{{#Wiki_filter:*,s o" An%T T r nii!^'PN n.'0": A i, ' N9 FWi !!T ENCE porxET t:0. 50-282 L7TT.T Preirie Islimd W.1 DATE 791101 Cf'.'TI ETF0 T.Y A. A . Hunstad
{{#Wiki_filter:*
_, TET TTI'ONE 632-308-A767 o>ry"'O'IT!!OCTOBER 1979 S , p..On October 2nd a tube break occurred in No. 11 Steam Generator. The resultant k leakage caused a reactor trip at 1424 hours on low pressurizer pressure and safety injection initiation five seconds later. All safety systems functioned as designed, and the reactor was d.. awn and cooled down and the steam gener-ator isolated expeditiously following existing operating procedures. It was found that a foreign object (a spring) had caused mechanical wear of the fail-ed tube and one or two more tubes. Six tubes were plugged, a pressure test conducted and the steam generator was returned to service. The unit was re-turned to service at 0645 on October 23rd." 9 122'7911140  
                                                                                  ,s o
..DAILY UNIT POWER OUTPUT
                      " An%T T r nii!^'PN n.' 0": A i, ' N9 FWi !!T ENCE porxET t:0. 50-282 L7TT.T Preirie Islimd W.1 DATE 791101 Cf'.'TI ETF0 T.Y A. A . Hunstad _,
*DOCKET NO. 50-9g7 UNIT Prairie Island No. 1 DATE 791101 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH OCTOBER 1979
TET TTI'ONE 632-308-A767 o
.DAY AVERAGE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net
ry "'O'IT!! OCTOBER 1979 S
.1 402 17-3_'277 18-3..3-11 19-15 4-5 20-19 5-5 21-20 6-4 22-19 7-4 23 143 8-4 24 269 9-4 25 419 10_ _ .-3 26 481 11-3 27 479 12-3 28 479 13-3 29 476 14-3 30 476 15-3 31 474 16-3 Average loads above 503 MWe-Net are due to cooler condenser circulating water.
p.. On October 2nd a tube break occurred in No. 11 Steam Generator. The resultant k   leakage caused a reactor trip at 1424 hours on low pressurizer pressure and safety injection initiation five seconds later. All safety systems functioned as designed, and the reactor was   d.. awn and cooled down and the steam gener-ator isolated expeditiously following existing operating procedures. It was found that a foreign object (a spring) had caused mechanical wear of the fail-ed tube and one or two more tubes. Six tubes were plugged, a pressure test conducted and the steam generator was returned to service. The unit was re-turned to service at 0645 on October 23rd.
'7'9 123  
                                                                    "9     122 7911140
..*OFFRATING DAT',RIPORT C DOCKET NO 50-282 DATE 791101 CO:1PLETED BY A. A. Hunstad OPERATING STATUS TELEPHONE 612-388-4767
* DAILY UNIT POWER OUTPUT DOCKET NO. 50-9g7 UNIT Prairie Island No. 1 DATE 791101 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH OCTOBER 1979 DAY           AVERAGE LOAD MWe-Net         DAY           AVERAGE LOAD MWe-Net 1              _
'1.Unit Name:
402                 17                   -3 277                 18                   -3 3                   -11                 19                 -15 4                     -5                 20                 -19 5                     -5                 21                 -20 6                     -4                 22                 -19 7                     -4                 23                 143 8                     -4                 24                 269 9                     -4                 25                 419 10              _ _ .
Prairie Island No. 1 2.Reporting Period: October 1979
                                  -3                 26                 481 11                     -3                 27                 479 12                     -3                 28                 479 13                     -3                 29                 476 14                     -3                 30                 476 15                     -3                 31                 474 16                     -3 Average loads above 503 MWe-Net are due to cooler condenser circulating water.
*3.Licensed Thermal Power (MWt):
                                                                  '7'9     123
1650 4.Nameplate Rating (Gross MWe):
 
