Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17310B07724 February 1994PVNGS Unit 1 Cycle 5 Startup Rept.
ML17306A59131 December 1991Reactor Containment Bldg 1991 Integrated Leak Rate Test Final rept.W/920319 LtrSafe Shutdown
ML17305B19213 November 1990Piping Verification Test Summary. W/901113 LtrFlow Induced Vibration
ML17305A84128 February 19901990 Reactor Containment Bldg Integrated Leak Rate Test Final Rept.Safe Shutdown
ML17304A62931 October 1988Startup Rept,Suppl 1.
ML17304A25531 July 1988Suppl 1 to Palo Verde Nuclear Generating Station Unit 3 Startup Rept.
ML20150E67129 February 1988Vols I-III of Reciprocating Charging Pump Test Rept
ML20155A93324 December 1987Analysis of Reactor Coolant Pump Shaft W/Modified Key Region
ML17303A4551 July 1987Piping Verification Program,Test Summary. W/870701 LtrBoric Acid
Flow Induced Vibration
ML17300A91830 June 1987Suppl 2 to Palo Verde Generating Station Unit 2 Startup Rept.
ML20207R99331 March 1987Suppl 1 to Palo Verde Nuclear Generating Station Unit 2 Startup Rept
ML20207N05331 December 1986Rev 0 to Palo Verde Nuclear Generating Station,Unit 2 Startup ReptSafe Shutdown
Shutdown Margin
High Radiation Area
Grab sample
Power change
ML17303A1811 December 1986Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept. W/861208 LtrSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Design basis earthquake
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Grace period
Power change
Unidentified leakage
ML20214T88930 November 1986Suppl 3 to Startup Rept
ML20214L84031 August 1986Suppl 2 to Palo Verde Nuclear Generating Station Unit 1 Startup Rept
ML17300A28215 July 1986Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept.Safe Shutdown
Operating Basis Earthquake
Earthquake
ML20210U67931 May 1986Rev 1 to Palo Verde Nuclear Generating Station Unit 1 Startup ReptSafe Shutdown
Shutdown Margin
High Radiation Area
Grab sample
Power change
Coast down
ML20154D46728 February 1986Startup ReptShutdown Margin
ML17299B05124 February 1986Startup Experience Rept:Mgt Overview.Boric Acid
ML20127J40320 January 1986Safety Equipment Status Sys (Sess) Commissioning Test
ML17299A90224 December 1985Auxiliary Feedwater Pump 48 H Endurance Test Results, Per Sser (NUREG-0857).W/851224 Ltr
ML17299A3477 May 1985Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept.Safe Shutdown Earthquake
Operating Basis Earthquake
ML17298B57224 October 1984Preliminary Prompt Notification Siren Sys Test Rept for 841024 Test.Coast down
ML20080C53915 October 1983Preliminary Rev 0 to Pre-Core Emergency & Auxiliary Feedwater Sys Test, Test Results Rept for 830503-0703Power Operated Valves
ML20080C5605 October 1983Preliminary Rev 0 to Pre-Core Instrumentation Correlation, Test Results Rept for 830516-0701
ML20080C45119 September 1983Preliminary Rev 0 to Pre-Core Chemical & Vol Control Sys Integrated Test, Test Results Rept for 830604-0704
ML20080C43417 September 1983Draft 7 of Preliminary Rev 0 to Pre-Core Turbine Bypass Control Sys Test, Test Results Rept for 830601-0705Stroke time
ML20080C42114 September 1983Preliminary Rev 0 to Pre-Core Safety Injection Check Valve Test, Test Results Rept for 830602
ML20080C4787 September 1983Preliminary Rev 0 to Main Steam Traps & Drain Valves Hot Functional Test, Test Results Rept for 830606-15Packing leak
ML20080C46725 August 1983Preliminary Rev 0 to MSIV & Bypass Valves Hot Functional Test, Test Results Rept for 830602-0703
ML20080C40925 August 1983Preliminary Rev 0 to Atmospheric Dump Valve Hot Functional Test, Test Results Rept for 830603-0822
ML20080C48520 August 1983Preliminary Rev 0 to Pressurized Performance, Test Results Rept for 830603-17
ML20080C3951 August 1983Preliminary Rev 1 to Steam Generator Blowdown Sys Test, Test Results Rept for 830611-15
ML20080C52027 July 1983Preliminary Rev 0 to RCS Expansion Measurements, Test Results Rept for 830411-0715
ML20080C50621 July 1983Preliminary Rev 0 to Main & Auxiliary Transformer Backfeed, Test Results Rept for 830420-0515
ML20077F42630 June 1983Rev 0 to Nonproprietary Cycle 1 CPC & Control Element Assembly Calculator Data Base Listing
ML20077F41430 June 1983Rev 1 to Nonproprietary Cpc/Control Element Assembly Calculator Sys Phase II Software Verification Test Rept
ML20077F40730 June 1983Rev 1 to Nonproprietary Cpc/Control Element Assembly Calculator Sys Phase I Software Verification Test Rept
ML20080C49314 June 1983Preliminary Rev 0 to Loose Parts & Vibration Monitoring Sys Hot Functional, Test Results Rept for 830506-0607
ML20080P6449 February 1983Soil Thermal Property Measurements for Palo Verde Nuclear Plant
ML20071E70831 January 1983Core Protection Calculation & Control Element Assembly Calculator Sys Phase II Software Verification Test Rept. Proprietary Info Deleted
ML20071E70031 January 1983Core Protection Calculation & Control Element Assembly Calculator Sys Phase I Software Verification Test Rept. Proprietary Info Deleted
ML17298A54322 October 1982Failure Analysis of 54-26-1770 Steel Rotor Returned on NPR-97152 from Palo Verde Nuclear Station.Safe Shutdown
ML17300A53230 September 1982Test Rept on Slender Walls.
ML20028G2199 October 1981Az Nuclear Power Project 150-Inch Reed Switch Position Transmitter & Litton Electrical Connector Seismic Qualification Test (Sine Sweep Testing). Age Considerations for Seismic Design & Surveillance in Mild Environs EnclEarthquake
ML20063A58018 May 1981Flow Interruption Test for Part 77910,Supplied to C-EHydrostatic
ML20009C6998 May 1981Flow Interruption Test on Gate Valve Assembly.
ML20063A6028 May 1981Corrected Flow Interruption Test on Gate Valve Assembly
ML20009C69525 March 1981Revision a to Flow Interruption Test for Part 77910 Supplied to C-E.Hydrostatic
ML17300A82028 August 1978Torsiograph Test Rept of KSV-20-T.