Emergency Core Cooling System (ECCS) total injection flow is 0 GPM.
Reactor Coolant System pressure is 1020 PSIG and lowering.
* Efforts to establish ECCS flow have been unsuccessful.
Emergency Core Cooling System (ECCS) total injection flow is 0 GPM. Efforts to establish ECCS flow have been unsuccessful.
* Reactor Coolant System (RCS) is superheated.
Reactor Coolant System (RCS) is superheated.
* All Steam Generator (SG) narrow range levels are 0%.
All Steam Generator (SG) narrow range levels are 0%.
* Total Auxiliary Feedwater flow is 570 GPM.
Total Auxiliary Feedwater flow is 570 GPM.
* Reactor Coolant Pumps 2-01, 2-02 and 2-03 are running.
Reactor Coolant Pumps 2
* Containment pressure is 6 PSIG.
-01, 2-02 and 2-03 are running.
* Critical Safety Function Status Trees are being addressed.
Containment pressure is 6 PSIG. Critical Safety Function Status Trees are being addressed.
Which of the following should be performed after attempts to establish Emergency Core Cooling System flow are unsuccessful per FRC-0.2B, Response to Degraded Core Cooling?
Which of the following should be performed after attempts to establish Emergency Core Cooling System flow are unsuccessful per FRC-0.2B, Response to Degraded Core Cooling
A. Open the Pressurizer and Reactor Vessel Head Vents to depressurize the RCS and increase ECCS flow.
A. Open the Pressurizer and Reactor Vessel Head Vents to depressurize the RCS and increase ECCS flow.
B. Transfer to Cold Leg Recirculation to ensure the Reactor Core remains covered.
B. Transfer to Cold Leg Recirculation to ensure the Reactor Core remains covered.
C. Stop Reactor Coolant Pumps 2
C. Stop Reactor Coolant Pumps 2-01, 2-02, and 2-03 then initiate Bleed and Feed.
-01, 2-02, and 2-03 then initiate Bleed and Feed.
D. Restore intact SG narrow range levels to greater than 18% in at least one SG to provide core cooling.
D. Restore intact SG narrow range levels to greater than 18% in at least one SG to provide core cooling.
Proposed Answer:
Proposed Answer:               D Page 19 of 52                                          Rev f
D ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 20 of 52 Rev f  Explanation:
 
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Explanation:
A. Incorrect. Plausible because it could be thought this would help cool the core, however, it is imperative to close all RCS and PRZR vents to conserve inventory.
A. Incorrect. Plausible because it could be thought this would help cool the core, however, it is imperative to close all RCS and PRZR vents to conserve inventory.
B. Incorrect. Plausible if thought that Transferring to Cold Leg Recirculation would help the condition, however, RWST level is not known and ECCS flow cannot be established.
B. Incorrect. Plausible if thought that Transferring to Cold Leg Recirculation would help the condition, however, RWST level is not known and ECCS flow cannot be established.
C. Incorrect. Plausible because RCPs would be stopped later in FRC
C. Incorrect. Plausible because RCPs would be stopped later in FRC-0.2A prior to depressurization, however, with Auxiliary Feedwater flow available Core Cooling will be regained by raising Steam Generator narrow range level and steaming that SG.
-0.2A prior to dep ressurization, however, with Auxiliary Feedwater flow available Core Cooling will be regained by raising Steam Generator narrow range level and steaming that SG. D. Correct. With Auxiliary Feedwater available and no ECCS flow, FRC
D. Correct. With Auxiliary Feedwater available and no ECCS flow, FRC-0.2A directs the restoration of at least one Steam Generator narrow range level to greater than 18% (Adverse Containment) to deal with a Degraded Core Cooling condition.
-0.2A directs the restoration of at least one Steam Generator narrow range level to greater than 18% (Adverse Containment) to deal with a Degraded Core Cooling condition.
Technical Reference(s)       FRC-0.2B, CSFST                               Attached w/ Revision # See FRC-0.2B, Steps 1 to 10                       Comments / Reference Proposed references to be provided during examination: None Learning Objective:     ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Core Cooling Monitor System/RVLIS, both initial and subsequent, for:
Technical Reference(s)
* FRC-0.2, Response to Degraded Core Cooling (OP51.SYS.RC3.OB13)
FRC-0.2B, CSFST Attached w/ Revision # See Comments / Reference FRC-0.2B, Steps 1 to 10 Proposed references to be provided during examination:
Question Source:             Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41 55.43   5 Page 20 of 52                                      Rev f
ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Core Cooling Monitor System/RVLIS, both initial and subsequent, for:
 
FRC-0.2, Response to Degraded Core Cooling (OP51.SYS.RC3.OB13)
ES-401                   CPNPP NRC 2011 SRO Written Exam Worksheet                                       Form ES-401-5 Examination Outline Cross-reference:                                 Level                           RO           SRO Tier #                                           1 Group #                                         2 K/A #                               032 AA2.07 Importance Rating                               3.4 Loss of Source Range NI: Ability to determine and interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Maximum allowable channel disagreement Proposed Question:                SRO 85 Given the following conditions:
Question Source:
* Unit 1 is in a REFUELING outage with core onload in progress.
Bank # CPNPP LXR   Modified Bank #
* 1-NI-50A-2, Gamma-Metrics Source Range Neutron Flux is out-of-service.
  (Note changes or attach parent)
* 1-NI-31B, Westinghouse Source Range Neutron Flux, has a lower voltage than 1-NI-32B, Westinghouse Source Range Neutron Flux.
New   Question History:
Which of the following describes the effect on 1-NI-31B due to the lower voltage and the applicable Technical Specification requirement if 1-NI-31B were declared out-of-service?
Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
With a lower voltage the count rate should be...
55.41   55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 21 of 52 Rev f  Examination Outline Cross
A. lower. Technical Specifications require two (2) OPERABLE Channels and 1-NI-50B-2 and 1-NI-32B are both available.
-reference:
Level RO SRO Tier #   1 Group #   2 K/A # 032 AA2.07 Importance Rating 3.4 Loss of Source Range NIProposed Question:
: Ability to determine and interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Maximum allowable channel disagreement SRO 85 Given the following conditions:
Unit 1 is in a REFUELING outage with core onload in progress.
1-NI-50A-2, Gamma-Metrics Source Range Neutron Flux is out
-of-service. 1-NI-31B, Westinghouse Source Range Neutron Flux, has a lower voltage than 1-NI-32B, Westinghouse Source Range Neutron Flux.
Which of the following describes the effect on 1
-NI-31B due to the lower voltage and the applicable Technical Specification requirement if 1
-NI-31B were declared out
-of-service? With a lower voltage the count rate should be... A. lower. Technical Specifications require two (2) OPERABLE Channels and 1-NI-50B-2 and 1-NI-32B are both available.
B. higher. Technical Specifications require two (2) OPERABLE channels and with only one CORE ALTERATIONS must stop immediately.
B. higher. Technical Specifications require two (2) OPERABLE channels and with only one CORE ALTERATIONS must stop immediately.
C. higher. Technical Specifications require two (2) OPERABLE Channels and 1-NI-50B-2 and 1-NI-32B are both available.
C. higher. Technical Specifications require two (2) OPERABLE Channels and 1-NI-50B-2 and 1-NI-32B are both available.
D. lower. Technical Specifications require two (2) OPERABLE Channels and with only one CORE ALTERATIONS must stop immediately.
D. lower. Technical Specifications require two (2) OPERABLE Channels and with only one CORE ALTERATIONS must stop immediately.
Proposed Answer:
Proposed Answer:                   D Page 21 of 52                                                  Rev f
D ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 22 of 52 Rev f  Explanation:
 
A. Incorrect. Plausible because wh en Core offload or onload are not in progress this is the CHANNEL CHECK for the Westinghouse SR Channels, however, Technical Specifications are not being met.
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Explanation:
A. Incorrect. Plausible because when Core offload or onload are not in progress this is the CHANNEL CHECK for the Westinghouse SR Channels, however, Technical Specifications are not being met.
B. Incorrect. Plausible because when Core offload or onload is not in progress this is the CHANNEL CHECK for the Westinghouse SR Channels. The Technical Specification REQUIRED ACTIONS are correct.
B. Incorrect. Plausible because when Core offload or onload is not in progress this is the CHANNEL CHECK for the Westinghouse SR Channels. The Technical Specification REQUIRED ACTIONS are correct.
C. Incorrect. Plausible because the shiftly CHANNEL CHECK is correct for Core onload, however, Technical Specifications are not being met.
C. Incorrect. Plausible because the shiftly CHANNEL CHECK is correct for Core onload, however, Technical Specifications are not being met.
D. Correct. CHANNEL CHECK requirements state that counts should be consistent with Core configuration for the given operating MODE; therefore, with lower voltage and lower counts the readings are not consistent. Credit can only be taken for matched sets of channels; two Westinghouse or two Gamma
D. Correct. CHANNEL CHECK requirements state that counts should be consistent with Core configuration for the given operating MODE; therefore, with lower voltage and lower counts the readings are not consistent. Credit can only be taken for matched sets of channels; two Westinghouse or two Gamma-Metrics, therefore, CORE ALTERATIONS must stop immediately.
-Metrics, therefore, CORE ALTERATIONS must stop immediately. Technical Reference(s)
Technical Reference(s)     Technical Specification LCO 3.9.3.A         Attached w/ Revision # See Technical Specification LCO 3.9.3 Bases     Comments / Reference OPT-102A-6, Page 2 of 6 Proposed references to be provided during examination: None Learning Objective:     EVALUATE the effect a loss of the Excore Instrumentation System has on the following:
Technical Specification LCO 3.9.3.A Attached w/ Revision # See Comments / Reference Technical Specification LCO 3.9.3 Bases OPT-102A-6, Page 2 of 6 Proposed references to be provided during examination:
* Refueling operations (OP51.SYS.EC1.OB22)
None Learning Objective:
Question Source:           Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
EVALUATE the effect a loss of the Excore Instrumentation System has on the following:
New Question History:           Last NRC Exam         CPNPP 2009 Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41 55.43   2 Page 22 of 52                                    Rev f
Refueling operations (OP51.SYS.EC1.OB22)
 
Question Source:
ES-401                   CPNPP NRC 2011 SRO Written Exam Worksheet                                       Form ES-401-5 Examination Outline Cross-reference:                               Level                           RO             SRO Tier #                                             2 Group #                                             1 K/A #                               076 G 2.4.45 Importance Rating                                 4.3 Service Water System: Emergency Procedures/Plan: Ability to prioritize and interpret the significance of each annunciator or alarm Proposed Question:            SRO 86 Given the following conditions:
Bank # CPNPP LXR   Modified Bank # (Note changes or attach parent)
* Unit 1 is in MODE 4.
New   Question History:
* Train A Component Cooling Water Pump (CCWP) and Train A Station Service Water Pump (SSWP) are in service.
Last NRC Exam CPNPP 2009 Question Cognitive Level:
* Train B CCWP and Train B SSWP are secured.
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
* The following Annunciators are in alarm:
55.41   55.43 2 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 23 of 52 Rev f  Examination Outline Cross-reference:
* 1-ALB-1, Window 1.7 - SSW TRN A/B HDR PRESS LO.
Level RO SRO Tier #   2 Group #   1 K/A # 076 G 2.4.45 Importance Rating
* 1-ALB-1, Window 1.8 - SSWP 1/2 OVRLOAD/TRIP.
* The BOP determines that SSWP 1-01 has tripped.
* NO other automatic action has occurred.
Which of the following describes the operator action per ABN-501, Station Service Water System Malfunction and what Technical Specification REQUIRED ACTIONS should be implemented?
A. 1.) Start SSWP 1-02 and CCWP 1-02.
2.) Restore SSW Pump 1-01 to OPERABLE status within 72 hours per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.
B. 1.) Start SSWP 1-02 only.
2.) Restore SSW Pump 1-01 to OPERABLE status within 7 days per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.
C. 1.) Start SSWP 1-02 and CCWP 1-02.
2.) Restore SSW Pump 1-01 to OPERABLE status within 7 days per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.
D. 1.) Start SSWP 1-02 only.
2.) Restore SSW Pump 1-01 to OPERABLE status within 72 hours per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.
Proposed Answer:              A Page 23 of 52                                                      Rev f


===4.3 Service===
ES-401                   CPNPP NRC 2011 SRO Written Exam Worksheet                   Form ES-401-5 Explanation:
Water SystemProposed Questio n: : Emergency Procedures/Plan: Ability to prioritize and interpret the significance of each annunciator or alarm SRO 86  Given the following conditions
A. Correct. A low SSW header pressure starts the standby SSW and CCW Pumps per ABN-501.
:  Unit 1 is in MODE 4. Train A Component Cooling Water Pump (CCWP) and Train A Station Service Water Pump (SSWP) are in service.
Additionally, this is the Technical Specification REQUIRED ACTION.
Train B CCWP and Train B SSWP are secured.
The following Annunciators are in alarm:
1-ALB-1, Window 1.7
- SSW TRN A/B HDR PRESS LO.
1-ALB-1, Window 1.8
- SSWP 1/2 OVRLOAD/TRIP.
The BOP determines that SSWP 1
-01 has tripped.
NO  other automatic action has occurred.
Which of the following describes the operator action per ABN
-501, Station Service Water System Malfunction and what Technical Specification REQUIRED ACTIONS should be implemented
?  A. 1.) Start SSWP 1-02 and2.) Restore SSW Pump 1-01 to OPERABLE status within 72 hours per LCO 3.7.8.B , Station Service Water System, One SSWS train inoperable.
CCWP 1-02. B. 1.) Start SSWP 1
-02 only2.) Restore SSW Pump 1
-01 to OPERABLE status within 7 days per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.
. C. 1.) Start SSWP 1
-02 and 2.) Restore SSW Pump 1
-01 to OPERABLE status within 7 days per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable
. CCWP 1-02. D. 1.) Start SSWP 1
-02 only2.) Restore SSW Pump 1
-01 to OPERABLE status within 72 hours per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.
. Proposed Answer: A ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 24 of 52 Rev f Explanation:
A. Correct. A low SSW header pressure starts the standby SSW and CCW Pumps per ABN-501. Additionally, this is the Technical Specification REQUIRED ACTION.
B. Incorrect. Plausible because the Train B SSW Pump should be started, however, both SSW and CCW Pumps AUTO start on low SSW header pressure and the Technical Specification COMPLETION TIME is 72 hours vice 7 days.
B. Incorrect. Plausible because the Train B SSW Pump should be started, however, both SSW and CCW Pumps AUTO start on low SSW header pressure and the Technical Specification COMPLETION TIME is 72 hours vice 7 days.
C. Incorrect. Plausible because a low SSW header pressure starts the standby SSW and CCW Pumps, however, the Technical Specification COMPLETION TIME is 72 hours vice 7 days
C. Incorrect. Plausible because a low SSW header pressure starts the standby SSW and CCW Pumps, however, the Technical Specification COMPLETION TIME is 72 hours vice 7 days.
. D. Incorrect. Plausible because the Technical Specification REQUIRED ACTION is correct and the Service Water Pump will AUTO start on low header pressure, however, both SSW and CCW Pumps should AUTO start on low header pressure.
D. Incorrect. Plausible because the Technical Specification REQUIRED ACTION is correct and the Service Water Pump will AUTO start on low header pressure, however, both SSW and CCW Pumps should AUTO start on low header pressure.
Technical Reference(s)
Technical Reference(s)       ALM-0011A, 1-ALB-1, Windows 1.7 & 1.8       Attached w/ Revision # See ABN-501, Steps 2.3.2, & 2.3.3               Comments / Reference Technical Specification LCO 3.7.8.A & B Proposed references to be provided during examination: None Learning Objective:       DISCUSS the Technical Specifications, Technical Requirements Manual, or ODCM associated with the components, parameters, and operation of the Station Service Water System. (OP51.SYS.SW1.OB13)
ALM-0011A, 1-ALB-1, Windows 1.7 & 1.8 Attached w/ Revision # See Comments / Reference ABN-501, Step s 2.3.2, & 2.3.3 Technical Specification LCO 3.7.8.A & B Proposed references to be provided during examination: None Learning Objective:
Question Source:             Bank #                 CPNPP LXR Modified Bank #                         (Note changes or attach parent)
DISCUSS the Technical Specifications, Technical Requirements Manual, or ODCM associated with the components, parameters, and operation of the Station Service Water System
New Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43   2, 5 Page 24 of 52                                   Rev f
. (OP51.SYS.SW1.OB13)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 2, 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 25 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  2  Group #  1  K/A # 006 A2.02  Importance Rating


===4.3 Emergency===
ES-401                      CPNPP NRC 2011 SRO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO              SRO Tier #                                            2 Group #                                            1 K/A #                                006 A2.02 Importance Rating                                4.3 Emergency Core Cooling System: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of flowpath Proposed Question:              SRO 87 Given the following conditions:
Core Cooling SystemProposed Question:
* A Plant Heatup is in progress on Unit 2 per IPO-001B, Plant Heatup from Cold Shutdown to Hot Standby.
: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of flowpath SRO 87 Given the following conditions:
* Current Unit 2 conditions are as follows:
A Plant Heatup is in progress on Unit 2 per IPO
* Reactor Coolant System temperature is 360&#xba;F.
-001B, Plant Heatup from Cold Shutdown to Hot Standby.
* Pressurizer pressure is 450 PSIG.
Current Unit 2 conditions are as follows:
* All four Reactor Coolant Pumps are in operation.
Reactor Coolant System temperature is 360&#xba;F.
* Centrifugal Charging Pump 2-01 tripped on low lube oil pressure.
Pressurizer pressure is 450 PSIG.
* Centrifugal Charging Pump 2-02 was started and plant conditions were stabilized.
All four Reactor Coolant Pumps are in operation.
* The Positive Displacement Charging Pump is tagged out per IPO-001B, Plant Heatup from Cold Shutdown to Hot Standby.
Centrifugal Charging Pump 2
-01 tripped on low lube oil pressure.
Centrifugal Charging Pump 2
-02 was started and plant conditions were stabilized.
The Positive Displacement Charging Pump is tagged out per IPO
-001B, Plant Heatup from Cold Shutdown to Hot Standby.
Which of the following completely describes the impact on Technical Specification / Technical Requirement Manual compliance due to this failure and what action is required?
Which of the following completely describes the impact on Technical Specification / Technical Requirement Manual compliance due to this failure and what action is required?
A. Only one of the required Boron Injection flow paths is INOPERABLE. Refer to ABN-107, Emergency Boration, and restore Boration Injection flow path to OPERABLE status within 72 hours.
A. Only one of the required Boron Injection flow paths is INOPERABLE. Refer to ABN-107, Emergency Boration, and restore Boration Injection flow path to OPERABLE status within 72 hours.
B. Only C. One Boron Injection flow path one of the required Emergency Core Cooling Trains is INOPERABLE. Refer to SOP-201B, Safety Injection System, and restore Emergency Core Cooling System Train to OPERABLE status within 7 days. and D. Refer to SOP
B. Only one of the required Emergency Core Cooling Trains is INOPERABLE. Refer to SOP-201B, Safety Injection System, and restore Emergency Core Cooling System Train to OPERABLE status within 7 days.
-103B, Chemical and Volume Control System and align the Positive Displacement Charging Pump within 72 hours to restore the Boration Injection flow path to OPERABLE status.
C. One Boron Injection flow path and one Emergency Core Cooling Train are INOPERABLE. Refer to ABN-105, Chemical and Volume Control System Malfunction, and restore the Boration flow path and ECCS Train to OPERABLE status within 7 days.
one Emergency Core Cooling Train are INOPERABLE. Refer to ABN
D. Refer to SOP-103B, Chemical and Volume Control System and align the Positive Displacement Charging Pump within 72 hours to restore the Boration Injection flow path to OPERABLE status.
-105, Chemical and Volume Control System Malfunction, and restore the Boration flow path and ECCS Train to OPERABLE status within 7 days.  
Page 25 of 52                                                  Rev f
 
ES-401                CPNPP NRC 2011 SRO Written Exam Worksheet                      Form ES-401-5 Proposed Answer:            C Explanation:
A. Incorrect. Plausible because the Boration Injection flow path is INOPERABLE and there may be a misconception that ABN-107 will restore boration flowpath.
B. Incorrect. Plausible because the ECCS Train is INOPERABLE and the Technical Specification LCO 3.5.2.A REQUIRED ACTION is correct, however, a Boration Injection flow path is also INOPERABLE. Entry into SOP-201B would be correct if this were the only condition.
C. Correct. Technical Specification LCO 3.5.2.A and Technical Requirement 13.1.31.B are both impacted. The correct COMPLETION TIME for both systems is 7 days. Entry into ABN-105 is correct for the conditions listed.
D. Incorrect. Plausible because the Positive Displacement Charging Pump (PDP) can be used in lieu of one of the required Centrifugal Charging Pumps, however, an Emergency Core Cooling Train is still INOPERABLE and the PDP can only be substituted when in MODE 4 per the Note in Technical Requirement 13.1.31. Entry into SOP-103B would be correct if this were the only condition.
Technical Reference(s)      Technical Specification LCO 3.5.2.A          Attached w/ Revision # See TRM LCO 13.1.31.B                            Comments / Reference ABN-105, Section 9.0 Proposed references to be provided during examination: None Learning Objective:    LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Emergency Core Cooling System:
* ECCS Subsystems 3.5.2 & 3.5.3 (OP51.SYS.SI1.OB30)
Question Source:            Bank #
Modified Bank #                          (Note changes or attach parent)
New                          X Question History:            Last NRC Exam Question Cognitive Level:    Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:      55.41 55.43    1, 2 Page 26 of 52                                    Rev f


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 26 of 52 Rev f Proposed Answer:
ES-401                     CPNPP NRC 2011 SRO Written Exam Worksheet                                       Form ES-401-5 Examination Outline Cross-reference:                                   Level                         RO             SRO Tier #                                           2 Group #                                         1 K/A #                               059 A2.07 Importance Rating                               3.3 Main Feedwater System: Ability to (a) predict the impacts of the following malfunctions or operations on the MFW System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Tripping of MFW pump turbine Proposed Question:                SRO 88 Given the following conditions:
C  Explanation:
* Unit 2 is at 100% power.
A. Incorrect. Plausible because the Boration Injection flow path is INOPERABLE and there may be a misconception that ABN
* Main Feedwater Pump 2A tripped.
-107 will restore boration flowpath.
* ABN-302, Feedwater, Condensate, Heater Drain System Malfunction, has been entered.
B. Incorrect. Plausible because the ECCS Train is INOPERABLE and the Technical Specification LCO 3.5.2.A REQUIRED ACTION is correct, however, a Boration Injection flow path is also INOPERABLE.
* Steam Generator levels initially stabilized but now are lowering in an uncontrolled manner.
Entry into SOP
* Main Feedwater Pump 2B speed dropped to 2000 rpm and steam header pressure is 150 PSIG greater than feedwater header pressure.
-201B would be correct if this were the only condition.
C. Correct. Technical Specification LCO 3.5.2.A and Technical Requirement 13.1.31.B are both impacted.
The correct COMPLETION TIME for both systems is 7 days. Entry into ABN
-105 is correct for the conditions listed.
D. Incorrect. Plausible because the Positive Displacement Charging Pump (PDP) can be used in lieu of one of the required Centrifugal Charging Pumps, however, an Emergency Core Cooling Train is still INOPERABLE and the PDP can only be substituted when in MODE 4 per the Note in Technical Requirement 13.1.31
. Entry into SOP
-103B would be correct if this were the only condition.
Technical Reference(s)
Technical Specification LCO 3.5.2.A Attached w/ Revision # See Comments / Reference TRM LCO 13.1.31.B ABN-105, Section 9.0 Proposed references to be provided during examination:
None  Learning Objective:
LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Emergency Core Cooling System:
ECCS Subsystems 3.5.2 & 3.5.3 (OP51.SYS.SI1.OB30)
Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41  55.43 1, 2 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 27 of 52 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier #   2 Group #   1 K/A # 059 A2.07 Importance Rating 3.3 Main Feedwater SystemProposed Question:
: Ability to (a) predict the impacts of the following malfunctions or operations on the MFW System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Tripping of MFW pump turbine SRO 88 Given the following conditions
Unit 2 is at 100% power.
Main Feedwater Pump 2A trip ped. ABN-302, Feedwater, Condensate, Heater Drain System Malfunction, has been entered. Steam Generator levels initially stabilized but now are lowering in an uncontrolled manner. Main Feedwater Pump 2B speed dropped to 2000 rpm and steam header pressure is 150 PSIG greater than feedwater header pressure.
Which of the following identifies the impact on the Unit and what actions should be taken to mitigate the situation?
Which of the following identifies the impact on the Unit and what actions should be taken to mitigate the situation?
A. 1.) A Turbine Runback to 700 MW e will be initiated.
A. 1.) A Turbine Runback to 700 MWe will be initiated.
2.) Initiate an additional manual Turbine Runback of 50 MWe then trip the Main Turbine per A BN-302, Feedwater System Malfunction
2.) Initiate an additional manual Turbine Runback of 50 MWe then trip the Main Turbine per ABN-302, Feedwater System Malfunction.
. B. 1.) A Reactor Trip and entry into EOP
B. 1.) A Reactor Trip and entry into EOP-0.0B, Reactor Trip or Safety Injection is required.
-0.0B, Reactor Trip or Safety Injection is required. 2.) Start Auxiliary Feedwater (AFW) Pumps and control AFW flow per EOP
2.) Start Auxiliary Feedwater (AFW) Pumps and control AFW flow per EOP-0.0B, Reactor Trip or Safety Injection, Attachment 1A, Foldout Page.
-0.0B,   Reactor Trip or Safety Injection , Attachment 1A, Foldout Page
C. 1.) A Turbine Runback to 700 MWe will be initiated.
. C. 1.) A Turbine Runback to 700 MW e will be initiated.
2.) Trip the Main Turbine and start both Motor Driven AFW Pumps per ABN-302, Feedwater System Malfunction.
2.) Trip the Main Turbine and start both Motor Driven AFW Pumps per ABN
D. 1.) A Reactor Trip and entry into EOP-0.0B, Reactor Trip or Safety Injection is required.
-302,   Feedwater System Malfunction.
2.) Start all available AFW Pumps at full flow in an attempt to restore Steam Generator level per ABN-302, Feedwater System Malfunction.
D. 1.) A Reactor Trip and entry into EOP
Page 27 of 52                                                  Rev f
-0.0B, Reactor Trip or Safety Injection is   required. 2.) Start all available AFW Pumps at full flow in an attempt to restore Steam Generator level per ABN
-302, Feedwater System Malfunction.


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 28 of 52 Rev f Proposed Answer:
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Proposed Answer:             B Explanation:
B   Explanation:
A. Incorrect. Plausible because a Turbine Runback is initiated and the 2nd Runback could allow Steam Dumps to control RCS temperature, however, the Reactor must be tripped and Auxiliary Feedwater flow initiated.
A. Incorrect. Plausible because a Turbine Runback is initiated and the 2nd Runback could allow Steam Dumps to control RCS temperature, however, the Reactor must be tripped and Auxiliar y Feedwater flow initiated
B. Correct. Given the conditions listed, a Reactor Trip is required and the Auxiliary Feedwater System is operated as shown.
. B. Correct. Given the conditions listed, a Reactor Trip is required and the Auxiliary Feedwater System is operated as shown.
C. Incorrect. Plausible because a Turbine Runback is initiated and the Motor Driven AFW Pumps will be started, however, a Reactor Trip is required.
C. Incorrect. Plausible because a Turbine Runback is initiated and the Motor Driven AFW Pumps will be started, however, a Reactor Trip is required.
D. Incorrect. Plausible because a Reactor Trip is required, however, this is not the appropriate response using the Auxiliary Feedwater System.
D. Incorrect. Plausible because a Reactor Trip is required, however, this is not the appropriate response using the Auxiliary Feedwater System.
Technical Reference(s)
Technical Reference(s)     ABN-302, Step 2.3.3 and Note                   Attached w/ Revision # See ABN-302, Step 2.3.1 and Note                   Comments / Reference Proposed references to be provided during examination: None Learning Objective:     DIAGNOSE plant conditions and IDENTIFY the indications which are entry-level conditions for ABNs required to be implemented in response to a Feedwater, Condensate, Heater Drain System Malfunction.
ABN-302, Step 2.3.3 and Note Attached w/ Revision # See Comments / Reference ABN-302, Step 2.3.1 and Note Proposed references to be provided during examination:
(LO21.ABN.302.OB07)
None Learning Objective: DIAGNOSE plant conditions and IDENTIFY the indications which are entry
EVALUATE the following as they apply to a Feedwater, Condensate, Heater Drain System malfunction:
-level conditions for ABNs required to be implemented in response to a Feedwater, Condensate, Heater Drain System Malfunction. (LO21.ABN.302.OB07)
* Differentiation between loss of all MFW and trip of one MFW pump (LO21.ABN.302.OB05)
EVALUATE the following as they apply to a Feedwater, Condensate, Heater Drain System malfunction
Question Source:           Bank #
:    Differentiation between loss of all MFW and trip of one MFW pump (LO21.ABN.302.OB05)
Modified Bank #                           (Note changes or attach parent)
Question Source:
New                         X Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:     55.41 55.43   5 Page 28 of 52                                     Rev f
Bank #   Modified Bank #
  (Note changes or attach parent)
New X   Question History: Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 29 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  2  Group #  1  K/A # 003 G 2.4.4  Importance Rating


===4.7 Reactor===
ES-401                      CPNPP NRC 2011 SRO Written Exam Worksheet                              Form ES-401-5 Examination Outline Cross-reference:                              Level                      RO              SRO Tier #                                        2 Group #                                        1 K/A #                            003 G 2.4.4 Importance Rating                            4.7 Reactor Coolant Pump System: Emergency Procedures/Plan: Ability to recognize abnormal indications for system operating parameters that are entry level conditions for emergency and abnormal procedures Proposed Question:                SRO 89 Given the following conditions:
Coolant Pump SystemProposed Question:
* Unit 1 is at 50% power.
: Emergency Procedures/Plan: Ability to recognize abnormal indications for system operating parameters that are entry level conditions for emergency and abnormal procedures SRO 89 Given the following conditions:
* Annunciator 1-ALB-5A, Window 1.3 - RC LOOP 1 1 OF 3 FLO LO is in alarm.
Unit 1 is at 50% power.
* 1-FI-414, RC LOOP 1 FLO CHAN I indication is reading 50%.
Annunciator 1
Which of the following procedures should be entered for this condition?
-ALB-5A, Window 1.3  
A. SOP-108A, Reactor Coolant Pump.
- RC LOOP 1 1 OF 3 FLO LO is in alarm.
1-FI-414, RC LOOP 1 FLO CHAN I indication is reading 50%. Which of the following procedures should be entered for this condition? A. SOP-108A, Reactor Coolant Pump.
B. ABN-713, RCS Loop Flow Instrument Malfunction.
B. ABN-713, RCS Loop Flow Instrument Malfunction.
C. EOP-0.0A, Reactor Trip or Safety Injection.
C. EOP-0.0A, Reactor Trip or Safety Injection.
D. ABN-101, Reactor Coolant Pump Trip/Malfunction.
D. ABN-101, Reactor Coolant Pump Trip/Malfunction.
Proposed Answer:
Proposed Answer:                   B Explanation:
B Explanation:
A. Incorrect. Plausible because if it is thought that at 50% power that 50% flow was expected and the procedure for system operation would be entered.
A. Incorrect. Plausible because if it is thought that at 50% power that 50% flow was expected and the procedure for system operation would be entered.
B. Correct. With only one channel failed, ALM-0051A, Window 1.3 directs the operator to ABN
B. Correct. With only one channel failed, ALM-0051A, Window 1.3 directs the operator to ABN-713, but only after ABN-101 and EOP-0.0A are ruled out.
-713, but only after ABN
C. Incorrect. Plausible because Reactor power is greater than 48% which means that the P-8 permissive is satisfied, however, a 2nd channel would have to be reading less than 90% in order to enter EOP-0.0.
-101 and EOP
D. Incorrect. Plausible because this annunciator is an entry condition for ABN-101, however, Reactor power would have to be less than 48% in order to meet the criteria for a Reactor Coolant Pump Malfunction as opposed to a Reactor Trip.
-0.0A are ruled out. C. Incorrect. Plausible because Reactor power is greater than 48% which means that the P
Technical Reference(s)           ABN-713, Steps 1 & 2                             Attached w/ Revision # See ABN-101, Sections 2.1 and 2.2                     Comments / Reference Proposed references to be provided during examination: None Page 29 of 52                                            Rev f
-8 permissive is satisfied, however, a 2 nd channel would have to be reading less than 90% in order to enter EOP-0.0. D. Incorrect. Plausible because this annunciator is an entry condition for ABN
 
-101, however, Reactor power would have to be less than 48% in order to meet the criteria for a Reactor Coolant Pump Malfunction as opposed to a Reactor Trip.
ES-401               CPNPP NRC 2011 SRO Written Exam Worksheet                   Form ES-401-5 Learning Objective:   ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Reactor Coolant System for:
Technical Reference(s)
* ABN-101, Reactor Coolant Pump Trip/Malfunction (OP51.SYS.RC1.OB17)
ABN-713, Steps 1 & 2 Attached w/ Revision # S ee Comments / Reference ABN-101, Sections 2.1 and 2.2 Proposed references to be provided during examination:
Question Source:           Bank #
None ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 30 of 52 Rev f  Learning Objective:
Modified Bank #                         (Note changes or attach parent)
ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Reactor Coolant System for:
New                         X Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:     55.41 55.43   5 Page 30 of 52                                   Rev f
ABN-101, Reactor Coolant Pump Trip/Malfunction (OP51.SYS.RC1.OB17)
Question Source:
Bank #   Modified Bank #
  (Note changes or attach parent)
New X   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41   55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 31 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  2  Group #  1  K/A # 013 A2.01  Importance Rating


===4.8 Engineered===
ES-401                      CPNPP NRC 2011 SRO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO              SRO Tier #                                              2 Group #                                            1 K/A #                                013 A2.01 Importance Rating                                  4.8 Engineered Safety Features Actuation System: Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: LOCA Proposed Question:              SRO 90 Given the following conditions:
Safety Features Actuation SystemProposed Question
* Unit 2 entered EOP-0.0B, Reactor Trip or Safety Injection, due to a Reactor Trip and Safety Injection with Containment Spray actuation.
: : Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: LOCA SRO 90 Given the following conditions:
* The actions of EOP-0.0B have been completed, including Attachment 2, Safety Injection Actuation Alignment, and a diagnosis has been made that a Loss of Reactor Coolant inside Containment exists.
Unit 2 entered EOP
* At the time of entry into EOP-1.0B, Loss of Reactor or Secondary Coolant, an ORANGE Path condition is noted on the Containment Status Tree.
-0.0B, Reactor Trip or Safety Injection, due to a Reactor Trip and Safety Injection with Containment Spray actuation.
* Containment pressure is 20 PSIG.
The actions of EOP
* Annunciator 1-ALB-4B, Window 1.8 - RWST 2 of 4 LVL LO-LO alarms and level is confirmed at 33%.
-0.0B have been completed, including Attachment 2, Safet y Injection Actuation Alignment, and a diagnosis has been made that a Loss of Reactor Coolant inside Containment exists.
At the time of entry into EOP
-1.0B, Loss of Reactor or Secondary Coolant, an ORANGE Path condition is noted on the Containment Status Tree. Containment pressure is 20 PSIG.
Annunciator 1
-ALB-4B, Window 1.8  
- RWST 2 of 4 LVL LO
-LO alarms and level is confirmed at 33%.
Which of the following identifies the impact of these conditions and what action(s) should be implemented?
Which of the following identifies the impact of these conditions and what action(s) should be implemented?
A. Complete Steps 1, 2 and 3 of EOS
A. Complete Steps 1, 2 and 3 of EOS-1.3B, Transfer to Cold Leg Recirculation, because of LO-LO RWST level then review Critical Safety Function Status Trees.
-1.3B, Transfer to Cold Leg Recirculation, because of LO
Transition to FRZ-0.1B, Response to High Containment Pressure, to ensure challenges to the Containment barrier are addressed.
-LO RWST level then review Critical Safety Function Status Trees. Transition to FRZ
B. Transition to FRZ-0.1B, Response to High Containment Pressure, because of Containment pressure and complete the actions without delay so that EOS-1.3B, Transfer to Cold Leg Recirculation, can be implemented to realign Emergency Core Cooling System injection.
-0.1B, Response to High Containment Pressure, to ensure challenges to the Containment barrier are addressed.
C. Complete Steps 1, 2 and 3 of EOS-1.3B, Transfer to Cold Leg Recirculation, because of LO-LO RWST level concurrent with EOP-1.0B, Loss of Reactor or Secondary Coolant. FRZ-0.1B, Response to High Containment Pressure, is not required as EOP-0.0B verified conditions for Containment Spray.
B. Transition to FRZ
D. Transition to FRZ-0.1B, Response to High Containment Pressure, because of Containment pressure and concurrently implement actions of EOS-1.3B, Transfer to Cold Leg Recirculation. When completed, return to EOP-1.0B, Loss of Reactor or Secondary Coolant.
-0.1B, Response to High Containment Pressure, because of Containment pressure and complete the actions without delay so that EOS
Page 31 of 52                                                    Rev f
-1.3B, Transfer to Cold Leg Recirculation, can be implemented to realign Emergency Core Cooling System injection.
C. Complete Steps 1, 2 and 3 of EOS
-1.3B, Transfer to Cold Leg Recirculation, because of LO
-LO RWST level concurrent with EOP
-1.0B, Loss of Reactor or Secondary Coolant. FRZ
-0.1B, Response to High Containment Pressure, is not required as EOP
-0.0B verified conditions for Containment Spray.
D. Transition to FRZ
-0.1B, Response to High Containment Pressure, because of Containment pressure and concurrently implement actions of EOS
-1.3B, Transfer to Cold Leg Recirculation. When completed, return to EO P-1.0B, Loss of Reactor or Secondary Coolant.


