Piping Verification Test Summary
ML17305B192
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/13/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
161-03591-WFC-R, 161-3591-WFC-R, NUDOCS 9011200322
Download: ML17305B192 (54)


Text

~ACCELERATED D> TRIBUTION DEMONS RATION SYSTEM

~ l.

p REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR'9011200322 DOC.DATE: 90/11/13 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

"Palo Verde Nuclear Generating Station Unit 3 Piping Verification Test Summary."

W/901113 ltr.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:Standardized plant.

D S

05000530 INTERNAL:

RECIPIENT ID CODE/NAME PD5 LA PETERSON,S.

ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS 1 RES/DS IR/EIB COPIES LTTR ENCL 1

1 2

2 6

6 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD5 PD TRAMMELL,C.

NRR/DET/ECMB 9H NRR/DOEA/OTS B1 1 NRR/DST/SELB 8D NRR/DST/SRXB 8E ZM G FILE 01 COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

0 1

1 D

D EXTERNAL: NRC PDR NOTES:

1 1

1 1

NSIC D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 25 D

D

~

~

Arizona Public Service Company P.O. BOX S3999

~

PHOENIX. ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCI.EAR 161-03591-tItFC/RAB/DAF November 13, 1990 Docket No.

STN 50-530 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Mail Station Pl-37 Washington, DE C.

20555

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 PVNGS Unit 3 Piping Verification Test Summary File:

90-F-056-026; 90-136-419

Attached, please find the PVNGS Unit 3 piping verification test summary, in accordance with Section 3.9.2 of the Safety Evaluation Report (SER),
November, 1981.

Ifyou have further questions on this matter, please contact Mr. M. E. Powell of my staff at (602) 340-4981.

Sincerely, WFC/RAB/DAF/pmm Attachment cc:

J.

B. Martin A. H. Gutterman A. C. Gehr D. H.

Coe 90ii200322 90iii3 PDR ADOCK 05000530 P

PDC

,9i

~'~

~

I s

I'

PVNGS UNIT III PIPING VERIFICATION Test Summary

l l

I

~

INDEX UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 1

OF 25 SECTION 1.0 2.0 2.1 2.2 TITLE INTRODUCTION DISCUSSION TEST OBJECTIVES INITIALTEST CONDITIONS PAGE 2.3 2.3.1 DEFINITION OF TEST MODES THERMAL EXPANSION 2.3.2 2.3.3 2.4 2.5 STEADY-STATE VIBRATION DYNAMIC EFFECTS PROGRAMS METHOD OF, TEST VERIFICATION ACCEPTANCE'RITERIA 9

10 2.6 2.7 2.7.1 2.7.1.1 2.7. 1.2 EVALUATION AND APPROVAL OF TEST RESULTS INDIVIDUALTEST DESCRIPTIONS PRE-CORE HOT FUNCTIONAL TEST PHASE 91HF-3ZZ06 B.O.P.

PIPING STEADY STATE VIBRATION TEST 91HF-3ZZ07 B.O.P.

PIPING DYNAMIC TRANSIENT TEST 12 12 12 13 2.7.1.3 2.7. 1.4 2.7. 1.5 2.7. 1. 6 91HF-3ZZ08 B.O.P.

PIPING THERMAL EXPANSION TEST 91HF-3ZZ12 B.O.P.

PIPING WHIP RESTRAINT AND 5-WAY RESTRAINT THERMAL EXPANSION TEST 91HF-3FW02 AUXILIARYFEEDWATER WATERHAMMER TEST 91HF-3RC01 RCS EXPANSION MEASUREMENTS 15 16 17 18

0 I

~

~

t t;

l

INDEX (Cont'd)

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 2

OF 25 SECTION TITLE PAGE 2.7.2 POST CORE HOT FUNCTIONAL TEST PHASE 20 2.7.2.1 73HF-3ZZ09 PIPE WHIP RESTRAINT MEASUREMENTS 20 2.7.2.2 2.7.3 2.7.3.1 2.7.3.2 73HF-3RC02 RCS THERMAL EXPANSION MEASUREMENTS POWER ASCENSION TESTING 73PA-3ZZ02 B.O.P.

PIPING STEADY STATE VIBRATION TEST 73PA-3ZZ03 B.O.P.

PIPING DYNAMIC TRANSIENT TEST 21 22 22 23 2.7.3.3 73PA-3ZZ04 B.O.P.

PIPING THERMAL EXPANSION TEST 24 2.7.3.4 73PA-3ZZ09 P.A.T.

