ML17299A902: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/24/1985
| issue date = 12/24/1985
| title = Auxiliary Feedwater Pump 48 H Endurance Test Results, Per Sser (NUREG-0857).W/851224 Ltr
| title = Auxiliary Feedwater Pump 48 H Endurance Test Results, Per Sser (NUREG-0857).W/851224 Ltr
| author name = VAN BRUNT E E
| author name = Van Brunt E
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name = KNIGHTON G W
| addressee name = Knighton G
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000529
| docket = 05000529
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'r RECULAOIY INFORNATION DISTRIDUTI(SYSTEN (RIDE')ACCESSION NBR: 8512310150 DOC.DATE: 85/12/24 NOTARIZED:
{{#Wiki_filter:'r RECULAOIY INFORNATION DISTRIDUTI(SYSTEN               (RIDE')
NO DOCKET 0 FACIL: STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 AUTH.NANE AUTHOR AFFILIATION VAN BRUNT', E.Arizona Nuclear Power ProJect (Formerly Arizona Public Serv RECIP.NANE RECIPIENT AFFILIATION KNIQHTON Q.M.PMR Prospect Directorate 7  
ACCESSION NBR: 8512310150       DOC. DATE:   85/12/24   NOTARIZED: NO             DOCKET 0 FACIL: STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 AUTH. NANE         AUTHOR AFFILIATION VAN BRUNT', E.     Arizona Nuclear Power ProJect (Formerly Arizona Public Serv RECIP. NANE         RECIPIENT AFFILIATION KNIQHTON Q. M.     PMR Prospect Directorate     7


==SUBJECT:==
==SUBJECT:==
"Auxiliary Feedeater Pump 48 H Endurance Test Resultsi" per SSER (NUREQ-0857).
  "Auxiliary Feedeater     Pump 48 H Endurance Test     Resultsi" per SSER (NUREQ-0857). N/851224     ltr.
N/851224 ltr.DISTRIBUTION CODE: AOOID COPIES RECEIVED: LTR g ENCL+SIZE: TITLE: OR Submittal:
DISTRIBUTION CODE: AOOID TITLE:  OR COPIES RECEIVED: LTR Submittal: Qeneral Distribution g ENCL   +   SIZE:
Qeneral Distribution NOTES: Standardized plant.05000529 RECIPIENT ID CODE/NANE PNR-B PD7 PD 01 INTERNAL: ACRS 09 ELD/HDS3 NRR PNR-A EB NRR/DHFT/TSCB NRR RBW B E~LE 04 COP IES LTTR ENCL 5 5 6 1 0 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LIC ITR*i E ADM/LFNB NRR BMR EB NRR PNR-B EB NRR/DSRO DIR NRR/GRAS RQN5 COPIES LTTR ENCL 1 1 1 0 1 1 1 1 1 1 0 1 1 EXTERNAL: 24X LPDR NSIC 03 05 1 1 1 EQSQ BRUSKEi 8 NRC PDR 02-, 1 1 1 1 TOTAL NUNBER OF COPIES REQUIRED: LTTR 28 ENCL 25  
NOTES: Standardized   plant.                                                       05000529 RECIPIENT         COP IES            RECIPIENT            COPIES ID CODE/NANE       LTTR ENCL        ID CODE/NAME        LTTR ENCL PNR-B PD7 PD 01          5    5      LIC ITR*iE              1      1 INTERNAL: ACRS             09       6            ADM/LFNB                1      0 ELD/HDS3                 1    0      NRR BMR EB              1      1 NRR PNR-A EB             1    1      NRR PNR-B EB            1 NRR/DHFT/TSCB           1     1       NRR/DSRO DIR            1     1 NRR   RBW B                   1      NRR/GRAS                 1     0 E~LE          04      1     1       RQN5                    1     1 EXTERNAL: 24X                       1             EQSQ BRUSKEi 8         1      1 LPDR            03      1            NRC PDR         02-,     1     1 NSIC            05      1 TOTAL NUNBER OF COPIES REQUIRED: LTTR           28   ENCL   25
~II II I-wi,l Jl Xf'QI 4 I'lf I'Il I 0 P 4 jww-45 4 VI 44~4 , 43k ff V,I;I4)'w I WI I J (I'Jfl fw Jl RP I 4"I wg , llx,(ff I wx 44 If 4 tf X",ii 4 I E,I'VV;VI 4 I 4'll I~VX R w.4,>-C, I',~4 Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA B5072-2034 December 24, 1985 ANPP-34329-EEVB/PGN-98.07 Director of Nuclear Reactor Regulation Attention:
 
Mr.George W.Knighton, Deputy Director PWR Project Directorate II7 Division of Pressurized Water Reactor Licensing-B U.S.Nuclear Regulatory Commission Washington, D.C.20555  
I
                                                      'lf
                                                                                          ~   II II Jl Xf'   Q    I 4 I       I
                                                                'Il 4 45
-                                                                                                       4 wi,l                                                              jww                                              VI I 0 P
44
                                                                              ~ 4
                                                                                              , 43k             ff   V,I; I
4    )'w I WI                             Jfl  fw  Jl I
J (I'                   RP I 4 "I wg               , llx,(                       ff I
                                                                                                  'VV tf X",ii 4 wx
                                                                                                          ;VI 4
44    If 4 I   4     'll I ~ VX I  E,I                                                      R w. 4,>-C, I',
                                                                                  ~ 4
 
Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA B5072-2034 December 24, 1985 ANPP-34329-EEVB/PGN-98.07 Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Deputy Director PWR Project Directorate II7 Division of Pressurized Water Reactor Licensing                     B U. S. Nuclear Regulatory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 (License NPF-46)Auxiliary Feedwater Pump 48 Hour E'ndurance Test File: 85-056-026
Palo Verde Nuclear Generating Station (PVNGS)
Unit   2 Docket No. STN   50-529 (License NPF-46)
Auxiliary Feedwater       Pump 48 Hour E'ndurance Test File: 85-056-026


