ML11263A273: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML11263A273 | | number = ML11263A273 | ||
| issue date = 08/17/2011 | | issue date = 08/17/2011 | ||
| title = | | title = Lr Hearing - IPEC - Requested Comments on Recent Entergy NRC Telecons | ||
| author name = Waters R | | author name = Waters R | ||
| author affiliation = Entergy Nuclear Operations, Inc | | author affiliation = Entergy Nuclear Operations, Inc | ||
| addressee name = Kuntz R | | addressee name = Kuntz R | ||
| addressee affiliation = NRC/NRR/DLR/RPB1 | | addressee affiliation = NRC/NRR/DLR/RPB1 | ||
| docket = 05000247, 05000286 | | docket = 05000247, 05000286 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Stuyvenberg, Andrew From: Waters, Roger M. [rwater1@entergy.com] | ||
Sent: Wednesday, August 17, 2011 8:17 AM To: Kuntz, Robert Cc: COX, ALAN B; Curry, John J; | Sent: Wednesday, August 17, 2011 8:17 AM To: Kuntz, Robert Cc: COX, ALAN B; Curry, John J; Caputo, Charles; Walpole, Robert W | ||
==Subject:== | ==Subject:== | ||
IPEC - Requested Comments on Recent Entergy/NRC Telecons Attachments: | IPEC - Requested Comments on Recent Entergy/NRC Telecons Attachments: Telecon Summary 7-21-11.docx; Telecon Summary 7-25-1.docx; Telecon Summary 8-3-11.docx | ||
Telecon Summary 7-21-11.docx; Telecon Summary 7-25-1.docx; Telecon Summary 8-3-11.docx Rob, Attached are the subject comments. | : Rob, Attached are the subject comments. | ||
Roger Waters IPEC Licensing 914-827-7714 | Roger Waters IPEC Licensing 914-827-7714 | ||
<<Telecon Summary 7-21-11.docx>> <<Telecon Summary 7-25-1.docx>> <<Telecon Summary 8-3-11.docx>> | |||
1 | |||
LICENSEE: Entergy Nuclear Operations, Inc. | LICENSEE: Entergy Nuclear Operations, Inc. Field Code Changed FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | ||
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL HELD ON JULY 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING OPERATING EXPERIENCE AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 21, 2011, to discuss the | OF CONFERENCE CALL HELD ON JULY 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING OPERATING EXPERIENCE AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 21, 2011, to discuss the applicants response to request for additional information B.0.4-1 which was provided in a letter dated July 14, 2011 (Agencywide Documents Access and Management System Accession No. ML11201A160). The staff questioned the applicant on why the response did not include an Updated Final Safety Analysis Report (UFSAR) supplement as required by Title 10 of The Code of Federal Regulations, Section 54.21(d). The applicant stated that it would review the submittal and provide an a discussion for the UFSAR supplement as needed. | ||
The applicant had an opportunity to comment on this summary. | |||
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation | Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 | ||
Docket Nos. 50-247 and 50-286 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Participants cc w/encl: | List of Participants cc w/encl: Listserv | ||
ML11215A056 | ML11215A056 *concurrence via e-mail OFFICE LA: DLR/RPB1* PM: DLR/RPB1 BC: RPB1:DLR LA: DLR/RPB1 PM: DLR/RPB1 NAME SFigueroa RKuntz DMorey SFigueroa RKuntz DATE 08/3/2011 08/ /2011 08/ /2011 08/ /2011 08/ /2011 Letter to Entergy Nuclear Operations, Inc. from Robert F. Kuntz dated August XX, 2011 | ||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL HELD ON JULY 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING OPERATING EXPERIENCE AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 DISTRIBUTION | OF CONFERENCE CALL HELD ON JULY 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING OPERATING EXPERIENCE AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 DISTRIBUTION: Field Code Changed HARD COPY: | ||
: | DLR R/F E-MAIL: | ||
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk, OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMcIntyre, OPA MCatts, RI EDacus, OCA MHalter, RI | |||
TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING STATION, UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 21, 2011 PARTICIPANTS: AFFILIATIONS: | |||
Robert F. Kuntz U.S. Nuclear Regulatory Commission (NRC) | |||
Bo Pham NRC Matthew Homiack NRC Mike Stroud Entergy Nuclear Operations, Inc. (Entergy) | |||
Alan Cox Entergy Ted Ivy Entergy Andy Andrew Taylor Entergy David Lach Entergy Comment [r2]: Ettlinger Alan Ettlinger Entergy John Curry Entergy Charlie Caputo Entergy Paul Bode Entergy Charles B. Rokes Entergy ENCLOSURE | |||
LICENSEE: Entergy Nuclear Operations, Inc. | |||
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | |||
LICENSEE: Entergy Nuclear Operations, Inc. | |||