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 32 of 52 Rev f  Proposed Answer:
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                         Form ES-401-5 Proposed Answer:           A Explanation:
A Explanation:
A. Correct. Given the conditions listed, this is the correct reason and set of actions to complete.
A. Correct. Given the conditions listed, this is the correct reason and set of actions to complete.
B. Incorrect. Plausible because the Critical Safety Function ORANGE Path is immediately addressed, however, entry and completion of EOS
B. Incorrect. Plausible because the Critical Safety Function ORANGE Path is immediately addressed, however, entry and completion of EOS-1.3B takes priority.
-1.3B takes priority.
C. Incorrect. Plausible because completing the actions of EOS-1.3B is correct, however, the Critical Safety Function ORANGE Path cannot be ignored.
C. Incorrect. Plausible because completing the actions of EOS
D. Incorrect. Plausible because the last two actions listed are correct, however, EOP-1.0B is not implemented at this time.
-1.3B is correct, however, the Critical Safety Function ORANGE Path cannot be ignored.
Technical Reference(s)     FRZ-0.1B, CSFST Flowchart                       Attached w/ Revision # See EOP-1.0B, Attachment 1.A, Foldout Page           Comments / Reference ODA-407, Attachment 8.A, Step 10 EOS-1.3B, Step 1 CAUTION Proposed references to be provided during examination: None Learning Objective:   Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOS-1.3. (LO21.ERG.E13.OB06)
D. Incorrect. Plausible because the last two actions listed are correct, however, EOP
Given the Containment CSFST (and necessary parameter data or access to the data), DETERMINE whether entry into FRZ-0.1A/B is applicable, and, if so, STATE the severity of the challenge. (LO21.ERG.FZ1.OB02)
-1.0B is not implemented at this time.
Question Source:           Bank #                   CPNPP LXR Modified Bank #                             (Note changes or attach parent)
Technical Reference(s)
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                       X 10 CFR Part 55 Content:     55.41   10 55.43 Page 32 of 52                                       Rev f
FRZ-0.1B, CSFST Flowchart Attached w/ Revision # See Comments / Reference EOP-1.0B, Attachment 1.A, Foldout Page ODA-407 , Attachment 8
.A, Step 10   EOS-1.3B, Step 1 CAUTION Proposed references to be provided during examination:
None Learning Objective:
Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOS-1.3. (LO21.ERG.E13.OB06)
Given the Containment CSFST (and necessary parameter data or access to the data), DETERMINE whether entry into FRZ
-0.1A/B is applicable, and, if so, STATE the severity of the challenge. (LO21.ERG.FZ1.OB02)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41 10 55.43 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 33 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  2  Group #  2  K/A # 001 G 2.2.
42  Importance Rating


===4.6 Control===
ES-401                    CPNPP NRC 2011 SRO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                Level                          RO                SRO Tier #                                              2 Group #                                            2 K/A #                            001 G 2.2.42 Importance Rating                                4.6 Control Rod Drive System: Equipment Control: Ability to recognize system parameters that are entry level conditions for Technical Specifications Proposed Question:              SRO 91 Given the following conditions:
Rod Drive SystemProposed Question:
* Power Range Channel N-41 indicates 48%, N-42 indicates 50%, N-43 indicates 49%
: Equipment Control: Ability to recognize system parameters that are entry level conditions for Technical Specifications SRO 91 Given the following conditions:
Power Range Channel N
-41 indicates 48%, N
-42 indicates 50%, N
-43 indicates 49%
and N-44 indicates 48%.
and N-44 indicates 48%.
Annunciator 1
* Annunciator 1-ALB-6D, Window 2.10 - AVE TAVE HI is in alarm.
-ALB-6D, Window 2.10  
* Control Bank D Rods stepped in at 72 steps/minute.
- AVE TAVE HI is in alarm.
* 1/1-RBSS, Control Rod Bank Select Switch was placed in MANUAL to stop rod movement.
Control Bank D Rods stepped in at 72 steps/minute.
Which of the following Technical Specifications should be referenced?
1/1-RBSS, Control Rod Bank Select Switch was placed in MANUAL to stop rod movement. Which of the following Technical Specifications should be referenced?
 
Refer to Technical Specification Limiting Conditions for Operations...
Refer to Technical Specification Limiting Conditions for Operations...
A. 3.3.1, Reactor Trip System Instrumentation, and identify the affected Function on Table 3.3.1
A. 3.3.1, Reactor Trip System Instrumentation, and identify the affected Function on Table 3.3.1-1, Reactor Trip System Instrumentation.
-1, Reactor Trip System Instrumentation.
B. 3.2.4, Quadrant Power Tilt Ratio (QPTR), and reduce thermal power at least 3% for each 1% of QPTR greater than 1.00.
B. 3.2.4, Quadrant Power Tilt Ratio (QPTR), and reduce thermal power at least 3% for each 1% of QPTR greater than 1.00.
C. 3.3.2, Engineering Safety Features Actuation System Instrumentation, and identify the affected Function on Table 3.3.2
C. 3.3.2, Engineering Safety Features Actuation System Instrumentation, and identify the affected Function on Table 3.3.2-1, Engineering Safety Features Actuation System Instrumentation.
-1, Engineering Safety Features Actuation System Instrumentation.
D. 3.1.6, Control Bank Insertion Limits, and verify SHUTDOWN MARGIN to be within the limits provided in the Core Operating Limits Report.
D. 3.1.6, Control Bank Insertion Limits, and verify SHUTDOWN MARGIN to be within the limits provided in the Core Operating Limits Report.
Proposed Answer:
Proposed Answer:               A Page 33 of 52                                                  Rev f
A ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 34 of 52 Rev f  Explanation:
 
A. Correct. Entry into Technical Specification LCO 3.3.1, Reactor Trip System Instrumentation, is required because a temperature instrument has failed
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Explanation:
. The affected Function must be determined per Table 3.3.1-1, Reactor Trip System Instrumentation
A. Correct. Entry into Technical Specification LCO 3.3.1, Reactor Trip System Instrumentation, is required because a temperature instrument has failed. The affected Function must be determined per Table 3.3.1-1, Reactor Trip System Instrumentation.
. B. Incorrect. Plausible because Technical Specification LCO 3.2.4 reference could be correct if power is greater than 50
B. Incorrect. Plausible because Technical Specification LCO 3.2.4 reference could be correct if power is greater than 50%, however, this action would not be required when less than 50% as the Technical Specification is N/A.
%, however, this action would not be required when less than 50% as the Technical Specification is N/A. C. Incorrect. Plausible if thought that an ESFAS feature was being affected, however, not for the conditions listed
C. Incorrect. Plausible if thought that an ESFAS feature was being affected, however, not for the conditions listed.
. D. Incorrect. Plausible because rods are stepping in and Technical Specification LCO 3.1.6 for Control Bank Insertion Limits could be impacted, however, Technical Specification LCO 3.3.1 entry is required
D. Incorrect. Plausible because rods are stepping in and Technical Specification LCO 3.1.6 for Control Bank Insertion Limits could be impacted, however, Technical Specification LCO 3.3.1 entry is required.
. Technical Reference(s)
Technical Reference(s)       ABN-704, Steps 2.2 & 3.1                     Attached w/ Revision # See Technical Specifications LCO 3.3.1 & 3.3.2   Comments / Reference Technical Specification LCO 3.1.6 & 3.2.4 Proposed references to be provided during examination: None Learning Objective:     DISCUSS interrelationships between the failed instrument in ABN-703 and ABN-704 and other plant systems. (LO21.ABN.703.OB03)
ABN-704, Step s 2.2 & 3.1 Attached w/ Revision # See Comments / Reference Technical Specification s LCO 3.3.1 & 3.3.2 Technical Specification LCO 3.1.6 & 3.2.4 Proposed references to be provided during examination:
IDENTIFY applicable Technical Specifications and DETERMINE actions required to meet the Limiting Condition for Operation (LCO).
None Learning Objective:
DISCUSS interrelationships between the failed instrument in ABN
-703 and ABN-704 and other plant systems. (LO21.ABN.703.OB03)
IDENTIFY applicable Technical Specifications and DETERMINE actions required to meet the Limiting Condition for Operation (LCO).  
(LO21.ABN.703.OB05)
(LO21.ABN.703.OB05)
Question Source:
Question Source:             Bank #
Bank #   Modified Bank #
Modified Bank #                           (Note changes or attach parent)
  (Note changes or attach parent)
New                         X Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41 55.43   2, 5 Page 34 of 52                                     Rev f
New X   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 2, 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 35 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  2  Group #  2  K/A # 029 A2.03  Importance Rating


===3.1 Containment===
ES-401                      CPNPP NRC 2011 SRO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                  Level                          RO              SRO Tier #                                            2 Group #                                          2 K/A #                              029 A2.03 Importance Rating                                3.1 Containment Purge System: Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup operations and the associated required valve lineups Proposed Question:                SRO 92 Given the following conditions:
Purge SystemProposed Question:
* Unit 1 is in MODE 5.
: Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup operations and the associated required valve lineups SRO 92   Given the following conditions:
* A Containment Purge is planned.
Unit 1 is in MODE 5.
* Containment pressure is 1.1 PSIG.
A Containment Purge is planned.
Which of the following identifies the impact on the Containment Purge and what actions should be taken?
Containment pressure is 1.1 PSIG. Which of the following identifies the impact on the Containment Purge and what action s should be taken
A. 1.) Containment Ventilation Isolation signal must be bypassed until the purge is initiated.
A. 1.) Containment Ventilation Isolation signal must be bypassed until the purge is initiated.
2.) Refer to SOP-706, Digital Radiation Monitoring System, Section for Bypassing Containment Ventilation Isolation.
2.) Refer to SOP
-706, Digital Radiation Monitoring System, Section for Bypassing Containment Ventilation Isolation.
B. 1.) Outage Auxiliary Containment Cooling Unit Fan should be redirected towards any highly contaminated areas to maximize purge impact.
B. 1.) Outage Auxiliary Containment Cooling Unit Fan should be redirected towards any highly contaminated areas to maximize purge impact.
2.) Contact Health Physics personnel for guidance on redirecting discharge flow per SOP-801A, Containment Ventilation System.
2.) Contact Health Physics personnel for guidance on redirecting discharge flow per SOP-801A, Containment Ventilation System.
C. 1.) Containment pressure must be reduced using the Containment Pressure Relief System. 2.) Refer to SOP
C. 1.) Containment pressure must be reduced using the Containment Pressure Relief System.
-801A, Containment Ventilation System, and lower Containment pressure to atmospheric.
2.) Refer to SOP-801A, Containment Ventilation System, and lower Containment pressure to atmospheric.
D. 1.) Fuel Transfer Tube Gate Valves must be closed to ensure Spent Fuel Pool level is unaffected by the purge.
D. 1.) Fuel Transfer Tube Gate Valves must be closed to ensure Spent Fuel Pool level is unaffected by the purge.
2.) Refer to RF0
2.) Refer to RF0-404, Refueling Gate Operation, for guidance regarding positioning of the Fuel Transfer Tube Gate Valves.
-404, Refueling Gate Operation, for guidance regarding positioning of the Fuel Transfer Tube Gate Valves
Proposed Answer:                   C Page 35 of 52                                                  Rev f
. Proposed Answer:
 
C ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 36 of 52 Rev f  Explanation:
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                     Form ES-401-5 Explanation:
A. Incorrect. Plausible because starting a Containment Purge can generate spurious Containment Ventilation Isolation signals, however, CVI must remain operational during core alterations or movement of irradiated fuel per Technical Specification LCO 3.9.4.
A. Incorrect. Plausible because starting a Containment Purge can generate spurious Containment Ventilation Isolation signals, however, CVI must remain operational during core alterations or movement of irradiated fuel per Technical Specification LCO 3.9.4.
B. Incorrect. Plausible because health physics personnel should be contacted if this fan is to be used, however, Precautions of SOP-801A do not allow this action.
B. Incorrect. Plausible because health physics personnel should be contacted if this fan is to be used, however, Precautions of SOP-801A do not allow this action.
C. Correct. With Containment pressure greater than atmospheric, pressure must be reduced per SOP-801A. D. Incorrect. Plausible because a Precaution does exist regarding the differential pressure created and resultant change in Spent Fuel Pool and Refueling Pool levels, however, this valve need not be closed.
C. Correct. With Containment pressure greater than atmospheric, pressure must be reduced per SOP-801A.
The Fuel Transfer Tube Gate Valves are closed for Transfer Canal and Refueling Cavity Lift Gate operations.
D. Incorrect. Plausible because a Precaution does exist regarding the differential pressure created and resultant change in Spent Fuel Pool and Refueling Pool levels, however, this valve need not be closed. The Fuel Transfer Tube Gate Valves are closed for Transfer Canal and Refueling Cavity Lift Gate operations.
Technical Reference(s)
Technical Reference(s)     SOP-801A, Step 5.6.5                         Attached w/ Revision # See SOP-801A, Precautions & Step 4.1.A           Comments / Reference SOP-801A, Step 5.1.1.C Proposed references to be provided during examination: None Learning Objective:     STATE the physical connections and EVALUATE the cause-effect relationships between the Containment Systems and the following systems, components or events:
SOP-801A, Step 5.6.5 Attached w/ Revision # See Comments / Reference SOP-801A, Precautions
* Containment Purge and Pressure Relief (OP51.SYS.CY1.OB22)
& Step 4.1.A SOP-801A, Step 5.1.1.C Proposed references to be provided during examination:
LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems.
None Learning Objective:
* Containment Building Penetrations 3.9.4 (OP51.SYS.CY1.OB32)
STATE the physical connections and EVALUATE the cause-effect relationships between the Containment Systems and the following systems, components or events:
Question Source:           Bank #
Containment Purge and Pressure Relief (OP51.SYS.CY1.OB22)
Modified Bank #                           (Note changes or attach parent)
LIS T and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems.
New                         X Question History:             Last NRC Exam Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43   4, 5 Page 36 of 52                                      Rev f
Containment Building Penetrations 3.9.4 (OP51.SYS.CY1.OB32)
 
Question Source:
ES-401                       CPNPP NRC 2011 SRO Written Exam Worksheet                             Form ES-401-5 Examination Outline Cross-reference:                               Level                       RO                 SRO Tier #                                           2 Group #                                         2 K/A #                             034 K4.01 Importance Rating                               3.4 Fuel Handling Equipment System: Knowledge of Fuel Handling Equipment design feature(s) and/or interlock(s) that provide for the following: Fuel protection from binding and dropping Proposed Question:                  SRO 93 Given the following conditions:
Bank #   Modified Bank #
* Refueling is in progress.
  (Note changes or attach parent)
* A fuel assembly is being lowered into the core.
New X   Question History:
* The hoist load decreased in excess of the Operator Load Limits prior to the fuel assembly reaching the bottom.
Last NRC Exam Question Cognitive Level:
Which of the following identifies the action required per RFO-302, Handling of Fuel Assemblies?
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
A. Lower the hoist speed to jog and continue to insert the assembly.
55.41   55.43 4, 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 37 of 52 Rev f  Examination Outline Cross
-reference:
Level RO SRO Tier #   2 Group #   2 K/A # 034 K4.01 Importance Rating 3.4 Fuel Handling Equipment SystemProposed Question:
: Knowledge of Fuel Handling Equipment design feature(s) and/or interlock(s) that provide for the following: Fuel protection from binding and dropping SRO 93   Given the following conditions
Refueling is in progress
. A fuel assembly is being lowered into the core.
The hoist load decreased in excess of the Operator Load Limits prior to the fuel assembly reaching the bottom.
Which of the following identifies the action required per RFO-302, Handling of Fuel Assemblies
A. Lower the hoist speed to jog and continue to insert the assembly.
B. Laterally position the crane hoist and slowly continue to insert the fuel assembly into the core location.
B. Laterally position the crane hoist and slowly continue to insert the fuel assembly into the core location.
C. Check the alignment of the lifting tool with respect to the fuel assembly and the reactor core location and reposition the hoist as necessary.
C. Check the alignment of the lifting tool with respect to the fuel assembly and the reactor core location and reposition the hoist as necessary.
D. If the hoist load decreased by more than 800 pounds, the fuel assembly and adjacent assemblies shall be examined for evidence of damage prior to continuing.
D. If the hoist load decreased by more than 800 pounds, the fuel assembly and adjacent assemblies shall be examined for evidence of damage prior to continuing.
Proposed Answer:
Proposed Answer:                     D Explanation:
D Explanation:
A. Incorrect. Plausible because this condition would have been allowed if hoist speed was in JOG at the time the hoist load decreased, however, it cannot be placed in a lower speed after the fact.
A. Incorrect. Plausible because this condition would have been allowed if hoist speed was in JOG at the time the hoist load decreased, however, it cannot be placed in a lower speed after the fact.
B. Incorrect. Plausible if thought that this would help the positioning of the fuel assembly, however, it does not meet the criteria established by CPNPP.
B. Incorrect. Plausible if thought that this would help the positioning of the fuel assembly, however, it does not meet the criteria established by CPNPP.
C. Incorrect. Plausible if thought that this would help the positioning of the fuel assembly, however, it does not meet the criteria established by CPNPP.
C. Incorrect. Plausible if thought that this would help the positioning of the fuel assembly, however, it does not meet the criteria established by CPNPP.
D. Correct. Per the guidance outlined in our RFO
D. Correct. Per the guidance outlined in our RFO-302.
-302. Technical Reference(s)
Technical Reference(s)             RFO-302, Step 6.12                             Attached w/ Revision # See Comments / Reference Page 37 of 52                                            Rev f
RFO-302, Step 6.12 Attached w/ Revision # See Comments / Reference


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 38 of 52 Rev f  Proposed references to be provided during examination:
ES-401               CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Proposed references to be provided during examination: None Learning Objective:   STATE the axial loading limitation and the location axial loading may be applied to the fuel assembly, as defined in RFO-302. (LO21.RFO.FH2.OB03)
None Learning Objective:
STATE the location that lateral loads may be applied to the fuel assembly as described in RFO-302. (LO21.RFO.FH2.OB02)
STATE the axial loading limitation and the location axial loading may be applied to the fuel assembly, as defined in RFO
STATE the Operator Load Limits, defined in RFO-302, that must be observed when inserting or withdrawing fuel assemblies from any location.
-302. (LO21.RFO.FH2.OB0
(LO21.RFO.FH2.OB07)
: 3) STATE the location that lateral loads may be applied to the fuel assembly as described in RFO
Question Source:         Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
-302. (LO21.RFO.FH2.OB02)
New Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge             X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 55.43   7 Page 38 of 52                                     Rev f
STATE the Operator Load Limits, defined in RFO
-302, that must be observed when inserting or withdrawing fuel assemblies from any location. (LO21.RFO.FH2.OB07
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41   55.43 7 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 39 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  3  Category #  1  K/A # G 2.1.39  Importance Rating


===4.3 Conduct===
ES-401                    CPNPP NRC 2011 SRO Written Exam Worksheet                          Form ES-401-5 Examination Outline Cross-reference:                              Level                  RO            SRO Tier #                                  3 Category #                              1 K/A #                        G 2.1.39 Importance Rating                      4.3 Conduct of Operations: Knowledge of conservative decision making practices Proposed Question:              SRO 94 As a supervisor, which of the following elements must be carefully considered during conservative decision making as it has the greatest potential to increase risk during performance of a particular activity?
of OperationsProposed Question: : Knowledge of conservative decision making practices SRO 94 As a supervisor, which of the following elements must be carefully considered during conservative decision making as it has the greatest potential to increase risk during performance of a particular activity?   New employees...
New employees...
A. with a "can do" attitude.
A. with a can do attitude.
B. with a healthy questioning attitude.
B. with a healthy questioning attitude.
C. stopping an activity when unsure of the outcome
C. stopping an activity when unsure of the outcome.
. D. applying error prevention techniques during an activity.
D. applying error prevention techniques during an activity.
Proposed Answer:
Proposed Answer:               A Explanation:
A Explanation:
A. Correct. As a supervisor, new employees should be monitored and mentored on conservative decision making but be cautious of a "can-do" attitude.
A. Correct. As a supervisor, new employees should be monitored and mentored on conservative decision making but be cautious of a "can
-do" attitude.
B. Incorrect. Plausible if thought that a healthy questioning attitude of a new employee was adverse to conservative decision making.
B. Incorrect. Plausible if thought that a healthy questioning attitude of a new employee was adverse to conservative decision making.
C. Incorrect. Plausible if thought that stopping an activity when unsure of the outcome was adverse to conservative decision making.
C. Incorrect. Plausible if thought that stopping an activity when unsure of the outcome was adverse to conservative decision making.
D. Incorrect. Plausible if thought that applying error prevention techniques was inadvisable because the employee was new.
D. Incorrect. Plausible if thought that applying error prevention techniques was inadvisable because the employee was new.
Technical Reference(s)
Technical Reference(s)       Nuclear Policy Statement 208, Pages 2 & 3           Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:       CONDUCT the required on-shift training and CONTROL the actions of trainees in accordance with station procedures. (OPD1.ADM.XA1.OB06)
Nuclear Policy Statement 208, Pages 2 & 3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
Question Source:             Bank #
None Learning Objective:
Modified Bank #                                 (Note changes or attach parent)
CONDUCT the required on
Page 39 of 52                                      Rev f
-shift training and CONTROL the actions of trainees in accordance with station procedures. (OPD1.ADM.XA1.OB06)
Question Source:
Bank #   Modified Bank #
  (Note changes or attach parent)


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 40 of 52 Rev f  New X   Question History:
ES-401               CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 New                       X Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 5 55.43 Page 40 of 52                   Rev f
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41 5 55.43 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 41 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  3  Category #  1  K/A # G 2.1.35  Importance Rating


===3.9 Conduct===
ES-401                    CPNPP NRC 2011 SRO Written Exam Worksheet                      Form ES-401-5 Examination Outline Cross-reference:                                Level            RO          SRO Tier #                          3 Category #                      1 K/A #                G 2.1.35 Importance Rating              3.9 Conduct of Operations: Knowledge of fuel handling responsibilities of SROs Proposed Question:              SRO 95 Given the following conditions:
of OperationsProposed Question: : Knowledge of fuel handling responsibilities of SROs SRO 95   Given the following conditions:
* Unit 1 is in MODE 6 with core off-load in progress.
Unit 1 is in MODE 6 with core off
* A Fuel Handling Accident has occurred in Containment.
-load in progress.
* Containment Particulate and Gas Radiation Monitors are alarming on PC-11, Digital Radiation Monitoring System.
A Fuel Handling Accident has occurred in Containment
* ABN-908, Fuel Handling Accident, has been entered.
. Containment Particulate and Gas Radiation Monitors are alarming on PC-11, Digital Radiation Monitoring System
. ABN-908, Fuel Handling Accident
, has been entered.
Which of the following describes responsibilities of the Fuel Handling Supervisor in the Containment Building?
Which of the following describes responsibilities of the Fuel Handling Supervisor in the Containment Building?
Along with placing the Fuel in a secured position, other responsibilities include: A. Ensure the Upender is horizontal
Along with placing the Fuel in a secured position, other responsibilities include:
. Ensure all Containment penetrations are isolated. Ensure the Fuel Transfer Cart is in Containment
A. Ensure the Upender is horizontal.
. B. Ensure the Upender is deenergized
Ensure all Containment penetrations are isolated.
. Direct personnel to exit Containment via any available means
Ensure the Fuel Transfer Cart is in Containment.
. Sound the local Radiological Emergency alarm.
B. Ensure the Upender is deenergized.
C. Ensure all Containment penetrations are isolated. Ensure no loads are suspended from the Manipulator Crane
Direct personnel to exit Containment via any available means.
. Initiate a Containment Purge once Personnel Airlocks are secured
Sound the local Radiological Emergency alarm.
. D. Ensure the Upender is horizontal.
C. Ensure all Containment penetrations are isolated.
Direct personnel to exit to the Safeguards Building control point
Ensure no loads are suspended from the Manipulator Crane.
. Ensure the Fuel Transfer Cart is in the Fuel Building
Initiate a Containment Purge once Personnel Airlocks are secured.
. Proposed Answer:
D. Ensure the Upender is horizontal.
D ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 42 of 52 Rev f  Explanation:
Direct personnel to exit to the Safeguards Building control point.
A. Incorrect. Plausible because the first two actions are correct, however, the Fuel Transfer Cart is moved to the Fuel Building and the Fuel Transfer Tube Gate Valve is closed
Ensure the Fuel Transfer Cart is in the Fuel Building.
. B. Incorrect. Plausible if thought that exiting via the nearest exit would be the safest choice, however, personnel are required to exit into the Safeguards Building control poin t to allow radiological monitoring
Proposed Answer:               D Page 41 of 52                                 Rev f
. C. Incorrect. Plausible because the first two actions are correct
, however, Containment Purge would be isolated upon receipt of Containment Particulate and Gas High Radiation alarms.
D. Correct. These actions are listed in the responsibilities of the Fuel Handling Supervisor during a Fuel Handling Accident within Containment
. Technical Reference(s)
ABN-908, Steps 2.1, 2.2, & 2.3.8 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
None  Learning Objective:
LIST those positions which are considered secure for storing a fuel assembly during a fuel handling accident as stated in ABN
-908. (LO21.RFO.FH2.OB09)
Given a specific fuel handling accident, be able to OUTLINE the Initial Operator Actions per ABN
-908. (LO21.RFO.FH2.OB10)
Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41   55.43 4, 7 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 43 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  3  Category #  2  K/A # G 2.2.1  Importance Rating


===4.4 Equipment===
ES-401                CPNPP NRC 2011 SRO Written Exam Worksheet                          Form ES-401-5 Explanation:
ControlProposed Question:
A. Incorrect. Plausible because the first two actions are correct, however, the Fuel Transfer Cart is moved to the Fuel Building and the Fuel Transfer Tube Gate Valve is closed.
: Ability to perform pre
B. Incorrect. Plausible if thought that exiting via the nearest exit would be the safest choice, however, personnel are required to exit into the Safeguards Building control point to allow radiological monitoring.
-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity SRO 96   Given the following conditions
C. Incorrect. Plausible because the first two actions are correct, however, Containment Purge would be isolated upon receipt of Containment Particulate and Gas High Radiation alarms.
Unit 2 is in MODE 3.
D. Correct. These actions are listed in the responsibilities of the Fuel Handling Supervisor during a Fuel Handling Accident within Containment.
Control Rod referencing is in progress per IPO-002B, Plant Startup from Hot Standby
Technical Reference(s)      ABN-908, Steps 2.1, 2.2, & 2.3.8                Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:    LIST those positions which are considered secure for storing a fuel assembly during a fuel handling accident as stated in ABN-908. (LO21.RFO.FH2.OB09)
. Source Range Channel N
Given a specific fuel handling accident, be able to OUTLINE the Initial Operator Actions per ABN-908. (LO21.RFO.FH2.OB10)
-31 suddenly fails low
Question Source:             Bank #
. Source Range Channel N-32 is indicating 100 cps
Modified Bank #                            (Note changes or attach parent)
. Control Rod motion was stopped.
New                          X Question History:            Last NRC Exam Question Cognitive Level:    Memory or Fundamental Knowledge Comprehension or Analysis                      X 10 CFR Part 55 Content:      55.41 55.43  4, 7 Page 42 of 52                                      Rev f
Which of the following actions is required
 
A. Continue the Reactor Startup until both Intermediate Range Channels reach 1x10
ES-401                      CPNPP NRC 2011 SRO Written Exam Worksheet                                      Form ES-401-5 Examination Outline Cross-reference:                                  Level                            RO              SRO Tier #                                                3 Category #                                            2 K/A #                                    G 2.2.1 Importance Rating                                    4.4 Equipment Control: Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity Proposed Question:                SRO 96 Given the following conditions:
-10 amps then block both Source Range Channels per IPO
* Unit 2 is in MODE 3.
-002B, Plant Startup from Hot Standby.
* Control Rod referencing is in progress per IPO-002B, Plant Startup from Hot Standby.
B. Restore N-31 to OPERABLE status or ensure all Control Rods inserted and made incapable of withdrawal within 49 hours per ABN
* Source Range Channel N-31 suddenly fails low.
-701, Source Range Instrument Malfunction.
* Source Range Channel N-32 is indicating 100 cps.
C. Block Source Range Channels N
* Control Rod motion was stopped.
-31 and N-32 because they are above the P
Which of the following actions is required?
-6 setpoint and are therefore not required for continued startup per ABN
A. Continue the Reactor Startup until both Intermediate Range Channels reach 1x10-10 amps then block both Source Range Channels per IPO-002B, Plant Startup from Hot Standby.
-701, Source Range Instrument Malfunction D. Immediately ensure both Reactor Trip Breakers are OPEN per ABN
B. Restore N-31 to OPERABLE status or ensure all Control Rods inserted and made incapable of withdrawal within 49 hours per ABN-701, Source Range Instrument Malfunction.
-701, Source Range Instrument Malfunction and continue in IPO
C. Block Source Range Channels N-31 and N-32 because they are above the P-6 setpoint and are therefore not required for continued startup per ABN-701, Source Range Instrument Malfunction D. Immediately ensure both Reactor Trip Breakers are OPEN per ABN-701, Source Range Instrument Malfunction and continue in IPO-002B, Plant Startup from Hot Standby.
-002B, Plant Startup from Hot Standby. Proposed Answer:
Proposed Answer:                   B Page 43 of 52                                                    Rev f
B ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 44 of 52 Rev f  Explanation:
 
A. Incorrect. Plausible because remaining in IPO
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Explanation:
-002B would be an appropriate action if the initial power level were higher, however, Technical Specification REQUIRED ACTIONS are not being met. B. Correct. These are the appropriate actions for one Source Range Channel INOPERABLE and Rod Control capable of rod withdrawal
A. Incorrect. Plausible because remaining in IPO-002B would be an appropriate action if the initial power level were higher, however, Technical Specification REQUIRED ACTIONS are not being met.
. C. Incorrect. Plausible because the Source Range Channels can eventually be blocked, however, Technical Specification REQUIRED ACTIONS are not being met
B. Correct. These are the appropriate actions for one Source Range Channel INOPERABLE and Rod Control capable of rod withdrawal.
. D. Incorrect. Plausible because this would be an appropriate action for two failed Source Range Channels, however, the wrong procedure is referenced. Technical Reference(s)
C. Incorrect. Plausible because the Source Range Channels can eventually be blocked, however, Technical Specification REQUIRED ACTIONS are not being met.
IPO-002A, Steps 4.1.1, 4.1.2 & 4.1.3 Attached w/ Revision # See Comments / Reference ABN-701, Section 2.3 ABN-701, Attachment 1, Steps 1 & 3 Technical Specification LCO s 3.3.1.I, J , K Proposed references to be provided during examination:
D. Incorrect. Plausible because this would be an appropriate action for two failed Source Range Channels, however, the wrong procedure is referenced.
None Learning Objective:
Technical Reference(s)     IPO-002A, Steps 4.1.1, 4.1.2 & 4.1.3         Attached w/ Revision # See ABN-701, Section 2.3                         Comments / Reference ABN-701, Attachment 1, Steps 1 & 3 Technical Specification LCOs 3.3.1.I, J, K Proposed references to be provided during examination: None Learning Objective:     DESCRIBE the basis for the precautions and limitations, and given major procedure steps, PLACE them in the proper sequence, for:
DESCRIBE the basis for the precautions and limitations, and given major procedure steps, PLACE them in the proper sequence, for:
* IPO-002, Plant Startup from Hot Standby (OP51.SYS.EC1.OB24)
IPO-002, Plant Startup from Hot Standby (OP51.SYS.EC1.OB24)
ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Excore Instrumentation system, both initial and subsequent, for:
ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Excore Instrumentation system, both initial and subsequent, for:
ABN-701, Source Range Instrumentation Malfunction (OP51.SYS.EC1.OB24)
* ABN-701, Source Range Instrumentation Malfunction (OP51.SYS.EC1.OB24)
LIST and DESCRIBE the following Technical Specifications (i.e., LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Excore Instrumentation System:
LIST and DESCRIBE the following Technical Specifications (i.e., LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Excore Instrumentation System:
3.3.1, Reactor Trip System Instrumentation (OP51.SYS.EC1.OB26)
* 3.3.1, Reactor Trip System Instrumentation (OP51.SYS.EC1.OB26)
Question Source:
Question Source:           Bank #
Bank #   Modified Bank #
Modified Bank #                           (Note changes or attach parent)
  (Note changes or attach parent)
New                         X Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41 55.43   2, 5, 6 Page 44 of 52                                       Rev f
New X   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 2, 5, 6 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 45 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  3  Category #  2  K/A # G 2.2.11  Importance Rating