593 5.Design Electrical Rating (Net MWe):
OFFRATING DAT',RIPORT C
530 6.Maximum Dependable capacity (Cross MWe): 501
DOCKET NO 50-282 DATE 791101 OPERATING STATUS CO:1PLETED BY A. A. Hunstad TELEPHONE 612-388-4767
__L_, d 7.FL1ximum Dependable Capacity (Net MWe):
: 1. Unit Name:   Prairie Island No. 1
470 8.If Changes Occur in Capacity Ratinge
: 2. Reporting Period: October 1979                                                                   *
(''a-s Number 3 Through 7) Since Last Report:
: 3. Licensed Thermal Power (MWt):             1650
,$Give Reason:
: 4. Nameplate Rating (Gross MWe):                 593
,. . - - - - . .
: 5. Design Electrical Rating (Net MWe):                   530
-os 9.Power Level To Which Restricted, Tf Anv (l'et MWe):
: 6. Maximum Dependable capacity (Cross MWe): 501                                 __
___10.Reasons for Restrictions, if Any:
L_                                    ,
~_ . . . . . _ _ _ . . . .
d     7. FL1ximum Dependable Capacity (Net MWe):                   470
_This Month Yr-To-Date Cu.ulative 11.Ilours In Reporting Period 745 7296 51504 12.Number Of Hours Reactor Was Crirical 252.2 5308.0 39997.1 13.Reactor Reserve Shutdown Hours 0 . 0 . _,_8_24.1 5279.2_ _ _ _14.Hours Generator on Line 248.7 5216.1 38933.3 15.Unit Reserve Shutdown 11onrs 0.0 0.0 0.0_ , , ,___16.Gross Thermal Energy Generated (U'.,'ll) 372109 8094243 60374825 17.Gross Electrical Energy Generated (FNIO
    ,    8. If Changes Occur in Capacity Ratinge                 (''a-s     Number 3 Through 7) Since Last Report:
._113390 __
    $         Give Reason:                             . . - - - - . .                               -
2590980 1962187'.'
os
18.Net Electrical Energy Generat..mi (Mul:)
: 9. Power Level To Which Restricted, Tf Anv (l'et MWe):                                                             ___
102195 2416833 18345265 19.Unit Service Factor 33.4 71.5 75.6 20.Unit Availability Factor 33.4 71.5 75.6 21.Unit Capacity Factor (Using MDC Net) 29.2 70.5 70.8 22.Unit Capacity Factor (Using DER Net) 25.9 62.5 u7.2 23.Unit Forced Outage Rate 66.6 19.4 13.5'4.Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Ecch):
    ~
Refueling, Summer 1980, 5 weeks
: 10. Reasons for Restrictions, if Any:
_ _ _ _ __ _ .25.If Shut Down at End Of Report Pcciod, Estimated Date of Ctartup:
This Month             Yr-To-Date           Cu.ulative
17'9 i24  
: 11. Ilours In Reporting Period                                               745                     7296               51504
..UNIT SHUT 30'.SS A190'4ER RZ3';'' ":S DOC"Er NO.
: 12. Number Of Hours Reactor Was Crirical                                     252.2                   5308.0             39997.1
30-282 UNIT N!JIZ Prairia I sland No.1 REPORT MONTH OCTOBER __1979 DATE 791101 COMPLETED 3Y A. A. Hunstad _ _ _ , ,_ ..
: 13. Reactor Reserve Shutdown Hours                                             0 . 0 . _,
,_ ,_-. _ . _ _ .
_ _ _ _                        _8_24.1             5279.2
512-333-476_7_, _ . . _ , T2LEPdOSE-'.-i'u Licansea;I a=m iu Causa & Caccactiva 34._, S.N l .3 7 5!.58 Event!fl -3 5m Action to Date$$$3 ti S Repart #j$$5 -$Prevanc Jacurceaca
: 14. Hours Generator on Line                                                 248.7                   5216.1             38933.3
'4 0 0.C;'3 Ol V)% O-4 m :=lc: u.r-c: 1 Qv (U r.o I a u , o==,4 4 u a*a e!Ollm-g i ,"ll1..J 791002 i F 496.3 A 3 79-27 i tIJ HTEXCH Shutdown due to rupture of one
: 15. Unit Reserve Shutdown 11onrs                                               0.0 0.0     ___
'0ll'll tube in No. 11 Steam Generator.
0.0
I e A oll!., 5lI*m 9 1 I!,;, t.'i?'!.-I!!i i e.I ill,-,'l., t i I.!'-.___.'4 1 2 3 4_. _ ...J F: Forced Reason Method: Exhibit.G-In-w S: Scheduled A-Equipment Failitre(Explain) 1-Manual structions for
: 16. Gross Thermal Energy Generated (U'.,'ll)                             372109             8094243             60374825
' , .B-Maintenance or Test 2-Manual Trip Preparation of
: 17. Gross Electrical Energy Generated (FNIO                         ._113390 __             2590980             1962187'.'
-'C-Refualing 3-Automatic Trip Data Entry Sheets N 6 D-Regulatory Restriction 4-Other (Explain) for Licensee Event W E-Operator Training & License Examination Report (LER) Fila F-Administrative (NUREG-0151)
: 18. Net Electrical Energy Generat..mi (Mul:)                               102195             2416833             18345265
G-Oper nional Error (F.xplain) 5 U-Other '7xp.ain Exhi'ait 1 - h m " '222  
: 19. Unit Service Factor                                                       33.4                     71.5                 75.6
.e rianRATTr? r,it: men 0 : am' rtu r m Es:PERTENCE
: 20. Unit Availability Factor                                                   33.4                     71.5                 75.6
, por.gr.T ?!O. 50-306 TRIIT Prof rin Ts?.nrad Na. 2 DAT2 791101 Cr?OT T'TED T.Y A. A. mmatad
: 21. Unit Capacity Factor (Using MDC Net)                                       29.2                     70.5                 70.8
.. _TET.TPf'ONE 6) 2-3CC-a767
: 22. Unit Capacity Factor (Using DER Net)                                       25.9                     62.5                 u7.2
.-o h M0'IT51 OCTOBER 1979
: 23. Unit Forced Outage Rate                                                   66.6                     19.4                 13.5
.?,-A The unit was in Load Follow operation this month; no shutdowns.
        '4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Ecch):
-o M M Pe)(  
Refueling, Summer 1980, 5 weeks                   _ _ _ _ _                               _ _ .
..DAILY UNIT POWER OUTPUT
: 25. If Shut Down at End Of Report Pcciod, Estimated Date of Ctartup:
.DOCKET NO. 50-306 UNIT Prairie Island No. 2 DATE 791101
17'9 i24
, COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH OCTOBER 1979 UAY AVERAGE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net
 