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 25, 2011, to discuss the | OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 25, 2011, to discuss the applicants letter dated July 14, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11201A160). Specifically, the staff questioned the applicant on Commitment 42. | ||
Commitment 42 contains two options for developing a plan for each unit to address the potential for cracking of the primary to secondary pressure boundary due to PWSCC of tube-to-tubesheet welds. The two options were to either perform an analysis or inspect the welds. The staff questioned the applicant on the implementation schedule for the two options. The | Commitment 42 contains two options for developing a plan for each unit to address the potential for cracking of the primary to secondary pressure boundary due to PWSCC of tube-to-tubesheet welds. The two options were to either perform an analysis or inspect the welds. The staff questioned the applicant on the implementation schedule for the two options. The applicants letter proposed to do the analysis for Indian Point Nuclear Generating Station Unit No. 3 several years after the implementation schedule for the inspections. The staff questioned the applicant on how the proposed implementation was acceptable since the analysis would need to be completed in order to support not completing the inspection. The staff also noted that the implementation schedule for Commitment 43 was extended 10 years for each unit from the previous letter which was dated March 28, 2011 (ADAMS Accession No. ML110960360). The applicant stated that it would review the submittal and revise commitments as needed. | ||
The applicant had an opportunity to comment on this summary. | |||
The applicant had an opportunity to comment on this summary. | Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 | ||
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation | |||
Docket Nos. 50-247 and 50-286 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Participants cc w/encl: | List of Participants cc w/encl: Listserv | ||
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | LICENSEE: Entergy Nuclear Operations, Inc. | ||
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 25, 2011, to discuss the | OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 25, 2011, to discuss the applicants letter dated July 14, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11201A160). Specifically, the staff questioned the applicant on Commitment 42. | ||
Commitment 42 contains two options for developing a plan for each unit to address the potential for cracking of the primary to secondary pressure boundary due to PWSCC of tube-to-tubesheet welds. The two options were to either perform an analysis or inspect the welds. The staff questioned the applicant on the implementation schedule for the two options. The | Commitment 42 contains two options for developing a plan for each unit to address the potential for cracking of the primary to secondary pressure boundary due to PWSCC of tube-to-tubesheet welds. The two options were to either perform an analysis or inspect the welds. The staff questioned the applicant on the implementation schedule for the two options. The applicants letter proposed to do the analysis for Indian Point Nuclear Generating Station Unit No. 3 several years after the implementation schedule for the inspections. The staff questioned the applicant on how the proposed implementation was acceptable since the analysis would need to be completed in order to support not completing the inspection. The staff also noted that the implementation schedule for Commitment 43 was extended 10 years for each unit from the previous letter which was dated March 28, 2011 (ADAMS Accession No. ML110960360). The applicant stated that it would review the submittal and revise commitments as needed. | ||
The applicant had an opportunity to comment on this summary. | |||
The applicant had an opportunity to comment on this summary. | Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 | ||
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation | |||
Docket Nos. 50-247 and 50-286 | |||
==Enclosure:== | ==Enclosure:== | ||
cc w/encl: | List of Participants cc w/encl: Listserv DISTRIBUTION: | ||
See next page ADAMS Accession No.: ML11215A088 *concurrence via e-mail | |||
Letter to Entergy Nuclear Operations, Inc. from Robert F. Kuntz dated August XX, 2011 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 | OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 DISTRIBUTION: | ||
HARD COPY: | |||
DLR R/F E-MAIL: | |||
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk, OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMcIntyre, OPA MCatts, RI EDacus, OCA MHalter, RI | |||
TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 25, 2011 PARTICIPANTS: AFFILIATIONS: | |||