==Reference:==
==Reference:==
Safety Evaluation      Report'elated          to the operation of Palo Verde Nuclear Generating        Station, Units 1, 2 and 3 (NUREG<857) dated November, 1981
==Dear Mr. Knighton:==
As  required by Section 22.2 (II.E.l.l) of the above reference,                              please find attached the results of the auxiliary feedwater system (AVOWS)                              pump 48-hour endurance  tests.
If you  have any questions or        require additional information, please contact Mr. W. F. Quinn of my staff.
Very    truly yours, CUW E. E. Van      Brunt, Jr.
Executive Vice President Project Director EEVB/WFQ/PGN/dim Attachment cc:  E. A. Licitra M. C. Ley R. P. Zimmerman A. C. Gehr
                                                          .. lad:    D, CRUTCNPIELD (Ltr only) g            EB (N JO!OISTON)
RSB (TIIONAS)
I  $        EICSB (PARR).    ~
FOB  (II REOAN)
0, it 0 ~
0 0
Attachment to ANPP- 34329 ATTACHMENT Auxiliary Feedwater Pump 48  Hour Endurance Test Results 8512310150 851224              I PDR    ADOCK 05000529 F                PDR
Page 2
: 1)  2M-AFN-POl  -  Non-essential    AFW pump    48 hour  endurance testing data:
a)    Date  of testing:    July 2,  1985  through July 4, 1985 b)    Bearing Temperatures  The limits for each bearing temperature, along with the maximum obtained temperature are listed below:
AFN-TE-79 (Limit 190'F max)          Max. 161'F AFN-TE-81 (Limi.t 190'F max)        Max. 153'F AFN-TE-89 (Limit 200'F max)          Max. 161 F AFN-TE-90 (Limit 200'F max)          Max. 152'F AFN-TE-91 (Limit 200'F max)          Max. 163'F c)    Flow Data:    Data was collected with a clamp on flowmeter on the recirculation    line to the CST. The MITE used was a Controlotron Model 865580 and flow data recorded was about 280 gpm during the test.
d)    Vibration Data:      Data was collected using a hand held vibration meter    and probe. The M&TE used was an IRD Model 8810. The  maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below:
Inboard bearing:    .4  .6 mils Outboard bearing:    .9  1.2 mils The 91PE-2AF01 48-hour endurance      run demonstrated that 2M-AFN-POl remained    within design limits with respect to bearing tempera-tures and vibration. The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded.
2M-AFN-PO1 AUXILIARY FEEDWATER PUMP
:  AFN-TE-79  FREE  END MOTOR BEARING 170 160 150 140 s  130 0
0 a  120 I
5I  110 C
100 I
80 70 I
60 0  2  4  6  8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0 I TINE -  Hours                                    I HOUR RUN AFTER COOLDOWN 48 HOUR RUN
2M-AFN-P01 AUXILIARY FEEONATER PUMP AFN-TE-81  COUPLING END MOTOR BEARING 170 160 150 140 u 130 a 120 5 110 100 90 80 70 60                                                                                        II 0  2  4  6 8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0 I TINE -  Hours                                    1 HOUR RUN AFTER COOLDOIIN 48  HOUR RUN
C 2M-AFN-P01 AUXILIARY FEEDMATER  PUMP AFN-TE-89  PUMP THRUST SEARING 170 160 150 140 u  130 0
o  120 I
EIJ 5  110 100 80 80 70 60 0  2 4  6 8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0  1 TINE -  Houcs                                    I HOUR RUN AFTER COOLOOW 48 HOUR RUN
l' 2M-AFN-POl AUXILIARY FEEOWATER PUMP AFN-TE-90  PUMP COUPLING ENO JOURNAL BEARING 170 160 150 140 130 a
0 o  120 I
5  110 100 I
90 80 70 60 8                20  22  24  26  28 30 32 34 36 38 40 42 44 M
0 2  4  6    10 12 14 16 18                                            46 48      0  1 TINE  Hour o                                    1 HOUR RUN AFTER COOLOOMN 48  HOUR RUN
2M-AFN-PO1 AUXILIARY FEEOWATER PUMP AFN-TE-91  PUMP FREE  ENO JOURNAL BEARING
          'l 170 160 150 140 g 130 120 I
5  110 100 I
90 80 70 60 0    2 4  6  8  10 12 14 16 18 20  22 24 26    28 30 32 34 36 38 40 42 44 46 48      0  1 TINE  Hours                                    1 HOUR RUN AFTER COOLDOMN 48 HOUR RUN
Page 8
: 2) 2M-AFB-P01  Essential    APW pump    48-hour endurance  testing data:
a)  Date of Testing:      June 13, 1985 through June 15, 1985.
b)  Bearing Temperatures - The limits for each bearing temperature, along with the maximum obtained temperature are listed below:
AFN-TE-80.  (Limit  190'F  max)    : Max. 151'F AFN-TE-82    (Limit  190'F  max)    : Max. 149'F AFN-TE-86    (Limit  200'F  max)    : Max. 162'F AFN-TE-87    (Limit  200'F  max)    : Max. 161'F AFN-TE-88    (Limit  200'F  max)    : Max. 148'F c)    Flow Data:    Data was    collected using    a clamp on  flowmeter on the recirculation      line to the      CST. The METE used    was  a Controlotron Model fI65580 and flow data recorded          was about 235 gpm during the test.
d)  Vibration Data:        Data was collected using a hand held vibration meter    and probe.      The ATE used was and IRD Model 8810. The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.
Inboard Bearing: .8  1.0 mils Outboard Bearing: .9  1.2 mils e)    Pump room  temperature and humidity data: Data was collected using a psychrometer            to measure wet and dry bulb temperatures. From this data relative humidity was also calculated.
Temperature Range:      68'F  -  73'F Relative Humidity Range:        52%  82%
The 48-hour endurance run demonstrated that 2M-AFB-P01 remained within design limits with respect to bearing temperatures and vibrations. The test data also showe'd that the pump room ambient conditions (temperature,        humidity) did not exceed environmental qualification limits for safety related equipment in the room, The following plots made for the bearing temperatures versus time demonstrated that the design limits . were not exceeded.              Plots were also made    fo'r the  pump  room temperature    and  humidity data versus time.
2M-AFB-PO1 AUXILIARY FEEOMATER PUMP AFN-TE-BO  FREE ENO MOTOR BEARING
                                                            +FOR THE FIRST 2.5 HOURS, A PROBLEN EXISTED WITH THE INPUT TO THE PLANT COHPUTER. OATh, AS SHOWN. IS NOT REPRESENTATIVE OF INITIAL STARTING TENPERATURES. SUPPLENENTARY DATA IS AVAILABLE IN APPENDIX E OF 91PE-2AFOI ~
