ML17297B735: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/06/1982
| issue date = 10/06/1982
| title = Corrected Copy of Commitment to Perform Guide Tube Wear Surveillance Insp Described in NUREG-0852 Section 4.2.3.1, Per NUREG-0857 Section 4.2.5 Requirement.Commitment Will Be Incorporated Into Next FSAR Amend
| title = Corrected Copy of Commitment to Perform Guide Tube Wear Surveillance Insp Described in NUREG-0852 Section 4.2.3.1, Per NUREG-0857 Section 4.2.5 Requirement.Commitment Will Be Incorporated Into Next FSAR Amend
| author name = VAN BRUNT E E
| author name = Van Brunt E
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name = NOVAK T
| addressee name = Novak T
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000528
| docket = 05000528
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATOR NFORMATION DISTRIBUTION EM (RLDS)'AOCE'SSION NBR;8210220394 DOC~DATE: 82/10/06 NOTARI'ZED:
{{#Wiki_filter:REGULATOR       NFORMATION DISTRIBUTION             EM     (RLDS)
NO FACIL:STN 50>>.528 Palo Verde Nuclear Station~Unit 1i Arizona Publi AUTH~NAME AUTHOR AFFILIATION VAN BRUNTiE F 6'rizona Public Service Co, REiCIP INAME RECIPIENT AFFILIATION NOVAKp'T~Assistant, Director for Licensi.ng
'AOCE'SSION NBR;8210220394           DOC ~ DATE: 82/10/06     NOTARI'ZED:   NO             DOCKET FACIL:STN 50>>.528 Palo Verde Nuclear Station~             Unit 1i Arizona Publi           05000528 AUTH ~ NAME           AUTHOR AFFILIATION VAN BRUNTiE F 6 REiCIP INAME
                  'rizona         Public Service Co, RECIPIENT AFFILIATION NOVAKp'T~               Assistant, Director for Licensi.ng


