ML15233A095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15233A095
| number = ML15233A095
| issue date = 08/20/2015
| issue date = 08/20/2015
| title = Peach Bottom, Unit 3 - Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions
| title = Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions
| author name = Borton K F
| author name = Borton K
| author affiliation = Exelon Generation Co, LLC, Westinghouse Electric Co
| author affiliation = Exelon Generation Co, LLC, Westinghouse Electric Co
| addressee name =  
| addressee name =  
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:U.S. Nuclear Regulatory Commission Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report August 20, 2015 Page 2 Should you have any questions concerning this letter, please call me at (610) 765-5528.
{{#Wiki_filter:PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 10 CFR 50.4 10 CFR 2.390 August 20, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Unit 3 Renewed Facility Operating License No. DPR-56 NRC Docket No. 50-278
Kevin F. Borton Manager, Power Uprate Licensing Exelon Generation Company, LLC Attachments:
: 1. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-P
: 2. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report -Proprietary, Westinghouse Electric Company LLC LTR-BWA-ENG-15-076-NP
: 3. Affidavit cc: USNRC Region J, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS A. A. Janati, Commonwealth of Pennsylvania S. T. Gray, State of Maryland w/attachments w/attachments w/attachme nts w/o proprietary attachment w/o proprietary attachment 


© 2015 Westinghouse Electric Company LLC All Rights Reserved Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions Revision 0
==Subject:==
Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report
 
==Reference:==
: 1. NRC Letter to Exelon, Peach Bottom Atomic Power Station, Units 2 and 3 - Issuance of Amendments Re: Extended Power Uprate (TAC Nos.
ME9631 and ME9632), dated August 25, 2014 (ADAMS Accession No. ML14133A046)
In accordance with 10 CFR 50.92, the NRC issued Reference 1, License Amendment Nos.
293 and 296 to the Peach Bottom Atomic Power Station (PBAPS) Renewed Facility Operating Licenses (FOLs) to increase the authorized maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt. This change to power level is considered an extended power uprate (EPU).
The amended FOLs contain specific license conditions that control the monitoring, evaluating, and taking prompt action in response to potential adverse flow effects as a result of the EPU on plant structures, systems, and components (including verifying the continued structural integrity of the replacement steam dryer (RSD)) during initial EPU power ascension. This letter satisfies Unit 3 License Condition 2.C(15)(a)1 by providing the results of the Unit 3 revised RSD analysis utilizing the Unit 2 on-dryer strain gauge based end-to-end bias and uncertainties at EPU conditions including updated limit curves and a list of dominate frequencies for Unit 3.
Westinghouse Electric Company (WEC) considers portions of the information provided in the Attachment 1 response proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. In accordance with 10 CFR 2.390 and in support of this request for withholding, an affidavit executed by WEC is provided in Attachment 3.
There are no regulatory commitments contained in this letter.
Attachment 1 contains Proprietary Information.
When separated from Attachment 1, this document is decontrolled.
 
U.S. Nuclear Regulatory Commission Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report August 20, 2015 Page 2 Should you have any questions concerning this letter, please call me at (610) 765-5528.
Kevin F. Borton Manager, Power Uprate Licensing Exelon Generation Company, LLC Attachments:
: 1. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report - Proprietary, Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-P
: 2. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report - Non-Proprietary, Westinghouse Electric Company LLC LTR-BWA-ENG-15-076-NP
: 3. Affidavit cc:    USNRC Region J, Regional Administrator              w/attachments USNRC Senior Resident Inspector, PBAPS              w/attachments USNRC Project Manager, PBAPS                        w/attachme nts A. A. Janati, Commonwealth of Pennsylvania          w/o proprietary attachment S. T. Gray, State of Maryland                      w/o proprietary attachment
 
Attachment 2 Peach Bottom Atomic Power Station Unit 3 NRC Docket No. 50-278 PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report - Non-Proprietary Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-NP The Nuclear Regulatory Commission (NRC) issued Amendment Nos. 293 and 296 to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 (ADAMS Accession No. ML14133A046).
These amendments authorized an increase in the maximum licensed thermal power level for PBAPS, Units 2 and 3, from 3514 megawatts thermal (MWt) to 3951 MWt, which is an increase of approximately 12.4 percent.
In accordance with PBAPS Unit 3 License Condition 2.C (15) (a) 1, EGC is providing the Unit 2 replacement steam dryer (RSD) power ascension testing results.
 
Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 USA LTR-BWR-ENG-15-076-NP Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions Revision 0
            © 2015 Westinghouse Electric Company LLC All Rights Reserved
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Table of Contents List of Tables ................................................................................................................................................ 3 List of Figures ............................................................................................................................................... 4 Executive Summary ...................................................................................................................................... 5 1    Background and Purpose..................................................................................................................... 6 2    ACE Revision 3.1 Acoustic Analysis ................................................................................................. 7 3    Non-MSL Acoustic Analysis .............................................................................................................. 8 4    High Cycle Fatigue Analysis Summary .............................................................................................. 9 5    PBAPS Unit 3 Power Ascension Limits ........................................................................................... 14 5.1  NMSLA Limit Curves ............................................................................................................. 14 5.1.1      Correlation for defining NMSLA Limit Curves......................................................... 14 5.1.2      NMSLA Limits .......................................................................................................... 17 5.2  ACE Limits ............................................................................................................................. 19 6    References ......................................................................................................................................... 21 Appendix A              Additional Correlation Plots for NMSLA Limit Curve Development ....................... 22 Appendix B              CLTP-based Limit Curves.......................................................................................... 30 2
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP List of Tables Table 2-1a: ACE Revision 3.1[                              ]a,c........................................................................... 7 Table 2-1b: ACE Revision 3.1[                              ]a,c .......................................................................... 7 Table 4-1: PBAPS Unit 3 Stress Ratio Summary at Predicted EPU Conditions ......................................... 9 Table 5-1: Unit 3 [      ]a,c Limit Curves ............................................................................................. 18 Table B-1: Unit 3 [                    ]a,c Limit Curves ....................................................................... 30 3
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP List of Figures Figure 4-1: [                                                      ]a,c ............................................................. 10 Figure 4-2: [                                                                      ]a,c ............................................ 11 Figure 4-3: [                                                      ]a,c ............................................................ 12 Figure 4-4: [                                                                      ]a,c ............................................ 13 Figure 5-1: [                                                                ]a,c ................................................... 15 Figure 5-2: [                                              ]a,c ..................................................................... 16 Figure 5-3: Unit 3 [  ]a,c Limit Curves ............................................................................................. 19 Figure 5-4: Unit 3 [  ]a,c Limit Curves ............................................................................................. 19 Figure 5-5: Unit 3 [ ]a,c Limit Curves .............................................................................................. 20 Figure 5-6: Unit 3 [  ]a,c Limit Curves ............................................................................................ 20 Figure A-1: [                                                                                                    ]a,c............... 22 Figure A-2: [                                                                                                    ]a,c............... 23 Figure A-3: [                                                                                                      ]a,c............. 24 Figure A-4: [                                                                                                      ]a,c............. 25 Figure A-5: [                                                                                                      ]a,c.............. 26 Figure A-6: [                                                                  ]a,c................................................. 27 Figure A-7: [                                                                  ]a,c.................................................. 28 Figure A-8: [                                    ]a,c .............................................................................. 29 Figure B-1: Unit 3 [                ]a,c Limit Curves ...................................................................... 30 Figure B-2: Unit 3 [                ]a,c Limit Curves ...................................................................... 31 Figure B-3: Unit 3 [                ]a,c Limit Curves ...................................................................... 31 Figure B-4: Unit 3 [                ]a,c Limit Curves ...................................................................... 32 4
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Executive Summary A high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 has been completed at predicted extended power uprate (EPU) conditions. The assessment utilizes the Westinghouse steam dryer acoustic/structural methodology, ACE Revision 3.1, utilizing the Unit 2 on-dryer strain gauge based bias errors and uncertainties at EPU conditions. This report provides steam dryer information to fulfill the requirements found in Peach Bottom Unit 3 Renewed Facility Operating License condition 15(a)1 (Reference 1). The analysis [
                                                                                                      ]a,b,c 5
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 1    BACKGROUND AND PURPOSE Following the September 2015 refueling outage, Peach Bottom Unit 3 will begin power ascension from 3514 MWt to 3951 MWt with a newly installed Westinghouse replacement steam dryer (RSD). [
                    ]a,c The purpose of this report is to provide the results of a revised high-cycle fatigue assessment for MSL and NMSLA loads at predicted EPU conditions based on subscale test data using the Unit 2 re-benchmark acoustic model, provide limit curves, and a list of dominant frequencies. Power ascension limits are defined to ensure reasonable assurance of RSD integrity from CLTP to EPU conditions. The report fulfills the requirements specified in the Peach Bottom Unit 3 Renewed Facility Operating License conditions 15(a)1 (Reference 1).
6
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 2 ACE REVISION 3.1 ACOUSTIC ANALYSIS
[
                                                                      ]a,c Table 2-1a: ACE Revision 3.1[                    ]a,c a,b,c Table 2-1b: ACE Revision 3.1[                    ]a,c a,b,c 7
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 3 Non-MSL ACOUSTIC ANALYSIS
[
          ]a,c 8
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 4    HIGH CYCLE FATIGUE ANALYSIS
 