160 ISD 140 a 130 a
a a 120 I
5 110 100 90 80 70 0  2  4  6  9  10 12 14 16 18 20  22  24  26  28 30 32  34  36  38  40  42  44  46  49      0 TIME -  Hours                                                I HOUR RUN AFTER COOl DOWN 49 HOUR RUN
O.
f
2M-AFB-POl AUXILIARY FEED>/ATER PUMP AFN-TE-82  COUPLING END MOTOR BEARING                                                  Oo (D
170 160 150 140 130 0
Ql c)  120 I
5    110 100 I
80 70 60 0 2  4  6 8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0  1 TIHE -  Hours                                    1 HOUR RUN AFTER COOLOOVN 48 HOUR RUN
2M-AFB-P01 AUXILIARY FEEDWATER PUMP gq AFN-TE-86  PUMP FREE END JOURNAL BEARING                                                  s I e
e 170 160 150 140 g  130 ee 120 I
5    110 100 e
90 80 70 60 2 4  6 8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0  1 T1HE -  Hours                                    1 HOUR RUN AFTER COOLOOWN 48 HOUR RUN
2M-AFB-PO1 AUXILIARY FEEDWATER PUMP AFN- TE-87  PUMP COUPLING END JOURNAL BEARING 170 160 150 140 g 130 0
a  120 I
5  110, 100 I
90 80 70 60 0  2  4  6  8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0  1 TINE  Hours                                    I HOUR RUN AFTER COOLDOWN 48 HOUR RUN
2M-AFB-P01 AUXILIARY FEEDWATER PUMP AFN-TE-88  PUMP THRUST BEARING 170 160 150 140 y 130 0
0 o  120 I
5I  110 100 90 80 70 60 2  4  6  8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0 M
TJME -  Hours                                    1 HOUR RUN AFTER COOLOOWN 48 HOUR RUN
2M-AFB-PO1 AUXILIARY FEEDWATER PUMP      ROOM ENVIRONMENTAL DATA 90 BO I
I H  70
)
w I-60 50 40 0  2  4 6  8 10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48 TINE  -  Havro 48 HOUR RUN 90 P. 80 a
D
                                                                                  ~
70                                                                                  ORY BULB
: o. 60                                                                                ~ WET BULB w
50 0  2  4  6  8 10 12 14 16 18 20  22  24    26  28 30 32 34 36 38 40 42 44 46 48 TINE "  Hovro 48 HOUR RUN
I
~ I
Page 15
: 3)  2M-AFA-P01  Essential  AFW pump    48 hour endurance    test data a)    Date of testing:      July 12,  1985  through July 14, 1985, and July 19, 1985.
b)    Bearing Temperatures          The    limits for each bearing temperature, along with the maximum obtained temperature are listed below:
AFN-TE-59    (Limit 200'F  max)    Max. 137'F  (128.8'F)*
AFN-TE-60    (Limit 200 F  max)    Max. 115'F  (126.7'F)*
AFN-TE-83    (Limit 200'F  max) : Max. 167'F AFN-TE-84    (Limit 200'F  max) : Max. 157'F AFN-TE-85    (Limit 200'F  max) : Max. 166 F
                    *Maximum  values while using hand held contact pyrometer (M&TE) for bearing surface temperatures.
c)  Flow Data:    AFA-POl was run on minimum recirculation during the 48 hour run.      Operations also used AFA-F01 to feed the steam generators      while at the 565'F and 2250 psia test plateau.
d)  Vibration Data:        Data was collected using a hand held vibration meter    and probe. The M&TE used was an IRD Model
                    /3350. The  maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.
Inboard Bearing:      .24  .46 mils Outboard Bearing:      .35  .64 mils e)    Pump room  temperature and humidity data:        Data was collected using  a calibrated temperature      and  humidity meter (M&TE).
Temperature Range:      67.2'F to 80.5'F Humidity Range:      49.3%  to 70.9/
The 48-hour endurance run demonstrated that 2M-AFA-P01 remained within design limits with respect to bearing temperatures and vibrati'on. The test data also showed that the pump room ambient conditions (temperature,        humidity) did not exceed environmental qualification limits for safety related equipment in the room.
The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded.              Plots were also made for the pump room temperature and humidity data versus time.
AJM:GEP:RLG:WHF:mg
~ .
2M-AFA-P01 AUXILIARY FEEO>lATER PUMP AFN-TE-59  TURBINE GOVERNOR ENO JOURNAL BEARING B EARING SURFACE TENPERATURE 170                                  H 8, TE USED WHILE AFN-TE-059 INOPERATIVE I
160 150 140 g 130 0
a  120 I
EU 5  110 100 90 8D 70 60 0  2  4  6  8 10 12  14 16    18  20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0 I TINE  -  Hours                                    I HOUR RUN AFTER COOLDOWN 48 HOUR RUN
2M-AFA-PO1 AUXILIARY FEEOWATER PUMP                                                            Q  ~
AFN- TE-60  TURBINE COUPLING ENO JOURNAL BEARING OCI lD 8 EARINC SURFACE TEHPERATURE 170                                  H L TE USED NIILE AFN-TE-060 INOPERATIVE 160 150 140 o 130 0
o  120 I
W 5  110 100 I
90 80 70 60 0  2  4  6 8  10 12 14 16    18  20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0 I TIHE -  Hours                                    I HOUR RUN AFTER COOLDOW 48 HOUR RUN
O.
J y,
2M-AFA-P01 AUXILIARY FEEDWATER PUMP AFN-TE-83  PUMP FREE ENO JOURNAL BEARING
      \
170 160 1SO 140 U.
s 130 a  120 I
IV 110 100 90 80 70 60                                                                                      1 I 0 2  4  6  8  10 12 14 16 18 20 22  24  26  28 30 32 34 36 38 40 42 44 46 48      0  1 TlHE -  Haves                                    1 HOUR RUN AFTER COOLDOMN 48 HOUR RUN
l' 2M-AFA-P01 AUXILIARY FEED>/ATER PUMP AFN-TE-84  PUMP COUPLING END 30URNAL BEARING
                                                                                        '7
                                                                                        ~ ',
        \
170 160
                                                                                                        ~
150 140 g 130 o  120 I
5  110 100 I~
80 70 6D 0  2 4  6 8  10 12 14 16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48        0  1 TIME "  Hours                                      I HOUR RUM hFTER COOLDOWH 48 HOUR  RUM


