ML20174A610

From kanterella
Jump to navigation Jump to search
05 Final Written Examination
ML20174A610
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/21/2020
From: Greg Werner
Operations Branch IV
To:
Vistra Operating Co. (VistraOpCo)
References
50-445/20-05, 50-446/20-05 50-445/OL-20, 50-446/OL-20
Download: ML20174A610 (583)


Text

CPNPP 2020 NRC RO Exam Answer Key 1 B 26 B 51 A 2 A 27 C 52 D 3 A 28 A 53 C 4 B 29 B 54 A 5 C 30 D 55 A 6 D 31 D 56 D 7 A 32 B 57 B 8 C 33 D 58 C 9 B 34 C 59 B 10 B 35 D 60 D 11 A 36 C 61 B 12 B 37 C 62 C 13 D 38 B 63 D 14 B 39 D 64 D 15 A 40 A 65 D 16 D 41 D 66 B 17 B 42 D 67 B 18 A 43 C 68 A 19 A 44 B 69 D 20 B 45 A 70 B 21 D 46 C 71 C 22 B 47 D 72 C 23 C 48 D 73 D 24 C 49 C 74 A 25 C 50 A 75 A A - 17 B - 20 C - 17 D - 21

CPNPP 2020 NRC SRO Exam Answer Key 1 B 26 B 51 A 76 B 2 A 27 C 52 D 77 B 3 A 28 A 53 C 78 C 4 B 29 B 54 A 79 A 5 C 30 D 55 A 80 C 6 D 31 D 56 D 81 A 7 A 32 B 57 B 82 C 8 C 33 D 58 C 83 A 9 B 34 C 59 B 84 A 10 B 35 D 60 D 85 D 11 A 36 C 61 B 86 D 12 B 37 C 62 C 87 B 13 D 38 B 63 D 88 D 14 B 39 D 64 D 89 D 15 A 40 A 65 D 90 D 16 D 41 D 66 B 91 B 17 B 42 D 67 B 92 A 18 A 43 C 68 A 93 D 19 A 44 B 69 D 94 A 20 B 45 A 70 B 95 A 21 D 46 C 71 C 96 A 22 B 47 D 72 C 97 B 23 C 48 D 73 D 98 B 24 C 49 C 74 A 99 D 25 C 50 A 75 A 100 C RO Overall SRO A - 17 A - 25 A-8 B - 20 B - 26 B-6 C - 17 C - 21 C-4 D - 21 D - 28 D-7

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 003.K5.02 Level of Difficulty: 4 Importance Rating 2.8 Reactor Coolant Pump: Knowledge of the operational implications of the following concepts as they apply to the RCPS:

Effects of RCP coastdown on RCS parameters Question # 1 The RCP ___(1)___ reactor trip is designed to ensure an adequate RCP coastdown time by tripping all RCP breakers.

Adequate coastdown time is designed to provide protection against violating ___(2)___

limits.

A. (1) undervoltage (2) Departure from Nucleate Boiling B. (1) underfrequency (2) Departure from Nucleate Boiling C. (1) undervoltage (2) Peak Fuel Centerline Temperature D. (1) underfrequency (2) Peak Fuel Centerline Temperature Answer: B Page 1 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

This question matches the KA by requiring knowledge of RCP underfrequency tripping requirements and the effect of coastdown on core cooling, which without coastdown would lead to violating DNBR limits.

Explanation:

A. Incorrect. Second part is correct. First part is plausible since breakers commonly are designed to trip on undervoltage, but the underfrequency trip is the only one of the two that opens the RCP breakers.

B. Correct. This reactor trip anticipates a loss of coolant flow and helps prevent exceeding DNBR limits by establishing natural circulation. Besides tripping the reactor, it also trips all RCP breakers to extend pump coastdown time.

C. Incorrect. First part plausibility described in "A" above. PCT is plausible since it is a limit of concern in TS, but is based on overpower and not loss of flow.

D. Incorrect. First part is correct. Second part plausibility described in "C" above.

Technical Reference(s) TS 3.3.1 Bases Attached w/ Revision # See RPS Study Guide Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Reactor Coolant system including interrelations with other systems to include interlocks and control loops in accordance with DBD-ME-0250, Reactor Coolant System. (ABN.101.OB01)

Question Source: Bank # 68303 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 2 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RPS Study Guide Revision: 5-4-2011 Page 3 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TSB 3.3.1 Revision: 73 Page 4 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 004.K4.16 Level of Difficulty: 3 Importance Rating 2.6 Chemical and Volume Control: Knowledge of CVCS design feature(s) and/or interlock(s) which provide for the following:

Temperature at which the temperature control valve automatically diverts flow from the demineralizer to the VCT; reason for this diversion Question # 2 Given the following conditions:

Unit 1 at 100% power.

1-ALB-6A, 1.3, LTDN HX OUT TEMP HI, is in alarm.

1-TI-130, LTDN HX OUT TEMP, is indicating 132oF and rising slowly.

(1) At what Letdown Heat Exchanger Outlet temperature setpoint does 1/1-TCV-129, LTDN DIVERT VLV automatically divert to the VCT; and, (2) Why does 1/1-TCV-129 divert to the VCT?

A. (1) 135oF (2) Prevent damage to the resin due to high temperature B. (1) 135oF (2) Prevent inadvertent dilution of the RCS due to boron retention in the demins C. (1) 155oF (2) Prevent damage to the resin due to high temperature D. (1) 155oF (2) Prevent inadvertent dilution of the RCS due to boron retention in the demins Answer: A Page 5 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Match to K/A because question requires knowledge of setpoint for diversion to the VCT and the reason for bypassing CVCS demins.

Explanation:

A. Correct. TCV-129 automatically diverts when TI-130 reaches 135oF. This diversion prevents damage to the CVCS demin resin.

B. Incorrect. Plausible since 1st part is correct (see A). 2nd part is plausible since boron retention in the resin is affected by temperature, but high temperature releases boron, resulting in a boration.

C. Incorrect. Plausible since TCV-129 will divert on high temperature of 155oF, but this is measured at the inlet to BTRS, not at TI-130. 2nd part is correct (see A).

D. Incorrect. 1st part is plausible (see C). 2nd part is plausible (see B).

Technical Reference(s) ALM-0061A Attached w/ Revision # See SOP-106A Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Chemical and Volume Control system in accordance with referenced procedures.

(SYS.CS1.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 6 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0061A Revision: 7 Page 7 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

CVCS Study Guide Revision: 4-28-2011 Page 8 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

CVCS Study Guide Revision: 4-28-2011 Examination Outline Cross-reference: Level RO SRO Page 9 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 0 Tier 2 Group 1 K/A 005.K2.03 Level of Difficulty: 3 Importance Rating 2.7 Residual Heat Removal: Knowledge of bus power supplies to the following: RCS pressure boundary motor-operated valves Question # 3 Which of the following identifies the NORMAL power supplies to the Train A RHR Pump Hot Leg Recirculation Valves 1-8701A and 1-8702A?

8701A 8702A A. 1EB3-2 1EB4-2 B. 1EB1-2 1EB4-2 C. 1EB3-2 1EB2-2 D. 1EB1-2 1EB2-2 Answer: A Page 10 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Match to K/A because question requires knowledge of power to MOVs on RCS to RHR isolation valves.

Explanation:

A. Correct. The normal power supply to 8701A is from 1EB3-2 and 8702A is 1EB4-2.

B. Incorrect. Plausible since 8702A is powered from 1EB4-2 and 8701A is powered from Train A, but it is 1EB3-2, not 1EB1-2, both of which are Train A power supplies.

C. Incorrect. Plausible since 8701A is powered from 1EB3-2 and 8702A is powered from Train B, but it is 1EB4-2, not 1EB2-2, both of which are Train B power supplies.

D. Incorrect. Plausible since 8701A is powered from Train A and 8702A is powered from Train B, but the other busses in each train.

Technical Reference(s) RHR System Study Guide Attached w/ Revision # See SOP-102A Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Residual Heat Removal system including interrelations with other systems to include interlocks and control loops in accordance with DBD-ME-260. (SYS.RH1.OB03)

Question Source: Bank #

Modified Bank # 23090 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 11 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 23090 Revision:

Page 12 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RHR Study Guide, Pg 15 Revision: 10-20-2011 Page 13 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 14 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-102A, Train A Elect Revision: 1 Page 15 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-102A, Train A Elect Revision: 1 Page 16 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 006.G.2.4.20 Level of Difficulty: 2 Importance Rating 3.8 Emergency Core Cooling: Knowledge of the operational implications of EOP warnings, cautions, and notes.

Question # 4 A CAUTION statement in EOS-1.3A, Transfer to Cold Leg Recirculation, states the ECCS pumps taking suction from the RWST shall be stopped if RWST level lowers to ___(1)___

and stopping the ___(2)___ has the highest priority due to NPSH and vortexing concerns.

A. (1) the empty alarm (2) SIP B. (1) the empty alarm (2) CCP C. (1) 0% level (2) SIP D. (1) 0% level (2) CCP Answer: B Page 17 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of EOP caution related to Emergency Core Cooling System.

Explanation:

A. Incorrect. 1st part is correct (see B). 2nd part is incorrect, but plausible because SIPs have higher flow capacity which might imply they could cavitate first, but the CCP has a higher suction line.

B. Correct. 1st part is correct. Caution states that the ECCS pumps should be secured at RWST empty (if still taking a suction from RWST). 2nd part is correct. The CCP should be stopped first due to the suction line to the CCPs being physically higher than the SIP suction.

C. Incorrect. 1st part is incorrect, but plausible because this is the level that the CSPs are stopped, but CCPs and SIPs are stopped at empty level. 2nd part is incorrect, but plausible (see A).

D. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is correct (see B).

Technical Reference(s) EOS-1.3A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE the bases for all steps, Notes and Cautions. (ERG.E13.OB05)

Question Source: Bank # 71618 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 18 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOS-1.3A Revision: 9 Page 19 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOS-1.3A Revision: 9 Page 20 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 2 Group 1 K/A 007.K1.03 Level of Difficulty: 2 Importance Rating 3.0 Pressurizer Relief Tank: Knowledge of the physical connections and/or cause effect relationships between the PRTS and the following systems: RCS Question # 5 While operating at 100% equilibrium power, the PRT temperature and level are slowly rising.

Which of the following identifies a possible source of inflow to the PRT?

A. 1/1-8032, RV SEAL LKOFF VLV, leak by B. 1/1-8143, XS LTDN DIVERT VLV, leak by C. 1-8117, U1 LTDN ORIF DNSTRM RLF VLV, lifting D. 1-8856A, RHR PUMP 1 DISCH CL INJ RLF VLV, lifting Answer: C Page 21 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

This question matches the KA by requiring knowledge of the interface between possible leakage paths from the RCS and the inputs to the PRT.

Explanation:

A. Incorrect. Plausible because vessel head leak off flow is directed to within Containment, however, but it goes to atmosphere.

B. Incorrect. Plausible because excess letdown divert valve is directed to a tank within Containment, however, it is the Reactor Coolant Drain Tank (RCDT).

C. Correct. The Chemical and Volume Control System Letdown Relief Line Valve goes to the Pressurizer Relief Tank.

D. Incorrect. Plausible because one might assume that the RHR Pump CL Injection Relief went to the PRT, however, it goes to the HUT. The RHR suction relief goes to the PRT.

Technical Reference(s) RCS Study Guide Attached w/ Revision # See ALM-0052A, 2.3, 3.3, 4.3 Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the basic design and flow path of the Reactor Coolant system in accordance with DBD-ME-0250, Reactor Coolant System. (SYS.RC1.OB02)

Question Source: Bank # 22454 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 22 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RCS Study Guide Revision: 4-28-2011 Page 23 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RCS Study Guide, Fig 17 Revision: 4-28-2011 Page 24 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0052A Revision: 6 Page 25 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0052A Revision: 6 Page 26 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0052A Revision: 6 Page 27 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 007.A4.10 Level of Difficulty: 3 Importance Rating 3.6 Pressurizer Relief Tank: Ability to manually operate and/or monitor in the control room: Recognition of leaking PORV/code safety Question # 6 Given the following conditions:

Containment pressure is 1.1 psig.

RCS pressure = 2235 psig and stable.

Pressurizer Relief Tank pressure is 39 psig and slowly increasing.

Which of the following tailpipe temperatures would be indicative of a leaking PRZR Safety or Relief Valve?

A. 216oF B. 235oF C. 264oF D. 284oF Answer: D Page 28 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Question matches K/A by requiring knowledge of how to determine the temperature indication downstream of leaking valve.

Explanation:

A. Incorrect. Plausible since this is saturation temperature for 1.1 psig (16 psia), but saturation for PRT conditions is 284oF which is correct.

B. Incorrect. Plausible since this is saturation temperature for 23 psia, but saturation for PRT conditions is 284oF which is correct. 23 psia could be used if incorrectly coverts 38 psig to psia.

C. Incorrect. Plausible since this is saturation temperature for 38 psia, but saturation for PRT conditions is 284oF which is correct. 38 psia could be used if incorrectly fails to convert 38 psig to psia.

D. Correct. Constant enthalpy through valve results in a temperature at saturation for the pressure downstream, 38 psig (53 psia) and 284oF Technical Reference(s) Steam Tables Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination: Steam Tables Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Pressurizer Pressure and Level Control System in accordance with ABN-705, Pressurizer Pressure Malfunction, and ABN-706, Pressurizer Level Instrumentation Malfunction. (SYS.PP1.OB07)

Question Source: Bank #

Modified Bank # 66279 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 29 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 66279 Revision:

Page 30 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Steam Tables Revision:

Page 31 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Steam Tables Revision:

Page 32 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Steam Tables Revision:

Page 33 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Steam Tables Revision:

Page 34 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 008.K1.01 Level of Difficulty: 2 Importance Rating 3.1 Component Cooling Water System: Knowledge of the physical connections and/or cause-effect relationships between the CCWS and the following systems: Service Water System Question # 7 After depressurizing a CCW safeguards loop, SSW to the CCW heat exchanger is isolated, and CCW side drains are opened, to prevent or minimize ...

A. chloride infusion into CCW.

B. hydrazine release into the SSI.

C. overpressurizing the heat exchanger.

D. thermal stresses in the heat exchanger.

Answer: A Page 35 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Matches the KA by requiring knowledge of the effect on SSW system as a result of operations performed on the CCW heat exchanger.

Explanation:

A. Correct. Isolating the SSW side and opening the drains on the CCW side of the heat exchanger will prevent chloride infusion into the CCW side of the CCW heat exchanger in the event of a tube leak in the HX. At operating conditions this is prevented due to CCW pressure being greater than SSW.

B. Incorrect. Plausible a CCW leak to SSW in the HX could cause hydrazine to enter the SSI, but with CCW depressurized any leakage would be into CCW.

C. Incorrect. Plausible since a maximum differential pressure would exist across the HX tubes with CCW depressurized, but HX pressure will not be higher than during normal operations.

D. Incorrect. Plausible since SSW cools the CCW HX and without CCW it might be considered that no heat source exists in the HX, but this will not cause thermal stresses to exist.

Technical Reference(s) CCW Study Guide Attached w/ Revision # See SOP-502A Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Station Service Water system including interrelations with other systems to include interlocks and control loops IAW DBD-ME-233. (SYS.SW1.OB03)

Question Source: Bank # 22818 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 36 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SSW Study Guide Revision: 4-28-2011 Page 37 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SSW Study Guide Revision: 4-28-2011 Page 38 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-502A Revision: 19 Page 39 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-502A Revision: 19 Page 40 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 008.K3.01 Level of Difficulty: 3 Importance Rating 3.4 Component Cooling Water System: Knowledge of the effect that a loss or malfunction of the CCWS will have on the following: Loads cooled by CCWS.

Question # 8 Given the following plant conditions:

A LOCA has occurred on Unit 2 SI has been actuated Containment Spray and Containment Isolation Phase B isolation have been verified The SI sequencers have timed out The operating SFP cooling HX was aligned to Unit 2 prior to the event Assuming NO operator action, which of the following is the expected response of the SFP cooling system?

A. The previously running SFP cooling pump is sequenced on the bus and restarted with CCW flow to the SFP heat exchanger.

B. The previously running SFP cooling pump will restart when the operator lockouts have cleared with NO CCW flow to the SFP heat exchanger.

C. Neither SFP cooling pump is running and there is NO CCW flow to the heat exchangers aligned to Unit 2.

D. Neither SFP cooling pump is running, but CCW flow is aligned to both SFP heat exchangers.

Answer: C Page 41 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Matches K/A by requiring understanding of interaction between SFPCS and CCW following an SI and Phase B signal.

Explanation:

A. Incorrect. Plausible since CCW would be aligned if the Phase B signal did not occur, but the sequencer does not restart the SFP cooling pumps.

B. Incorrect. Plausible since CCW is not aligned due to the Phase B signal, but the sequencer does not restart the SFP cooling pumps.

C. Correct. Neither pump will be started without operator action and there is no flow to the heat exchanger cooled by Unit 2 due to the phase B.

D. Incorrect. Plausible since neither pump will be running, but CCW flow will not be aligned to the heat exchanger aligned to Unit 2 due to the phase B.

Technical Reference(s) SFPCS Study Guide Attached w/ Revision # See EOP-0.0A Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Spent Fuel Pool Cooling and Cleanup system IAW SOP-506 and ABN-909.

(SYS.SF1.OB04)

Question Source: Bank # 23470 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 42 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SFPCS Study Guide Revision: 5-2-2011 Page 43 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SFPCS Study Guide Revision: 5-2-2011 Page 44 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SFPCS Study Guide Revision: 5-2-2011 Page 45 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 46 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 47 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 48 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 010.A1.08 Level of Difficulty: 4 Importance Rating 3.2 Pressurizer Pressure Control System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR PCS controls including: Spray nozzle DT.

Question # 9 The PRZR spray nozzle T cyclic and transient limit between ___(1)___ and the PRZR vapor space SHALL NOT exceed ___(2)___.

A. (1) Auxiliary Spray (2) 320oF B. (1) Auxiliary Spray (2) 625oF C. (1) Normal Spray (2) 625oF D. (1) Normal Spray (2) 320oF Answer: B Page 49 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Matches K/A by requiring knowledge of differential temperature limits between RCS cold leg and Przr steam space.

Explanation:

A. Incorrect. Plausible since the administrative DT limit is 320oF based on the temperature of Auxiliary Spray and Pressurizer Vapor Space temperature, but the cyclic limit is 625oF.

B. Correct. The limit is based upon Auxiliary Spray temperature and the cyclic limit is 625oF.

C. Incorrect. Plausible since cyclic limit is 625oF, but it is based on Auxiliary Spray temperature.

D. Incorrect. Plausible since administrative DT limit is 320oF, but it is based on Auxiliary Spray temperature and the cyclic limit is 625oF.

Technical Reference(s) IPO-001A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS IPO-001, Plant Heatup from Cold Shutdown to Hot Standby, to include the following: Applicability; Precautions; Limitations; Notes; Instructions.

(IPO.001.OB02)

Question Source: Bank #

Modified Bank # 34461 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 50 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 34461 Revision:

Page 51 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

IPO-001A Revision: 24 Page 52 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 012.K6.02 Level of Difficulty: 4 Importance Rating 2.9 Reactor Protection: Knowledge of the effect of a loss or malfunction of the following will have on the RPS: Redundant channels.

Question # 10 Given the following conditions:

Unit 2 at 100%

Distribution Panel 2PC3, (CP2-ECDPPC-03) is de-energized ABN-603, Loss of Protection or Instrument Bus, is in progress Subsequently:

2-PT-936, Containment Pressure Channel II, fails high Automatic Safety Injection actuation ____(1)____ occur.

Automatic Containment Spray actuation ____(2)____ occur.

A. (1) does (2) does B. (1) does (2) does NOT C. (1) does NOT (2) does D. (1) does NOT (2) does NOT Answer: B Page 53 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match since knowledge of failure of redundant channels is required.

Explanation:

A. Incorrect. First part is correct (See B below). Second part is incorrect but plausible because may believe that the CS signal is energize to actuate which would cause CS auto actuation.

B. Correct. First part is correct because the containment high pressure SI signal is a 2/3 coincidence which is de-energize to actuate. With channel III de-energized due to the loss of power to 2PC3 which de-energizes 2-PT-935, plus the failure of 2-PT-936 (channel II) the 2/3 coincidence is met causing an auto SI. Second part is correct because the CS signal is 2/4 coincidence and energize to actuate. With channel III de-energized due to the loss of 2PC3 and the failure of 2-PT-936 (channel II) which is energize to actuate for the CS signal there is only 1/4 coincidence met and Containment Spray will not actuate.

C. Incorrect. First part is incorrect but plausible since one of the two signals is energized to actuate and the other is de-energized to actuate, but SI is de-energize to actuate and CS is energized to actuate and must recall which is which. Second part is incorrect but plausible (See A above).

D. Incorrect. First part is incorrect but plausible (See C above). Second part is correct (See B above).

Technical Reference(s) RPS Study Guide Attached w/ Revision # See DBD-EE-021, RPS and NSSS Controls Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the instrumentation and controls of the Reactor Protection and Engineered Safeguard Actuation Systems and PREDICT the system response in accordance with DBD-EE-021, Reactor Protection and NSSS Related Control Systems and Westinghouse Drawings 7247D05. (SYS.ES1.OB04)

Question Source: Bank # 18531 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 54 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

DBD-EE-021 Revision: 36 Page 55 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RPS Study Guide Revision: 5-4-2011 Page 56 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RPS Study Guide Revision: 5-4-2011 Page 57 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

OP51.SYS.ES1.FG23 Revision: 9-20-2004 Page 58 of 58 CPNPP 2020-05 retake NRC Written Exam Worksheet 1-10 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 1 K/A 013.A1.04 Level of Difficulty: 2 Importance Rating 3.4 Engineered Safety Features Actuation: Ability to predict and/or monitor changes in parameters (to Prevent exceeding design limits) associated with operating the ESFAS controls including: S/G level Question # 11 Given the following conditions:

Unit 1 is at 55% power.

1-FK-510, SG 1 FW FLO CTRL, fails OPEN.

Which of the following describes the plant response, assuming NO operator action?

Turbine trip due to a coincidence of___(1)___ NR level channels on SG 1-01 rising to a MINUMUM value of GREATER THAN OR EQUAL TO ___(2)___.

A. (1) 2 of 3 (2) 84%

B. (1) 2 of 4 (2) 84%

C. (1) 2 of 3 (2) 81.5%

D. (1) 2 of 4 (2) 81.5%

Answer: A Page 1 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of interrelationship between ESFAS bistables associated with SG hi-hi level, P-14.

Explanation:

A. Correct. 2/3 channels reaching the hi-hi level setpoint of 84% on Unit 1 will cause a P-14 actuation, tripping the turbine.

B. Incorrect. Plausible since 84% level will result in a P-14 actuation, but it requires only 2/3 channels.

C. Incorrect. Plausible since P-14 requires 2/3 channels, but the Unit 1 setpoint is 84%. Unit 2 setpoint is 81.5%.

D. Incorrect. Plausible since each SG has 4 level channels, but P-14 requires 2/3 channels, and the Unit 1 setpoint is 84%. Unit 2 setpoint is 81.5%.

Technical Reference(s) ALM-0081A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Steam Generator Level Instrument Malfunction in accordance with ABN-710, Steam Generator Level Instrumentation Malfunction.

(ABN.710.OB01)

Question Source: Bank # 38421 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 2 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0081A Revision: 8 Page 3 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0081B Revision: 3 Page 4 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 022.A3.01 Level of Difficulty: 3 Importance Rating 4.1 Containment Cooling: Ability to monitor automatic operation of the CCS, including: Initiation of safeguards mode of operation Question # 12 Which of the following describes how the CACRs respond to an SI Signal and a Loss of Offsite Power?

The fans are _____(1)______ following an SI Signal and _____(2)_____ following a Loss of Offsite Power.

A. (1) load shed (2) trip on UV and remain off B. (1) load shed (2) trip on UV and are sequenced on by the Blackout Sequencer C. (1) sequenced on by the Safety Injection Sequencer (2) trip on UV and remain off D. (1) sequenced on by the Safety Injection Sequencer (2) trip on UV and are sequenced on by the Blackout Sequencer Answer: B Page 5 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match as question requires knowledge of Containment Fan Cooler response to safeguards signals.

Explanation:

A. Incorrect. Plausible since the fans are load shed by the SI and trip on UV on loss of power, but the BOS will restart them.

B. Correct. Fans are load shed by an SI signal and trip on UV due to a loss of offsite power. Once power is restored to the bus, the fans are sequenced on by the BOS.

C. Incorrect. Plausible since the fans trip on UV due to the loss of offsite power, but SI causes a load shed and the BOS restarts the fans.

D. Incorrect. Plausible since the fans trip on UV due to a loss of offsite power and once power is restored to the bus, the fans are sequenced on by the BOS, but the SIS does not sequence the fans on.

Technical Reference(s) EOP-0.0A Attached w/ Revision # See ABN-602 Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Containment Ventilation system including interrelations with other systems to include interlocks and control loops IAW DBD-ME-300 and 301. (SYS.CL1.OB01)

Question Source: Bank #

Modified Bank # 58020 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 6 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 58020 Revision:

Page 7 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 58020 Revision:

Page 8 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 9 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 10 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 11 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-602 Revision: 8 Page 12 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-602, Pg 80 Revision: 8 Page 13 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Cont Vent Study Guide Revision: 5-2-2011 Page 14 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 026.A4.05 Level of Difficulty: 2 Importance Rating 3.5 Containment Spray: Ability to manually operate and/or monitor in the control room: Containment spray reset switches Question # 13 Given the following conditions:

A LOCA has occurred, resulting in a Safety Injection and a Containment Spray actuation.

The crew is responding to the event and are resetting ESF signals in accordance with EOS-1.3A, Transfer to Cold Leg Recirculation.

When the CONTAINMENT SPRAY RESET pushbuttons are depressed on CB-02, which of the following indications are expected regarding associated alarm windows on ALB-02B?

Window 1.8, CS ACT, ___(1)___ and Windows 3.5, CS HX 1 OUT VLV NOT CLOSE HV-4776, and 4.5, CS HX 2 OUT VLV NOT CLOSE HV-4777 ___(2)___.

A. (1) CLEARS (2) CLEAR B. (1) remains LIT (2) ALARM C. (1) remains LIT (2) CLEAR D. (1) CLEARS (2) ALARM Answer: D Page 15 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to monitor alarms associated with CS Reset switches and identifying correct state.

Explanation:

A. Incorrect. Plausible since Window 1.8 changes state from LIT to DARK and HX outlet valves are open, but Windows 3.5 and 4.5 are blocked from being LIT while a CS signal is active. Once Reset is depressed, these alarms are enabled and LIGHT.