.1 497 17 514 2 418 18 511.3 509 19 509 4 514 20 503 5 514 21 508 6 516 22 510 7 517 23 515 8 511 24 509 9 518 25 506 10 508 26 505 11 509 27 499 12 518 28 474 13 518 29 496 14 471 30 500 15 515 31 497 16 514 Average loads above 500 MWe-Net are due to cooler condenser circulating water.
UNIT SHUT 30'.SS A190'4ER RZ3';'' ":S DOC"Er NO. 30-282 REPORT MONTH        OCTOBER __1979 UNIT N!JIZ Prairia I sland No.1 DATE     791101 COMPLETED 3Y     A. A. Hunstad     _ _ _ , ,_ ..
(' " 9 127  
T2LEPdOSE 512-333-476_7_
.s*.Oi'fyATI!iG DEUIf0RT (DOCKET NO 50-306 DATE 791101 C0!!PLETED BY A. A. Hunstad OPERATING STATUS 612-388-4767]
a            =          m          iu  .-i'u       Licansea       ;
TELEPHONE 1.Unit Name:
34    ._,          I Causa & Caccactiva Date            S.
Prairie Island No. 2 2.Reporting Period: October 1979
N l $$      .3   7 5!           .58           Event       !fl -3     5m                               Action to
*3.Licensed Thermal Power (MWt):
                                                '4 0 0
1650 4.Nameplete Rating (Gross MWe):
3
593 5.Design Electrical Rating (Net MWe):_ 530 6.Maximum Dependable Capacity (Cross MWe):
                                                                      .C ti SO
531_, N 7.Maximum Dependable Capacity (Ne* MWel:
                                                                          ;'3 Repart #     j$$       5   -$                       Prevanc Jacurceaca 4
500 ,-8.If Changes Occur in Capacity Ratinne (ffems Number 3 Through 7) Since Last Report-
m :=       c:       u .r-   c:                   l V)        %O Qv l
,$Give Reason:. . _ . _ . . _ _ _ . . _. _ _ _ _ . . _ _ _
(U r.o                       I           a u 1
,.m[9.Power Level To Which Restricted Tf Any (?'et ffWe):
                                                                      =       =                     ,           o a                         *
o_ , _ , ,_ _ _*10.Reasons for Restrictions, If Any ___ _ _ _ _ ,,_____ _ __ _ _ _ ,.,_ _ _ . . . . . _ . . .
                                          ,4                                  a 4          u
_This Month Yr-To-Date Co.olative 11.Hours In Reporting Period 745 7296 42622 12.Number Of Hours Reactor Was critical 745.0 7242.2 37685.8 13.Reactor Reserve Shutdown Hours 0.0 6.5 1385.2 14.Hours Generator On Line 745.0 7229.8 36965.4 15.Unit Reserve Shutdown Hour:.
                              !                                                                    e
0.0 , 0.0 0.0_ . , _._16.Gross Thermal Energy Cencrated (?f','ll) 1121050 11326804 57346089 17.Gross Electrical Energy Generated (FNT:1 400100 3717820 18305560 18.Net Electrical Energy Generat mi OS'H) 375449 3489459 17135047 19.Unit Service Factor 100.0 99.1 86.7 20.Unit Availability Factor 100.0 99.1 86.7 21.Unit Capacity Factor (lising MDC t:ct) 100.8 95.7 80.4 22.Unit Capacity Factor (Using DER Net) 95.1 90.2 75.9 23.Unit Forced Outage Rate 0.0 0.3 5.0'4.Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of E.xh):
      -                                                                       O l        l,                                    m g                       i l                                    l                              1 J           791002                                           '
Refueling, January 1980, 5 weeks 25.If Shut Down at End Of Report Period, Estimated Date of Startup:
i F             496.3       A               3             79-27       i tIJ       HTEXCH           Shutdown due to rupture of one 0                        l                                                                    '
__' " 9 128  
A I
.9 11 NIT PRIT00'NF APJ POT:R 'GI' ' ";s DOOR-'I N3.
l e              l                        l tube in No. 11 Steam Generator.
50 306-UNIT N10G Prairi2 I;1and No. 2 r.m ,DRT MO,.u, H OCTOBER.1979 DATE J 3119,1 COMPL31'ED 3Y
o                        l                        ,
___A._A Hunstad..,_ , , _ , ,. . . .~~*TlL2PdOSE $12 333-4 M7---
l                                        !
.{_. . - _ _
5 m                       l I
-..m+=m!% .: u Lia nsea ,se i 2 3 Cause & Carcactiva Date 3, 32 5i 0 .3 O l Event 5 0 .$$n I Actica to x u u a 1 -o a u 3 m 3 3-6 oa o ou o Repart u i 3 a S.o Provanc Jacurreaca l m,-6 O O ,c 3 o a a e n ::: I a u .c x u 4 av om!3=s;u<, i.ollIll>,9-..I!l, I.: I:..o.N I- 1 i!H+i}l!I N I, o I 4 i x't''l,-[!'~'f..i 1-, e i!''.t,.i', ,: 'd'''!i i i I'.!lI!!,l,e , f.,-~--- -- - -l. _ .i.___.,____j , , . . . . _
9                                                                                               1 I                         !
._ _ _ ,_ , . . _1 4 F: Forced?~ R2ason 3 4 Method: Exhibit.G-In-S: Scheduled A-Equipment Failure (Explain) 1-Mantial structions for
                                                                  ,               t                                                                                         .
" B '!aintanance or Test 2-Manual Trip Preparation of N C-L fualir.g 3-Automatic Trip Data Entry Sheets
i                                   ?
#D-Regulatory Restriction 4-Other (Explain) for Licensea Event E-Operatar Training & License Examination Report (LER) File F-Maindtntive OFJREG-01M1.)
I                                                     !                                         !
G-Opartti nal. Error (Unplain) 5 L 0 t'.w r ,1::pi. a in Exhi$tt 1 -
i                                                     i                                         e                                             .
:l'-'' -222  
I                                         i, l                                                    -                                                                                         l, l               .
..CORRECTED'Oi'FRATING DAT; PEPORT DOCKET NO 50-306 DATE 791001 C0!!PLETED BY A. A. Hunstad _
          ,                                                                     t i
OPERATING STATUS TELEPHONE 612-388-4767 1.Unit Name:
I
Prairie Island No. 2 2.Reporting Period: September 1979 es 3.Licensed Thermal Power (MWt):
  '4   1 2                                                                         3                             4 J           F: Forced                           Reason                                                                 Method:                       Exhibit.G-In-w             S: Scheduled                       A-Equipment Failitre(Explain)                                         1-Manual                       structions for                     ',.
1650 4.Nameplate Rating (Gross MWe):
B-Maintenance or Test                                                 2-Manual Trip                 Preparation of C-Refualing                                                           3-Automatic Trip               Data Entry Sheets N                 6 W                                                  D-Regulatory Restriction                                               4-Other (Explain)             for Licensee Event E-Operator Training & License Examination                                                             Report (LER) Fila F-Administrative                                                                                       (NUREG-0151)
593 1 5.Design Electrical Rating (Net MWe):_ 530 6.Maximum Dependable Capacity (Cross MWe):
G-Oper nional Error (F.xplain)
531__, , u 7.Maximum Dependable Capacity (Net %'e):
U-Other '7xp.ain                                                                                   5 Exhi'ait 1 - h m " '222
500__ _ _ _, 8.If Changes occur in Capacity Ratinys Orems Number 3 Through 7) Since Last Report:
 