==SUMMARY==
 
A structural evaluation was performed considering both the [
                                                                                ]a,c Table 4-1 presents the limiting RSD high-cycle fatigue stress ratios.
Table 4-1: PBAPS Unit 3 Stress Ratio Summary at Predicted EPU Conditions a,b,c The MASR location above and below the support ring were further analyzed to determine the [
                                                                            ]a,c 9
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP
[
                    ]a,b,c a,b,c Figure 4-1: [                                          ]a,c 10
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 4-2: [                                                ]a,c 11
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 4-3: [                                          ]a,c 12
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 4-4: [                                                ]a,c 13
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 5    PBAPS UNIT 3 POWER ASCENSION LIMITS
[
                ]a,c 5.1    NMSLA Limit Curves 5.1.1  Correlation for defining NMSLA Limit Curves
[
          ]a,c 14
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 5-1: [                                                ]a,c 15
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 5-2: [                                      ]a,c 16
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP
[
          ]a,c a,b,c                Equation 5-1 Equation 5-2 5.1.2  NMSLA Limits
[
                                ]a,c a,b,c          Equation 5-3 Equation 5-4
[                                                                                    ]a,c a,b,c Equation 5-5 Equation 5-6 Where:
a,b,c
[
                ]a,b,c 17
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Table 5-1: Unit 3 [            ]a,c Limit Curves a,b,c
[
              ]a,c a,b,c Equation 5-7 Equation 5-8
[
                                                                                              ]a,c This process will be repeated until EPU power level is achieved.
18
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 5.2 ACE Limits
[
                              ]a,c
[
        ]a,c are shown in Appendix B for reference.
a,b,c Figure 5-3: Unit 3 [          ]a,c Limit Curves a,b,c Figure 5-4: Unit 3 [          ]a,c Limit Curves 19


5.1 NMSLA Limit Curves 5.1.1 Correlation for defining NMSLA Limit Curves  
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 5-5: Unit 3 [      ]a,c Limit Curves a,b,c Figure 5-6: Unit 3 [        ]a,c Limit Curves
[                                                                                ]a,c
[
                                                                    ]a,c This process will be repeated until EPU power level is achieved.
20


Equation 5
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 6  REFERENCES
-1 Equation 5
: 1. Peach Bottom Atomic Power Station, Unit 3 Renewed Facility Operating License, Unit 3 License Condition (15).
-2 5.1.2 NMSLA Limits
: 2. Westinghouse Document No. LTR-BWR-ENG-15-066, Transmittal of Peach Bottom Unit 2 Replacement Steam Dryer Report at EPU Conditions, August 6, 2015.
: 3. Westinghouse Report WCAP-17655-P, Rev. 4, Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate, April 2014.
21


Equation 5
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Appendix A Additional Correlation Plots for NMSLA Limit Curve Development a,b,c Figure A-1: [                                                                ]a,c 22
-3 Equation 5
-4 Equation 5-5 Equation 5-6


Equation 5
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-2: [                                                          ]a,c 23
-7 Equation 5
-8


5.2 ACE Limits
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-3: [                                                          ]a,c 24


Appendix A Additional Correlation Plots for NMSLA Limit Curve Development
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-4: [                                                          ]a,c 25