===3.3 Equipment===
ES-401                    CPNPP NRC 2011 SRO Written Exam Worksheet                              Form ES-401-5 Examination Outline Cross-reference:                              Level                    RO            SRO Tier #                                    3 Category #                                2 K/A #                          G 2.2.11 Importance Rating                        3.3 Equipment Control: Knowledge of the process for controlling temporary design changes Proposed Question:              SRO 97 Who shall review Temporary Modifications to ensure compatibility with existing plant conditions, current operating mode and impact on the opposite units operation prior to authorizing installation per STA-602, Temporary Modifications and Transient Equipment Placements?
ControlProposed Question:
A. Station Operations Review Committee (SORC).
: Knowledge of the process for controlling temporary design changes SRO 97   Who shall review Temporary Modifications to ensure compatibility with existing plant conditions, current operating mode and impact on the opposite unit's operation prior to authorizing installation per STA-602, Temporary Modifications and Transient Equipment Placements
B. Plant Manager.
A. Station O perations Review Committee (SORC).
C. Temporary Modification Coordinator.
B. Plant Manager
D. Shift Manager.
. C. Temporary Modification Coordinator
Proposed Answer:               D Explanation:
. D. Shift Manager
A. Incorrect. Plausible since SORC must review specific temporary modifications prior to installation per STA-602 Section 5.4.
. Proposed Answer:
B. Incorrect. Plausible since Plant Manager approves all Temporary Modifications prior to installation per STA-602 Section 5.5.
D Explanation:
C. Incorrect. Plausible since the TMC has multiple responsibilities per STA-602; however, he does not authorize installation per STA-602, Section 5.3.
A. Incorrect. Plausible since SORC must review specific temporary modifications prior to installation per STA-602 Section 5.4. B. Incorrect. Plausible since Plant Manager approves all Temporary Modifications prior to installation
D. Correct. In accordance with STA-602, Step 6.5.3.
Technical Reference(s)        STA-602, Sections 5.3 & 5.4                            Attached w/ Revision # See STA-602, Steps 5.5, 5.6.3, & 6.5.3                    Comments / Reference Proposed references to be provided during examination: None Learning Objective:      REVIEW and APPROVE the installation and restoration of Temporary Modifications, and MAINTAIN files and documentation of Temporary Modifications. (OPD1.ADM.XA1.OB14)
Question Source:              Bank #
Modified Bank #                                    (Note changes or attach parent)
New                                X Page 45 of 52                                          Rev f


per STA-602 Section 5.5. C. Incorrect. Plausible since the TMC has multiple responsibilities per STA
ES-401               CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Question History:         Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 55.43 3 Page 46 of 52                   Rev f
-602; however, he does not authorize installation per STA-602 , Section 5.3. D. Correct. In accordance with STA
-602, Step 6.5.3. Technical Reference(s)
STA-602, Sections 5.3 & 5.4 Attached w/ Revision # See Comments / Reference STA-602, Steps 5.5, 5.6.3, & 6.5.3  Proposed references to be provided during examination:
None  Learning Objective:
REVIEW and APPROVE the installation and restoration of Temporary Modifications, and MAINTAIN files and documentation of Temporary Modifications. (OPD1.ADM.XA1.OB14)
Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 46 of 52 Rev f  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge X   Comprehension or Analysis 10 CFR Part 55 Content:
55.41   55.43 3 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 47 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  3  Category #  3  K/A # G 2.3.13  Importance Rating


===3.8 Radiation===
ES-401                        CPNPP NRC 2011 SRO Written Exam Worksheet                                    Form ES-401-5 Examination Outline Cross-reference:                                Level                            RO              SRO Tier #                                              3 Category #                                          3 K/A #                                  G 2.3.13 Importance Rating                                  3.8 Radiation Control: Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
ControlProposed Question:
Proposed Question:                SRO 98 Given the following conditions:
: Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high
* The Unit is in MODE 1.
-radiation areas, aligning filters, etc.
* STA-620, Containment Entry, is in progress.
SRO 98   Given the following conditions:
* The gasket on the Inner Air Lock Door was reported damaged.
The Unit is in MODE 1.
* There is a gouge across the entire sealing surface approximately 1/8 inch deep and 1/2 inch wide and air flow could be heard through the gouge before pressure was equalized.
STA-620, Containment Entry, is in progress.
The gasket on the Inner Air Lock Door was reported damaged.
There is a gouge across the entire sealing surface approximately 1/8 inch deep and 1/2 inch wide and air flow could be heard through the gouge before pressure was equalized.
Which of the following are the Technical Specification REQUIRED ACTIONS?
Which of the following are the Technical Specification REQUIRED ACTIONS?
Verify that the Outer Air Lock Door is CLOSED within 1 hour, and...
Verify that the Outer Air Lock Door is CLOSED within 1 hour, and...
A. within 24 hours LOCK the Outer Air Lock Door CLOSED. Operation may then continue provided the Outer Air Lock Door is verified LOCKED CLOSED at least once per 31 days.
A. within 24 hours LOCK the Outer Air Lock Door CLOSED. Operation may then continue provided the Outer Air Lock Door is verified LOCKED CLOSED at least once per 31 days.
B. within 24 hours LOCK the Inner Air Lock Door CLOSED. Be in at least MODE 3 within 6 hours and in MODE 5 within 36 hours.
B. within 24 hours LOCK the Inner Air Lock Door CLOSED. Be in at least MODE 3 within 6 hours and in MODE 5 within 36 hours.
C. within 24 hours LOCK the Outer Air Lock Door CLOSED. Be in at least MODE 3 within 6 hours and in MODE 5 within 36 hours. D. within 24 hours LOCK the Inner Air Lock Door CLOSED. Operation may then continue provided that the Inner Air Lock Door is verified to be LOCKED CLOSED at least once per 31 days.
C. within 24 hours LOCK the Outer Air Lock Door CLOSED. Be in at least MODE 3 within 6 hours and in MODE 5 within 36 hours.
Proposed Answer:
D. within 24 hours LOCK the Inner Air Lock Door CLOSED. Operation may then continue provided that the Inner Air Lock Door is verified to be LOCKED CLOSED at least once per 31 days.
A ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 48 of 52 Rev f  Explanation:
Proposed Answer:                 A Page 47 of 52                                                    Rev f
A. Correct. Technical Specification LCO 3.6.2.A REQUIRED ACTION is to verify an OPERABLE Air Lock Door is closed within one hour, locked in 24 hours, and surveillance performed every 31 days. B. Incorrect. Plausible because the Outer Air Lock Door must be closed within 1 hour. The MODE changes are necessary only if the REQUIRED ACTION and COMPLETION TIME of TS LCO 3.6.2.A are not met.
 
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                       Form ES-401-5 Explanation:
A. Correct. Technical Specification LCO 3.6.2.A REQUIRED ACTION is to verify an OPERABLE Air Lock Door is closed within one hour, locked in 24 hours, and surveillance performed every 31 days.
B. Incorrect. Plausible because the Outer Air Lock Door must be closed within 1 hour. The MODE changes are necessary only if the REQUIRED ACTION and COMPLETION TIME of TS LCO 3.6.2.A are not met.
C. Incorrect. Plausible because the initial actions are correct, however, changing MODES is only required if the REQUIRED ACTION and COMPLETION TIME are not met.
C. Incorrect. Plausible because the initial actions are correct, however, changing MODES is only required if the REQUIRED ACTION and COMPLETION TIME are not met.
D. Incorrect. Plausible because the 1 st action is correct, however, REQUIRED ACTIONS and COMPLETION TIMES listed for the Inner Air Lock Door are required for the Outer Air Lock Door.
D. Incorrect. Plausible because the 1st action is correct, however, REQUIRED ACTIONS and COMPLETION TIMES listed for the Inner Air Lock Door are required for the Outer Air Lock Door.
Technical Reference(s)
Technical Reference(s)     Technical Specification LCO 3.6.2.A           Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective:     LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems:
Technical Specification LCO 3.6.2.A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:
* Containment Air Locks 3.6.2 (OP51.SYS.CY1.OB32)
None Learning Objective:
Question Source:           Bank #                 CPNPP LXR Modified Bank #                           (Note changes or attach parent)
LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems:
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:     55.41 55.43   1, 2 Page 48 of 52                                      Rev f
Containment Air Locks 3.6.2 (OP51.SYS.CY1.OB32)
Question Source:
Bank # CPNPP LXR   Modified Bank #
  (Note changes or attach parent)
New   Question History:
Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 1, 2  


ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 49 of 52 Rev f  Examination Outline Cross
ES-401                   CPNPP NRC 2011 SRO Written Exam Worksheet                             Form ES-401-5 Examination Outline Cross-reference:                               Level                   RO           SRO Tier #                                 3 Category #                             4 K/A #                       G 2.4.27 Importance Rating                     3.9 Emergency Procedures / Plan: Knowledge of fire in the plant procedures Proposed Question:            SRO 99 Given the following conditions:
-reference:
* Both Units are at 100% power.
Level RO SRO Tier #   3 Category #   4 K/A # G 2.4.2 7  Importance Rating
* A fire occurs in the Unit 1 Cable Spreading Room.
 
* Both Units are required to be shut down.
===3.9 Emergency===
* The Shift Manager is injured and cannot perform his duties.
Procedures / PlanProposed Question: : Knowledge of "fire in the plant" procedures SRO 99   Given the following conditions:
Who will perform the duties of the Shift Manager and which Unit will control systems common to both Units per ABN-803A, Response to a Fire in the Control Room or Cable Spreading Room?
Both Units are at 100% power.
A. Unit 1 Unit Supervisor; Unit 1 will control.
A fire occurs in the Unit 1 Cable Spreading Room.
Both Units are required to be shut down.
The Shift Manager is injured and cannot perform his duties.
Who will perform the duties of the Shift Manager and which Unit will control systems common to both Units per ABN
-803A, Response to a Fire in the Control Room or Cable Spreading Room? A. Unit 1 Unit Supervisor; Unit 1 will control.
B. Unit 1 Unit Supervisor; Unit 2 will control.
B. Unit 1 Unit Supervisor; Unit 2 will control.
C. Unit 2 Unit Supervisor; Unit 1 will control.
C. Unit 2 Unit Supervisor; Unit 1 will control.
D. Unit 2 Unit Supervisor; Unit 2 will control.
D. Unit 2 Unit Supervisor; Unit 2 will control.
Proposed Answer:
Proposed Answer:               C Explanation:
C Explanation:
A. Incorrect. Plausible because Unit 1 will control, however, the Unit 2 Unit Supervisor will act as Shift Manager.
A. Incorrect. Plausible because Unit 1 will control, however, the Unit 2 Unit Supervisor will act as Shift Manager. B. Incorrect. Plausib le if thought that Unit 1 Unit Supervisor should act as Shift Manager since the fire is in the Unit 1 Cable Spreading Room, however, the opposite Unit's Unit Supervisor performs this function. C. Correct. Per the guidance set forth in ABN
B. Incorrect. Plausible if thought that Unit 1 Unit Supervisor should act as Shift Manager since the fire is in the Unit 1 Cable Spreading Room, however, the opposite Unit's Unit Supervisor performs this function.
-803A. D. Incorrect. Plausible because the Unit 2 Unit Supervisor will act as Shift Manager, however, even though the fire is in the Unit 1 Cable Spreading Room, Unit 1 controls common systems.
C. Correct. Per the guidance set forth in ABN-803A.
Technical Reference(s)
D. Incorrect. Plausible because the Unit 2 Unit Supervisor will act as Shift Manager, however, even though the fire is in the Unit 1 Cable Spreading Room, Unit 1 controls common systems.
ABN-803A, Steps 2.3.1 & 2.3.3 Notes Attached w/ Revision # Se e Comments / Reference Proposed references to be provided during examination:
Technical Reference(s)       ABN-803A, Steps 2.3.1 & 2.3.3 Notes                 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 49 of 52                                       Rev f
None ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 50 of 52 Rev f  Learning Objective:
ASSESS the implementation of ABNs entered in Response To A Fire In The Control Room Or Cable Spreading Room in conjunction with EOPs.  (LO21.ABN.803.OB09) EVALUATE all system limitations and precautions associated with Response To A Fire In The Control Room Or Cable Spreading Room.  (LO21.ABN.803.OB06)
Question Source:
Bank #    Modified Bank #
  (Note changes or attach parent)
New X  Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41  55.43 5 ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5  Page 51 of 52 Rev f   Examination Outline Cross
-reference:
Level RO  SRO  Tier #  3  Category #  4  K/A # G 2.4.1  Importance Rating


===4.8 Emergency===
ES-401                CPNPP NRC 2011 SRO Written Exam Worksheet                  Form ES-401-5 Learning Objective:  ASSESS the implementation of ABNs entered in Response To A Fire In The Control Room Or Cable Spreading Room in conjunction with EOPs.
Procedures / PlanProposed Question:
(LO21.ABN.803.OB09)
: Knowledge of EOP entry conditions and immediate action steps SRO 100   Given the following conditions:
EVALUATE all system limitations and precautions associated with Response To A Fire In The Control Room Or Cable Spreading Room.
A Steam Generator Tube Rupture has occurred on Unit 1.
(LO21.ABN.803.OB06)
Due to equipment failures, ECA
Question Source:          Bank #
-3.2A, SGTR With a Loss of Reactor Coolant
Modified Bank #                        (Note changes or attach parent)
-Saturated Recovery Desired, is being performed.
New                        X Question History:          Last NRC Exam Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:    55.41 55.43  5 Page 50 of 52                                  Rev f
The STA informs you that the Critical Safety Function Status Trees (CSFST) are all GREEN with the exception of the following:
 
CORE COOLING CSFST is YELLOW based on Reactor Vessel Level.
ES-401                  CPNPP NRC 2011 SRO Written Exam Worksheet                          Form ES-401-5 Examination Outline Cross-reference:                            Level                    RO          SRO Tier #                                  3 Category #                              4 K/A #                        G 2.4.1 Importance Rating                      4.8 Emergency Procedures / Plan: Knowledge of EOP entry conditions and immediate action steps Proposed Question:            SRO 100 Given the following conditions:
INVENTORY CSFST is YELLOW based on Reactor Vessel Level.
* A Steam Generator Tube Rupture has occurred on Unit 1.
* Due to equipment failures, ECA-3.2A, SGTR With a Loss of Reactor Coolant-Saturated Recovery Desired, is being performed.
* The STA informs you that the Critical Safety Function Status Trees (CSFST) are all GREEN with the exception of the following:
* CORE COOLING CSFST is YELLOW based on Reactor Vessel Level.
* INVENTORY CSFST is YELLOW based on Reactor Vessel Level.
Which of the following describes the implementation of procedures for this event?
Which of the following describes the implementation of procedures for this event?
A. Remain in ECA
A. Remain in ECA-3.2A. Do not address either CSFST YELLOW path as implementation is not allowed in the ECA procedures.
-3.2A. Do not address either CSFST YELLOW path as implementation is not allowed in the ECA procedures.
B. Hand off both CSFST YELLOW paths to other operators while remaining in ECA-3.2A. The actions of all procedures are to be implemented.
B. Hand off both CSFST YELLOW paths to other operators while remaining in ECA-3.2A. The actions of all procedures are to be implemented.
C. Transition from ECA
C. Transition from ECA-3.2A and address both CSFST YELLOW paths. The actions for CORE COOLING take precedence over the actions for INVENTORY.
-3.2A and address both CSFST YELLOW paths. The actions for CORE COOLING take precedence over the actions for INVENTORY.
D. Remain in ECA-3.2A. Address INVENTORY actions as desired and do not perform the actions for CORE COOLING due to conflict with ECA-3.2A actions.
D. Remain in ECA
Proposed Answer:               D Page 51 of 52                                      Rev f
-3.2A. Address INVENTORY actions as desired and do not perform the actions for CORE COOLING due to conflict with ECA
 
-3.2A actions.
ES-401                 CPNPP NRC 2011 SRO Written Exam Worksheet                     Form ES-401-5 Explanation:
Proposed Answer:
A. Incorrect. Plausible because remaining in ECA-3.2A is correct, however, the only limitation imposed on the YELLOW path procedures is for the CORE COOLING Safety Functions.
D ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5   Page 52 of 52 Rev f  Explanation:
B. Incorrect. Plausible because remaining in ECA-3.2A is correct, however, the limitation imposed on the YELLOW path procedures is for the CORE COOLING Safety Functions.
A. Incorrect. Plausible because remaining in ECA
C. Incorrect. Plausible because FRC-0.3A is a higher priority, however, it cannot be performed as it conflicts with ECA-3.2A.
-3.2A is correct, however, the only limitation imposed on the YELLOW path procedures is for the CORE COOLING Safety Functions.
D. Correct. Per the guidance contained in FRC-0.3A, Response to Saturated Core Cooling. FRC-0.3A directs a reestablishment of RCS subcooling via Safety Injection Flow. This is inconsistent with the actions of ECA-3.2A which reduce RCS subcooling via ECCS flow reduction in order to minimize primary to secondary leakage during a SGTR.
B. Incorrect. Plausible because remaining in ECA
Technical Reference(s)     FRC-0.3A, Step 1 Note                         Attached w/ Revision # See FRC-0.3A, Attachment 2 Bases                 Comments / Reference ECA-3.2A, Flow Chart FRI-0.3A, CSFST Proposed references to be provided during examination: None Learning Objective:     STATE the two paths through which the ERG network may be entered, and DESCRIBE the conditions that require/allow entry for each.
-3.2A is correct, however, the limitation imposed on the YELLOW path procedures is for the CORE COOLING Safety Functions.
(LO21.ERG.XD2.OB21)
C. Incorrect. Plausible because FRC
-0.3A is a higher priority, however, it cannot be performed as it conflicts with ECA
-3.2A. D. Correct. Per the guidance contained in FRC
-0.3A, Response to Saturated Core Cooling.
FRC-0.3A directs a reestablishment of RCS subcooling via Safety Injection Flow. This is inconsistent with the actions of ECA
-3.2A which reduce RCS subcooling via ECCS flow reduction in order to minimize primary to secondary leakage during a SGTR.
Technical Reference(s)
FRC-0.3A, Step 1 Note Attached w/ Revision # See Comments / Reference FRC-0.3A, Attachment 2 Bases ECA-3.2A, Flow Chart FRI-0.3A, CSFST Proposed references to be provided during examination:
None Learning Objective:
STATE the two paths through which the ERG network may be entered, and DESCRIBE the conditions that require/allow entry for each.
(LO21.ERG.XD2.OB21)
DESCRIBE the expectations associated with performing immediate actions for the US/RO. (LO21.ERG.XD2.OB29)
DESCRIBE the expectations associated with performing immediate actions for the US/RO. (LO21.ERG.XD2.OB29)
Question Source:
Question Source:           Bank #               CPNPP LXR Modified Bank #                         (Note changes or attach parent)
Bank # CPNPP LXR   Modified Bank #
New Question History:           Last NRC Exam Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:     55.41 55.43   5 Page 52 of 52                                        Rev f}}
  (Note changes or attach parent) New   Question History:
Last NRC Exam Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X   10 CFR Part 55 Content:
55.41   55.43 5}}

Latest revision as of 19:37, 10 March 2020

CPNPP June 2011 NRC Written Examination Senior Reactor Operator
ML111870305
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/06/2011
From:
Operations Branch IV
To:
Luminant Generation Co
References
50-445/11-301, 50-446/11-301
Download: ML111870305 (207)


Text

CPNPP June 2011 NRC Written Examination Senior Reactor Operator Page 2 of 105 Rev f

CPNPP June 2011 NRC Written Examination Senior Reactor Operator Page 3 of 105 Rev f

CPNPP NRC 2011 Written Exam Reference List

1. NRC Generic Fundamentals Equation Sheet
2. Steam Tables

GENERIC FUNDAMENTALS EXAMINATION EQUATIONS AND CONVERSIONS HANDOUT SHEET EQUATIONS



Q  pT mc P = Po10SUR(t)



Q 

mh P = Poe(t/)

 A = Aoe-t Q UAT CRS/D = S/(1 - Keff)

  m Q

3

 Nat Circ CR1(1 - Keff1) = CR2(1 - Keff2) 2 T  m  Nat Circ 1/M = CR1/CRX Keff = 1/(1 - ) A = r 2

= (Keff - 1)/Keff F = PA SUR = 26.06/ m = Av eff W 

mP Pump eff E = IR 5 eff

 Thermal Efficiency = Net Work Out/Energy In 1  eff g(z2 - z1) + (v22 - v12) + (P2 - P1) + (u2 - u1) + (q - w) = 0 5* = 1 x 10-4 sec gc 2gc eff = 0.1 sec-1 (for small positive ) gc = 32.2 lbm-ft/lbf-sec2 2 2 DRW  tip / avg CONVERSIONS 1 Mw = 3.41 x 106 Btu/hr 1 Curie = 3.7 x 1010 dps 1 hp = 2.54 x 103 Btu/hr 1 kg = 2.21 lbm 1 Btu = 778 ft-lbf 1 galwater = 8.35 lbm (C = (5/9)((F - 32) 1 ft3water = 7.48 gal (F = (9/5)((C) + 32 ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 003 A3.01 Importance Rating 3.3 Reactor Coolant Pump System: Ability to monitor automatic operation of the RCPs including: Seal injection flow Proposed Question: Common 1 Given the following condition:

  • Unit 2 is in MODE 1.

Which of the following indications would you expect to observe if the #1 seal on Reactor Coolant Pump 2-01 failed?

A. Seal #1 differential pressure rising.

Seal leak off flow rising.

B. Seal injection flow rising.

Seal leak off flow rising.

C. Seal #1 differential pressure rising.

Seal leak off flow lowering.

D. Seal injection flow lowering.

Seal leak off flow rising.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because seal leak off flow could be rising, however, seal #1 differential pressure would be lowering. Seal #1 differential pressure rising is plausible because leak rate rises as differential pressure rises (referred to SOP-108A reference drawing).

B. Correct. With seal injection and seal leak off flows both rising, the RCP #1 seal has failed.

C. Incorrect. Plausible because seal leak off flow could be lowering, however, seal #1 differential pressure would be lowering. Seal #1 differential pressure rising is plausible because leak rate rises as differential pressure rises (referred to SOP-108A reference drawing).

D. Incorrect. Plausible because seal leak off flow can be rising or lowering, however, seal injection flow would be rising.

Technical Reference(s) ABN-101, Section 4.1 Attached w/ Revision # See SOP-108A, Step 5.1.G, Figure 1 Comments / Reference Proposed references to be provided during examination: None Page 1 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: STATE the function and operation of the following Reactor Coolant System components, flowpaths and features:

ANALYZE the relationship between a Reactor Coolant Pump malfunction and the following:

  • RCP Seals (LO21.ABN.101.OB02)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 3, 10 55.43 Page 2 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 004 K1.05 Importance Rating 2.7 Chemical and Volume Control System: Knowledge of the physical connections and/or cause-effect relationships between the CVCS and the following systems: CRDS operation in automatic mode control Proposed Question: Common 2 Given the following conditions:

  • Unit 1 is at 100% power.
  • Rod Control is in AUTO.
  • An unsaturated mixed bed demineralizer was just placed in service without aligning Letdown to the Recycle Holdup Tank (HUT).

Which of the following is the expected plant response for the conditions listed?

Control Rods will start to...

A. withdraw as boron is absorbed by the demineralizer.

B. insert as boron is released from the demineralizer.

C. withdraw as boron is released from the demineralizer.

D. insert as boron is absorbed by the demineralizer.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because boron is being absorbed by the demineralizer, however, this will cause Control Rods to insert.

B. Incorrect. Plausible because Control Rods will insert, however, the reason is due to boron being absorbed by the demineralizer with beginning-of-cycle conditions.

C. Incorrect. Plausible if thought that a fresh mixed bed demineralizer was already borated.

D. Correct. With beginning-of-cycle conditions, a fresh mixed to bed demineralizer will absorb boron from the system and cause Control Rods to insert.

Technical Reference(s) SOP-103A, Section 3.0 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 3 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationships between the CVCS and the following systems, components or events:

  • Expected reactivity changes after valving in a new mixed-bed demineralizer that has not been pre-borated (OP51.SYS.CS1.OB9)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 1, 5, 55.43 Page 4 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 005 K3.07 Importance Rating 3.2 Residual Heat Removal System: Knowledge of the effect that a loss or malfunction of the RHRs will have on the following:

Refueling operations Proposed Question: Common 3 Given the following conditions:

  • The Reactor Vessel Head and Upper Internals are removed.
  • Core offload is in progress per RFO-102, Refueling Operation.
  • The other Train of RHR is AVAILABLE.
  • Refueling Cavity level is 858 feet.

Which of the following actions is taken per RFO-102, Refueling Operations, to preclude the water above the core from boiling if a running RHR Pump trips?

A. Maintaining greater than 23 feet of water above the Reactor vessel flange.

B. Requiring both trains of RHR to be OPERABLE during Refueling.

C. Waiting to begin core offload for at least 75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> after shutdown.

D. Starting an additional train of RHR prior to the start of Core offload.

Proposed Answer: A Explanation:

A. Correct. Per RFO-102, the basis for requiring one RHR loop >23 feet is to prevent the water above the core from boiling in the event of a loss of RHR cooling.

B. Incorrect. Plausible because this is a requirement if level is less than 23 feet.

C. Incorrect. Plausible because this is a Spent Fuel Pool limitation.

D. Incorrect. Plausible if thought that this were required, however, it is not.

Technical Reference(s) RFO-102, Steps 4.1.8 through 4.1.11 Attached w/ Revision # See RFO-102, Step 4.1.3 Comments / Reference Proposed references to be provided during examination: None Page 5 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: DESCRIBE or STATE how the following concepts or conditions apply to the Residual Heat Removal System:

  • Loss of RHR cooling capability (OP51.SYS.RH1.OB14)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Page 6 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 006 K5.06 Importance Rating 3.5 Emergency Core Cooling System: Knowledge of the operational implications of the following concepts as they apply to ECCS: Relationship between ECCS flow and RCS pressure Proposed Question: Common 4 Given the following conditions:

  • The break is in one of the RCS Cold Legs.
  • RCS inventory decreases, leading to partial core uncovery.

Assuming NO operator actions, which of the following is the event that initiates the RCS pressure decrease, allowing higher ECCS flow and re-covering the core?

A. Clearing of the RCS Intermediate Leg (loop seal).

B. Hot leg level drops below mid-loop level.

C. Opening of any Main Steam Safety Valve.

D. Uncovering of the Guide Tube flow holes.

Proposed Answer: A Explanation:

A. Correct. As outlined in the WOG E-1 Background Guideline.

B. Incorrect. Plausible if thought that this helped RCS pressure to decrease, however, core uncovery must occur for clearing of the loop seal to be accomplished.

C. Incorrect. Plausible because heat removal by the secondary system is required during a Small Break LOCA, however, this is not the event that allows the core recover with fluid.

D. Incorrect. Plausible if thought that this mechanism would help, however, it is clearing of the loop seal that allows pressure to decrease.

Technical Reference(s) WOG E-1 Background Guideline, Page 21 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 7 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: DESCRIBE the events that create pressure equilibrium during a small break loss of coolant accident. (LO21.MCO.MI2.OB02)

SUMMARIZE the normal sequence of events which would occur during a small break loss of coolant accident with normal Emergency Core Cooling Systems.

(LO21.MCO.MI2.OB03)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 5 55.43 Page 8 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 006 K4.01 Importance Rating 2.6 Emergency Core Cooling System: Knowledge of ECCS design feature(s) and/or interlock(s) which provide for the following:

Cooling of centrifugal pump bearings Proposed Question: Common 5 Given the following condition:

  • A Small Break Loss of Coolant Accident has occurred on Unit 1 and Safety Injection has properly actuated.

Which of the following describes how the Centrifugal Charging Pump (CCP) Bearings are cooled in this situation?

A. Component Cooling Water flow through the CCP Lube Oil Cooler.

B. Station Service Water flow through the CCP Lube Oil Cooler.

C. Pump recirculation via the Refueling Water Storage Tank.

D. Pump recirculation via the RHR Heat Exchanger outlet.

Proposed Answer: B Explanation:

A. Incorrect. Plausible if thought that the CCP lube oil cooler is cooled by CCW.

B. Correct. The CCP lube oil cooler is cooled by SSW and lube oil cools the bearings.

C. Incorrect. Plausible if thought that cool water from RWST keeps bearings cool during ECCS injection and an additional cooling source for lube oil is not required.

D. Incorrect. Plausible if thought that cool water from the outlet of the RHR Heat Exchanger keeps bearings cool during ECCS recirculation and an additional cooling source for lube oil is not required.

Technical Reference(s) OP51.SYS.SI1.LN, Page 27 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationships between the Emergency Core Cooling System and the following systems, components or events:

Page 9 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5

  • Chemical and Volume Control System (OP51.SYS.SI1.OB09)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7, 8 55.43 Page 10 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 007 A1.01 Importance Rating 2.9 Pressurizer Relief / Quench Tank System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS controls including: Maintaining quench tank water level within limits Proposed Question: Common 6 Given the following conditions on Unit 2:

  • Volume Control Tank (VCT) level is being maintained in automatic.
  • The following Primary System parameters are observed:

Time: 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> Pressurizer Relief Tank Level: 86% 88%

Pressurizer Relief Tank Temperature: 96ºF 96ºF Pressurizer Level: 45% 45%

Tavg: 570ºF 570ºF Containment Temperature: 102ºF 100ºF Which of the following caused the Pressurizer Relief Tank level increase?

A. Pressurizer PORV leakage.

B. Containment temperature change.

C. Letdown Relief Valve (inside Containment) leakage.

D. Seal Return Relief Valve (inside Containment) leakage.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because the PORVs are directed to the PRT, however, one would expect PRT temperature to also rise.

B. Incorrect. Plausible because Containment temperature is changing, however, there is not a corresponding change in PRT temperature and this would be expected.

C. Incorrect. Plausible because the Letdown Relief Valve is directed to the PRT, however, given the temperature of Letdown an expected temperature increase in the PRT would occur.

D. Correct. Given the temperature of the seal return water and the corresponding increase in PRT level without an increase in temperature; this is the source of the water.

Page 11 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Technical Reference(s) ALM-0052B, 2-ALB-5B, Window 4.3 Attached w/ Revision # See OP51.SYS.RC1, Figure 17 Comments / Reference OP51.SYS.RC1.LN. Page 28 Proposed references to be provided during examination: None Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationship between the Reactor Coolant System and the following systems, components or events:

  • Pressurizer Relief Tank (OP51.SYS.RC1.OB11)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 3, 5 55.43 Page 12 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 008 K1.02 Importance Rating 3.3 Component Cooling Water System: Knowledge of the physical connections and/or cause-effect relationships between the CCWS and the following systems: Loads cooled by CCWS Proposed Question: Common 7 Given the following conditions:

  • Unit 1 is at full power, with a normal Component Cooling Water (CCW) System alignment.
  • Subsequently, 1-HV-4701, RCP CLR CCW RET ISOL VLV, is observed with the following indication:
  • 1-HS-4701, green light LIT and red light DARK.

Which of the following describes the effect on CCW flow indications as a result of this condition?

Loss of ALL Reactor Coolant Pump A. Lower Bearing Lube Oil Cooler CCW Return flows.

Motor Air Cooler CCW Return flows.

Thermal Barrier Cooler CCW Return flows.

B. Upper Bearing Lube Oil Cooler CCW Return flows.

Lower Bearing Lube Oil Cooler CCW Return flows.

Motor Air Cooler CCW Return flows.

C. Upper Bearing Lube Oil Cooler CCW Return flows.

Motor Air Cooler CCW Return flows.

Thermal Barrier Cooler CCW Return flows.

D. Upper Bearing Lube Oil Cooler CCW Return flows.

Lower Bearing Lube Oil Cooler CCW Return flows.

Thermal Barrier Cooler CCW Return flows.

Proposed Answer: B Page 13 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because Lower Bearing Lube Oil Cooler and Motor Air Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply.

B. Correct. The common return for Upper Bearing Lube Oil Cooler, Lower Bearing Lube Oil Cooler, and Motor Air Coolers is isolated.

C. Incorrect. Plausible because Upper Bearing Lube Oil Cooler and Motor Air Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply.

D. Incorrect. Plausible because Upper and Lower Bearing Lube Oil Coolers are correct, however, the Thermal Barrier Cooler has a separate return via a common supply.

Technical Reference(s) OP51.SYS.CC1.LP, Figure 4 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the functions, operation and interlocks of the following Component Cooling Water System components:

  • u-HV-4701 and u-HV-4708, RCP Cooler CCW Return Isolation Valves (OP51.SYS.CC1.OB02)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 4, 7 55.43 Page 14 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 008 K2.02 Importance Rating 3.0 Component Cooling Water System: Knowledge of bus power supplies to the following: CCW pump, including emergency backup Proposed Question: Common 8 Given the following conditions:

  • Unit 2 is in MODE 1.
  • An XST 1 Transformer fault has just occurred.
  • Component Cooling Water (CCW) Pump 2-01 was running.
  • CCW Pump 2-02 is in standby.

If Safeguards Bus 2EA2 receives an 86-2 Lockout, which of the following identifies when CCW Pump 2-02 is started?

A. After the 86-2 Lockout on Bus 2EA2 is reset, due to low pressure on Train A CCW.

B. When directed by procedure, the pump is manually started.

C. At the appropriate step on the Blackout Sequencer, the pump is started.

D. Immediately after Bus 2EA2 is reenergized, due to low pressure on Train A CCW.

Proposed Answer: C Page 16 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible if thought that the Lockout must be reset, however, the EDG will load the Bus with an 86-2 Lockout present.

B. Incorrect. Plausible if thought it would not start automatically as the pump was not previously running, however, the BOS will start the pump.

C. Correct. The Blackout Sequencer will start the CCW Pump 2-02 at Step 2.

D. Incorrect. Plausible if thought the pump would AUTO start immediately upon reenergizing the bus, however, the BOS Auto Lockout is present and prevent the pump from starting.

Technical Reference(s) OP51.SYS.ES3.LN, Pages 10 & 20 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: COMPARE and CONTRAST the function and operation of the BOS and SIS Operator Lockouts and Automatic Lockouts. (OP51.SYS.ES3.OB10)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 4, 7, 8 55.43 Page 17 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 010 A3.02 Importance Rating 3.6 Pressurizer Pressure Control System: Ability to monitor automatic operation of the PZR PCS including: PZR pressure Proposed Question: Common 9 Given the following conditions on Unit 2:

  • 2-PK-455A, Pressurizer Master Pressure Controller will NOT control in AUTO.
  • 2-PK-455A was placed in MANUAL and the demand lowered to 0%.

With NO further operator action, which of the following will be the response of the plant?