PIPE WHIP RESTRAINTS THERMAL EXPANSION MEASUREMENTS 25

3.0 CONCLUSION

26

LIST OF ABBREVIATIONS UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 3

OF 25 AF APS AS ASME BOP BPC CE CESSAR Auxiliary Feedwater System Arizona Public Service Auxiliary Steam System American Society of Mechanical Engineers Balance of Plant Bechtel Power Corporation Combustion Engineering Combustion Engineering Standard Safety Analysis Report CH or CVCS Chemical and Volume Control System CS CT DF DG EC EER EW FSAR HFT HPSI LPSI LVDT MS MSSS Containment Spray L

Condensate Transfer System I

J'iesel Fuel Oil and Transfer System Diesel Generator System II Essential Chilled Water System Engineering Evaluation Request Essential Cooling Water System Final Safety Analysis Report Hot Functional Testing High Pressure Safety Injection System Low Pressure Safety Injection System Linear Variable Differential Transformer Main Steam System Main Steam Support Structure

l

\\

)

M lt

),

IL II if

NC NED PAT PC PVNGS RCP RCS SFR Nuclear Cooling Water System Nuclear Engineering Department UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 4

OF 25 Power Ascension Testing Fuel Pool Cooling and Cleanup System Palo Verde Nuclear Generating Station Reactor Coolant Pump Reactor Coolant System Startup Field Report S/G or SG

Steam Generator System SI SP TC TER WR Safety Injection System Essential Spray Pond System Thermocouple Test Exception Report Work Request

I 4'

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 5

OF 25 PVNGS UNIT III PIPING VERIFICATION PROGRAM TEST

SUMMARY

1.0 INTRODUCTION

The Piping Verification Program at PVNGS was established to meet various Code and Regulatory Guidelines and was conducted over a

period of several years which included Initial Prerequisite

Testing, Pre-Core Hot Functional Testing, and Post Core Testing.

The Program complied with the following guides and standards:

A.

PVNGS Design Criteria Part II, Section 5.10 of the Plant

Design, General Design Criteria Section.

B.

U.S.

NRC Regulatory Guides 1.26, 1.58 and 1.68 C.

U.S.

NRC Standard Review Plan 3.9.2 D.

PVNGS FSAR Section 3.9.2, Appendix 14.B.11, and Section 14.2 E.

ASME Code Section III Subsections NA, NB, NC and ND F.

G.

Requirements for Pre-Operational and Initial Startup Vibration Testing of Nuclear Plant Piping

Systems, ANSI/ASME/OM-3; Draft 1, Revision 3 (future testing will be to OMa-1988)

NUREG/CR-1606, "An Evaluation of Condensation Induced Water Hammer in Preheat Steam Generators."

H.

CESSAR Section 14.2.12.2.3, "Pre-Core Reactor Coolant System Expansion Measurements."

CESSAR Section 14.2.12.2.14, "Downcomer Feedwater System Waterhammer Test."

J.

CESSAR Section 14.2.12.5.17, "Main and Emergency Feedwater Systems Test."

2.0 DISCUSSION

2.1 TEST OBJECTIVES:

The objective of the piping verification program was to ensure the structural 'and functional integrity of the, piping systems.

The piping verification program was conducted in three separate test steps:

thermal expansion, steady-state vibration, and dynamic effects testing.

The piping verification program included

I

~

~

I

~

I UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 6

OF 25 selected portions of the following systems:

1.

ASME Code Class 1,

2 and 3 systems.

2.

Other high energy systems inside Seismic Category

" I structures.

3.

High energy portions of systems whose failure could reduce, the functioning of any Seismic Category I plant feature to an unacceptable safety level.

4.

Seismic Category I portions of moderate energy systems located outside containment.

System selection was based upon a determination that there shall be a reasonable expectation of occurrence for the tested events, and that the s'stem is in a normal plant operating mode.

High energy piping is defined as piping with operating temperature greater than 200'F or operating pressure greater than 275 psig.

Moderate energy piping is defined as piping with operating temperature less than 200'F and'perating pressure less than 275 psig.

Additionally, the testing program verified the operability of snubbers on the above identified systems with an expected thermal travel greater than 0.25 inches.

Thermal expansion testing was performed to verify that during the process of heating up and cooling down the plant, piping and major components subjected to various steady-state temperature conditions were free to expand and contract with no stress in excess of ASME Code allowable stress generated from piping s'upports,

hangers, stops, pipe whip restraints, or the piping itself.

Assurance of the operability of snubbers was also verified.

Steady-state vibration testing was performed to verify that vibrations in the piping systems, induced by,flow in the pipe and equipment

motion, did not produce unacceptable vibration levels.