Appendix B CLTP-based Limit Curves
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-5: [                                                          ]a,c 26


in ouse U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA Direct tel: (412) 374-4643 Direct fax: (724) 940-8560 e-mail: greshaja@westinghouse.com CAW-15-4256 August, 18, 2015 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE  
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-6: [                                                ]a,c 27
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-7: [                                                ]a,c 28
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-8: [                                ]a,c 29
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Appendix B CLTP-based Limit Curves
[
                          ]a,c Table B-1: Unit 3 [                          ]a,c Limit Curves a,b,c The Unit 3 [                      ]a,c are shown in Figure B-1 through Figure B-4.
a,b,c Figure B-1: Unit 3 [                          ]a,c Limit Curves 30
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure B-2: Unit 3 [                      ]a,c Limit Curves a,b,c Figure B-3: Unit 3 [                      ]a,c Limit Curves 31
 
Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure B-4: Unit 3 [                      ]a,c Limit Curves 32
 
Attachment 3 Peach Bottom Atomic Power Station Unit 3 NRC Docket No. 50-278 AFFIDAVIT Note  contains proprietary information as defined by 10 CFR 2.390.
WEC, as the owner of the proprietary information, has executed the enclosed affidavit, which identifies that the proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. The proprietary information has been faithfully reproduced in the attachment such that the affidavit remains applicable.
 
in ouse                                                Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission                                Direct tel: (412) 374-4643 Document Control Desk                                            Direct fax: (724) 940-8560 11555 Rockville Pike                                                e-mail: greshaja@westinghouse.com Rockville, MD 20852 CAW-15-4256 August, 18, 2015 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE


==Subject:==
==Subject:==
LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions" (Proprietary)
LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions" (Proprietary)
The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), pursuant to the provisions of paragraph (b)( 1) of Section 2.390 of the Commission's regulations.
The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), pursuant to the provisions of paragraph (b)( 1) of Section 2.390 of the Commission's regulations. It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence.
It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence.
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-15-4256 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The Affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 of the Commission's regulations.
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW 4256 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The Affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Exelon Generation.
Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Exelon Generation.
Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CAW-15-4256, and should be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry Township, Pennsylvania 16066.
Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CAW-15-4256, and should be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry Township, Pennsylvania 16066.
Regulatory Compliance COMMONWEALTH OF PENNSYLVANIA:
                                                ~~~MMager Regulatory Compliance
COUNTY OF BUTLER: AFFIDAVIT ss CAW-15-4256 August, 18, 2015 I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief.
 
A. Gresham, Manager Regulatory Compliance 2 CAW-15-4256 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.  
CAW-15-4256 August, 18, 2015 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.  
ss COUNTY OF BUTLER:
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information. ( 4) Pursuant to the provisions of paragraph (b)( 4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld. (i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse. (ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief.
The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required.
                                                      ~ames A. Gresham, Manager Regulatory Compliance
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 3 CAW 4256 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability. (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers. (e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse. (f) It contains patentable ideas, for which patent protection may be desirable. (iii) There are sound policy reasons behind the Westinghouse system which include the following: (a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors.
 
It is, therefore, withheld from disclosure to protect the Westinghouse competitive position. (b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information. (c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
2                                     CAW-15-4256 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse),
4 CAW-15-4256 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage. (e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries. (f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage. (iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission. (v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief. (vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Stearn Dryer Report at Predicted EPU Conditions" (Proprietary), for submittal to the Commission, being transmitted by Exelon Generation letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 at predicted extended power uprate (EPU) conditions, and may be used only for that purpose.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
5 CAW-15-4256 (a) This information is part of that which will enable Westinghouse to: (i) Assist Exelon Generation in fulfilling the requirements specified in the PBAPS Unit 3 Renewed Facility Operating License. (b) Further this information has substantial commercial value as follows: (i) Westinghouse plans to sell the use of similar information to its customers for the purpose of plant specific replacement steam dryer analysis for licensing basis applications. (ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications. (iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation and licensing defense services for commercial power reactors without commensurate expenses.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
(i)     The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money. In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
(ii)     The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a)     The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of
 
3                                       CAW-15-4256 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b)     It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c)     Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d)     It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e)     It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f)     It contains patentable ideas, for which patent protection may be desirable.
(iii) There are sound policy reasons behind the Westinghouse system which include the following:
(a)     The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b)     It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c)     Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
 
4                                     CAW-15-4256 (d)     Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e)     Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f)     The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission.
(v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Stearn Dryer Report at Predicted EPU Conditions" (Proprietary), for submittal to the Commission, being transmitted by Exelon Generation letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 at predicted extended power uprate (EPU) conditions, and may be used only for that purpose.
 