Pressurizer pressure will...

A. INCREASE until 2-PCV-456 opens. 2-PCV-455A will remain CLOSED.

B. INCREASE until 2-PCV-455A opens. 2-PCV-456 will remain CLOSED.

C. DECREASE due to all Control and Backup Heaters remaining OFF. The Spray Valves remain CLOSED.

D. DECREASE due to all Control and Backup Heaters remaining OFF. The Spray Valves will OPEN.

Proposed Answer: A Explanation:

A. Correct. This is the controller response when placed in MANUAL with 0% demand. Heaters turn on and Spray Valves remain closed, PCV-456 will open at 2335 PSIG and PCV-455A will remain closed.

B. Incorrect. Plausible if thought that PCV-455A will open, however with PK-455A in manual at 0%

demand the PZR heaters will energize and Sprays will not open and pressure will rise to 2335 PSIG but only PV-456 will open and PV-455A will remain closed.

C. Incorrect. Plausible if thought that the Control and Backup Heaters remain OFF when PK-455A is taken to 0% demand, however the Heaters will actually come on.

D. Incorrect. Plausible if thought that the Control and Backup Heaters remain OFF when PK-455A is taken to 0% demand, however the Heaters will actually come on. The Spray Valves will remain closed with PK-455A taken to 0% demand.

Technical Reference(s) OP51.SYS.PP1.LN, Pages 12 & 13 Attached w/ Revision # See Page 18 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 OP51.SYS.PP1.LN, Figure 4 Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the Pressurizer Pressure and Level Control System design features which provide for the trips, permissives and interlocks associated with the following:

  • PRZR PORVS Open Interlock in AUTO (OP51.SYS.PP1.OB07)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Page 19 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 010 A1.07 Importance Rating 3.7 Pressurizer Pressure Control System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR PCS controls including: RCS pressure Proposed Question: Common 10 Given the following conditions:

  • Unit 1 is in MODE 4
  • 1-PT-405, RCS Wide Range Pressure Transmitter is out of service.
  • The associated train of Low Temperature Overpressure Protection (LTOP) is removed from service.
  • 1-PT-403, RCS pressure transmitter fails LOW.

Which of the following describes the consequence of the 1-PT-403 failure?

A. 1-PCV-456, PRZR PORV will open and depressurize the RCS.

B. 1-PCV-455A, PRZR PORV will open and depressurize the RCS.

C. All RCS Low Temperature Overpressure Protection via the PORVs will be lost.

D. RCS LTOP will still be provided by 1-PCV-455A, PRZR PORV.

Proposed Answer: C Explanation:

A. Incorrect. Plausible if thought that with PT-403 failed low, PCV-456 would still function.

B. Incorrect. Plausible if thought that PCV-455A is available with PT-405 being out of service.

C. Correct. LTOP uses wide range RCS temperature, PT-405 for Train A and PT-403 for Train B. When PT-403 fails, no PORVs will automatically open.

D. Incorrect. Plausible if thought that PCV-455A is available with PT-405 being out of service.

Technical Reference(s) OP51.SYS.PP2.LN, Pages 10 & 11 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE how the Low Temperature Overpressure Protection System Main Control Board/Plant Computer controls, alarms and indications are used to Page 20 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 predict, monitor and control changes in the system. (OP51.SYS.PP2.OB11)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Page 21 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 012 K3.02 Importance Rating 3.2 Reactor Protection System: Knowledge of the effect that a loss or malfunction of the RPS will have on the following: Turbine generator Proposed Question: Common 11 Given the following conditions:

  • The plant is at 20% power with all systems operating normally.

Which of the following identifies the impact on the Main Turbine?

A. P-4 is NOT enabled and the Main Turbine will NOT trip.

B. P-9 is NOT enabled and the Main Turbine will trip.

C. P-4 is enabled and the Main Turbine will trip.

D. P-9 is enabled and the Main Turbine will NOT trip.

Proposed Answer: A Explanation:

A. Correct. If the Reactor Trip Breakers fail to open, P-4 is NOT enabled and the Main Turbine will NOT trip.

B. Incorrect. Plausible because P-9 is not enabled until power is greater than 50%, however, this Permissive generates a Reactor Trip if a Turbine Trip occurs.

C. Incorrect. Plausible if thought that P-4 is enabled, however, it is not enabled and the Main Turbine will not trip.

D. Incorrect. Plausible because P-9 is not enabled until power is greater than 50%, however, this Permissive generates a Reactor Trip if a Turbine Trip occurs.

Technical Reference(s) OP51.SYS.ES1.LN, Pages 67 & 68 Attached w/ Revision # See OP51.SYS.ES1.LN, Pages 70 & 71 Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the coincidence and setpoints associated with the following Permissives and Controls:

Page 22 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 6, 7 55.43 Page 23 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 012 K5.01 Importance Rating 3.3 Reactor Protection System: Knowledge of the operational implications of the following concepts as they apply to the RPS:

DNB Proposed Question: Common 12 Which of the following Reactor Protection System Trips is NOT designed to protect against Departure from Nuclear Boiling (DNB)?

A. Pressurizer Low Pressure.

B. Overtemperature N-16.

C. Reactor Coolant Pump Undervoltage.

D. Intermediate Range High Flux.

Proposed Answer: D Explanation:

A. Incorrect. Plausible if thought that the Pressurizer Low Pressure Trip was only concerned with void formation.

B. Incorrect. Plausible because Overtemperature N-16 could be construed to imply a high flux type of trip which would not protect against DNB.

C. Incorrect. Plausible because the RCP Undervoltage Trip may be considered differently from the RCP Under Frequency Trip. With the latter, under frequency implies a loss of speed which converts to a loss of flow.

D. Correct. There is no credit taken in the Accident Analysis for this trip.

Technical Reference(s) OP51.SYS.ES1.LN, Pages as listed Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE or STATE how the following concepts or conditions apply to the Reactor Protection System:

  • DNB (OP51.SYS.ES1.OB07)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Page 24 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Page 25 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 013 K4.03 Importance Rating 3.9 Engineered Safety Features Actuation System: Knowledge of the ESFAS design feature(s) and/or interlock(s) that provide for the following: Main Steam Isolation System Proposed Question: Common 13 Given the following conditions:

  • The plant is at 75% power with power ascension in progress at 8% per hour.
  • Containment temperature, pressure, and humidity are slowly rising.
  • TAVE is lowering.

Which of the following Engineered Safety Feature Actuation Signals is designed to prevent exceeding the Containment pressure limit?

A. Containment Isolation Phase A.

B. Containment Isolation Phase B.

C. Main Steam Line Isolation.

D. Safety Injection Actuation.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because all non-essential lines in or out of Containment are isolated by Phase A, however, Phase A isolation is designed to prevent radiological release from Containment.

B. Incorrect. Plausible because all CCW support for RCPs in or out of Containment is isolated by Phase B, however, Phase B isolation is designed to prevent radiological release from Containment.

C. Correct. MSLI is designed to minimize excessive cooldown and Containment pressure.

D. Incorrect. Plausible because the SI signal starts Containment Spray and initiates Phase A isolation, however, the SI signal starts pumps and positions valves to ensure the core is cooled during an accident.

Technical Reference(s) FSAR Section 7.0, I & C, Page 130 Attached w/ Revision # See OP51.SYS.ES1.LN, Pages as listed Comments / Reference Page 26 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: LIST the ESF Systems and STATE their functions. (OP51.SYS.ES1.OB03)

LIST and EXPLAIN the coincidence and setpoints associated with the following ESF actuation signals:

  • Steamline Isolation (OP51.SYS.ES1.OB05)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Page 27 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 022 A2.05 Importance Rating 3.1 Containment Cooling System: Ability to (a) predict the impacts of the following malfunctions or operations on the CCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Major leak in CCS Proposed Question: Common 14 Given the following conditions:

  • Unit 1 is at 50% power.
  • 1-ALB-02B, Window 1.12 - CNTMT FN CLR 3 & 4 CNDS LVL HI.
  • 1-ALB-02B, Window 3.12 - CNTMT FN CLR 3 & 4 CND FILL RATE HI.
  • X-ALB-11C, Window 1.11 - CH WTR SRG TK LVL HI-HI / LO-LO is alarming intermittently due to a low level.
  • A Containment Ventilation Chilled Water System leak has been diagnosed.
  • 1-HS-5413A, CNTMT FN CLR FN 3, and 1-HS-5417A, CNTMT FN CLR FN 4 were stopped.

Which of the following describes the impact of securing Containment Fan Coolers 3 and 4?

The Ventilation Chilled Water leak will...

A. be isolated; the Unit must be tripped and EOP-0.0A, Reactor Trip or Safety Injection, entered.

B. be isolated; continued plant operation per IPO-003A, Power Operation, is permitted.

C. NOT be isolated; enter Containment per STA-620, Containment Entry, and locally isolate the leak.

D. NOT be isolated; refer to SOP-814, Ventilation Chilled Water, and isolate leak from Ventilation Panel CV-03.

Page 28 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Proposed Answer: C Explanation:

A. Incorrect. Plausible if thought that with 2 Containment Fan Coolers out of service the Unit must be tripped.

B. Incorrect. Plausible because continued plant operation is allowed, however, the leak has not been isolated.

C. Correct. A Containment entry must be made to locally isolate the leak. The Chill Water Outlet Valves automatically close, however, the Chill Water Inlet valves must be manually closed and are NOT shown on Figure 3.

D. Incorrect. Plausible because the leak is not isolated, however, leak isolation must be performed inside Containment.

Technical Reference(s) 1-ALB-02B, Windows 1.12 & 3.12 Attached w/ Revision # See X-ALB-11C, Window 1.11 Comments / Reference OP51.SYS.CY1.LN, Pages 31 & 32 M1-0307, Sheet A Proposed references to be provided during examination: None Learning Objective: STATE the functions, operation and interlocks of the following Ventilation Chilled Water System components:

  • Containment Air Cooling and Recirculation Units (OP51.SYS.CH2.OB03)

IDENTIFY and DESCRIBE the Main Control Board/Plant Computer controls, alarms and indications associated with the Ventilation Chilled Water System.

(OP51.SYS.CH2.OB06)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 4, 9, 10 55.43 Page 29 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 026 G 2.4.21 Importance Rating 4.0 Containment Spray System: Emergency Procedures/Plan: Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.

Proposed Question: Common 15 Given the following conditions:

  • A Loss of Coolant Accident has occurred inside Containment.
  • Containment pressure is 20 PSIG.
  • Containment temperature is 260ºF.
  • Containment sump level is 814 feet.
  • Containment radiation level is 10R/hr.

Which of the following procedures should be entered?

A. A RED path condition exists.

Enter FRZ-0.1A, Response to High Containment Pressure.

B. An ORANGE path condition exists.

Enter FRZ-0.1A, Response to High Containment Pressure.

C. An ORANGE path condition exists.

Enter FRZ-0.2A, Response to Containment Flooding.

D. A YELLOW path condition exists.

Enter FRZ-0.3A, Response to High Containment Radiation.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because the procedure entry is correct, however, Containment pressure would have to be greater than 50 PSIG for a RED path to exist.

B. Correct. With Containment pressure at 20 PSIG, an ORANGE path condition exists and FRZ-0.1A must be entered.

C. Incorrect. Plausible because an ORANGE path condition would exist, however, containment sump level must be greater than 816 feet.

D. Incorrect. Plausible because this is the correct path and procedure for high containment radiation, Page 30 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 however, radiation level must be greater than 20 R/hr.

Technical Reference(s) FRZ-0.1A, CSF Status Tree Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given the Containment CSFST (and necessary parameter data or access to the data), DETERMINE whether entry into FRZ-0.1A/B is applicable, and, if so, STATE the severity of the challenge. (LO21.ERG.FZ1.OB02)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 31 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 039 A4.07 Importance Rating 2.8 Main and Reheat Steam System: Ability to manually operate and/or monitor in the control room: Steam dump valves Proposed Question: Common 16 Given the following conditions:

  • 1-PK-507, Steam Dump Pressure Controller is at 50% demand in MANUAL.
  • Steam Dump Mode Select Switch is in the STEAM PRESSURE Mode.
  • Steam Dump Interlock Select Switch is in the NEUTRAL position.

Which of the following will be the status of the Steam Dump Cooldown Valves?

The Steam Dump Cooldown Valves are...

A. NOT open.

B. open 50%.

C. full open.

D. throttled to maintain 557ºF.

Proposed Answer: C Explanation:

A. Incorrect. Plausible if thought that no demand signal is present with the Steam Dump Pressure Controller in Manual.

B. Incorrect. Plausible because the Steam Dump Controller is set at 50%, however, with the conditions listed the valves will go full open.

C. Correct. With the Steam Dump Controller positioned as listed and with temperature above the Bypass Interlock setpoint, the valves will be full open.

D. Incorrect. Plausible if thought that the Bypass Interlock signal will throttle close the valves to fully closed at 553ºF.

Technical Reference(s) OP51.SYS.SD1.LN, Pages 14 & 26 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 32 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: STATE the performance and design attributes of the following Steam Dump System components, flowpaths and features:

  • Mode Selector Switch and Interlock Selector Switch (OP51.SYS.SD1.OB02)

LIST the input signals to the Steam Dump System, and DESCRIBE how these signals are generated and utilized in controlling RCS/Secondary fluid conditions.

Description should include the following:

  • Number of dump valves
  • Number of Banks and number of Dump valves per Bank (OP51.SYS.SD1.OB03)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Page 33 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 059 A4.03 Importance Rating 2.9 Main Feedwater System: Ability to manually operate and/or monitor in the control room: Feedwater control during power increase and decrease Proposed Question: Common 17 Given the following condition:

  • A power ascension is in progress on Unit 2.

Which of the following describes the operation of the Unit 2 Feedwater Preheater Bypass Valve?

Unit 2 Feedwater Preheater Bypass Valve...

A. automatically OPENS whenever the water hammer permissives are cleared and the Feedwater Isolation Valve is OPENED.

B. cannot be OPENED until the water hammer permissives are satisfied.

C. automatically OPENS when the Feedwater Isolation Valve is CLOSED due to a Feedwater Isolation Signal.

D. automatically CLOSES whenever the water hammer permissives are cleared and the Feedwater Isolation Valve is OPENED.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because the water hammer permissives must be cleared, however, this condition closes the Unit 2 Feedwater Preheater Bypass Valve.

B. Incorrect. Plausible if thought that the water hammer permissives must be satisfied.

C. Incorrect. Plausible because the 1st part of the answer is correct, however, a Feedwater Isolation Signal cannot be present.

D. Correct. This is the design of the Unit 2 Feedwater Preheater Bypass Valve. Additional information is available in IPO-003B, Power Operation, Sections 5.2, 5.3, and 5.7.

Technical Reference(s) OP51.SYS.MF1.LN, Pages 51 & 72 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 34 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: LIST and EXPLAIN the Main Feedwater System design features which provide for the trips, permissives, and interlocks associated with the following:

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 4, 7 55.43 Page 35 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 061 K5.01 Importance Rating 3.6 Auxiliary/Emergency Feedwater System: Knowledge of the operational implications of the following concepts as they apply to the AFW: Relationship between AFW flow and RCS heat transfer Proposed Question: Common 18 Given the following conditions:

  • Unit 1 is in MODE 1.
  • The running Main Feedwater Pump just tripped on low oil pressure.
  • The crew responded by tripping the Main Turbine which was loaded to 160 MWe.

Which of the following identifies the maximum Reactor power level to ensure adequate Auxiliary Feedwater flow?

A. 2%

B. 5%

C. 6%

D. 10%

Proposed Answer: C Explanation:

A. Incorrect. Plausible if thought that POAH could not be achieved with Auxiliary Feedwater flow.

B. Incorrect. Plausible if thought that MODE 1 could not be achieved with Auxiliary Feedwater flow.

C. Correct. As identified in ABN-403 Caution.

D. Incorrect. Plausible because AFW must be placed in standby readiness prior to exceeding 10%.

Technical Reference(s) ABN-403, Step 2 Caution Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST the maximum reactor power equivalent that can be maintained utilizing AFW System flow Reactor Coolant System. (OP51.SYS.AF1.OB12)

Page 36 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 5 55.43 Page 37 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 061 A3.03 Importance Rating 3.9 Auxiliary/Emergency Feedwater System: Ability to monitor automatic operation of the AFW including: AFW steam generator level control on automatic start Proposed Question: Common 19 On Unit 2, which of the following describes the response to the AUTO start of the Motor Driven Auxiliary Feedwater Pumps (MDAFWP)?

A. Condensate Storage Tank Discharge Valves OPEN.

B. MDAFWP Flow Control Valves trip to AUTO and fully OPEN.

C. Main Feedwater Preheater Bypass Valves CLOSE.

D. Main Feedwater Isolation Valves CLOSE.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because it could be thought that the Condensate Storage Tank Discharge Valves would open on the AFW actuation signal, however, they close.

B. Correct. As described in SOP-304B, Auxiliary Feedwater System.

C. Incorrect. Plausible because it could be thought that the FPBVs receive a close signal to ensure AFW flow into SGs, however, the AFW line enters the Feedwater Preheater Bypass Line downstream of the FPBVs and a check valve and there is no closure signal to the FPBVs.

D. Incorrect. Plausible because it could be thought that the FIVs receive a close signal to ensure AFW flow into the SGs, however, AFW enters the Preheater Bypass Line and the closure of the FSBVs ensures AFW flow into the SGs.

Technical Reference(s) SOP-304B, Step 5.2.1.F.1) Note Attached w/ Revision # See SOP-304B, Step 4.2 Comments / Reference Proposed references to be provided during examination: None Learning Objective: IDENTIFY and ILLUSTRATE the Auxiliary Feedwater System design features which provide for the automatic starts, trips, permissives and interlocks associated with the following:

Page 38 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 4, 7 55.43 Page 39 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 062 G 2.2.12 Importance Rating 3.7 AC Electrical Distribution System: Equipment Control: Knowledge of surveillance procedures Proposed Question: Common 20 Given the following conditions:

  • Unit 1 is in MODE 3.

Which of the following actions are required to be taken within one (1) hour of determining the Emergency Diesel Generator is INOPERABLE?

A. Perform OPT-215, Class 1E Electrical Systems Operability, to verify proper breaker alignments.

B. Verify operation of the Turbine Driven Auxiliary Feedwater Pump per OPT-206A, AFW System.

C. Initiate surveillance testing of the Train B Emergency Diesel Generator per OPT-214A, Diesel Generator Operability Test.

D. Perform OPT-414A, SI/Blackout Sequencers, to verify operability of the Blackout Sequencer.

Proposed Answer: A Explanation:

A. Correct. This procedure meets the surveillance testing requirements of Technical Specification LCO 3.8.1, AC Sources-Operating.

B. Incorrect. Plausible because the Turbine Driven Auxiliary Feedwater Pump is considered a redundant feature, however, this only applies when 2 required Offsite Power Sources are INOPERABLE.

C. Incorrect. Plausible because surveillance testing would be required if both Emergency Diesel Generators were declared INOPERABLE, however, this action must be performed within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

D. Incorrect. Plausible because Blackout Sequencer testing is part of this Technical Specification, however, it is the EDG not the Blackout Sequencer that was declared INOPERABLE.

Technical Reference(s) OPT-215, Section 1.0 Attached w/ Revision # See Page 40 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Technical Specification LCO 3.8.1 Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given a Technical Specification or a Technical Specification situation, DIAGNOSE the situation and APPLY the LCO and SR Applicability of Section 3.0 to DETERMINE all corrective actions. (LO21.RLS.SL1.OB12)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 41 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 062 A4.04 Importance Rating 2.6 AC Electrical Distribution System: Ability to manually operate and/or monitor in the control room: Local operation of breakers Proposed Question: Common 21 Given the following condition:

Which of the following describes how the Main Control Board RHR Pump indication and local breaker control is affected by the loss of control power?

Main Control Board RHR Pump red / green running indications will be...

A. lost.

Local OPEN / CLOSE light indication is available, and local breaker control will be lost until control power is restored.

B. lost.

Local OPEN / CLOSE mechanical indication is available, and local breaker control is possible without the control power.

C. available.

Local OPEN / CLOSE light indication is available, and local breaker control is possible without the control power.

D. available.

Local OPEN / CLOSE mechanical indication is available, and local breaker control will be lost until control power is restored.

Proposed Answer: B Page 42 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because Main Control Board red / green running indications will be lost, however, local breaker control is possible without control power.

B. Correct. With a loss of control power, Main Control Board red / green running indications will be lost. Local breaker control is still possible.

C. Incorrect. Plausible because local breaker control is possible without control power, however, local OPEN / CLOSE light indication is NOT available.

D. Incorrect. Plausible because local OPEN/CLOSE indication is available, however, Main Control Board indications are lost and local control is available.

Technical Reference(s) STA-694, Attachment 8.B Attached w/ Revision # See Electrical Print E1-0031, Sheet 49 Comments / Reference Proposed references to be provided during examination: None Learning Objective: EVALUATE the effect a loss of the following systems has on the Residual Heat Removal System and components:

  • DC Power (OP51.SYS.RH1.OB17)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam CPNPP 2009 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7, 10 55.43 Page 43 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 063 K4.01 Importance Rating 2.7 DC Electrical Distribution System: Knowledge of the DC electrical system design feature(s) and/or interlock(s) which provide for the following: Manual/automatic transfers of control Proposed Question: Common 22 Which of the following identifies the types of trips or protective isolation circuits associated with the DC Distribution Panels?

A. Overcurrent only.

B. Ground fault only.

C. Overcurrent and undervoltage only.

D. Overvoltage, ground fault, and undervoltage.

Proposed Answer: A Explanation:

A. Correct. This is the only trip associated with the DC Distribution Panels.

B. Incorrect. Plausible because ground fault indication does exist, however, it provides BUS TROUBLE indication only in the Control Room.

C. Incorrect. Plausible because an overcurrent trip does exist, however, an undervoltage condition provides BUS TROUBLE indication only in the Control Room.

D. Incorrect. Plausible because all three of these indications exist, however, they only provide BUS TROUBLE indication in the Control Room.

Technical Reference(s) OP51.SYS.DC1.LN, Page 32 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the DC Electrical System design features which provide for the trips, permissives, and interlocks associated with the following:

  • Protective Relay actuations (OP51.SYS.DC1.OB12)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Page 46 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Page 47 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 064 K1.01 Importance Rating 4.1 Emergency Diesel Generator System: Knowledge of the physical connections and/or cause-effect relationships between the EDG system and the following systems: AC distribution system Proposed Question: Common 23 Given the following conditions:

  • Unit 2 is in a normal operating alignment at 100% power.
  • An 86-1/2EA1 Lockout Relay actuation occurs on Safeguards Bus 2EA1.
  • The Electrical Distribution System responds as expected.
  • NO operator actions have been performed.

Which of the following identifies the status of Safeguards Bus 2EA1 power supplies?

Diesel Generator 2-01 is...

A. stopped, Breaker 2EG1 is open, and Safeguards Bus 2EA1 is deenergized.

B. running, Breaker 2EG1 is closed, and Safeguards Bus 2EA1 is energized.

C. running, Breaker 2EA1-1 is open, and Safeguards Bus 2EA1 is deenergized.

D. stopped, Breaker 2EA1-2 is closed, and Safeguards Bus 2EA1 is energized.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because the Breaker would be open and the Bus would be deenergized, however, the Emergency Diesel Generator would be running.

B. Incorrect. Plausible because this is the correct status for an 86-2 Lockout Relay actuation, however, an 86-1 lockout relay actuation has occurred.

C. Correct. Given that an 86-1 lockout relay actuation has occurred, this is the correct condition of the Emergency Diesel Generator and its associated bus.

D. Incorrect. Plausible if thought that alternate supply would close onto bus with 86-1 lockout, 1 second time delay allows for slow transfer to occur to alternate supply without start of Emergency Diesel Generator if no lockout exists.

Technical Reference(s) ABN-602, Step 2.3.3 Note Attached w/ Revision # See Comments / Reference Page 48 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: COMPARE and CONTRAST the 6.9Kv bus 86-1 and 86-2 relay operation to include the effect on the preferred, alternate and emergency power supplies.

(OP51.SYS.AC2.OB11)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Page 49 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 064 A3.05 Importance Rating 2.8 Emergency Diesel Generator System: Ability to monitor automatic operation of the EDG system including: Operation of the governor control of frequency and voltage control during parallel operation Proposed Question: Common 24 Given the following conditions:

  • EDG Breaker 1EG1 is closed with EDG voltage (INCOMING) slightly greater than Safeguards Bus 1EA1 voltage (RUNNING).
  • The Unit Supervisor has directed that zero (0) KVARs OUT be maintained following paralleling the EDG with the Safeguards Bus.

Based on the above conditions, which of the following identifies the response of the Emergency Diesel output voltage and what action should be taken?

A. 1.) EDG VAR meter will move in the positive (+) VAR (LAG-OUT) direction.

2.) Place the EDG Voltage Control Switch in the LOWER position to adjust VAR load.

B. 1.) EDG VAR meter will move in the positive (+) VAR (LAG-OUT) direction.

2.) Place the EDG Voltage Control Switch in the RAISE position to adjust VAR load.

C. 1.) EDG VAR meter will move in the negative (-) VAR (LEAD-IN) direction.

2.) Place the EDG Voltage Control Switch in the RAISE position to adjust VAR load.

D. 1.) EDG VAR meter will move in the negative (-) VAR (LEAD-IN) direction.

2.) Place the EDG Voltage Control Switch in the LOWER position to adjust VAR load.

Proposed Answer: A Page 50 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. With EDG voltage greater than bus voltage when the breaker is closed, a positive VAR load will be supplied by the Emergency Diesel Generator. The Voltage Control Switch is placed in LOWER to decrease generator terminal voltage and zero out the VAR load.

B. Incorrect. Plausible because the VAR response is correct, however, this action would only serve to increase the VAR load.

C. Incorrect. Plausible because this would be the correct action if generator voltage were lower than Safeguards Bus voltage when the breaker was closed and it was desired to zero out the VAR load.

D. Incorrect. Plausible because the action is correct, however, this VAR response would occur if generator voltage were less than Safeguards Bus voltage.

Technical Reference(s) SOP-609A, Step 5.2.X Note Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Emergency Diesel Generator System:

  • Voltage Regulator Raise/Lower Switch (OP51.SYS.ED1.OB04)

STATE the physical connections and EVALUATE the cause-effect relationships between the Emergency Diesel Generator System and the following systems, components or events:

  • AC Distribution System (OP51.SYS.ED1.OB08)

Question Source: Bank #

Modified Bank # CPNPP LXR (Note changes or attach parent)

New Question History: Last NRC Exam CPNPP 2009 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5 55.43 Page 51 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 073 A2.01 Importance Rating 2.5 Process Radiation Monitoring System: Ability to (a) predict the impacts of the following malfunctions or operations on the PRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Erratic or failed power supply Proposed Question: Common 25 Given the following condition:

  • The power supply to the RM-80 portion of X-RE-5895A, Control Room North Intake Radiation Monitor, has just failed.

Which of the following identifies the affect of this failure and action required to remove the Control Room Emergency Filtration from Emergency Recirculation per SOP-706, Digital Radiation Monitoring System?

A. A high radiation signal is generated.

Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in BLOCK.

B. A low radiation signal is generated.

Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in BLOCK.

C. A high radiation signal is generated.

Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in ON.

D. A low radiation signal is generated.

Place X-HS-5895A, High Radiation Actuation BLOCK/ON handswitch in ON.

Proposed Answer: A Page 52 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. When the power supply for the Control Room Intake Radiation Monitor is deenergized for any reason, it will fail safe and generate a high radiation signal. The Control Room Emergency Filtration System (CREFS) can not be taken out of Emergency Recirculation until X-HS-5895A is taken to BLOCK.

B. Incorrect. Plausible because required action is correct, however, a high radiation signal is generated.

C. Incorrect. Plausible because a high radiation signal is generated, however, placing X-HS-5895A in ON does not allow the CREFS to be taken out of Emergency Recirculation.

D. Incorrect. Plausible if it is believed that loss of power generates a loss of signal, however, a high radiation signal is generated and placing X-HS-5895A in ON does not allow the CREFS to be taken out of Emergency Recirculation.

Technical Reference(s) SOP-706, Sections 5.6 & 5.11 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Digital Radiation Monitoring System:

  • RM-80 Microprocessor Block Handswitches (OP51.SYS.RM1.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 11 55.43 Page 53 of 53 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 076 K2.08 Importance Rating 3.1 Service Water System: Knowledge of bus power supplies to the following: ESF actuated MOVs Proposed Question: Common 26 Given the following conditions:

  • Station Service Water Pump 2-01 Discharge Valve was closed using the Control Room handswitch.

Which of the following identifies the condition of the Station Service Water Pump 2-01 Discharge Valve and the appropriate action to be taken per SOP-501A, Station Service Water System?

Station Service Water Pump 2-01 Discharge Valve is...

A. fully closed. Hold the Control Room Hand Switch in the CLOSE position for an additional 10 seconds to ensure valve closure.

B. 10% open. Open the breaker on Motor Control Center 2EB3-3 and locally CLOSE the valve the last 10%.

C. fully closed. Hold the Control Room Hand Switch in the CLOSE position for an additional 10 seconds until the breaker trips on thermal overload.

D. 10% open. Open the breaker on Motor Control Center 2EB4-3 and locally CLOSE the valve the last 10%.

Proposed Answer: B Explanation:

A. Incorrect. Plausible if thought that this condition would fully close the valve.

B. Correct. Per the guidance in the SOP-501A, the valve remains 10% open when closed from the Control Room and must be closed locally once the valve is deenergized. The power supply for this ESF operated valve is MCC 2EB3-3.

C. Incorrect. Plausible if thought that this was the action necessary to fully close the valve.

D. Incorrect. Plausible because the valve does remain 10% open and the valve must be locally close the last 10%, however, the power supply for this ESF operated valve is MCC 2EB3-3.

Page 1 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Technical Reference(s) SOP-501A, Step 5.7.1.D, & Note Attached w/ Revision # See OP51.SYS.SW1.LN, Page 28 Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE the function and operating characteristics for the following Station Service Water System components:

  • SSW Pump Discharge Valve (OP51.SYS.SW1.OB05)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7, 8 55.43 Page 2 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 078 G 2.1.30 Importance Rating 4.4 Instrument Air System: Conduct of Operations: Ability to locate and operate components, including local controls Proposed Question: Common 27 Given the following conditions:

Steam Supply Valves, failed opened during a Loss of Instrument Air.

  • After two hours, Instrument Air pressure has been restored and TDAFW Pump shutdown is required.

Which of the following identifies where the valves will be operated from per ABN-301, Instrument Air System Malfunction?

HV-2452-1 and HV-2452-2, TDAFW Pump Steam Supply Valves, will be operated...

A. locally in the TDAFW Pump Room.

B. remotely from the Control Room.

C. remotely from the TDAFW Pump Room.

D. locally in the Main Steam Header Room.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because AFW flow to the Steam Generators would be locally controlled from the TDAFW Pump room.

B. Correct. Because restoration of TDAFWP is directed per SOP-304A by ABN-301.

C. Incorrect. Plausible because it could be thought that the local control panel in the TDAFW Pump Room has remote controls that are functional for the Main Steam Supply Valves.

D. Incorrect. Plausible if thought that the valves were AOVs or MOVs which could be locally controlled.

Technical Reference(s) ABN-301, Step 3.3.7.b Attached w/ Revision # See SOP-304A, Step 5.2.2.A Comments / Reference Proposed references to be provided during examination: None Page 3 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: IDENTIFY and ILLUSTRATE the Auxiliary Feedwater System design features which provide for the automatic starts, trips, permissives and interlocks associated with the following:

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 8, 10 55.43 Page 4 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 103 K3.02 Importance Rating 3.8 Containment System: Knowledge of the effect that a loss or malfunction of the Containment System will have on the following: Loss of containment integrity under normal conditions Proposed Question: Common 28 Which of the following would cause entry into the Limiting Condition for Operation for Containment Isolation Valves while in MODE 1?

A. Damage to the operator for 1-LCV-459, LTDN ISOL VLV which prohibits closure of the valve.

B. A galled stem on 1MS-0357, SG 1-03 BLDN DNSTRM ISOL VLV which will not allow the valve to be closed.

C. A large leak from the supply side of 1-8875B, ACCUM 2 N2 SPLY/VENT VLV which prohibits closure of the valve.

D. Damage to the stem for 1-HV-3487, CNTMT INST AIR ISOL which will not allow the valve to be closed.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because valve will not close and is part of the Letdown System, however, it is not a Containment Isolation Valve.

B. Incorrect. Plausible because valve will not close and is part of the SG Blowdown System, however, it is not a Containment Isolation Valve.

C. Incorrect. Plausible because the leak exists on an Accumulator Nitrogen Supply Valve, however, it is not a Containment Isolation Valve.

D. Correct. This is a Containment Isolation Valve that closes on a Phase A signal.

Technical Reference(s) Technical Specification LCO 3.6.3 Attached w/ Revision # See OP51.SYS.IA1.LN, Page 27 Comments / Reference Proposed references to be provided during examination: None Page 5 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: COMPARE and CONTRAST Phase A and Phase B isolation signals including types of valves utilized to perform each function and expected system and operator response following an actuation signal which provides incomplete isolation (OP51.SYS.CY1.OB20)

LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems:

  • Containment Isolation Valves 3.6.3 (OP51.SYS.CY1.OB32)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 9, 10 55.43 Page 6 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 071 K5.04 Importance Rating 2.5 Waste Gas Disposal System: Knowledge of the operational implications of the following concepts as they apply to the Waste Gas Disposal System: Relationship of hydrogen/oxygen concentration to flammability Proposed Question: Common 29 In accordance with RWS-201, Waste Gas Processing System, which of the following combinations of Oxygen and Hydrogen concentration (by volume) in the Waste Gas Holdup System would require immediate action to suspend all Waste Gas additions to the system?

O2% H2%

A. 2.7 3.2 B. 3.3 3.6 C. 3.5 3.8 D. 4.1 4.2 Proposed Answer: D Explanation:

A. Incorrect. Plausible because H2 exceeds 3%, however, O2 does not exceed 3%.

B. Incorrect. Plausible because O2 exceeds 3%, however, H2 does not exceed 4%.

C. Incorrect. Plausible because O2 exceeds 3%, however, H2 does not exceed 4%.

D. Correct. When O2 is equal to or greater than 3%, H2 cannot be greater than 4%.

Technical Reference(s) RWS-201, Section 4.1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE the basis for the precautions, limitations for following procedures associated with the Gaseous Waste Processing System:

  • RWS-201, Gaseous Waste Processing System (OP51.SYS.GH1.OB07)

ANALYZE the risk significance of any major component being out of service.

(OP51.SYS.GH1.OB11)

Page 7 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10, 12 55.43 Page 8 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 016 K1.02 Importance Rating 3.4 Non-Nuclear Instrumentation System: Knowledge of the physical connections and/or cause-effect relationships between the NNIS and the following systems: PZR LCS Proposed Question: Common 30 Given the following conditions:

  • A Reactor Startup is in progress.
  • As Reactor power enters the Power Range, Pressurizer Level and Level Setpoint begin to rise with no apparent change in Charging or Letdown flow.

