2021-08-DRAFT Outline Comments
ML21299A019
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/23/2021
From: Heather Gepford
Operations Branch IV
To:
Luminant Generation Co
References
Download: ML21299A019 (2)


Text

PROPOSED OUTLINE COMMENTS Facility: Comanche Peak First Exam Date: August 9, 2021 Written Exam Outline March 8, 2021 Comment Resolution 1 None Administrative JPM Outline March 8, 2021 Comment Resolution Is SA2 the same bank JPM as 2018 No exam? The task number is the same

  • Task SO1002 is to Interpret and ensure but the noun name is different. If it is compliance with plant administrative and the same, then SA1 and SA2 were both operational procedures, guidelines, and used in 2018. policies.
  • In 2018 the JPM was to Calculate RCS 1

Leakrate and determine TS LCO entry conditions.

  • This year the JPM is to Identify Reduced Inventory Contingencies.
  • Both of these JPMs fall under the same SRO task but are different.

Control Room / In-Plant System JPM Outline March 8, 2021 Comment Resolution Though not a strict requirement, is it

  • Yes possible to make either P1 or P3
  • P-3 can be made into an alternate path alternate path? I would like everyone to JPM.

have at least 1 alternate path JPM.

  • I will have the upgrades perform S-6 1

instead of S-4, so they continue to only have 3 alternate paths.

  • Upgrades still have all different Safety Functions Simulator Scenario Outline Comments March 8, 2021 Comment Resolution Scenario 3, Critical Task 2. The I will remove the word incorrectly from the wording is confusing. It is stating to do CT.

1 something (start a diesel) before incorrectly doing something else OBDI 202 - IOLE Process Rev 3

(placing equipment in pull-out). That is recognizing that something will be incorrectly performed. OBDI 202 - IOLE Process Rev 3