.Dynamic effects testing was performed to verify the adequacy of piping systems and piping restraints during normal operation and transient conditions such as pump

starts, stops, and valve closures.

E l

t 4

l'

+

Ii

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 7

OF 25 2.2 INITIALTEST CONDITIONS:

A.

All quality class mechanical snubbers have been tested per PVNGS Station Procedure 73TI-9ZZ03, "Snubber Pre-Service Inspection."

B.

Inspection for possible obstructions before pending piping and RCS components thermal

,movement has been performed.

C.

Inspection for damage to piping supports and restraints (rigid, spring and snubber) and insulation has been performed.

D.

Initial position of RCS components,

pipe, snubbers, or spring hangers before thermal heatup for anticipated measurement of pipe snubber movement has been established and proper cold set verified and recorded.

E.

All temporary hangers and spring hanger travel stops have been removed.

F.

Testing personnel have been familiarized with the piping system to be tested and are familiar with the communication procedure to stop the test.

2.3 DEFINITION OF TEST MODES:

2.3.1 Thermal Expansion 2.3 2

The thermal expansion testing was performed in incremental temperature steps.

The step increment for heatup was governed by the reactor coolant system temperature during Hot Functional Testing, and by power testing plateaus during Power Ascension Testing for piping systems connected to the RCS.

Steady-State Vibration 2.3.3 The steady-state vibration testing was performed at the normal operating mode of the piping systems.

Dynamic Effects Program The dynamic effects program was performed at the system conditions specified below. Operating modes were as follows:

A.

Preoperational (Pre-Core Hot Functional)

Testing

I b

r

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 8

OF 25 1.

Charging

'System starting and stopping of the charging pumps during conditions of both low and high pressure within the reactor coolant system.

2.

Letdown System opening and closing of valves with the reactor at operating temperature and pressure.

3.

Pressurizer Spray System opening and closing of the control valves under maximum flow conditions.

4.

Shutdown Cooling System opening of the isolation valves and operation of the LPSI pumps with the system aligned for shutdown cooling.

Operation of containment spray (placed on recirculation) and LPSI pumps simultaneously.

5.

Steam Generator Blowdown

closing of the containment isolation valve with the steam generator at high rate flow condition.

6.

Safety Injection starting, full operation, and shutdown of the HPSI pumps.

7.

Actuation of a

main steam relief valve at set pressure at its (approximate) rated flow capacity.

8.

Starting and stopping:

a ~b.

c ~

d.

Essential Cooling,Water Pumps Essential Chilled Water Pumps Auxiliary Feedwater Pumps Fuel Pool Cooling Pumps l(

i 9.

Auxiliary Feedwater Waterhammer Test lowering S/G Water Level below the Feed sparger and restoring Auxiliary Feedwater Fl'ow.

Power Ascension Testing Main Steam a ~

Rapid closure of turbine stop valves at 100 percent po9er level.

b.

Actuation of atmospheric dump valves.

2 ~

Main Feedwater a ~

Starting and stopping of feedwater pumps.

g

'\\j r

1'

r ~

~

I 1

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 9

OF 25 b.

Operating main feedwater pump using the S/G downcomer inlet up to approximately 15 percent

power, then switching flow to S/G economizer inlet.

Testing also involved observing feedwater piping response within containment building.

2.4 METHOD OF TEST VERIFICATION:

A. Thermal Expansion 1 ~

The thermal expansion test involved monitoring all identified systems for piping expansion due to temperature changes of the metal itself.

The monitoring was performed by measuring the RCS components and the piping thermal movement and/or by visual inspection.

Specified RCS temperature plateaus were attained for plant heatup and cooldown.

The piping expansion and contraction was monitored by measuring the movement of snubbers and spring hangers complimented with remote position indicating instrumentation.

All necessary data was then obtained and recorded.

The following tests were performed to fulfillthese requirements:

91HF-3ZZ08g 91HF-3ZZ12; 91HF-3RC01; 73HF-3ZZ09; 73HF-3RC02 73HF-3RC01; 73PA-3ZZ04; 73PA-3ZZ09.

B. Steady-State Vibration 1 ~

The piping was checked by visual means for steady-state vibration during normal systems operation and supplemented with quantitative measurements obtained with vibration monitoring instruments.

2 ~

Velocity measurements, made with portable instrumentation, were at intervals along the pipe on exposed portions of the pipe or on the pipe clamp.

Measurements were taken perpendicular to the pipe and at right'ngles.,to

'each other at a section of the pipe.

ft Personnel utilized for the, vibration inspection',were trained in the usage of equipment and the vibration monitoring technique.

I The following tests were performed to fulfillthese requirements:

91HF-3ZZ06; 73PA-'3ZZ02~.