5                                     CAW-15-4256 (a)     This information is part of that which will enable Westinghouse to:
(i)     Assist Exelon Generation in fulfilling the requirements specified in the PBAPS Unit 3 Renewed Facility Operating License.
(b)     Further this information has substantial commercial value as follows:
(i)     Westinghouse plans to sell the use of similar information to its customers for the purpose of plant specific replacement steam dryer analysis for licensing basis applications.
(ii)     Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications.
(iii)   The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of documents furnished to the NRC associated with the high-cycle fatigue assessment of the replacement steam dryer at predicted extended power uprate (EPU) conditions for PBAPS Unit 3 with regards to the PBAPS Unit 3 license condition, and may be used only for that purpose. In order to conform to the requirements of 10 CPR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted).
 
The justification for claiming the information so designated as proprietary that Westinghouse customarily holds in confidence is identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CPR 2.390(b)(l).
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of documents furnished to the NRC associated with the high-cycle fatigue assessment of the replacement steam dryer at predicted extended power uprate (EPU) conditions for PBAPS Unit 3 with regards to the PBAPS Unit 3 license condition, and may be used only for that purpose.
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CPR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding.
In order to conform to the requirements of 10 CPR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary that Westinghouse customarily holds in confidence is identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CPR 2.390(b)(l).
With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.}}
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CPR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.}}

Latest revision as of 09:32, 5 February 2020

Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions
ML15233A095
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/20/2015
From: Borton K
Exelon Generation Co, Westinghouse
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15233A094 List:
References
CAW-15-4256, TAC ME9631, TAC ME9632 LTR-BWR-ENG-15-076-NP, Rev. 0
Download: ML15233A095 (43)


Text

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 10 CFR 50.4 10 CFR 2.390 August 20, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Unit 3 Renewed Facility Operating License No. DPR-56 NRC Docket No. 50-278

Subject:

Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report

Reference:

1. NRC Letter to Exelon, Peach Bottom Atomic Power Station, Units 2 and 3 - Issuance of Amendments Re: Extended Power Uprate (TAC Nos.

ME9631 and ME9632), dated August 25, 2014 (ADAMS Accession No. ML14133A046)

In accordance with 10 CFR 50.92, the NRC issued Reference 1, License Amendment Nos.

293 and 296 to the Peach Bottom Atomic Power Station (PBAPS) Renewed Facility Operating Licenses (FOLs) to increase the authorized maximum power level from 3514 megawatts thermal (MWt) to 3951 MWt. This change to power level is considered an extended power uprate (EPU).

The amended FOLs contain specific license conditions that control the monitoring, evaluating, and taking prompt action in response to potential adverse flow effects as a result of the EPU on plant structures, systems, and components (including verifying the continued structural integrity of the replacement steam dryer (RSD)) during initial EPU power ascension. This letter satisfies Unit 3 License Condition 2.C(15)(a)1 by providing the results of the Unit 3 revised RSD analysis utilizing the Unit 2 on-dryer strain gauge based end-to-end bias and uncertainties at EPU conditions including updated limit curves and a list of dominate frequencies for Unit 3.

Westinghouse Electric Company (WEC) considers portions of the information provided in the Attachment 1 response proprietary and, therefore, exempt from public disclosure pursuant to 10 CFR 2.390. In accordance with 10 CFR 2.390 and in support of this request for withholding, an affidavit executed by WEC is provided in Attachment 3.

There are no regulatory commitments contained in this letter.

Attachment 1 contains Proprietary Information.

When separated from Attachment 1, this document is decontrolled.