==SUBJECT:==
==SUBJECT:==
Cor rected copy of commitment to per form'guide~tube wear surveillance insp described in NUREG 0852 Section 4''t1I per NUREG 0857 Section 4.2'requirements CommiItment will be incorporated into ne~t PSAR--amends DI'STRI BUTTON CODE t 8001S;COPIES
Cor rected copy of commitment to per form 'guide           ~tube wear surveillance insp described in NUREG 0852 Section 4 ' 't1I per NUREG 0857 Section 4.2 ' requirements CommiItment will be incorporated into ne~t PSAR--amends DI'STRI BUTTON CODE t 8001S;COPIES ~RKCEI VED: LTR / ENCL             /
~RKCEI VED: LTR-/ENCL/SIZE'ITLE:
Licensing   'Submi t ta1: PSAR/FSAR Amdts S Related         Correspondence SIZE'ITLE:
Licensing'Submi t ta1: PSAR/FSAR Amdts S Related Correspondence NOTES:Standardized implant, DOCKET 05000528 05000528 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERhALt ELD/HDS3 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/KQB 13 NRR/DK/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AE8 26 NRR/DSI/CPB 10 NRR/DSI/KTSB 12 NRR/DS I/PSB 19 NRR//RSB 23 L 04 M7'M I 8 EXTERNAL!ACRS 41 DMB/DSS (AMDTS)LPDR 03 NSIC-05 ICOP LES LTTR ENCL 1 0 1 0 i,0 1 0 3 2 1 1 1 1 1 1 1 1 1 1 e0 6 6 1 1 1 1 1 1 RECIPLENT ID CODE/NAME NRR LB3 BC LICLTRAt E~'1 IK FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28.NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CS8 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN5 BNL(AMDTS ONLY)FEMA REP DIV'39 NRC PDR 02 NTIS COPIES LTTR ENCL 0 1 1 1 1'3 3 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'2 2 1 1 1 1 1 1 1~TOTAL NUMBER OF COPIES REQUIRED+L~TTR 55 ENCL 49 4 O s lX (QCo)EQIHKÃFP P.Q BQX 2I666'HQENIXi ARIZONA BSQ36 October 6 1982 ANPP-21957
NOTES:Standardized implant,                                                               05000528 RECIPIENT           ICOP LES            RECIPLENT            COPIES ID CODE/NAME NRR/DL/ADL NRR LB3 LA LTTR ENCL 1
-WFQ/TFQ Mr.Thomas Novak Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Nashington, D.C.20555  
1      0 0    NRR  LB3 BC LICLTRAtE ~ '1 ID CODE/NAME          LTTR ENCL 1
0 1
INTERhALt ELD/HDS3                           i,0    IK FILE                            1 1 IE/DEP EPDS     35               1    IE/DEP/EPLB    36            '3    3 NRR/DE/AEAB                       0    NRR/DE/CEB      11                1 1 NRR/DE/KQB      13              3      NRR/DE/GB      28                2 2 NRR/DK/HGEB 30                    2    .NRR/DE/MEB      18                1 NRR/DE/MTEB 17                    1    NRR/DE/QAB      21                1 1 NRR/DE/SAB      24                1    NRR/DE/SEB      25                1 1 NRR/DHFS/HFEB40                    1    NRR/DHFS/LQB 32                    1 1 NRR/DHFS/OLB 34                    1    NRR/DHFS/PTRB20                    1 1 NRR/DSI/AE8 26                    1    NRR/DS I/ASB 27                   1 1 NRR/DSI/CPB 10                    1    NRR/DSI/CS8 09                     1 1 NRR/DSI/KTSB 12                    1    NRR/DSI/ICSB 16                   1 1 NRR/DS I/PSB    19                1    NRR/DS I/RAB 22                   1 1 NRR/    /RSB    23                1    NRR/DST/LGB     33                 1 1
                                                                                      '2 M7    'MI L
8 04 e0 1    RGN5                                 2 EXTERNAL! ACRS                41      6      6      BNL(AMDTS ONLY)                   1 1 DMB/DSS (AMDTS)          1        1    FEMA REP DIV '39                   1 1 LPDR            03      1       1     NRC PDR        02                  1 NSIC            -05      1       1     NTIS                              1 1
~TOTAL NUMBER OF COPIES       REQUIRED+     L~TTR   55   ENCL   49
 
4           O   s                                             lX (QCo)EQIHKÃFP P. Q BQX 2I666   'HQENIXi ARIZONA BSQ36 October 6 1982 ANPP-21957 WFQ/TFQ Mr. Thomas Novak                                   CORRECTED COPY Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Nashington, D. C.         20555


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Docket Nos.STN-50-528/529/530 File: 82-056-026; G.1.01.10 CORRECTED COPY 4  
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 File: 82-056-026; G.1.01.10 4


==References:==
==References:==
(A)NUREG-0857,"Safety Evaluation Report related.to the operation of the Palo Verde Nuclear Generating Station Units, 1, 2 and 3,"'date'd Novemb'er,1981.(B)NUREG-0852,"Safety Evaluation Report related to the Final Design Approval of the Combustion Engineering Standard Nuclear Steam Supply'System", dated, November, 1981  
(A)   NUREG-0857,   "Safety Evaluation Report related.to the operation of the Palo Verde Nuclear Generating Station Units, 1, 2 and 3," 'date'd Novemb'er, 1981.
(B) NUREG-0852, "Safety Evaluation Report related to the Final Design Approval of the Combustion Engineering Standard Nuclear Steam Supply'System", dated, November, 1981
 