K 2

~

~

t UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 10 OF 25 C.

Dynamic Effects 1 ~

2.

For the dynamic effects test, the monitoring of specified lines and points was accomplished with instrumentation temporarily installed on the piping or piping restraints through visual inspection.

Visual inspections were performed prior to and after the system had undergone a transient.

Piping, pipe whip restraints, pipe supports, penetration sleeves (where piping passes through walls and floors), or other components in the system were inspected for signs of damage.

The following tests were performed to fulfillthese requirements:

91HF-3ZZ07; 91HF-3FN02; 73PA-3ZZ03.

2.5 ACCEPTANCE CRITERIA:

A. Thermal Expansion Measured thermal deflection was consistent with calculated deflection that had been corrected to test condition temperature.

2.

Piping movement was not obstructed.

3.

Movement of supports was not to exceed the working travel range.

4 ~

The resulting stress values, from thermal expansion was in compliance with the applicable ASME Boiler and Pressure Vessel Code.

B. Steady-State Vibration 2 ~

3 ~

Measured steady-state values:

less than 2.5 in/sec velocity Visual inspection:

No noticeable vibration.

The resulting stress

values, from vibration, were not greater than one-half the alternating stress intensity at 106 stress'ycles,

,as defined in Section III of the ASME Boiler and Pressure Vessel Code.

I

1

~

)

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 11 OF 25 C.

Dynamic Effects 1.

Measured dynamic values for specific locations were below predetermined maximum allowable loads.

2.

No visual detectable permanent deformations occurred in the piping supporting system that would negate the support's intended function.

2.6 EVALUATION AND APPROVAL OF TEST RESULTS:

All obtained data was forwarded to the respective APS,BPC or CE Engineering organizations for evaluation and reconciliation with existing engineering documents and calculations.

Approval of the test results by these organizations was made part of the permanent test package.

All test packages were reviewed and approved by the PVNGS Test Results Review Group (TRRG) in accordance with the appropriate PVNGS Station Manual Procedures.

2.7 INDIVIDUALTEST DESCRIPTIONS:

The individual tests as well as the obtained test results will be discussed in this section.

Section 2.7.1 will discuss tests conducted during the Pre-Core Hot Functional Test Phase.

Section 2.7.2 will discuss tests conducted during the Post Core HFT. Section 2.7.3 addresses the tests performed during Power Ascension Testing.

E 2.7.1 PRE-CORE HOT FUNCTIONAL TEST PHASE a.

91HF-3ZZ06 B.O.P. Piping Steady State Vibration Test b.

91HF-3ZZ07

, B.O.P. Piping Dynamic Transient Test c.

91HF-3ZZ08' B.O.P. Piping Thermal Expansion Test d.

91HF-3ZZ12 B.O.P.

Piping Whip Restraint and 5-Way Restraint Thermal Expansion Test e.

91HF-3FW02 Auxiliary Feedwater Waterhammer Test f.

91HF-3RC01 RCS Expansion Measurements 2.7.1.1 91HF-3ZZ06 B:O.P.

PIPING STEADY STATE VIBRATION TEST A.

Test Objective:

gi 1

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 12 OF 25 The purpose of this procedure was to demonstrate

'that the flow induced vibration experienced by the ASME Section III Code Class 1,

2; and 3

Systems piping and other selected high and moderate energy piping is acceptable.'cceptable vibrations are those which could not be visually observed, or when measured did not exceed a screening velocity of 2.5 in/sec. Ifvibration was to exceed 2.5 in/sec. the particular piping vibration 'ould have to be analyzed for acceptability.

The following systems were tested:

AF Auxiliary Feedwater SI Safety Injection and Shutdown Cooling RC Reactor Coolant CH Chemical and Volume Control PC Fuel Pool Cooling and Cleanup NC Nuclear Cooling Water EW Essential Cooling Water EC Essential Chilled Water DF Diesel Fuel Oil and Transfer AS Auxiliary Steam SS Nuclear Sampling System SP Essential Spray Pond System DG Diesel Generator System MS Main Steam System CT Condensate Transfer System B.

Test

Description:

Systems to be tested were operated in their normal operational

mode, as required by their applicable

'\\

5

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 13 OF 25 station operating procedures.

While in this mode the system piping, applicable branch

piping, and components were observed for vibration.

The acceptability of the vibrations was determined by visual inspection and supplemented by portable vibrometer readings at preselected points.

C.

Test Results All of the data collected and test results obtained were within the acceptance criteria.

D.

==

Conclusions:==

All systems tested operated normally and the vibrations observed or manually measured fell within the acceptance criteria.