B. Incorrect. Plausible since Windows 3.5 and 4.5 change state from DARK to LIT, but Window 1.8 changes state.

C. Incorrect. Plausible since HX outlet valves are open prior to reset, but alarm is blocked until reset is depressed.

A. Correct. Upon CS actuation, Window 1.8 LIGHTS, but Windows 3.5 and 4.5 remain DARK even though valves are open. Once CS signal is reset, valves are still open, but alarm becomes enabled.

Technical Reference(s) EOS-1.3A Attached w/ Revision # See ALM-0022A Comments / Reference Cont Spray Study Guide Proposed references to be provided during examination:

Learning Objective: EXPLAIN the instrumentation and controls of the Containment Spray System and PREDICT the system response in accordance with FRZ-0.1A/B and EOS-1.3A/B. (SYS.CT1.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 16 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOS-1.3A Revision: 9 Page 17 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0022A Revision: 10 Page 18 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0022A Revision: 10 Page 19 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0022A Revision: 10 Page 20 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0022A Revision: 10 Page 21 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Cont Spray Study Guide Revision: 5-2-2011 Page 22 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 1 K/A 039.A3.02 Level of Difficulty: 3 Importance Rating 3.1 Main and Reheat Steam: Ability to monitor automatic operation of the MRSS, including: Isolation of the MRSS.

Question # 14 Given the following conditions:

Unit 2 is in the process of a cooldown for refueling Przr Pressure is 1990 psig and stable Steamline pressures are 825 psig and lowering slowly At this time, Przr Low Pressure and Steamline Low Pressure SI signals are ___(1)___ of being blocked.

Subsequently:

A steam break outside containment occurs Main Steamline Isolation actuates Steamline pressures are 545 psig and lowering The MSL Isolation is due to ___(2)___.

A. (1) capable (2) low Steamline Pressure B. (1) NOT capable (2) low Steamline Pressure C. (1) capable (2) high Steamline Pressure Rate D. (1) NOT capable (2) high Steamline Pressure Rate Answer: B Page 23 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring understanding of when automatic Main Steam Line Isolation signals are enabled and blocked.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible as the pressure is only slightly above the pressure where P-11 occurs, permitting the manual block. 2nd part is correct (see B).

B. Correct. 1st part is correct. SI cannot be blocked until pressurizer pressure drops below P-11, which is 1960 psig. 2nd part is correct. Since SI is not blocked, the low steamline pressure MSLI signal is still active. The high steamline pressure rate signal is enabled only when SI is blocked below P-11.

C. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is incorrect, but plausible since the high pressure negative rate is the only signal which will cause a MSLI after SI has been blocked.

D. Incorrect. 1st part is correct (see B). 2nd part is incorrect, but plausible (see C).

Technical Reference(s) IPO-005A Attached w/ Revision # See ALM-0065A Comments / Reference RPS Study Guide Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Main Steam system in accordance with SOP-301, IPO-001, IPO-002, IPO-003, ABN -707, ABN-709, ABN-710, OPT-504 and OPT-509. (SYS.MR1.OB05)

Question Source: Bank #

Modified Bank # 29561 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 24 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 29561 Revision:

Page 25 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 26 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RPS Study Guide ES1 Revision:

Page 27 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RPS Study Guide Revision: 5-4-2011 Page 28 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

MS Study Guide Revision: 6-9-2011 Page 29 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 30 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

MS Study Guide Revision: 6-9-2011 Page 31 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

IPO-005A Revision: 27 Page 32 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

IPO-005A Revision: 27 Page 33 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0065A Revision: 4 Page 34 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 059.G.2.2.44 Level of Difficulty: 2 Importance Rating 4.2 Main Feedwater: Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions.

Question # 15 Given the following conditions:

Unit 1 at 60% power with all controls in AUTO.

MS HDR PRESS, 1-PT-507, fails LOW.

When the operator takes manual control of 1-SK-509A, FWPT MASTER SPD CTRL, the operator should __(1)___ speed and establish a calculated P value of __(2)___ psid to be on program for this power level.

A. (1) raise (2) 131 B. (1) raise (2) 141 C. (1) lower (2) 131 D. (1) lower (2) 141 Answer: A Page 35 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring ability to determine how operator should control FW following a failure needing intervention.

Explanation:

A. Correct. Unit 1 program P is 80 to 181 psid from 20% power to 100% power. At 60% power, the P should be established at 131 psid. Since steam pressure failed low, the FWP speed will have decreased and must be raised.

B. Incorrect. Plausible since speed should be raised, but 141 psid is the value that would be calculated if program P were ramped from 80 to 181 psid from 0% power to 100% power, instead of 20% to 100%.

C. Incorrect. Plausible since the program P should be established at 131 psid, but the speed must be raised and not lowered. Lowering speed is plausible if incorrectly believes the failed channel causes speed to increase.

D. Incorrect. Plausible since 141 psid is the value that would be calculated if program P were ramped from 80 to 181 psid from 0% power to 100% power, instead of 20% to 100%. Lowering speed is plausible if incorrectly believes the failed channel causes speed to increase.

Technical Reference(s) ABN-709 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Steam Line Pressure Instrument Malfunction in accordance with ABN-709 Steam Line Pressure, Steam Header Pressure, Turbine 1st-Stage Pressure and Feed Header Pressure Instrument Malfunction.

(ABN.710.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 36 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-709 Revision: 9 Page 37 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-709 Revision: 9 Page 38 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Main Feed Study Guide Revision: 3-12-2014 Page 39 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 061.K6.01 Level of Difficulty: 3 Importance Rating 2.5 Auxiliary/Emergency Feedwater: Knowledge of the effect of a loss or malfunction of the following will have on the AFW components: Controllers and positioners Question # 16 Given the following conditions:

Unit 1 is in Mode 5.

AFW Pump 1-01 is being used to feed all 4 SGs.

Flow to each SG is 175 gpm.

FT-2456, MDAFWP 1 DISCH FLOW, fails LOW.

Assuming NO operator actions, which of the following describes the effect the low failure of the flow transmitter has on the operation of AFW Pump 1-01?

A. Operates at shutoff head B. Trips on low suction pressure C. Trips on low discharge pressure D. Flow exceeds limitations Answer: D Page 40 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of AFW recirc valve response to low flow condition indicated by failed flow detector.

Explanation:

A. Incorrect. Plausible if thought that this would cause the discharge valve to close, but it has no effect on the discharge.

B. Incorrect. Plausible since the pump will be running at runout conditions and suction pressure will lower, but there is no low suction pressure trip.

C. Incorrect. Plausible since the pump will be running at runout conditions and discharge pressure will lower, but there is no low discharge pressure trip.

D. Correct. Flow is limited to 800 gpm per MDAFW pump, and is currently at 700 gpm. With the loss of discharge flow, the recirc valve will open, causing an additional 200 gpm of flow and flow limits will be exceeded.

Technical Reference(s) SOP-304 Attached w/ Revision # See ABN-603 Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the instrumentation and controls of the Auxiliary Feedwater system and PREDICT the system response in accordance with DBD-ME-206.

(SYS.AF1.OB04)

Question Source: Bank # 23238 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 41 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-304 Revision: 17 Page 42 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-603 Revision: 8 Page 43 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

AFW Study Guide Revision: 5-11-2011 Page 44 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 062.K3.01 Level of Difficulty: 4 Importance Rating 3.5 AC Electrical Distribution: Knowledge of the effect that a loss or malfunction of the ac distribution system will have on the following: Major system loads Question # 17 Given the following conditions:

A Sudden Pressure Trip has occurred on 345 KV XFMR XST2.

All equipment responded as designed, with the exception of the Train B SSW Pump on the affected bus, which failed to start on the BOS.

Which major load is operating without cooling until the affected SSW Pump can be started?

A. EDG 1-02 B. CCP 1-02 C. EDG 2-02 D. CCP 2-02 Answer: B Page 45 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of power supplies to major AC system loads.

Explanation:

A. Incorrect. Plausible because the fault on XST2 will cause a loss of the preferred offsite power supply to 1EA2 but the slow transfer to the alternate offsite power supply will occur prior to the EDG getting a start signal. EDG 1-02 does not start and is thus not running without cooling.

B. Correct. The fault on XST2 will cause a loss of the preferred offsite power supply to 1EA2 which will result in the Blackout Sequencer operating. The Blackout Sequencer will start CCP 1-02 and should also start SSWP 1-02. Since the malfunction is a failure of the SSWP 1-02 to start, CCP 1-02 which is cooled by SSW is running without cooling water.

C. Incorrect. Plausible because the loss of XST2 will affect both units. However, the effect on Unit 2 is the loss of the alternate power supply to 2EA2 and thus the Blackout Sequencer does not operate for Unit 2 and there is no affected train of equipment.

D. Incorrect. Plausible because the loss of XST2 will affect both units. However, the effect on Unit 2 is the loss of the alternate power supply to 2EA2 and thus the Blackout Sequencer does not operate for Unit 2 and there is no affected train of equipment.

Technical Reference(s) ABN-601 Attached w/ Revision # See ABN-502 Comments / Reference ABN-101 Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Safeguard 6.9 KV Bus Fault in accordance with ABN-602, 6900/480 V System Malfunction. (ABN.601.OB03)

Question Source: Bank # 62612 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC22 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 46 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 62612 Revision:

Page 47 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 48 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 49 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-602 Revision: 8 Page 50 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-602 Revision: 8 Page 51 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 062.G.2.4.20 Level of Difficulty: 3 Importance Rating 3.8 AC Electrical Distribution: Knowledge of the operational implications of EOP warnings, cautions, and notes Question # 18 Given the following conditions:

Unit 1 is at 100% power.

ABN-601, Response to a 138/345 KV System Malfunction, Section 3.0, Plant Recovery from a Blackout Sequencer Signal, is being performed.

Operators have performed a 50 MWe load reduction.

(1) Which of the following actions should be taken regarding operation of the Turbine Driven Auxiliary Feedwater Pump?

(2) Which of the following actions should be taken regarding operation of the Motor Driven Auxiliary Feedwater Pumps?

A. (1) Stop the TDAFW Pump after the BOS Operator Lockouts clear.

(2) Stop the MDAFW Pumps after the BOS is reset.

B. (1) Place the TDAFW Pump in PULLOUT if power subsequently exceeds 100%.

(2) Place the MDAFW Pumps in PULLOUT if power subsequently exceeds 100%.

C. (1) Place the TDAFW Pump in PULLOUT if power subsequently exceeds 100%.

(2) Stop the MDAFW Pumps after the BOS is reset.

D. (1) Stop the TDAFW Pump after the BOS Operator Lockouts clear.

(2) Place the MDAFW Pumps in PULLOUT if power subsequently exceeds 100%.

Answer: A Page 52 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring understanding of the cautions associated with recovering from a loss of AC power and the TS implications.

Explanation:

A. Correct. The Blackout Sequencer starts the associated train MDAFW Pump. The BOS OL starts the TDAFWP. Placing a pump in PULLOUT or throttling AFW flow above 10%

power renders the train inoperable. The TDAFW Pump should be allowed to run until the BOS OL clears and the MDAFW Pumps should be allowed to run until the Blackout Sequencer is reset.

B. Incorrect. Plausible since the pumps must be allowed to continue to operate until the respective start signal is removed, but this means for the TDAFWP when the OL clears and for the MDAFWPs when the BOS is reset.

C. Incorrect. Plausible since the MDAFWPs are stopped after the BOS is reset, but placing the TDAFWP in PULLOUT or throttling AFW flow above 10% power renders the train inoperable.

D. Incorrect. Plausible since the TDAFWP is stopped after the BOS OL clears, but placing the MDAFWPs in PULLOUT or throttling AFW flow above 10% power renders the trains inoperable.

Technical Reference(s) ABN-601 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Safety Injection and Blackout Sequencers in accordance with ABN-601, ABN-602 and EOP-0.0A/B. (SYS.ES3.OB06)

Question Source: Bank #

Modified Bank # 40701 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 53 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 40701 Revision:

Page 54 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 55 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 56 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 57 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 58 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 59 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 063.A2.01 Level of Difficulty: 3 Importance Rating 2.5 DC Electrical Distribution: Ability to (a) predict the impacts of the following malfunctions or operations on the DC electrical systems; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Grounds Question # 19 1-ALB-10B Window 1.13, 125 VDC SWITCH PNL 1ED1 TRBL annunciates Per ALM-0102A, 1-ALB-10B...

Place GROUND TEST switch in TEST; if NEGATIVE-GND white light is dimly LIT and the POSITIVE-GND white light is normally LIT, a ground condition exists for the ___(1)___

terminal.

Verify 1ED1 DC VOLTS are a Technical Specification MINIMUM of ___(2)___ VDC.

A. (1) NEGATIVE (2) 128 B. (1) NEGATIVE (2) 120 C. (1) POSITIVE (2) 128 D. (1) POSITIVE (2) 120 Answer: A Page 60 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match as it requires the ability to interpret procedure steps when responding to a GROUND on the DC power system.

Explanation:

A. Correct. Part 1 is correct in accordance with ALM-0102A. Part 2 is correct in accordance with ALM-0102A.

B. Incorrect. Part 1 is correct as described in 'A' above. Part 2 is incorrect but plausible in that the Alarm Setpoint 120 VDC but the procedure requires that Voltage be verified above 128 VDC.

C. Incorrect. Part 1 is incorrect in that the indications are for a ground on the Negative Terminal, not the Positive terminal. Part 2 is correct as described in 'A' above.

D. Incorrect. Part 1 is incorrect as described in 'C' above. Part 2 is incorrect but plausible as described in 'B' above.

Technical Reference(s) ALM-0102A Attached w/ Revision # See TS 3.8.4 Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the DC Electrical Distribution system including interrelations with other systems to include interlocks and control loops in accordance with DBD-EE-044 DC POWER SYSTEMS. (SYS.DC1.OB02)

Question Source: Bank # 34864 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC24 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 61 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 34864 Revision:

Page 62 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 34864 Revision:

Page 63 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

DC Study Guide Revision: 5-5-2011 Page 64 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0102A Revision: 12 Page 65 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0102A Revision: 12 Page 66 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.8.4 Revision: 150 Examination Outline Cross-reference: Level RO SRO Page 67 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 0 Tier 2 Group 1 K/A 064.K3.01 Level of Difficulty: 2 Importance Rating 3.8 Emergency Diesel Generator: Knowledge of the effect that a loss or malfunction of the ED/G system will have on the following: Systems controlled by automatic loader Question # 20 Given the following conditions:

OPT-214A, Diesel Generator Operability Test, Section 8.1, Train A Diesel Generator Monthly Operability Test, is being performed.

EDG 1-01 is FAST STARTED by a Normal Start.

EDG 1-01 trips on High Jacket Water Temperature.

Before any additional actions are taken, a Loss of Off-Site Power occurs.

EDG 1-01 ___(1)___; and, Loads are ___(2)___ onto Bus 1EA1.

A. (1) requires a manual start (2) automatically sequenced B. (1) automatically starts (2) automatically sequenced C. (1) requires a manual start (2) manually loaded D. (1) automatically starts (2) manually loaded Answer: B Page 68 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the operation of the EDG following a malfunction and the subsequent effect upon the automatic loader.

Explanation:

A. Incorrect. First part is incorrect but plausible (See C below). Second part is correct (See B below).

B. Correct. First part is correct per OPT-214A, with the EDG governor in the fast position the EDG will respond to a Blackout signal with an Emergency Start. Second part is correct because once the EDG is "Ready to Load" the sequencer will automatically load the bus being supplied by the EDG.

C. Incorrect. First part is incorrect but plausible as applicant may believe with manual normal start that all emergency starts are blocked. Second part is incorrect but plausible if thought due to the normal start of the EDG the sequencer will not operate as designed and manual loading of the EDG is required.

D. Incorrect. First part is correct (See B above). Second part is incorrect but plausible (See C above).

Technical Reference(s) OPT-214A Attached w/ Revision # See SOP-609A Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the normal, abnormal and emergency operation of the Emergency Diesel Generator system in accordance with referenced SOPs, ABNs, and ERGs . (SYS.ED1.OB23)

Question Source: Bank # 75722 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC24 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 69 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 75722 Revision:

Page 70 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 75722 Revision:

Page 71 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-609A Revision: 21 Page 72 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-609A Revision: 21 Page 73 of 73 CPNPP 2020-05 retake NRC Written Exam Worksheet 11-20 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 064.K4.02 Level of Difficulty: 2 Importance Rating 3.9 Emergency Diesel Generator: Knowledge of ED/G system design feature(s) and/or interlock(s) which provide for the following: Trips for ED/G while operating (normal or emergency)

Question # 21 When operating the diesel generator in the emergency mode, all shutdown protection except

___(1)___ and ___(2)___ are deactivated.

A. (1) Low Lube Oil Pressure (2) Phase-To-Ground Fault B. (1) Low Lube Oil Pressure (2) Phase-To-Phase Fault C. (1) Overspeed (2) Phase-To-Ground Fault D. (1) Overspeed (2) Phase-To-Phase Fault Answer: D Page 1 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of EDG trips that are active during emergency operations.

Explanation:

A. Incorrect. Plausible since these trips are both active during normal operations to protect the integrity of the EDG, but both are blocked during emergency operations.

B. Incorrect. Plausible since Phase-to-Phase is active during emergency operations and Low Lube Oil Pressure is active during normal operations, Low Lube Oil Pressure is blocked during emergency operations.

C. Incorrect. Plausible since Overspeed is active during emergency operations and Phase-to-Ground is active during normal operations, Phase-to-Ground is blocked during emergency operations.

D. Correct. The Overspeed and Phase-to-Phase trips are active during both normal and emergency operations of the EDG.

Technical Reference(s) SOP-609A Attached w/ Revision # See EDG Lesson Plan Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the instrumentation and controls of the Emergency Diesel Generator system and PREDICT the system response in accordance with DBD-ME-011.

(SYS.ED1.OB22)

Question Source: Bank # 20697 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 2 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-609 Revision: 21 Page 3 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EDG Lesson Plan Revision: 8-24-2017 Page 4 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 2 Group 1 K/A 073.K1.01 Level of Difficulty: 3 Importance Rating 3.6 Process Radiation Monitoring: Knowledge of the physical connections and/or cause effect relationships between the PRM system and the following systems: Those systems served by PRMs Question # 22 Which of the following describes the response of the Control Room HVAC System to a loss of power to a Train A radiation monitor, RE-5895A (CRV-053), CR VENT N. INTK?

The loss of power will cause ___(1)___ CR HVAC to shift to Emergency ___(2)___ Mode.

A. (1) ONLY Train A (2) Recirculation B. (1) BOTH Trains of (2) Recirculation C. (1) ONLY Train A (2) Ventilation D. (1) BOTH Trains of (2) Ventilation Answer: B Page 5 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the interrelationship between the rad monitoring system and the CR ventilation system.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since Train A is on the north intake, but a loss of power to any of four radiation monitors, will cause BOTH Trains of CR HVAC to shift. 2nd part is correct (see B).

B. Correct. 1st part is correct. A loss of power to any of four radiation monitors will cause BOTH Trains of CR HVAC to shift. 2nd part is correct. Trains automatically shift to Emergency Recirculation Mode.

C. Incorrect, 1st part is incorrect, but plausible (see A). 2nd part is incorrect, but plausible since the Emergency Ventilation Mode is automatically aligned by operation of a single switch and it may be thought that a loss of power causes this automatic action.

D. Incorrect, 1st part is correct (see B). 2nd part is incorrect, but plausible (see C).

Technical Reference(s) ABN-203 Attached w/ Revision # See ALM-3200 Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to Control Room Intake Radiation Monitor Maintenance/Loss of Power in accordance with ABN-203 Control Room Ventilation System Malfunction. (ABN.301.OB02)

Question Source: Bank # 17674 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 6 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-203 Revision: 4 Page 7 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-3200 Revision: 5 Page 8 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 073.K5.02 Level of Difficulty: 4 Importance Rating 2.5 Process Radiation Monitoring System: Knowledge of the operational implications as they apply to concepts as they apply to the PRM system: Radiation intensity changes with source distance Question # 23 Given the following conditions:

Radiography is in progress in the Auxiliary Building.

The local Area Radiation Monitor is reading 10 mRem/hr due to background radiation, prior to the source being EXPOSED.

When the source is EXPOSED 20 feet from the monitor, the reading is 30 mRem/hr.

Assuming no change in background radiation, if the source distance is reduced to 10 feet from the local Area Radiation Monitor, which of the following describes the indication that should be seen on the local Area Radiation Monitor when the source is EXPOSED?

A. 50 mRem/hr B. 60 mRem/hr C. 90 mRem/hr D. 120 mRem/hr Answer: C Page 9 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the change in radiation levels based on distance from a source.

Explanation:

A. Incorrect. Plausible if radiation level is assumed to be doubled at half the distance, again accounting for background radiation (20 mr/hr at 20 feet, 40 mr/hr at 10 feet, plus background =

50 mr/hr).

B. Incorrect. Plausible if radiation level is assumed to be doubled at half the distance, without accounting for background radiation (30 mr/hr at 20 feet, 60 mr/hr at 10 feet).

C. Correct. Point source question. Move half the distance, the radiation level is 4 times. Must add original background. 30-10 = 20 mr/hr at 20 feet. At 10 feet rad level will be 80 mr/hr, plus background of 10 mr/hr, equaling 90 mr/hr.

D. Incorrect. Plausible if radiation level is calculated correctly, except without accounting for background radiation (30 mr/hr at 20 feet, 120 mr/hr at 10 feet).

Technical Reference(s) Radiation Protection Practices Lesson Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given radiological conditions and various shielding configurations, CALCULATE dose rates and stay times to minimize total radiation exposure in accordance with RPI-608, Control of Shielding. (ADM.RAD.OB08)

Question Source: Bank #

Modified Bank # 34701 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 10 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 34701 Revision:

Page 11 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 12 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

LO21ADMRAD Revision: 3-21-2017 Page 13 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 076.A4.02 Level of Difficulty: 3 Importance Rating 2.6 Service Water System: Ability to manually operate and/or monitor in the control room: SWS valves Question # 24 An SSW Pump has been stopped for maintenance.

When the pump is stopped, the pump discharge valve goes to the ___(1)___ position and the Control Room SSW discharge valve WHITE light valve position indication will be

___(2)___.

A. (1) full closed (2) LIT B. (1) full closed (2) DARK C. (1) 10% open (2) LIT D. (1) 10% open (2) DARK Answer: C Page 14 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the indication associated with the SSW pump discharge valve.

Explanation:

A. Incorrect. Plausible since the WHITE light will illuminate, but the valve is at 10% open.

B. Incorrect. Plausible since the SSW valve uses a WHITE light (normally reserved for TRIP indication on components), and the valve position is 10% open. Normally this light is DARK because the valve is full open at power.

C. Correct. The valve will go to the 10% open valve position. The WHITE light above the valve handswitch will illuminate.

D. Incorrect. Plausible since the valve will go to the 10% open valve position, but the WHITE light above the valve handswitch will illuminate.

Technical Reference(s) SOP-501A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Station Service Water system including interrelations with other systems to include interlocks and control loops IAW DBD-ME-233. (SYS.SW1.OB03)

Question Source: Bank #

Modified Bank # 23101 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 15 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 23101 Revision:

Page 16 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 17 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-501 Revision: 20 Page 18 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

CB-01 Revision:

Page 19 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 078.K2.02 Level of Difficulty: 2 Importance Rating 3.3 Instrument Air System: Knowledge of bus power supplies to the following: Emergency air compressor Question # 25 Which of the following is the power supply for Instrument Air Compressor 1-01?

A. 1B4 B. XB1 C. 1EB3 D. 1EB4 Answer: C Page 20 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of IA compressor power supplies.

Explanation:

A. Incorrect. Plausible because this is the power supply to Instrument Air Compressor X-01, but the supply to 1-01 is 1EB3.

B. Incorrect. Plausible because this is the power supply to Instrument Air Compressor X-02, but the supply to 1-01 is 1EB3.

C. Correct. This is the power supply to Instrument Air Compressor 1-01.

D. Incorrect. Plausible because this is the power supply to Instrument Air Compressor 1-02, but the supply to 1-01 is 1EB3.

Technical Reference(s) Instrument Air Study Guide Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Instrument Air system including interrelations with other systems to include interlocks and control loops in accordance with DBD-ME-218. (SYS.IA1.OB03)

Question Source: Bank # 36622 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 21 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Instrument Air Study Guide Revision: 5-7-2011 Page 22 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 1 K/A 078.A3.01 Level of Difficulty: 2 Importance Rating 3.1 Instrument Air System: Ability to monitor automatic operation of the IAS, including: Air pressure.

Question # 26 Given the following conditions:

Instrument Air Compressor 1-01 is aligned as the lead compressor Instrument Air Compressor 1-02 is aligned as a backup compressor Instrument Air Compressor X-01 is aligned as a backup compressor Due to a small leak, Instrument Air pressure begins to lower IA Compressor 1-02 will automatically start at a setpoint of ___(1)___ psig and IA Compressor X-01 will automatically start at a setpoint of ___(2)___ psig.

A. (1) 100 (2) 85 B. (1) 100 (2) 95 C. (1) 105 (2) 85 D. (1) 105 (2) 95 Answer: B Page 23 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

This question matches the KA by requiring knowledge of the air pressure when air compressors will automatically start and load.

Explanation:

A. Incorrect. 1st part is correct. 1-02 compressor will start at 100 psig. 2nd part is incorrect, but plausible as this is the low pressure alarm setpoint which may be confused with the starting of the X-01 compressor.

B. Correct. 1st part is correct (see A). 2nd part is correct. X-01 starts and loads at 95 psig.

C. Incorrect. 1st part is incorrect, but plausible as it is reasonable to think that a compressor will start at 10 psig below its unloading setpoint of 115 psig. 2nd part is incorrect, but plausible (see A).

D. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is correct (see B).

Technical Reference(s) SOP-509A Attached w/ Revision # See Instrument Air Study Guide Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Instrument Air system including interrelations with other systems to include interlocks and control loops in accordance with DBD-ME-218. (SYS.IA1.OB03)

Question Source: Bank #

Modified Bank # 76498 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 24 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 76498 Revision:

Page 25 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 76498 Revision:

Page 26 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-509A Revision: 22 Page 27 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-509A Revision: 22 Page 28 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-509A Revision: 22 Page 29 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

IA Study Guide Revision: 5-7-2011 Page 30 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 103.A1.01 Level of Difficulty: 2 Importance Rating 3.7 Containment System: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the containment system controls including: Containment pressure, temperature, and humidity Question # 27 Given the following conditions:

The Reactor Coolant System is at 540ºF during a Unit 1 heatup following a maintenance outage.

Three CACRs are in service.

Four Subsystem 1 Ventilation Chillers are in service.

Containment average air temperature is 108ºF.

Containment pressure is 1.4 psig.

Which of the following actions are required to restore Containment conditions within Technical Specification limits?

Reduce Containment ...