g$Cive Reason:. _ _ _ _ _ _ . . _
e rianRATTr? r,it: men 0 : am' rtu r m Es:PERTENCE por.gr.T ?!O. 50-306 TRIIT Prof rin Ts?.nrad Na. 2 DAT2 791101 Cr?OT T'TED T.Y A. A. mmatad     .. _
_ _ _ _ _.j*--. . _. . _ _9.Power Level To Which Restricted. If Any (Pet m'c);
TET.TPf'ONE 6) 2-3CC-a767         -
_ _ , _ _ _ , _ _
o h   M0'IT51 OCTOBER 1979                   .
10.Reasons for Restrictions, i f A n't _ , _ _ _ _ __ , _ , , __
      ?,
_ , _ _ , _ _ , . _
A o
_ _ _ . . . . _ . . . _
The unit was in Load Follow operation this month; no shutdowns.
This Month Yr-To-Date Co.olative 11.Hours In Reporting Period
M M
__ ,,720 6551 41877l12.Number Of Hours Reactor Was Critical
Pe
, 720.0 6497.2__36940.8l13.Reactor Reserve Shutdown Hours 0.0 6.5 1385.2 14.Hours Generator On Line 720.0 6484.8 36220.4 (15.Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.Gross Thermal Energy Generated (IP..'H) 1154994 10205754 56225039 17.Gross Electrical Energy Generated (Ps'n) 369820 3317720 17905460 18.Net Electrical Energy Generated O!WH) 347023 3114010 16759598 19.Unit Service Factor 100.0 99.0 86.5 (20.Unit Availability Factor 100.0 99.0 86.5 21.Unit Capacity Factor (Using MDC Net) 96.4 95.1 80.0 22.Unit Capacity Factor (Using DER Net)
                                                                            )
_90.9 _ _89.7_75.5 23.Unit Forced Outage Rate 0.0 0.3 5.1'4.Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Ench):
(
g Refueling, January 1990, 5 weeks
 
_25.If Shut Down at End Of Report Period, Estimated Date of Startup:
.                                   DAILY UNIT POWER OUTPUT DOCKET NO. 50-306 UNIT Prairie Island No. 2
' "9 i30}}
                            ,                                    DATE 791101 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH OCTOBER 1979 UAY           AVERAGE LOAD MWe-Net         DAY           AVERAGE LOAD MWe-Net 1                   497                   17                 514 2                   418                   18                 511 3                   509                   19                 509 4                   514                   20                 503 5                   514                   21                 508 6                   516                   22                 510 7                   517                   23                 515 8                   511                   24                 509 9                   518                   25                 506 10                   508                   26                 505 11                   509                   27                 499 12                   518                   28                 474 13                   518                   29                 496 14                   471                   30                 500 15                   515                   31                 497 16                   514 Average loads above 500 MWe-Net are due to cooler condenser circulating water.
(
                                                                '"9     127
 