All systems, as supported and operated, performed as designed.

2.7.1.2 91HF-3ZZ07 B.O.P.

PIPING DYNAMIC TRANSIENT TEST A.

Test Objective:

The purpose of this procedure was to verify, visually and through installed instrumentation, the adequacy of piping systems and their supports during transient conditions such as pump starts,

stops, and valve closures during normal plant operations.

The following systems were tested:

EW Essential Cooling Water System PC EC SI CVCS Fuel Pool Cooling System f

Essential Chilled Water System Safety Injection Systems Chemical and Volume Control System RC Pressurizer Spray System SC Steam Generator Blowdown System SG Steam Generator Safety Valve Lift AF Auxiliary Feedwater

l

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 14 OF 25 RC Reactor and Pressurizer

[lead Vent Systems]

B.

Test

Description:

For this test, each system was inspected prior to the transient for damaged insulation,

pipes, and hangers.

After this inspection the transient was initiated either by starting and stopping pumps or by opening and closing valves.

After the transient, the piping system was inspected again to verify that no damage was apparent other than that noted during the pre-test inspection.

Additionally, the S/G 1

blowdown piping was instrumented with load cells to determine the induced loads on the snubber pins during closing of the containment isolation valve.

C.

Test Results:

Each system that was tested met the acceptance criteria in that no damage was noted during the post-test

walkdown, thus proving that the system
supports, as installed, are adequate to handle normal operational transients.

Observed loads were below the calculated maximum allowable loads.

D.

==

Conclusions:==

The procedure met its objective by subjecting selected systems and components to normally expected operational transients

except, as noted above.

The systems tested responded without causing any damage to components, piping, or supports.

2.7.1.3 91HF-3ZZ08 B.O.P.

PIPING THERMAL EXPANSION A.

Test Objective:

The purpose of this procedure was to verify that selected ASME III Class 1, 2, 6

3 piping was capable of expanding and contracting during system heat up and cooldown.

Additionally, it was demonstrated that selected hangers and snubbers on these systems worked as designed without exceedi'ng the, design limits.

The following systems were tested:

DG Diesel Generator System AS Auxiliary Steam System

1 I

I 4 ~

I

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 15 OF 25 CH Chemical and Volume Control System SI Safety Injection System RC Reactor Coolant System SG Steam Generator System SS Nuclear Sampling System B.

Test Description During heatup and cooldown, the system piping and supports were checked by visual observation, by measurements taken with instruments and by hand rulers at selected points.

All the data taken was compared to the cold ambient data for assurance of proper movements and stress acceptability.

C.

Test Results:

The data obtained during the performance of this procedure proved the ability of the systems tested to expand and contract without binding from ambient (70 F

130'F) conditions to normal operating conditions at 565'F and back to ambient.

Four TE's were resolved during the test.

Two TE's, TE-02

& TE-04, covered a disconnected hanger.

TE-01 was for an Auxiliary steam line warmed up prior to the cold ambient walk down.

TE-03 was for hangers that were inaccessible at temperature due to hot lines.

D.

==

Conclusions:==

The B.O.P.

piping, as installed, expanded and returned to normal as was expected.

Therefore, the systems are acceptable.

2.7.1.4 91HF-3ZZ12 B.O.P.

PIPING WHIP RESTRAINT AND 5-WAY RESTRAINT THERMAL EXPANSION TEST A.

Test Objective:

The purpose of this procedure was to observe and document the thermal movement of the SG and RC piping systems relative to their respective whip restraints for the heatup and cooldown during Hot Functional Testing.

, Verification of the unobstructed movement of the piping system while

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 16 OF 25 B.

Test maintaining prescribed maximum/minimum clearances for those'ystems operating at design temperatures was also an objective of this test.

==

Description:==

The referenced piping systems were observed at the various test plateaus during plant heatup and cooldown ambient (70 F,

460 F, 565 F,

350 F,

280 F,

and ambient.

Measurements were taken at preselected locations to determine the movement of the pipe relative to the whip restraints due to thermal movement of the piping system.

These observations and measurements were compared to the data obtained at plant ambient conditions.

C.

Test Results:

D.

The acceptance criteria has been met by all restraints with respect to paragraphs 1.2.1 and 1.2.3 from the procedure in that pipe movement was not restrained at any of the monitored pipe whip restraint locations, and all measured gaps were above the prescribed minimum.

The acceptance criteria as defined by paragraph 1.2.2 was not achieved as indicated by the installed surface thermocouple.

Additionally, for several restraints, the required gaps were not obtained.

Test Exception 02 and SFR 3-XX-079 address these discrepancies by evaluating the safety significance of each measurement.