A. pressure by placing the Containment Purge Supply and Exhaust System in service.

B. temperature by placing an additional Ventilation Chiller in service.

C. pressure by placing the Containment Pressure Relief System in service.

D. temperature by placing an additional CACR in service.

Answer: C Page 31 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of containment temperature and pressure limits, along with actions necessary to restore within limits.

Explanation:

A. Incorrect. Plausible since Containment pressure is exceeding Tech Spec limits, but the Containment Purge Supply and Exhaust System is only permitted to be used in Modes 5 and 6.

B. Incorrect. Plausible since Containment temperature is higher than normal and a high Containment temperature alarm would exist, but temperature is within limits and pressure needs to be reduced.

C. Correct. Containment pressure is exceeding the upper limit of 1.3 psig while containment temperature is within the upper limit of 120ºF. With the Unit in Mode 4 (>200ºF) only the Containment Pressure Relief System is to be used to adjust Containment pressure.

D. Incorrect. Plausible since Containment temperature is higher than normal and a high Containment temperature alarm would exist, but temperature is within limits and pressure needs to be reduced.

Technical Reference(s) TS 3.6.4 Attached w/ Revision # See SOP-801A Comments / Reference ALM-0031A Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Containment Ventilation system IAW DBD-ME-300 and 301, SOP-801 and 205, EOP-0.0, and EOS-0.2. (SYS.CL1.OB03)

Question Source: Bank # 23020 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 32 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.6.4 Revision: 156 Page 33 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.6.5 Revision: 156 Page 34 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-801A Revision: 14 Page 35 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-801A Revision: 14 Page 36 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0031A Revision: 8 Page 37 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0031A Revision: 8 Page 38 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0031A Revision: 8 Page 39 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 103.A2.04 Level of Difficulty: 2 Importance Rating 3.5 Containment System: Ability to (a) predict the impacts of the following malfunctions or operations on the containment system and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations Containment evacuation (including recognition of the alarm)

Question # 28 Given the following conditions:

Unit 1 core is being offloaded during a refueling outage.

ABN-908, Fuel Handling Accident, has been entered due to an accident inside Containment.

The Radiological Emergency Alarm has been sounded.

All fuel assemblies are either in the core or have been transferred to the Fuel Handling Building.

Which of the following:

(1) Identifies the Radiological Emergency Alarm inside Containment?

(2) Describes the primary exit path for workers evacuating Containment in accordance with ABN-908?

A. (1) WAILING tone (2) Personnel Airlock B. (1) STEADY tone (2) Personnel Airlock C. (1) WAILING tone (2) Emergency Airlock D. (1) STEADY tone (2) Emergency Airlock Answer: A Page 40 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to recognize radiological alarm and pathway for containment evacuation.

Explanation:

A. Correct. Radiological alarm is a WAILING sound and evacuation path from Containment is via Personnel Airlock.

B. Incorrect. Plausible since evacuation is via Personnel Airlock, but alarm is a WAILING sound.

STEADY tone is for Fire Alarm.

C. Incorrect. Plausible since radiological alarm is a WAILING sound, but evacuation path from Containment is via Personnel Airlock.

D. Incorrect. Plausible since STEADY tone is a valid alarm sound, but radiological alarm is WAILING tone and it may be thought that in an emergency the Emergency Airlock is to be used.

STEADY tone is for Fire Alarm.

Technical Reference(s) ABN-908 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: (ABN.SELF.908)

Question Source: Bank # 35861 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 41 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-908 Revision: 5 Page 42 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Plant Access Training Material Revision: NA After identification of an emergency, onsite employees, and visitors will be notified by means of the Plant Wide Alarm System. The Plant Wide Alarm System has three distinct alarm tones and consists of loudspeakers located throughout the plant and permanent structures onsite.

The 3 alarm tones + Alarm Notification are as follows:

Fire Alarm....................................Steady Tone.

Radiation Hazard Alarm.............Wailing Tone.

Site Evacuation Alarm................Pulse Tone.

Alarm Notification.......................Yelp Tone.

Page 43 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 2 K/A 002.K1.03 Level of Difficulty: 2 Importance Rating 3.8 Reactor Coolant: Knowledge of the physical connections and/or cause-effect relationships between the RCS and the following systems: Borated water storage tank Question # 29 Given the following conditions:

While responding to a Reactor Trip, Emergency Boration is required.

The operator attempts to emergency borate using Emergency Borate Valve 1/1-8104, but is unsuccessful at starting EITHER Boric Acid Transfer pump.

Which of the following contain two available flowpaths, each of which would independently meet the Emergency Boration requirements for the given condition?

A. Emergency Boration Through Normal Boration Valves FCV-110A and FCV-110B; or, Emergency Boration Through Manual Emergency Borate Valve CS-8439 B. Transfer of Charging Pump Suction to the RWST; or, Gravity Feed From BA Storage Tanks to Charging Pump Suction C. Emergency Boration Through Normal Boration Valves FCV-110A and FCV-110B; or, Gravity Feed From BA Storage Tanks to Charging Pump Suction D. Transfer of Charging Pump Suction to the RWST; or, Emergency Boration Through Manual Emergency Borate Valve CS-8439 Answer: B Page 44 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of relationship between BAT, RWST, and RCS to enable emergency boration of the RCS.

Explanation:

A. Incorrect. Plausible since these are both flowpaths that are available, but both flowpaths require use of a Boric Acid Transfer pump.

B. Correct. Transferring suction to the RWST and gravity feeding from the BAT to the charging pump do not require a Boric Acid Transfer pump and would be a viable flowpath.

C. Incorrect. Plausible since gravity feed from the BATs does not require use of a Boric Acid Transfer pump, but using the normal boration flowpath does require use of a pump.

D. Incorrect. Plausible since transferring the charging pump suction to the RWST does not require a Boric Acid Transfer pump, but manual emergency boration does require use of a pump.

Technical Reference(s) ABN-107 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to an Emergency Boration in accordance with ABN-107, Emergency Boration. (ABN.105.OB06)

Question Source: Bank # 23533 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 45 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-107 Revision: 9 Page 46 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-107 Revision: 9 Examination Outline Cross-reference: Level RO SRO Page 47 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 0 Tier 2 Group 2 K/A 011.K5.15 Level of Difficulty: 2 Importance Rating 3.6 Pressurizer Level Control: Knowledge of the operational implications of the following concepts as they apply to the PZR LCS: PZR level indication when RCS is saturated.

Question # 30 Given the following conditions:

A Unit 1 Reactor Trip has occurred concurrent with a Loss of Offsite Power.

EOS-0.4A, Natural Circulation Cooldown with Steam Void in Vessel (without RVLIS),

is in progress.

The crew is depressurizing the RCS using Auxiliary Spray.

During the depressurization to the target pressure of 800 psig, Pressurizer level rapidly increases to 92% when RCS pressure is 950 psig.

What has caused the rapid increase in Pressurizer Level?

A. CVCS Letdown has isolated B. A Pressurizer PORV has failed open C. The Auxiliary Spray Valve has failed closed D. The bubble in the Reactor Vessel Head has expanded Answer: D Page 48 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to needing to understand the relationship between the RCS reaching saturation conditions in the Reactor Vessel Head and the response of pressurizer level.

Explanation:

A. Incorrect. Plausible since isolating letdown will cause inventory to increase in the RCS, but it would be a controlled level increase and not a rapid level rise.

B. Incorrect. Plausible since opening a PORV would cause pressurizer level to rise, but the cause of the rapid rise is reaching saturation conditions in the vessel head, shifting water from the head to the pressurizer.

C. Incorrect. Plausible since use of the Auxiliary Spray Valve is directed in the procedure and the rapidly rising pressurizer level is an undesirable outcome from the actions being taken, so it may be considered that the directed action has failed.

D. Correct. Upper head voiding during the depressurization results in rapidly increasing pressurizer level.

Technical Reference(s) EOS-0.4A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the recovery technique used and the procedure steps of EOS-0.3, Natural Circulation Cooldown with steam void in vessel (with RVLIS) and EOS-0.4, Natural Circulation Cooldown with steam void in vessel (without RVLIS).

(ERG.E02.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 49 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOS-0.4A Revision: 9 Page 50 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOS-0.4A Revision: 9 Page 51 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOS-0.4A Revision: 9 Page 52 of 52 CPNPP 2020-05 retake NRC Written Exam Worksheet 21-30 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 2 K/A 014.K3.02 Level of Difficulty: 3 Importance Rating 2.5 Rod Position Indication: Knowledge of the effect that a loss or malfunction of the RPIS will have on the following: Plant computer Question # 31 During a Reactor Startup, Control Bank D position is as follows:

DRPI = 48 steps Step Counters = 54 steps The plant computer will display CBD position as ___(1)___ steps withdrawn based on these conditions.

If DRPI System was subsequently lost, the plant computer display would ___(2)____.

A. (1) 48 steps (2) indicate 0 steps B. (1) 48 steps (2) NOT change C. (1) 54 steps (2) indicate 0 steps D. (1) 54 steps (2) NOT change Answer: D Page 1 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of how the plant computer responds to changes in rod position and malfunctions of the DRPI system.

Explanation:

A. Incorrect. 1st part is incorrect. It is plausible because DRPI has remained at 48 steps withdrawn. 2nd part is incorrect (see C).

B. Incorrect. 1st part is incorrect but plausible (see A). 2nd part is correct (see D).

C. Incorrect. 1st part is correct. 2nd part is incorrect. It is plausible since the computer does reset to 0 when a P4 signal is received.

D. Correct. 1st part is correct. The signal from the data logging circuitry sends information to the step counters as well as the plant computer. 2nd part is correct. A loss of DRPI power will not have an effect on the plant computer.

Technical Reference(s) DRPI Study Guide Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS overall operation of the Rod Control and Digital Rod Position Indication systems in accordance with SOP-702. (SST.ROD.OB01)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 2 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

DRPI Study Guide Revision: 05-02-2011 Page 3 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

DRPI Study Guide Revision: 05-02-2011 Page 4 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

DRPI Study Guide Revision: 05-02-2011 Page 5 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 2 K/A 015.K2.01 Level of Difficulty: 2 Importance Rating 3.3 Nuclear Instrumentation: Knowledge of bus power supplies to the following: NIS channels, components, and interconnections Question # 32 Given the following conditions:

While performing a Unit 2 startup, SR Count Rate is stable at 50 cps A fault causes a loss of 118 VAC Protection Bus 2PC3.

Which of the following is the expected Nuclear Instrument and plant response?

A. Reactor trip due to Intermediate Range NI High Flux trip.

B. Bistables for Power Range NI N-43 will trip, Reactor will NOT trip.

C. Bistables for Power Range NI N-42 will trip, Reactor will NOT trip.

D. Reactor trip due to Source Range NI High Flux trip.

Answer: B Page 6 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of power supplies to nuclear instrumentation.

Explanation:

A. Incorrect. Plausible because a loss of power to an IR Channel would cause a trip under these conditions, however, IR channels N-35 and N-36 are powered from 2PC1 and 2PC2 respectively and no IR channels will be lost.

B. Correct. Power Range N-43 is powered from 2PC3 and bistables will trip on loss of power. Since the coincidence for a Reactor Trip is 2 of 4 channels, the Reactor will NOT trip.

C. Incorrect. Plausible because bistables for Power Range N-42 will trip upon a loss of power, however, N-42 is powered from 2PC2 and will not lose power.

D. Incorrect. Plausible because a loss of power to a SR Channel would cause a trip under these conditions, however, SR channels N-31 and N-32 are powered from 2PC1 and 2PC2 respectively and no SR channels will be lost.

Technical Reference(s) ABN-603 Attached w/ Revision # See ABN-701 Comments / Reference ABN-703 Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Excore Instrumentation system including interrelations with other systems to include interlocks and control loops in accordance with the FSAR and DBD-EE-021. (SYS.EC1.OB03)

Question Source: Bank # 31201 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 7 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-603 Revision: 8 Page 8 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-701 Revision: 12 Page 9 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-703 Revision: 9 Page 10 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 2 K/A 017.G.2.4.21 Level of Difficulty: 2 Importance Rating 4.0 In Core Temperature Monitor: Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc Question # 33 The RCS SAT MARGIN indications on CB-05 use the ___(1)___ CET input and the

___(2)___ RCS pressure input to determine RCS subcooling.

A. (1) lowest (2) highest B. (1) lowest (2) lowest C. (1) highest (2) highest D. (1) highest (2) lowest Answer: D Page 11 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to determine the inputs to core cooling monitor used to assess safety functions.

Explanation:

A. Incorrect. 1st part is plausible (see B). 2nd part is plausible (see C).

B. Incorrect. 1st part is incorrect, but plausible since multiple temperature inputs are used, making this plausible. 2nd part is correct (see D).

C. Incorrect. 1st part is correct (see D). 2nd part is incorrect, but plausible since multiple RCS pressure inputs are used.

D. Correct. 1st part is correct. SMM uses the highest CET. 2nd part is correct. The lowest RCS pressure to determine the conditions in the RCS.

Technical Reference(s) Core Cooling Monitor Study Guide/DBD- Attached w/ Revision # See 004 Comments / Reference FRC-0.1A Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of Core Cooling Monitor/Reactor Vessel Level Indication System (RVLIS) including interrelations with other systems to include interlocks and control loops IAW DBD-EE-004. (SYS.RC3.OB03)

Question Source: Bank # 19209 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 12 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Core Cooling Monitor Study Guide Revision: 04-27-2011 Page 13 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Core Cooling Monitor Study Guide Revision: 04-27-2011 Page 14 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

DBD-EE-004, Attachment 1 Revision: 44 Page 15 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRC-0.1A Revision: 9 Page 16 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 2 K/A 033.A2.01 Level of Difficulty: 4 Importance Rating 3.0 Spent Fuel Pool Cooling System: Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadequate SDM Question # 34 Spent Fuel Pool boron concentration must be maintained greater than a MINIMUM of

____(1)____ ppm.

In accordance with SOP-506, Spent Fuel Pool Cooling and Cleanup System, if level in the SFP is low following isolation of a leak in the system, makeup to the SFP should be from the

___(2)___.

A. (1) 2000 (2) RWST B. (1) 2000 (2) RMUWST C. (1) 2400 (2) RWST D. (1) 2400 (2) RMUWST Answer: C Page 17 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

This matches the K/A by requiring the operator to have knowledge of design feature(s) and/or interlock(s) which provide for the following: Adequate SDM (boron concentration).

Explanation:

A. Incorrect. First part is incorrect but plausible because 2000 ppm is greater than the COLR refueling requirement of 1775 ppm. Second part is correct, see C below.

B. Incorrect. First part is incorrect but plausible, see A above. Second part is incorrect but plausible because the RMUWST is used as a makeup source to the SFP if low level is due to evaporation.

C. Correct. First part is correct, Per TS 3.7.16, the required concentration is 2400 ppm. Second part is correct in that makeup to the SFP for leakage is the RWST and for evaporation is the RMUWST.

D. Incorrect. First part is correct, see C above. Second part is incorrect but plausible, see B above.

Technical Reference(s) TS 3.7.16 Attached w/ Revision # See SOP-506 Comments / Reference U1 COLR Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Spent Fuel Pool Cooling and Cleanup system IAW Technical Specifications, TRM and ODCM.

(SYS.SF1.OB05)

Question Source: Bank #

Modified Bank # 66156 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 18 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 66156 Revision:

Page 19 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 66156 Revision:

Page 20 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.7.16 Revision: 162 Page 21 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

U1 COLR, Cycle 19 Revision: 0 Page 22 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-506 Revision: 21 Page 23 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 2 K/A 045.K4.12 Level of Difficulty: 3 Importance Rating 3.3 Main Turbine Generator: Knowledge of MT/G system design feature(s) and/or interlock(s) which provide for the following:

Automatic turbine runback Question # 35 Unit 1 is operating at 1260 MWe when Main Feedwater Pump A trips.

The Main Turbine will runback at a rate of ___(1)___ per minute and Main Turbine load will stabilize at approximately ___(2)___ MWe.

A. (1) 200%

(2) 800 B. (1) 200%

(2) 700 C. (1) 35%

(2) 800 D. (1) 35%

(2) 700 Answer: D Page 24 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of automatic turbine runback signals.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since the OTN16 and OPN16 runbacks occur at a rate of 200% per minute, but the MFW pump trip runback is 35% per minute. 2nd part is incorrect, but plausible since the HDP trip runback reduces load to approximately 800 MWe.

B. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is correct (see D).

C. Incorrect. 1st part is correct (see D). 2nd part is incorrect, but plausible (see A).

D. Correct. 1st part is correct. A MFW pump trip will result in a runback at 35% per minute. 2nd part is correct. The turbine runback will reduce load to approximately 700 MWe.

Technical Reference(s) ABN-302 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal and abnormal operation of Main Turbine Control System in accordance with IPO-003, SOP-401, ALM-0092, and ABN-401.

(SYS.MT1.OB17)

Question Source: Bank # 30643 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 25 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-302 Revision: 14 Page 26 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-302 Revision: 14 Page 27 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 2 K/A 068.K6.10 Level of Difficulty: 2 Importance Rating 2.5 Liquid Radwaste: Knowledge of the effect of a loss or malfunction on the following will have on the Liquid Radwaste System: Radiation monitors Question # 36 Given the following conditions:

Unit 1 Turbine Building Sumps are being released per STA-603-16, Secondary Waste Release Data Sheet.

1-RV-5100A, TURB BLDG SMP 1-02 DISCH DRN HDR TO LVW/EVAP POND ISOL VLV, and 1-RV-5100B, TURB BLDG SMP 1-02 DISCH HDR TO WWHT ISOL VLV, are aligned for the normal liquid release path.

1-RE-5100 (TBD172), TURBINE BUILDING DRAINS RADIATION MONITOR, experiences an OPERATE FAILURE.

1-RV-5100B, TURB BLDG SMP 1-02 DISCH HDR TO WWHT ISOL VLV, will A. remain closed.

B. automatically close.

C. automatically open.

D. remain open.

Answer: C Page 28 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of how system responds to a failed radiation monitor.

Explanation:

A. Incorrect. Plausible since CLOSED is the normal position of this valve during a release and only select automatic actions occur as a result of a radiation monitor operate failure. This is one of the monitors where automatic actions occur, so the valve will reposition to its open position.

Examples of other rad monitors which do not provide automatic actions on an operate failure include containment air gas/particulate, CR radiation, and secondary sample.

B. Incorrect. Plausible if thought normal release flowpath is to Co-Current Waste, however 1-RV-5100A will close isolating the Low Volume Waste flowpath and 1-RV-5100B will open aligning the Co-Current Waste flowpath.

C. Correct. On a rad monitor operate failure, the automatic action for these valves will occur. The normal release path is to Low Volume Waste, so 1-RV-5100A will close isolating the Low Volume Waste flowpath and 1-RV-5100B will open, aligning the Co-Current Waste flowpath.

D. Incorrect. Plausible if thought that 1-RV-5100A and 1-RV-5100B remain in their current position on a rad monitior operate failure since only select automatic actions occur as a result of a radiation monitor operate failure, and the normal position for 1-RV-5100B is open. Examples of other rad monitors which do not provide automatic actions on an operate failure include containment air gas/particulate, CR radiation, and secondary sample.

Technical Reference(s) ALM-3200 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Digital Radiation Monitoring System including interrelations with other systems to include interlocks and control loops in accordance with DBD-EE-023. (SYS.RWS.OB08)

Question Source: Bank # 23708 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC21 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 29 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 23708 Revision:

Page 30 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 23708 Revision:

Page 31 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-3200 Revision: 5 Comments /

Reference:

ALM-3200 Revision: 5 Page 32 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 33 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 2 K/A 035.A3.01 Level of Difficulty: 2 Importance Rating 4.0 Steam Generator: Ability to monitor automatic operation of the SG, including: SG water level control Question # 37 Given the following conditions:

Unit 1 is at 28% power, ramping to 100%.

Steam Flow channel, FT-512A is selected for AUTOMATIC control of SG 1-01.

The associated compensating Steam Pressure channel, PT-514A, fails HIGH.

Assuming NO operator action, which of the following SG Water Level Control responses is expected to occur?

A. HS-2162, SG 1 FW BYP & CTRL VLV, OPENS B. HS-2162, SG 1 FW BYP & CTRL VLV, CLOSES C. FK-510, SG 1 FW FLO CTRL, OPENS D. FK-510, SG 1 FW FLO CTRL, CLOSES Answer: C Page 34 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of how the SG water level control system responds in automatic to changing inputs.

Explanation:

A. Incorrect. Incorrect, but plausible since steam flow fails high, causing the controlling valve to fail open, but at this power level the FCV is in AUTO control with the FCBV closed in MAN.

B. Incorrect. Incorrect, but plausible if thought that the high failure of the pressure compensation would result is a lower steam flow due to the density difference and that the FCBV is controlling in AUTO at this power level.

C. Correct. A high failure of steam pressure causes the associated steam flow channel to fail high, causing FK-510 to open to match feed flow to steam flow. At this power level the FCV is in service in AUTO and the FCBV is closed in MAN.

D. Incorrect. Incorrect, but plausible if thought that the high failure of the pressure compensation would result is a lower steam flow due to the density difference and the FCV is controlling in AUTO at this power level.

Technical Reference(s) ABN-709 Attached w/ Revision # See SGWLC Study Guide Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the instrumentation and controls of the Steam Generator Water Level Control system and PREDICT the system response in accordance with DBD-ME-203. (SYS.SN1.OB04)

Question Source: Bank # 29641 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 35 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-709 Revision: 9 Page 36 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SGWLC Study Guide Revision: 5-7-2011 Page 37 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SGWLC Study Guide Revision: 5-7-2011 Page 38 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 2 K/A 086.A4.02 Level of Difficulty: 3 Importance Rating 3.5 Fire Protection System: Ability to manually operate and/or monitor in the control room: Fire detection panels Question # 38 When responding to a fire alarm on the Main Control Room Fire Detection Panel, the following alarm window is LIT:

DG RM TRN A CP1-33 23 Which of the following identifies the indications associated with this alarm window?

CP1-33 A. UV Flame Fire Detector Local Fire Detection Panel Number B. Thermal Detector Local Fire Detection Panel Number C. UV Flame Fire Detector Detector Zone Number D. Thermal Detector Detector Zone Number Answer: B Page 39 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of indications on fire alarm panel to allow proper monitoring.

Explanation:

A. Incorrect. Plausible since the CPX number is the local fire detection panel, but the circle is a thermal detector type.

B. Correct. The circle is indication of a thermal detector and can be various other symbols depending on the type of detector, the CPX number is the local fire detection panel.

C. Incorrect. Plausible since the circle is a detector type, but is a thermal detector, and the 23 is the detector zone D. Incorrect. Plausible since the circle is a thermal detector type, but CPX is a local detection panel number and the 23 is the zone number.

Technical Reference(s) ABN-901 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Fire Suppression system including interrelations with other systems to include interlocks and control loops in accordance with DBD-ME-225. (SYS.FP1.OB03)

Question Source: Bank #

Modified Bank # 29983 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 40 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 29983 Revision:

Comments /

Reference:

ABN-901 Revision: 9 Page 41 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 42 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-901 Revision: 9 Page 43 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000007.EK1.04 Level of Difficulty: 2 Importance Rating 3.6 Reactor Trip: Knowledge of the operational implications of the following concepts as they apply to the reactor trip:

Decrease in reactor power following reactor trip (prompt drop and subsequent decay)

Question # 39 A Reactor Trip from 100% power at MOL has occurred.

Following the trip, Source Range NIs should automatically energize within ___(1)___

minutes.

Failure of the Source Range NIs to energize within this time is due to ___(2)___ of an Intermediate Range NI.

A. (1) 5-8 (2) overcompensation B. (1) 15-18 (2) overcompensation C. (1) 5-8 (2) undercompensation D. (1) 15-18 (2) undercompensation Answer: D Page 44 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the time associated with the long lived delayed neutrons and the resultant startup rate.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is incorrect, but plausible (see B).

B. Incorrect. 1st part is correct (see D). 2nd part is incorrect, but plausible since overcompensation would effect the time response of the IR channel, but overcompensation would cause the SR to energize earlier.

C. Incorrect. 1st part is incorrect, but plausible if thought that a startup rate of -1 dpm would be achieved following a trip, resulting in a time of 5-8 minutes before the SR energizes. 2nd part is correct (see D).

D. Correct. 1st part is correct. Based on a prompt drop and subsequent response due to long lived delayed neutrons, a startup rate of -1/3 dpm will cause power to be below P-6 within 15-18 minutes (5-6 decades). 2nd part is correct. Failure of the SR to energize after this time frame is due to an IR channel being undercompensated and stabilizing above P-6.

Technical Reference(s) ABN-701 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: (ABN.SELF.701)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 45 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-701 Revision: 12 Page 46 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000008.AA2.12 Level of Difficulty: 2 Importance Rating 3.4 Pressurizer Vapor Space Accident: Ability to determine and interpret the following as they apply to the Pressurizer Vapor Space Accident: PZR level indicators Question # 40 Given the following conditions:

Unit 1 is operating at 30% power A Reactor Trip and Safety Injection occur due to a Pressurizer steam space break Which of the following indications would you expect to observe in the Pressurizer?

A. Level rising and pressure lowering B. Level lowering and pressure rising C. Level lowering and pressure lowering D. Level rising and pressure rising Answer: A Page 47 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring understanding of the response of pressurizer level to a vapor space leak.

Explanation:

A. Correct. A Pressurizer steam space leak will cause pressure to decrease and level to rise due to the expansion of Reactor Coolant System fluid. The break will cause pressure to lower in the steam space of the Pressurizer. As the RCS pressure lowers, saturation conditions will be reached which will cause voids to form and a two-phase mixture to flow into the Pressurizer, resulting in an increase in Pressurizer level indication.

B. Incorrect. Plausible because for all LOCAs except the Pressurizer vapor space break, Pressurizer level indication decreases. Pressure increasing is plausible if thought that ECCS flow exceeds break flow, causing the RCS pressure to rise.

C. Incorrect. Plausible because pressure will decrease, however, level will rise due to the expansion of Reactor Coolant System fluid.

D. Incorrect. Plausible because level will increase, however, Pressurizer pressure will decrease.

Pressure increasing is plausible if thought that ECCS flow exceeds break flow, causing the RCS pressure to rise as the RCS goes solid.

Technical Reference(s) FSAR 15.6.1.1 Attached w/ Revision # See MCO.TAA Lesson Plan Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the Pressurizer Vapor Space LOCA IAW the CPNPP FSAR and Westinghouse ERG background documents. (MCO.TAA.OB06)

Question Source: Bank # 73921 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 48 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FSAR 15.6.1.1 Revision: 108 Page 49 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

LO21MCOTAA Revision: 7-27-2017 Page 50 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

LO21MCOTAA Revision: 7-27-2017 Page 51 of 51 CPNPP 2020-05 retake NRC Written Exam Worksheet 31-40 Rev. 1

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000009.G.2.1.7 Level of Difficulty: 4 Importance Rating 4.4 Small Break LOCA: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Question # 41 Given the following conditions:

A LOCA has occurred.