Safety Evaluation Report'elated to the operation of Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (NUREG<857) dated November, 1981
2M-AFA-PQ 1 AUXILIARY FEEQWATER PUMP AFN-TE-85  PUMP THRUST BEARING 170 160 150 140 130 0
a t.
o  120 I
110 100 90 80 70 60 0  2 4  6  8 10 12 14  16 18 20  22  24  26  28 30 32 34 36 38 40 42 44 46 48      0  1 TINE  Hours                                    1 HOUR RUN AFTER COOLOOMN 48 HOUR RUN


==Dear Mr.Knighton:==
VR 2M-AFA-PO1 AUXILIARY FEEOWATER PUMP       ROOM
As required by Section 22.2 (II.E.l.l) of the above reference, please find attached the results of the auxiliary feedwater system (AVOWS)pump 48-hour endurance tests.If you have any questions or require additional information, please contact Mr.W.F.Quinn of my staff.Very truly yours, CUW E.E.Van Brunt, Jr.Executive Vice President Project Director EEVB/WFQ/PGN/dim Attachment cc: E.A.Licitra M.C.Ley R.P.Zimmerman A.C.Gehr..lad: g D, CRUTCNPIELD (Ltr only)EB (N JO!OISTON)
    - ENVIRONMENTAL QATA
RSB (TIIONAS)I$EICSB (PARR).~FOB (II REOAN) 0, it 0~0 0 Attachment to ANPP-34329 ATTACHMENT Auxiliary Feedwater Pump 48-Hour Endurance Test Results 8512310150 851224 I PDR ADOCK 05000529 F PDR Page 2 1)2M-AFN-POl
        \
-Non-essential AFW pump 48 hour endurance testing data: a)Date of testing: July 2, 1985 through July 4, 1985 b)Bearing Temperatures
90 80 I
-The limits for each bearing temperature, along with the maximum obtained temperature are listed below: AFN-TE-79 AFN-TE-81 AFN-TE-89 AFN-TE-90 AFN-TE-91 (Limit 190'F max)(Limi.t 190'F max)(Limit 200'F max)(Limit 200'F max)(Limit 200'F max)Max.Max.Max.Max.Max.161'F 153'F 161 F 152'F 163'F c)Flow Data: Data was collected with a clamp on flowmeter on the recirculation line to the CST.The MITE used was a Controlotron Model 865580 and flow data recorded was about 280 gpm during the test.d)Vibration Data: Data was collected using a hand held vibration meter and probe.The M&TE used was an IRD Model 8810.The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below: Inboard bearing:.4-.6 mils Outboard bearing:.9-1.2 mils The 91PE-2AF01 48-hour endurance run demonstrated that 2M-AFN-POl remained within design limits with respect to bearing tempera-tures and vibration.
I 70 y.
The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded.
w   60 I-50 40 0 2 4 6 8 10 12 14 16 18 20 22   24   26 28 30 32 34 36 38 40 42 44 46 48 tIME  "  Hours 48 HOUR RUN 90 P. BO                                                                                DRY BULB Cl 70 60 50 0 4 6 8 10 12 14 16 18 20 22   24   26 28 30 32 34 36 38 40 42 44 46 48 tIME -   Hours 48 HOUR RUN
2M-AFN-PO1 AUXILIARY FEEDWATER PUMP: AFN-TE-79-FREE END MOTOR BEARING 170 160 150 140 s 130 0 0 a 120 I 5 110 I C 100 I 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Hours 48 HOUR RUN I 0 I I HOUR RUN AFTER COOLDOWN 2M-AFN-P01 AUXILIARY FEEONATER PUMP AFN-TE-81-COUPLING END MOTOR BEARING 170 160 150 140 u 130 a 120 5 110 100 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Hours 48 HOUR RUN I-I 0 I 1 HOUR RUN AFTER COOLDOIIN C
2M-AFN-P01 AUXILIARY FEEDMATER PUMP AFN-TE-89-PUMP THRUST SEARING 170 160 150 140 u 130 0 o 120 I EIJ 5 110 100 80 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Houcs 48 HOUR RUN 0 1 I HOUR RUN AFTER COOLOOW l'
2M-AFN-POl AUXILIARY FEEOWATER PUMP AFN-TE-90-PUMP COUPLING ENO JOURNAL BEARING 170 160 150 140 130 a 0 o 120 I 5 110 100 I 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Hour o 48 HOUR RUN M 0 1 1 HOUR RUN AFTER COOLOOMN 2M-AFN-PO1 AUXILIARY FEEOWATER PUMP AFN-TE-91-PUMP FREE ENO JOURNAL BEARING'l 170 160 150 140 g 130 120 I 5 110 100 I 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Hours 48 HOUR RUN 0 1 1 HOUR RUN AFTER COOLDOMN Page 8 2)2M-AFB-P01
-Essential APW pump 48-hour endurance testing data: a)Date of Testing: June 13, 1985 through June 15, 1985.b)Bearing Temperatures
-The limits for each bearing temperature, along with the maximum obtained temperature are listed below: AFN-TE-80.
AFN-TE-82 AFN-TE-86 AFN-TE-87 AFN-TE-88 (Limit 190'F max)(Limit 190'F max)(Limit 200'F max)(Limit 200'F max)(Limit 200'F max): Max.151'F: Max.149'F: Max.162'F: Max.161'F: Max.148'F c)Flow Data: Data was collected using a clamp on flowmeter on the recirculation line to the CST.The METE used was a Controlotron Model fI65580 and flow data recorded was about 235 gpm during the test.d)Vibration Data: Data was collected using a hand held vibration meter and probe.The ATE used was and IRD Model 8810.The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.Inboard Bearing:.8-1.0 mils Outboard Bearing:.9-1.2 mils e)Pump room temperature and humidity data: Data was collected using a psychrometer to measure wet and dry bulb temperatures.
From this data relative humidity was also calculated.
Temperature Range: 68'F-73'F Relative Humidity Range: 52%-82%The 48-hour endurance run demonstrated that 2M-AFB-P01 remained within design limits with respect to bearing temperatures and vibrations.