U.S. Nuclear Regulatory Commission Extended Power Uprate: Unit 3 Replacement Steam Dryer Revised Analysis Report August 20, 2015 Page 2 Should you have any questions concerning this letter, please call me at (610) 765-5528.

Kevin F. Borton Manager, Power Uprate Licensing Exelon Generation Company, LLC Attachments:

1. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report - Proprietary, Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-P
2. PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report - Non-Proprietary, Westinghouse Electric Company LLC LTR-BWA-ENG-15-076-NP
3. Affidavit cc: USNRC Region J, Regional Administrator w/attachments USNRC Senior Resident Inspector, PBAPS w/attachments USNRC Project Manager, PBAPS w/attachme nts A. A. Janati, Commonwealth of Pennsylvania w/o proprietary attachment S. T. Gray, State of Maryland w/o proprietary attachment

Attachment 2 Peach Bottom Atomic Power Station Unit 3 NRC Docket No. 50-278 PBAPS Unit 3 Replacement Steam Dryer Revised Analysis Report - Non-Proprietary Westinghouse Electric Company LLC LTR-BWR-ENG-15-076-NP The Nuclear Regulatory Commission (NRC) issued Amendment Nos. 293 and 296 to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 (ADAMS Accession No. ML14133A046).

These amendments authorized an increase in the maximum licensed thermal power level for PBAPS, Units 2 and 3, from 3514 megawatts thermal (MWt) to 3951 MWt, which is an increase of approximately 12.4 percent.

In accordance with PBAPS Unit 3 License Condition 2.C (15) (a) 1, EGC is providing the Unit 2 replacement steam dryer (RSD) power ascension testing results.

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 USA LTR-BWR-ENG-15-076-NP Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions Revision 0

© 2015 Westinghouse Electric Company LLC All Rights Reserved

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Table of Contents List of Tables ................................................................................................................................................ 3 List of Figures ............................................................................................................................................... 4 Executive Summary ...................................................................................................................................... 5 1 Background and Purpose..................................................................................................................... 6 2 ACE Revision 3.1 Acoustic Analysis ................................................................................................. 7 3 Non-MSL Acoustic Analysis .............................................................................................................. 8 4 High Cycle Fatigue Analysis Summary .............................................................................................. 9 5 PBAPS Unit 3 Power Ascension Limits ........................................................................................... 14 5.1 NMSLA Limit Curves ............................................................................................................. 14 5.1.1 Correlation for defining NMSLA Limit Curves......................................................... 14 5.1.2 NMSLA Limits .......................................................................................................... 17 5.2 ACE Limits ............................................................................................................................. 19 6 References ......................................................................................................................................... 21 Appendix A Additional Correlation Plots for NMSLA Limit Curve Development ....................... 22 Appendix B CLTP-based Limit Curves.......................................................................................... 30 2

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP List of Tables Table 2-1a: ACE Revision 3.1[ ]a,c........................................................................... 7 Table 2-1b: ACE Revision 3.1[ ]a,c .......................................................................... 7 Table 4-1: PBAPS Unit 3 Stress Ratio Summary at Predicted EPU Conditions ......................................... 9 Table 5-1: Unit 3 [ ]a,c Limit Curves ............................................................................................. 18 Table B-1: Unit 3 [ ]a,c Limit Curves ....................................................................... 30 3

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP List of Figures Figure 4-1: [ ]a,c ............................................................. 10 Figure 4-2: [ ]a,c ............................................ 11 Figure 4-3: [ ]a,c ............................................................ 12 Figure 4-4: [ ]a,c ............................................ 13 Figure 5-1: [ ]a,c ................................................... 15 Figure 5-2: [ ]a,c ..................................................................... 16 Figure 5-3: Unit 3 [ ]a,c Limit Curves ............................................................................................. 19 Figure 5-4: Unit 3 [ ]a,c Limit Curves ............................................................................................. 19 Figure 5-5: Unit 3 [ ]a,c Limit Curves .............................................................................................. 20 Figure 5-6: Unit 3 [ ]a,c Limit Curves ............................................................................................ 20 Figure A-1: [ ]a,c............... 22 Figure A-2: [ ]a,c............... 23 Figure A-3: [ ]a,c............. 24 Figure A-4: [ ]a,c............. 25 Figure A-5: [ ]a,c.............. 26 Figure A-6: [ ]a,c................................................. 27 Figure A-7: [ ]a,c.................................................. 28 Figure A-8: [ ]a,c .............................................................................. 29 Figure B-1: Unit 3 [ ]a,c Limit Curves ...................................................................... 30 Figure B-2: Unit 3 [ ]a,c Limit Curves ...................................................................... 31 Figure B-3: Unit 3 [ ]a,c Limit Curves ...................................................................... 31 Figure B-4: Unit 3 [ ]a,c Limit Curves ...................................................................... 32 4