The discrepanci'es were eval'uated as

'cceptable or reworked to within the acceptance criteria.

Therefore, all measured gaps were acceptable for'. continued'esting.

There was no observed case of rubbin'g or crushing of the energy absorbing material (EAM).

==

Conclusions:==

The restraints that did not meet the acceptance criteria of this procedure were monitored during Post-Core HFT in accordance with procedure 73HF-3ZZ09, "Pipe Whip Restraint Measurements." All other restraints were acceptable and thus this procedure was closed out and the test results accepted.

To meet the requirements of CESSAR Section 14.2.12.2.14, "Downcomer Feedwater System Waterhammer Test", the following test was performed:

t, II

~ I)

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 17 OF 25 2.7.1.5 91HF-3FW02 '- AUXILIARYFEEDWATER WATERHAMMER TEST A.

Test Objective:

This test was performed to satisfy CESSAR Section 14.2.12.2.14 requirements.

The test consisted of lowering the S/G feedwater level below the feedring, securing feed for at least thirty minutes and initiating auxiliary feedwater flow with both essential auxiliary feedwater pumps at the same time.

The test boundaries included both essential auxiliary feedwater pumps auxiliary feedwater piping to S/G gl and the gl S/G. This test verified the systems ability to withstand the waterhammer induced by these conditions.

B.

Test

Description:

A pretest walkdown of the piping to be tested was conducted to verify pipe integrity.

The S/G feedring had been previously inspected and verified to be properly installed and undamaged.

For the

test, the S/G 01 water level was lowered below the feedring (15~

on narrow range instrumentation).

After 90 minutes without feed flow, full flow from both essential auxiliary feedwater pumps was directed to S/G 41,

'potentially causing a

waterhammer.

After the transient, the auxiliary feedwater piping was walked down again to check for any damage.

The gl S/G auxiliary feed ring was inspected for damage after the plant attained ambient conditions following HFT.

C.

Test Results:

The inspection of the auxiliary feedwater piping following the dynamic event was satisfactory.

The installed instrumentation (load cells) on the auxiliary feedwater line showed no extreme forces were applied to the piping during the test.

The visual inspection of the feed sparger and associated pipe supports also showed no damage due to the induced transient.

D.

==

Conclusions:==

The response of the piping system to the induced waterhammer was acceptable.

No abnormalities either

1

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 18 OF 25 visually or by instrumentation were observed.

To meet the requirements of CESSAR Section 14.2.12.2.3, "Pre-Core Reactor Coolant System Expansion Measurements",

the following test was conducted:

2.7. 1. 6 91HF-3RC01 RCS EXPANSION MEASUREMENTS:

A.

Test Objective:

The purpose of this test was to demonstrate the unobstructed freedom of the RCS to expand and contract during plant heatup and cooldown and to verify the correct sizing of various RCS support shims.

B.

Test Included in this test were all major RCS components including RCS piping, with the exception of the RCS pipe stops.

==

Description:==

At the various test plateaus, RCS components were observed for even expansion by:

a)

Visual Observation b)

Go-No-Go Measurements c)

Measurements at Predetermined Locations These measurements were compared to the original ambient measurements and also against.

each other to assure that no component was locked up.

Feeler

gages, vernier calipers, tape measures and similar:

hand tools were used to obtain the required measurements.

Thermocouples were installed to measure temperature at the top and bottom of the reactor support columns.

C.

Test Results:

I Most of the',obtained measurements were, within the required acceptance criteria, with the exception of the pressurizer keys 3

and 4

which have been documented by TERs and SFRs.

The system responded as expected and the repeatability during the various heatup/cooldown cycles was acceptable.

The above components were reworked and successfully tested during Post Core Hot Functional Testing per procedure 73HF-3RC02.

f i

V

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 19 OF 25 D.

==

Conclusions:==

The reactor coolant system (RCS) and its major components expanded and contracted thermally as expected except at the points described above which were retested successfully during the performance of 73HF-3RC02.

2.7.2 POST CORE HOT FUNCTIONAL TEST PHASE To meet the additional requirements of FSAR Sections 3.9.2 and 14.B.11 the following tests were performed during Post Core HFT.

a.

73HF-3ZZ09 Pipe Whip Restraint Measurements b.

73HF-3RC02 RCS Thermal Expansion Measurements 2.7.2.1 73HF-3ZZ09 PIPE WHIP RESTRAINT MEASUREMENTS A.

Test Objective:

B.

The purpose of this test was to observe and document the thermal movement of the SG and RC piping systems relative-to their respective whip restraints during plant heatup during post Core Hot Functional Testing.