: | Robert F. Kuntz U.S. Nuclear Regulatory Commission (NRC) | ||
Bo Pham NRC Allen Hiser NRC Rachel Voucher NRC On Yee NRC Alan Cox Entergy Nuclear Operations, Inc. (Entergy) | |||
Charles B. Rokes Entergy | |||
LICENSEE: Entergy Nuclear Operations, Inc. Field Code Changed FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | |||
LICENSEE: Entergy Nuclear Operations, Inc. | |||
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL HELD ON AUGUST 3, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE NON-EQ INACCESSIBLE MEDIUM-BOTAGE CABLE PROGRA FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on August 3, 2011 to discuss the | OF CONFERENCE CALL HELD ON AUGUST 3, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE NON-EQ INACCESSIBLE MEDIUM-BOTAGE CABLE PROGRA FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on August 3, 2011 to discuss the applicants letter dated July 27, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11215A128). Specifically, the staff questioned the applicant on the UFSAR revisions in LRA Sections A.2.1.22 and A.3.1.22. The staff was unclear if the revised Non-EQ Inaccessible Medium-Voltage Cable Program as described in LRA Sections A.2.1.22 and A.3.1.22 would include event driven inspections (such as heavy rain or flooding). The applicant indicated that the periodic inspections completed as part of the Non-EQ Inaccessible Medium-Voltage Cable Program would be determined based on operating experience. The staff indicated that Non-EQ Inaccessible Medium-Voltage Cable Program would have to ensure that water accumulation would not submerge underground cables for more than a few days and that even if periodic inspections were done frequently, if there they were not accomplished when the cables are most likely to be submerged, then there was a potential that the cables could be would be exposed to an environment that they were not design to withstandsubmerged for more than a few days. The applicant stated that it would review the submittal and revise the p Non-EQ Inaccessible Medium-Voltage Cable Program as needed. | ||
, then there was a potential that the cables could be would be exposed to an environment that they were not design to withstandsubmerged for more than a few days. The applicant stated that it would review the submittal and revise the p Non-EQ Inaccessible Medium-Voltage Cable Program as needed. | The applicant had an opportunity to comment on this summary. | ||
The applicant had an opportunity to comment on this summary. | Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 ENCLOSURE: | ||
List of Participants cc w/encl: Listserv | |||
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation | |||
Docket Nos. 50-247 and 50-286 | |||
ENCLOSURE: List of Participants cc w/encl: | |||
*concurrence via e-mail OFFICE LA: DLR/RPB1* PM: DLR/RPB1 BC: RPB1:DLR LA: DLR/RPB1 PM: DLR/RPB1 NAME SFigueroa RKuntz DMorey SFigueroa RKuntz DATE 08/ /2011 08/ /2011 08/ /2011 08/ /2011 08/ /2011 Letter to Entergy Nuclear Operations, Inc. from Robert F. Kuntz dated August 3, 2011 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL HELD ON AUGUST 3, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 DISTRIBUTION | OF CONFERENCE CALL HELD ON AUGUST 3, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING Comment [r5]: Correct title STATION, UNITS 2 AND 3 DISTRIBUTION: Field Code Changed HARD COPY: | ||
: | DLR R/F E-MAIL: | ||
AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk, OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMcIntyre, OPA MCatts, RI EDacus, OCA MHalter, RI | PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk, OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMcIntyre, OPA MCatts, RI EDacus, OCA MHalter, RI | ||
Comment [r6]: Roger}} | TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 3, 2011 PARTICIPANTS: AFFILIATIONS: | ||
Robert F. Kuntz U.S. Nuclear Regulatory Commission (NRC) | |||
Cliff Doutt NRC Alan Cox Entergy Nuclear Operations, Inc. (Entergy) | |||
Comment [r6]: Roger Robert Waters Entergy Charlie Caputo Entergy Steve Manzione Entergy Lou Lubrano Entergy Mike Stroud Entergy Roger Rucker Entergy ENCLOSURE}} |
Latest revision as of 00:00, 7 February 2020
ML11263A273 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 08/17/2011 |
From: | Waters R Entergy Nuclear Operations |
To: | Robert Kuntz License Renewal Projects Branch 1 |
References | |
Download: ML11263A273 (13) | |
Text
Stuyvenberg, Andrew From: Waters, Roger M. [rwater1@entergy.com]
Sent: Wednesday, August 17, 2011 8:17 AM To: Kuntz, Robert Cc: COX, ALAN B; Curry, John J; Caputo, Charles; Walpole, Robert W
Subject:
IPEC - Requested Comments on Recent Entergy/NRC Telecons Attachments: Telecon Summary 7-21-11.docx; Telecon Summary 7-25-1.docx; Telecon Summary 8-3-11.docx
- Rob, Attached are the subject comments.
