ML21299A019
| ML21299A019 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/23/2021 |
| From: | Heather Gepford Operations Branch IV |
| To: | Luminant Generation Co |
| References | |
| Download: ML21299A019 (2) | |
Text
Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility: Comanche Peak First Exam Date: August 9, 2021 Written Exam Outline March 8, 2021 Comment Resolution 1 None Administrative JPM Outline March 8, 2021 Comment Resolution 1
Is SA2 the same bank JPM as 2018 exam? The task number is the same but the noun name is different. If it is the same, then SA1 and SA2 were both used in 2018.
No Task SO1002 is to Interpret and ensure compliance with plant administrative and operational procedures, guidelines, and policies.
In 2018 the JPM was to Calculate RCS Leakrate and determine TS LCO entry conditions.
This year the JPM is to Identify Reduced Inventory Contingencies.
Both of these JPMs fall under the same SRO task but are different.
Control Room / In-Plant System JPM Outline March 8, 2021 Comment Resolution 1
Though not a strict requirement, is it possible to make either P1 or P3 alternate path? I would like everyone to have at least 1 alternate path JPM.
Yes P-3 can be made into an alternate path JPM.
I will have the upgrades perform S-6 instead of S-4, so they continue to only have 3 alternate paths.
Upgrades still have all different Safety Functions Simulator Scenario Outline Comments March 8, 2021 Comment Resolution 1
Scenario 3, Critical Task 2. The wording is confusing. It is stating to do something (start a diesel) before incorrectly doing something else I will remove the word incorrectly from the CT.
OBDI 202 - IOLE Process Rev 3 (placing equipment in pull-out). That is recognizing that something will be incorrectly performed.