s
                                                      .Oi'fyATI!iG DEUIf0RT
(
DOCKET NO 50-306 DATE 791101 OPERATING STATUS C0!!PLETED BY A. A. Hunstad TELEPHONE 612-388-4767]
: 1. Unit Name:   Prairie Island No. 2
: 2. Reporting Period: October 1979                                                                       *
: 3. Licensed Thermal Power (MWt):             1650
: 4. Nameplete Rating (Gross MWe):               593
: 5. Design Electrical Rating (Net MWe):_ 530
: 6. Maximum Dependable Capacity (Cross MWe):                       531_                                                             ,
N       7. Maximum Dependable Capacity (Ne* MWel:                     500
: 8. If Changes Occur in Capacity Ratinne (ffems Number 3 Through 7) Since Last Report-
  $             Give Reason:                           . . _ . _ . . _ _ _ . . _             . _ _ _ _ . . _ _ _
m
[         9. Power Level To Which Restricted           Tf Any (?'et ffWe):
o*
: 10. Reasons for Restrictions, If Any ___ _ _ _ _ ,,_____ _ __ _ _ _ ,.,
This Month                    Yr-To-Date       Co.olative
: 11. Hours In Reporting Period                                                 745                       7296                 42622
: 12. Number Of Hours Reactor Was critical                                       745.0                     7242.2               37685.8
: 13. Reactor Reserve Shutdown Hours                                                                           6.5 0.0                                           1385.2
: 14. Hours Generator On Line                                                   745.0                     7229.8               36965.4
: 15. Unit Reserve Shutdown Hour:.                                                 0.0 ,                     0.0 0.0
: 16. Gross Thermal Energy Cencrated (?f','ll)                             1121050                   11326804           57346089
: 17. Gross Electrical Energy Generated (FNT:1                                 400100                   3717820         18305560
: 18. Net Electrical Energy Generat mi OS'H)                                   375449                   3489459         17135047
: 19. Unit Service Factor                                                         100.0                       99.1                 86.7
: 20. Unit Availability Factor                                                   100.0                       99.1                 86.7
: 21. Unit Capacity Factor (lising MDC t:ct)                                     100.8                       95.7                 80.4
: 22. Unit Capacity Factor (Using DER Net)                                         95.1                       90.2                 75.9
: 23. Unit Forced Outage Rate                                                       0.0                       0.3                   5.0
          '4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of E.xh):
Refueling, January 1980, 5 weeks
: 25. If Shut Down at End Of Report Period, Estimated Date of Startup:                                                                 __
                                                                                                                  '"9         128
 
9 11 NIT PRIT00'NF APJ POT:R 'GI' ' ";s DOOR-'I N3. 50 306 r.m ,DRT MO,.u, H                                               UNIT N10G Prairi2 I;1and No. 2 OCTOBER.1979 DATE J 3119,1 COMPL31'ED 3Y ___A._A   Hunstad..,_ , , _ , ,
              ~
                                                          ~*
TlL2PdOSE $12 333-4 M7---
                                                                              .m                                        {
                                    +           =           m       !% .: u             Lia nsea           ,se     i 2 3
Cause & Carcactiva Date             3, x
32 u u            5i 0 .3 O l a 1 -o a u Event             5 m0 .$$n 3 I
Actica to 6         oa             o       ou o             Repart u3                                                Provanc Jacurreaca l m, a
                                                  -6 O         O       ,c 3 o i 3      S      .o e             n ::: I       a       u .c x                                           a a 4
av                     om                                                       u
                                                                        =                                    !           3 s                           ;           u i         .                                 o
    >                           l          l                                        I                      l
    ,9                                         .
l I           !                                                               .
l o
                                  .          I
                                                                      .                                       :                           I N                             I   - 1 H                           +
i                                       !
N                           !          I                                                                                               l o                           I         4                                         i                       }                                                                      I, i
x                                       '
t''
    '~'                        l                                                                                                           [                                       !
: f.                                                   -
1 e                             i i                             .
          ,                  t,           ,                                                                .i
:                             d                         '
i                                                    !                       i i                                                     I                                                                                               .
I                                                                            !
                                                                                                                                          !                                       l
        ,                 l
                                                                                  ,e f
          -~-               -- -         - - -l             . _ .i.                       , , . . . . _           . _ _ _ ,         _ , . . _              __.,____j 1                                                                                                                            3                        4 4              F: Forced                       ?~ R2ason                                                                             Method:                   Exhibit.G-In-S: Scheduled                       A-Equipment Failure (Explain)                                                       1-Mantial                 structions for B '!aintanance or Test                                                             2-Manual Trip             Preparation of N
C-L fualir.g                                                                       3-Automatic Trip           Data Entry Sheets D-Regulatory Restriction                                                           4-Other (Explain)         for Licensea Event E-Operatar Training & License Examination                                                                     Report (LER) File F-Maindtntive                                                                                                 OFJREG-01M1.)
G-Opartti nal. Error (Unplain)
L 0 t'.w r ,1::pi. a in                                                                                     5 Exhi$tt 1 -   :l'-' ' -222
 