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Executive Summary A high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 has been completed at predicted extended power uprate (EPU) conditions. The assessment utilizes the Westinghouse steam dryer acoustic/structural methodology, ACE Revision 3.1, utilizing the Unit 2 on-dryer strain gauge based bias errors and uncertainties at EPU conditions. This report provides steam dryer information to fulfill the requirements found in Peach Bottom Unit 3 Renewed Facility Operating License condition 15(a)1 (Reference 1). The analysis [

]a,b,c 5

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 1 BACKGROUND AND PURPOSE Following the September 2015 refueling outage, Peach Bottom Unit 3 will begin power ascension from 3514 MWt to 3951 MWt with a newly installed Westinghouse replacement steam dryer (RSD). [

]a,c The purpose of this report is to provide the results of a revised high-cycle fatigue assessment for MSL and NMSLA loads at predicted EPU conditions based on subscale test data using the Unit 2 re-benchmark acoustic model, provide limit curves, and a list of dominant frequencies. Power ascension limits are defined to ensure reasonable assurance of RSD integrity from CLTP to EPU conditions. The report fulfills the requirements specified in the Peach Bottom Unit 3 Renewed Facility Operating License conditions 15(a)1 (Reference 1).

6

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 2 ACE REVISION 3.1 ACOUSTIC ANALYSIS

[

]a,c Table 2-1a: ACE Revision 3.1[ ]a,c a,b,c Table 2-1b: ACE Revision 3.1[ ]a,c a,b,c 7

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 3 Non-MSL ACOUSTIC ANALYSIS

[

]a,c 8

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 4 HIGH CYCLE FATIGUE ANALYSIS

SUMMARY

A structural evaluation was performed considering both the [

]a,c Table 4-1 presents the limiting RSD high-cycle fatigue stress ratios.

Table 4-1: PBAPS Unit 3 Stress Ratio Summary at Predicted EPU Conditions a,b,c The MASR location above and below the support ring were further analyzed to determine the [

]a,c 9

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP

[

]a,b,c a,b,c Figure 4-1: [ ]a,c 10

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 4-2: [ ]a,c 11

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 4-3: [ ]a,c 12

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 4-4: [ ]a,c 13

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 5 PBAPS UNIT 3 POWER ASCENSION LIMITS

[

]a,c 5.1 NMSLA Limit Curves 5.1.1 Correlation for defining NMSLA Limit Curves

[

]a,c 14

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 5-1: [ ]a,c 15

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 5-2: [ ]a,c 16

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP

[

]a,c a,b,c Equation 5-1 Equation 5-2 5.1.2 NMSLA Limits

[

]a,c a,b,c Equation 5-3 Equation 5-4

[ ]a,c a,b,c Equation 5-5 Equation 5-6 Where:

a,b,c

[

]a,b,c 17

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Table 5-1: Unit 3 [ ]a,c Limit Curves a,b,c

[

]a,c a,b,c Equation 5-7 Equation 5-8

[

]a,c This process will be repeated until EPU power level is achieved.

18

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 5.2 ACE Limits

[

]a,c

[

]a,c are shown in Appendix B for reference.

a,b,c Figure 5-3: Unit 3 [ ]a,c Limit Curves a,b,c Figure 5-4: Unit 3 [ ]a,c Limit Curves 19

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure 5-5: Unit 3 [ ]a,c Limit Curves a,b,c Figure 5-6: Unit 3 [ ]a,c Limit Curves

[ ]a,c

[

]a,c This process will be repeated until EPU power level is achieved.