The crew is responding per EOP-1.0A, Loss of Reactor or Secondary Coolant.

Containment pressure is 7.5 psig and stable.

Pressurizer level is off-scale low.

The RVLIS 49 above flange light is DARK, with all other RVLIS lights LIT.

RCS subcooling is 0oF and stable.

RCS pressure is 350 psig and stable.

Which of the following parameters is evaluated, along with RHR pump injection flow, to determine whether the crew should remain in EOP-1.0A or transition to EOS-1.2A, Post LOCA Cooldown and Depressurization?

A. Pressurizer level B. Reactor Vessel level C. RCS subcooling D. RCS pressure Answer: D Page 1 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to know the plant parameters that are used to determine the size of a LOCA.

Explanation:

A. Incorrect. Plausible since this parameter is used to determine if EOP-1.0 can be exited, but the transition path for ECCS flow reduction is to EOS-1.1, Safety Injection Termination.

B. Incorrect. Plausible since RV level is used in procedures where pressurizer level is not considered reliable, but the parameter used is RCS pressure.

C. Incorrect. Plausible since this parameter is used to determine if EOP-1.0 can be exited, but the transition path for ECCS flow reduction is to EOS-1.1, Safety Injection Termination.

D. Correct. A check of RCS pressure is made to determine if pressure is above the shutoff head of the RHR pumps and, if not, whether or not the RHR pumps are injecting. If the RHR pumps are not injecting, a transition is made to EOS-1.2, and if they are injecting EOP-1.0 implementation continues.

Technical Reference(s) EOP-1.0A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE the bases for operator actions, notes and cautions from EOP-1.0 in accordance with EOP-1.0, Loss of Reactor or Secondary Coolant.

(ERG.E1A.OB04)

Question Source: Bank # 18471 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 2 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-1.0A Revision: 9 Page 3 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-1.0A Revision: 9 Page 4 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000011.EK3.14 Level of Difficulty: 2 Importance Rating 4.1 Large Break LOCA: Knowledge of the reasons for the following responses as the apply to the Large Break LOCA: RCP tripping requirement Question # 42 Given the following plant conditions:

Unit 1 LBLOCA Containment pressure is 35 psig and slowly decreasing CET temperatures are 400ºF and slowly increasing RCS pressure is approximately the same as Containment pressure CCP 1-02 tripped after automatically starting All other ECCS equipment is operating properly RCPs should A. continue to run due to the rising CETs.

B. continue to run due to CCP 1-02 being tripped.

C. be manually tripped due to Containment Spray water on the motors.

D. be manually tripped due to a loss of Component Cooling Water to the coolers.

Answer: D Page 5 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to know the tripping criteria for the RCPs.

Explanation:

A. Incorrect. Plausible since in inadequate core cooling conditions, RCPs are not tripped even if conditions to operate the RCPs are not met, but inadequate core cooling does not exist even with CETs rising and RCPs are tripped due to a loss of CCW to the motors and bearing coolers.

B. Incorrect. Plausible since RCPs are not tripped due to a loss of subcooling if ECCS pumps are not available and a CCP trip may be confused with this condition, but they are tripped due to a loss of cooling to the pump coolers.

C. Incorrect. Plausible since RCPs should be stopped, but the reason in this case is due to the loss of CCW. Spray water on the motors is plausible since old versions of ALMs required the RCPs be tripped when sprayed upon.

D. Correct. With containment pressure above the Hi-3 setpoint, Phase B actuation would have occurred resulting in a loss of CCW flow to the RCP motor and bearing coolers. The RCPs are required to be tripped under these conditions.

Technical Reference(s) FRZ-0.1A Attached w/ Revision # See RCP Trip/Restart Study Guide Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE the bases for the procedure steps, NOTEs and CAUTIONs contained in FRZ-0.1A/B. (ERG.FZ1.OB04)

Question Source: Bank # 22974 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 6 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 22974 Revision:

Page 7 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 22974 Revision:

Page 8 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRZ-0.1A Revision: 9 Page 9 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRZ-0.1A Revision: 9 Page 10 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

LO21ERGXD3 Revision: 2-11-2016 Page 11 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000022.G.2.4.4 Level of Difficulty: 2 Importance Rating 4.5 Loss of Reactor Coolant Makeup: Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.

Question # 43 During the response to a fault of 6.9 kV Safeguards Bus 1EA1, the following annunciators alarm:

ALB-6A, Window 1.3, LTDN HX OUT TEMP HI ALB-6A, Window 1.4, REGEN HX LTDN OUT TEMP HI ALB-6A, Window 2.3, LTDN HX NORM OUT FLO DIVERT ALB-6A, Window 3.4, CHRG FLO HI/LO What CVCS malfunction has occurred that requires entry into ABN-105, CVCS Malfunctions?

A. Loss of letdown B. Reactor Makeup System malfunction C. Charging pump trip D. Pressurizer level increasing above program level Answer: C Page 12 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to determine the conditions which causes entry into ABN-105.

Explanation:

A. Incorrect. Plausible since this is a section in ABN-105 related to temperature issues when letdown flow is lost, but the temperatures will be low, not high.

B. Incorrect. Plausible since this is a section in ABN-105 which could eventually result in charging pump issues due to a loss of suction from the VCT, but the RWST would provide adequate suction.

C. Correct. A charging pump trip will cause charging flow to be low, causing high temperatures in the CVCS letdown system, resulting in the numerous alarms.

D. Incorrect. Plausible since this is a section in ABN-105 related to charging pump/flow issues, but high flow, not loss of flow.

Technical Reference(s) ABN-105 Attached w/ Revision # See ALM-0061A Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Charging Pump Trip in accordance with ABN-105, CVCS System Malfunctions. (ABN.105.OB01)

Question Source: Bank # 20817 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 13 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0061A Revision: 7 Page 14 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0061A Revision: 7 Page 15 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0061A Revision: 7 Page 16 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0061A Revision: 7 Page 17 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-105 Revision: 8 Examination Outline Cross-reference: Level RO SRO Page 18 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000025.AK1.01 Level of Difficulty: 4 Importance Rating 3.9 Loss of Residual Heat Removal System: Knowledge of the operational implications of the following concepts as they apply to Loss of Residual Heat Removal System: Loss of RHRS during all modes of operation Question # 44 Given the following conditions:

RHR Pump 1-01 in Shutdown Cooling Mode ABN-108, Shutdown Loss of Coolant, in progress RCS subcooling is 18ºF and degrading slowly RCS pressure is 480 psig and decreasing slowly RWST level is 53% and decreasing slowly CST level is 35% and decreasing slowly Per ABN-108, Attachment 1, Continuous Action Steps, what action is required?

A. Align SI Accumulators for injection B. Place RHR Pump 1-01 in Pull-Out C. Transfer to Cold Leg Recirculation D. Switch to an Alternate AFW supply source Answer: B Page 19 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to having to analyze plant conditions to determine that the effect on continues RHR operations.

Explanation:

A. Incorrect. Plausible since SI Accumulators are isolated before conditions would be met to enter this procedure and are a source of RCS makeup, but in ABN-108 they are not realigned as they are in other leakage procedures.

B. Correct. This is a continuous action to be taken in ABN-108, and with less than 25oF subcooling, the RHR pump is to be stopped.

C. Incorrect. Plausible since this is a continuous action to be taken in ABN-108, but only if less than 33%.

D. Incorrect. Plausible since this is a continuous action to be taken in ABN-108, but only if less than 10%.

Technical Reference(s) ABN-108 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Shutdown Loss of Cooling in accordance with ABN-108, Shutdown Loss of Coolant. (ABN.104.OB07)

Question Source: Bank # 17692 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 20 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-108 Revision: 8 Page 21 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000026.AK3.02 Level of Difficulty: 4 Importance Rating 3.6 Loss of Component Cooling Water: Knowledge of the reasons for the following responses as they apply to the Loss of Component Cooling Water: The automatic actions (alignments) within the CCWS resulting from the actuation of the ESFAS Question # 45 Which of the following describes the basis for isolating the CCW containment penetrations upon receipt of a Containment Isolation Phase B actuation?

A. Ensures CCW system is not a potential radioactive release path from containment B. Reduces heat load on CCW system by isolating flow to the RCP thermal barrier HXs C. Reduces likelihood that CCW system leakage is contributing to excessive flooding in containment D. Ensures that CCW system is capable of providing adequate flow to RHR and CS HXs by isolating containment loads Answer: A Page 22 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the Phase B isolation to determine the reason for the isolation.

Explanation:

A. Correct. Isolation of Component Cooling Water is required for Containment Integrity.

B. Incorrect. Plausible because there would be a reduction in heat load on the CCW System due to isolating flow to the RCP thermal barrier HXs, however, a heat load reduction is not required to meet design load limits.

C. Incorrect. Plausible since CCW leakage inside containment is a concern during Containment Flooding conditions, but it is isolated on Phase B for containment integrity.

D. Incorrect. Plausible because the CCW System is required to supply flow to the RHR and CS HXs during accident conditions, but it is capable of providing these loads while supplying containment loads.

Technical Reference(s) TSB 3.3.2 Attached w/ Revision # See EOP-0.0A Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Component Cooling Water system in accordance with:

1) SOP-502A COMPONENT COOLING WATER SYSTEM
2) ABN-502 COMPONENT COOLING WATER SYSTEM MALFUNCTIONS
3) ALM-0032A ALARM PROCEDURE 1-ALB-3B. (SYS.CC1.OB05)

Question Source: Bank # 34083 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 23 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TSB 3.3.2 Revision: 73 Page 24 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 25 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 26 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 27 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000027.AK3.03 Level of Difficulty: 3 Importance Rating 3.7 Pressurizer Pressure Control System Malfunction: Knowledge of the reasons for the following responses as they apply to the Pressurizer Pressure Control Malfunctions: Actions contained in EOP for PZR PCS malfunction Question # 46 BEFORE terminating Safety Injection in EOP-3.0A, Steam Generator Tube Rupture, the crew is preparing to depressurize the RCS.

Due to a malfunction of the Pressurizer Pressure Master Controller, it is determined that Normal Spray is unavailable.

EOP-3.0A directs depressurizing the RCS using A. Auxiliary Spray instead of PRZR PORVs to minimize RCS inventory loss.

B. Auxiliary Spray instead of PRZR PORVs to prevent rupturing the PRT.

C. PRZR PORVs instead of Auxiliary Spray since letdown is isolated.

D. PRZR PORVs instead of Auxiliary Spray since charging is in ECCS injection mode.

Answer: C Page 28 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to know methods of restoring pressure control following a loss of pressure control during a SGTR event.

Explanation:

A. Incorrect. Plausible since PORVs would result in a loss of inventory when opened, but PORVs are used before aux spray due to letdown being isolated.

B. Incorrect. Plausible since PORVs would result in rupturing the PRT after being opened, but PORVs are used before aux spray due to letdown being isolated.

C. Correct. PORVs are used before aux spray due to letdown being isolated, preventing thermal fracture of the pressurizer spray nozzle.

D. Incorrect. Plausible since PORVs are used before Aux Spray and it could be thought charging flow is unavailable with SI in service, but it is because of letdown being isolated.

Technical Reference(s) EOP-3.0A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural step, or sequence of steps from EOP-3.0, STATE the purpose/basis for the step(s). (ERG.E3A.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 29 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-3.0A Revision: 9 Page 30 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-3.0A Revision: 9 Page 31 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-3.0A Revision: 9 Page 32 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 3 Tier 1 Group 1 K/A 000038.EA1.04 Level of Difficulty: 2 Importance Rating 4.3 Steam Generator Tube Rupture: Ability to operate and monitor the following as they apply to a SGTR: PZR spray, to reduce coolant system pressure Question # 47 Given the following conditions:

A tube rupture has occurred on SG 1-03 The SG has been isolated The RCS has been cooled down and depressurized SI has been terminated Normal charging has been established Normal letdown has been established SG 1-03 level is 74% and slowly rising Pressurizer level is 55% and slowly rising Which of the following actions should be taken to establish stable Pressurizer level and SG 1-03 level?

A. Use Pressurizer spray to lower RCS pressure while raising charging flow B. Use Pressurizer heaters to raise RCS pressure while raising charging flow C. Use Pressurizer heaters to raise RCS pressure while lowering charging flow D. Use Pressurizer spray to lower RCS pressure while lowering charging flow Answer: D Page 33 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring understanding of the relationship between the RCS and ruptured SG and how Przr spray is used to control equilibrium conditions.

Explanation:

A. Incorrect. Plausible since spray flow should be used to lower RCS pressure and since pressurizer level is to be maintained between 50-70%, plausible that being at lower end of level band requires more charging, but lowering RCS pressure will result in SG draining back into RCS, so charging flow is to be lowered. If pressurizer level were below 30% (or 50% if Adverse Containment conditions existed) then charging flow would be required to be raised as well.

B. Incorrect. Plausible since using heaters to raise pressure would be the proper action if SG level were lowering, and since pressurizer level is to be maintained between 50-70%, plausible that being at lower end of level band requires more charging, but lowering RCS pressure will result in SG draining back into RCS, so charging flow is to be lowered. If pressurizer level were below 30% (or 50% if Adverse Containment conditions existed) then charging flow would be required to be raised as well.

C. Incorrect. Plausible since charging flow is to be lowered, but with rising SG level, RCS pressure is to be lowered, not raised.

D. Correct. With Pressurizer level between 50% and 75% and SG level rising, the RCS pressure is to be lowered using spray and charging flow is to be lowered.

Technical Reference(s) EOP-3.0A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural step, or sequence of steps from EOP-3.0, STATE the purpose/basis for the step(s). (ERG.E3A.OB04)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 34 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-3.0A Revision: 9 Page 35 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000040.AK1.02 Level of Difficulty: 4 Importance Rating 3.2 Steam Line Rupture: Knowledge of the operational implications of the following concepts as they apply to Steam Line Rupture: Leak rate versus pressure change Question # 48 Given the following conditions:

Following a Reactor Trip, a SG Safety Valve failed partially open on SG 1-02.

After isolating the SG per EOP-2.0A, Faulted SG Isolation, the following indications were noted for SG 1-02:

o Steam pressure 800 psig o Steam flow 600,000 lbm/hr Several minutes later, SG 1-02 steam pressure has lowered to 400 psig Steam flow at this lower pressure should indicate approximately A. 150,000 lbm/hr.

B. 212,000 lbm/hr.

C. 300,000 lbm/hr.

D. 424,000 lbm/hr.

Answer: D Page 36 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of how flow rate changes with changes in differential pressure.

Explanation:

A. Incorrect. Plausible if the square root were neglected and the ratio in pressures were used was incorrectly determined to be 0.25 instead of 0.5.

B. Incorrect. Plausible if the square root were accounted for but the ratio in pressures were used was incorrectly determined to be 0.25 instead of 0.5.

C. Incorrect. Plausible if thought the ratio were the new differential pressure to the original differential pressure, without accounting for the square root.

D. Correct. The relationship between differential pressure and flow rate is based on the square root of the ratio of the new pressure to the old pressure. With a new pressure of 400 psig and an original pressure of 800 psig, the ratio is 0.5. The square root of 0.5 is approximately 0.707. 0.707 x 600,000 lbm/hr = 424,000 lbm/hr.

Technical Reference(s) GFE Fluid Statics and Dynamics Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given an event that results in an excessive increase in secondary steam flow transient, DISCUSS accident analysis assumptions, predicted plant response, and analysis conclusions as described in the Final Safety Analysis Report.

(MCO.TA8.OB02)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 37 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

GFE Fluid Statics and Dynamics Revision: 2017 Page 38 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

GFE Fluid Statics and Dynamics Revision: 3 Page 39 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000055.EA1.06 Level of Difficulty: 2 Importance Rating 4.1 Station Blackout: Ability to operate and monitor the following as they apply to a Station Blackout: Restoration of power with one ED/G Question # 49 Given the following conditions:

ABN-601, Response to a 138/345 KV System Malfunction, is in progress.

Actions of Section 3.0, Plant Recovery from a Blackout Sequencer Signal, are being performed.

Safeguards Bus 1EA1 is being powered by EDG 1-01.

No Offsite Power source is available.

Attachment 19, MCC Undervoltage Load Shed, is about to be performed.

EDG 1-01 load should be maintained at a MAXIMUM of ___(1)___ under ___(2)___

conditions.

A. (1) 7 MWe (2) transient B. (1) 3 MWe (2) transient C. (1) 7 MWe (2) steady state D. (1) 3 MWe (2) steady state Answer: C Page 40 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the operational limitations of an EDG when restoring power.

Explanation:

A. Incorrect. Plausible since 7 MWe is the limit, but it is based upon steady state conditions.

B. Incorrect. Plausible since 3 MWe is a limit, but it is based upon restoring power to the bus by using the APDG. Typical maximum loading on the EDG when carrying the bus is approximately 3 MWe.

C. Correct. The steady state loading limit on the EDG is 7 MWe.

D. Incorrect. Plausible since the limit is based upon steady state conditions, but it is 7 MWe, not 3 MWe. The 3 MWe limit is based upon the operation of the APDG and typical maximum loading on the EDG when carrying the bus is approximately 3 MWe.

Technical Reference(s) ABN-601 Attached w/ Revision # See TS 3.8.1 Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to Loss of All Offsite AC Power in accordance with ABN-601, Response to 138/345 KV System Malfunction. (ABN.601.OB01)

Question Source: Bank # 38522 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 41 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 42 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000057.G.2.1.31 Level of Difficulty: 2 Importance Rating 4.6 Loss of Vital AC Instrument Bus: Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.

Question # 50 Given the following conditions:

1/1-LS-459D, PRZR LVL CTRL CHAN SELECT is in the 459/460 position Pressurizer pressure is 2200 psig.

1-LK-459, PZR LVL CTRL, is in AUTO.

CVCS letdown is in service at 130 gpm.

All Pressurizer heaters are in AUTO.

Which of the following describes how Pressurizer heater control and CVCS letdown are affected by a loss of 1PC2?

All Heaters are ___(1)___.

Letdown ___(2)___.

A. (1) de-energized (2) is isolated B. (1) de-energized (2) remains in service C. (1) energized (2) remains in service D. (1) energized (2) is isolated Answer: A Page 43 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of response of vital plant systems to a loss of vital ac power.

Explanation:

A. Correct. On a loss of PC2, All heaters will de-energize and letdown will isolate.

B. Incorrect. Plausible since heaters de-energize, but letdown will isolate.

C. Incorrect. Plausible since this would be the response if the loss of power were 1PC3 or 1PC4, but with a loss of 1PC2 this is incorrect.

D. Incorrect. Plausible since letdown will isolate on a loss of PC2, but heaters will de-energize.

Technical Reference(s) ABN-603 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the abnormal operation of the Protection and Instrument Power Supply System in accordance with ABN-603 and ABN-604. (SYS.ES4.OB03)

Question Source: Bank # 31121 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 44 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-603 Revision: 8 Page 45 of 45 CPNPP 2020-05 retake NRC Written Exam Worksheet 41-50 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000058.AA1.03 Level of Difficulty: 3 Importance Rating 3.1 Loss of DC Power: Ability to operate and / or monitor the following as they apply to the Loss of DC Power: Vital and battery bus components Question # 51 Given the following conditions:

Unit 1 is at 100% power.

A loss of 1ED1, 125 VDC Switch Panel, occurs.

Which of the following are the responses of:

(1) Reactor Trip Breaker A; and, (2) 1-HV-2452-1, TDAFW Pump Steam Supply Valve?

A. (1) Reactor Trip Breaker A can only trip on an undervoltage trip (2) Fails open B. (1) Reactor Trip Breaker A can only trip on an undervoltage trip (2) Fails closed C. (1) Reactor Trip Breaker A can only trip on a shunt trip (2) Fails open D. (1) Reactor Trip Breaker A can only trip on a shunt trip (2) Fails closed Answer: A Page 1 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

This question matches the KA by requiring knowledge of the effect on components that respond to a loss of DC power.

Explanation:

A. Correct. Plausible because Reactor Trip Breaker A CANNOT trip due to a shunt trip as the shunt trip coil is powered from 1ED1 and is energized to actuate, so it can only trip on an undervoltage trip which are deenergized to actuate. The TDAFWP steam supply fails open on the loss of 1ED1.

B. Incorrect. Reactor Trip Breaker A CANNOT trip due to a shunt trip as the shunt trip coil is powered from 1ED1 and is energized to actuate, so it can only trip on an undervoltage trip which are deenergized to actuate. The TDAFWP steam supply fails open on the loss of 1ED1, but is plausible as air operated valves can fail either open or closed.

C. Incorrect. Plausible because Reactor Trip Breaker A CANNOT trip due to a shunt trip as the shunt trip coil is powered from 1ED1 and is energized to actuate, so it can only trip on an undervoltage trip which are deenergized to actuate, which is a common misconception as to which is energized to actuate. The TDAFWP steam supply fails open on the loss of 1ED1.

D. Incorrect. Plausible because Reactor Trip Breaker A CANNOT trip due to a shunt trip as the shunt trip coil is powered from 1ED1 and is energized to actuate, so it can only trip on an undervoltage trip which are deenergized to actuate, which is a common misconception as to which is energized to actuate. The TDAFWP steam supply fails open on the loss of 1ED1, but is plausible as air operated valves can fail either open or closed.

Technical Reference(s) DC Electrical Study Guide Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the DC Electrical Distribution system including interrelations with other systems to include interlocks and control loops in accordance with DBD-EE-044 DC POWER SYSTEMS. (SYS.DC1.OB01)

Question Source: Bank #

Modified Bank # 41962 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 2 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 41962 Revision:

Page 3 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

DC Electrical Study Guide Revision: 5-5-2011 Page 4 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0102A Revision: 12 Page 5 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000062.AA2.03 Level of Difficulty: 3 Importance Rating 2.6 Loss of Nuclear Service Water: Ability to determine and interpret the following as they apply to the Loss of Nuclear Service Water: The valve lineups necessary to restart the SWS while bypassing the portion of the system causing the abnormal condition Question # 52 Given the following conditions:

Unit 1 is at 100% power.

A body to bonnet leak has developed on the SSW system EDG 1-02 Jacket Water Cooler inlet flange.

To repair the leak, SSW Train B ___(1)___ should be isolated, isolating ___(2)___.

A. (1) 30 header (2) 1-02 SIP lube oil cooler and 1-02 CSP bearing cooler B. (1) 10 header (2) 1-02 CCP lube oil cooler and 1-02 CCW HX C. (1) 30 header (2) 1-02 CCP lube oil cooler and 1-02 CCW HX D. (1) 10 header (2) 1-02 SIP lube oil cooler and 1-02 CSP bearing cooler Answer: D Page 6 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the components isolated to bypass the leaking portion of the system.

Explanation:

A. Incorrect. Plausible because it could be thought that the entire train must be isolate, however only the 10 header should be isolated and the SIP and CSP are the correct components if the 10 header were isolated.

B. Incorrect. Plausible because the 10 header should be isolated however the CCW heat exchanger is not supplied from the 10 header, though the CCP is.

C. Incorrect. Plausible because it could be thought that the entire train must be isolate, however only the 10 header should be isolated and isolating the entire train would affect the CCW heat exchanger and CCP.

D. Correct. The SIP and CSP are loads on the 10 inch SSW header that would be affected by isolating the 10 header.

Technical Reference(s) SOP-501A Attached w/ Revision # See ABN-501 Comments / Reference SSW Study Guide Proposed references to be provided during examination:

Learning Objective: DESCRIBE the components of the Station Service Water system including interrelations with other systems to include interlocks and control loops IAW DBD-ME-233. (SYS.SW1.OB03)

Question Source: Bank # 52721 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC21 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 7 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 52721 Revision:

Page 8 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 52721 Revision:

Page 9 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SSW Study Guide Revision: 4-28-2011 Page 10 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SSW Study Guide Revision: 4-28-2011 Page 11 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-501A Revision: 20 Page 12 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-501 Revision: 9 Page 13 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000065.AA2.06 Level of Difficulty: 2 Importance Rating 3.6 Loss of Instrument Air: Ability to determine and interpret the following as they apply to the Loss of Instrument Air: When to trip reactor if instrument air pressure is decreasing Question # 53 Given the following conditions:

Unit 1 100%

IA header pressure begins to lower rapidly ABN-301, Instrument Air System Malfunction, in progress As IA pressure lowers, the FIRST failure that will result in an AUTOMATIC trip of the reactor is the ___(1)___.

ABN-301 directs a MANUAL trip of the Reactor when IA pressure drops below a setpoint of

___(2)___.

A. (1) MSIVs failing closed.

(2) 35 psig B. (1) MSIVs failing closed.

(2) 85 psig C. (1) FW control valves failing closed.

(2) 35 psig D. (1) FW control valves failing closed.

(2) 85 psig Answer: C Page 14 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of when the reactor will trip on a loss of IA.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible because per ABN-301 the MSIVs fail closed, but the valves are operated by compressed nitrogen and do not immediately close on loss of IA. 2nd part is correct. A manual reactor trip is to be initiated if IA pressure drops below 35 psig.

B. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is incorrect, but plausible because ABN-301 uses this value of pressure as a minimum value to maintain in the system while recovering from a loss of IA and the low pressure alarm value is 85 psig.

C. Correct. 1st part is correct. Per ABN-301 the FCVs failed closed which will lead to a reactor trip on SG lo-lo levels. 2nd part is correct. ABN-301 directs a manual trip of the reactor if IA falls below 35 psig.

D. Incorrect. 1st part is correct (see C). 2nd part is incorrect, but plausible (see B).

Technical Reference(s) ABN-301 Attached w/ Revision # See Instrument Air Study Guide Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to Instrument Air Compressor Trip or Header Pressure Low in accordance with ABN-301 Instrument Air System Malfunction.

(ABN.301.OB03)

Question Source: Bank #

Modified Bank # 23300 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 15 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 23300 Revision:

Page 16 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 17 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-301 Revision: 13 Page 18 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-301 Revision: 13 Page 19 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Instrument Air Study Guide Revision: 5-7-2011 Page 20 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A WE04.EK2.02 Level of Difficulty: 2 Importance Rating 3.8 LOCA Outside Containment: Knowledge of the interrelations between the (LOCA Outside Containment) and the following:

Facility's heat removal systems, including primary coolant, emergency coolant, the decay heat removal systems, and relations between the proper operation of these systems to the operation of the facility.

Question # 54 Given the following conditions:

A LOCA outside containment has resulted in unsafe radiological conditions in the Auxiliary Building The crew has taken all the actions of ECA-1.2A, LOCA Outside Containment, to isolate the break RCS subcooling is 0ºF Which of the following is the primary indication used in ECA-1.2A that the actions taken have been successful?

A. RCS pressure increasing B. Auxiliary Building sump level alarms clearing C. PRZR level increasing D. Auxiliary Building temperatures decreasing Answer: A Page 21 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Matches the KA due to requiring knowledge of the interrelations between a LOCA outside containment and heat removal systems (RCS).