The test data also showe'd that the pump room ambient conditions (temperature, humidity)did not exceed environmental qualification limits for safety related equipment in the room, The following plots made for the bearing temperatures versus time demonstrated that the design limits.were not exceeded.Plots were also made fo'r the pump room temperature and humidity data versus time.
2M-AFB-PO1 AUXILIARY FEEOMATER PUMP AFN-TE-BO-FREE ENO MOTOR BEARING 160+FOR THE FIRST 2.5 HOURS, A PROBLEN EXISTED WITH THE INPUT TO THE PLANT COHPUTER.OATh, AS SHOWN.IS NOT REPRESENTATIVE OF INITIAL STARTING TENPERATURES.
SUPPLENENTARY DATA IS AVAILABLE IN APPENDIX E OF 91PE-2AFOI
~ISD 140 a 130 a a a 120 I 5 110 100 90 80 70 0 2 4 6 9 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 49 TIME-Hours 49 HOUR RUN 0 I HOUR RUN AFTER COOl DOWN O.f 2M-AFB-POl AUXILIARY FEED>/ATER PUMP AFN-TE-82-COUPLING END MOTOR BEARING Oo (D 170 160 150 140 130 0 Ql c)120 I 5 110 100 I 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TIHE-Hours 48 HOUR RUN 0 1 1 HOUR RUN AFTER COOLOOVN 2M-AFB-P01 AUXILIARY FEEDWATER PUMP AFN-TE-86-PUMP FREE END JOURNAL BEARING gq s I e e 170 160'150 140 g 130 ee 120 I 5 110 100 e 90 80 70 60 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 T1HE-Hours 48 HOUR RUN 0 1 1 HOUR RUN AFTER COOLOOWN 2M-AFB-PO1 AUXILIARY FEEDWATER PUMP AFN-TE-87-PUMP COUPLING END JOURNAL BEARING 170 160 150 140 g 130 0 a 120 I 5 110, 100 I 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Hours 48 HOUR RUN 0 1 I HOUR RUN AFTER COOLDOWN 2M-AFB-P01 AUXILIARY FEEDWATER PUMP AFN-TE-88-PUMP THRUST BEARING 170 160 150 140 y 130 0 0 o 120 I 5 110 I 100 90 80 70 60 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TJME-Hours 48 HOUR RUN M 0 1 HOUR RUN AFTER COOLOOWN 2M-AFB-PO1 AUXILIARY FEEDWATER PUMP ROOM ENVIRONMENTAL DATA 90 BO I I H 70 w 60)I-50 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Havro 48 HOUR RUN 90 P.80 a D 70 ORY BULB o.60 w 50~~WET BULB 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE" Hovro 48 HOUR RUN I~I Page 15 3)2M-AFA-P01 Essential AFW pump 48 hour endurance test data a)Date of testing: July 12, 1985 through July 14, 1985, and July 19, 1985.b)Bearing Temperatures
-The limits for each bearing temperature, along with the maximum obtained temperature are listed below: AFN-TE-59 (Limit AFN-TE-60 (Limit AFN-TE-83 (Limit AFN-TE-84 (Limit AFN-TE-85 (Limit 200'F max)200 F max)200'F max)200'F max)200'F max)Max.Max.: Max.: Max.: Max.137'F (128.8'F)*
115'F (126.7'F)*
167'F 157'F 166 F*Maximum values while using hand held contact pyrometer (M&TE)for bearing surface temperatures.
c)Flow Data: AFA-POl was run on minimum recirculation during the 48 hour run.Operations also used AFA-F01 to feed the steam generators while at the 565'F and 2250 psia test plateau.d)Vibration Data: Data was collected using a hand held vibration meter and probe.The M&TE used was an IRD Model/3350.The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.Inboard Bearing:.24-.46 mils Outboard Bearing:.35-.64 mils e)Pump room temperature and humidity data: Data was collected using a calibrated temperature and humidity meter (M&TE).Temperature Range: 67.2'F to 80.5'F Humidity Range: 49.3%to 70.9/The 48-hour endurance run demonstrated that 2M-AFA-P01 remained within design limits with respect to bearing temperatures and vibrati'on.
The test data also showed that the pump room ambient conditions (temperature, humidity)did not exceed environmental qualification limits for safety related equipment in the room.The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded.Plots were also made for the pump room temperature and humidity data versus time.AJM:GEP:RLG:WHF:mg
~.
2M-AFA-P01 AUXILIARY FEEO>lATER PUMP AFN-TE-59-TURBINE GOVERNOR ENO JOURNAL BEARING 170 160 B EARING SURFACE TENPERATURE H 8, TE USED WHILE AFN-TE-059 INOPERATIVE I 150 140 g 130 0 a 120 I EU 5 110 100 90 8D 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Hours 48 HOUR RUN 0 I I HOUR RUN AFTER COOLDOWN 2M-AFA-PO1 AUXILIARY FEEOWATER PUMP AFN-TE-60-TURBINE COUPLING ENO JOURNAL BEARING Q~OCI lD 170 160 8 EARINC SURFACE TEHPERATURE H L TE USED NIILE AFN-TE-060 INOPERATIVE 150 140 o 130 0 o 120 I W 5 110 100 I 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TIHE-Hours 48 HOUR RUN 0 I I HOUR RUN AFTER COOLDOW O.J y, 2M-AFA-P01 AUXILIARY FEEDWATER PUMP AFN-TE-83-PUMP FREE ENO JOURNAL BEARING\170 160 1SO 140 U.s 130 a 120 I IV 110 100 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TlHE-Haves 48 HOUR RUN 1-I 0 1 1 HOUR RUN AFTER COOLDOMN l'
2M-AFA-P01 AUXILIARY FEED>/ATER PUMP AFN-TE-84-PUMP COUPLING END 30URNAL BEARING'7~',\170 160-~150 140 g 130 o 120 I 5 110 100 I~80 70 6D 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TIME" Hours 48 HOUR RUM 0 1 I HOUR RUM hFTER COOLDOWH