20

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP 6 REFERENCES

1. Peach Bottom Atomic Power Station, Unit 3 Renewed Facility Operating License, Unit 3 License Condition (15).
2. Westinghouse Document No. LTR-BWR-ENG-15-066, Transmittal of Peach Bottom Unit 2 Replacement Steam Dryer Report at EPU Conditions, August 6, 2015.
3. Westinghouse Report WCAP-17655-P, Rev. 4, Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate, April 2014.

21

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Appendix A Additional Correlation Plots for NMSLA Limit Curve Development a,b,c Figure A-1: [ ]a,c 22

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-2: [ ]a,c 23

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-3: [ ]a,c 24

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-4: [ ]a,c 25

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-5: [ ]a,c 26

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-6: [ ]a,c 27

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-7: [ ]a,c 28

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure A-8: [ ]a,c 29

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP Appendix B CLTP-based Limit Curves

[

]a,c Table B-1: Unit 3 [ ]a,c Limit Curves a,b,c The Unit 3 [ ]a,c are shown in Figure B-1 through Figure B-4.

a,b,c Figure B-1: Unit 3 [ ]a,c Limit Curves 30

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure B-2: Unit 3 [ ]a,c Limit Curves a,b,c Figure B-3: Unit 3 [ ]a,c Limit Curves 31

Westinghouse Non-Proprietary Class 3 LTR-BWR-ENG-15-076-NP a,b,c Figure B-4: Unit 3 [ ]a,c Limit Curves 32

Attachment 3 Peach Bottom Atomic Power Station Unit 3 NRC Docket No. 50-278 AFFIDAVIT Note contains proprietary information as defined by 10 CFR 2.390.

WEC, as the owner of the proprietary information, has executed the enclosed affidavit, which identifies that the proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. The proprietary information has been faithfully reproduced in the attachment such that the affidavit remains applicable.

in ouse Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax: (724) 940-8560 11555 Rockville Pike e-mail: greshaja@westinghouse.com Rockville, MD 20852 CAW-15-4256 August, 18, 2015 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE

Subject:

LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Steam Dryer Report at Predicted EPU Conditions" (Proprietary)

The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), pursuant to the provisions of paragraph (b)( 1) of Section 2.390 of the Commission's regulations. It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence.

The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-15-4256 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The Affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 of the Commission's regulations.

Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Exelon Generation.

Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CAW-15-4256, and should be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry Township, Pennsylvania 16066.

~~~MMager Regulatory Compliance

CAW-15-4256 August, 18, 2015 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:

ss COUNTY OF BUTLER:

I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief.

~ames A. Gresham, Manager Regulatory Compliance

2 CAW-15-4256 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse),

and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.

(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.

(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.

(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.

(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required.

Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of

3 CAW-15-4256 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

(f) It contains patentable ideas, for which patent protection may be desirable.

(iii) There are sound policy reasons behind the Westinghouse system which include the following:

(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.

(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.

(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.

4 CAW-15-4256 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.

(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.

(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.

(iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission.

(v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.

(vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-BWR-ENG-15-076-P, Revision 0, "Peach Bottom Unit 3 Replacement Stearn Dryer Report at Predicted EPU Conditions" (Proprietary), for submittal to the Commission, being transmitted by Exelon Generation letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the high-cycle fatigue assessment of the replacement steam dryer at Peach Bottom Atomic Power Station (PBAPS) Unit 3 at predicted extended power uprate (EPU) conditions, and may be used only for that purpose.

5 CAW-15-4256 (a) This information is part of that which will enable Westinghouse to:

(i) Assist Exelon Generation in fulfilling the requirements specified in the PBAPS Unit 3 Renewed Facility Operating License.

(b) Further this information has substantial commercial value as follows:

(i) Westinghouse plans to sell the use of similar information to its customers for the purpose of plant specific replacement steam dryer analysis for licensing basis applications.

(ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications.

(iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.

Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.

The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.

Further the deponent sayeth not.

PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of documents furnished to the NRC associated with the high-cycle fatigue assessment of the replacement steam dryer at predicted extended power uprate (EPU) conditions for PBAPS Unit 3 with regards to the PBAPS Unit 3 license condition, and may be used only for that purpose.

In order to conform to the requirements of 10 CPR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary that Westinghouse customarily holds in confidence is identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CPR 2.390(b)(l).

COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CPR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.