CP-201700402, Response to RIS 2017-03

From kanterella
Jump to navigation Jump to search
Response to RIS 2017-03
ML17143A232
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/28/2017
From: Cox D
Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201700402, RIS-17-003
Download: ML17143A232 (2)


Text

David Coit Luminant Power Luminant Operat!ons Initial Tra!nlng Supeivisor David.Gox@luminant.com P 0Box1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5578 F 254 897 5400 April 2s; 2017 CP-201700402 U.S. Nuclear Regulatory Commission

_ATI'.N': Document Control Oesk Washington, DC 20S55-0001 Re: Response to RIS 2017-03 T,o whom it may concern, Please find attached NRC 'Form *536 for Comanche Peak. This is in response to RJS 2017-03, requesting update of initial examination schedules for CYs 2019 through 2022.

The attached document has also been electronically submitted to Vincent Gaddy in the Region

. IV office, as requested in the RIS. *

/ 'I Art: NRC Form 536, Comanche Peak Nuc::lear Power Plant

  • ~

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, This

<>""""**~,

" ....0 information collection is used to plan budgets and resources for operator examinations. Send

/!!

~n 0

OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

..;-1'~

i EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

,..,.. ...... ~.o~ NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Comanche Peak Nuclear Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 19 CY 20 CY 21 CY 22 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 19 CY 20 CY 21 CY 22 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 6 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 6 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 9 9 6 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/10/2019 06/15/2020 06/14/2021 06/13/2022 I

ALTERNATE DATE 06/17/2019 06/22/2020 06/21/2021 06/20/2022

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY CY PROPOSED NUMBER MARCH

--- SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRG FORM 536 (05-2016)