Which of the following would cause this change to occur?

A. Input to the Pressurizer Level Control System from the Power Range Nuclear Instruments.

B. Main Steam header pressure lowering when the Point of Adding Heat is reached.

C. Increased Reactor Coolant System TAVE when the Point of Adding Heat is reached.

D. Pressurizer Heaters energizing when Steam Dumps throttle further open.

Proposed Answer: C Explanation:

A. Incorrect. Plausible if thought that Level Setpoint originated from a nuclear instrument as opposed to a temperature instrument.

B. Incorrect. Plausible because steam pressure does change, however, it rises not lowers.

C. Correct. When the Point of Adding Heat is reached, the RCS heats up and causes an expansion of liquid into the Pressurizer. Because the Level Setpoint is derived from temperature, it will also rise.

D. Incorrect. Plausible because Steam Dumps do open but not to the point were RCS pressure lowers far enough to cause PRZR Heaters to energize.

Technical Reference(s) OP51.SYS.PP1.LN, Pages 22 & 24 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE how the Pressurizer Pressure and Level Control System Main Control Board/Plant Computer controls, alarms and indications are used to predict, monitor and control changes in the system. (OP51.SYS.PP1.OB16)

Page 9 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5, 7 55.43 Page 10 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 035 G 2.1.7 Importance Rating 4.4 Steam Generator System: Conduct of Operations: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation Proposed Question: Common 31 Given the following conditions:

  • Unit 1 is at 28% power with all systems in normal alignment.
  • The Main Generator is synchronized to the grid.

Which of the following describes the response of Loop T, Steam Generator (SG) steam pressure in Loop 1 and the expected operator action?

Loop T A. rises and SG steam pressure rises; Turbine trip is required.

B. lowers and SG steam pressure rises; Reactor trip is required.

C. rises and SG steam pressure lowers; Turbine trip is required.

D. lowers and SG steam pressure lowers; Reactor trip is required.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because SG steam pressure rises, however, Loop T will lower.

B. Correct. In the affected loop, RCS T lowers to zero and SG steam pressure rises because heat removal is minimal. 1-ALB-7A, Window 1-12 requires a Reactor trip if an MSIV closes and power is

>5%.

C. Incorrect. Plausible because SG steam pressure could lower if the affected loop RCP had stopped, however, Loop T will lower.

D. Incorrect. Plausible because Loop T will lower and a Reactor trip is required, however, SG steam pressure will rise.

Technical Reference(s) LO21.MCO.TA9.LN, Page 11 Attached w/ Revision # See ALM-0071A, 1-ALB-7A, Window 1-12 Comments / Reference Proposed references to be provided during examination: None Page 11 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: DISCUSS a design loss of load accident and STATE the major concern following a Loss of Load accident and DESCRIBE the conclusions with respect to DNB and system integrity (LO21.MC0.TA9.OB01)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 3, 4, 5 55.43 Page 12 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 033 K3.01 Importance Rating 2.6 Spent Fuel Pool Cooling System: Knowledge of the effect that a loss or malfunction of the Spent Fuel Pool Cooling System will have on the following: Area ventilation systems Proposed Question: Common 32 Given the following conditions:

  • A loss of Spent Fuel Cooling in Spent Fuel Pool #2 is in progress.
  • The following PC-11, Digital Radiation Monitoring System monitors are in alarm:
  • SFP-002 LRAM SFP 2 N. WALL (X-RE-6273).
  • SFP-001 LRAM SFP 2 E. WALL (X-RE-6272).
  • ABN-908, Fuel Handling Accident, has been entered and all automatic and operator actions have been completed.

Which of the following identifies the ventilation alignment in the Fuel Building?

A. All Spent Fuel Pool ventilation is automatically stopped.

B. All Spent Fuel Pool ventilation is manually stopped.

C. One supply fan in Spent Fuel Pool X-02 is running.

D. One exhaust fan in Spent Fuel Pool X-02 is running.

Proposed Answer: D Explanation:

A. Incorrect. Plausible if thought that the Area Radiation Monitors automatically isolated ventilation.

B. Incorrect. Plausible if thought that all ventilation is left running to clean the air, however, only one exhaust fan is kept running to maintain a negative pressure in the Fuel Building.

C. Incorrect. Plausible if thought that this would maintain the correct pressure within the Fuel Building, however, it would tend to pressurize the Fuel Building and release radiation.

D. Correct. Leaving one exhaust fan running in the Spent Fuel Pool area is required per ABN-908.

Technical Reference(s) ABN-908, Step 3.3.3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 13 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationship between the Digital Radiation Monitoring System and the following systems, components or events:

  • Plant Ventilation (OP51.SYS.RM1.OB10)

EVALUATE the effect a loss of the Spent Fuel Pool Cooling and Cleanup System has on the following:

  • Area and ventilation radiation monitoring systems (OP51.SYS.SF1.OB17)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10, 12 55.43 Page 14 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 011 A1.02 Importance Rating 3.3 Pressurizer Level Control System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR LCS controls including: Charging and letdown flows Proposed Question: Common 33 Given the following conditions:

  • Unit 1 is at 48% power.
  • Pressurizer Level Control System is in AUTO.
  • 1-8106, Charging Pump to RCS Isolation Valve, fails closed due to a control switch circuit malfunction and cannot be reopened.
  • Letdown has been isolated.

Which of the following describes the response of Pressurizer level to this event?

Pressurizer level will.

A. stabilize when letdown is isolated.

B. lower at a rate equal to seal leakoff flow.

C. rise at a rate equal to seal injection flow.

D. rise at a rate equal to seal injection minus seal leakoff flow.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because seal injection is upstream of the isolation valves and seal leakoff is not isolated on this event, so the Pressurizer is NOT bottled up.

B. Incorrect. Plausible because seal leakoff is not isolated, however, neither is seal injection.

C. Incorrect. Plausible because seal injection flow is available with this failure, however, leak off flow must be included.

D. Correct. Seal Injection will provide makeup. Seal leakoff will be the only source of letdown for this event prior to any other actions.

Technical Reference(s) OP51.SYS.CS1.LN, Pages 58 & 88 Attached w/ Revision # See Comments / Reference Page 15 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationships between the CVCS and the following systems, components or events:

  • Interface between charging flow path and seal return flowpath (OP51.SYS.CS1.OB10)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Page 16 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 017 K6.01 Importance Rating 2.7 In-Core Temperature Monitor System: Knowledge of the effect of a loss or malfunction of the following ITM system components: Sensors and detectors Proposed Question: Common 34 Given the following conditions:

  • All failed CETs have been removed from active input to the Plant Computer.

Which of the following combinations of CETs meets the minimum requirements per OPT-112A-1, Accident Monitoring Instrumentation Check?

A. Two (2) Train A and two (2) Train B CETs per core quadrant.

B. Two (2) Train A or two (2) Train B CETs per core quadrant.

C. Four (4) Train A and four (4) Train B CETs per core quadrant.

D. Four (4) Train A or four (4) Train B CETs per core quadrant.

Proposed Answer: A Explanation:

A. Correct. OPT-112A-1 surveillance requires 2 CHANNELS with 2 CETs per quadrant.

B. Incorrect. Plausible because the CHANNELS required is correct, however, both Trains must be in service.

C. Incorrect. Plausible because both Trains must be in service, however, only 2 CETs each per quadrant are required.

D. Incorrect. Plausible if thought that this was the required number of CHANNELS on either Train.

Technical Reference(s) OPT-112A-1, Page 6 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the performance and design attributes of the following Core Cooling Monitor System/RVLIS components, flowpaths and features:

Page 17 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 2, 10 55.43 Page 18 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 002 K6.02 Importance Rating 3.6 Reactor Coolant System: Knowledge of the effect that a loss or malfunction of the following will have on the RCS: RCP Proposed Question: Common 35 Given the following conditions:

  • A Small Break Loss of Coolant Accident has occurred on Unit 1.
  • Containment pressure is 12 PSIG.

Which of the following is the reason for stopping the Reactor Coolant Pumps for these plant conditions?

To prevent...

A. core damage resulting from pump operation under forced two-phase flow conditions.

B. core damage resulting from phase separation upon subsequent loss of forced flow.

C. pump damage resulting from a loss of Component Cooling Water to the motor.

D. pump damage resulting from the adverse Containment environment.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because two-phase flow conditions will occur, however, it is the separation of phases when the Reactor Coolant Pumps are secured that is the concern.

B. Correct. Given the conditions listed, this is the reason the Reactor Coolant Pumps are stopped.

C. Incorrect. Plausible if thought that CCW would be lost for the conditions listed.

D. Incorrect. Plausible because an adverse Containment does exist, however, the concern is separation of phases upon subsequent loss of flow.

Technical Reference(s) EOP-1.0A, Attachment 4 Bases Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 19 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: DISCUSS the bases for all steps, Cautions and Notes included in EOP-1.0.

(LO21.ERG.E1A.OB105)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 20 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 086 K4.02 Importance Rating 3.0 Fire Protection System: Knowledge of Fire Protection System design feature(s) and/or interlock(s) which provide for the following: Maintenance of fire header pressure Proposed Question: Common 36 Given the following conditions:

  • A fire has been reported in the Auxiliary Building.
  • The Fire Brigade is using Hose Stations to fight the fire.

Which of the following describes the response of the Fire Pumps to decreasing fire header pressure?

A. Both Diesel Fire Pumps start 3 seconds after pressure drops below 142 PSIG, then the Electric Fire Pump starts 10 seconds after pressure drops below 140 PSIG.

B. The Electric Fire Pump starts 3 seconds after pressure drops below 142 PSIG, then one Diesel Fire Pump starts 10 seconds after pressure drops below 140 PSIG.

C. Both Diesel Fire Pumps start after pressure drops below 148 PSIG, then the Electric Fire Pump starts immediately at 142 PSIG.

D. The Electric Fire Pump starts after pressure drops below 148 PSIG, then one Diesel Fire Pump starts immediately at 142 PSIG.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because both Diesel Fire Pumps will start, however, not consistent with the times listed.

B. Correct. Per the guidance provided in SOP-904, this is the response of the Electric and Diesel Fire Pumps.

C. Incorrect. Plausible because both the Electric and Diesel Fire Pumps will start, however, not for the setpoints and sequence listed.

D. Incorrect. Plausible if thought that the Electric Fire Pump will start without delay after pressure drops below setpoint, however, the setpoint is incorrect and the Diesel Fire Pumps do not start until 140 PSIG.

Technical Reference(s) SOP-904, Section 4.2 Attached w/ Revision # See Page 21 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the functions, operation and interlocks of the following Fire Suppression components:

  • Electric Fire Pump & Diesel Fire Pumps (OP51.SYS.FP1.OB05)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 8 55.43 Page 22 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 041 A3.02 Importance Rating 3.3 Steam Dump/Turbine Bypass Control System: Ability to monitor automatic operation of the SDS, including: RCS pressure, RCS temperature, and reactor power Proposed Question: Common 37 Given the following conditions:

  • Unit 2 is operating at 60% power during ascension to 100% power.
  • The following parameters are observed:
  • TAVE = 575ºF.
  • Pressurizer Level = 44%.
  • 2-PT-505, Turbine Impulse Pressure = 55%.
  • Main Generator load = 700 MWe.
  • Subsequently, PT-505 fails to 0% which equates to a TREF of 557ºF.

Given the above conditions, which of the following identifies the status of the Steam Dump Valves and the indication on 2-UI-500, STM DMP DEMAND?

A. All valves CLOSED; 2-UI-500 indicates 100% demand.

B. All valves CLOSED; 2-UI-500 indicates 0% demand.

C. Group 1 valves full OPEN; 2-UI-500 indicates 50% demand.

D. Groups 1 and 2 valves full OPEN; 2-UI-500 indicates 100% demand.

Proposed Answer: A Explanation:

A. Correct. The Steam Dump Valves remain closed because the arming signal comes from PT-506.

B. Incorrect. Plausible if thought that the reference signal (TREF) lowering armed the dumps; however, PT-506 is the arming signal for C-7.

C. Incorrect. Plausible if thought that both groups only open on a plant trip vice a load rejection, however, no valves open as there is no arming signal.

D. Incorrect. Plausible if thought that the Steam Dumps are armed, the valves would be 100% open.

Technical Reference(s) ABN-709, Section 4.2 Attached w/ Revision # See Page 23 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 LO21.SYS.SD1.LN, Page 16 Comments / Reference Proposed references to be provided during examination: None Learning Objective: EVALUATE the affect a loss of the following systems has on the Steam Dump system:

  • Tref (Turbine Impulse Pressure) OP51.SYS.SD1.OB15)

Question Source: Bank #

Modified Bank # CPNPP LXR (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7, 8 55.43 Page 24 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 068 A4.04 Importance Rating 3.8 Liquid Radwaste System: Ability to manually operate and/or monitor in the control room: Automatic isolation Proposed Question: Common 38 Which of the following will cause an AUTO closure of X-RV-5253, Liquid Waste Processing System Discharge Isolation Valve while a release is in progress?

A. PC-11 channel not responding to POLL (MAGENTA).

B. Only 2 of 4 Circulating Water Pumps running on associated Unit.

C. PC-11 channel in ALERT alarm (YELLOW).

D. Loss of counts on X-RE-5253, Liquid Effluent Radiation Monitor.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because it could be thought that a monitor not responding to POLL would be INOPERABLE.

B. Incorrect. Plausible because Circulating Water Pumps must be running for the valve to remain open, however, a 2 of 4 coincidence allows release to Unit aligned for discharge.

C. Incorrect. Plausible because radiation level has increased, however, it requires a high radiation level alarm to close X-RV-5253.

D. Correct. A loss of counts on the Liquid Effluent Radiation Monitor will trip X-RV-5253 (OPERATE FAILURE).

Technical Reference(s) OP51.SYS.RM1.LN, Page 39 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the functions, operation and interlocks of the following Liquid Waste Processing System components:

  • X-RE-5253 (OP51. SYS.WP1.OB02)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Page 25 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 11, 13 55.43 Page 26 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 008 AK2.02 Importance Rating 2.7 Pressurizer Vapor Space Accident: Knowledge of the interrelations between the Pressurizer Vapor Space Accident and the following: Sensors and detectors Proposed Question: Common 39 Given the following conditions:

  • A Loss of Coolant Accident is in progress.
  • Subcooled Margin is 2ºF superheat and becoming more superheated.
  • A cooldown is in progress using the Steam Dump System.
  • Containment pressure is 4 PSIG and slowly rising.
  • Pressurizer level is 12% and rising.
  • All Safety Systems have actuated properly.
  • Reactor Vessel Level Indication System Indication: Top 2 lights are DARK and bottom 6 lights are LIT.

Which of the following describes the location of the Reactor Coolant System leak and the status of Reactor Coolant System Inventory?

A. The leak is on the Upper Reactor Head.

Reactor Coolant System Inventory is lowering.

B. The leak is on a Reactor Coolant System Hot Leg.

Reactor Coolant System Inventory is rising.

C. The leak is on the bottom of the Reactor Vessel.

Reactor Coolant System Inventory is rising.

D. The leak is on the steam space of the Pressurizer.

Reactor Coolant System Inventory is lowering.

Proposed Answer: D Page 27 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because it could be thought that the leak on the upper head would cause voiding in the head and lead to increasing level and inventory is decreasing, however, as the inventory leaves the head the Pressurizer level will drop and saturated water in the Pressurizer will flash to steam to try and maintain pressure.

B. Incorrect. Plausible because it could be thought that rising Pressurizer level was indicating that Reactor Coolant Inventory was increasing, however, as the water leaves the Hot Leg it is replaced by a loss of level in the Pressurizer and saturated water in the Pressurizer will flash to steam to try and maintain pressure. Also with pressure and subcooling still dropping then inventory is still lowering.

C. Incorrect. Plausible because it could be thought that the leak on the lower head could lower inventory in the vessel and reach saturation and cause voiding under the head, however, as the inventory leaves the head the Pressurizer level will drop and saturated water in the Pressurizer will flash to steam to try and maintain pressure. Also with pressure and subcooling still dropping then inventory is still decreasing.

D. Correct. A leak in the Pressurizer steam space results in a loss of subcooling in the Pressurizer and when pressure drops to the saturation temperature in the upper head then a void will start forming and Pressurizer level will increase. With subcooling and pressure continuing to lower, inventory is lowering.

Technical Reference(s) LO21.MCO.TAA.LN, Pages 11 & 12 Attached w/ Revision # See LO21.MCO.TAA.LN, Pages 21 & 22 Comments / Reference EOP-1.0A, Attachment 4, Step 6 Proposed references to be provided during examination: None Learning Objective: DISCUSS the bases for all Steps, Cautions, and Notes included in EOP-1.0.

(LO21.ERG.E1A.OB105)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 3, 5 55.43 Page 28 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 009 G 2.1.27 Importance Rating 3.9 Small Break LOCA: Conduct of Operations: Knowledge of system purpose and/or function Proposed Question: Common 40 Given the following conditions:

  • A Loss of Coolant Accident has occurred.

Which of the following describes the status of operating Emergency Core Cooling System equipment?

A. Centrifugal Charging Pump Safety Injection flow is stable.

Safety Injection Pump discharge flow is rising.

Safety Injection Accumulator level is stable.

Residual Heat Removal injection flow is rising.

B. Centrifugal Charging Pump Safety Injection flow is rising.

Safety Injection Pump discharge flow is rising.

Safety Injection Accumulator level is stable.

Residual Heat Removal injection flow is zero.

C. Centrifugal Charging Pump Safety Injection flow is stable.

Safety Injection Pump discharge flow is zero.

Safety Injection Accumulator level is lowering.

Residual Heat Removal injection flow is zero.

D. Centrifugal Charging Pump Safety Injection flow is rising.

Safety Injection Pump discharge flow is zero.

Safety Injection Accumulator level is lowering.

Residual Heat Removal injection flow is rising.

Proposed Answer: B Page 29 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because there is CCP SI flow and SI Pump flow is rising, however, RCS pressure is lowering which will cause CCP Pump flow to rise while still above the shutoff head of the RHR Pumps.

B. Correct. Given the pressure of the Reactor Coolant System, this is the operating condition of the ECCS Pumps and Accumulator.

C. Incorrect. Plausible because there is CCP SI flow however, RCS pressure is below the shutoff head of the SI Pumps and above that of the RHR Pumps and the SI Accumulator would not be injecting at this pressure.

D. Incorrect. Plausible because CCP SI flow is rising, however, RCS pressure is below the shutoff head of the SI Pumps and the SI Accumulator and RHR Pumps would not be injecting.

Technical Reference(s) OP51.SYS.SI1.LN, Pages 27, 30, 35 & 41 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE the normal capacities, the sources of water, and the approximate flow rates of emergency core cooling components as RCS pressure decreases following a LOCA, include shutoff head values. (OP51.SYS.SI1.OB13)

Question Source: Bank #

Modified Bank # CPNPP LXR (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7, 14 55.43 Page 30 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 015 AK2.10 Importance Rating 2.8 RCP Malfunctions: Knowledge of the interrelations between the Reactor Coolant Pump Malfunctions (Loss of RC Flow) and the following: RCP indicators and controls Proposed Question: Common 41 Given the following conditions:

  • Unit 1 is at 70% power.

Time Shaft Frame 0130 14.7 mils 3.25 mils 0200 15.0 mils 3.30 mils 0230 15.2 mils 3.52 mils 0300 15.5 mils 3.73 mils 0330 15.9 mils 3.75 mils 0400 17.7 mils 3.85 mils Which of the following states the earliest time that RCP trip criteria were exceeded?

A. 0200 B. 0230 C. 0300 D. 0330 Proposed Answer: B Page 31 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because shaft is greater than 15 mils and frame is greater than 3 mils, however, shaft vibration must be increasing at greater than 1 mil/hr and frame vibration must be increasing at greater than 0.2 mils/hr.

B. Correct. Frame vibration was greater than 3 mils/hr and has risen greater than 0.2 mils/hour.

C. Incorrect. Plausible because shaft vibration is greater than 15 mils, frame vibration is greater than 3 and rate is greater than 0.2 mils/hr, however, it is not the earliest time.

D. Incorrect. Plausible because the shaft and frame rates have been excessive for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, however, it is not the earliest time.

Technical Reference(s) ABN-101, Step 6.3.1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Reactor Coolant System for:

Question Source: Bank #

Modified Bank # CPNPP LXR (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 3, 10 55.43 Page 32 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Comments /

Reference:

From CPNPP LXR Exam Bank Revision # 03/22/07 Given the following conditions:

  • Unit 1 is at 85% power.

Time Shaft Frame 0330 14.7 mils 2.65 mils 0400 15.0 mils 2.70 mils 0430 15.2 mils 2.72 mils 0500 15.5 mils 2.73 mils 0530 16.9 mils 3.05 mils 0600 17.7 mils 3.15 mils Which of the following states the earliest time that RCP trip criteria were exceeded?

A. 0430 B. 0500 C. 0530 D. 0600 Page 33 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 022 AA2.01 Importance Rating 3.2 Loss of Reactor Coolant Makeup: Ability to determine and interpret the following as they apply to the Loss of Reactor Coolant Makeup: Whether charging line leak exists Proposed Question: Common 42 Given the following conditions:

  • Unit 1 is at 100% power and all system alignments are normal.
  • 1-ALB-5C, Window 1.2 - PRZR LVL DEV LO.
  • 1-ALB-6A, Window 1.4 - REGEN HX LTDN OUT TEMP HI.
  • 1-ALB-2A, Window 2.8 - ANY CNTMT SMP PUMP RUN.
  • Pressurizer level is 56% and slowly lowering.
  • TCV-129, Letdown Demineralizer Bypass Valve, is in the VCT position.
  • FCV-121, Charging Pump Control Valve, is full open.
  • FI-121A, Charging Flow Meter, indicates 175 GPM and slowly rising.

Which of the following identifies the location of the leak? (Drawing attached)

The leak is located in the...

A. Charging line between 1/1-8105, Containment Isolation Valve and Regenerative Heat Exchanger.

B. Letdown line between 1/1-8117, Letdown Relief Valve and Regenerative Heat Exchanger.

C. Charging line between 1/1-8106, Charging Line Isolation Valve and 1/1-HCV-182, Charging Line Flow Control Valve.

D. Letdown line between 1/1-8152, Containment Isolation Valve and Letdown Heat Exchanger.

Proposed Answer: A Page 34 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. With Pressurizer level lowering, a Containment Sump Pump running, and a Letdown Heat Exchanger outlet high temperature alarm the leak is located between the Charging Line Isolation Valve and the Regenerative Heat Exchanger.

B. Incorrect. Plausible because a Containment Sump Pump is running and Letdown Heat Exchanger outlet temperature is high which is indicative of a high flow rate, however, if this were the location of the leak Charging flow would exceed Letdown flow and a Pressurizer level deviation HI alarm would be received.

C. Incorrect. Plausible because Pressurizer level is lowering and Letdown Heat Exchanger outlet temperature is rising, however, a Containment Sump Pump is running which is indicative of a leak inside Containment.

D. Incorrect. Plausible because Letdown Heat Exchanger outlet temperature is high, however, if this were the location of the leak Pressurizer level deviation would be high and a Containment Sump Pump would not be running.

Technical Reference(s) ABN-105, Section 2.0 Attached w/ Revision # See OP51.SYS.CS1.FG02 Comments / Reference Proposed references to be provided during examination: OP51.SYS.CS1.FG02 Learning Objective: ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Chemical and Volume Control System, both initial and subsequent, for:

  • ABN-105, Chemical and Volume Control System Malfunctions (OP51.SYS.CS1.OB20)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 3, 5, 7 55.43 Page 35 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 025 G 2.4.9 Importance Rating 3.8 Loss of RHR System: Emergency Procedures/Plan: Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies Proposed Question: Common 43 Given the following conditions:

  • Unit 1 is operating in Reduced Inventory.

Which of the following describes the role of a Hot Leg vent path in mitigating the consequences of a loss of Residual Heat Removal cooling?

A. WITH the Hot Leg vent path, the core heatup and pressurization of the Reactor Coolant will force water out of the Hot Leg and cool the core.

B. WITHOUT the Hot Leg vent path, the core heatup could pressurize the Reactor Coolant causing core uncovery by forcing water out the Cold Leg.

C. WITH the Hot Leg vent path, the time required for the Reactor Coolant to reach saturation conditions in the Reactor Vessel is extended.

D. WITHOUT the Hot Leg vent path, the core heatup could pressurize the Reactor Coolant applying excessive stress at the Reactor Vessel Flange.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because a loss of RHR will cause a heatup, but the RCS should not pressurize with a Hot Leg vent path.

B. Correct. When a Cold Leg opening exists without an adequate Hot Leg vent path, subsequent pressurization of the RCS following a loss of RHR could force water from the core and out the Cold Leg opening. Once water level is below the fuel, the risk of sustaining core damage is substantially increased.

C. Incorrect. Plausible because a major concern when in Reduced Inventory Operations is time to reach saturation conditions, however, providing a Hot Leg vent path will maintain a lower pressure in the RCS and therefore result in a lower saturation temperature and shorter time to core boiling.

D. Incorrect. Plausible because the RCS would pressurize without a Hot Leg vent path, however, Page 36 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 stresses on the Vessel Flange due to the pressure are minimal compared to full pressure conditions.

Technical Reference(s) IPO-010A, Step 3.1.4 Attached w/ Revision # See IPO-010A, Step 5.1.26 Caution Comments / Reference IPO-010A, Attachment 15 Proposed references to be provided during examination: None Learning Objective: Given a specific set of system conditions, PREDICT system and instrumentation response. (OPD1.IPO.XO0.OB09)

SUMMARIZE the major action steps for each of the sections of IPO-010 considering the following:

  • RHR support system requirements (OPD1.IPO.XO0.OB06)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 5, 10 55.43 Page 37 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 026 AA2.02 Importance Rating 2.9 Loss of Component Cooling Water: Ability to determine and interpret the following as they apply to the Loss of Component Cooling Water: The cause of possible CCW loss Proposed Question: Common 44 Given the following conditions on Unit 2:

  • Component Cooling Water Pumps 2-01 and 2-02 are in service.
  • Component Cooling Water Surge Tank Level is lowering with the following Annunciators in alarm:
  • 2-ALB-3B, Window 2.4 - CCW SRG TK TRN A LVL HI-HI/LO.
  • 2-ALB-3B, Window 1.3 - CCW SRG TK TRN A/B LVL LO-LO.
  • Component Cooling Water Surge Tank levels are slowly lowering on each compartment.

Per ABN-502, Component Cooling Water System Malfunctions, which of the following describes the operator actions that would identify the leak source?

CLOSE the...

A. Non-Safeguards Loop Isolation Valves and monitor Tank compartment levels.

Leak is on the side that continues to fall below 37% with the other side stable.

B. Non-Safeguards Loop Isolation Valves and monitor Tank compartment levels.

Leak is on the side that continues to fall below 58% with the other side stable.

C. Safeguards Loop Supply and Return Isolation Valves one Train at a time and monitor Tank compartment levels.

Leak is on the side that continues to fall below 37% with the other side stable.

D. Safeguards Loop Supply and Return Isolation Valves one Train at a time and monitor Tank compartment levels.

Leak is on the side that continues to fall below 58% with the other side stable.

Proposed Answer: C Page 38 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible if thought that with both compartments lowering, the source must be the common piping and the methodology would identify a leak on the Non-Safeguards header, however, the isolation of Reactor Coolant Pump cooling should not be performed if other procedurally specified lineups are available.

B. Incorrect. Plausible because it could be thought that with both compartments lowering, the source must be the common piping and the methodology would identify a leak on the Non-Safeguards header, however, the tanks are common until 37% level on Unit 2 which is where the partition plate starts.

C. Correct. The tank is common above 37% on Unit 2 and the leak cannot be identified using this methodology until level reaches 37%. This is the procedurally specified method.

D. Incorrect. Plausible because the tank is common above 58% on Unit 1 and the leak cannot be identified using this methodology until level reaches 58%. This is the procedurally specified method but the wrong Unit.

Technical Reference(s) ABN-502, Steps 3.3.1 Note & 3.3.5 Attached w/ Revision # See OP5.1.SYS.CC1.LN, Figure 1 Comments / Reference ALM-0032B, 2-ALB-3B, Windows 1.3 & 2.4 Proposed references to be provided during examination: None Learning Objective: ANALYZE the indications and DESCRIBE the mitigation strategy for the following procedures as they affect the Component Cooling Water system:

  • ABN-502, Component Cooling Water System Malfunctions (OP51.SYS.CC1.OB21)

DESCRIBE any unit differences between the Unit 1 and Unit 2 Component Cooling Water System or components. (OP51.SYS.CC1.OB15)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam CPNPP 2010 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7, 8, 10 55.43 Page 39 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 027 AA1.01 Importance Rating 4.0 Pressurizer Pressure Control Malfunction: Ability to operate and/or monitor the following as they apply to the Pressurizer Pressure Control Malfunction: PZR heaters, sprays, and PORVs Proposed Question: Common 45 Given the following conditions:

  • The Unit is at 100% power.
  • Pressurizer Pressure is 2235 PSIG and stable.
  • Handswitch PS-455F, PRZR PRESS CTRL CHAN SELECT is in the 455/456 position.
  • PT-455A, Pressurizer Pressure Control Channel fails high.

Assuming NO operator action, which of the following would be the PROGRESSION of events in the primary system (including Pressurizer Pressure Control System response), following the instrument failure?

1. Both PRZR Spray Valves (PCV-455B and PCV-455C) CLOSE.
2. Both PRZR Spray Valves (PCV-455B and PCV-455C) OPEN.
3. PORV PCV-455A OPENS.
4. PORV PCV-456 OPENS.
5. PORVs PCV-455A CLOSES.
6. PORVs PCV-456 CLOSES.
7. Reactor Trip on low Pressurizer pressure.
8. Reactor Trip on high Pressurizer pressure.

A. 1, 3, 4, 8 B. 2, 3, 5, 7 C. 3, 1, 6, 8 D. 4, 2, 5, 7 Proposed Answer: B Page 40 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because PORV PCV-455A will open, however, the Spray Valves will open and only PORV PCV-456 would remain closed.

B. Correct. Given Pressurizer pressure setpoint prior to the Control Channel failing high, the sequence of events is as listed.

C. Incorrect. Plausible because PORV PCV-455A will open, however, the Spray Valves will open not close, the Reactor will trip on low pressure not high pressure.

D. Incorrect. Plausible because the spray valves open, the Reactor trips on low pressure and PORV PCV-455A will close, however, not in the order listed and PORV PCV-456 remains closed.

Technical Reference(s) ABN-705, Step 2.2.a Attached w/ Revision # See OP51.SYS.PP1, Figure 5 & Slide 58 Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the Pressurizer Pressure and Level Control System design features which provide for the trips, permissives and interlocks associated with the following:

  • PRZR PORVS Open Interlock in AUTO.

ANALYZE the indications and DESCRIBE the mitigation strategy for the following procedures as they affect the Pressurizer Pressure and Level Control system:

  • ABN-705, Pressurizer Pressure Malfunction (OP51.SYS.PP1.OB14)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Page 41 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 029 EK2.06 Importance Rating 2.9 ATWS: Knowledge of the interrelations between the following and an ATWS: Breakers, relays, and disconnects Proposed Question: Common 46 Given the following conditions:

  • The Reactor does NOT trip from the AUTOMATIC signal.

Which of the following describes the condition that has contributed to the Reactor Trip failure?

Reactor Trip...

A. Breaker "B" Undervoltage Trip coil failed to energize.

B. Bypass Breaker "A" Undervoltage Trip coil failed to deenergize.

C. Bypass Breaker "A" Shunt Trip coil failed to energize.

D. Breaker "B" Shunt Trip coil failed to deenergize.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because Breaker "B" is equipped with an undervoltage trip coil, however, trip coils are normally energized and deenergize on a trip signal.

B. Correct. Given the conditions listed, the Bypass Breaker Undervoltage Trip coil failed to deenergize.

C. Incorrect. Plausible because the Shunt Trip coil is designed to energize and trip open the breaker, however, Bypass Breaker "A" is not equipped with a Shunt Trip.

D. Incorrect. Plausible because Breaker B is equipped with a Shunt Trip coil, however, it energizes to trip.

Technical Reference(s) OP51.SYS.ES1.LN, Page 35 & Figure 1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 42 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: STATE the performance and design attributes of the following Solid State Protection System components, flow paths, and features:

DRAW a basic one line diagram of the reactor trip and bypass breaker configuration and EXPLAIN the operation of the reactor trip and bypass breakers, the undervoltage trip coil, the shunt trip coil, and the auto shunt trip coil and DESCRIBE switchgear response to a manual or automatic reactor trip signal. (OP51.SYS.ES2.OB05)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 6 55.43 Page 43 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 038 EA1.01 Importance Rating 4.5 Steam Generator Tube Rupture: Ability to operate and/or monitor the following as they apply to a Steam Generator Tube Rupture: SG levels, for abnormal increase in any SG Proposed Question: Common 47 Given the following condition:

Which of the following guidance is provided for this situation?

A. Close Blowdown Isolation Valves from all Steam Generators.

B. Isolate all Steam Generators prior to identifying the ruptured SG.

C. Do NOT isolate any Steam Generator until ruptured SG identified.

D. Close Auxiliary Feedwater Flow Control Valves to all Steam Generators.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because this action would be performed if the ruptured Steam Generator was identified at Step 3.

B. Incorrect. Plausible because this action would be performed if the ruptured Steam Generator was identified at Step 3 and its associated MSIV could not be closed per the RNO column.

C. Correct. In this condition, the RNO column directs performance of Steps 7 through 15 in an attempt to identify the ruptured Steam Generator.

D. Incorrect. Plausible if thought that isolating Auxiliary Feedwater flow would help identify the ruptured Steam Generator, however, this action violates minimum feedwater requirements.

Technical Reference(s) EOP-3.0A, Steps 2, 3, & 7 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given a procedural step, or sequence of steps from EOP-3.0, STATE the purpose/bases for the step(s). (LO21.ERG.E3A.OB103)

Page 44 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Page 45 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 040 AK1.06 Importance Rating 3.7 Steam Line Rupture: Knowledge of the operational implications of the following concepts as they apply to the Steam Line Rupture: High energy steam line break considerations Proposed Question: Common 48 How would the accuracy of the Steam Generator narrow range level indication be affected following a high energy line break inside Containment?

A. Expected to consistently indicate higher than actual.

B. Environmental conditions do not affect indicated level.

C. Expected to consistently indicate lower than actual.

D. Indicated level is erratic, but accuracy is not affected.

Proposed Answer: A Explanation:

A. Correct. When the reference leg flashes indicated level will be consistently higher than actual level.

B. Incorrect. Plausible if thought that there were no significant effects on Steam Generator level during a high energy line break.

C. Incorrect. Plausible because reference leg flashing doesn't lower level in the reference leg, however, this results in indicated level being higher than actual level.

