ML18157A060

From kanterella
Jump to navigation Jump to search
NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301
ML18157A060
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/06/2018
From: Vincent Gaddy
Operations Branch IV
To: Thomas McCool
Luminant Generation Co
References
50-445/18-01, 50-446/18-01 50-445/OL-18-01, 50-446/OL-18-01
Download: ML18157A060 (3)


See also: IR 05000445/2018301

Text

June 6, 2018

Mr. Thomas P. McCool, Site Vice President

Attention: Regulatory Affairs

Luminant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC INITIAL

OPERATOR LICENSING EXAMINATION APPROVAL 05000445/2018301;

05000446/2018301

Dear Mr. McCool:

The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at Comanche Peak Nuclear Power Plant, Units 1, and 2.

The Nuclear Regulatory Commission (NRC) has completed its review of the operator license

applications submitted in connection with this examination and separately provided a list of

approved applicants to Ms. Donna Christiansen, Training Director. Note that any examination

waivers and applications denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the

written examination in accordance with NUREG-1021, "Operator Licensing Examination

Standards for Power Reactors," Revision 11, on June 20, 2018. The NRC staff will administer

the operating tests during the week of June 11, 2018. This examination has undergone

extensive review by my staff and representatives responsible for licensed operator training at

your facility. Based on this review, I have concluded that the examination meets the guidelines

of NUREG-1021 for content, operational, and discrimination validity. By administering this

examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for

measuring the qualifications of licensed operator applicants at your facility. If you determine

that this examination is not appropriate for licensing operators at your facility, do not administer

the examination and contact me at (817) 200-1159.

T. McCool 2

Please contact your Chief Examiner, Kelly Clayton, at (817) 200-1216, if you have any

questions or identify any errors or changes in the license level (RO or SRO) or type of

examination (partial or complete written examination and/or operating test) specified for each

applicant.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

cc:

Jordan Ruby

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043-1147

Electronic Distribution for Comanche Peak

ML18157A060

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: KDC Yes No Non-Publicly Available Sensitive RGN-002

OFFICE R4/DRS/OB/SOE R4/DRS/OB/BC

NAME KClayton VGaddy

SIGNATURE /RA/ /RA/

DATE 6/6/2018 6/6/2018