CORRECTED Oi'FRATING DAT; PEPORT DOCKET NO 50-306 DATE 791001 OPERATING STATUS                                                                              C0!!PLETED BY A. A. Hunstad _
TELEPHONE 612-388-4767
: 1. Unit Name:     Prairie Island No. 2
: 2. Reporting Period: September 1979                                                                               es
: 3. Licensed Thermal Power (MWt):                 1650
: 4. Nameplate Rating (Gross MWe):                   593                                                                                       1
: 5. Design Electrical Rating (Net MWe):_ 530
: 6. Maximum Dependable Capacity (Cross MWe):                       531                __        ,
u     7. Maximum Dependable Capacity (Net %'e):                       500_          _ _ _ _                                               ,
g    8. If Changes occur in Capacity Ratinys Orems Number 3 Through 7) Since Last Report:
    $           Cive Reason:                               . _ _ _ _ _ _ . . _                                   _ _ _ _ _                       .
j*                                                     -                 -
: 9. Power Level To Which Restricted. If Any (Pet m'c);                                     _ _ , _ _ _ , _ _
: 10. Reasons for Restrictions, i f A n't _ , _ _ _ _ __ , _ , , __                               _ , _ _ , _ _ , . _
This Month                      Yr-To-Date               Co.olative
: 11. Hours In Reporting Period                                         __ ,,720                                       6551           41877        l
: 12. Number Of Hours Reactor Was Critical                                       720.0 6497.2_        _36940.8    l
: 13. Reactor Reserve Shutdown Hours                                                 0.0                                 6.5           1385.2
: 14. Hours Generator On Line                                                     720.0                                 6484.8         36220.4     (
: 15. Unit Reserve Shutdown Hours                                                     0.0                                 0.0               0.0
: 16. Gross Thermal Energy Generated (IP..'H)                             1154994                           10205754               56225039
: 17. Gross Electrical Energy Generated (Ps'n)                               369820                           3317720               17905460
: 18. Net Electrical Energy Generated O!WH)                                 347023                           3114010               16759598
: 19. Unit Service Factor                                                         100.0                                   99.0               86.5   (
: 20. Unit Availability Factor                                                     100.0                                   99.0               86.5
: 21. Unit Capacity Factor (Using MDC Net)                                         96.4                                   95.1               80.0
: 22. Unit Capacity Factor (Using DER Net)                                                                                 89.7              75.5
_          90.9 _ _                                      _
: 23. Unit Forced Outage Rate                                                         0.0                                   0.3               5.1 g      '4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Ench):
Refueling, January 1990, 5 weeks
: 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
                                                                                                                            ' "9         i30}}

Latest revision as of 13:19, 22 February 2020

Monthly Operating Rept for Oct 1979
ML19210C404
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/01/1979
From: Hunstad A
NORTHERN STATES POWER CO.
To:
Shared Package
ML19210C401 List:
References
NUDOCS 7911140180
Download: ML19210C404 (9)


Text

,s o

" An%T T r nii!^'PN n.' 0": A i, ' N9 FWi !!T ENCE porxET t:0. 50-282 L7TT.T Preirie Islimd W.1 DATE 791101 Cf'.'TI ETF0 T.Y A. A . Hunstad _,

TET TTI'ONE 632-308-A767 o

ry "'O'IT!! OCTOBER 1979 S

p.. On October 2nd a tube break occurred in No. 11 Steam Generator. The resultant k leakage caused a reactor trip at 1424 hours0.0165 days <br />0.396 hours <br />0.00235 weeks <br />5.41832e-4 months <br /> on low pressurizer pressure and safety injection initiation five seconds later. All safety systems functioned as designed, and the reactor was d.. awn and cooled down and the steam gener-ator isolated expeditiously following existing operating procedures. It was found that a foreign object (a spring) had caused mechanical wear of the fail-ed tube and one or two more tubes. Six tubes were plugged, a pressure test conducted and the steam generator was returned to service. The unit was re-turned to service at 0645 on October 23rd.

"9 122 7911140

  • DAILY UNIT POWER OUTPUT DOCKET NO. 50-9g7 UNIT Prairie Island No. 1 DATE 791101 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH OCTOBER 1979 DAY AVERAGE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net 1 _

402 17 -3 277 18 -3 3 -11 19 -15 4 -5 20 -19 5 -5 21 -20 6 -4 22 -19 7 -4 23 143 8 -4 24 269 9 -4 25 419 10 _ _ .

-3 26 481 11 -3 27 479 12 -3 28 479 13 -3 29 476 14 -3 30 476 15 -3 31 474 16 -3 Average loads above 503 MWe-Net are due to cooler condenser circulating water.