2M-AFA-PQ 1 AUXILIARY FEEQWATER PUMP AFN-TE-85-PUMP THRUST BEARING 170 160 150 140 130 0 a t.o 120 I 110 100 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE-Hours 48 HOUR RUN 0 1 1 HOUR RUN AFTER COOLOOMN VR 2M-AFA-PO1 AUXILIARY FEEOWATER PUMP ROOM-ENVIRONMENTAL QATA\90 80 I I H 70 y.w 60 I-50 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 tIME" Hours 48 HOUR RUN 90 P.BO Cl 70 60 50 DRY BULB 0?4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 tIME-Hours 48 HOUR RUN 0 I'V J\}}
0   I' V
J
    \}}

Latest revision as of 04:57, 4 February 2020

Auxiliary Feedwater Pump 48 H Endurance Test Results, Per Sser (NUREG-0857).W/851224 Ltr
ML17299A902
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/24/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0857, RTR-NUREG-857 ANPP-34329-EEVB, NUDOCS 8512310150
Download: ML17299A902 (35)


Text

'r RECULAOIY INFORNATION DISTRIDUTI(SYSTEN (RIDE')

ACCESSION NBR: 8512310150 DOC. DATE: 85/12/24 NOTARIZED: NO DOCKET 0 FACIL: STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 AUTH. NANE AUTHOR AFFILIATION VAN BRUNT', E. Arizona Nuclear Power ProJect (Formerly Arizona Public Serv RECIP. NANE RECIPIENT AFFILIATION KNIQHTON Q. M. PMR Prospect Directorate 7

SUBJECT:

"Auxiliary Feedeater Pump 48 H Endurance Test Resultsi" per SSER (NUREQ-0857). N/851224 ltr.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED: LTR Submittal: Qeneral Distribution g ENCL + SIZE:

NOTES: Standardized plant. 05000529 RECIPIENT COP IES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NAME LTTR ENCL PNR-B PD7 PD 01 5 5 LIC ITR*iE 1 1 INTERNAL: ACRS 09 6 ADM/LFNB 1 0 ELD/HDS3 1 0 NRR BMR EB 1 1 NRR PNR-A EB 1 1 NRR PNR-B EB 1 NRR/DHFT/TSCB 1 1 NRR/DSRO DIR 1 1 NRR RBW B 1 NRR/GRAS 1 0 E~LE 04 1 1 RQN5 1 1 EXTERNAL: 24X 1 EQSQ BRUSKEi 8 1 1 LPDR 03 1 NRC PDR 02-, 1 1 NSIC 05 1 TOTAL NUNBER OF COPIES REQUIRED: LTTR 28 ENCL 25

I

'lf

~ II II Jl Xf' Q I 4 I I

'Il 4 45

- 4 wi,l jww VI I 0 P

44

~ 4

, 43k ff V,I; I

4 )'w I WI Jfl fw Jl I

J (I' RP I 4 "I wg , llx,( ff I

'VV tf X",ii 4 wx

VI 4

44 If 4 I 4 'll I ~ VX I E,I R w. 4,>-C, I',

~ 4

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA B5072-2034 December 24, 1985 ANPP-34329-EEVB/PGN-98.07 Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Deputy Director PWR Project Directorate II7 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-46)

Auxiliary Feedwater Pump 48 Hour E'ndurance Test File: 85-056-026

Reference:

Safety Evaluation Report'elated to the operation of Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (NUREG<857) dated November, 1981

Dear Mr. Knighton:

As required by Section 22.2 (II.E.l.l) of the above reference, please find attached the results of the auxiliary feedwater system (AVOWS) pump 48-hour endurance tests.

If you have any questions or require additional information, please contact Mr. W. F. Quinn of my staff.

