Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants.
ML17312A632
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/26/1996
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A631 List:
References
RTR-NUREG-1432 NUDOCS 9604020035
Download: ML17312A632 (2)


Text

REFUEL ING OPERAT IONS a

. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with:

a. A minimum capacity of 3590 pou.>ds and an overload cut off limit.

APPLICABILITY: During movement of fuel assemblies within the refueling cavity.

ACTION:

With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies.

SURVEILLANCE RE UIREMENTS 4.9.6. 1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing load test of at least 3590 pounds and demonstrating an automatic d<< ff a

1 1 1'1g df 1 1 '-d I+5 cse rico ddoc c 4 0(F (l rrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO. ~76

U 4 i ~