'7'9 123

OFFRATING DAT',RIPORT C

DOCKET NO 50-282 DATE 791101 OPERATING STATUS CO:1PLETED BY A. A. Hunstad TELEPHONE 612-388-4767

1. Unit Name: Prairie Island No. 1
2. Reporting Period: October 1979 *
3. Licensed Thermal Power (MWt): 1650
4. Nameplate Rating (Gross MWe): 593
5. Design Electrical Rating (Net MWe): 530
6. Maximum Dependable capacity (Cross MWe): 501 __

L_ ,

d 7. FL1ximum Dependable Capacity (Net MWe): 470

, 8. If Changes Occur in Capacity Ratinge (a-s Number 3 Through 7) Since Last Report:

$ Give Reason: . . - - - - . . -

os

9. Power Level To Which Restricted, Tf Anv (l'et MWe): ___

~

10. Reasons for Restrictions, if Any:

This Month Yr-To-Date Cu.ulative

11. Ilours In Reporting Period 745 7296 51504
12. Number Of Hours Reactor Was Crirical 252.2 5308.0 39997.1
13. Reactor Reserve Shutdown Hours 0 . 0 . _,

_ _ _ _ _8_24.1 5279.2

14. Hours Generator on Line 248.7 5216.1 38933.3
15. Unit Reserve Shutdown 11onrs 0.0 0.0 ___

0.0

16. Gross Thermal Energy Generated (U'.,'ll) 372109 8094243 60374825
17. Gross Electrical Energy Generated (FNIO ._113390 __ 2590980 1962187'.'
18. Net Electrical Energy Generat..mi (Mul:) 102195 2416833 18345265
19. Unit Service Factor 33.4 71.5 75.6
20. Unit Availability Factor 33.4 71.5 75.6
21. Unit Capacity Factor (Using MDC Net) 29.2 70.5 70.8
22. Unit Capacity Factor (Using DER Net) 25.9 62.5 u7.2
23. Unit Forced Outage Rate 66.6 19.4 13.5

'4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Ecch):

Refueling, Summer 1980, 5 weeks _ _ _ _ _ _ _ .

25. If Shut Down at End Of Report Pcciod, Estimated Date of Ctartup:

17'9 i24

UNIT SHUT 30'.SS A190'4ER RZ3'; ":S DOC"Er NO.30-282 REPORT MONTH OCTOBER __1979 UNIT N!JIZ Prairia I sland No.1 DATE 791101 COMPLETED 3Y A. A. Hunstad _ _ _ , ,_ ..

T2LEPdOSE 512-333-476_7_

a = m iu .-i'u Licansea  ;

34 ._, I Causa & Caccactiva Date S.

N l $$ .3 7 5! .58 Event !fl -3 5m Action to

'4 0 0

3

.C ti SO

'3 Repart # j$$ 5 -$ Prevanc Jacurceaca 4

m := c: u .r- c: l V) %O Qv l

(U r.o I a u 1

= = , o a *

,4 a 4 u

! e

- O l l, m g i l l 1 J 791002 '

i F 496.3 A 3 79-27 i tIJ HTEXCH Shutdown due to rupture of one 0 l '

A I

l e l l tube in No. 11 Steam Generator.

o l ,

l  !

5 m l I

9 1 I  !

, t .

i  ?

I  !  !

i i e .

I i, l - l, l .

, t i

I

'4 1 2 3 4 J F: Forced Reason Method: Exhibit.G-In-w S: Scheduled A-Equipment Failitre(Explain) 1-Manual structions for ',.

B-Maintenance or Test 2-Manual Trip Preparation of C-Refualing 3-Automatic Trip Data Entry Sheets N 6 W D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) Fila F-Administrative (NUREG-0151)

G-Oper nional Error (F.xplain)

U-Other '7xp.ain 5 Exhi'ait 1 - h m " '222

e rianRATTr? r,it: men 0 : am' rtu r m Es:PERTENCE por.gr.T ?!O. 50-306 TRIIT Prof rin Ts?.nrad Na. 2 DAT2 791101 Cr?OT T'TED T.Y A. A. mmatad .. _

TET.TPf'ONE 6) 2-3CC-a767 -

o h M0'IT51 OCTOBER 1979 .

?,

A o

The unit was in Load Follow operation this month; no shutdowns.

M M

Pe

)

(

. DAILY UNIT POWER OUTPUT DOCKET NO. 50-306 UNIT Prairie Island No. 2

, DATE 791101 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH OCTOBER 1979 UAY AVERAGE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net 1 497 17 514 2 418 18 511 3 509 19 509 4 514 20 503 5 514 21 508 6 516 22 510 7 517 23 515 8 511 24 509 9 518 25 506 10 508 26 505 11 509 27 499 12 518 28 474 13 518 29 496 14 471 30 500 15 515 31 497 16 514 Average loads above 500 MWe-Net are due to cooler condenser circulating water.

(

'"9 127

s

.Oi'fyATI!iG DEUIf0RT

(

DOCKET NO 50-306 DATE 791101 OPERATING STATUS C0!!PLETED BY A. A. Hunstad TELEPHONE 612-388-4767]

1. Unit Name: Prairie Island No. 2
2. Reporting Period: October 1979 *
3. Licensed Thermal Power (MWt): 1650
4. Nameplete Rating (Gross MWe): 593
5. Design Electrical Rating (Net MWe):_ 530
6. Maximum Dependable Capacity (Cross MWe): 531_ ,