Roger Waters IPEC Licensing 914-827-7714
<<Telecon Summary 7-21-11.docx>> <<Telecon Summary 7-25-1.docx>> <<Telecon Summary 8-3-11.docx>>
1
LICENSEE: Entergy Nuclear Operations, Inc. Field Code Changed FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON JULY 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING OPERATING EXPERIENCE AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 21, 2011, to discuss the applicants response to request for additional information B.0.4-1 which was provided in a letter dated July 14, 2011 (Agencywide Documents Access and Management System Accession No. ML11201A160). The staff questioned the applicant on why the response did not include an Updated Final Safety Analysis Report (UFSAR) supplement as required by Title 10 of The Code of Federal Regulations, Section 54.21(d). The applicant stated that it would review the submittal and provide an a discussion for the UFSAR supplement as needed.
The applicant had an opportunity to comment on this summary.
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
List of Participants cc w/encl: Listserv
ML11215A056 *concurrence via e-mail OFFICE LA: DLR/RPB1* PM: DLR/RPB1 BC: RPB1:DLR LA: DLR/RPB1 PM: DLR/RPB1 NAME SFigueroa RKuntz DMorey SFigueroa RKuntz DATE 08/3/2011 08/ /2011 08/ /2011 08/ /2011 08/ /2011 Letter to Entergy Nuclear Operations, Inc. from Robert F. Kuntz dated August XX, 2011
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON JULY 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING OPERATING EXPERIENCE AT INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 DISTRIBUTION: Field Code Changed HARD COPY:
DLR R/F E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk, OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMcIntyre, OPA MCatts, RI EDacus, OCA MHalter, RI
TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING STATION, UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 21, 2011 PARTICIPANTS: AFFILIATIONS:
Robert F. Kuntz U.S. Nuclear Regulatory Commission (NRC)
Bo Pham NRC Matthew Homiack NRC Mike Stroud Entergy Nuclear Operations, Inc. (Entergy)
Alan Cox Entergy Ted Ivy Entergy Andy Andrew Taylor Entergy David Lach Entergy Comment [r2]: Ettlinger Alan Ettlinger Entergy John Curry Entergy Charlie Caputo Entergy Paul Bode Entergy Charles B. Rokes Entergy ENCLOSURE
LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 25, 2011, to discuss the applicants letter dated July 14, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11201A160). Specifically, the staff questioned the applicant on Commitment 42.
Commitment 42 contains two options for developing a plan for each unit to address the potential for cracking of the primary to secondary pressure boundary due to PWSCC of tube-to-tubesheet welds. The two options were to either perform an analysis or inspect the welds. The staff questioned the applicant on the implementation schedule for the two options. The applicants letter proposed to do the analysis for Indian Point Nuclear Generating Station Unit No. 3 several years after the implementation schedule for the inspections. The staff questioned the applicant on how the proposed implementation was acceptable since the analysis would need to be completed in order to support not completing the inspection. The staff also noted that the implementation schedule for Commitment 43 was extended 10 years for each unit from the previous letter which was dated March 28, 2011 (ADAMS Accession No. ML110960360). The applicant stated that it would review the submittal and revise commitments as needed.
The applicant had an opportunity to comment on this summary.
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
List of Participants cc w/encl: Listserv
LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on July 25, 2011, to discuss the applicants letter dated July 14, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11201A160). Specifically, the staff questioned the applicant on Commitment 42.
Commitment 42 contains two options for developing a plan for each unit to address the potential for cracking of the primary to secondary pressure boundary due to PWSCC of tube-to-tubesheet welds. The two options were to either perform an analysis or inspect the welds. The staff questioned the applicant on the implementation schedule for the two options. The applicants letter proposed to do the analysis for Indian Point Nuclear Generating Station Unit No. 3 several years after the implementation schedule for the inspections. The staff questioned the applicant on how the proposed implementation was acceptable since the analysis would need to be completed in order to support not completing the inspection. The staff also noted that the implementation schedule for Commitment 43 was extended 10 years for each unit from the previous letter which was dated March 28, 2011 (ADAMS Accession No. ML110960360). The applicant stated that it would review the submittal and revise commitments as needed.