==Dear Mr. Novak:==
 
Section 4.2.5 of Reference (A), requires the first CESSAR System 80 applicant, PVNGS Unit 1, commit to performing the Guide Tube Surveillance Program described in Reference (B), Section 4.2.3.1.
Our commitment      to this item  will be    as  follows:
Ne  will perform    the Guide Tube Near Surveillance inspection on representative bundles of the      first reload    of Unit 1. If,  following this inspection,  no significant      Guide Tube wear    is observed,    no subsequent  inspections for Guide Tube wear will be conducted.          If,  on the other hand, significant Guide Tube arrear  is observed, we will perform the inspection at the next reload and eval-uate action to be taken to eliminate the problem, as well as future inspec-tion programs.
This commitment        will be  incorporated into the      PVNGS FSAR  in an upcoming amendment.
Please contact      me  if you have  any questions on    this matter.
Very  trul  you s, c~        'l ~
E. E. Van  Brunt, Jr.
82>om0i9O sa1O0S                                              APS  Vice President, PDR ADOCK    05000528                                            Nuclear Projects PDR ANPP  Project Director EEVBJr/TFQ/sp


==Dear Mr.Novak:==
DISTRIBUTION E. Licitra L. Bernabei P. L. Hourihan R. Meyer A. C. Gehr bcc:
Section 4.2.5 of Reference (A), requires the first CESSAR System 80 applicant, PVNGS Unit 1, commit to performing the Guide Tube Surveillance Program described in Reference (B), Section 4.2.3.1.Our commitment to this item will be as follows: Ne will perform the Guide Tube Near Surveillance inspection on representative bundles of the first reload of Unit 1.If, following this inspection, no significant Guide Tube wear is observed, no subsequent inspections for Guide Tube wear will be conducted.
G. C. Andognini J. E. Kirby J.
If, on the other hand, significant Guide Tube arrear is observed, we will perform the inspection at the next reload and eval-uate action to be taken to eliminate the problem, as well as future inspec-tion programs.This commitment will be incorporated into the PVNGS FSAR in an upcoming amendment.
J. M. Allen A. Rogers Vorees lV. F. Quinn R. 1(. Kramer S. R. Frost hf. D. Holohan C. Ferguson W. G. Binham G. F. Kopchinsl'i}}
Please contact me if you have any questions on this matter.Very trul you s, c~'l~82>om0i9O sa1O0S PDR ADOCK 05000528 PDR E.E.Van Brunt, Jr.APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/TFQ/sp DISTRIBUTION E.Licitra L.Bernabei P.L.Hourihan R.Meyer A.C.Gehr bcc: G.C.Andognini J.E.Kirby J.M.Allen A.'.Rogers J.Vorees lV.F.Quinn R.1(.Kramer S.R.Frost hf.D.Holohan C.Ferguson W.G.Binham G.F.Kopchinsl'i}}

Latest revision as of 06:30, 4 February 2020

Corrected Copy of Commitment to Perform Guide Tube Wear Surveillance Insp Described in NUREG-0852 Section 4.2.3.1, Per NUREG-0857 Section 4.2.5 Requirement.Commitment Will Be Incorporated Into Next FSAR Amend
ML17297B735
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/06/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Novak T
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0852, RTR-NUREG-0857, RTR-NUREG-852, RTR-NUREG-857 ANPP-21957-WFQ, NUDOCS 8210220394
Download: ML17297B735 (3)


Text

REGULATOR NFORMATION DISTRIBUTION EM (RLDS)

'AOCE'SSION NBR;8210220394 DOC ~ DATE: 82/10/06 NOTARI'ZED: NO DOCKET FACIL:STN 50>>.528 Palo Verde Nuclear Station~ Unit 1i Arizona Publi 05000528 AUTH ~ NAME AUTHOR AFFILIATION VAN BRUNTiE F 6 REiCIP INAME

'rizona Public Service Co, RECIPIENT AFFILIATION NOVAKp'T~ Assistant, Director for Licensi.ng

SUBJECT:

Cor rected copy of commitment to per form 'guide ~tube wear surveillance insp described in NUREG 0852 Section 4 ' 't1I per NUREG 0857 Section 4.2 ' requirements CommiItment will be incorporated into ne~t PSAR--amends DI'STRI BUTTON CODE t 8001S;COPIES ~RKCEI VED: LTR / ENCL /