N 7. Maximum Dependable Capacity (Ne* MWel: 500

8. If Changes Occur in Capacity Ratinne (ffems Number 3 Through 7) Since Last Report-

$ Give Reason: . . _ . _ . . _ _ _ . . _ . _ _ _ _ . . _ _ _

m

[ 9. Power Level To Which Restricted Tf Any (?'et ffWe):

o*

10. Reasons for Restrictions, If Any ___ _ _ _ _ ,,_____ _ __ _ _ _ ,.,

This Month Yr-To-Date Co.olative

11. Hours In Reporting Period 745 7296 42622
12. Number Of Hours Reactor Was critical 745.0 7242.2 37685.8
13. Reactor Reserve Shutdown Hours 6.5 0.0 1385.2
14. Hours Generator On Line 745.0 7229.8 36965.4
15. Unit Reserve Shutdown Hour:. 0.0 , 0.0 0.0
16. Gross Thermal Energy Cencrated (?f','ll) 1121050 11326804 57346089
17. Gross Electrical Energy Generated (FNT:1 400100 3717820 18305560
18. Net Electrical Energy Generat mi OS'H) 375449 3489459 17135047
19. Unit Service Factor 100.0 99.1 86.7
20. Unit Availability Factor 100.0 99.1 86.7
21. Unit Capacity Factor (lising MDC t:ct) 100.8 95.7 80.4
22. Unit Capacity Factor (Using DER Net) 95.1 90.2 75.9
23. Unit Forced Outage Rate 0.0 0.3 5.0

'4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of E.xh):

Refueling, January 1980, 5 weeks

25. If Shut Down at End Of Report Period, Estimated Date of Startup: __

'"9 128

9 11 NIT PRIT00'NF APJ POT:R 'GI' ' ";s DOOR-'I N3. 50 306 r.m ,DRT MO,.u, H UNIT N10G Prairi2 I;1and No. 2 OCTOBER.1979 DATE J 3119,1 COMPL31'ED 3Y ___A._A Hunstad..,_ , , _ , ,

~

~*

TlL2PdOSE $12 333-4 M7---

.m {

+ = m  !% .: u Lia nsea ,se i 2 3

Cause & Carcactiva Date 3, x

32 u u 5i 0 .3 O l a 1 -o a u Event 5 m0 .$3 $n 3 I

Actica to 6 oa o ou o Repart u3 Provanc Jacurreaca l m, a

-6 O O ,c 3 o i 3 S .o e n ::: I a u .c x a a 4

av om u

=  ! 3 s  ; u i . o

> l l I l

,9 .

l I  ! .

l o

. I

.  : I N I - 1 H +

i  !

N  ! I l o I 4 i } I, i

x '

t

'~' l [  !

f. -

1 e i i .

, t, , .i

d '

i  ! i i I .

I  !

! l

, l

,e f

-~- -- - - - -l . _ .i. , , . . . . _ . _ _ _ , _ , . . _ __.,____j 1 3 4 4 F: Forced  ?~ R2ason Method: Exhibit.G-In-S: Scheduled A-Equipment Failure (Explain) 1-Mantial structions for B '!aintanance or Test 2-Manual Trip Preparation of N

C-L fualir.g 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensea Event E-Operatar Training & License Examination Report (LER) File F-Maindtntive OFJREG-01M1.)

G-Opartti nal. Error (Unplain)

L 0 t'.w r ,1::pi. a in 5 Exhi$tt 1 - :l'-' ' -222

CORRECTED Oi'FRATING DAT; PEPORT DOCKET NO 50-306 DATE 791001 OPERATING STATUS C0!!PLETED BY A. A. Hunstad _

TELEPHONE 612-388-4767

1. Unit Name: Prairie Island No. 2
2. Reporting Period: September 1979 es
3. Licensed Thermal Power (MWt): 1650
4. Nameplate Rating (Gross MWe): 593 1
5. Design Electrical Rating (Net MWe):_ 530
6. Maximum Dependable Capacity (Cross MWe): 531 __ ,

u 7. Maximum Dependable Capacity (Net %'e): 500_ _ _ _ _ ,

g 8. If Changes occur in Capacity Ratinys Orems Number 3 Through 7) Since Last Report:

$ Cive Reason: . _ _ _ _ _ _ . . _ _ _ _ _ _ .

j* - -

9. Power Level To Which Restricted. If Any (Pet m'c); _ _ , _ _ _ , _ _
10. Reasons for Restrictions, i f A n't _ , _ _ _ _ __ , _ , , __ _ , _ _ , _ _ , . _

This Month Yr-To-Date Co.olative

11. Hours In Reporting Period __ ,,720 6551 41877 l
12. Number Of Hours Reactor Was Critical 720.0 6497.2_ _36940.8 l
13. Reactor Reserve Shutdown Hours 0.0 6.5 1385.2
14. Hours Generator On Line 720.0 6484.8 36220.4 (
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (IP..'H) 1154994 10205754 56225039
17. Gross Electrical Energy Generated (Ps'n) 369820 3317720 17905460
18. Net Electrical Energy Generated O!WH) 347023 3114010 16759598
19. Unit Service Factor 100.0 99.0 86.5 (
20. Unit Availability Factor 100.0 99.0 86.5
21. Unit Capacity Factor (Using MDC Net) 96.4 95.1 80.0
22. Unit Capacity Factor (Using DER Net) 89.7 75.5

_ 90.9 _ _ _

23. Unit Forced Outage Rate 0.0 0.3 5.1 g '4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Ench):

Refueling, January 1990, 5 weeks

25. If Shut Down at End Of Report Period, Estimated Date of Startup:

' "9 i30