Explanation:

A. Correct. Without being able to perform a visual inspection of the AB due to rad levels being at an unsafe level, the only means used to determine if the LOCA outside containment is isolated is RCS pressure increasing per ECA-1.2.

B. Incorrect. Plausible since this may be indicative of leak being isolated, but is not the primary means used in ECA-1.2.

C. Incorrect. Plausible since this could potentially be indicative of the leak being isolated, but with the RCS being at saturation conditions an increase in PRZR level may be indicative of voiding in the RCS as well as indication of the leak being isolated.

D. Incorrect. Plausible since this may be indicative of leak being isolated, but is not the primary means used in ECA-1.2.

Technical Reference(s) ECA-1.2 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural step, or sequence of steps from ECA-1.2, STATE the purpose/basis for the step(s). (ERG.C12.OB04)

Question Source: Bank # 18483 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 22 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECA-1.2A Revision: 9 Page 23 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECA-1.2A Revision: 9 Page 24 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A WE11.EK2.01 Level of Difficulty: 3 Importance Rating 3.6 Loss of Emergency Coolant Recirculation: Knowledge of the interrelations between the (Loss of Emergency Coolant Recirculation) and the following: Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Question # 55 Given the following conditions:

Unit 2 has experienced a LOCA.

During performance of EOP-1.0B, Loss of Reactor or Secondary Coolant, the crew determined that RHR Pump 2-01 was NOT available and that Bus 2EA2 was de-energized.

RWST level is currently 43% and lowering.

Containment pressure is 12 psig and rising slowly.

The Unit Supervisor transitions to ECA-1.1B, Loss of Emergency Coolant Recirculation, and reads the following CAUTION:

If offsite power is lost after SI reset, manual action may be required to restore safeguards equipment to desired status.

The SI and SI sequencers are subsequently reset.

In accordance with ECA-1.1B, the primary operational concern regarding the above CAUTION is that the Train A ____ must be manually re-started.

A. SIP B. CCP C. CSPs D. CCWP Answer: A Page 25 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the effect on equipment necessary for plant recovery in ECA-1.1 when also responding to a malfunction (loss of power) which affects the equipment.

Explanation:

A. Correct. The only ECCS Pumps available are Centrifugal Charging Pump 2-01 which would auto restart on the BOS and Safety Injection Pump 2-01 which would need to be manually started.

B. Incorrect. Plausible because a concern is always that cooling to the RCP seals is occurring. If the Centrifugal Charging Pump did not restart, manually restarting would be required. However, the CCP receives an auto start from the BOS.

C. Incorrect. Plausible because the CSPs do not receive an autostart signal from the BOS, and if needed, would be required to be manually started, but these pumps are not currently required to be operating although they would have been previously operating before the loss of offsite power would occur.

D. Incorrect. Plausible because a concern is always that cooling to the safeguards loads is occurring. If the Component Cooling Pump did not restart, manually restarting would be required.

However, the CCWP receives an auto start from the BOS.

Technical Reference(s) ECA-1.1B Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural step, or sequence of steps from ECA-1.1, STATE the purpose/basis for the step(s). (ERG.C11.OB04)

Question Source: Bank # 62582 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC22 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 26 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 62582 Revision:

Page 27 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 62582 Revision:

Page 28 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECA-1.1B Revision: 9 Page 29 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECA-1.1B Revision: 9 Page 30 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-602 Revision: 8 Page 31 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECCS Study Guide Revision: 5-2-2011 Page 32 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 1 Group 1 K/A WE05.EK2.02 Level of Difficulty: 3 Importance Rating 3.9 Loss of Secondary Heat Sink: Knowledge of the interrelations between the (Loss of Secondary Heat Sink) and the following: Facility's heat removal systems, including primary coolant, emergency coolant, the decay heat removal systems, and relations between the proper operation of these systems to the operation of the facility.

Question # 56 Given the following conditions:

A LBLOCA has occurred on Unit 1.

The STA reports that a RED path condition exists on HEAT SINK following implementation of the CSFSTs.

A transition is made to FRH-0.1A, Response to Loss of Secondary Heat Sink.

Upon entering FRH-0.1A the following conditions exist:

o All SG levels are between 10% NR and 20% NR.

o All MFW Pumps and AFW Pumps have tripped.

o All SG pressures are 300 psig and slowly decreasing.

o RCS pressure is 120 psig and stable.

Why would the crew be directed to return to the procedure and step in effect as soon as the above conditions are verified?

A. SG levels are sufficient as a heat sink.

B. Feed and bleed is ineffective in removing heat at this RCS pressure.

C. SG thermal shock could result in tube failures and feedwater should NOT be established.

D. Establishing a secondary heat sink would NOT provide any additional heat removal from the RCS.

Answer: D Page 33 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of relationship between RCS and secondary heat sink following a loss of feedwater.

Explanation:

A. Incorrect. Plausible since this level would direct the crew to exit the FRH if this were Unit 2, but the required level is higher on Unit 1 and the reason for exiting is that a secondary heat sink does not provide additional heat removal on a LBLOCA.

B. Incorrect. Plausible since bleed and feed criteria are met, but a secondary heat sink is not required.

C. Incorrect. Plausible since feeding a SG can result in thermal or mechanical shock in accordance with the caution prior to Step 1 and the applicant may consider that FW flow should not be established based on this, but this caution warns the operator to stop feeding the SG if it does fault.

D. Correct. A heat sink is not required if RCS pressure is below non-faulted SG pressure. Adequate heat/energy is being removed via the break under these conditions. A near immediate transition is made out of FRH-0.1 to the procedure and step in effect under these conditions. SG pressures dropping under these conditions is expected as the RCS is removing heat from the SGs.

Technical Reference(s) FRH-0.1 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural Step, NOTE, or CAUTION, DISCUSS the reason or basis for the Step, NOTE, or CAUTION in FRH-0.1. (ERG.FH1.OB04)

Question Source: Bank # 32602 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 34 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRH-0.1A Revision: 9 Page 35 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRH-0.1A Revision: 9 Page 36 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 2 K/A 000003.AA2.02 Level of Difficulty: 2 Importance Rating 2.7 Dropped Control Rod: Ability to determine and interpret the following as they apply to the Dropped Control Rod: Signal inputs to rod control system Question # 57 Given the following conditions:

The crew has determined that control rod M-4 in Control Bank D, Group 2, has dropped to the bottom of the core.

Actions are being performed in accordance with ABN-712, Rod Control System Malfunction, using the DRPI method to realign the rod.

Control Bank D rods have just been moved to the desired DRPI light.

The disconnect switches for all rods in Control Bank D Groups 1 and 2, other than rod M-4, have been placed in the DISCONNECT position.

During dropped rod recovery, the Rod Bank Selector Switch should be placed in the

___(1)___ position.

While withdrawing the dropped rod, a ROD CONTROL CTRL URGENT FAILURE alarm will occur in Rod Control Power Cabinet ___(2)___.

A. (1) MAN (2) 1BD B. (1) CBD (2) 1BD C. (1) MAN (2) 2BD D. (1) CBD (2) 2BD Answer: B Page 37 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of what signals from the rod control are used to recover a dropped rod and the required switches to enable the inputs to the rod control system under these conditions. The only inputs used to recover a dropped/slipped rod are the rod bank selector switch, the rod disconnect switches, and the shim switch.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is correct (see B).

B. Correct. 1st part is correct. Due to an urgent failure in the associated power cabinet, control rods are prevented from moving in all but the individual (CBD) position. 2nd part is correct. The urgent failure occurs as a result of opening the lift disconnect switches for the remaining rods in the other groups power cabinet, 1BD, to prevent them from moving.

C. Incorrect. 1st part is incorrect, but plausible since control bank D rods are normally moved with the bank selector switch in the MAN position. 2nd part is incorrect, but plausible (see D).

D. Incorrect. 1st part is correct (see B). 2nd part is incorrect, but plausible since rods in power cabinet 2BD are also disconnected, but one rod in the group, the dropped rod, remaining connected results in no urgent failure in that power cabinet.

Technical Reference(s) ABN-712 Attached w/ Revision # See Rod Control Study Guide Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the normal, abnormal and emergency operation of the Rod Control System in accordance with ABN-712. (ABN.712.OB02)

Question Source: Bank #

Modified Bank # 20872 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 38 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 20872 Revision:

Page 39 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 20872 Revision:

Page 40 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-712 Revision: 11 Page 41 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-712 Revision: 11 Page 42 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-712 Revision: 11 Page 43 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Rod Control Study Guide Revision: 5-2-2011 Page 44 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 2 K/A 000028.AK1.01 Level of Difficulty: 3 Importance Rating 2.8 Pressurizer Level Control Malfunction: Knowledge of the operational implications of the following concepts as they apply to Pressurizer Level Control Malfunctions: PZR reference leak abnormalities Question # 58 Given the following conditions:

Reactor power = 100%

PRZR LVL CTRL CHAN SELECT switch is in 459/460 position PRZR level indications o 1-LI-459A = 62% rising o 1-LI-460A = 58% lowering o 1-LI-461 = 58% lowering A leak on the ____(1)____ leg of 1-LT-459A has occurred.

PRZR PRESS CHAN ____(2)____ will indicate a RAPID pressure drop.

A. (1) variable (2) 1-PI-455 B. (1) variable (2) 1-PI-456 C. (1) reference (2) 1-PI-455 D. (1) reference (2) 1-PI-456 Answer: C Page 45 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the effect of the reference leg on pressurizer level.

Explanation:

A. Incorrect. 1st part is incorrect because a leak on the variable leg will result in indicated Przr level lowering. It is plausible because this is a common misconception when discussing wet leg level detectors. 2nd part is correct for the leak coming from the reference leg since LI-459 and PI-455 share a common sensing tap. This is listed in ABN-706, Attachment 1.

B. Incorrect. 1st part is incorrect but plausible (see A). 2nd part is incorrect because it is the incorrect channel, but is plausible since PI-456 shares a common tap with LI-460, but not LI-459.

C. Correct. 1st part is correct. A leak on the reference leg of a wet leg level detector will result in an increase in indicated level. 2nd part is correct (see A).

D. Incorrect. 1st part is correct (see C). 2nd part is incorrect but plausible (see B).

Technical Reference(s) ABN-706 Attached w/ Revision # See ABN-705 Comments / Reference Przr Pressure and Level Study Guide Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Pressurizer Level Instrument Malfunction in accordance with ABN-706, Pressurizer Level Instrument Malfunction.

(ABN.706.OB02)

Question Source: Bank # 77181 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.8 55.43 Page 46 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-706 Revision: 8 Page 47 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-706 Revision: 8 Page 48 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-706 Revision: 8 Page 49 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-705 Revision: 13 Page 50 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Przr Pressure and Level Study Guide Revision: 5-5-2011 Page 51 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Przr Pressure and Level Study Guide Revision: 5-5-2011 Page 52 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 2 K/A 000032.AA2.02 Level of Difficulty: 3 Importance Rating 3.6 Loss of Source Range Nuclear Instrumentation: Ability to determine and interpret the following as they apply to the Loss of Source Range Nuclear Instrumentation: Expected change in source range count rate when rods are moved Question # 59 Given the following conditions:

A Reactor startup using Control Rod Withdrawal in progress on Unit 1 The Reactor is critical with Source Range counts reading 5 x 103 cps The Reactor Operator has withdrawn control rods to establish the exact startup rate as directed in IPO-002A, Plant Startup from Hot Standby, to raise power to 10-8 amps in the Intermediate Range Source Range Channel N-32 has just failed low and the US is determining the required Technical Specification actions How much time should pass before a Source Range Neutron Flux High Reactor Trip will occur if NO actions are taken by the Reactor Operator?

A. 0 to 2 minutes B. 2 to 4 minutes C. 4 to 6 minutes D. 6 to 8 minutes Answer: B Page 53 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of how the SR counts will respond to the withdrawal of the control rods.

Explanation:

A. Incorrect. Incorrect but plausible if 1 dpm is used as described in 'B' below. 1 dpm is plausible as this is the Caution value in the procedure which is not to be exceeded.

B. Correct. In accordance with the GFE Equation Sheet P=P010(SURt). With the Source Range Count Rate at 5 x 103 cps and the Source Range Neutron Flux High reactor trip occurs at a setpoint of 1 x 105 cps and, using the equation above, the time between 5 x 103 cps and 1 x 105 cps at a procedurally prescribed 0.5 dpm yields 2.60 minutes before the trip setpoint.

C. Incorrect. Incorrect but plausible if the applicant mistakenly believes a 0.3 dpm were used in the calculation as described in 'B' above.

D. Incorrect. Incorrect but plausible if 0.2 dpm is used as described in 'B' above. 0.2 dpm is a procedurally prescribed SUR for the evolution of increasing power to 2 to 3 % in Section 5.4.

Technical Reference(s) IPO-002A Attached w/ Revision # See ALM-0063A, 1.5 Comments / Reference Proposed references to be provided during examination: GFE Equation Sheet Learning Objective: DISCUSS the actions to perform a reactor startup per IPO-002, Plant Startup from Hot Standby. (IP.002.OB03)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 54 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

IPO-002A Revision: 22 Page 55 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0063A, 1.5 Revision: 5 Page 56 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0063A, 1.5 Revision: 5 Examination Outline Cross-reference: Level RO SRO Page 57 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 1 Tier 1 Group 2 K/A 000051.AK3.01 Level of Difficulty: 3 Importance Rating 2.8 Loss of Condenser Vacuum: Knowledge of the reasons for the following responses as they apply to the Loss of Condenser Vacuum: Loss of steam dump capability upon loss of condenser vacuum Question # 60 Given the following conditions:

Unit 2 is in MODE 3 IPO-007B, Maintaining Hot Standby, is in progress RCS temperature is 557°F and stable on Steam Dumps Subsequently:

Main Condenser vacuum begins rapidly degrading When Main Condenser vacuum drops below the setpoint of ___(1)___ Steam Dump valves will close to prevent ___(2)___ in Main Condenser.

A. (1) 17.5"Hg (2) overheating B. (1) 12.3"Hg (2) overheating C. (1) 17.5"Hg (2) overpressure D. (1) 12.3"Hg (2) overpressure Answer: D Page 58 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

Matches K/A due to requiring knowledge of plant response with respect to the capacity of the steam dump system to prevent damage to the main condenser upon loss of condenser vacuum.

Explanation:

A. Incorrect. First part is incorrect but plausible (See C below). Second part is incorrect but plausible (See B below).

B. Incorrect. First part is correct (See D below). Second part is incorrect but plausible because the applicant could think that stopping steam flow into the main condenser will stop the heat input and protect the condenser from overheat not overpressure. Saturation temperature for 12.3 Hg is approximately 170oF. Overheating is addressed by opening the exhaust hood spray valve when temperature exceeds 194oF.

C. Incorrect. First part is incorrect but plausible in that the Unit 2 set point for MFP trip is 17.5"Hg.

Second part is correct (See D below).

D. Correct. First part is correct in that C-9 is lost when condenser vacuum drops below 12.3"Hg.

Second part is correct in that C-9 will be lost and the steam dump valves close to protect the condenser from rupture due to overpressure.

Technical Reference(s) ABN-304 Attached w/ Revision # See Steam Dumps Study Guide Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Main or Auxiliary Condenser Vacuum Decreasing in accordance with ABN-304, Main Condenser and Circulating Water System Malfunction.. (ABN.304.OB02)

Question Source: Bank # 75842 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC24 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 59 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 75842 Revision:

Page 60 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 75842 Revision:

Page 61 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-304 Revision: 9 Page 62 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Steam Dumps Study Guide Revision: 5-4-2011 Page 63 of 63 CPNPP 2020-05 retake NRC Written Exam Worksheet 51-60 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 2 K/A 000068.AA1.10 Level of Difficulty: 2 Importance Rating 2.9 Control Room Evacuation: Ability to operate and / or monitor the following as they apply to the Control Room Evacuation:

Power distribution: ac and dc Question # 61 Given the following conditions:

Both units are at 100% power A fire in the Control Room requires it to be evacuated ABN-803A, Response to a Fire in The Control Room or Cable Spreading Room, Attachment 1, Reactor Operator Actions to Achieve Hot Shutdown, is being performed In accordance with ABN-803A, Attachment 1:

ONLY the ____(1)____ Safeguards Bus will be energized by its associated EDG when is complete.

The EDG is started from the ____(2)____.

A. (1) Train A (2) RSP B. (1) Train A (2) EDG room C. (1) Train B (2) RSP D. (1) Train B (2) EDG room Answer: B Page 1 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of power requirements when evacuating the control room.

Explanation:

A. Incorrect. 1st part is correct. Only 1EA1 will be energized with the EDG. 2nd part is incorrect because the EDG is started locally. It is plausible because the EDG breaker and bus feeder breaker controls are located at the RSP.

B. Correct. 1st part is correct (see A). 2nd part is correct. The EDG is started locally before the operator at the RSP gains control of it.

C. Incorrect. 1st part is incorrect because ONLY the Train A EDG will be powering its respective bus. It is plausible because both 1EA1 and 1EA2 are de energized in attachment 1. 2nd part is incorrect but plausible (see A).

D. Incorrect. 1st part is incorrect but plausible (see C). 2nd part is correct (see B).

Technical Reference(s) ABN-803A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Fire in the Electrical or Control Building in accordance with ABN-803, Response To A Fire In The Control Room Or Cable Spreading Room. (ABN.803.OB01)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 2 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-803A Revision: 13 Page 3 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-803A Revision: 13 Page 4 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 1 Group 2 K/A 000076.AK2.01 Level of Difficulty: 2 Importance Rating 2.6 High Reactor Coolant Activity: Knowledge of the interrelations between the High Reactor Coolant Activity and the following:

Process radiation monitors Question # 62 Given the following conditions:

Unit 2 is at 800 MWe, 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> following a trip of HDP 2-01.

FFL-160, Gross Failed Fuel, is in alarm.

Chemistry reports that RCS radiation levels due to Xe-133 and Cs-137 are elevated over the last shift.

Letdown flow is 75 gpm.

The cause of the FFL-160 alarm is ___(1)___.

In accordance with ABN-102, High Reactor Coolant Activity, letdown flow should be raised to a MINIMUM of ___(2)___.

A. (1) a crud burst (2) 120 gpm B. (1) a crud burst (2) 100 gpm C. (1) failed fuel (2) 120 gpm D. (1) failed fuel (2) 100 gpm Answer: C Page 5 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the process radiation monitor associated with failed fuel.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since a crud burst would cause FFL-160 to alarm, but Xe-133 and Cs-137 are indicative of failed fuel. 2nd part is correct (see C).

B. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is incorrect, but plausible if thought that letdown flow was only required to be raised to 100 gpm.

C. Correct. 1st part is correct. Xe-133 and Cs-137 are indicative of failed fuel. 2nd part is correct.

Raising letdown flow to 120 gpm is required to remove more radioactive ions and particles.

D. Incorrect. 1st part is correct (see C). 2nd part is incorrect, but plausible (see B).

Technical Reference(s) ABN-102 Attached w/ Revision # See ALM-3200 Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS the response to High Reactor Coolant Activity in accordance with ABN-102, High Reactor Coolant Activity. (ABN.103.OB01)

Question Source: Bank # 62589 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 6 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-3200 Revision: 5 Page 7 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-102 Revision: 8 Page 8 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-102 Revision: 8 Page 9 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 2 K/A WE02.G.2.1.20 Level of Difficulty: 3 Importance Rating 4.6 SI Termination: Ability to interpret and execute procedure steps.

Question # 63 Given the following conditions:

Unit 1 has experienced a Safety Injection due to a leak inside containment.

EOS-1.1A, Safety Injection Termination, is in progress.

At time 0750, Normal charging and letdown have been established.

Based on the following conditions, per EOS-1.1A, the EARLIEST time that SI Reinitiation criteria is met is ______.

TIME SUBCOOLING PRZR LEVEL CONT PRESS A. 0800 69oF 31% 3.5 psig B. 0810 63oF 33% 4.5 psig C. 0820 57oF 35% 5.5 psig D. 0830 51oF 37% 6.5 psig Answer: D Page 10 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of procedural steps required to be performed during SI termination.

Explanation:

A. Incorrect. Plausible because at 0800 PRZR level is 31%, which is less than 34%, however Containment is NOT adverse so SI reinitiation criteria are NOT met.

B. Incorrect. Plausible because at 0810 PRZR level is 33%, which is less than 34%, however Containment is NOT adverse so SI reinitiation criteria are NOT met.

C. Incorrect. Plausible since adverse containment conditions exist at 0820, but with 57°F subcooling and 35% pressurizer level, SI reinitiation criteria are NOT met.

D. Correct. At 0830 with adverse Containment conditions, 51°F subcooling is less than the required 55°F and SI reinitiation is required.

Technical Reference(s) EOS.1.1A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural step, or sequence of steps from EOS-1.1, STATE the purpose/basis for the step(s). (ERG.E11.OB04)

Question Source: Bank #

Modified Bank # 62538 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 11 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank Question 62538 Revision:

Page 12 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOS-1.3A Revision: 9 Page 13 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 2 K/A WE13.EA1.03 Level of Difficulty: 2 Importance Rating 3.1 Steam Generator Overpressure: Ability to operate and / or monitor the following as they apply to the (Steam Generator Overpressure): Desired operating results during abnormal and emergency situations.

Question # 64 Given the following conditions:

Unit 1 reactor is tripped.

SG 1-01 pressure is 1260 psig.

SG 1-01 (NR) level is 62%.

RCS temperature is 557°F.

The crew is performing FRH-0.2A, Response to Steam Generator Overpressure, in an attempt to lower pressure.

Which of the following should be the FIRST action taken in accordance with FRH-0.2A?

A. Isolate AFW flow to SG 1-01 B. Initiate SG Blowdown flow from SG 1-01 C. Cool down the RCS to <535°F using intact SGs D. Open Atmospheric Relief Valve on SG 1-01 Answer: D Page 14 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of actions to be taken in response to a SG overpressure condition to obtain desired operating conditions of a lower SG pressure.

Explanation:

A. Incorrect. Plausible because this action would be taken if attempts to depressurize the SG were unsuccessful.

B. Incorrect. Plausible because this action would be taken if the cause of the SG overpressure was the SG being overfilled, and a transition would be made to FRH-0.3A in this case.

C. Incorrect. Plausible because this action would be taken if attempts to depressurize the SG were unsuccessful.

D. Correct. Either drip pot isolation, TDAFW supply, MSIV Bypass, or SG ARV are used first. AFW flow is isolated after blowdown is used in FRH-0.3A, and Cooldown is performed after other attempts do not work.

Technical Reference(s) FRH-0.2A Attached w/ Revision # See FRH-0.3A Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural Step, NOTE, or CAUTION, DISCUSS the reason or basis for the Step, NOTE, or CAUTION in FRH-0.2 A/B. (ERG.FH2.OB04)

Question Source: Bank # 34242 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7 55.43 Page 15 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRH-0.2A Revision: 9 Page 16 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRH-0.2A Revision: 9 Page 17 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRH-0.3A Revision: 9 Page 18 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRH-0.3A Revision: 9 Examination Outline Cross-reference: Level RO SRO Page 19 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 0 Tier 1 Group 2 K/A WE15.G.2.1.23 Level of Difficulty: 2 Importance Rating 4.3 Containment Flooding: Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Question # 65 Given the following conditions:

Unit 1 has experienced a LOCA Containment pressure is 8 psig and rising All actions of EOP-0.0A, Reactor Trip or Safety Injection, were successfully performed.

While performing EOP-1.0A, Loss of Reactor or Secondary Coolant, the Control Room observed Containment Sump level greater than 816 feet and entered FRZ-0.2A, Response to Containment Flooding.

The crew is attempting to identify water volumes other than the RWST or SI Accumulators that may be the source of flooding.

Per FRZ-0.2A, which of the following systems may still be contributing to the Containment Flooding?

A. Main Feedwater B. Fire Protection Water C. Ventilation Chilled Water D. Component Cooling Water Answer: D Page 20 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of procedure actions associated with addressing Containment Flooding.

Explanation:

A. Incorrect. Plausible because Main Feedwater could be a contributor if not isolated on reactor trip with low Tave B. Incorrect. Plausible because Fire Protection Water could be a contributor if not isolated by Phase A containment isolation C. Incorrect. Plausible because Ventilation Chilled Water could be a contributor if not isolated by Phase A containment isolation D. Correct. Containment pressure has not reached 18 psig yet so Component Cooling water is not completely isolated to containment and could be the source Technical Reference(s) FRZ-0.2A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a procedural Step, NOTE, or CAUTION, DISCUSS the reason or basis for the Step, NOTE, or CAUTION in FRZ-0.2 A/B. (ERG.FZ2.OB04)

Question Source: Bank # 52729 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC21 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 21 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 52729 Revision:

Page 22 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRZ-0.2A Revision: 9 Page 23 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 24 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 25 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-0.0A Revision: 9 Page 26 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 3 Group K/A 2.1.44 Level of Difficulty: 4 Importance Rating 3.9 Knowledge of RO duties in the control room during fuel handling, such as responding to alarms from the fuel handling area, communication with the fuel storage facility, systems operated from the control room in support of fueling operations, and supporting instrumentation.

Question # 66 Given the following conditions:

Core off loaded for refueling Core reload is about to begin Initial Source Range count rate is 25 cps No switchyard activities are in progress Per RFO-102, Refueling Operations, during core reload the Source Range High Flux at Shutdown alarm is normally set at ___(1)___.

If the Source Range High Flux at Shutdown alarm is blocked, ___(2)___.

A. (1) 75 cps (2) Refueling may continue if the SR is monitored continuously and an ICRR is performed B. (1) 300 cps (2) Refueling may continue if the SR is monitored continuously and an ICRR is performed C. (1) 75 cps (2) Refueling must be immediately suspended until alarm is restored D. (1) 300 cps (2) Refueling must be immediately suspended until alarm is restored Answer: B Page 27 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of control room requirements regarding High Flux at SD alarm during refueling operations.

Explanation:

A. Incorrect. First part is incorrect but plausible (See C below). Second part is correct (See B below).

B. Correct. First part is correct as RFO-102 states alarm may be set at 300 cps or 5 times measured count rate however it also states that 300 cps is the normal setpoint. Second part is correct as RFO-102 states alarm may be blocked if SR is continuously monitored by the operator and an ICRR is performed by nuclear engineering.

C. Incorrect. First part is incorrect but plausible as RFO-102 allows setting alarm at 300 cps or 5 times measured count rate however the alarm is normally set at 300 cps. 75 cps could be thought correct as this is 3 times measured rate. Second part is incorrect (See D below).

D. Incorrect. First part is correct (See B above). Second part is incorrect but plausible because applicant may believe that alarm must be in service during core alterations (i.e.

fuel movement).