D. Incorrect. Plausible because the Note prior to Step 1 reminds the operator to use the correct level indication due to temperature induced errors. Additionally, not only does reference leg flashing create an indicated level that is erratic but also impacts Steam Generator level accuracy.

Technical Reference(s) EOP-1.0A, Step 1 Caution Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DISCUSS the bases for all steps, Cautions and Notes included in EOP-1.0.

(LO21.ERG.E1A.OB105)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Page 46 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 5 55.43 Page 47 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # W/E12 EK3.1 Importance Rating 3.5 Uncontrolled Depressurization of All Steam Generators: Knowledge of the reasons for the following responses as they apply to the Uncontrolled Depressurization of All Steam Generators: Facility operating characteristics during transient conditions, including coolant chemistry and the effects of temperature, pressure, and reactivity changes and operating limitations and reasons for these operating characteristics Proposed Question: Common 49 Given the following conditions:

  • ECA-2.1A, Uncontrolled Depressurization of All Steam Generators, is in progress on Unit 1 following a Loss of Offsite Power.

Which of the following describes the expected plant response to the AFW flow reduction and what actions are to be taken as SG pressures decrease?

A. RCS Hot Leg temperatures will eventually increase as a result of a loss of Natural Circulation. Raise AFW flow while continuing in ECA-2.1A, Uncontrolled Depressurization of All Steam Generators.

B. RCS Hot Leg temperatures will eventually increase as a result of a loss of Natural Circulation, Raise AFW flow and transition to FRH-0.1A, Response to Loss of Secondary Heat Sink.

C. The SGs will eventually become completely depressurized due to inadequate secondary heat sink. A transition to EOP-2.0A, Faulted Steam Generator Isolation, is required.

D. The SGs will eventually become completely depressurized due to inadequate secondary heat sink. A transition to FRH-0.1A, Response to Loss of Secondary Heat Sink, is required.

Proposed Answer: A Page 48 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. When AFW flow is reduced to 100 GPM, eventually Hot Leg temperatures will rise when SG inventory is depleted. AFW flow is raised to restore Natural Circulation.

B. Incorrect. Plausible because Hot Leg temperatures will begin to increase as SG inventory lowers, however, FRH-0.1A conditions are not met because the AFW flow reduction was controlled by the crew.

C. Incorrect. Plausible because the SGs depressurize as long as they are faulted, however, transition to EOP-2.0A is only performed when one Steam Generator re-pressurizes.

D. Incorrect. Plausible because the SGs depressurize as long as they are faulted, however, ECA-2.1 must be performed to completion unless a SG is isolated or tubes rupture.

Technical Reference(s) ECA-2.1A, Step 2 Attached w/ Revision # See ECA-2.1A, Attachment 4, Step 33 Bases Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given a major action step of ECA-2.1, STATE the basis for all actions taken.

(LO21.ERG.C21.OB03)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5, 10 55.43 Page 49 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 054 AA2.02 Importance Rating 4.1 Loss of Main Feedwater: Ability to determine and interpret the following as they apply to the Loss of Main Feedwater:

Differentiation between loss of all MFW and trip of one MFW pump Proposed Question: Common 50 Given the following condition:

  • Unit 2 is at 100% power.

What effect would actuation of Train A Safety Injection have on the Main Feedwater Pumps?

A. Both Main Feedwater Pumps run until tripped by P-4, Reactor Trip.

B. Both Main Feedwater Pumps trip when the Safety Injection occurs.

C. Main Feedwater Pump 2-01 trips due to the Safety Injection Signal.

Main Feedwater Pump 2-02 is tripped by P-4, Reactor Trip.

D. Main Feedwater Pump 2-01 trips due to the Safety Injection Signal.

Main Feedwater Pump 2-02 continues to run.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because P-4 will generate a Feedwater Isolation Signal if TAVE is below the low TAVE setpoint of 564ºF.

B. Correct. Either Train of Safety Injection will trip both Main Feedwater Pumps.

C. Incorrect. Plausible because the Train A related Main Feedwater Pump trip and the Train B related Main Feedwater Pump trips when the interlocks associated with P-4 actuated.

D. Incorrect. Plausible if thought that Train separation existed to trip each of the Main Feedwater Pumps.

Technical Reference(s) OP51.SYS.MF1.LN, Pages 43 & 46 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and EXPLAIN the Main Feedwater System design features which provide for the trips, permissives, and interlocks associated with the following:

Page 50 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5

  • Safety Injection (OP51.SYS.MF1.OB11)

Question Source: Bank #

Modified Bank # CPNPP LXR (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 4, 7 55.43 Page 51 of 51 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 055 EK3.02 Importance Rating 4.3 Station Blackout: Knowledge of the reasons for the following responses as they apply to the Station Blackout: Actions contained in EOP for loss of offsite and onsite power Proposed Question: Common 51 Which of the following describes the reasons for depressurizing the Steam Generators to 270 PSIG in accordance with ECA-0.0A, Loss of All AC Power?

A. Initiates Safety Injection System Accumulator discharge and minimize Reactor Coolant Pump seal leakage.

B. Establishes Natural Circulation conditions and initiates Safety Injection System Accumulator discharge.

C. Establishes Natural Circulation conditions and minimizes secondary heat sink requirements if Auxiliary Feedwater inventory is limited.

D. Minimizes secondary heat sink requirements if Auxiliary Feed inventory is limited and minimizes RCP seal leakage.

Proposed Answer: A Explanation:

A. Correct. Lowering RCS pressure and restoring lost inventory is the reason for depressurizing.

B. Incorrect. Plausible because RCS depressurization will assist Natural Circulation, but is not the reason for depressurization to 270 PSIG.

C. Incorrect. Plausible because Natural Circulation will be established as a byproduct of rapid depressurization. Rapid cooldown and depressurization due to limited AFW is an action that could be taken in E-3 series procedures.

D. Incorrect. Plausible because in E-3 series procedures, rapid secondary depressurizations may be performed when there is limited makeup availability.

Technical Reference(s) ECA-0.0A, Step 18 Attached w/ Revision # See ECA-0.0A, Attachment 7, Step 18 & Bases Comments / Reference Proposed references to be provided during examination: None Learning Objective: DESCRIBE the major action taken by the operator during a loss of all AC power to increase the time to core uncovery. (LO21.ERG.C00.OB05)

Given a procedural step, or sequence of steps from ECA-0.1, STATE the purpose/basis for the step(s). (LO21.ERG.C00.OB15)

Page 1 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5, 10 55.43 Page 2 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 057 AA1.03 Importance Rating 3.6 Loss of Vital AC Instrument Bus: Ability to determine and interpret the following as they apply to the Loss of Vital AC Instrument Bus: Feedwater pump speed to control pressure and level in SG Proposed Question: Common 52 Given the following conditions:

  • Unit 2 is at 80% power with all controls in AUTO.
  • All Feedwater Flow Control Valves are opening.
  • NO operator actions have occurred.

Which of the following has occurred?

A. 2-FT-512A, SG 1 STM FLO failed high.

B. 2-LT-551, SG 1 LVL (NR) CHAN 1 failed high.

C. 2-PT-507, MS HDR PRESS failed low.

D. 2-PT-508, FWP DISCH HDR PRESS failed low.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because if SG 1 STM FLO failed low Main Feedwater Pump speed would lower and the conditions listed would be the same.

B. Incorrect. Plausible because when SG 1 LVL CHAN 1 fails high, the Steam Generator 1-01 Feedwater Flow Control Valve would open, however, for the conditions listed each Steam Generator would have to have a level channel failure. Additionally, opening of the FWCV would cause P to lower which would increase Main Feedwater Pump speed.

C. Correct. When Main Steam Header pressure fails low due to a Loss of Vital Instrument Bus supplied power, the Feedwater System would sense a high P and would lower Main Feedwater Pump speed. Feedwater Flow Control Valves open in an attempt to maintain level consistent with the conditions listed.

D. Incorrect. Plausible because if Feedwater Pump Discharge Header Pressure failed high Main Feedwater Pump speed would lower and the conditions listed would be the same.

Page 3 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Technical Reference(s) ABN-603, Attachments 1 & 2 Attached w/ Revision # See ABN-709, Steps 3.1 & 3.2 Comments / Reference ABN-709, Steps 5.1 & 5.2 ABN-707, Steps 2.1 & 2.2 ABN-710, Steps 2.1 & 2.2 Proposed references to be provided during examination: None Learning Objective: DESCRIBE the impact of the following malfunctions on operation of the Steam Generator Water Level Control System:

  • Steam pressure transmitter (OP51.SYS.SN1.OB10)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5, 7 55.43 Page 4 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 062 AA2.04 Importance Rating 2.5 Loss of Nuclear Service Water: Ability to determine and interpret the following as they apply to the Loss of Nuclear Service Water: The normal values and upper limits for the temperatures of the components cooled by SWS Proposed Question: Common 53 Given the following conditions:

  • Unit 1 is at 100% power.
  • SSW Pump 1-02 discharge flow lowers to zero (0) GPM.
  • Train A and Train B Component Cooling Water (CCW) Heat Exchanger outlet temperatures are 125ºF and rising.

Which of the following describes the actions required per ABN-501, Station Service Water Malfunction?

Trip the...

A. CCW Pumps only.

B. Reactor and CCW Pumps only.

C. Reactor and Reactor Coolant Pumps only.

D. CCW Pumps, Reactor, and Reactor Coolant Pumps.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because the CCW Pumps are stopped, however, the Reactor would be tripped and RCPs are secured.

B. Incorrect. Plausible because the Reactor is tripped and the RCPs are stopped, however, the CCW Pumps would also be secured.

C. Incorrect. Plausible because the Reactor and RCPs are tripped, however, the CCW Pumps would also be secured.

D. Correct. When CCW Heat Exchanger outlet temperatures exceed 122ºF, the CCW Pumps are stopped, Reactor tripped, and RCPs secured per the RNO action of ABN-501.

Page 5 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Technical Reference(s) ABN-501, Step 5.3.6 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: EXPLAIN the reasons for the following responses as they apply to a SSW /

CCW malfunction:

  • Reactor and/or Turbine trip, manual and automatic (LO21.ABN.501.OB03)

DESCRIBE the function and operation of systems, components, and controls required to be operated in response to a SSW / CCW malfunction.

(LO21.ABN.501.OB05)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 8, 10 55.43 Page 6 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 065 G 2.4.4 Importance Rating 4.5 Loss of Instrument Air: Emergency Procedures / Plan: Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures Proposed Question: Common 54 Given the following conditions:

  • Unit 1 is at 100% power.
  • A major break in the Instrument Air System has occurred.
  • ABN-301, Instrument Air System Malfunction, is being implemented.
  • All available Air Compressors are running.

Which of the following describes required actions for this condition?

A. Continue efforts to restore Instrument Air pressure and simultaneously initiate a Manual Turbine Runback per ABN-302, Feedwater, Condensate, Heater Drain System Malfunction.

B. Trip the Reactor and enter EOP-0.0A, Reactor Trip or Safety Injection. Continue in ABN-301, Instrument Air System Malfunction, and take actions to control Charging flow locally.

C. Align the Unit Instrument Air Cross-tie to assist in pressure recovery. If loss of air operated valve control is observed, trip the Reactor and enter EOP-0.0A, Reactor Trip or Safety Injection.

D. Continue efforts to restore Instrument Air pressure per ABN-301, Instrument Air System Malfunction, and when pressure reaches 25 PSIG, trip the Reactor and enter EOP-0.0A, Reactor Trip or Safety Injection.

Proposed Answer: B Page 7 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because loss of Instrument Air has a significant impact on the secondary plant and it could be thought that rapidly reducing power would minimize the effects, however, ABN-301 requires a Unit trip when pressure reaches 35 PSIG.

B. Correct. ABN-301, Instrument Air Malfunction, requires a Unit trip when pressure reaches 35 PSIG. The EOP is entered but the actions of ABN-301, Instrument Air Malfunction are still performed which includes local control of Charging flow due to failed open valves.

C. Incorrect. Plausible if thought that the only trip criteria was loss of air operated valve control and that would be the proper actions until loss of control was observed, however, ABN-301 requires a Unit trip when pressure reaches 35 PSIG.

D. Incorrect. Plausible if thought that the pressure criteria for tripping was 25 PSIG and the actions to trip at that point would be correct.

Technical Reference(s) ABN-301, Steps 5, 7, & 14 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: EVALUATE all system limitations and precautions associated with responding to Instrument Air System malfunctions. (LO21.ABN.301.OB06)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5, 10 55.43 Page 8 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # W/E04 EK1.1 Importance Rating 3.5 LOCA Outside Containment: Knowledge of the operational implications of the following concepts as they apply to the LOCA Outside Containment: Components, capacity, and function of emergency systems Proposed Question: Common 55 Given the following conditions:

  • A Loss of Coolant Accident has occurred on Unit 2.
  • Actions of ECA-1.2B, LOCA Outside Containment, are being performed.
  • The break was not isolated by the actions of ECA-1.2B, and a transition to ECA-1.1B, Loss of Emergency Coolant Recirculation, is required.

Which of the following identifies the effect that a transition to ECA-1.1B, Loss of Emergency Coolant Recirculation, has on mitigating the accident?

Actions are taken to...

A. ensure all Containment Isolation Phase A and Containment Isolation Phase B valves are closed.

B. minimize Refueling Water Storage Tank depletion by reducing injection flow.

C. increase the injection flow rate to restore Reactor Coolant System pressure.

D. stabilize RCS pressure to prevent the Safety Injection Accumulators from dumping out the break.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because this action is performed, however, it is done during EOP-1.0B entry.

B. Correct. Reducing injection flow will minimize RWST depletion and pumps would be stopped in the event the RWST is emptied.

C. Incorrect. Plausible if thought that this would help mitigate the problem, however, actions contained in ECA-1.1B are taken to restore Reactor Coolant System mass.

D. Incorrect. Plausible because for certain events this action is performed, however, the ECA-1.1B Flowchart dumps the accumulators if there is no other source of water.

Technical Reference(s) ECA-1.1B, Flowchart Attached w/ Revision # See Page 9 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 ECA-1.2B, Step 3 Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given a procedural Step, Note or Caution from ECA-1.1, DISCUSS the reason or basis for the Step, Note or Caution (LO21.ERG.C11.104)

Give a procedural Step, Note or Caution, from ECA-1.2, DISCUSS the reason or bases for the Step, Note, or Caution. (LO21.ERG.C12.OB04)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 8, 10 55.43 Page 10 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 077 AK3.02 Importance Rating 3.6 Generator Voltage and Electric Grid Disturbances: Knowledge of the reasons for the following responses as they apply to the Generator Voltage and Electric Grid Disturbances: Actions contained in the abnormal operating procedure for voltage and grid disturbances Proposed Question: Common 56 Given the following conditions:

  • Unit 2 Turbine load was at 1265 MWe prior to a degradation of Grid frequency.
  • ABN-601, Response to a 138/345 KV System Malfunction, Section 9.0, Grid Frequency Fluctuations/Loss of QSE Generation Controller Communications, is in progress.
  • All four High Pressure Turbine Control Valves have fully opened.
  • Grid frequency has lowered to 57.0 HZ.
  • QSE Generation Controller is unable to raise Grid frequency.

Which of the following identifies the action required by ABN-601, Response to a 138/345 KV System Malfunction?

A. Ensure the Reactor is tripped and go to EOP-0.0B, Reactor Trip and Safety Injection.

B. Perform a Normal Start of both Diesel Generators and attempt to stabilize frequency on Safeguards Buses.

C. Take actions to stabilize plant power level for a load reduction.

D. Coordinate with QSE Generation Controller to trip the Reactor.

Proposed Answer: A Page 11 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. Main Turbine load has increased in response to decreasing grid frequency with the Turbine not in LOAD CONTROL. Grid frequency is less than 57.2 Hz which is the setpoint for the RCP under frequency trip.

B. Incorrect. Plausible because this action is correct as Grid Frequency lowers, however, less than 57.5 Hz requires a Reactor Trip.

C. Incorrect. Plausible because Main Turbine load will change, however, this action is required on a high Grid frequency.

D. Incorrect. Plausible because notification of the QSE Generation Controller is desirable, however, not when a Reactor Trip is required.

Technical Reference(s) ABN-601, Section 9.2 Attached w/ Revision # See ABN-601, Steps 9.3,.1 & 9.3.3 RNO Comments / Reference ABN-601, Steps 9.3.4 RNO & 9.3.7 RNO Proposed references to be provided during examination: None Learning Objective: DIAGNOSE plant conditions and IDENTIFY the indications which are entry-level conditions for ABNs required to be implemented in response to a Station Electrical malfunction. (LO21.ABN.601.OB04)

EVALUATE all system limitations and precautions associated with responding to a Station Electrical malfunction. (LO21.ABN.601.OB12)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5, 10 55.43 Page 12 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 051 AA2.02 Importance Rating 3.9 Loss of Condenser Vacuum: Ability to determine and interpret the following as they apply to the Loss of Condenser Vacuum:

Conditions requiring reactor and/or turbine trip Proposed Question: Common 57 Given the following conditions:

  • Condenser vacuum indicates 23.5 inches Hg and is degrading by 0.25 inches Hg per minute.
  • The crew is reducing load at approximately 2% per minute.
  • Power is currently at 40%.

Assuming the current trends continue, which of the following describes the action that must be taken, and the LATEST time the action must be taken, in accordance with ABN-304, Main Condenser and Circulating Water System Malfunction?

Trip the...

A. Reactor within 10 minutes.

B. Turbine within 10 minutes.

C. Reactor within 15 minutes.

D. Turbine within 15 minutes.

Proposed Answer: A Explanation:

A. Correct. In 10 minutes vacuum would not be greater than 21 inches Hg, and power is > 10%,

therefore, trip the Reactor.

B. Incorrect. Plausible because tripping the Turbine is the correct action if power level is less than 10%, however, in 10 minutes power would still exceed 10%.

C. Incorrect. Plausible because power would be at 10% in 15 minutes but vacuum will be 21 in 10 minutes, requiring a Reactor Trip in 10 minutes.

Page 13 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 D. Incorrect. Plausible because power would be at 10% in 15 minutes but vacuum will be 21 in 10 minutes, requiring a Reactor Trip in 10 minutes.

Technical Reference(s) ABN-304, Step 3.3.3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: EVALUATE all system limitations and precautions associated with responding to a Main Condenser, Circ Water, and TPCW malfunction.

(LO21.ABN.304.OB12)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 14 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 060 AK2.02 Importance Rating 2.7 Accidental Gaseous Radwaste Release: Knowledge of the interrelations between Accidental Gaseous Radwaste Release and the following: Auxiliary building ventilation system Proposed Question: Common 58 Given the following conditions:

  • X-HCV-0014, Waste Gas Discharge Control Valve, was inadvertently opened while transferring Waste Gas Decay Tanks.
  • Radiation levels in the Ventilation System are rapidly rising.

Which of the following Radiation Monitors will cause an automatic closure of X-HCV-0014, Waste Gas Discharge Control Valve?

1. X-RE-5250, Waste Gas.
2. X-RE-5567A/B, South/North Vent Stack Discharge Noble Gas.
3. X-RE-5570A/B, South/North Wide Range Gas Monitor Effluent.
4. X-RE-5701, Auxiliary Building Vent Duct.

A. 1 and 2.

B. 1 and 3.

C. 2 and 4.

D. 3 and 4.

Proposed Answer: D Explanation:

A. Incorrect. Plausible if thought that X-RE-5250 Radiation Monitor provides an input to close the Waste Gas Discharge Control Valve, however, it is used to monitor gaseous activity at the Waste Gas Compressor suction. Additionally, noble gases would be released and end in the Vent Stack flow path, however, this function is not provided by X-RE-5567A/B.

B. Incorrect. Plausible because X-RE-5570A/B will close X-HCV-0014, however, X-RE-5250 does not.

C. Incorrect. Plausible because X-RE-5701 will close X-HCV-0014, however, X-RE-5567A/B does not.

D. Correct. Per ABN-902, both of these Radiation Monitors will close X-HCV-0014.

Technical Reference(s) ABN-902, Steps 2.1.b & 2.2 Attached w/ Revision # See Page 15 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 OP51.SYS.GH1.LN, Page 33 Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the functions, operation and interlocks of the following Gaseous Waste Processing System components:

  • X-HCV-0014, GWPS Discharge to Plant Vent Stacks (OP51.SYS.GH1.OB02)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 11, 14 55.43 Page 16 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 037 AK1.02 Importance Rating 3.5 Steam Generator Tube Leak: Knowledge of the operational implications of the following concepts as they apply to the Steam Generator Tube Leak: Leakrate versus pressure drop Proposed Question: Common 59 Given the following conditions with Steam Generator Tube Leakage of 200 gallons per day (GPD):

The Unit is tripped and plant parameters following the trip are:

Based on the two sets of data, which of the following describes the effect on primary-to-secondary leakage?

Leakage following the trip is approximately...

A. 50% of the initial leak rate or about 100 GPD.

B. 67% of the initial leak rate or about 133 GPD.

C. 100% of the initial leak rate or about 200 GPD.

D. 150% of the initial leak rate or about 300 GPD.

Proposed Answer: B Explanation:

A. Incorrect. Plausible if thought that half the pressure drop yielded half the flow rate.

B. Correct. Flow is proportional to the square root of the differential pressure; therefore, leakage following the trip is approximately 67% of the initial leak rate.

C. Incorrect. Plausible if thought that leakage was not going to change.

D. Incorrect. Plausible if a math error is made when calculating square root of the differential pressure.

Page 17 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Technical Reference(s) LO21.GFT. FSD, Page 26 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: NRC Generic Fundamentals Equation Sheet Learning Objective: SOLVE problems using the continuity of fluid flow equation.

(OP51.GFT.FSD.OB13)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 14 55.43 Page 18 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 076 AK3.05 Importance Rating 2.9 High Reactor Coolant Activity: Knowledge of the reasons for the following responses as they apply to the High Reactor Coolant Activity: Corrective actions as a result of high fission product radioactivity level in the RCS Proposed Question: Common 60 Given the following conditions:

  • Unit 1 is at 70% power following a Turbine Runback due to Heater Drain Pump 1-01 trip.
  • 1-RE-0406, Gross Failed Fuel Monitor (FFL-160), indication has been rising for the past hour, and is now in alarm.

Which of the following describes the action required and reason per ABN-102, High Reactor Coolant Activity?

A. Ensure Letdown flow is 120-140 GPM to reduce Reactor Coolant System contamination.

B. Isolate Letdown to minimize radiation levels in the Auxiliary Building.

C. Bypass the mixed bed demineralizer to allow the Letdown filter to remove CRUD.

D. Alternate mixed bed demineralizers to minimize radiation levels in the Auxiliary Building.

Proposed Answer: A Explanation:

A. Correct. Letdown flow is raised to increase purification of the Reactor Coolant System.

B. Incorrect. Plausible because it is desirable to minimize radiation levels in the Auxiliary Building, however, personnel would be informed and the RCS must be cleaned up.

C. Incorrect. Plausible because CRUD release may have occurred, however, bypassing the mixed bed demineralizer is not an appropriate action.

D. Incorrect. Plausible because it is always desirable to minimize radiation levels, however, when this occurs personnel are notified and entry into the Auxiliary Building would be minimized.

Technical Reference(s) ABN-102, Steps 2.1.b & Section 2.3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 19 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: EXPLAIN the reasons for the following responses as they apply to a high reactor coolant activity and excessive reactor coolant leakage:

  • Corrective actions as a result of high fission-product radioactivity level in the RCS. (LO21.ABN.103.OB03)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 12, 13 55.43 Page 20 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # W/E08 EA1.3 Importance Rating 3.6 RCS Overcooling-PTS: Ability to operate and/or monitor the following as they apply to Pressurized Thermal Shock: Desired operating results during abnormal and emergency situations Proposed Question: Common 61 FRP-0.1A, Response to Imminent Pressurized Thermal Shock (PTS) Condition directs the operator to check if Emergency Core Cooling System (ECCS) flow can be terminated.

Which of the following conditions is required with respect to this step?

A. ECCS flow should not be terminated until adequate Pressurizer level is established to support restarting a Reactor Coolant Pump.

B. Emergency Core Cooling System flow must be terminated to stabilize Reactor Coolant System Hot Leg temperature.

C. Monitor RVLIS and Core Exit Thermocouples to determine if adequate Reactor Coolant System inventory exists such that core cooling can be verified.

D. Subcooling and Pressurizer level must be closely monitored because Safety Injection termination criteria are more restrictive in this procedure.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because starting an RCP could be a desired action, however, the concerns are adequate inventory and subcooling.

B. Incorrect. Plausible because flow may need to be terminated, however, the reason is not that listed.

C. Correct. Core inventory and adequate subcooling are requirements that must be met prior to Safety Injection (SI) termination.

D. Incorrect. Plausible because these are the two criteria that must be met for SI flow to be terminated, however, they are less restrictive than other Functional Recovery Procedures.

Technical Reference(s) FRP-0.1A, Attachment 4, Step 7 Bases Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 21 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: Given a major action step of FRP-0.2A/B, STATE the basis for all actions taken. (LO21.ERG.FP2.OB03)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam CPNPP 2009 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Page 22 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 033 AA2.07 Importance Rating 3.9 Loss of Intermediate Range NI: Ability to determine and interpret the following as they apply to the Loss of Intermediate Range Nuclear Instrumentation: Confirmation of reactor trip Proposed Question: Common 62 Given the following conditions:

  • Unit 1 is operating at 3% power.
  • First Out Panel annunciator 1-ALB-6C, Window 2.5 - IR FLUX HI, goes into alarm.

Which of the following describes the immediate response to this alarm?

Enter...

A. ABN-107, Emergency Boration, and immediately commence a boration greater than 30 GPM.

B. ABN-702, Intermediate Range Instrument Malfunction, and verify Reactor power greater than P-6 setpoint.

C. EOP-0.0A, Reactor Trip or Safety Injection, and verify the Reactor is tripped.

D. Technical Specification LCO 3.3.1, Reactor Trip System Instrumentation, and perform actions for a loss of an Intermediate Range Nuclear Instrument.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because one of the probable causes of this alarm is an inadvertent dilution, however, this first-out indication requires an immediate Reactor Trip.

B. Incorrect. Plausible because this is an entry condition into ABN-702, however, receipt of this alarm indicates one channel of Intermediate Range Nuclear Instrument amps is greater than 25%. This action is correct unless the Reactor is tripped.

C. Correct. One channel of Intermediate Range Nuclear Instrument amps is greater than 25%. An immediate Reactor Trip and entry into EOP-0.0A is required.

D. Incorrect. Plausible because Technical Specifications would be entered if one channel has failed, however, the channel indicates high and a Reactor Trip is required.

Page 23 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Technical Reference(s) ABN-702, Step 2.1.a, 2.2.a, 2.3.1 & 2.3.2 Attached w/ Revision # See ABN-107, Steps 2.1.b Comments / Reference Technical Specification LCO 3.3.1 Proposed references to be provided during examination: None Learning Objective: EVALUATE the following as they apply to a Reactor Trip or Safety Injection:

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 24 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # W/E02 EK3.3 Importance Rating 3.9 SI Termination: Knowledge of the reasons for the following responses as they apply to the SI Termination: Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations Proposed Question: Common 63 Given the following conditions:

  • EOS-1.1A, Safety Injection Termination, is in progress.
  • Centrifugal Charging Pump 1-01 is running and aligned to the normal Charging flow path.
  • Centrifugal Charging Pump 1-02 is OFF and in AUTO.
  • Safety Injection Pumps 1-01 and 1-02 are OFF and in AUTO.
  • FRI-0.1A, Response to High Pressurizer Level, was started due to a YELLOW path Critical Safety Function Status Tree (CSFST) for Inventory.
  • While performing FRI-0.1A, subcooling approaches 20ºF.

Which of the following action is required and reason for the action per EOS-1.1A, Safety Injection Termination?

A. Reestablish a Pressurizer bubble per FRI-0.1A to restore subcooling.

B. Close FCV-121, Charging Flow Control Valve to minimize Charging flow.

C. Manually start ECCS Pumps to restore subcooled margin.

D. Manually initiate Safety Injection to immediately start all ECCS Pumps.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because this action is performed here, however, subcooling has been lost and EOS-1.1A Foldout Page requires starting ECCS Pumps.

B. Incorrect. Plausible if thought that correcting high Pressurizer level was the desired action.

C. Correct. Per the EOS-1.1A, Attachment 1.A, Foldout Page.

D. Incorrect. Plausible because SI has been reset, however, not per EOS-1.1A Foldout Page Page 25 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 guidance.

Technical Reference(s) EOS-1.1A, Attachment 1.A, Foldout Page Attached w/ Revision # See ODA-407, Attachment 8.A, Steps 4 & 10 Comments / Reference Proposed references to be provided during examination: None Learning Objective: IDENTIFY the items on EOS-1.1 Foldout page including any equipment, parameter, set point or condition. (LO21.ERG.E11.OB107)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 26 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 061 G 2.1.28 Importance Rating 4.1 ARM System Alarms: Conduct of Operations: Knowledge of the purpose and function of major system components and controls Proposed Question: Common 64 Which of the following identifies the status of an Area Radiation Monitor channel with a dark blue background on the PC-11, Digital Radiation Monitoring System?

A. PC-11 POLL STATUS.

B. OPERATE FAILURE.

C. Channel ALERT alarm.

D. Channel HIGH alarm.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because there is an alarm associated with PC-11 POLL STATUS, however, it is a white indication.

B. Correct. Designated in the Stem as a dark blue background because an EQUIPMENT FAILURE alarm is a light blue background.

C. Incorrect. Plausible because there is an alarm associated with Channel ALERT, however, it is a yellow indication.

D. Incorrect. Plausible because there is an alarm associated with Channel HIGH, however, it is a red indication.

Technical Reference(s) ALM-3200, Attachment 8 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the location (if applicable) of the following indications and controls, and DESCRIBE how each is interpreted or used to predict, monitor, or control changes in the Digital Radiation Monitoring System:

  • PC-11 Color/Intensity Status Cues (OP51.SYS.RM1.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

Page 27 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 11 55.43 Page 28 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 059 AK1.02 Importance Rating 2.6 Accidental Liquid Radwaste Release: Knowledge of the operational implications of the following concepts as they apply to the Accidental Liquid Radwaste Release: Biological effects on humans of various types of radiation, exposure levels that are acceptable for nuclear power plant personnel, and the units used for radiation intensity measurements and for radiation exposure levels Proposed Question: Common 65 Given the following conditions:

  • A Waste Holdup Tank has ruptured in the Auxiliary Building.
  • The event has critically injured an operator.
  • High dose rates exist in the area and the Emergency Coordinator has implemented EPP-305, Emergency Exposure Guidelines and Personnel Dosimetry.

Which of the following describes an eligible volunteers dose limit for this life-saving rescue?

A volunteer may receive...

A. a maximum of 5 REM TEDE.

B. a maximum of 10 REM TEDE.

C. a maximum of 25 REM TEDE.

D. greater than 25 REM TEDE.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because this is the limit for all activities.

B. Incorrect. Plausible because this is the limit for protecting valuable property.

C. Incorrect. Plausible because this is the limit for life saving or protecting large populations (non-volunteer).

D. Correct. An eligible volunteer is not limited in dose for a life-saving action.

Technical Reference(s) EPP-305, Step 4.3.2 and Attachment 1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 29 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: STATE the effect of radiation on cells. (RWT009)

STATE the Federal Dose Limits for Total Effective Dose Equivalent (TEDE).

(RWT017)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 12 55.43 Page 30 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 1 K/A # G 2.1.38 Importance Rating 3.7 Conduct of Operations: Knowledge of the station's verbal requirements when implementing procedures Proposed Question: Common 66 Given the following conditions:

  • Unit 2 Reactor tripped from 100% power.
  • The transition brief was completed.
  • The Continuous Action at Step 1 is being directed.

Identify the expected verbal communication based on CPNPP verbal requirements during implementation of Emergency Response Guidelines within the Control Room?

A. US: Continuous Action, Joe. Check RCS temperature stable at or trending to five five seven degrees.

RO: Dave, RCS temperature is five six one degrees and slowly lowering.

US: Joe, RCS temperature is five six one degrees and slowly lowering.

RO: That is correct.

B. US: Joe, this next step is a Continuous Action.

RO: Dave, the next step is a Continuous Action.

US: Joe, that is correct. Check RCS temperature stable at or trending to five five seven degrees.

RO: Dave, RCS temperature is five six one degrees and slowly decreasing.

C. US: Joe, Check RCS temperature stable at or trending to five five seven degrees.

RO: RCS temperature is five six one degrees and slowly lowering.

US: Five sixty one and slowly lowering.

RO: Thats right.

D. US: Attention in the Control Room, Continuous Action. End of announcement.

US: Joe, Check RCS temperature stable at or trending to five five seven degrees.

RO: I understand that this step is a Continuous Action.

RO: Dave, RCS temperature is five six one degrees and slowly decreasing.

Proposed Answer: A Page 31 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. Per the guidance identified and the Site Communication Guide, Operations Procedure Guideline, and Operations Department Procedure Use and Adherence.

B. Incorrect. Plausible because the Continuous Action Step must be identified, first names are used, and value with trend is included in the communication, however, decreasing should not be used and acknowledging a Continuous Action Step is not required.

C. Incorrect. Plausible because the communication listed is correct, however, the Reactor Operator failed to state the Unit Supervisor's first name.

D. Incorrect. Plausible because the Continuous Action Step must be identified and value with trend is included in the communication, however, decreasing should not be used, first names are not used consistently, and acknowledging a Continuous Action Step is not required.

Technical Reference(s) NMG-114, Pages 1 & 2 Attached w/ Revision # See NMG-114, Attachment 1 Comments / Reference OPG-3, Section 2.3 ODA-403, Attachment 8.A Proposed references to be provided during examination: None Learning Objective: STATE requirements for Conduct of Operations in accordance with ODA-102, ODA-407 and Operations Guideline 3. (LO21.ADM.XA3.OB01)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Page 32 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 1 K/A # G 2.1.34 Importance Rating 2.7 Conduct of Operations: Knowledge of primary and secondary plant chemistry limits Proposed Question: Common 67 Which of the following is the setpoint and MODE limitation for Dose Equivalent Iodine-131 (I-131) in the Secondary System?

A. 0.10 Ci/gm for MODES 1 and 2 only.

B. 1.00 Ci/gm for MODES 1 and 2 only.

C. 0.10 Ci/gm for MODES 1, 2, 3, and 4 only.

D. 1.00 Ci/gm for MODES 1, 2, 3, and 4 only.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because the setpoint is correct, however, the MODE limitation is not.

B. Incorrect. Plausible if thought that secondary system dose equivalent I-131 was only applicable in MODES 1 and 2.

C. Correct. Per Technical Specification LCO 3.7.18.

D. Incorrect. Plausible because the MODE limitation is correct, however, the setpoint is not.

Technical Reference(s) Technical Specification LCO 3.7.18 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: IDENTIFY indications for system operating parameters, met as a result of high secondary activity, which are entry level conditions for Technical Specifications, ASSESS the limiting conditions for operations and safety limits which may be entered, and APPLY TS action statements which require response within one hour or less. (LO21.ABN.106.OB07)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Page 33 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 34 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 1 K/A # G 2.1.25 Importance Rating 3.9 Conduct of Operations: Ability to interpret reference materials, such as graphs curves, tables, etc.