This test.also included the restraints that did not meet the acceptance criteria of 91HF-3ZZ12, "B.O.P. Piping Whip Restraint and 5-Way Restraint Thermal Expansion Test." Shims and energy absorbing material blocks had previously been installed. It was also the purpose of this test to verify the unobstructed freedom of the piping systems while maintaining the prescribed maximum/minimum clearances for those systems operating at design temperatures or controlled by RCS equipment movement.

Test

Description:

The referenced piping systems were observed at the various test plateaus during plant heatup (ambient, 280'F, 340'F, 565'F after 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> soak, and 565'F after 7

days).

Measurements were taken at predetermined locations to determine the movement of the pipe relative to the whip restraints due to'he thermal movement of the piping system or thermal movement of some major piece of equipment '(i.e.,

steam generator) which imposed movement upon the piping system, in question (i.e.,

Safety Injecti'on

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 20 OF 25 and Shut Down Cooling).

These observations and measurements were compared to data obtained during the previous hot functional test and data obtained at plant ambient conditions.

The data obtained for those systems that did not reach design temperature during this test was utilized to forecast design clearances when these systems do reach plant operating temperatures during power ascension testing.

Information concerning repeatability, tolerance, and reliability of the instrumentation provided the basis to give certain assurances that the piping systems were not "hard-up" against the restraints during power ascension when entry into containment was prohibited.

C.

Test Results All pipe whip restraints have met the acceptance criteria of not inhibiting pipe movement.

The specific gap criteria has not been met by several of the restraints.

These whip restraints were either evaluated "accept as is" or reworked and monitored during the power ascension stage of testing.

D.

Conclusions Even though not all measured gaps of the pipe whip restraints fell within the stated acceptance criteria some were determined to meet all the applicable design requirements, one was reworked and monitored during power ascension and the rest were added to the acceptance criteria of 73PA-3ZZ09 and monitored during power ascension testing.

2.7.2.2 73HF-3RC02 RCS THERMAL EXPANSION MEASUREMENTS A.

Test Objective:

B.

The purpose of this procedure was to verify correct sizing of the S/G cross stop shims as well as to satisfy open test exceptions of the pre-core HFT procedure 91HF-3RCOl which involve gap measurements on the pressurizer keys 53 and g4. Another objective was to observe the RCS components again for even expansion.

Test

Description:

As was the case during performance of 91HF-3RC01, the RCS components were observed for even expansion,

p

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 21 OF 25 by visual observation, go-no-go measurements and measurements at predetermined locations, feeler

gages, vernier calipers, tape measures and similar hand tools were used to obtain the required measurements.

C.

Test Results:

All measurements were within the acceptance criteria.

This test satisfies the retest requirements for 73HF-3RC01 TE g3 and 54.

D.

==

Conclusions:==

As installed the RCS expanded with no binding or sticking of the major components.

All required measurements met the stated acceptance criteria.

2.7.3 POWER ASCENSION TESTING To meet the test objective of FSAR section 14.B.11 applicable during power ascension

testing, the following procedures have been implemented:

a.

73PA-3ZZ02 BOP Piping Steady State Vibration Test b.

73PA-3ZZ03 BOP Piping Dynamic Transient Test c.

73PA-3ZZ04 BOP Piping Thermal Expansion Test d.

73PA-3ZZ09 PAT Pipe Whip Restraints Thermal Expansion Measurements'.7.3.1 73PA-3ZZ02 BOP PIPING STEADY STATE VIBRATION TEST A.

B.

Test Objective:

The objective of this procedure was to verify, by; observation and by measurements at selected locations, that the vibrations of the systems were either not visually detectable or were less then 2.5 in/sec of velocity when measured.

The Main Steam and Main Feedwater systems have been tested at the full power plateau.

Test

Description:

)r 4

I

I~, ~

( ~

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 22 OF 25 The piping systems identified in the procedure were visually inspected for apparent vibration.

At selected points vibrations measurements were also taken.

This test was conducted at the 100 percent power plateau and included the Main Steam and Main Feed piping in the turbine building, the MSSS and in containment up to the secondary shield wa11.

C.

Test Results:

The piping met both the visual and measured acceptance criteria.

D.

==

Conclusions:==

The designated systems met the acceptance criteria and performed as designed.

2.7.3.2 73PA-3ZZ03 B.O.P.

PIPING DYNAMIC TRANSIENT TEST A.

Test Objective:

The objective of this procedure was to verify, visually and through installed instrumentation, the adequacy of the piping systems and their supports during transient conditions such as pump starts and stops and valve closures during normal plant operation.