Technical Reference(s) RFO-102 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Fuel Handling system including Technical Specifications, TRM and ODCM. (ADM.XA1.OB01)

Question Source: Bank # 35481 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 28 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RFO-102 Revision: 13 Page 29 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RFO-102 Revision: 13 Page 30 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RFO-102 Revision: 13 Page 31 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 3 Group K/A 2.1.40 Level of Difficulty: 2 Importance Rating 2.8 Knowledge of refueling administrative requirements.

Question # 67 During MODE 6 operation, under which of the following conditions would Technical Specifications require both RHR pumps be OPERABLE?

A. Refueling cavity boron is greater than required by the COLR, but below 2400 ppm.

B. Refueling cavity level is less than 23 feet above the vessel flange.

C. Both SI Pumps are NOT capable of injecting water into the RCS.

D. Spent Fuel is being transferred in the Containment Building.

Answer: B Page 32 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of administrative requirements during refueling operations.

Explanation:

A. Incorrect. Plausible since the COLR limit is the minimum required by TS, but the administrative limit for boron concentration during refueling is 2400 ppm. It could be thought that if the higher limit were not met that both RHR pumps would be required to be operable and capable of adding RWST water with a concentration of greater than 2400 ppm.

B. Correct. With refueling cavity level less than 23 feet above the flange in MODE 6, two RHR loops are required to be operable, with one in operation.

C. Incorrect. Plausible since SIPs are required to be maintained available during MODE 6 reduced inventory operations in the event of a loss of RHR capability, but during actual fuel movement the SIPs are not required due to the high water level.

D. Incorrect. Plausible since movement of spent fuel inside containment must be suspended if cavity level is less than 23 feet, but even with both trains of RHR operable, movement cannot be restarted.

Technical Reference(s) TS 3.9.6 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Fuel Handling system including Technical Specifications, TRM and ODCM. (RFO.FH2.OB02)

Question Source: Bank # 22584 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 33 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.9.6 Revision: 150 Page 34 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TSB 3.9.5 Revision: 150 Page 35 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 3 Group K/A 2.1.4 Level of Difficulty: 3 Importance Rating 3.3 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc.

Question # 68 Per ODA-315, Licensed Operator Maintenance Tracking, which of the following would meet the MINIMUM hours required on shift to maintain an active license, assuming the hours all occur in a calendar quarter?

A. Five (5) 12-hour shifts plus two (2) 4-hour shift segments B. Four (4) 12-hour shifts plus three (3) 8-hour shift segments C. Four (4) 12-hour shifts plus seven (7) 4-hour shift segments D. Three (3) 12-hour shifts plus five (5) 8-hour shift segments Answer: A Page 36 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

KA match due to requiring knowledge of administrative requirements, including requirements to maintain an active license.

Explanation:

A. Correct. The minimum required shift time to maintain an active license is five 12-hour shifts. The minimum required shift time to maintain an active license is five 12-hour shifts.

B. Incorrect. Plausible since this exceeds the total number of hours that would be attained if the minimum number of shifts were completed, but anything less than a full shift does not count toward maintaining an active license.

C. Incorrect. Plausible since this exceeds the total number of hours that would be attained if the minimum number of shifts were completed and is the greatest number of hours total, but anything less than a full shift does not count toward maintaining an active license.

D. Incorrect. Plausible since this exceeds the total number of hours that would be attained if the minimum number of shifts were completed and is the greatest number of hours total, but anything less than a full shift does not count toward maintaining an active license.

Technical Reference(s) ODA-315 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE requirements for Procedure Use and Adherence in accordance with ODA-102, ODA-407, STA-201 and Operations Guideline 3. (ADM.XA3.OB01)

Question Source: Bank # 23480 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 37 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-315 Revision: 7 Page 38 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 3 Group K/A 2.2.14 Level of Difficulty: 4 Importance Rating 3.9 Knowledge of the process for controlling equipment configuration or status.

Question # 69 Given the following conditions:

Unit 2 is in MODE 3, preparing to enter MODE 2.

A LOCKED OPEN valve is requested by Engineering to be UNLOCKED and CLOSED, per a maintenance clearance.

A status review has concluded that the system impact is acceptable at this time.

Upon the clearance release, the valve is to be repositioned to OPEN and verified LOCKED OPEN per the clearance.

Is OWI-103-3, Locked Component Deviation Log, required to be completed?

A. No, because the valve is being unlocked and closed by a clearance.

B. Yes, unless the Shift Manager suspends the Locked Component Deviation Log.

C. No, the Locked Component Deviation Log is only applicable during MODES 1 and 2.

D. Yes, even though the valve is opened and verified locked open per the clearance release.

Answer: D Page 39 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the process for maintaining equipment configuration.

Explanation:

A. Incorrect. Plausible because the clearance could appear as being the only administrative guidance necessary for the configuration control of the valve, however, the Locked Component Deviation Log is still required by ODA-403.

B. Incorrect. Plausible because the Shift Manager can suspend the Locked Component Deviation Log in MODES 5, 6 and defueled, however, the Log cannot be suspended in MODE 3.

C. Incorrect. Plausible because could be thought the Locked Component Deviation Log is only required in Modes 1 and 2, however it is required during Modes 1-4 and may be suspended at lower Modes by SM direction.

D. Correct. In accordance with ODA-403.

Technical Reference(s) ODA-403 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the administrative controls of valves, breakers and other equipment required to be secured-in-position in accordance with ODA-403 and OWI-103.

(ADM.XA1.OB18)

Question Source: Bank # 44372 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 40 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-403 Revision: 8 Page 41 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-403 Revision: 8 Examination Outline Cross-reference: Level RO SRO Page 42 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 1 Tier 3 Group K/A 2.2.38 Level of Difficulty: 2 Importance Rating 3.6 Knowledge of conditions and limitations in the facility license.

Question # 70 Assuming all instrumentation is operable, which of the following conditions, by itself, would be a violation of the Facility Operating License for Unit 1?

A. Power increase of 35% at ramp rate of 18%/hour.

B. Average 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> calorimetric power of 3615 MWth.

C. 101.5% power as indicated on N16 during transient conditions.

D. 100.5% power as indicated on NIS PR during steady state conditions.

Answer: B Page 43 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of indications used to determine if license requirements are being met.

Explanation:

A. Incorrect. Plausible since this would require isotopic analysis of the RCS, but does not violate the Facility License.

B. Correct. Maximum power level allowed by the license is 3612 MW over a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> average.

C. Incorrect. Plausible since it is greater than 101% and plant is in transient conditions, but

>101% N-16 does not necessarily correlate to power in excess of RTP as indicated by not being required by TS to adjust N-16 indication until outside 2% of calorimetric.

D. Incorrect. Plausible since it is greater than 100% and plant is at steady state conditions, but >100% NI does not necessarily correlate to power in excess of RTP as indicated by not being required by TS to adjust NI indication until outside 2% of calorimetric.

Technical Reference(s) Unit 1/2 Facility Operating License Attached w/ Revision # See TS 1.1 Definitions Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given various plant operating conditions and the appropriate forms from ODA-308, APPLY Technical Specification requirements and LCO Tracking Program requirements, in accordance with ODA-308. (ADM.XA1.OB13)

Question Source: Bank # 35242 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.7/10 55.43 Page 44 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Unit 1 Operating License Revision: 171 Page 45 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Unit 2 Operating License Revision: 171 Page 46 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 1.1 DEFINITIONS Revision: 150 Page 47 of 47 CPNPP 2020-05 retake NRC Written Exam Worksheet 61-70 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 3 Group K/A 2.3.15 Level of Difficulty: 4 Importance Rating 2.9 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

Question # 71 Given the following conditions:

A portable frisker is being used to perform a whole body frisk.

Background radiation is at 100 counts per minute.

Which of the following is the MINIMUM count rate at which an individual is considered to be contaminated in accordance with STA-653, Contamination Control Program?

A. 125 counts per minute B. 175 counts per minute C. 225 counts per minute D. 275 counts per minute Answer: C Page 1 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the operation of a portable radiation monitoring instrument.

Explanation:

A. Incorrect. Plausible if background radiation level is not accounted for when answering the question.

B. Incorrect. Plausible if thought contamination was evident at 50 cpm above background.

C. Correct. With a background radiation of 100 cpm + a detected radiation level of 100 cpm above background = 200 cpm. Therefore, the minimum choice that would indicate that the worker is contaminated would be 225 cpm.

D. Incorrect. Plausible if thought contamination was evident at 150 cpm above background.

Technical Reference(s) STA-653 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a set of contamination conditions, DETERMINE the posting requirements for the area in accordance with the following: STA-652, Radioactive Material Control, and STA-653, Contamination Control Program. (ADM.RAD.OB02)

Question Source: Bank # 38006 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC22 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.12 55.43 Page 2 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 38006 Revision:

Page 3 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 38006 Revision:

Page 4 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STA-653 Revision: 20 Page 5 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Revision:

Page 6 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 3 Group K/A 2.3.13 Level of Difficulty: 3 Importance Rating 3.4 Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Question # 72 Given the following conditions:

The plant is in Mode 5 for maintenance activities inside Containment.

Maintenance Services has requested entry into the Incore Instrumentation Room, Elev.

832' to clean up debris around the Seal Table.

Which of the following identifies the condition that must be met prior to allowing access per STA-620, Containment Entry?

The Incore Detectors must be A. fully withdrawn from the core.

B. fully inserted into the core.

C. stored and tagged out-of-service.

D. disconnected from the drive system.

Answer: C Page 7 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring the knowledge of conditions which must be established to make a Containment Entry.

Explanation:

A. Incorrect. Plausible if thought that withdrawing incore detectors from the core places detectors in storage. However, when incore detectors are fully withdrawn, they are located in the incore instrumentation room. Additionally, the system must be tagged out to prevent inadvertent movement.

B. Incorrect. Plausible because the incore detectors may be fully inserted in the core, however, the incore detectors may also be inserted in their storage locations and the system is required to be tagged out to prevent inadvertent movement.

C. Correct. Per STA-620 the Incore Detectors System should be stored and tagged out of service to prevent possible movement and radiation overexposure of personnel.

D. Incorrect. Plausible if thought that disconnecting the drive system would prevent inadvertent movement of the Incore Detectors, however, it is the tagout that ultimately protects personnel.

Technical Reference(s) STA-620 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS the administrative requirements for entry into hazardous restricted areas including the containment buildings, switchyard and confined spaces in accordance with STA-902, STA-650, STA-660, STA-637, STA-628, STA-620 and STA-629. (ADM.XA1.OB21)

Question Source: Bank # 36341 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC21 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.12 55.43 Page 8 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 36341 Revision:

Page 9 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 36341 Revision:

Page 10 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STA-620 Revision: 14 Page 11 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 3 Group K/A 2.4.37 Level of Difficulty: 3 Importance Rating 3.0 Knowledge of the lines of authority during implementation of the emergency plan.

Question # 73 An NEO is NOT assigned to any operations watchstation.

The EARLIEST the NEO should report to the ___(1)____ for assignments is upon declaration of an ___(2)____.

A. (1) Technical Support Center Manager (2) Unusual Event B. (1) Operations Support Center Manager (2) Unusual Event C. (1) Technical Support Center Manager (2) Alert D. (1) Operations Support Center Manager (2) Alert Answer: D Page 12 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to being required to know the lines of authority associated with operations personnel not assigned a watchstation during declaration of an E-plan emergency.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since operations personnel support the TSC Manager, but the NEOs are assigned to the OSC Manager. 2nd part is incorrect, but plausible (see B).

B. Incorrect. 1st part is correct (see D). 2nd part is incorrect, but plausible if thought that the OSC were manned upon any declaration of the E-plan.

C. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is correct (see D).

D. Correct. 1st part is correct. After OSC activation, accountability and assignments of non-watchstanding NEOs becomes the responsibility of the OSC Manager. 2nd part is correct. The OSC is staffed upon declaration of an Alert or higher.

Technical Reference(s) EPP-205 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: IDENTIFY the function of the Emergency Response Facilities in accordance with Emergency Plan Procedures, to include: 1) Control Room 2) Technical Support Center 3) Operations Support Center 4) Emergency Operations Facility 5) Joint Information Center 6) ERO Staging Area (ERB.EP1.OB05)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 13 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EPP-205 Revision: 13 Page 14 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 3 Group K/A 2.4.13 Level of Difficulty: 2 Importance Rating 4.0 Knowledge of crew roles and responsibilities during EOP usage.

Question # 74 During the performance of the ERGs, the US hands off a 9-page Attachment to the Extra RO.

Upon returning the completed attachment to the US, how does the Extra RO indicate to the US that the attachment has been page checked?

A. Circle the Page 1 of 9 on the first page B. Initial and date the page number on each page C. Sign and date the completion block on the last page D. Check the box notifying the US the attachment is complete Answer: A Page 15 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of the placekeeping responsibilities of operators during emergency procedure implementation.

Explanation:

A. Correct. During performance of ERG attachments of multiple pages, the performer is to circle the Page 1 of X on the first page to indicate to the SRO that the page check was performed.

B. Incorrect. Plausible since initials and dates are required for numerous entries in procedures and logs, but page checking is annotated as explained in A above.

C. Incorrect. Plausible since signing and dating completion blocks are required for numerous entries in procedures and data sheets, but page checking is annotated as explained in A above.

D. Correct. Plausible since this box is required to be checked, but page checking is annotated as explained in A above, not by completion of this box.

Technical Reference(s) Ops Guideline 3, Att 6 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE the requirements for Procedure Use and Adherence in accordance with ODA-102, ODA-407, STA-201 and Operations Guideline 3. (ADM.XA3.OB01)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.5 55.43 Page 16 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Ops Guideline 3, Att 6 Revision: 28 Page 17 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 3 Group K/A 2.4.43 Level of Difficulty: 2 Importance Rating 3.2 Knowledge of emergency communications systems and techniques.

Question # 75 Given the following conditions:

An event has occurred at the plant requiring NRC notification.

The Shift Manager directs that you notify the NRC via the Emergency Notification System.

You pick up the phone and notice the line is dead.

Which of the following is the correct action in response to the failure of the ENS?

In accordance with STA-501, Non-Routine Reporting, use a land line to call NRC A. Operations Center.

B. Senior Resident Inspector.

C. Region IV Administrator.

D. Nuclear Reactor Regulation.

Answer: A Page 18 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match:

K/A match due to requiring knowledge of primary and backup communication techniques for the ENS.

Explanation:

A. Correct. STA-501 provides direction and phone numbers if ENS is not available.

B. Incorrect. Plausible as the Resident Inspector is the onsite NRC representative, but proper response from the NRC requires Operations Center notification.

C. Incorrect. Plausible as CPNPP is assigned to Region IV of the NRC, but proper response from the NRC requires Operations Center notification.

D. Incorrect. Plausible as one of the responsibilities of NRR is incident response for operating commercial nuclear power reactors, but notifications must go through the NRC Operations Center for correct NRC response.

Technical Reference(s) STA-501 Attached w/ Revision # See EPP-203 Comments / Reference Proposed references to be provided during examination:

Learning Objective: CLASSIFY reportable events in accordance with STA-501, Non-Routine Reporting, and the administrative requirements in reporting these events to outside agencies. (ADM.XA7.OB00)

Question Source: Bank # 41784 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 41.10 55.43 Page 19 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STA-501 Revision: 21 Page 20 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EPP-203 Revision: 16 Page 21 of 21 CPNPP 2020-05 retake NRC Written Exam Worksheet 71-75 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 2 Group 1 K/A 003.G.2.4.30 Level of Difficulty: 3 Importance Rating 4.1 Reactor Coolant Pump: Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.

Question # 76 Given the following conditions:

Unit 1 was operating at 100% power.

RCP 1-04 tripped.

The Reactor failed to trip from the Control Room and had to be tripped at the Reactor Trip Switchgear.

In accordance with EPP-203, Notifications, which of the following describes the EARLIEST off-site report required for this event?

Notify the ___(1)___ within ___(2)___.

A. NRC 15 minutes B. State and Local Agencies 15 minutes C. NRC 60 minutes D. State and Local Agencies 60 minutes Answer: B Page 1 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the reporting requirements following a failure of an RCP and the subsequent failure of the reactor to trip.

SRO Only: SRO Only due to requiring knowledge of reporting requirements and emergency classifications per 10 CFR 55.43(b)(7).

Explanation:

A. Incorrect. Plausible since the NRC is required to be notified following this event, but the time associated is immediately following notification of state and local agencies, in no case later than 60 minutes after event.

B. Correct. Failure of the reactor to trip automatically, even if the reactor subsequently trips locally, requires activation of the emergency plan. EP notification of the classification to the state and county is required within 15 minutes.

C. Incorrect. Plausible since the NRC is required to be notified following this event, but the time associated is immediately following notification of state and local agencies, in no case later than 60 minutes after event.

D. Incorrect. Plausible since failure of the reactor to trip automatically, even if the reactor subsequently trips locally, requires activation of the emergency plan. EP notification of the classification to the state and county is required, but within 15 minutes, not 60 minutes.

Technical Reference(s) EPP-203 Attached w/ Revision # See EPP-201 Comments / Reference STA-501 Proposed references to be provided during examination:

Learning Objective: IDENTIFY time requirements for emergency notification in accordance with EPP-203. (ECN.OW1.OB03)

Question Source: Bank #

Modified Bank # 80958 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 43.7 Page 2 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 80958 Revision:

Page 3 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EPP-203 Revision: 16 Page 4 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EPP-201, EAL Hot Chart Revision: 13 Page 5 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STA-501 Revision: 21 Page 6 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 004.A2.27 Level of Difficulty: 2 Importance Rating 4.2 Chemical and Volume Control: Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper RWST boron concentration Question # 77 Given the following plant conditions:

Unit 1 is operating at 100% power.

Chemistry sample results on the RWST determined that the boron concentration is 2617 ppm.

The boron concentration could ___(1)___.

Restore RWST boron concentration within limits per TS 3.5.4, Refueling Water Storage Tank, within a MAXIMUM of ___(2)___.

A. (1) reduce the time requirement to align Hot Leg Injection during an accident.

(2) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. (1) reduce the time requirement to align Hot Leg Injection during an accident.

(2) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> C. (1) result in the post LOCA containment sump boron concentration being insufficient to assure continued core subcriticality.

(2) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D. (1) result in the post LOCA containment sump boron concentration being insufficient to assure continued core subcriticality.

(2) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Answer: B Page 7 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the impact of improper RWST boron concentration and the requirements to adjust boron concentration.

SRO Only: SRO Only due to requiring knowledge of TS bases associated with potential reactivity affects on the RCS per 10 CFR 55.43(b)(2).

Explanation:

A. Incorrect. Plausible because concern is that the time to HL recirc may not be valid, but the time to correct the boron concentration is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, though reasons for the RWST being inoperable, such as level, permit only 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to correct.

B. Correct. The required boron concentration of the RWST is 2400-2600 ppm. The upper limits is used to determine the maximum allowable time to switch to HL recirc following a LOCA to avoid boron precipitation in the core following the accident. If outside this limit, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> are permitted to correct.

C. Incorrect. Plausible because the lower limit of RWST concentration is associated with both sump concentration, but the upper limit is based on sump pH and transfer times to HL recirc. The time to correct the boron concentration is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, though reasons for the RWST being inoperable, such as level, permit only 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to correct.

D. Incorrect. Plausible since 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> are permitted to correct the RWST boron concentrations, and because the lower limit of RWST concentration is associated with sump concentration, but the upper limit is based on sump pH and transfer times to HL recirc.

Technical Reference(s) TS 3.5.4 Attached w/ Revision # See TSB 3.5.4 Comments / Reference Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Emergency Core Cooling system including Technical Specifications. (SYS.SI1.OB06)

Question Source: Bank #

Modified Bank # 36981 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 8 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 36981 Revision:

Page 9 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 36981 Revision: 156 Page 10 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(2) Analysis Revision:

Page 11 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.5.4 Revision: 156 Page 12 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TSB 3.5.4 Revision: 69 Page 13 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 006.G.2.4.18 Level of Difficulty: 4 Importance Rating 4.0 Emergency Core Cooling System: Knowledge of the specific bases for EOPs.

Question # 78 Per EOP-1.0A, Loss of Reactor Coolant or Secondary Coolant, the RCS hot leg temperature criterion for SI Accumulator isolation is ___(1)___.

This temperature ensures ___(2)___.

A. (1) 350ºF (2) SI accumulator water is injected, while minimizing the nitrogen injected.

B. (1) 350ºF (2) adequate RCS subcooling without further SI accumulator injection.

C. (1) 405ºF (2) SI accumulator water is injected, while minimizing the nitrogen injected.

D. (1) 405ºF (2) adequate RCS subcooling without further SI accumulator injection.

Answer: C Page 14 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the bases of ECCS equipment while operating in the ERGs.

SRO Only: SRO Only due to requiring knowledge beyond that expected for a Reactor Operator.

The hot leg temperatures for isolating the SI accumulators is well beyond the overall mitigation strategy of EOP-1.0A. An RO only needs to know that the accumulators are to be isolated to prevent nitrogen injection into the RCS if not needed.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since this temperature is a common value used in the ERG network, but it is the temperature at which ECCS must be locked out and LTOP made available. 2nd part is correct (see C).

B. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is incorrect, but plausible since the accumulators are designed to cover the core upon injection, which may be considered as providing subcooling. This temperature is based upon minimizing nitrogen injection.

C. Correct. 1st part is correct. This is the temperature identified in EOP-1.0 for isolating accumulators after injection. 2nd part is correct. This ensures that RCS saturation pressure exceeds SI accumulator pressure after the water is injected, but before the nitrogen is injected.

D. Incorrect. 1st part is correct (see C). 2nd part is incorrect, but plausible (see B).

Technical Reference(s) EOP-1.0A Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the Safety Injection Accumulators generic issue in the ERG network and proper operator response in accordance with the applicable Executive Volume. (ERG.XD5.OB08)

Question Source: Bank # 20179 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 15 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-1.0A Revision: 9 Page 16 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-1.0A Revision: 9 Examination Outline Cross-reference: Level RO SRO Page 17 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Rev. Date: Rev. 1 Tier 2 Group 1 K/A 039.G.2.4.46 Level of Difficulty: 2 Importance Rating 4.2 Main and Reheat Steam: Ability to verify that the alarms are consistent with the plant conditions.

Question # 79 Given the following conditions:

Following a Main Steam Line Break, the actions of EOP-2.0A, Faulted SG Isolation, are being performed.

MSIVs have been manually closed.

SG 1-02 has been identified as the faulted SG and has been isolated.

The following Containment conditions and alarms are noted:

o 1-ALB-3A, 4.6, CNTMT NR PRESS HI/LO, is LIT.

o NR Containment Pressures are indicating 1.3 psig and rising slowly.

The following SG 1-02 conditions and alarms are noted:

o 1-ALB-8A, MSL 2 1 OF 3 PRESS LO, is LIT.

o 1-ALB-8A, SG 2 1 OF 4 LVL LO-LO, is LIT.

o SG 1-02 is completely depressurized.

Based on the above alarms and indications, the steam break is located ___(1)___

containment.

To ensure the SG 1-02 MSIV remains closed, direct the FSS to ___(2)___.

A. (1) outside (2) align Battery Charger BC1D24 to Battery BT1D2 B. (1) inside (2) align Battery Charger BC1D24 to Battery BT1D2 C. (1) outside (2) isolate and vent IA off the valve regulator D. (1) inside (2) isolate and vent IA off the valve regulator Answer: A Page 18 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the alarms that will require specific ERG actions to be implemented.

SRO Only: SRO Only due to requiring analysis of the plant conditions, assessment of the plant response to the conditions, and identification of the proper procedure and actions to address the failure per 10 CFR 55.43(b)(5).

Explanation:

A. Correct. 1st part is correct. During the performance of EOP-2.0A, a determination is made as to whether the steam break is inside or outside containment based primarily on containment pressure. At this pressure, with the SG completely depressurized, the abnormal pressure inside containment is likely due to loss of containment cooling. 2nd part is correct. If outside containment, Attachment 2 of EOP-2.0A is performed to align BC1D2 or BC1D24 to BT1D2 since the power supply to BC1D2 is load shed on SI and the degradation of BT1D2 in an adverse environment may cause the MSIVs to open. This action is taken to ensure the MSIVs remain closed.

B. Incorrect. 1st part is incorrect, but plausible since containment pressure is abnormally high, but this is likely due to a loss of containment cooling on the SI. 2nd part is correct (see A).

C. Incorrect. 1st part is correct (see A). 2nd part is incorrect, but plausible since isolating IA and venting it from the MSIV operator is how the MSIV is locally closed in the event it fails to closed from the control room.

D. Incorrect. 1st part is incorrect, but plausible (see B). 2nd part is incorrect, but plausible (see C).

Technical Reference(s) EOP-2.0 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE the bases for operator actions, notes, and cautions from EOP-2.0.

(ERG.E2A.OBO5)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 19 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 20 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-2.0A Revision: 9 Page 21 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-2.0A Revision: 9 Page 22 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

EOP-2.0A Revision: 9 Page 23 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 1 K/A 063.A2.02 Level of Difficulty: 2 Importance Rating 3.1 DC Electrical Distribution: Ability to (a) predict the impacts of the following malfunctions or operations on the DC electrical systems; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of ventilation during battery charging Question # 80 Given the following conditions:

Unit 1 is operating at 100%.

Battery 1ED1 is in EQUALIZE on 125 VDC BATTERY CHARGER BC1ED1-1.

Battery Room Exhaust Fan 7 is running with Battery Room Exhaust Fan 8 in standby.

The Reactor Operator reports that Battery Room Exhaust Fan 7 is tripped and Battery Room Exhaust Fan 8 did not AUTO start and will NOT manually start.

Battery Room temperature is 81oF and stable.

Which of the following completes the statement below?

To ensure ___(1)___ is maintained within limits, the battery should be placed in FLOAT per

___(2)___.

A. (1) room temperature (2) ALM-0112A, 2.4, BATT RM EXH FN 8 AUTO START FAIL B. (1) room temperature (2) ALM-0112A, 2.3, BATT RM TRN A TEMP HI/LO-LO C. (1) hydrogen concentration (2) ALM-0112A, 2.4, BATT RM EXH FN 8 AUTO START FAIL D. (1) hydrogen concentration (2) ALM-0112A, 2.3, BATT RM TRN A TEMP HI/LO-LO Answer: C Page 24 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the concern of a loss of ventilation while charging a battery and the procedure and actions required to address this.

SRO Only: SRO Only due to requiring an assessment of plant conditions and then the selection of a section of a procedure to mitigate or recover, or with which to proceed.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible because there is a TRM limit for temperature and the exhaust fan draws air through the battery room, however, the reason for placing the battery on float is for hydrogen concentration. 2nd part is correct. The procedure that directs placing the battery on float is correct, ALM-0112A, 2.4.

B. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is plausible since room temperature would direct starting a second fan, but the correct procedure is ALM-0112A, 2.4.