Proposed Question: Common 68 Given the following conditions:

  • The following conditions exist:
  • Containment pressure is 1.3 PSIG.
  • Containment radiation levels are 2.2 REM/hr.

Based on the above plant conditions, which of the following is the required Core Exit Temperature for the cooldown? (Table provided.)

A. 425ºF B. 440ºF C. 445ºF D. 460ºF Page 35 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Proposed Answer: C Page 36 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible if thought that the Adverse Containment number should be used or that the RCS should be cooled to the temperature corresponding to 700 PSIG.

B. Incorrect. Plausible if thought that the Adverse Containment number should be used.

C. Correct. This is the correct temperature for cooling down Steam Generator 1-04 with an initial pressure of 880 PSIG.

D. Incorrect. Plausible because it could be thought that Steam Generator 1-04 was already less than the required pressure.

Technical Reference(s) EOP-3.0A, Step 6.b Attached w/ Revision # See EOP-3.0A, Attachment 6, Step 6 Bases Comments / Reference Proposed references to be provided during examination: Steam Tables EOP-3.0A, Step 6.b, Page 8 Learning Objective: Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOP-3.0. (LO21.ERG.E3A.OB106)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10, 14 55.43 Page 37 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 2 K/A # G 2.2.13 Importance Rating 4.1 Equipment Control: Knowledge of tagging and clearance procedures Proposed Question: Common 69 Given the following condition:

  • During the implementation of a Clearance that requires a manually operated valve to be danger tagged in the CLOSED position, it is noted that the valve is already danger tagged in the OPEN position on another Clearance.

Which of the following actions is required per OWI-110, Operations Work Control and Clearance and Safety Tagging?

A. CLOSE the valve and attach the Danger Tag and note this in the Comment Section of the Clearance.

B. STOP the Clearance implementation and immediately notify the Unit Supervisor.

C. ATTACH the Danger Tag leaving the valve in the OPEN position and note this in the Comments Section of the Clearance.

D. CONTINUE with the next tag on the Clearance and report the discrepancy to the Control Room after completion.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because the valve is positioned per the Clearance, however, the other Danger Tag may still be applicable and could endanger personnel.

B. Correct. As outlined in OWI-110.

C. Incorrect. Plausible if thought that hanging two Danger Tags on the same valve in opposite positions is appropriate.

D. Incorrect. Plausible because the other Danger Tag may not be applicable, however, the Operations Work Control procedure requires that the Unit Supervisor be immediately notified.

Technical Reference(s) OWI-110, Step 6.2.3.1.C Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 38 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Learning Objective: At the conclusion of this lesson the Operator will STATE the requirements of STA-605, STA-606 and supporting procedures related to the initiation and processing of Work Orders and Clearances. (OPD1.ADM.XAA.OB00)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Page 39 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 2 K/A # G 2.2.35 Importance Rating 3.6 Equipment Control: Ability to determine Technical Specification Mode of Operation Proposed Question: Common 70 Which of the following conditions defines MODE 3 per Technical Specifications?

A. keff < 0.99 TAVG < 350ºF B. keff 0.99 TAVG 350ºF C. keff 0.99 TAVG < 350ºF D. keff < 0.99 TAVG 350ºF Proposed Answer: D Explanation:

A. Incorrect. Plausible because keff is correct, however, temperature is not.

B. Incorrect. Plausible because temperature is correct, however, keff is not.

C. Incorrect. Plausible because keff is correct for MODE 2 and temperature is correct for MODE 4.

D. Correct. When keff is < 0.99 and TAVG is 350ºF the Unit is in MODE 3, HOT STANDBY.

Technical Reference(s) Tech Spec Definitions, Table 1.1.1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: DISCUSS the terms defined in Technical Specifications. (LO21.RLS.SL1.OB01)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 40 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 3 K/A # G 2.3.14 Importance Rating 3.4 Radiation Control: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities Proposed Question: Common 71 Given the following conditions:

  • Unit 2 is in MODE 6 and Containment Fan Coolers are being alternated per SOP-801B, Containment Ventilation System.

Which of the following describes a CAUTION that exists applicable to rotating the Containment Fan Coolers?

A. Always stop the running fan prior to starting the standby fan to protect the discharge ductwork.

B. Always stop the running fan prior to starting the running fan to protect the suction ductwork.

C. Monitor to ensure air flows into Containment from the Equipment Hatch and not from Containment out of the Equipment Hatch.

D. Alternating Fan Coolers can cause changes in indicated radiation levels due to noble gases in stagnant pockets of air.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because it could be thought that restrictions on the number of fans discharging into the ductwork existed, however, there is no CAUTION pertaining to this issue.

B. Incorrect. Plausible because it could be thought that restrictions on the number of fans taking suction from a suction ductwork existed, however, there is no common suction ductwork.

C. Incorrect. Plausible because this is a concern in ventilation changes that change air flow out of or into Containment, however, these fans recirculate air and alternating these fans does not change the air flow through the Equipment Hatch.

D. Correct. The CAUTION is concerned with stagnant pockets of air with noble gases that will be introduced into the Containment atmosphere and the potential to cause automatic Containment Isolation.

Technical Reference(s) SOP-801B, Step 5.1.3 Caution Attached w/ Revision # See OP51.SYS.CL1.LN, Page 8 Comments / Reference Page 41 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: DESCRIBE the basis for the precautions and limitations, and given major procedure steps relative to the Containment Ventilation system, PLACE them in the proper sequence for:

  • SOP-801, Containment Ventilation System (OP51.SYS.CL1.OB13)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 9, 12 55.43 Page 42 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 3 K/A # G 2.3.11 Importance Rating 3.8 Radiation Control: Ability to control radiation releases Proposed Question: Common 72 Given the following conditions with Unit 1 in MODE 6:

  • A Containment Purge is in progress.
  • 1-RE-5502, Containment Particulate Radiation Monitor is in HI alarm.
  • 1-RE-5503, Containment Gas Radiation Monitor has a stable trend.
  • X-RE-5567A, Plant Vent Gas Monitor shows no increase in activity.
  • X-RE-5570A, Wide Range Gas Monitor Low shows no increase in activity.
  • 1-RE-6251 and 1-RE-6253, Refueling Cavity Area Radiation Monitors are alarming.

Which of the following describes the equipment actions to take first for these conditions per ABN-902, Release of Radioactive/Toxic Gas?

A. Manually secure the Containment Purge and stop the Cavity fill.

B. Slow the Cavity fill and place the Containment Pre-Access Filtration Units in service.

C. Verify Containment Ventilation Isolation has occurred and evacuate Containment.

D. Leave Containment Purge in service as long as X-RE-5567A, Plant Vent Gas Monitor is not showing an increasing trend and evacuate Containment.

Proposed Answer: C Page 43 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because it could be thought that Containment Isolation only occurred on the Containment Gas channel because it is the channel required by Technical Specifications and stopping the Containment Purge and cavity fill would be prudent, however, automatic Containment Isolation occurs on either channel and Containment Evacuation is required.

B. Incorrect. Plausible because it could be thought that the cause was the cavity fill and reducing the fill rate would reduce the particulate activity seen by the monitor, however, while reducing or stopping the fill would be prudent and starting the Pre-Access Filtration Units is required later by procedure an automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required.

C. Correct. An automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required per ABN-902, Release of Radioactive/Toxic Gas.

D. Incorrect. Plausible because if the Containment Radiation Monitors were not in High Alarm then the Purge could stay operating while monitoring the Plant Vent Monitors and Containment evacuation, however, an automatic Containment Isolation occurs on Containment Particulate High alarm and Containment evacuation is required.

Technical Reference(s) ABN-902, Steps 2.3.1 to 2.3.4 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given conditions that warrant a radioactive effluent release, EVALUATE and DETERMINE the proper methodology for review and authorization of the release permit. (OPD1.ADM.XA8.OB106)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 11,12 55.43 Page 44 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 4 K/A # G 2.4.19 Importance Rating 3.4 Emergency Procedures / Plan: Knowledge of EOP layout, symbols, and icons Proposed Question: Common 73 Which of the following identifiers is used to alert the operator of an Emergency Response Guideline (ERG) step that, when performed, could create a radiation hazard?

The procedure step is annotated with a (an)

A. (*)

B. [R]

C. [CV]

D. (HRA)

Proposed Answer: B Explanation:

A. Incorrect. This is the designator for a Continuous Action Step.

B. Correct. ERG steps that are performed in an area where radiation hazards are positively identified or which, when performed, create a radiation hazard are annotated as shown.

C. Incorrect. This annotation is used for Concurrent Verification (CV).

D. Incorrect. This annotation is used for a High Radiation Area (HRA), but is not stated in the ERG Rules of Usage. HRA, LHRA, and VHRA are used by Radiation Protection personnel.

Technical Reference(s) STA-660, Steps 4.1, 4.4 & 4.11 Attached w/ Revision # See ODA-407, Attachment 8.A, Steps 5.A & 5.B Comments / Reference ODA-407, Step 6.2.J Proposed references to be provided during examination: None Learning Objective: Upon completion of this lesson, the student should be able to DESCRIBE how to use and comply with station procedures. (OPD1.ADM.XA3.OB300/400)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Page 45 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10, 12 55.43 Page 46 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 4 K/A # G 2.4.49 Importance Rating 4.6 Emergency Procedures / Plan: Ability to perform without reference to procedures those actions that require immediate operation of system components and controls Proposed Question: Common 74 Given the following:

  • All High Pressure Turbine Stop Valves indicate OPEN after attempting a manual Main Turbine Trip.

Which of the following is the NEXT action required per EOP-0.0A, Reactor Trip or Safety Injection?

A. Place all Electro Hydraulic Control Pumps in PULLOUT.

B. Dispatch an operator to locally trip the Main Turbine.

C. Manually runback the Main Turbine using Load Control.

D. Close Main Steam Isolation Valves and Bypass Valves.

Proposed Answer: A Explanation:

A. Correct. This is the RNO action outlined in EOP-0.0A, Reactor Trip or Safety Injection.

B. Incorrect. Plausible because this action could be performed, however, time does not meet need to limit steam demand.

C. Incorrect. Plausible because the Main Turbine would eventually be taken off-line, however, Runback time does not meet need to limit steam demand.

D. Incorrect. This action is required after the EHC Pumps are stopped and the Main Turbine is not tripped.

Technical Reference(s) EOP-0.0A, Step 2 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: PERFORM, without reference to procedures, the actions that require Page 47 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 immediate operation of system components and controls as a result of a Reactor Trip or Safety Injection. (LO21. ERG.E0A.OB06)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Page 48 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 4 K/A # G 2.4.5 Importance Rating 3.7 Emergency Procedures / Plan: Knowledge of the organization of the operating procedures network for normal, abnormal, and emergency evolutions.

Proposed Question: Common 75 Which of the following procedures are designed to protect specific fission product barriers?

A. Abnormal Conditions Procedures (ABN).

B. Alarm Response Procedures (ALM).

C. Functional Restoration Guidelines (FRG).

D. Optimal Recovery Guidelines (ORG).

Proposed Answer: C Explanation:

A. Incorrect. Plausible because ABNs address specific radiation and contamination issues, such as, ABN-102, High Reactor Coolant Activity, ABN-106, High Secondary Activity, and ABN-903, Accidental Release of Radioactive Liquid, however, it is the FRG that protects specific fission product barriers.

B. Incorrect. Plausible because numerous ALMs address specific radiation issues, however, it is the FRG that protects specific fission product barriers.

C. Correct. FRGs protect specific fission product barriers via the Critical Safety Function Status Trees.

D. Incorrect. Plausible because ORGs are part of the Emergency Procedures network, however, they act as a conduit for the FRGs.

Technical Reference(s) LO21.ERG.XG1.LN, Pages 14 & 15 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: STATE the primary function of the Functional Restoration Guides.

(LO21.ERG.XG1.OB07)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Page 49 of 50 Rev f

ES-401 CPNPP NRC 2011 RO Written Exam Worksheet Form ES-401-5 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Page 50 of 50 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 058 AA2.03 Importance Rating 3.9 Loss of DC Power: Ability to determine and interpret the following as they apply to the Loss of DC Power: DC loads lost; impact on ability to operate and monitor plant systems Proposed Question: SRO 76 Given the following condition:

  • Safeguards DC Bus voltage is at 105 VDC during a Loss of All AC Power.

Which of the following should be performed?

Conduct actions per A. ABN-601, Response to a 138/345 KV System Malfunction, because DC power is not required to support AC power restoration.

B. ABN-602, Response to a 6900/480V System Malfunction, because the 480 VAC Battery Charger is an immediate need with voltage at minimum levels on the batteries.

C. ABN-603, Loss of Protection or Instrument Bus, because Safeguards DC Bus voltage is insufficient to operate Safeguards Bus related breakers.

D. ECA-0.0, Loss of All AC Power, in order to determine the necessity for load shedding of additional DC loads.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because ABN-601 is referenced when power is not restored to one AC Safeguards Bus, however, DC power is required for control power to Vital AC breakers for restoration activities.

B. Incorrect. Plausible because Battery Chargers are required, however, the immediate need is to reduce load on the Battery per ECA-0.0A.

C. Incorrect. Plausible because ABN-603 is referenced in the Load Shedding Attachment of ECA-0.0A, however, 105 VDC is the threshold below which many components fail to work, such as breaker control power which is not addressed in ABN-603.

D. Correct. At 105 VDC the DC Bus is below the threshold at which many components fail to work, actions per ECA-0.0, Loss of All AC Power must be performed.

Page 1 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Technical Reference(s) ECA-0.0A, Attachment 2 Attached w/ Revision # See ECA-0.0A, Flow Chart Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given a major action Step, Note or Caution of ECA-0.0, STATE the basis for the Step, Note or Caution. (LO21.ERG.C00.OB11)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 2 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 056 G 2.2.40 Importance Rating 4.7 Loss of Offsite Power: Equipment Control: Ability to apply Technical Specifications for a system Proposed Question: SRO 77 Given the following conditions:

  • A Loss of Offsite Power has occurred with Unit 2 in MODE 3.
  • No other equipment was previously out of service.

Per Technical Specification LCO 3.8.1, which of the following COMPLETION TIMES would apply to restore one (1) required offsite circuit to OPERABLE status?

Restore one (1) required offsite circuit to OPERABLE status within A. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

B. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

C. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

D. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Proposed Answer: C Explanation:

A. Incorrect. Plausible because this is the COMPLETION TIME when both Emergency Diesel Generators are INOPERABLE per Technical Specification LCO 3.8.1.E.

B. Incorrect. Plausible because this is the COMPLETION TIME when one required offsite circuit and one Emergency Diesel Generator are INOPERABLE per Technical Specification LCO 3.8.1.D.

C. Correct. When two required offsite circuits are INOPERABLE, restore one required offsite circuit to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per Technical Specification LCO 3.8.1.C.

D. Incorrect. Plausible because this is the COMPLETION TIME when one required offsite circuit is INOPERABLE per Technical Specification LCO 3.8.1.A.

Technical Reference(s) Technical Specification LCO 3.8.1.A & C Attached w/ Revision # See Technical Specification LCO 3.8.1.D & E Comments / Reference Page 3 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, Action Statements and conditional surveillance requirements of one hour or less, if applicable) for the AC Distribution 6.9 Kv and 480 V Systems:

  • 3.8.1, AC Sources-Operating (OP51.SYS.AC2.OB16)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 2 Page 4 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 038 EA2.17 Importance Rating 4.4 Steam Generator Tube Rupture: Ability to determine or interpret the following as they apply to the SGTR: RCP restart criteria Proposed Question: SRO 78 Given the following conditions:

  • RCS depressurization is complete.
  • Normal Charging and Letdown are in service.
  • RCP seal cooling has been maintained throughout the event.
  • Pressurizer level is 35%.
  • Reactor Vessel Level Indication System 49 in. above flange light is LIT.
  • RCS subcooling is 43ºF.
  • Ruptured SG narrow range level is 56% and stable.

What action(s) is (are) required regarding RCP status per EOP-3.0A, Steam Generator Tube Rupture (SGTR)?

RCP start is...

A. desired for the subsequent cooldown.

Determine if RCPs may be started per SOP-108A, Reactor Coolant Pump.

B. NOT desired once they have been stopped in EOP-3.0A, SGTR.

Engineering guidance must be obtained prior to any subsequent RCP restart.

C. desired for the subsequent cooldown.

Determine if RCPs may be started per EOP-3.0A, SGTR.

D. NOT desired once they have been stopped in EOP-3.0A, SGTR.

Verify Natural Circulation exists per EOP-3.0A, SGTR.

Proposed Answer: C Page 5 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because RCP restart is desired, however, guidance for the restart is contained in EOP-3.0A, Step 38, RNO.

B. Incorrect. Plausible because in most EOPs engineering guidance is required prior to restarting RCPs if seal cooling is lost, however, given the conditions listed this is not required.

C. Correct. Reactor Coolant Pump operation is desired during the subsequent cooldown per EOP-3.0A. This information is contained in Attachment 2, Starting An RCP.

D. Incorrect. Plausible because EOP-3.0A, Attachment 3, addresses Natural Circulation Verification, however, RCP restart is desirable for the subsequent cooldown.

Technical Reference(s) EOP-3.0A, Step 38 RNO and Caution Attached w/ Revision # See EOP-3.0A, Attachments 2 & 3 Comments / Reference Proposed references to be provided during examination: None Learning Objective: Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOP-3.0. (LO21.ERG.E3A.OB106)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 6 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # W/E11 EA2.2 Importance Rating 4.2 Loss of Emergency Coolant Recirculation: Ability to determine and interpret the following as they apply to the Loss of Emergency Coolant Recirculation: Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments Proposed Question: SRO 79 Given the following conditions:

  • A Loss of Coolant Accident is in progress on Unit 1.
  • EOS-1.3A, Transfer to Cold Leg Recirculation was entered.
  • A transition to ECA-1.1A, Loss of Emergency Coolant Recirculation is in effect.
  • Refueling Water Storage Tank level is 25%.
  • Containment pressure has increased to 20 PSIG.

Which of the following procedures would be used, per the ERG Rules of Usage, and what action should be taken in response to the High Containment Pressure?

A. Transition to FRZ-0.1A, Response to High Containment Pressure, and remain in FRZ-0.1A and operate all Containment Spray Pumps until Containment pressure is

< 3 PSIG, then stop the Containment Spray Pumps.

B. Transition to FRZ-0.1A, Response to High Containment Pressure, and operate two (2) Containment Spray Pumps to conserve RWST inventory per ECA-1.1A, Loss of Emergency Coolant Recirculation.

C. Remain in ECA-1.1A, Loss of Emergency Coolant Recirculation. Operate all Containment Spray Pumps until Containment pressure is <18 PSIG, then stop and start Containment Spray Pumps as required to maintain pressure less than 18 PSIG.

D. Remain in ECA-1.1A, Loss of Emergency Coolant Recirculation. Do not run the Containment Spray Pumps due to a loss of emergency coolant recirculation capability unless Containment pressure reaches 50 PSIG.

Proposed Answer: B Page 7 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because the transition to FRZ-0.1A is correct, however, this procedure sends you to ECA-1.1A when it is determined that a Loss of Emergency Coolant Recirculation has occurred.

B. Correct. Enter FRZ-0.1A and exit at Step 4d when it is determined that ECA-1.1A entry is required.

Containment Spray Pumps are operated per ECA-1.1 until sump blockage is overcome.

C. Incorrect. Plausible if thought that remaining in ECA-1.1A is correct, however, only two Containment Spray Pumps would be operated due to emergency sump blockage.

D. Incorrect. Plausible if thought that remaining in ECA-1.1A is correct, however, two Containment Spray Pumps must be operated when Containment pressure is greater than 18 PSIG.

Technical Reference(s) ECA-1.1A, Symptoms or Entry Conditions Attached w/ Revision # See ECA-1.1A, Step 10 Comments / Reference EOS-1.3A, Step 3 FRZ-0.1A, Step 4.d and CSF Status Tree Proposed references to be provided during examination: None Learning Objective: DISCUSS the applicability of ECA-1.1 to include: Modes, RHR/SI Status, and the required action of ECA-1.1 as otherwise used. (LO21.ERG.C11.102)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 8 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 011 EA2.01 Importance Rating 4.7 Large Break LOCA: Ability to determine and interpret the following as they apply to a Large Break LOCA: Actions to be taken, based on RCS temperature and pressure - saturated or superheated Proposed Question: SRO 80 The Critical Safety Function Status Trees are being reviewed in order to verify the CORE COOLING Critical Safety Function during a Large Break Loss of Coolant Accident. Plant conditions are as follows:

  • Containment pressure is 10 PSIG and stable.
  • Reactor Vessel Level Indication System (RVLIS) indication: 11 inches above the Core Plate light is LIT all other RVLIS lights are DARK.

Which of the following procedures would be used to mitigate the CORE COOLING Critical Safety Function and what is the basis for that action?

Enter procedure...

A. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 25ºF and Core Exit Thermocouples less than 750ºF.

B. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling less than 25ºF and Core Exit Thermocouples less than 750ºF.

C. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 55ºF and RVLIS indication at 11 inches above the Core Plate LIT.

D. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling less than 55ºF and RVLIS indication at 11 inches above the Core Plate LIT.

Proposed Answer: D Page 9 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible if thought that both RCS subcooling and Core Exit Thermocouples temperatures were being met.

B. Incorrect. Plausible because procedure entry is correct and Core Exit Thermocouples temperatures are being met, however, RCS subcooling does not meet Adverse Containment conditions.

C. Incorrect. Plausible because RCS subcooling does not meet Adverse Containment conditions, however, with RVLIS indication at 11 inches above the Core Plate LIT and subcooling not met, entry into FRC-0.3A, Response to Saturated Core Cooling is required.

D. Correct. Given that Adverse Containment conditions exist then RCS subcooling must be >55ºF.

With CET temperature less than 750ºF and RVLIS indication at 11 inches above the Core Plate LIT, entry into FRC-0.3A, Response to Saturated Core Cooling is correct.

Technical Reference(s) FRC-0.3A, CSFST Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Core Cooling Monitor System/RVLIS, both initial and subsequent, for:

  • FRC-0.3, Response to Saturated Core Cooling (OP51.SYS.RC3.OB13)

Question Source: Bank #

Modified Bank # CPNPP LXR (Note changes or attach parent)

New Question History: Last NRC Exam CPNPP 2010 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 10 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Comments /

Reference:

From CPNPP LXR Exam Bank Revision # 03/22/10 The Critical Safety Function Status Trees are being reviewed in order to verify the CORE COOLING Critical Safety Function during a Large Break Loss of Coolant Accident. Plant conditions are as follows:

  • Containment pressure is 16 PSIG and stable.
  • RVLIS indication 11 inches above the Core Plate is NOT lit.

Which of the following procedures would be used to mitigate the CORE COOLING Critical Safety Function and what is the basis for that action?

Enter procedure...

A. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 55ºF and Core Exit Thermocouples greater than 750ºF.

B. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling less than 55ºF and Core Exit Thermocouples less than 1200ºF.

C. FRC-0.2, Response to Degraded Core Cooling, due to RCS subcooling less than 25ºF and RVLIS indication at 11 inches above the Core Plate NOT lit.

D. FRC-0.3, Response to Saturated Core Cooling, due to RCS subcooling greater than 25ºF and RVLIS indication at 11 inches above the Core Plate NOT lit.

Page 11 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # W/E05 G 2.1.32 Importance Rating 4.0 Inadequate Heat Transfer - Loss of Secondary Heat Sink: Conduct of Operations: Ability to explain and apply system limits and precautions Proposed Question: SRO 81 Given the following conditions:

  • A Reactor Trip and Safety Injection have occurred on Unit 1.
  • Containment pressure is 6 PSIG.
  • FRH-0.1A, Response to Loss of Secondary Heat Sink, has been entered.
  • Reactor Vessel Level Indication System (RVLIS) indication: All lights are DARK.

Which of the following describes the plant conditions and action required?

Steam Generators are...

A. required for RCS heat removal. Continue in FRH-0.1A, Response to Loss of Secondary Heat Sink, and initiate Bleed and Feed.

B. NOT required for RCS heat removal. Transition to EOP-1.0A, Loss of Reactor or Secondary Coolant, and ensure correct diagnosis of the event prior to continuing.

C. required for RCS heat removal. Continue in FRH-0.1A, Response to Loss of Secondary Heat Sink, and attempt to restore feedwater to the Steam Generators.

D. NOT required for RCS heat removal. Transition to FRC-0.2A, Response to Degraded Core Cooling, due to current RVLIS indication and loss of AFW flow.

Proposed Answer: C Page 12 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because Steam Generators are required for RCS heat removal, however, bleed and feed criteria is not met because SG wide range level is not less than 40% (in at least 3 SGs), per FRH-0.1A, Step 3.

B. Incorrect. Plausible because a LOCA is occurring and entry into EOP-1.0A would be made, however, current RCS pressure requires a heat sink.

C. Correct. SGs are required for RCS heat removal because RCS pressure is higher than intact SG pressure. Bleed and Feed criteria is not met because SG wide range level is not less than 40% (in at least 3 SGs), therefore, the procedure should continue with attempts to establish feedwater to any Steam Generator.

D. Incorrect. Plausible because when RVLIS 11 inch core plate light is NOT lit, one of the criteria for FRC-0.2A entry has been met, however, Core Exit Thermocouple temperature is only high enough to warrant FRC-0.3C, Response to Saturated Core Cooling, entry which is a YELLOW Path Critical Safety Function.

Technical Reference(s) FRH-0.1A, Steps 1, 3, & 4 Attached w/ Revision # See FRC-0.2A, CSFST Comments / Reference EOP-1.0A, Entry Conditions Proposed references to be provided during examination: None Learning Objective: DESCRIBE the Symptoms or Entry Conditions for FRH-0.1.

(LO21.ERG.FH1.OB03)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 13 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # W/E15 EA2.2 Importance Rating 3.3 Containment Flooding: Ability to determine and interpret the following as they apply to the Containment Flooding: Adherence to appropriate procedures and operation within limitations in the facility's license and amendments Proposed Question: SRO 82 Given the following conditions:

  • EOP-1.0B, Loss of Reactor or Secondary Coolant, is in progress.
  • The initial scan of the Critical Safety Function Status Tree parameters indicate the following:
  • Pressurizer level is 0%.
  • Containment water level indicates 817 feet and slowly rising.
  • Containment pressure is 14 PSIG and slowly lowering.
  • Containment Radiation Monitors are in ALARM at 25 REM/hr.
  • Reactor Vessel Level Indication System has no lights LIT.
  • Loop Cold Leg temperatures are 270ºF.

Which of the following procedures must be entered to address the above conditions?

A. FRZ-0.2B, Response to Containment Flooding.

B. FRP-0.2B, Response to Anticipated Pressurized Thermal Shock Condition.

C. FRI-0.2B, Response to Low Pressurizer Level.

D. FRZ-0.3B, Response to High Containment Radiation Level.

Proposed Answer: A Page 14 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. Given the conditions listed, entry into FRZ-0.2B is correct due to a Containment Flooding condition existing.

B. Incorrect. Plausible because the cooldown rate exceeded 100ºF per hour and Loop Cold Leg temperatures are less than 350ºF, however, it is a Yellow Path condition in the CSFST hierarchy.

C. Incorrect. Plausible because Pressurizer level is low and the requirements to enter FRI-0.2B are met, however, it is a Yellow Path condition in the CSFST hierarchy.

D. Incorrect. Plausible because Containment radiation level is high and entry conditions for FRZ-0.3B are met, however, it is a Yellow Path condition in the CSFST hierarchy.

Technical Reference(s) FRZ-0.2B, CSFST Attached w/ Revision # See FRI-0.2B, CSFST Comments / Reference FRP-0.2B, CSFST Proposed references to be provided during examination: None Learning Objective: Given the Containment CSF Status Tree and a description of applicable plant conditions, DETERMINE if entry into FRZ-0.2A/B is indicated, and STATE the severity of the challenge, if any. (LO21.ERG.FZ2.OB03)

Question Source: Bank #

Modified Bank # CPNPP LXR (Note changes or attach parent)

New Question History: Last NRC Exam CPNPP 2010 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 15 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Comments /

Reference:

From CPNPP LXR Exam Bank Revision # 03/22/10 Given the following conditions:

  • A Large Break Loss of Coolant Accident has occurred on Unit 2.
  • EOP-1.0B, Loss of Reactor or Secondary Coolant, is in progress.
  • The initial scan of the Critical Safety Function Status Tree parameters indicate the following:
  • Pressurizer level is 0%.
  • Containment water level indicates 817 feet and slowly rising.
  • Containment pressure is 14 PSIG and slowly lowering.
  • Containment Radiation Monitors are in ALARM at 25 REM/hr.
  • Reactor Vessel Level Indication System has no lights LIT.

Which of the following procedures must be entered to address the above conditions?

A. FRZ-0.2B, Response to Containment Flooding.

B. FRZ-0.1B, Response to High Containment Pressure.

C. FRI-0.2B, Response to Low Pressurizer Level.

D. FRZ-0.3B, Response to High Containment Radiation Level.

Page 16 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # W/E16 G 2.2.42 Importance Rating 4.6 High Containment Radiation: Equipment Control: Ability to recognize system parameters that are entry level conditions for Technical Specifications Proposed Question: SRO 83 Given the following conditions:

  • Unit 1 is in MODE 3.
  • 1-RE-6290A, Containment High Range Radiation Monitor, has failed.

Which of the following is the Technical Specification (TS) impact?

A. Enter a Tracking LCOAR for TS LCO 3.3.3, Post Accident Monitoring (PAM)

Instrumentation, for 1 of 3 Channels INOPERABLE.

B. Enter a Tracking LCOAR for TS LCO 3.3.4, Remote Shutdown System, for 1 of 3 Channels INOPERABLE.

C. Enter an Active LCOAR for TS LCO 3.3.3, Post Accident Monitoring (PAM)

Instrumentation, for 1 of 2 Required Channels INOPERABLE.

D. Enter an Active LCOAR for TS LCO 3.3.4, Remote Shutdown System, for 1 of 2 Required Channels INOPERABLE.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because the Technical Specification is correct, however, an Active LCOAR must be initiated and only one of 2 channels is INOPERABLE.

B. Incorrect. Plausible if thought that Containment High Range Radiation was a Technical Specification LCO 3.3.4 entry.

C. Correct. An Active LCOAR must be initiated and only one of 2 channels is INOPERABLE for Technical Specification LCO 3.3.3.

D. Incorrect. Plausible because an Active LCOAR must be initiated and only one of 2 channels is INOPERABLE, however, the Technical Specification entry is incorrect.

Page 17 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Technical Reference(s) Technical Specification Table 3.3.3-1, #10 Attached w/ Revision # See Technical Specification LCO 3.3.3.A & F Comments / Reference ODA-308, Steps 6.2.1.A & 6.2.2.A Proposed references to be provided during examination: None Learning Objective: LIST and DESCRIBE the following Technical Specifications (i.e., LCOs, action statements and conditional surveillance requirement of one hour and less, if applicable) for the Reactor Coolant System:

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Page 18 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # W/E06 & E07 G 2.4.20 Importance Rating 4.7 Inadequate Core Cooling: Emergency Procedures/Plan: Knowledge of EOP mitigation strategies Proposed Question: SRO 84 Given the following conditions:

  • A Small Break Loss of Coolant Accident has occurred on Unit 2.
  • Reactor Vessel Level Indication System (RVLIS) Indication: All lights are DARK.
  • Efforts to establish ECCS flow have been unsuccessful.
  • Containment pressure is 6 PSIG.
  • Critical Safety Function Status Trees are being addressed.

Which of the following should be performed after attempts to establish Emergency Core Cooling System flow are unsuccessful per FRC-0.2B, Response to Degraded Core Cooling?

A. Open the Pressurizer and Reactor Vessel Head Vents to depressurize the RCS and increase ECCS flow.

B. Transfer to Cold Leg Recirculation to ensure the Reactor Core remains covered.

C. Stop Reactor Coolant Pumps 2-01, 2-02, and 2-03 then initiate Bleed and Feed.

D. Restore intact SG narrow range levels to greater than 18% in at least one SG to provide core cooling.

Proposed Answer: D Page 19 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because it could be thought this would help cool the core, however, it is imperative to close all RCS and PRZR vents to conserve inventory.

B. Incorrect. Plausible if thought that Transferring to Cold Leg Recirculation would help the condition, however, RWST level is not known and ECCS flow cannot be established.

C. Incorrect. Plausible because RCPs would be stopped later in FRC-0.2A prior to depressurization, however, with Auxiliary Feedwater flow available Core Cooling will be regained by raising Steam Generator narrow range level and steaming that SG.

D. Correct. With Auxiliary Feedwater available and no ECCS flow, FRC-0.2A directs the restoration of at least one Steam Generator narrow range level to greater than 18% (Adverse Containment) to deal with a Degraded Core Cooling condition.

Technical Reference(s) FRC-0.2B, CSFST Attached w/ Revision # See FRC-0.2B, Steps 1 to 10 Comments / Reference Proposed references to be provided during examination: None Learning Objective: ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Core Cooling Monitor System/RVLIS, both initial and subsequent, for:

  • FRC-0.2, Response to Degraded Core Cooling (OP51.SYS.RC3.OB13)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 20 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 032 AA2.07 Importance Rating 3.4 Loss of Source Range NI: Ability to determine and interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Maximum allowable channel disagreement Proposed Question: SRO 85 Given the following conditions:

  • Unit 1 is in a REFUELING outage with core onload in progress.
  • 1-NI-50A-2, Gamma-Metrics Source Range Neutron Flux is out-of-service.
  • 1-NI-31B, Westinghouse Source Range Neutron Flux, has a lower voltage than 1-NI-32B, Westinghouse Source Range Neutron Flux.

Which of the following describes the effect on 1-NI-31B due to the lower voltage and the applicable Technical Specification requirement if 1-NI-31B were declared out-of-service?

With a lower voltage the count rate should be...

A. lower. Technical Specifications require two (2) OPERABLE Channels and 1-NI-50B-2 and 1-NI-32B are both available.

B. higher. Technical Specifications require two (2) OPERABLE channels and with only one CORE ALTERATIONS must stop immediately.

C. higher. Technical Specifications require two (2) OPERABLE Channels and 1-NI-50B-2 and 1-NI-32B are both available.

D. lower. Technical Specifications require two (2) OPERABLE Channels and with only one CORE ALTERATIONS must stop immediately.

Proposed Answer: D Page 21 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because when Core offload or onload are not in progress this is the CHANNEL CHECK for the Westinghouse SR Channels, however, Technical Specifications are not being met.

B. Incorrect. Plausible because when Core offload or onload is not in progress this is the CHANNEL CHECK for the Westinghouse SR Channels. The Technical Specification REQUIRED ACTIONS are correct.

C. Incorrect. Plausible because the shiftly CHANNEL CHECK is correct for Core onload, however, Technical Specifications are not being met.