The piping systems tested were the Main Steam Piping to the Atmospheric Dump valves, Main Steam Piping to the Turbine Stop/Control valves, and the Downcomer and Main Feedwater Piping inside and outside of containment.

B.

Test

Description:

For this test, thirty load sensing clevis pins were installed at various hanger locations to record any loads that might be imposed on the piping systems and the restraints.

Additionally, the piping was inspected, prior to and after the transient, to visually verify that no damage had occurred.

The piping to the atmospheric dump valves was tested at 354 power.

The response of the main steam piping to a fast closure of the turbine stop valves was observed during a turbine trip at the 100:

power plateau.

The feedwater piping was monitored during fast

5e i) h l~

$ JA 4

III I

I

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 23 OF 25 closure of the turbine stop valves at 100~ power.

The feedwater piping was also monitored during the up and down power feedwater transfer at approximately 15< power.

C.

Test Results:

Where load cells were installed, the measured loads were within the acceptable calculated values determined by BPC Stress Engineering.

The visual inspection did not reveal any apparent damage due to the transients.

Thus all acceptance criteria has been met for all test plateaus.

No evidence of damaging waterhammer was observed during the feedwater transfer.

TE-01 documented the deletion of the 50%

and 804 trip as the commitment in the FSAR for dynamic transient testing was met by the 1004 trip.

D.

==

Conclusions:==

The piping systems and their supports, as installed, were adequate to safely accommodate expected transients without incurring damage.

2.7.3.3 73PA-3ZZ04 B.O.P.

PIPING THERMAL EXPANSION TEST A.

Test Objective:

The objective of this test was to verify that the selected piping can freely expand and contract during power operations without interference from

supports, other piping, and structures.

The piping systems tested were the Downcomer Feedwater and Main Feedwater Piping.

B.

Test

Description:

Forty two displacement transducers and ten thermocouples were installed at various locations in the system.

The obtained displacement data at each power'lateau,was'orwarded to BPC Stress Engineering.

Upon BPC Engineering acceptance of

'he

data, the responsible engineer notified the Shift Supervisor that the thermal expansion of the systems was acceptable and that power ascension could continue.

Visual inspection and manual measurements were taken on portions of the systems

jl

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 24 OF 25 outside the containment.

Testing was being performed at the 0, 20, 40, 60, 80, and 100 percent power plateaus.

C.

Test Results:

The piping systems tested expanded and contracted in a predictable and acceptable manner without interference.

Two test exceptions were noted.

TE-01 was written to allow system walk down before instrumentation data evaluation by BPC.

TE-02 was written to allow closing of the procedure and tracking removal of the test instrumentation by work order.

D.

==

Conclusions:==

This test was performed successfully with all data received being acceptable at each power plateau.

No retesting was required.

The systems tested expanded thermally as predicted.

2 7.3.4 73PA-3ZZ09 PIPE WHIP RESTRAINTS THERMAL EXPANSION MEASUREMENTS A.

Test Objective:

The objective of this test was to ensure that, after installation of shims and energy absorbing material (EAM) at the pipe whip restraint locations, no piping thermal movement was inhibited and that design clearances of the pipe whip restraints are met when the associated systems are at normal operating conditions. The piping systems tested were the Main Feedwater

System, the Pressurizer Surge
Piping, and the Downcomer Feedwater Piping.

This test also included the restraints that did not meet the acceptance criteria of 73HF-3ZZ09, "Pipe Whip Restraint Measurements."

B.

Test

Description:

This test was monitored entirely by remote instrumentation. Fifty nine lanyards and twenty two linear variable differential transformers (LVDTs) were installed to monitor the gaps between the pipes and the restraints.

Twenty,,one thermocouples to monitor the pipe surface temperature were also

~ ~

UNIT III PIPING VERIFICATION TEST

SUMMARY

PAGE 25 OF 25 installed, one at each restraint data point.

The data was. evaluated for actual gaps and also to establ'ish trends.

C.

Test Results:

The measured gaps at the pipe whip restraints were within the expected

values, with the exception of six restraints.

Two of the six restraints have been evaluated "accept as is" (EER 90-SG-034) and four restraints needed minor adjustments to meet their acceptance criteria.

D.

==

Conclusions:==

The four restraints that required modifications will be reworked during the first planned outage of suffici*ent duration, currently anticipated to begin in March, 1991.

These modifications will bring the restraints within the acceptance criteria.

These

, restraints will be inspected after modification to insure desired gaps have been achieved.

3.0 CONCLUSION

The PVNGS Unit 3

Piping Verification Program has met all

, established licensing and regulatory requirements.

The Piping Verification Program for PVNGS Unit 3 is complete and the results are acceptable.