Licensing 'Submi t ta1: PSAR/FSAR Amdts S Related Correspondence SIZE'ITLE:

NOTES:Standardized implant, 05000528 RECIPIENT ICOP LES RECIPLENT COPIES ID CODE/NAME NRR/DL/ADL NRR LB3 LA LTTR ENCL 1

1 0 0 NRR LB3 BC LICLTRAtE ~ '1 ID CODE/NAME LTTR ENCL 1

0 1

INTERhALt ELD/HDS3 i,0 IK FILE 1 1 IE/DEP EPDS 35 1 IE/DEP/EPLB 36 '3 3 NRR/DE/AEAB 0 NRR/DE/CEB 11 1 1 NRR/DE/KQB 13 3 NRR/DE/GB 28 2 2 NRR/DK/HGEB 30 2 .NRR/DE/MEB 18 1 NRR/DE/MTEB 17 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 NRR/DHFS/PTRB20 1 1 NRR/DSI/AE8 26 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CPB 10 1 NRR/DSI/CS8 09 1 1 NRR/DSI/KTSB 12 1 NRR/DSI/ICSB 16 1 1 NRR/DS I/PSB 19 1 NRR/DS I/RAB 22 1 1 NRR/ /RSB 23 1 NRR/DST/LGB 33 1 1

'2 M7 'MI L

8 04 e0 1 RGN5 2 EXTERNAL! ACRS 41 6 6 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA REP DIV '39 1 1 LPDR 03 1 1 NRC PDR 02 1 NSIC -05 1 1 NTIS 1 1

~TOTAL NUMBER OF COPIES REQUIRED+ L~TTR 55 ENCL 49

4 O s lX (QCo)EQIHKÃFP P. Q BQX 2I666 'HQENIXi ARIZONA BSQ36 October 6 1982 ANPP-21957 WFQ/TFQ Mr. Thomas Novak CORRECTED COPY Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Nashington, D. C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 File: 82-056-026; G.1.01.10 4

References:

(A) NUREG-0857, "Safety Evaluation Report related.to the operation of the Palo Verde Nuclear Generating Station Units, 1, 2 and 3," 'date'd Novemb'er, 1981.

(B) NUREG-0852, "Safety Evaluation Report related to the Final Design Approval of the Combustion Engineering Standard Nuclear Steam Supply'System", dated, November, 1981

Dear Mr. Novak:

Section 4.2.5 of Reference (A), requires the first CESSAR System 80 applicant, PVNGS Unit 1, commit to performing the Guide Tube Surveillance Program described in Reference (B), Section 4.2.3.1.

Our commitment to this item will be as follows:

Ne will perform the Guide Tube Near Surveillance inspection on representative bundles of the first reload of Unit 1. If, following this inspection, no significant Guide Tube wear is observed, no subsequent inspections for Guide Tube wear will be conducted. If, on the other hand, significant Guide Tube arrear is observed, we will perform the inspection at the next reload and eval-uate action to be taken to eliminate the problem, as well as future inspec-tion programs.

This commitment will be incorporated into the PVNGS FSAR in an upcoming amendment.

Please contact me if you have any questions on this matter.

Very trul you s, c~ 'l ~

E. E. Van Brunt, Jr.

82>om0i9O sa1O0S APS Vice President, PDR ADOCK 05000528 Nuclear Projects PDR ANPP Project Director EEVBJr/TFQ/sp

DISTRIBUTION E. Licitra L. Bernabei P. L. Hourihan R. Meyer A. C. Gehr bcc:

G. C. Andognini J. E. Kirby J.

J. M. Allen A. Rogers Vorees lV. F. Quinn R. 1(. Kramer S. R. Frost hf. D. Holohan C. Ferguson W. G. Binham G. F. Kopchinsl'i