Proposed Tech Spec Sections 3.9.6 & 4.9.6.1, Refueling Machine
ML17311A385
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/31/1994
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17311A384 List:
References
NUDOCS 9411080119
Download: ML17311A385 (6)


Text

R INFORMATIONONL+

REFU.LING OPERATIONS 3/4'. 9. 6 REFUELING MACHINE LIMITED CONDITION FOR OPERATION 3.9.6 The refueling machine. shall be used for movement of fuel assemblies and shall be OPERABLE with:

a.

A minimum capacity of of less than or equal machine.

APPLICABILITY: During movement cavl ty.

ACTIGN:

3590 ounds and an overload cut off limit t

155 ounds for the refueling m (coo of fuel assemblies within the refueling With the above requirements for the refueling machine not satisfied, suspend use of the refueling machine from operations involving the movement of fuel assemblies.

SURVEILLANCE RE UIREMENTS 4.9.6.1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 3590 pounds and dern trating an automatic load cut off when the refueling machine load exceed 155 pounds.

941108011'2I 941031 PDR ADQDK 05000528 P

PDR PALO VERDE - UNIT 1 3/4 9-6 AMEND"lENT NO. 54;~."

ti

)

R INFORMATIONONl REFUELING OPERATIONS 3/4. 9. 6 REFUELING HACHINE LIHITING CONDITION FOR OPERATION 3.9.6 The refue1ing machine shall be used for movement of fuel assemblies and shall be OPERABLE with:

a.

A minimum capacity of 3590 ounds and an overload cut off limit of less than or equal t 155 pounds for the refueling machine.

I &DO APPLICABILITY: During movement of fuel assemblies within the refueling cavity.

ACTION:

With'the'above requirements for the refueling machine not satisfied, suspend use of the refueling machine from operations involving the movement of fuel assemblies.

SURVEILLANCE RE UIREHENTS

~

4

~ I 4.9.6.1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 3590 pounds and d

strating an automatic load cut off when the refueling machine load excee 1556 ounds.

< )(,oz PALO VERDE - UNIT 2 3/4 9"6 AHENORENT NO.

39

T 1

I

Q)R INFORMATIONONI REFUELING OPERATIONS 3/4. I. 6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with:

a.

A minimum capacity of 3590 ounds and an overload cut off limit of less than or equal t 1 5 pounds for the refueling machine.

l6QD APPLICABILITY; During movement of fuel assemblies within the refueling cavs ty.

ACTION:

With the above requirements for the refueling machine not satisfied, suspend use of the refueling machine from operations involving the movement of fuel assemblies.

SURVEILLANCE RE UIREHENTS 4.9.6.l The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 3590 pounds and demo trating an automatic'oad cut off when the refueling machine load exceed 56 ounds.

PALO VERDE - UNIT 3 3/4 9-6 AHc'NDVI'NT NO.