Very truly yours, CUW E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/WFQ/PGN/dim Attachment cc: E. A. Licitra M. C. Ley R. P. Zimmerman A. C. Gehr

.. lad: D, CRUTCNPIELD (Ltr only) g EB (N JO!OISTON)

RSB (TIIONAS)

I $ EICSB (PARR). ~

FOB (II REOAN)

0, it 0 ~

0 0

Attachment to ANPP- 34329 ATTACHMENT Auxiliary Feedwater Pump 48 Hour Endurance Test Results 8512310150 851224 I PDR ADOCK 05000529 F PDR

Page 2

1) 2M-AFN-POl - Non-essential AFW pump 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance testing data:

a) Date of testing: July 2, 1985 through July 4, 1985 b) Bearing Temperatures The limits for each bearing temperature, along with the maximum obtained temperature are listed below:

AFN-TE-79 (Limit 190'F max) Max. 161'F AFN-TE-81 (Limi.t 190'F max) Max. 153'F AFN-TE-89 (Limit 200'F max) Max. 161 F AFN-TE-90 (Limit 200'F max) Max. 152'F AFN-TE-91 (Limit 200'F max) Max. 163'F c) Flow Data: Data was collected with a clamp on flowmeter on the recirculation line to the CST. The MITE used was a Controlotron Model 865580 and flow data recorded was about 280 gpm during the test.

d) Vibration Data: Data was collected using a hand held vibration meter and probe. The M&TE used was an IRD Model 8810. The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below:

Inboard bearing: .4 .6 mils Outboard bearing: .9 1.2 mils The 91PE-2AF01 48-hour endurance run demonstrated that 2M-AFN-POl remained within design limits with respect to bearing tempera-tures and vibration. The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded.

2M-AFN-PO1 AUXILIARY FEEDWATER PUMP

AFN-TE-79 FREE END MOTOR BEARING 170 160 150 140 s 130 0

0 a 120 I

5I 110 C

100 I

80 70 I

60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TINE - Hours I HOUR RUN AFTER COOLDOWN 48 HOUR RUN

2M-AFN-P01 AUXILIARY FEEONATER PUMP AFN-TE-81 COUPLING END MOTOR BEARING 170 160 150 140 u 130 a 120 5 110 100 90 80 70 60 II 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TINE - Hours 1 HOUR RUN AFTER COOLDOIIN 48 HOUR RUN

C 2M-AFN-P01 AUXILIARY FEEDMATER PUMP AFN-TE-89 PUMP THRUST SEARING 170 160 150 140 u 130 0

o 120 I

EIJ 5 110 100 80 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE - Houcs I HOUR RUN AFTER COOLOOW 48 HOUR RUN

l' 2M-AFN-POl AUXILIARY FEEOWATER PUMP AFN-TE-90 PUMP COUPLING ENO JOURNAL BEARING 170 160 150 140 130 a

0 o 120 I

5 110 100 I

90 80 70 60 8 20 22 24 26 28 30 32 34 36 38 40 42 44 M

0 2 4 6 10 12 14 16 18 46 48 0 1 TINE Hour o 1 HOUR RUN AFTER COOLOOMN 48 HOUR RUN

2M-AFN-PO1 AUXILIARY FEEOWATER PUMP AFN-TE-91 PUMP FREE ENO JOURNAL BEARING

'l 170 160 150 140 g 130 120 I

5 110 100 I

90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE Hours 1 HOUR RUN AFTER COOLDOMN 48 HOUR RUN

Page 8

2) 2M-AFB-P01 Essential APW pump 48-hour endurance testing data:

a) Date of Testing: June 13, 1985 through June 15, 1985.

b) Bearing Temperatures - The limits for each bearing temperature, along with the maximum obtained temperature are listed below:

AFN-TE-80. (Limit 190'F max)  : Max. 151'F AFN-TE-82 (Limit 190'F max)  : Max. 149'F AFN-TE-86 (Limit 200'F max)  : Max. 162'F AFN-TE-87 (Limit 200'F max)  : Max. 161'F AFN-TE-88 (Limit 200'F max)  : Max. 148'F c) Flow Data: Data was collected using a clamp on flowmeter on the recirculation line to the CST. The METE used was a Controlotron Model fI65580 and flow data recorded was about 235 gpm during the test.

d) Vibration Data: Data was collected using a hand held vibration meter and probe. The ATE used was and IRD Model 8810. The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.

Inboard Bearing: .8 1.0 mils Outboard Bearing: .9 1.2 mils e) Pump room temperature and humidity data: Data was collected using a psychrometer to measure wet and dry bulb temperatures. From this data relative humidity was also calculated.

Temperature Range: 68'F - 73'F Relative Humidity Range: 52% 82%

The 48-hour endurance run demonstrated that 2M-AFB-P01 remained within design limits with respect to bearing temperatures and vibrations. The test data also showe'd that the pump room ambient conditions (temperature, humidity) did not exceed environmental qualification limits for safety related equipment in the room, The following plots made for the bearing temperatures versus time demonstrated that the design limits . were not exceeded. Plots were also made fo'r the pump room temperature and humidity data versus time.