C. Correct. The battery should be placed in FLOAT to minimize the buildup of hydrogen gas. This is directed by ALM-0112A, Window 2.4, BATT RM EXH FN 8 AUTO START FAIL.

D. Incorrect. 1st part is correct (see C). 2nd part is incorrect, but plausible (see B).

Technical Reference(s) ALM-0112A, 2.4 Attached w/ Revision # See ALM-0112A, 2.3 Comments / Reference SOP-805A Proposed references to be provided during examination:

Learning Objective: EXPLAIN<OB 27385(1101)><<EXPLAINEX the normal, abnormal and emergency operation of the DC Electrical Distribution system in accordance with procedures:

1) SOP 605A 125 VDC SWITCHGEAR AND DISTRIBUTION SYSTEMS, BATTERIES AND BATTERY CHARGERS
2) SOP 606A 24/48V & 125/250 VDC SWITCHGEAR AND DISTRIBUTION SYSTEMS, BATTERIES & BATTERY CHARGERS
3) Review loss of DC loads in accordance with DBD-EE-044 DC POWER SYSTEMS. (SYS.DC1.OB04)

Question Source: Bank # 50415 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 25 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 26 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0112A, 2.4 Revision: 6 Page 27 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0112A, 2.4 Revision: 6 Page 28 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-805A Revision: 11 Page 29 of 29 CPNPP 2020-05 retake NRC Written Exam Worksheet 76-80 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 2 K/A 001.A2.03 Level of Difficulty: 2 Importance Rating 4.2 Control Rod Drive: Ability to (a) predict the impacts of the following malfunction or operations on the CRDS- and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

Effect of stuck rod or Misaligned rod Question # 81 Given the following conditions:

Unit 1 at 100% and 1265 MWe near End of Life Control Rod Bank D at 215 steps 1/1-RBSS, CONTROL ROD BANK SELECT in AUTO Control Rod D4 drops into core Subsequently:

1-TI-412A, AVE TAVE-TREF DEV is -3°F and stable 1-NI-41B, PR POWER CHAN I reads 102%

1-NI-42B, PR POWER CHAN II reads 102%

1-NI-43B, PR POWER CHAN III reads 68%

1-NI-44B, PR POWER CHAN IV reads 102%

Turbine load remains at 1265 MWe Remaining Control Rod Bank D rods are ___(1)___ steps withdrawn.

Per ABN-712, Rod Control System Malfunction, reduce turbine load to MAXIMUM of

___(2)___ MWe prior to placing 1/1-RBSS in MANUAL.

A. (1) 223 (2) 1100 B. (1) 231 (2) 1100 C. (1) 223 (2) 1215 D. (1) 231 (2) 1215 Answer: A Page 1 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring demonstrating the ability to determine where the C-11 control rod stop would stop rods following a dropped control rod, as well as ability to implement procedures in response to the failure.

SRO Only: SRO Only due to requiring demonstration of the knowledge of diagnostic steps including the action required to be performed based on not obtaining the Action/Expected Response and thus implementing a Response Not Obtained action.

Explanation:

A. Correct. Part 1 is correct as a response to the negative reactivity insertion from the dropped control rod, the RCS average temperature will lower resulting in a demand for rod withdrawal.

Control Rod Bank D will withdraw until the C-11 rod stop is reached at 223 steps withdrawn. Part 2 is correct in accordance with ABN-712, when the operator identifies that power is not less than or equal to 100% on the highest reading NI the RNO must be implemented. The RNO requires a load reduction to 1100 MW. Following the load reduction, 1/1-RBSS is placed in MANUAL.

B. Incorrect. Part 1 is incorrect but plausible if the applicant did not account for the C-11 rod stop and in such case the Control Rod Bank D rods would withdraw to the full out position of 231 steps withdrawn as RCS temperature remains well below TREF. Part 2 is correct as described in A above.

C. Incorrect. Part 1 is correct as described in A above. Part 2 is incorrect but plausible if the required load reduction is thought to be 50 MWe.

D. Incorrect. Part 1 is incorrect but plausible as described in B above. Part 2 is incorrect but plausible as described in C above.

Technical Reference(s) ABN-712 Attached w/ Revision # See ALM-0064A, 4.14 Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS the response to a Dropped or Misaligned Rod in MODE 1 or 2 in accordance with ABN-712, Rod Control System Malfunction. (ABN.712.OB02)

Question Source: Bank # 75860 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC24 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 2 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 75860 Revision:

Page 3 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 75860 Revision:

Page 4 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 75860 Revision:

Page 5 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-712 Revision: 11 Page 6 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-712 Revision: 11 Page 7 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ALM-0064A, 4.14 Revision: 6 Page 8 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 2 Group 2 K/A 016.A2.02 Level of Difficulty: 3 Importance Rating 3.2 Non-nuclear Instrumentation: Ability to (a) predict the impacts of the following malfunctions or operations on the NNIS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of power supply Question # 82 Given the following conditions:

A Unit 1 power increase is in progress at 85% power.

PT-455, Channel I Pressurizer Pressure, fails high, and has been removed from service, including tripping all associated bistables.

PR Channel N-43 subsequently fails high.

Which of the following bistables associated with the N-43 channel failure will require a plant shutdown to MODE 3 to comply with Technical Specifications?

A. PR High Flux Trip (High Setpoint)

B. OT N-16 Rod Stop C. OT N-16 Reactor Trip D. PR Overpower Rod Stop Answer: C Page 9 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the effect of a loss of power has on non-nuclear instrumentation.

SRO Only: SRO Only due to requiring application of generic LCO requirements (TS 3.0.3) since the LCO (TS 3.3.1) cannot be met as tripping the required OTN-16 bistables from the second instrument failure will result in a Reactor Trip. The Unit must be placed in MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

Explanation:

A. Incorrect. Plausible since this is a valid Reactor Protection bistable associated with a failure of a PR NI channel, but there will only be a single pressurizer high power reactor trip bistable tripped if this channel is placed in trip.

B. Incorrect. Plausible since this is a valid Reactor Protection bistable associated with a failure of PR NI channel, but this is a rod stop which can be bypassed at the NI cabinets.

C. Correct. Inputs to OT N-16 are power, pressure, and temperature. One pressure bistable (Channel I) is already tripped. The second OT N-16 (Channel III) cannot be tripped without causing a reactor trip. Therefore, because the ACTION cannot be completed, a shutdown is required by TS 3.0.3.

D. Incorrect. Plausible since this is a valid Reactor Protection bistable associated with a failure of PR NI channel but this is a rod stop which can be bypassed at the NI cabinets.

Technical Reference(s) TS 3.0.3 Attached w/ Revision # See TS 3.3.1 Comments / Reference Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the N-16 Power/Flow/RCS Temperature System including Technical Specifications and the TRM.

(SYS.NT1.OB06)

Question Source: Bank # 80650 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.2 Page 10 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(2) Analysis Revision:

Page 11 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.0.3 Revision: 150 Page 12 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.3.1 Revision: 156 Page 13 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.3.1 Revision: 150 Page 14 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 2 Group 2 K/A 041.G.2.1.32 Level of Difficulty: 4 Importance Rating 4.0 Steam Dump/Turbine Bypass Control: Ability to explain and apply system limits and precautions.

Question # 83 Given the following conditions:

Unit 1 is being maintained between 6% and 8% power in preparation for rolling the Main Turbine to 1800 rpm.

Condenser Steam Dumps are modulating to maintain power and temperature.

SG Blowdown flow is adjusted to 200 gpm total flow.

SG Atmospheric Relief Valves are in AUTO, set for 1125 psig.

LP Turbine casing T is 45oF and rising slowly.

Which of the following identifies:

(1) The procedure that should be used to respond to these conditions; and, (2) The action that should be taken to lower LP Turbine casing T?

A. (1) IPO-003A, Power Operations (2) Reduce steam dump operation B. (1) IPO-003A, Power Operations (2) Reduce SG Blowdown flow C. (1) ABN-401, Main Turbine Malfunction (2) Reduce steam dump operation D. (1) ABN-401, Main Turbine Malfunction (2) Reduce SG Blowdown flow Answer: A Page 15 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the limitations associated with operating the steam dump system during low power operations.

SRO Only: SRO Only due to requiring assessment of plant conditions and then selecting a procedure to mitigate or recover from the condition, or with which to proceed.

Explanation:

A. Correct. 1st part is correct as this is directed by IPO-003A. 2nd part is correct. LP Turbine casing T is to be addressed by reducing steam dump flow while maintaining power constant and lowering the heat input into the LP condensers.

B. Incorrect. 1st part is correct (see A). 2nd part is incorrect, but plausible since procedure states to adjust, not necessarily raise, blowdown flow in some places and this may be incorrectly thought to meet that requirement.

C. Incorrect. 1st part is plausible, but incorrect, since ABN-401 has a section regarding turbine casing T, but it addresses the HP turbine casing. 2nd part is correct (see A).

A. Incorrect. 1st part is plausible, but incorrect (see C). 2nd part is plausible, but incorrect (see B).

Technical Reference(s) IPO-003A Attached w/ Revision # See ABN-401 Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS IPO-003, Power Operations, to include the following: Applicability; Precautions; Limitations; Notes; Instructions. (IPO.03B.OB01)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 16 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 17 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

IPO-003A Revision: 30 Page 18 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

IPO-003A Revision: 30 Page 19 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-401 Revision: 12 Page 20 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 000015.G.2.4.45 Level of Difficulty: 4 Importance Rating 4.3 Reactor Coolant Pump Malfunctions: Ability to prioritize and interpret the significance of each annunciator or alarm.

Question # 84 Given the following conditions:

Unit 1 is operating at 50% power.

The following annunciators are lit:

o 1-ALB-5A, 1.2, ANY RCP SEAL 1 LKOFF FLO HI o 1-ALB-5B, 3.2, RCP 1 VIBR HI All other annunciators associated with RCPs are dark 1-FR-0157, RCP 1-01 SEAL LEAKOFF / SEAL WATER INJECTION FLOW, are indicating:

o RCP 1 SEAL LEAKOFF FLOW (WR) 7.20 gpm, stable o RCP 1 SEAL WATER INJECTION FLOW 9.40 gpm, stable RCP 1-01 TEMPERATURES on the Plant Computer are indicating:

o LOW SEAL WTR BEARING TEMP (T0417A) 152ºF, stable o SEAL WTR IN TEMP (T0181A) 159ºF, rising RCP 1-01 vibration levels are indicating:

o 15.2 mil and stable on the shaft o 3.1 mil and stable on the frame The US should direct ___(1)___ in accordance with ABN-101, Reactor Coolant Pump Trip/Malfunction, ___(2)___.

A. (1) a Reactor Trip (2) Section 4.0, RCP NUMBER 1 SEAL FAILURE B. (1) a Reactor Trip (2) Section 6.0, EXCESSIVE RCP VIBRATION C. (1) an orderly plant shutdown to MODE 3 (2) Section 4.0, RCP NUMBER 1 SEAL FAILURE D. (1) an orderly plant shutdown to MODE 3 (2) Section 6.0, EXCESSIVE RCP VIBRATION Answer: A Page 21 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge and priority of alarms associated with the RCPs.

SRO Only: SRO Only due to requiring assessment of abnormal plant conditions and then selecting a procedure section to mitigate or recover from the condition, or with which to proceed.

Explanation:

A. Correct. 1st part is correct. With total #1 seal flow greater than 8 gpm at 8.20 gpm (total =

  1. 1 seal leakoff + assumed 1 gpm for #2 seal leakoff with alarm dark, thus 7.20 + 1 = 8.20 gpm), a Reactor Trip is directed to enable securing the RCP. 2nd part is correct, the failure requiring a trip is a #1 seal failure.

B. Incorrect. 1st part is correct (see A). 2nd part is incorrect, but plausible, since entry condtions are met for entry into Section 6 to address the RCP vibration, but no trip or power reduction is required unless conditions worsen.

C. Incorrect. 1st part is incorrect, but plausible. An orderly shutdown would be required per Section 4 if the leak rate were below 8 gpm and indication is only greater than 7.2 gpm.

The SRO must recognize that 1 gpm must be added for #2 seal, causing the value to exceed the RCP trip criteria. 2nd part is correct (see A).

D. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is plausible, but incorrect (see B).

Technical Reference(s) ABN-101 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS the response to an RCP Number 1 Seal Failure in accordance with ABN-101, Reactor Coolant Pump Trip/Malfunction. (ABN.101.OB03)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 22 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 23 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-101 Revision: 12 Page 24 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-101 Revision: 12 Page 25 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-101 Revision: 12 Page 26 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-101 Revision: 12 Page 27 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-101 Revision: 12 Page 28 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000027.AA2.18 Level of Difficulty: 3 Importance Rating 3.5 Pressurizer Pressure Control System Malfunction: Ability to determine and interpret the following as they apply to the Pressurizer Pressure Control Malfunctions: Operable control channel Question # 85 Given the following conditions:

Pressurizer Spray Valve PCV-455C inadvertently opened and is now closed, in MAN, per ABN-705, Pressurizer Pressure Malfunction.

PI-455, PRZR PRESS CH I, is 2190 psig and rising slowly.

PI-456, PRZR PRESS CH II, is 2185 psig and rising slowly.

PI-457, PRZR PRESS CH III, is 2110 psig and rising slowly.

PI-458, PRZR PRESS CH IV, is 2200 psig and rising slowly.

The crew has re-entered ABN-705 to address PI-457.

PI-457 should be considered ___(1)___ and Pressurizer Pressure must be restored to

___(2)___ within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

A. (1) OPERABLE (2) 2220 psig B. (1) OPERABLE (2) 2222 psig C. (1) INOPERABLE (2) 2220 psig D. (1) INOPERABLE (2) 2222 psig Answer: D Page 29 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the maximum allowed deviation between pressure channels to determine the operability of a channel.

SRO Only: SRO Only due to requiring the ability to apply the required actions of TS in accordance with the rules of application requirements, as well as the bases for the TS, and values contained within the COLR.

Explanation:

A. Incorrect. Plausible since with 4 operable channels the value used for DNB limits would be 2220 psig, but the channel is outside the maximum allowed deviation and is considered inoperable.

B. Incorrect. Plausible since average of the operable channels is used for DNB limits, and with 4 operable channels, the value would be 2220 psig, but the channel is outside the maximum allowed deviation and is considered inoperable.

C. Incorrect. Plausible since the maximum allowed deviation between pressurizer pressure channels is 60 psig and PI-457 is 75 psig less than any other operable channel. With only 3 pressurizer channels operable, the average of the 3 must be > 2222 psig to meet TS limits, not the highest channel.

D. Correct. Maximum allowed deviation between pressurizer pressure channels is 60 psig and PI-457 is 75 psig less than any other operable channel. With only 3 pressurizer channels operable, the average of the 3 must be > 2222 psig to meet TS limits.

Technical Reference(s) TS 3.4.1 Attached w/ Revision # See TSB 3.4.1 Comments / Reference Unit 1 COLR OPT-102-1 Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Reactor Coolant system in accordance with Technical Specifications and TRM. (SYS.RC1.OB06)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.2 Page 30 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(2) Analysis Revision:

Page 31 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.4.1 Revision: 150 Page 32 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

U1 COLR Revision: 0 Page 33 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TSB 3.4.1 Revision: 73 Page 34 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

OPT-102A-1 Revision: 37 Page 35 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000029.G.2.2.22 Level of Difficulty: 4 Importance Rating 4.0 Anticipated Transient Without Scram: Knowledge of limiting conditions for operations and safety limits.

Question # 86 Given the following conditions:

Unit 1 is at 100% power PT-506, TURB IMP PRESS CHAN II, fails LOW If an AMSAC condition occurs 2 minutes after the failure, AMSAC___(1)___.

Per Technical Specification 3.7.5, AFW System, the AFW pumps are considered___(2)___.

A. (1) actions must be manually performed (2) INOPERABLE B. (1) will automatically actuate (2) INOPERABLE C. (1) actions must be manually performed (2) OPERABLE D. (1) will automatically actuate (2) OPERABLE Answer: D Page 36 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the bases in TS for AFW and AMSAC actuation.

SRO Only: SRO Only due to requiring knowledge of the bases in technical specifications.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since either first stage pressure channel failing below 40% load will result in AMSAC blocking after 260 seconds. At this time, manual action would be required. 2nd part is incorrect, but plausible since AMSAC is an autostart signal to the AFW pumps. However, IAW the bases in 3.7.5, the autostart from AMSAC is not required for AFW operability.

B. Incorrect. 1st part is correct (see D). 2nd part is incorrect, but plausible (see A).

C. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is correct (see D).

D. Correct. 1st part is correct. AMSAC will function even with one first stage pressure channel failing below 40% load for 260 seconds before it will no longer function. 2nd part is correct. IAW the bases in 3.7.5, the autostart from AMSAC is not required for AFW operability.

Technical Reference(s) TSB 3.7.5 Attached w/ Revision # See ABN-709 Comments / Reference Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Auxiliary Feedwater system including Technical Specifications and TRM. (SYS.AF1.OB06)

Question Source: Bank #

Modified Bank # 66450 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.2 Page 37 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 66450 Revision:

Page 38 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 66450 Revision:

Page 39 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(2) Analysis Revision:

Page 40 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TSB 3.7.5 Revision: 73 Page 41 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-709 Revision: 9 Page 42 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000054.AA2.03 Level of Difficulty: 4 Importance Rating 4.1 Loss of Main Feedwater: Ability to determine and interpret the following as they apply to the Loss of Main Feedwater (MFW): Conditions and reasons for AFW pump startup Question # 87 UNIT 2 is operating at 18% power while conducting a plant startup in accordance with IPO-003B, Power Operations.

___(1)___ would result in the automatic start of the Unit 2 MDAFW Pumps.

Technical Specification Bases for LCO 3.3.2, ESFAS Instrumentation, requires a MINIMUM of ___(2)___ Unit 2 SG(s) be available to act as a heat sink for the Reactor?

A. (1) NR Level in ONE SG lowering to 37% and stabilizing following a Reactor Trip (2) ONE B. (1) A Trip of Main Feedwater Pump 2A (2) ONE C. (1) NR Level in ONE SG lowering to 37% and stabilizing following a Reactor Trip (2) TWO D. (1) Trip of Main Feedwater Pump 2A (2) TWO Answer: B Page 43 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the conditions starting an AFW pump automatically, as well as the reasons for the pump start.

SRO Only: SRO Only due to requiring knowledge of the TS bases associated with the start of the AFW pumps.

Explanation:

A. Incorrect. Plausible since a single SG lowering to 37% on Unit 1 would start both Motor Driven AFW Pumps, however, on Unit 2 the level would need to lower to 35.4%. According to Technical Specification (TS) LCO 3.3.2 Bases, the reason for the AFW Pump start is to ensure at least one SG is available to act as a heat sink.

B. Correct. At 18% power only one Main Feedwater Pump would be in operation, however, the other Main Feedwater Pump would either be in a tripped condition or the trip oil pressure switches isolated to indicate a trip to the RPS. Thus, a trip of the operating Main Feedwater Pump would start both motor driven AFW Pumps. According to TS LCO 3.3.2 Bases, the reason for the AFW pump start is to ensure at least one SG is available to act as a heat sink.

C. Incorrect. Plausible since a single SG lowering to 37% on Unit 1 would start both Motor Driven AFW Pumps, however on Unit 2 the level would need to lower to 35.4%. According to TS LCO 3.3.2 Bases, the reason as stated is incorrect in that the start signal only ensures at least ONE SG is available and not TWO. The distractor is plausible as Unit 1 requires two SG for SGTR recovery in accordance with the FSAR.

D. Incorrect. Plausible since the signal for starting the Motor Driven AFW Pumps is correct, however, the reason as stated is incorrect in that the start signal only ensures at least ONE SG is available and not TWO. The distractor is plausible as Unit 1 requires two SG for SGTR recovery in accordance with the FSAR.

Technical Reference(s) TSB 3.3.2 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Auxiliary Feedwater System including Technical Specifications and TRM. (SYS.AF1.OB06)

Question Source: Bank # 62639 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC22 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 44 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 45 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 62639 Revision:

Page 46 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 62639 Revision:

Page 47 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(2) Analysis Revision:

Page 48 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TSB 3.3.2 Revision: 73 Page 49 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 1 K/A 0000056.AA2.04 Level of Difficulty: 4 Importance Rating 3.7 Loss of Offsite Power: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: Operational status of service water pump Question # 88 Given the following conditions:

A Station Blackout has occurred.

Power has been re-established to 1EA1 via the Alternate Power Generator.

SG pressures have been stabilized in accordance with ECA-0.0A, Loss of All AC Power.

SSW Pump 1-01 and CCW Pump 1-01 have both been placed in PULLOUT in accordance with SOP-614A, Alternate Power Generation Operation.

Plant conditions are as follows following power restoration:

o Containment pressure is 0.8 psig and stable.

o RCS subcooling is 32oF and stable.

o Pressurizer level is 3% and stable.

Based on power source availability and loading considerations, which of the following describes:

(1) The correct sequence for starting SSWP 1-01 and CCWP 1-01; and, (2) The correct procedure to follow while starting the pumps under these conditions?

A. (1) Start SSWP 1-01 and then start CCWP 1-01 (2) ECA-0.1A, Loss of All AC Power Recovery Without SI Required B. (1) Start CCWP 1-01 and then start SSWP 1-01 (2) ECA-0.1A, Loss of All AC Power Recovery Without SI Required C. (1) Start SSWP 1-01 and then start CCWP 1-01 (2) ECA-0.2A, Loss of All AC Power Recovery With SI Required D. (1) Start CCWP 1-01 and then start SSWP 1-01 (2) ECA-0.2A, Loss of All AC Power Recovery With SI Required Answer: D Page 50 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the SSWP when recovering from a loss of all AC power using the APG.

SRO Only: SRO Only due to requiring assessment of plant conditions and selecting a procedure to mitigate or recover from the condition.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is incorrect, but plausible (see B).

B. Incorrect. 1st part is correct (see D). 2nd part is incorrect, but plausible because there are no indications of any RCS pressure boundary failure. Pressurizer level is low because of the cooldown and it is plausible to think that charging flow can be used to refill the pressurizer, thus requiring entry in ECA-0.1A instead of ECA-0.2A.

C. Incorrect. 1st part is incorrect, but plausible because if the electrical bus was repowered from an emergency diesel generator the SSWP would have been left in AUTO and auto started on the Blackout Sequencer prior to starting the CCWP which would have been placed in PULL-OUT.

However, when the bus is powered from the APG, the CCWP is manually started before the SSWP for bus loading considerations IAW SOP-614A. 2nd part is correct (see D).

D. Correct. 1st part is correct. When the electrical bus is powered from the APG, the correct starting order for the pumps is the CCWP before the SSWP for bus loading considerations. 2nd part is correct. As a result of the cooldown in ECA-0.0A, pressurizer level requires recovery per ECA-0.2A.

Technical Reference(s) ECA-0.0A Attached w/ Revision # See ECA-0.1A Comments / Reference SOP-614A Proposed references to be provided during examination:

Learning Objective: Given a procedural step, or sequence of steps from ECA-0.1, DISCUSS the purpose/basis for the step(s) in accordance with ECA-0.1. (ERG.C00.OB11)

Question Source: Bank # 52595 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 51 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Page 52 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-614A Revision: 13 Page 53 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECA-0.0A Revision: 9 Page 54 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECA-0.1A Revision: 9 Page 55 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ECA-0.1A Revision: 9 Page 56 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 1 K/A 000077.G.2.1.32 Level of Difficulty: 2 Importance Rating 4.0 Generator Voltage and Electric Grid Disturbances: Ability to explain and apply system limits and precautions.

Question # 89 Given the following conditions:

0800 Automatic ERCOT grid load shedding removed 25% of grid load and both ERCOT grid and CPNPP main generator frequencies are stable at 58.8 Hz.

At 0802, ABN-601, Response to a 138/345 KV System Malfunction, requires ___(1)___.

Subsequently, per TS 3.8.1, AC Sources - Operating, and OPT-215, Class 1E Electrical Systems Operability, two off-site power sources ___(2)___ remain OPERABLE.

A. (1) tripping both reactors and entering EOP-0.0A/B, Reactor Trip or Safety Injection.

(2) do B. (1) powering both safeguards busses on both Units from the EDGs, with the preferred and alternate feeder breakers placed in PULLOUT.

(2) do C. (1) tripping both reactors and entering EOP-0.0A/B, Reactor Trip or Safety Injection.

(2) do NOT D. (1) powering both safeguards busses on both Units from the EDGs, with the preferred and alternate feeder breakers placed in PULLOUT.

(2) do NOT Answer: D Page 57 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of limitations associated with grid frequency lowering.

SRO Only: SRO Only due to requiring assessment of plant conditions and selecting a procedure to mitigate or recover from the condition, as well as determining the operability of TS equipment.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible (See C). 2nd part is incorrect but plausible as applicant may believe off-site sources remain operable since the breakers were manually disabled due to frequency and could be restored if taken from the PULL-OUT position.

B. Incorrect. 1st part is incorrect but plausible because if still within the 9 minute window plant conditions are maintained to allow for frequency recovery. 2nd part is incorrect, but plausible (See A).

C. Incorrect. 1st part is incorrect, but plausible because per ABN-601 a trip will be required after 9 minutes at <59.4 Hz or if frequency were to drop below 58.4 Hz. 2nd part is correct (see D).

D. Correct. 1st part is correct because ABN-601 requires divorcing the safeguards buses from the grid under these conditions. 2nd part is correct because OPT-215 requires the preferred and alternate supply breakers to the 6.9 KV safeguards buses be either closed or in standby in order for the off-site power sources to be operable.

Technical Reference(s) ABN-601 Attached w/ Revision # See OPT-215 Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to Loss of All Offsite AC Power in accordance with ABN-601, Response to 138/345 KV System Malfunction. (ABN.601.OB01)

Question Source: Bank #

Modified Bank # 62563 (Note changes or attach parent)

New Question History: Last NRC Exam LC23 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.2 Page 58 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 62563 Revision:

Page 59 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

Bank 62563 Revision:

Page 60 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(2) Analysis Revision:

Page 61 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 62 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 63 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-601 Revision: 13 Page 64 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

OPT-215-1 Revision: 17 Page 65 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 3 Tier 1 Group 2 K/A 000001.AA2.03 Level of Difficulty: 4 Importance Rating 4.8 Continuous Rod Withdrawal: Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: Proper actions to be taken if automatic safety functions have not taken place Question # 90 Given the following conditions:

Unit 1 is at 60% power and stable.

All systems are operating normally with the rod control system in AUTO when the following conditions are observed:

o Control Bank D, Group 2, rods begin stepping OUT.

o Rod Control is placed in MAN and rod motion stops.

o Control Bank D, Group 1, DRPI indicates 168 steps.

o Control Bank D, Group 1, step counter indicates 165 steps.

o Control Bank D, Group 2, DRPI indicates 180 steps.

o Control Bank D, Group 2, step counter indicates 164 steps.