D. Correct. CHANNEL CHECK requirements state that counts should be consistent with Core configuration for the given operating MODE; therefore, with lower voltage and lower counts the readings are not consistent. Credit can only be taken for matched sets of channels; two Westinghouse or two Gamma-Metrics, therefore, CORE ALTERATIONS must stop immediately.

Technical Reference(s) Technical Specification LCO 3.9.3.A Attached w/ Revision # See Technical Specification LCO 3.9.3 Bases Comments / Reference OPT-102A-6, Page 2 of 6 Proposed references to be provided during examination: None Learning Objective: EVALUATE the effect a loss of the Excore Instrumentation System has on the following:

  • Refueling operations (OP51.SYS.EC1.OB22)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam CPNPP 2009 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Page 22 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 076 G 2.4.45 Importance Rating 4.3 Service Water System: Emergency Procedures/Plan: Ability to prioritize and interpret the significance of each annunciator or alarm Proposed Question: SRO 86 Given the following conditions:

  • Unit 1 is in MODE 4.
  • Train A Component Cooling Water Pump (CCWP) and Train A Station Service Water Pump (SSWP) are in service.
  • Train B CCWP and Train B SSWP are secured.
  • 1-ALB-1, Window 1.7 - SSW TRN A/B HDR PRESS LO.
  • 1-ALB-1, Window 1.8 - SSWP 1/2 OVRLOAD/TRIP.
  • The BOP determines that SSWP 1-01 has tripped.
  • NO other automatic action has occurred.

Which of the following describes the operator action per ABN-501, Station Service Water System Malfunction and what Technical Specification REQUIRED ACTIONS should be implemented?

A. 1.) Start SSWP 1-02 and CCWP 1-02.

2.) Restore SSW Pump 1-01 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.

B. 1.) Start SSWP 1-02 only.

2.) Restore SSW Pump 1-01 to OPERABLE status within 7 days per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.

C. 1.) Start SSWP 1-02 and CCWP 1-02.

2.) Restore SSW Pump 1-01 to OPERABLE status within 7 days per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.

D. 1.) Start SSWP 1-02 only.

2.) Restore SSW Pump 1-01 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> per LCO 3.7.8.B, Station Service Water System, One SSWS train inoperable.

Proposed Answer: A Page 23 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. A low SSW header pressure starts the standby SSW and CCW Pumps per ABN-501.

Additionally, this is the Technical Specification REQUIRED ACTION.

B. Incorrect. Plausible because the Train B SSW Pump should be started, however, both SSW and CCW Pumps AUTO start on low SSW header pressure and the Technical Specification COMPLETION TIME is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> vice 7 days.

C. Incorrect. Plausible because a low SSW header pressure starts the standby SSW and CCW Pumps, however, the Technical Specification COMPLETION TIME is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> vice 7 days.

D. Incorrect. Plausible because the Technical Specification REQUIRED ACTION is correct and the Service Water Pump will AUTO start on low header pressure, however, both SSW and CCW Pumps should AUTO start on low header pressure.

Technical Reference(s) ALM-0011A, 1-ALB-1, Windows 1.7 & 1.8 Attached w/ Revision # See ABN-501, Steps 2.3.2, & 2.3.3 Comments / Reference Technical Specification LCO 3.7.8.A & B Proposed references to be provided during examination: None Learning Objective: DISCUSS the Technical Specifications, Technical Requirements Manual, or ODCM associated with the components, parameters, and operation of the Station Service Water System. (OP51.SYS.SW1.OB13)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2, 5 Page 24 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 006 A2.02 Importance Rating 4.3 Emergency Core Cooling System: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of flowpath Proposed Question: SRO 87 Given the following conditions:

  • A Plant Heatup is in progress on Unit 2 per IPO-001B, Plant Heatup from Cold Shutdown to Hot Standby.
  • Current Unit 2 conditions are as follows:
  • Pressurizer pressure is 450 PSIG.
  • Centrifugal Charging Pump 2-01 tripped on low lube oil pressure.
  • Centrifugal Charging Pump 2-02 was started and plant conditions were stabilized.
  • The Positive Displacement Charging Pump is tagged out per IPO-001B, Plant Heatup from Cold Shutdown to Hot Standby.

Which of the following completely describes the impact on Technical Specification / Technical Requirement Manual compliance due to this failure and what action is required?

A. Only one of the required Boron Injection flow paths is INOPERABLE. Refer to ABN-107, Emergency Boration, and restore Boration Injection flow path to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

B. Only one of the required Emergency Core Cooling Trains is INOPERABLE. Refer to SOP-201B, Safety Injection System, and restore Emergency Core Cooling System Train to OPERABLE status within 7 days.

C. One Boron Injection flow path and one Emergency Core Cooling Train are INOPERABLE. Refer to ABN-105, Chemical and Volume Control System Malfunction, and restore the Boration flow path and ECCS Train to OPERABLE status within 7 days.

D. Refer to SOP-103B, Chemical and Volume Control System and align the Positive Displacement Charging Pump within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore the Boration Injection flow path to OPERABLE status.

Page 25 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Proposed Answer: C Explanation:

A. Incorrect. Plausible because the Boration Injection flow path is INOPERABLE and there may be a misconception that ABN-107 will restore boration flowpath.

B. Incorrect. Plausible because the ECCS Train is INOPERABLE and the Technical Specification LCO 3.5.2.A REQUIRED ACTION is correct, however, a Boration Injection flow path is also INOPERABLE. Entry into SOP-201B would be correct if this were the only condition.

C. Correct. Technical Specification LCO 3.5.2.A and Technical Requirement 13.1.31.B are both impacted. The correct COMPLETION TIME for both systems is 7 days. Entry into ABN-105 is correct for the conditions listed.

D. Incorrect. Plausible because the Positive Displacement Charging Pump (PDP) can be used in lieu of one of the required Centrifugal Charging Pumps, however, an Emergency Core Cooling Train is still INOPERABLE and the PDP can only be substituted when in MODE 4 per the Note in Technical Requirement 13.1.31. Entry into SOP-103B would be correct if this were the only condition.

Technical Reference(s) Technical Specification LCO 3.5.2.A Attached w/ Revision # See TRM LCO 13.1.31.B Comments / Reference ABN-105, Section 9.0 Proposed references to be provided during examination: None Learning Objective: LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Emergency Core Cooling System:

  • ECCS Subsystems 3.5.2 & 3.5.3 (OP51.SYS.SI1.OB30)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 1, 2 Page 26 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 059 A2.07 Importance Rating 3.3 Main Feedwater System: Ability to (a) predict the impacts of the following malfunctions or operations on the MFW System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Tripping of MFW pump turbine Proposed Question: SRO 88 Given the following conditions:

  • Unit 2 is at 100% power.
  • ABN-302, Feedwater, Condensate, Heater Drain System Malfunction, has been entered.
  • Steam Generator levels initially stabilized but now are lowering in an uncontrolled manner.

Which of the following identifies the impact on the Unit and what actions should be taken to mitigate the situation?

A. 1.) A Turbine Runback to 700 MWe will be initiated.

2.) Initiate an additional manual Turbine Runback of 50 MWe then trip the Main Turbine per ABN-302, Feedwater System Malfunction.

B. 1.) A Reactor Trip and entry into EOP-0.0B, Reactor Trip or Safety Injection is required.

2.) Start Auxiliary Feedwater (AFW) Pumps and control AFW flow per EOP-0.0B, Reactor Trip or Safety Injection, Attachment 1A, Foldout Page.

C. 1.) A Turbine Runback to 700 MWe will be initiated.

2.) Trip the Main Turbine and start both Motor Driven AFW Pumps per ABN-302, Feedwater System Malfunction.

D. 1.) A Reactor Trip and entry into EOP-0.0B, Reactor Trip or Safety Injection is required.

2.) Start all available AFW Pumps at full flow in an attempt to restore Steam Generator level per ABN-302, Feedwater System Malfunction.

Page 27 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Proposed Answer: B Explanation:

A. Incorrect. Plausible because a Turbine Runback is initiated and the 2nd Runback could allow Steam Dumps to control RCS temperature, however, the Reactor must be tripped and Auxiliary Feedwater flow initiated.

B. Correct. Given the conditions listed, a Reactor Trip is required and the Auxiliary Feedwater System is operated as shown.

C. Incorrect. Plausible because a Turbine Runback is initiated and the Motor Driven AFW Pumps will be started, however, a Reactor Trip is required.

D. Incorrect. Plausible because a Reactor Trip is required, however, this is not the appropriate response using the Auxiliary Feedwater System.

Technical Reference(s) ABN-302, Step 2.3.3 and Note Attached w/ Revision # See ABN-302, Step 2.3.1 and Note Comments / Reference Proposed references to be provided during examination: None Learning Objective: DIAGNOSE plant conditions and IDENTIFY the indications which are entry-level conditions for ABNs required to be implemented in response to a Feedwater, Condensate, Heater Drain System Malfunction.

(LO21.ABN.302.OB07)

EVALUATE the following as they apply to a Feedwater, Condensate, Heater Drain System malfunction:

  • Differentiation between loss of all MFW and trip of one MFW pump (LO21.ABN.302.OB05)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 28 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 003 G 2.4.4 Importance Rating 4.7 Reactor Coolant Pump System: Emergency Procedures/Plan: Ability to recognize abnormal indications for system operating parameters that are entry level conditions for emergency and abnormal procedures Proposed Question: SRO 89 Given the following conditions:

  • Unit 1 is at 50% power.
  • 1-FI-414, RC LOOP 1 FLO CHAN I indication is reading 50%.

Which of the following procedures should be entered for this condition?

A. SOP-108A, Reactor Coolant Pump.

B. ABN-713, RCS Loop Flow Instrument Malfunction.

C. EOP-0.0A, Reactor Trip or Safety Injection.

D. ABN-101, Reactor Coolant Pump Trip/Malfunction.

Proposed Answer: B Explanation:

A. Incorrect. Plausible because if it is thought that at 50% power that 50% flow was expected and the procedure for system operation would be entered.

B. Correct. With only one channel failed, ALM-0051A, Window 1.3 directs the operator to ABN-713, but only after ABN-101 and EOP-0.0A are ruled out.

C. Incorrect. Plausible because Reactor power is greater than 48% which means that the P-8 permissive is satisfied, however, a 2nd channel would have to be reading less than 90% in order to enter EOP-0.0.

D. Incorrect. Plausible because this annunciator is an entry condition for ABN-101, however, Reactor power would have to be less than 48% in order to meet the criteria for a Reactor Coolant Pump Malfunction as opposed to a Reactor Trip.

Technical Reference(s) ABN-713, Steps 1 & 2 Attached w/ Revision # See ABN-101, Sections 2.1 and 2.2 Comments / Reference Proposed references to be provided during examination: None Page 29 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Learning Objective: ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Reactor Coolant System for:

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Page 30 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 013 A2.01 Importance Rating 4.8 Engineered Safety Features Actuation System: Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: LOCA Proposed Question: SRO 90 Given the following conditions:

  • The actions of EOP-0.0B have been completed, including Attachment 2, Safety Injection Actuation Alignment, and a diagnosis has been made that a Loss of Reactor Coolant inside Containment exists.
  • At the time of entry into EOP-1.0B, Loss of Reactor or Secondary Coolant, an ORANGE Path condition is noted on the Containment Status Tree.
  • Containment pressure is 20 PSIG.
  • Annunciator 1-ALB-4B, Window 1.8 - RWST 2 of 4 LVL LO-LO alarms and level is confirmed at 33%.

Which of the following identifies the impact of these conditions and what action(s) should be implemented?

A. Complete Steps 1, 2 and 3 of EOS-1.3B, Transfer to Cold Leg Recirculation, because of LO-LO RWST level then review Critical Safety Function Status Trees.

Transition to FRZ-0.1B, Response to High Containment Pressure, to ensure challenges to the Containment barrier are addressed.

B. Transition to FRZ-0.1B, Response to High Containment Pressure, because of Containment pressure and complete the actions without delay so that EOS-1.3B, Transfer to Cold Leg Recirculation, can be implemented to realign Emergency Core Cooling System injection.

C. Complete Steps 1, 2 and 3 of EOS-1.3B, Transfer to Cold Leg Recirculation, because of LO-LO RWST level concurrent with EOP-1.0B, Loss of Reactor or Secondary Coolant. FRZ-0.1B, Response to High Containment Pressure, is not required as EOP-0.0B verified conditions for Containment Spray.

D. Transition to FRZ-0.1B, Response to High Containment Pressure, because of Containment pressure and concurrently implement actions of EOS-1.3B, Transfer to Cold Leg Recirculation. When completed, return to EOP-1.0B, Loss of Reactor or Secondary Coolant.

Page 31 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Proposed Answer: A Explanation:

A. Correct. Given the conditions listed, this is the correct reason and set of actions to complete.

B. Incorrect. Plausible because the Critical Safety Function ORANGE Path is immediately addressed, however, entry and completion of EOS-1.3B takes priority.

C. Incorrect. Plausible because completing the actions of EOS-1.3B is correct, however, the Critical Safety Function ORANGE Path cannot be ignored.

D. Incorrect. Plausible because the last two actions listed are correct, however, EOP-1.0B is not implemented at this time.

Technical Reference(s) FRZ-0.1B, CSFST Flowchart Attached w/ Revision # See EOP-1.0B, Attachment 1.A, Foldout Page Comments / Reference ODA-407, Attachment 8.A, Step 10 EOS-1.3B, Step 1 CAUTION Proposed references to be provided during examination: None Learning Objective: Given a set of plant conditions, IDENTIFY the proper transitions through/out of EOS-1.3. (LO21.ERG.E13.OB06)

Given the Containment CSFST (and necessary parameter data or access to the data), DETERMINE whether entry into FRZ-0.1A/B is applicable, and, if so, STATE the severity of the challenge. (LO21.ERG.FZ1.OB02)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Page 32 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 001 G 2.2.42 Importance Rating 4.6 Control Rod Drive System: Equipment Control: Ability to recognize system parameters that are entry level conditions for Technical Specifications Proposed Question: SRO 91 Given the following conditions:

  • Power Range Channel N-41 indicates 48%, N-42 indicates 50%, N-43 indicates 49%

and N-44 indicates 48%.

  • Annunciator 1-ALB-6D, Window 2.10 - AVE TAVE HI is in alarm.
  • Control Bank D Rods stepped in at 72 steps/minute.
  • 1/1-RBSS, Control Rod Bank Select Switch was placed in MANUAL to stop rod movement.

Which of the following Technical Specifications should be referenced?

Refer to Technical Specification Limiting Conditions for Operations...

A. 3.3.1, Reactor Trip System Instrumentation, and identify the affected Function on Table 3.3.1-1, Reactor Trip System Instrumentation.

B. 3.2.4, Quadrant Power Tilt Ratio (QPTR), and reduce thermal power at least 3% for each 1% of QPTR greater than 1.00.

C. 3.3.2, Engineering Safety Features Actuation System Instrumentation, and identify the affected Function on Table 3.3.2-1, Engineering Safety Features Actuation System Instrumentation.

D. 3.1.6, Control Bank Insertion Limits, and verify SHUTDOWN MARGIN to be within the limits provided in the Core Operating Limits Report.

Proposed Answer: A Page 33 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. Entry into Technical Specification LCO 3.3.1, Reactor Trip System Instrumentation, is required because a temperature instrument has failed. The affected Function must be determined per Table 3.3.1-1, Reactor Trip System Instrumentation.

B. Incorrect. Plausible because Technical Specification LCO 3.2.4 reference could be correct if power is greater than 50%, however, this action would not be required when less than 50% as the Technical Specification is N/A.

C. Incorrect. Plausible if thought that an ESFAS feature was being affected, however, not for the conditions listed.

D. Incorrect. Plausible because rods are stepping in and Technical Specification LCO 3.1.6 for Control Bank Insertion Limits could be impacted, however, Technical Specification LCO 3.3.1 entry is required.

Technical Reference(s) ABN-704, Steps 2.2 & 3.1 Attached w/ Revision # See Technical Specifications LCO 3.3.1 & 3.3.2 Comments / Reference Technical Specification LCO 3.1.6 & 3.2.4 Proposed references to be provided during examination: None Learning Objective: DISCUSS interrelationships between the failed instrument in ABN-703 and ABN-704 and other plant systems. (LO21.ABN.703.OB03)

IDENTIFY applicable Technical Specifications and DETERMINE actions required to meet the Limiting Condition for Operation (LCO).

(LO21.ABN.703.OB05)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2, 5 Page 34 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 029 A2.03 Importance Rating 3.1 Containment Purge System: Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Startup operations and the associated required valve lineups Proposed Question: SRO 92 Given the following conditions:

  • Unit 1 is in MODE 5.
  • A Containment Purge is planned.
  • Containment pressure is 1.1 PSIG.

Which of the following identifies the impact on the Containment Purge and what actions should be taken?

A. 1.) Containment Ventilation Isolation signal must be bypassed until the purge is initiated.

2.) Refer to SOP-706, Digital Radiation Monitoring System, Section for Bypassing Containment Ventilation Isolation.

B. 1.) Outage Auxiliary Containment Cooling Unit Fan should be redirected towards any highly contaminated areas to maximize purge impact.

2.) Contact Health Physics personnel for guidance on redirecting discharge flow per SOP-801A, Containment Ventilation System.

C. 1.) Containment pressure must be reduced using the Containment Pressure Relief System.

2.) Refer to SOP-801A, Containment Ventilation System, and lower Containment pressure to atmospheric.

D. 1.) Fuel Transfer Tube Gate Valves must be closed to ensure Spent Fuel Pool level is unaffected by the purge.

2.) Refer to RF0-404, Refueling Gate Operation, for guidance regarding positioning of the Fuel Transfer Tube Gate Valves.

Proposed Answer: C Page 35 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because starting a Containment Purge can generate spurious Containment Ventilation Isolation signals, however, CVI must remain operational during core alterations or movement of irradiated fuel per Technical Specification LCO 3.9.4.

B. Incorrect. Plausible because health physics personnel should be contacted if this fan is to be used, however, Precautions of SOP-801A do not allow this action.

C. Correct. With Containment pressure greater than atmospheric, pressure must be reduced per SOP-801A.

D. Incorrect. Plausible because a Precaution does exist regarding the differential pressure created and resultant change in Spent Fuel Pool and Refueling Pool levels, however, this valve need not be closed. The Fuel Transfer Tube Gate Valves are closed for Transfer Canal and Refueling Cavity Lift Gate operations.

Technical Reference(s) SOP-801A, Step 5.6.5 Attached w/ Revision # See SOP-801A, Precautions & Step 4.1.A Comments / Reference SOP-801A, Step 5.1.1.C Proposed references to be provided during examination: None Learning Objective: STATE the physical connections and EVALUATE the cause-effect relationships between the Containment Systems and the following systems, components or events:

  • Containment Purge and Pressure Relief (OP51.SYS.CY1.OB22)

LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems.

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 4, 5 Page 36 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 034 K4.01 Importance Rating 3.4 Fuel Handling Equipment System: Knowledge of Fuel Handling Equipment design feature(s) and/or interlock(s) that provide for the following: Fuel protection from binding and dropping Proposed Question: SRO 93 Given the following conditions:

  • Refueling is in progress.
  • A fuel assembly is being lowered into the core.
  • The hoist load decreased in excess of the Operator Load Limits prior to the fuel assembly reaching the bottom.

Which of the following identifies the action required per RFO-302, Handling of Fuel Assemblies?

A. Lower the hoist speed to jog and continue to insert the assembly.

B. Laterally position the crane hoist and slowly continue to insert the fuel assembly into the core location.

C. Check the alignment of the lifting tool with respect to the fuel assembly and the reactor core location and reposition the hoist as necessary.

D. If the hoist load decreased by more than 800 pounds, the fuel assembly and adjacent assemblies shall be examined for evidence of damage prior to continuing.

Proposed Answer: D Explanation:

A. Incorrect. Plausible because this condition would have been allowed if hoist speed was in JOG at the time the hoist load decreased, however, it cannot be placed in a lower speed after the fact.

B. Incorrect. Plausible if thought that this would help the positioning of the fuel assembly, however, it does not meet the criteria established by CPNPP.

C. Incorrect. Plausible if thought that this would help the positioning of the fuel assembly, however, it does not meet the criteria established by CPNPP.

D. Correct. Per the guidance outlined in our RFO-302.

Technical Reference(s) RFO-302, Step 6.12 Attached w/ Revision # See Comments / Reference Page 37 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Proposed references to be provided during examination: None Learning Objective: STATE the axial loading limitation and the location axial loading may be applied to the fuel assembly, as defined in RFO-302. (LO21.RFO.FH2.OB03)

STATE the location that lateral loads may be applied to the fuel assembly as described in RFO-302. (LO21.RFO.FH2.OB02)

STATE the Operator Load Limits, defined in RFO-302, that must be observed when inserting or withdrawing fuel assemblies from any location.

(LO21.RFO.FH2.OB07)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 7 Page 38 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 1 K/A # G 2.1.39 Importance Rating 4.3 Conduct of Operations: Knowledge of conservative decision making practices Proposed Question: SRO 94 As a supervisor, which of the following elements must be carefully considered during conservative decision making as it has the greatest potential to increase risk during performance of a particular activity?

New employees...

A. with a can do attitude.

B. with a healthy questioning attitude.

C. stopping an activity when unsure of the outcome.

D. applying error prevention techniques during an activity.

Proposed Answer: A Explanation:

A. Correct. As a supervisor, new employees should be monitored and mentored on conservative decision making but be cautious of a "can-do" attitude.

B. Incorrect. Plausible if thought that a healthy questioning attitude of a new employee was adverse to conservative decision making.

C. Incorrect. Plausible if thought that stopping an activity when unsure of the outcome was adverse to conservative decision making.

D. Incorrect. Plausible if thought that applying error prevention techniques was inadvisable because the employee was new.

Technical Reference(s) Nuclear Policy Statement 208, Pages 2 & 3 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: CONDUCT the required on-shift training and CONTROL the actions of trainees in accordance with station procedures. (OPD1.ADM.XA1.OB06)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

Page 39 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 5 55.43 Page 40 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 1 K/A # G 2.1.35 Importance Rating 3.9 Conduct of Operations: Knowledge of fuel handling responsibilities of SROs Proposed Question: SRO 95 Given the following conditions:

  • Unit 1 is in MODE 6 with core off-load in progress.
  • A Fuel Handling Accident has occurred in Containment.
  • Containment Particulate and Gas Radiation Monitors are alarming on PC-11, Digital Radiation Monitoring System.
  • ABN-908, Fuel Handling Accident, has been entered.

Which of the following describes responsibilities of the Fuel Handling Supervisor in the Containment Building?

Along with placing the Fuel in a secured position, other responsibilities include:

A. Ensure the Upender is horizontal.

Ensure all Containment penetrations are isolated.

Ensure the Fuel Transfer Cart is in Containment.

B. Ensure the Upender is deenergized.

Direct personnel to exit Containment via any available means.

Sound the local Radiological Emergency alarm.

C. Ensure all Containment penetrations are isolated.

Ensure no loads are suspended from the Manipulator Crane.

Initiate a Containment Purge once Personnel Airlocks are secured.

D. Ensure the Upender is horizontal.

Direct personnel to exit to the Safeguards Building control point.

Ensure the Fuel Transfer Cart is in the Fuel Building.

Proposed Answer: D Page 41 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because the first two actions are correct, however, the Fuel Transfer Cart is moved to the Fuel Building and the Fuel Transfer Tube Gate Valve is closed.

B. Incorrect. Plausible if thought that exiting via the nearest exit would be the safest choice, however, personnel are required to exit into the Safeguards Building control point to allow radiological monitoring.

C. Incorrect. Plausible because the first two actions are correct, however, Containment Purge would be isolated upon receipt of Containment Particulate and Gas High Radiation alarms.

D. Correct. These actions are listed in the responsibilities of the Fuel Handling Supervisor during a Fuel Handling Accident within Containment.

Technical Reference(s) ABN-908, Steps 2.1, 2.2, & 2.3.8 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST those positions which are considered secure for storing a fuel assembly during a fuel handling accident as stated in ABN-908. (LO21.RFO.FH2.OB09)

Given a specific fuel handling accident, be able to OUTLINE the Initial Operator Actions per ABN-908. (LO21.RFO.FH2.OB10)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 4, 7 Page 42 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 2 K/A # G 2.2.1 Importance Rating 4.4 Equipment Control: Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity Proposed Question: SRO 96 Given the following conditions:

  • Unit 2 is in MODE 3.
  • Control Rod referencing is in progress per IPO-002B, Plant Startup from Hot Standby.
  • Source Range Channel N-31 suddenly fails low.
  • Source Range Channel N-32 is indicating 100 cps.

Which of the following actions is required?

A. Continue the Reactor Startup until both Intermediate Range Channels reach 1x10-10 amps then block both Source Range Channels per IPO-002B, Plant Startup from Hot Standby.

B. Restore N-31 to OPERABLE status or ensure all Control Rods inserted and made incapable of withdrawal within 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> per ABN-701, Source Range Instrument Malfunction.

C. Block Source Range Channels N-31 and N-32 because they are above the P-6 setpoint and are therefore not required for continued startup per ABN-701, Source Range Instrument Malfunction D. Immediately ensure both Reactor Trip Breakers are OPEN per ABN-701, Source Range Instrument Malfunction and continue in IPO-002B, Plant Startup from Hot Standby.

Proposed Answer: B Page 43 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because remaining in IPO-002B would be an appropriate action if the initial power level were higher, however, Technical Specification REQUIRED ACTIONS are not being met.

B. Correct. These are the appropriate actions for one Source Range Channel INOPERABLE and Rod Control capable of rod withdrawal.

C. Incorrect. Plausible because the Source Range Channels can eventually be blocked, however, Technical Specification REQUIRED ACTIONS are not being met.

D. Incorrect. Plausible because this would be an appropriate action for two failed Source Range Channels, however, the wrong procedure is referenced.

Technical Reference(s) IPO-002A, Steps 4.1.1, 4.1.2 & 4.1.3 Attached w/ Revision # See ABN-701, Section 2.3 Comments / Reference ABN-701, Attachment 1, Steps 1 & 3 Technical Specification LCOs 3.3.1.I, J, K Proposed references to be provided during examination: None Learning Objective: DESCRIBE the basis for the precautions and limitations, and given major procedure steps, PLACE them in the proper sequence, for:

  • IPO-002, Plant Startup from Hot Standby (OP51.SYS.EC1.OB24)

ANALYZE the indications and DESCRIBE the mitigation strategy and major steps taken relative to the Excore Instrumentation system, both initial and subsequent, for:

  • ABN-701, Source Range Instrumentation Malfunction (OP51.SYS.EC1.OB24)

LIST and DESCRIBE the following Technical Specifications (i.e., LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Excore Instrumentation System:

  • 3.3.1, Reactor Trip System Instrumentation (OP51.SYS.EC1.OB26)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2, 5, 6 Page 44 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 2 K/A # G 2.2.11 Importance Rating 3.3 Equipment Control: Knowledge of the process for controlling temporary design changes Proposed Question: SRO 97 Who shall review Temporary Modifications to ensure compatibility with existing plant conditions, current operating mode and impact on the opposite units operation prior to authorizing installation per STA-602, Temporary Modifications and Transient Equipment Placements?

A. Station Operations Review Committee (SORC).

B. Plant Manager.

C. Temporary Modification Coordinator.

D. Shift Manager.

Proposed Answer: D Explanation:

A. Incorrect. Plausible since SORC must review specific temporary modifications prior to installation per STA-602 Section 5.4.

B. Incorrect. Plausible since Plant Manager approves all Temporary Modifications prior to installation per STA-602 Section 5.5.

C. Incorrect. Plausible since the TMC has multiple responsibilities per STA-602; however, he does not authorize installation per STA-602, Section 5.3.

D. Correct. In accordance with STA-602, Step 6.5.3.

Technical Reference(s) STA-602, Sections 5.3 & 5.4 Attached w/ Revision # See STA-602, Steps 5.5, 5.6.3, & 6.5.3 Comments / Reference Proposed references to be provided during examination: None Learning Objective: REVIEW and APPROVE the installation and restoration of Temporary Modifications, and MAINTAIN files and documentation of Temporary Modifications. (OPD1.ADM.XA1.OB14)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Page 45 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 3 Page 46 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 3 K/A # G 2.3.13 Importance Rating 3.8 Radiation Control: Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Proposed Question: SRO 98 Given the following conditions:

  • The Unit is in MODE 1.
  • STA-620, Containment Entry, is in progress.
  • The gasket on the Inner Air Lock Door was reported damaged.
  • There is a gouge across the entire sealing surface approximately 1/8 inch deep and 1/2 inch wide and air flow could be heard through the gouge before pressure was equalized.

Which of the following are the Technical Specification REQUIRED ACTIONS?

Verify that the Outer Air Lock Door is CLOSED within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and...

A. within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LOCK the Outer Air Lock Door CLOSED. Operation may then continue provided the Outer Air Lock Door is verified LOCKED CLOSED at least once per 31 days.

B. within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LOCK the Inner Air Lock Door CLOSED. Be in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

C. within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LOCK the Outer Air Lock Door CLOSED. Be in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

D. within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LOCK the Inner Air Lock Door CLOSED. Operation may then continue provided that the Inner Air Lock Door is verified to be LOCKED CLOSED at least once per 31 days.

Proposed Answer: A Page 47 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Correct. Technical Specification LCO 3.6.2.A REQUIRED ACTION is to verify an OPERABLE Air Lock Door is closed within one hour, locked in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and surveillance performed every 31 days.

B. Incorrect. Plausible because the Outer Air Lock Door must be closed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The MODE changes are necessary only if the REQUIRED ACTION and COMPLETION TIME of TS LCO 3.6.2.A are not met.

C. Incorrect. Plausible because the initial actions are correct, however, changing MODES is only required if the REQUIRED ACTION and COMPLETION TIME are not met.

D. Incorrect. Plausible because the 1st action is correct, however, REQUIRED ACTIONS and COMPLETION TIMES listed for the Inner Air Lock Door are required for the Outer Air Lock Door.

Technical Reference(s) Technical Specification LCO 3.6.2.A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Learning Objective: LIST and DESCRIBE the following Technical Specifications (i.e. LCOs, action statements and conditional surveillance requirements of one hour and less, if applicable) for the Containment Systems:

  • Containment Air Locks 3.6.2 (OP51.SYS.CY1.OB32)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 1, 2 Page 48 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 4 K/A # G 2.4.27 Importance Rating 3.9 Emergency Procedures / Plan: Knowledge of fire in the plant procedures Proposed Question: SRO 99 Given the following conditions:

  • Both Units are at 100% power.
  • A fire occurs in the Unit 1 Cable Spreading Room.
  • Both Units are required to be shut down.
  • The Shift Manager is injured and cannot perform his duties.

Who will perform the duties of the Shift Manager and which Unit will control systems common to both Units per ABN-803A, Response to a Fire in the Control Room or Cable Spreading Room?

A. Unit 1 Unit Supervisor; Unit 1 will control.

B. Unit 1 Unit Supervisor; Unit 2 will control.

C. Unit 2 Unit Supervisor; Unit 1 will control.

D. Unit 2 Unit Supervisor; Unit 2 will control.

Proposed Answer: C Explanation:

A. Incorrect. Plausible because Unit 1 will control, however, the Unit 2 Unit Supervisor will act as Shift Manager.

B. Incorrect. Plausible if thought that Unit 1 Unit Supervisor should act as Shift Manager since the fire is in the Unit 1 Cable Spreading Room, however, the opposite Unit's Unit Supervisor performs this function.

C. Correct. Per the guidance set forth in ABN-803A.

D. Incorrect. Plausible because the Unit 2 Unit Supervisor will act as Shift Manager, however, even though the fire is in the Unit 1 Cable Spreading Room, Unit 1 controls common systems.

Technical Reference(s) ABN-803A, Steps 2.3.1 & 2.3.3 Notes Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: None Page 49 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Learning Objective: ASSESS the implementation of ABNs entered in Response To A Fire In The Control Room Or Cable Spreading Room in conjunction with EOPs.

(LO21.ABN.803.OB09)

EVALUATE all system limitations and precautions associated with Response To A Fire In The Control Room Or Cable Spreading Room.

(LO21.ABN.803.OB06)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 50 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Tier # 3 Category # 4 K/A # G 2.4.1 Importance Rating 4.8 Emergency Procedures / Plan: Knowledge of EOP entry conditions and immediate action steps Proposed Question: SRO 100 Given the following conditions:

  • Due to equipment failures, ECA-3.2A, SGTR With a Loss of Reactor Coolant-Saturated Recovery Desired, is being performed.
  • The STA informs you that the Critical Safety Function Status Trees (CSFST) are all GREEN with the exception of the following:
  • CORE COOLING CSFST is YELLOW based on Reactor Vessel Level.
  • INVENTORY CSFST is YELLOW based on Reactor Vessel Level.

Which of the following describes the implementation of procedures for this event?

A. Remain in ECA-3.2A. Do not address either CSFST YELLOW path as implementation is not allowed in the ECA procedures.

B. Hand off both CSFST YELLOW paths to other operators while remaining in ECA-3.2A. The actions of all procedures are to be implemented.

C. Transition from ECA-3.2A and address both CSFST YELLOW paths. The actions for CORE COOLING take precedence over the actions for INVENTORY.

D. Remain in ECA-3.2A. Address INVENTORY actions as desired and do not perform the actions for CORE COOLING due to conflict with ECA-3.2A actions.

Proposed Answer: D Page 51 of 52 Rev f

ES-401 CPNPP NRC 2011 SRO Written Exam Worksheet Form ES-401-5 Explanation:

A. Incorrect. Plausible because remaining in ECA-3.2A is correct, however, the only limitation imposed on the YELLOW path procedures is for the CORE COOLING Safety Functions.

B. Incorrect. Plausible because remaining in ECA-3.2A is correct, however, the limitation imposed on the YELLOW path procedures is for the CORE COOLING Safety Functions.

C. Incorrect. Plausible because FRC-0.3A is a higher priority, however, it cannot be performed as it conflicts with ECA-3.2A.

D. Correct. Per the guidance contained in FRC-0.3A, Response to Saturated Core Cooling. FRC-0.3A directs a reestablishment of RCS subcooling via Safety Injection Flow. This is inconsistent with the actions of ECA-3.2A which reduce RCS subcooling via ECCS flow reduction in order to minimize primary to secondary leakage during a SGTR.

Technical Reference(s) FRC-0.3A, Step 1 Note Attached w/ Revision # See FRC-0.3A, Attachment 2 Bases Comments / Reference ECA-3.2A, Flow Chart FRI-0.3A, CSFST Proposed references to be provided during examination: None Learning Objective: STATE the two paths through which the ERG network may be entered, and DESCRIBE the conditions that require/allow entry for each.

(LO21.ERG.XD2.OB21)

DESCRIBE the expectations associated with performing immediate actions for the US/RO. (LO21.ERG.XD2.OB29)

Question Source: Bank # CPNPP LXR Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Page 52 of 52 Rev f