2M-AFB-PO1 AUXILIARY FEEOMATER PUMP AFN-TE-BO FREE ENO MOTOR BEARING

+FOR THE FIRST 2.5 HOURS, A PROBLEN EXISTED WITH THE INPUT TO THE PLANT COHPUTER. OATh, AS SHOWN. IS NOT REPRESENTATIVE OF INITIAL STARTING TENPERATURES. SUPPLENENTARY DATA IS AVAILABLE IN APPENDIX E OF 91PE-2AFOI ~

160 ISD 140 a 130 a

a a 120 I

5 110 100 90 80 70 0 2 4 6 9 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 49 0 TIME - Hours I HOUR RUN AFTER COOl DOWN 49 HOUR RUN

O.

f

2M-AFB-POl AUXILIARY FEED>/ATER PUMP AFN-TE-82 COUPLING END MOTOR BEARING Oo (D

170 160 150 140 130 0

Ql c) 120 I

5 110 100 I

80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TIHE - Hours 1 HOUR RUN AFTER COOLOOVN 48 HOUR RUN

2M-AFB-P01 AUXILIARY FEEDWATER PUMP gq AFN-TE-86 PUMP FREE END JOURNAL BEARING s I e

e 170 160 150 140 g 130 ee 120 I

5 110 100 e

90 80 70 60 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 T1HE - Hours 1 HOUR RUN AFTER COOLOOWN 48 HOUR RUN

2M-AFB-PO1 AUXILIARY FEEDWATER PUMP AFN- TE-87 PUMP COUPLING END JOURNAL BEARING 170 160 150 140 g 130 0

a 120 I

5 110, 100 I

90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE Hours I HOUR RUN AFTER COOLDOWN 48 HOUR RUN

2M-AFB-P01 AUXILIARY FEEDWATER PUMP AFN-TE-88 PUMP THRUST BEARING 170 160 150 140 y 130 0

0 o 120 I

5I 110 100 90 80 70 60 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 M

TJME - Hours 1 HOUR RUN AFTER COOLOOWN 48 HOUR RUN

2M-AFB-PO1 AUXILIARY FEEDWATER PUMP ROOM ENVIRONMENTAL DATA 90 BO I

I H 70

)

w I-60 50 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE - Havro 48 HOUR RUN 90 P. 80 a

D

~

70 ORY BULB

o. 60 ~ WET BULB w

50 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE " Hovro 48 HOUR RUN

I

~ I

Page 15

3) 2M-AFA-P01 Essential AFW pump 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance test data a) Date of testing: July 12, 1985 through July 14, 1985, and July 19, 1985.

b) Bearing Temperatures The limits for each bearing temperature, along with the maximum obtained temperature are listed below:

AFN-TE-59 (Limit 200'F max) Max. 137'F (128.8'F)*

AFN-TE-60 (Limit 200 F max) Max. 115'F (126.7'F)*

AFN-TE-83 (Limit 200'F max) : Max. 167'F AFN-TE-84 (Limit 200'F max) : Max. 157'F AFN-TE-85 (Limit 200'F max) : Max. 166 F

  • Maximum values while using hand held contact pyrometer (M&TE) for bearing surface temperatures.

c) Flow Data: AFA-POl was run on minimum recirculation during the 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> run. Operations also used AFA-F01 to feed the steam generators while at the 565'F and 2250 psia test plateau.

d) Vibration Data: Data was collected using a hand held vibration meter and probe. The M&TE used was an IRD Model

/3350. The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.

Inboard Bearing: .24 .46 mils Outboard Bearing: .35 .64 mils e) Pump room temperature and humidity data: Data was collected using a calibrated temperature and humidity meter (M&TE).

Temperature Range: 67.2'F to 80.5'F Humidity Range: 49.3% to 70.9/

The 48-hour endurance run demonstrated that 2M-AFA-P01 remained within design limits with respect to bearing temperatures and vibrati'on. The test data also showed that the pump room ambient conditions (temperature, humidity) did not exceed environmental qualification limits for safety related equipment in the room.

The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded. Plots were also made for the pump room temperature and humidity data versus time.

AJM:GEP:RLG:WHF:mg

~ .

2M-AFA-P01 AUXILIARY FEEO>lATER PUMP AFN-TE-59 TURBINE GOVERNOR ENO JOURNAL BEARING B EARING SURFACE TENPERATURE 170 H 8, TE USED WHILE AFN-TE-059 INOPERATIVE I

160 150 140 g 130 0

a 120 I

EU 5 110 100 90 8D 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TINE - Hours I HOUR RUN AFTER COOLDOWN 48 HOUR RUN

2M-AFA-PO1 AUXILIARY FEEOWATER PUMP Q ~

AFN- TE-60 TURBINE COUPLING ENO JOURNAL BEARING OCI lD 8 EARINC SURFACE TEHPERATURE 170 H L TE USED NIILE AFN-TE-060 INOPERATIVE 160 150 140 o 130 0

o 120 I

W 5 110 100 I

90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TIHE - Hours I HOUR RUN AFTER COOLDOW 48 HOUR RUN

O.

J y,

2M-AFA-P01 AUXILIARY FEEDWATER PUMP AFN-TE-83 PUMP FREE ENO JOURNAL BEARING

\

170 160 1SO 140 U.

s 130 a 120 I

IV 110 100 90 80 70 60 1 I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TlHE - Haves 1 HOUR RUN AFTER COOLDOMN 48 HOUR RUN

l' 2M-AFA-P01 AUXILIARY FEED>/ATER PUMP AFN-TE-84 PUMP COUPLING END 30URNAL BEARING

'7

~ ',

\

170 160

~

150 140 g 130 o 120 I

5 110 100 I~

80 70 6D 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TIME " Hours I HOUR RUM hFTER COOLDOWH 48 HOUR RUM

2M-AFA-PQ 1 AUXILIARY FEEQWATER PUMP AFN-TE-85 PUMP THRUST BEARING 170 160 150 140 130 0

a t.

o 120 I

110 100 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE Hours 1 HOUR RUN AFTER COOLOOMN 48 HOUR RUN

VR 2M-AFA-PO1 AUXILIARY FEEOWATER PUMP ROOM

- ENVIRONMENTAL QATA

\

90 80 I

I H 70 y.

w 60 I-50 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 tIME " Hours 48 HOUR RUN 90 P. BO DRY BULB Cl 70 60 50 0  ? 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 tIME - Hours 48 HOUR RUN

0 I' V

J

\