Per TS 3.1.4, Rod Group Alignment Limits, Control Bank D, Group 2, rods are considered

___(1)___ alignment limits.

In accordance with ABN-712, Rod Control System Malfunction, and TS 3.1.4, if multiple rods are determined to be MISALIGNED, the Unit is to be ___(2)___.

A. (1) within (2) tripped and EOP-0.0A, Reactor Trip or Safety Injection, entered.

B. (1) within (2) placed in MODE 3 per IPO-003A, Power Operation.

C. (1) outside (2) tripped and EOP-0.0A, Reactor Trip or Safety Injection, entered.

D. (1) outside (2) placed in MODE 3 per IPO-003A, Power Operation.

Answer: D Page 66 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of actions required to be taken in response to continuous rod withdrawal with no automatic actions occurring.

SRO Only: SRO Only due to requiring assessment of plant conditions and selecting a procedure to mitigate or recover from the condition, as well as application of TS requirements to comply with actions.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since alignment limit is within 12 steps between DRPI and group demand. The given indication is within 12 steps of the other DRPI and this may be confused as to meeting the requirement. 2nd part is incorrect, but plausible (see C).

B. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is correct (see D).

C. Incorrect. 1st part is correct (see D). 2nd part is incorrect, but plausible since ABN-712 requires the reactor be tripped if rod motion occurs without demand, but this is after placing rods in MAN, not while in AUTO. Unit is to be placed in Mode 3.

D. Correct. 1st part is correct. Alignment limits are DRPI within 12 steps of group demand indication.

Group 2 rods are at 180 steps on DRPI and 164/5 steps on group demand, exceeding the limit.

2nd part is correct. TS 3.1.4 and ABN-712 require the unit be placed in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> if more than 1 rod is misaligned.

Technical Reference(s) TS 3.1.4 Attached w/ Revision # See ABN-712 Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to a Abnormal Control Rod Response in accordance with ABN-712. (ABN.712.OB02)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.2/5 Page 67 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(2) Analysis Revision:

Page 68 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 69 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.1.4 Revision: 150 Page 70 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TS 3.1.4 Revision: 156 Page 71 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-712 Revision: 11 Page 72 of 72 CPNPP 2020-05 retake NRC Written Exam Worksheet 81-90 Rev. 3

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 2 K/A 000036.G.2.4.9 Level of Difficulty: 2 Importance Rating 4.2 Fuel Handling Incidents: Knowledge of low power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.

Question # 91 Given the following conditions:

Unit 1 is in MODE 6, preparing to flood up the cavity for fuel handling.

RHR is in service with RCS Mid-Loop Level indication at 59".

Current level indication reads 54.5" and slowly TRENDING DOWN.

___(1)___ is used to raise the level of the RCS by ___(2)___ .

A. (1) ABN-108, Shutdown Loss of Coolant (2) raising charging flow B. (1) ABN-104, RHR System Malfunction (2) raising charging flow C. (1) ABN-104, RHR System Malfunction (2) starting an SI pump D. (1) ABN-108, Shutdown Loss of Coolant (2) starting an SI pump Answer: B Page 1 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the response needed during a loss of inventory incident during fuel handling preparations.

SRO Only: SRO Only due to requiring assessment of plant conditions and selecting a procedure to mitigate or recover from the condition. Both procedures can be used to raise level, and within each procedure can be used as the method of restoring level, but an assessment must be made based on plant conditions which procedure, and action taken, is the proper selection to be used.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since this procedure section addresses RCS leakage when the RCS is full if the SRO incorrectly assesses plant conditions and selects this procedure for actions to restore level, but under mid-loop conditions ABN-104 would be the proper selection.

2nd part is correct (see B).

B. Correct. 1st part is correct. With the RCS not filled, the proper procedure used to respond to this event would be ABN-104. 2nd part is correct. Raising charging flow during mid-loop operations is the correct method of raising level with RHR in service.

C. Incorrect. 1st part is correct (see B). 2nd part is incorrect, but plausible since an SI pump would be used in either ABN-104 if the leakage were severe enough that both RHR pumps were required to be secured, or if the SRO incorrectly assesses plant conditions and selects ABN-108 as the proper procedure to respond to this event.

D. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is correct (see C).

Technical Reference(s) ABN-104 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: ANALYZE the response to an Unexpected Decrease in RCS Level in accordance with ABN-104, Residual Heat Removal System Malfunctions.

(ABN.104.OB06)

Question Source: Bank # 17610 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 2 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 3 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-104 Revision: 9 Page 4 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-104 Revision: 9 Page 5 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-104 Revision: 9 Page 6 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-104 Revision: 9 Page 7 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-108 Revision: 4 Page 8 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ABN-108 Revision: 4 Page 9 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 1 Group 2 K/A 000059.G.2.1.20 Level of Difficulty: 3 Importance Rating 4.6 Accidental Liquid Radwaste Release: Ability to interpret and execute procedure steps.

Question # 92 Given the following conditions:

Both units are operating at 100% power A discharge of Plant Effluent Tank, PET X-01, is in progress to Outfall 004 via Unit 1 Circulating Water in accordance with RWS-103, Drain Channel B.

1-HS-WM181, OUTFALL 004 CWS VLV, is in AUTO AFTER OPEN.

All power is lost to the Unit 1 non-safeguards busses.

(1) Which of the following is the status of the discharge; and, (2) What action must be taken?

A. (1) Discharge is secured due to 1-HS-WM181, OUTFALL 004 CWS VLV, closing.

(2) Close the release permit and reissue a new permit to release the tank via Unit 2 CW.

B. (1) Discharge is secured due to 1-HS-WM181, OUTFALL 004 CWS VLV, closing.

(2) Release permit may remain open and release reinitiated via Unit 2 CW.

C. (1) Discharge continues due to 2-HS-WM181, OUTFALL 004 TO UNIT #2 CW SYSTEM VLV, opening, and the release must be terminated locally.

(2) Close the release permit and reissue a new permit to release the tank via Unit 2 CW.

D. (1) Discharge continues due to 2-HS-WM181, OUTFALL 004 TO UNIT #2 CW SYSTEM VLV, opening, and the release must be terminated locally.

(2) Release permit may remain open and release reinitiated via Unit 2 CW.

Answer: A Page 10 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the requirement to locally secure a liquid discharge under conditions where the discharge valves provide continued release.

SRO Only: SRO Only due to requiring knowledge of the process associated with liquid release permits and approvals.

Explanation:

A. Correct. 1st part is correct. The Unit 1 valve closes and the Unit 2 equivalent valve would have been aligned to remain closed. 2nd part is correct. The release permit must be closed and reissued.

B. Incorrect. 1st part is correct (see A). 2nd part is plausible because the dilution path for either unit is the same, however, it is incorrect because the release may be reinitiated only after issuing a new permit.

C. Incorrect. 1st part is incorrect, but plausible since the release would continue if the Unit 2 valve were operated per the original design and placed in AUTO. It would then subsequently open, but it is required to be in CLOSE during a Unit 1 release. 2nd part is correct (see A).

D. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is incorrect, but plausible (see B).

Technical Reference(s) STA-603 Attached w/ Revision # See RWS-103 Comments / Reference LO21SYSRWS Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Liquid Waste systems including Technical Specifications, TRM and ODCM. (SYS.RWS.OB11)

Question Source: Bank #

Modified Bank # 19143 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.4 Page 11 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 19143 Revision:

Page 12 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 19143 Revision:

Page 13 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

SOP-603 Revision: 21 Page 14 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RWS-103 Revision: 19 Page 15 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

LO21SYSRWS Revision: 00.0000 Page 16 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

LO21SYSRWS Revision: 00.0000 Page 17 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

LO21SYSRWS Revision:

Page 18 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 1 Group 2 K/A WE16.EA2.02 Level of Difficulty: 2 Importance Rating 3.3 High Containment Radiation: Ability to determine and interpret the following as they apply to the (High Containment Radiation): Adherence to appropriate procedures and operation within the limitations in the facilitys license and amendments.

Question # 93 Given the following conditions:

A SBLOCA has occurred on Unit 1.

Attachment 2 of EOP-0.0A, Reactor Trip or Safety Injection, is complete.

EOS-1.2A, Post LOCA Cooldown and Depressurization, is being implemented during a cooldown.

The initial scan of the Critical Safety Function Status Tree parameters indicate the following:

o Pressurizer level is 0%.

o RVLIS 49 inch above flange light is LIT.

o Containment pressure is 8 psig and slowly rising.

o Containment water level indicates 814 feet and slowly rising.

o Containment Radiation Monitors are in ALARM at 25 REM/hr.

Which of the following should be performed?

A. Enter FRI-0.2A, Response to Low Pressurizer Level, and verify ECCS flow has been terminated.

B. Enter FRI-0.2A, Response to Low Pressurizer Level, and verify letdown has been isolated.

C. Enter FRZ-0.3A, Response to High Containment Radiation Level, and verify Phase B Containment Isolation.

D. Enter FRZ-0.3A, Response to High Containment Radiation Level, and verify Containment Ventilation Isolation.

Answer: D Page 19 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the procedures associated with high containment radiation levels.

SRO Only: SRO Only due to requiring knowledge of diagnostic steps and decision points in the ERG network that involve transitions to event specific procedures or emergency continguency procedures, specifically entry conditions into a YELLOW path procedure and the actions required based on the entry.

Explanation:

A. Incorrect. Plausible since pressurizer level meets procedure entry conditions, but FRZ is a higher priority. Verifying ECCS flow terminated is an action taken within FRI-0.2A.

B. Incorrect. Plausible since pressurizer level meets procedure entry conditions, but FRZ is a higher priority. Verifying letdown isolated is an action taken within FRI-0.2A.

C. Incorrect. Plausible since FRZ-0.3A entry conditions are met and Phase B prevents potential release of radioactive materials from containment, but only CVI is verified during this procedure.

A. Correct. YELLOW path conditions are met for entry into FRZ-0.3A for high radiation levels. Action taken within the procedure is to verify CVI to prevent potential release of radioactive materials from containment.

Technical Reference(s) ODA-407 Attached w/ Revision # See FRZ-0.3A Comments / Reference FRI-0.2A Proposed references to be provided during examination:

Learning Objective: DISCUSS the symptoms, or Entry Conditions for FRZ-0.3 A/B. (ERG.FZ2.OB06)

Question Source: Bank #

Modified Bank # 22976 (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 20 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 22976 Revision:

Page 21 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 22976 Revision:

Page 22 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 23 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-407 Revision: 16 Page 24 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRZ-0.3A Revision: 9 Page 25 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

FRZ-0.3A Revision: 9 Page 26 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 3 Group K/A 2.1.41 Level of Difficulty: 3 Importance Rating 3.7 Knowledge of the refueling process.

Question # 94 Given the following conditions:

At 0200 on 6/1, the Reactor was manually tripped At 1400 on 6/1, a plant cooldown was initiated Per RFO-102, Refueling Operation, the EARLIEST date and time Reactor core off-load to the SFP can be started is ______.

A. 0500 on 6/4 B. 1700 on 6/4 C. 0700 on 6/6 D. 1900 on 6/6 Answer: A Page 27 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the refueling process, including when core off load can be started.

SRO Only: SRO Only due to requiring ability to assess decay heat loads and administrative requirements to ensure limits are maintained.

Explanation:

A. Correct. The earliest time that core off-load can commence is 75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> following the shutdown.

B. Incorrect. Plausible since this is based on 75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br />, but is based on the time the cooldown is started, not the shutdown.

C. Incorrect. Plausible since this is based on time since shutdown, but is 125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> which is the earliest that the core off-load is allowed to be completed, not started.

D. Incorrect. Plausible since this is based on 125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> which is the earliest that the core off-load is allowed to be completed, not started. It is also based upon the time the cooldown is started, not the shutdown.

Technical Reference(s) RFO-102 Attached w/ Revision # See TRM 13.9.31 Comments / Reference Proposed references to be provided during examination:

Learning Objective: APPLY the administrative requirements of the Fuel Handling system including Technical Specifications, TRM and ODCM. (RFO.FH2.OB02)

Question Source: Bank # 66131 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.6 Page 28 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

RFO-102 Revision: 13 Page 29 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TRM 13.9.31 Revision: 77 Page 30 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

TRM 13.9.31 Revision: 77 Page 31 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 3 Group K/A 2.1.7 Level of Difficulty: 3 Importance Rating 4.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Question # 95 Given the following conditions:

A small steam leak has resulted in reactor power = 100.01% and rising In accordance with ODA-102, Conduct of Operations, Attachment 8B, Operations Reactivity Management, for an unknown inefficiency, complete the following statements:

For the initial reactor power reduction below 100%, a MINIMUM turbine load reduction of

___(1)____ is adequate to determine the magnitude of the inefficiency.

If power returns to above 100%, the next turbine load reduction should be ___(2)____.

A. (1) 5 MWe (2) 50 MWe B. (1) 5 MWe (2) 100 MWe C. (1) 10 MWe (2) 50 MWe D. (1) 10 MWe (2) 100 MWe Answer: A Page 32 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring ability to evaluate plant conditions and make operational judgments based on plant response and reactor behavior.

SRO Only: SRO Only due to requiring knowledge of administrative procedures that specify the implementation of abnormal operating procedures, requiring reactivity management due to exceeding power limits.

Explanation:

A. Correct. 1st part is correct because ODA-102 states that turbine load is reduced a minimum of 5 MWe to determine the existence and magnitude of the efficiency. 2nd part is correct. Each additional reduction will be 50 MWe load reductions.

B. Incorrect. 1st part is correct (see A). 2nd part is incorrect because after the initial reduction, further reductions are in 50 MWe increments. It is plausible because the rate for the 50 MWe reductions are at 100MWe/min rates.

C. Incorrect. 1st part is incorrect because the minimum reduction is 5 MWe. It is plausible because if it was for an additional load reduction, it would be correct. 2nd part is correct (see A).

D. Incorrect. 1st part is incorrect but plausible (see C). 2nd part is incorrect but plausible (see B).

Technical Reference(s) ODA-102 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE requirements for Procedure Use and Adherence in accordance with ODA-102, ODA-407, STA-201 and Operations Guideline 3. (ADM.XA3.OB01)

Question Source: Bank # 72318 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 33 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 34 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-102 Revision: 28 Page 35 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-102 Revision: 28 Page 36 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 1 Tier 3 Group K/A 2.2.19 Level of Difficulty: 2 Importance Rating 3.4 Knowledge of maintenance work order requirements.

Question # 96 In accordance with STI-606.01, Work Control Process, a Priority 2 activity must have a MINIMUM of ___(1)___ approval to start work.

Manpower scheduling for a Priority 2 activity requires coverage ___(2)___ to complete the activity.

A. (1) Shift Manager (2) during normal work hours ONLY B. (1) Shift Manager (2) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day C. (1) RWO Supervisor (2) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day D. (1) RWO Supervisor (2) during normal work hours ONLY Answer: A Page 37 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of maintenance work order requirements.

SRO Only: SRO Only due to requiring knowledge of administrative procedures necessitating SRO approval to implement.

Explanation:

A. Correct. 1st part is correct. The Shift Manager is responsible for work start authorization for Priority 2 activities. This can be delegated to the CPC or US. 2nd part is correct. Priority 2 requires the responsible manager to allocate resources as necessary during normal working hours until completed.

B. Incorrect. 1st part is correct (see A). 2nd part is incorrect, but plausible because Priority 1 activities require work 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day until complete. It is plausible because if it were Priority 1, it would be correct.

C. Incorrect. 1st part is incorrect, but plausible because the RWO Supervisor is responsible for signing and dating the WO for technical review in the Authorization to Start Work section. It is plausible because Priority 2 would allow WC SRO approval. 2nd part is incorrect, but plausible (see B).

D. Incorrect. 1st part is incorrect, but plausible (see C). 2nd part is correct (see A).

Technical Reference(s) STI-606.01 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: EXPLAIN the requirements for conducting briefs, reviewing and authorizing work documents and permits in accordance with STA-606, STI-606.01, STI-606.04, STI-605.01, STI-604.03, STI-604.02, STA-696, STA-605 and Technical Specification 5.5.18. (ADM.XA1.OB09)

Question Source: Bank # 72428 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 43.3 Page 38 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STI-606.01 Revision: 6 Page 39 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 3 Group K/A 2.2.20 Level of Difficulty: 2 Importance Rating 3.8 Knowledge of the process for managing troubleshooting activities.

Question # 97 Troubleshooting is in progress under a troubleshooting Work Order for a safeguards piece of equipment.

In accordance with STI-601.01, Work Control Process, which of the following describes the process to complete troubleshooting and repair activities on the equipment, once it is determined that several components of the equipment must be replaced?

A. The Maintenance Supervisor should initial and date the Work Order changes and provide verbal authorization to continue the work.

B. The existing Work Order must be revised, Operations must re-impact the Work Order and authorize continuing the work.

C. The Maintenance Supervisor should perform a technical review on the Work Order and provide written authorization to continue the work.

D. The existing Work Order must be edited, Operations re-impact is NOT required and need NOT authorize continuing the work Answer: B Page 40 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of the process for troubleshooting and maintenance activities.

SRO Only: SRO Only due to requiring knowledge of administrative procedures necessitating SRO approval to implement.

Explanation:

A. Incorrect. Plausible because the Maintenance supervisor could authorize an editorial change by initial and date of the change and verbally authorizing work to continue, but this scope requires a WO revision.

B. Correct. STI-606-0.1 requires the work order be revised when work order intent changes and the work order must be re-impacted when troubleshooting becomes corrective. Operations management must review and authorize work when a troubleshooting work order scope is expanded to include corrective actions.

C. Incorrect. Plausible because the Maintenance supervisor normally performs a technical review of work orders but cannot authorize continuing work IAW requirements of STI-606.01 because revision is required.

D. Incorrect. Plausible because an editorial change would not require re-impact or Operations management authorization, but this scope requires a WO revision.

Technical Reference(s) STI-606.01 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: Given a plant emergency, IDENTIFY the Emergency Exposure Guidelines in accordance with EPP-305, Emergency Response Guidelines and Personnel Dosimetry, and 10CFR20, Standards for Protection Against Radiation.

(ADM.XA1.OB02)

Question Source: Bank # 33101 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam LC22 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 43.3 Page 41 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 33101 Revision:

Page 42 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

BANK 33101 Revision:

Page 43 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STI-606.01 Revision: 6 Page 44 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STI-606.01 Revision: 6 Page 45 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STI-606.01 Revision: 6 Page 46 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STI-606.01 Revision: 6 Page 47 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STI-606.01 Revision: 6 Page 48 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 3 Group K/A 2.3.12 Level of Difficulty: 2 Importance Rating 3.7 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Question # 98 In accordance with STA-620, Containment Entry, ROUTINE containment entry during MODE 1 operation is authorized by the ____(1)____ and shall be made by a MINIMUM of two personnel ____(2)____ the Radiation Protection Technician.

A. (1) Shift Manager (2) in addition to B. (1) Shift Manager (2) one of which can be C. (1) Radiation Protection Manager (2) in addition to D. (1) Radiation Protection Manager (2) one of which can be Answer: B Page 49 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of containment entry requirements.

SRO Only: SRO Only due to requiring knowledge of radiological procedures associated with containment entry authorization.

Explanation:

A. Incorrect. 1st part is correct. The SM authorizes containment entry. 2nd part is incorrect because the IAW STA-620, the RP tech can be counted as the second person. It is plausible in that the RP tech will be performing duties related to radiation surveys and not what the other person is making the entry for.

B. Correct. 1st part is correct (see A). 2nd part is correct. The RP tech can be counted as the second person.

C. Incorrect. 1st part is incorrect because the SM authorizes containment entry. It is plausible because the RP Manager does authorize entry into certain areas of containment (S/G Loop Rooms). 2nd part is incorrect but plausible (see A).

D. Incorrect. 1st part is incorrect but plausible (see C). 2nd part is correct (see B).

Technical Reference(s) STA-620 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: DISCUSS the administrative requirements for entry into hazardous restricted areas including the containment buildings, switchyard and confined spaces in accordance with STA-902, STA-650, STA-660, STA-637, STA-628, STA-620 and STA-629. (ADM.XA1.OB18)

Question Source: Bank # 71604 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 43.4 Page 50 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STA-620 Revision: 14 Page 51 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STA-620 Revision: 14 Page 52 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

STA-620 Revision: 14 Page 53 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 0 Tier 3 Group K/A 2.4.1 Level of Difficulty: 2 Importance Rating 4.8 Knowledge of EOP entry conditions and immediate action steps.

Question # 99 Given the following conditions:

The crew is responding to a SBLOCA and are making a determination regarding whether the RCS is intact in EOP-0.0A, Reactor Trip or Safety Injection.

The Extra RO is in the process of performing Attachment 2 of EOP-0.0A to verify automatic actions have occurred.

A CORE COOLING RED path is noted on the CSFSTs.

The RED path procedure identified on the CSFST should be implemented A. immediately.

B. immediately upon transitioning out of EOP-0.0A.

C. while in EOP-0.0A as soon as Attachment 2 has been completed.

D. after transitioning out of EOP-0.0A and Attachment 2 has been completed.

Answer: D Page 54 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of conditions which would require entry into functional restoration guideline procedures.

SRO Only: SRO Only due to requiring knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant emergency procedures.

Explanation:

A. Incorrect. Plausible since CSFST red paths are generally the highest priority procedures and both SUBCRITICALITY and HEAT SINK have direct transitions from EOP-0.0A, but FRG implementation, outside these two procedures, is initiated when either directed by an ERG procedure step, or when a transition is made out of EOP-0.0A and EOP-0.0A automatic action verification is complete.

B. Incorrect. Plausible because there must have been a transition out of EOP-0.0A as part of the requirement to implement FRGs, however, completing the actions of Attachment 2 is also required.

C. Incorrect. Plausible because completing the actions of Attachment 2 is part of the requirement, however, there also must have been a transition out of EOP-0.0A.

D. Correct. FRG implementation is initiated when either directed by an ERG procedure step, or when a transition is made out of EOP-0.0A and EOP-0.0A automatic action verification is complete.

Technical Reference(s) ODA-407 Attached w/ Revision # See Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE the points in the ERGs that Critical Safety Function monitoring (and FRG implementation) is required in accordance with ODA-407, Operations Department Procedure Use and Adherence. (LO21.ERG.XD2.OB21)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 43.5 Page 55 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 56 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-407 Revision: 16 Page 57 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-407 Revision: 16 Page 58 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-407 Revision: 16 Page 59 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Examination Outline Cross-reference: Level RO SRO Rev. Date: Rev. 2 Tier 3 Group K/A 2.4.31 Level of Difficulty: 4 Importance Rating 4.1 Knowledge of annunciator alarms, indications, or response procedures.

Question # 100 When an initiating event requires immediate operator attention to verify automatic actions have occurred or initiate corrective action to protect equipment, the annunciator color used to identify the associated alarm is ___(1)___.

In accordance with ODA-407, Operations Department Procedure Use and Adherence, during the performance of Emergency Response Guidelines, the US ___(2)___ direct the implementation of steps contained in alarm procedures while performing actions contained in the ERGs.

A. (1) YELLOW (2) may B. (1) YELLOW (2) may NOT C. (1) ORANGE (2) may D. (1) ORANGE (2) may NOT Answer: C Page 60 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 K/A Match: K/A match due to requiring knowledge of alarm indications and rules of usage for associated alarm procedures.

SRO Only: SRO Only due to requiring knowledge of administrative procedures that specify hierarchy, implementation, and/or coordination of plant abnormal and emergency procedures.

Explanation:

A. Incorrect. 1st part is incorrect, but plausible since YELLOW alarms are used to identify conditions resulting in multiple alarm windows coming in on the same, or nearby, panels. 2nd part is correct (see C).

B. Incorrect. 1st part is incorrect, but plausible (see A). 2nd part is incorrect, but plausible since there are conditions when implementing ALMs where the Rules of Usage require the US to obtain another SROs concurrence before implementing an action, specifically a deviation to an ALM action, but the Rules of Usage permit an SRO to direct an ALM action over an ERG action.

C. Correct. 1st part is correct. ORANGE alarm windows are used to identify initiating events requiring immediate operator attention to verify automatic actions have occurred or initiate corrective action to protect equipment. 2nd part is correct. The SRO may direct an ALM action over an ABN or ERG action, but normally an ABN or ERG has higher priority D. Incorrect. 1st part is correct (see C). 2nd part is incorrect, but plausible (see B).

Technical Reference(s) OWI-109 Attached w/ Revision # See ODA-407 Comments / Reference Proposed references to be provided during examination:

Learning Objective: STATE the requirements for procedure use and adherence in accordance with ODA-102, ODA-407, STA-201, and Operations Guideline 3. (ADM.XA3.OB01)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 43.3 Page 61 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

10 CFR 55.43(b)(5) Analysis Revision:

Page 62 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

OWI-109 Revision: 9 Page 63 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

ES-401 CPNPP 2020-05 retake NRC Written Exam Worksheet Form ES-401-5 Comments /

Reference:

ODA-407, Attachment 8C Revision: 16 Page 64 of 64 CPNPP 2020-05 retake NRC Written Exam Worksheet 91-100 Rev. 2

CPNPP 2020 NRC SRO/RO Written Exam Reference List Validation #1

1. NRC Generic Fundamentals Equation Sheet
2. Steam Tables CPNPP 2020-05 retake NRC Written Exam Reference List

GENERIC FUNDAMENTALS EXAMINATION EQUATIONS AND CONVERSIONS HANDOUT SHEET EQUATIONS



Q  pT mc P = Po10SUR(t)



Q 

mh P = Poe(t/)

 A = Aoe-t Q UAT CRS/D = S/(1 - Keff)

  m Q

3

 Nat Circ CR1(1 - Keff1) = CR2(1 - Keff2) 2 T  m  Nat Circ 1/M = CR1/CRX Keff = 1/(1 - ) A = r 2

= (Keff - 1)/Keff F = PA SUR = 26.06/ m = Av eff W 

mP Pump eff E = IR 5 eff

 Thermal Efficiency = Net Work Out/Energy In 1  eff g(z2 - z1) + (v22 - v12) + (P2 - P1) + (u2 - u1) + (q - w) = 0 5* = 1 x 10-4 sec gc 2gc eff = 0.1 sec-1 (for small positive ) gc = 32.2 lbm-ft/lbf-sec2 2 2 DRW  tip / avg CONVERSIONS 1 Mw = 3.41 x 106 Btu/hr 1 Curie = 3.7 x 1010 dps 1 hp = 2.54 x 103 Btu/hr 1 kg = 2.21 lbm 1 Btu = 778 ft-lbf 1 galwater = 8.35 lbm (C = (5/9)((F - 32) 1 ft3water = 7.48 gal (F = (9/5)((C) + 32 CPNPP 2020-05 retake NRC Written Exam Reference List