The applicant had an opportunity to comment on this summary.
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
List of Participants cc w/encl: Listserv DISTRIBUTION:
See next page ADAMS Accession No.: ML11215A088 *concurrence via e-mail
Letter to Entergy Nuclear Operations, Inc. from Robert F. Kuntz dated August XX, 2011
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON JULY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 DISTRIBUTION:
HARD COPY:
DLR R/F E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk, OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMcIntyre, OPA MCatts, RI EDacus, OCA MHalter, RI
TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 25, 2011 PARTICIPANTS: AFFILIATIONS:
Robert F. Kuntz U.S. Nuclear Regulatory Commission (NRC)
Bo Pham NRC Allen Hiser NRC Rachel Voucher NRC On Yee NRC Alan Cox Entergy Nuclear Operations, Inc. (Entergy)
Charles B. Rokes Entergy
LICENSEE: Entergy Nuclear Operations, Inc. Field Code Changed FACILITY: Indian Point Nuclear Generating Station, Units 2 and 3
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON AUGUST 3, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE NON-EQ INACCESSIBLE MEDIUM-BOTAGE CABLE PROGRA FOR INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3 Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff), and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant), held a conference call on August 3, 2011 to discuss the applicants letter dated July 27, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11215A128). Specifically, the staff questioned the applicant on the UFSAR revisions in LRA Sections A.2.1.22 and A.3.1.22. The staff was unclear if the revised Non-EQ Inaccessible Medium-Voltage Cable Program as described in LRA Sections A.2.1.22 and A.3.1.22 would include event driven inspections (such as heavy rain or flooding). The applicant indicated that the periodic inspections completed as part of the Non-EQ Inaccessible Medium-Voltage Cable Program would be determined based on operating experience. The staff indicated that Non-EQ Inaccessible Medium-Voltage Cable Program would have to ensure that water accumulation would not submerge underground cables for more than a few days and that even if periodic inspections were done frequently, if there they were not accomplished when the cables are most likely to be submerged, then there was a potential that the cables could be would be exposed to an environment that they were not design to withstandsubmerged for more than a few days. The applicant stated that it would review the submittal and revise the p Non-EQ Inaccessible Medium-Voltage Cable Program as needed.
The applicant had an opportunity to comment on this summary.
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 ENCLOSURE:
List of Participants cc w/encl: Listserv
- concurrence via e-mail OFFICE LA: DLR/RPB1* PM: DLR/RPB1 BC: RPB1:DLR LA: DLR/RPB1 PM: DLR/RPB1 NAME SFigueroa RKuntz DMorey SFigueroa RKuntz DATE 08/ /2011 08/ /2011 08/ /2011 08/ /2011 08/ /2011 Letter to Entergy Nuclear Operations, Inc. from Robert F. Kuntz dated August 3, 2011
SUBJECT:
SUMMARY
OF CONFERENCE CALL HELD ON AUGUST 3, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., STEAM GENERATOR AGING MANAGEMENT AND METAL FATIGUE ANALYSIS FOR INDIAN POINT NUCLEAR GENERATING Comment [r5]: Correct title STATION, UNITS 2 AND 3 DISTRIBUTION: Field Code Changed HARD COPY:
DLR R/F E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource AStuyvenberg GMeyer, RI RAuluck RConte, RI BPham JBoska DPelton DScrenci, RI OPA MKowal NSheehan, RI OPA DJackson, RI PCataldo, RI BMizuno, OGC NMcNamara, RI STurk, OGC BWelling, RI SBurnell, OPA OAvegbusi, RI DMcIntyre, OPA MCatts, RI EDacus, OCA MHalter, RI
TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 3, 2011 PARTICIPANTS: AFFILIATIONS:
Robert F. Kuntz U.S. Nuclear Regulatory Commission (NRC)
Cliff Doutt NRC Alan Cox Entergy Nuclear Operations, Inc. (Entergy)
Comment [r6]: Roger Robert Waters Entergy Charlie Caputo Entergy Steve Manzione Entergy Lou Lubrano Entergy Mike Stroud Entergy Roger Rucker Entergy ENCLOSURE