Preliminary Rev 0 to Pre-Core Safety Injection Check Valve Test, Test Results Rept for 830602
ML20080C421
Person / Time
Site: Palo Verde, 05000000
Issue date: 09/14/1983
From: Doyle K
AFFILIATION NOT ASSIGNED
To:
Shared Package
ML20080C249 List:
References
FOIA-83-609 91HF-1SI01, 91HF-1SI01-R00, 91HF-1SI1, 91HF-1SI1-R, NUDOCS 8402080082
Download: ML20080C421 (6)


Text

{{#Wiki_filter:_ - _ _ .\ 'N* c f/Ze-{. fty) f rYG f TEST RESULTS REPORT PROCEDURE NO. 91HF-1SIO1 __ PROCEDURE TITLE PRECORE SAFETY INJECTION CHECK VALVE TEST REVISION AT THE COMMENCEMENT OF TESTING. O DATE 6/1/83_ REVISION AT COMPLETION OF TESTING 0 DATF 6/1/83 LATEST TEST CHANGE NOTICE NO. TCN 004 DATE 6/2/83 DATES OF TEST PERFORMANCE JUNE 2, 1983 PAGE 1 0F 6 Review and _ Approval of Test Results PREPARED BY: WM M _/ r/m DATE f // 3 TECHNICAL REVIEW: DATE fO GROUP SUPERVISOR REVIE

                                                ,       [d m _                                DATE    /#!/3 TEST WORKING GROUP MEETI      UMBER:

DATE PLANT REVIEW BOARD MEETING NUMBER: DATE QUALITY ASSURANCE REVIEW: DATE (Required for Test Results Reports not reviewed by TWG) ~ STARTUP MANAGER A? PROVAL: DATE 91HF-1SIO1, TRR/TCN004 8402080082 831116 PDR FOIA CARDE83 -607 PDR ~ g-5lW 4 E S' ,,. . ... 4&d. -- - ;_ - -- ,....

                                                                                    - - - -     -               ~

e. 46# 9) IMAGE EVALUATION ////p [Sgg~ 4gjk*'f/ Fg TEST TARGET (MT-3) ,[,[4 /{4, pf * %zzzz

                          !5l[

l!lE i.i [m na l 1.8 I.25 1.4 l 1.6 h-4 150mm > 4 6" > 4

  • W % ,, / '4 br/
                                             'QuQ&$

y c,y;,

Test Results Report 91HF-ISIO1

  • TCN 004 PAGE 2 0F 6 A. TEST PURPOSE AND SCOPE
                 , ,           This test was conducted to ensure the following:

1

1. To verify that'the Safety Injection Tank (SIT) discharge check valves, (SIA-V235, SIA-V245, SIB-V215, SIB-V225) will pass flow with the RCS at normal operating pressure and tempera 6ure.
2. To verify that the Safety Injection loop check valves (SIB-V217, SIB-V227, SIA-V237, SIA-V247) will pass flow with the RCS at normal operating pressure and temperature.
3. To verify that the RCS loop hot leg check valves (SIB-V532, SIA-V522) will pass flow with the RCS at normal operating pressure and temperature.

B. COMPLEMENTARY TESTS This precore hot functional test satisfied the following licensing commitments:

1. Verified flow through the safety injection loop check valves by lining up to the CVCS charging pumps to discharge into the safety injection discharge header. (Source Document CESSAR 14.2.12.2.12)
2. Demonstrated the operability of emergency core cooling system to show the operability of the check valves along the safety injection l

discharge path at operating temperatures. (Source Document ASME X XI IWV-3520)

3. Demonstrated the operability of the check valves for the high pressure safety injection system hot operating condition flow test. (Source Document Reg. Guide 1.79, Rev.'O, C.3.A(2)
         ~          . _
... .~_ .

t t

  • s '. ',

Test Results Report l 91HF- 1SIO1 l, TCN 004 l PAGE 3 0F 6 l ! The'preoperational test 91PE-1SIO1 satisfied the licensing commitment to , ! verify flow through each safety injection check valve'by flowing back to ' the Refueling Water Tank. (Source Document CESSAR 14.2.12.2.12)  ; i t C. TEST DESCRIPTION ' The four RCS Loop Check Valves (SIA-V237, SIA-V247, SIB-V217, SIB-V227) were tested as follows:

1. Maintained RCS at normal operating temperature and pressure.
2. Two charging pumps were used to maintain an 88 gpm output. ,
3. Maintained RCP seal injection flow at g-eater than 40 gpm through the
                                                                                                                      ~

seal injection line.

4. Established conditions for a parallel flow path ,through the HPSI header.
5. Established flow through the RCS Loop Check Valve via the HPSI header by jogging open the associated HPSI Header Control Valve (SIA UV-637, -647, -617, and -627). Recorded the RCS pressurc, HPSI Header Pressure, and Charging Header flow upon opening and closing the HPSI Header Control Valve.
6. Verified flow through the loop check valves when charging flow decreased and HPSI Header Pressure increased to greater than RCS pressure. .
7. Depressurized the HPSI line to equalize it with the Safety Injection  !

l Tank. Recorded both SIT pressure and HPSI pressure. m__ _.___.__._.--me.

f I. O o-O. Test Results -Report -- 91HF-1SIO1

                                                                          .TCN 004 PAGE.4.0F 6 p

l _ The Safety Injection Tank Discharge Check Valves (SIB-V715 and -V225, and GIA-V235 and -V245) were tested as follows:

1. Maintained RCS at normal operating temperature and pressure.
2. Recorded SIT level and pressure.
3. Maintained HPSI header pressure of less than 620 psig.
4. Established valve lineup to allow depressurization to the

[ Reactor Drain Tank, as per TCN 003. 1 . S. Opened the discharge header drain valve and monitored the SIT i. level for decrease.--Closed the valve when a-level decrease was - observed.

6. Recorded the SIT leve'l and pressure. A decrease in both parameters indicated that the check valve passed flow.

The two RCS Loop Hot Leg Check Valves (SIA-V522 and SIB-V532) were tested as follows:

1. Maintained RCS at normal operating temperature and pressure.
2. Recorded RCS Pressure, HPSI Header pressure, and Charging Header l

Flow.

3. Opened HP Long Path Recirculation valve (SIA-HV-640 or SIB-HV-509).

4 Jogged Open HPSI Header Centrol Valve (SIC-HV-321 or SID-HV-331) to pressurize the line to the check valve being tested.

5. Closed HPSI Header Control Valve (SIC-HV-321 or SID-HV-331) .
6. Recorded RCS pressure, HPSI Header Pressure and Charging Header flow.
7. Verified flow through check valve (SIA-YI22 or SIB-V532) by observing a decrease in charging flow and an increase in HPSI header pressure to slightly greater than RCS pressure.
8. Closed HP long path recirculation valve (SIA-HV-604 or SIB-HV-509).
                       ~.       ,

f_Y ,. . -- "' ' W <

t . .. . Test Results Report--- 91H7-1SI01

  -~
     '                                                                                                   ~ TCN 004 PAGE 5 0F.6-
9. Closed Charging Pump Discharge Isolation Valve upon completion of testing the sccond valve. -

D. TEST EVENTS All testing was conducted on June 2, 1983. All check valves tested passed flow in accordance with the test requirements. No TER's were issued agcinst this procedure. E. TEST RESULTS The RCS loop 1A check valve SIA-V237 was tested in Section 8.1.5 and met the requirements of the Acceptance Criteria in Section 2.1.1. The RCS loop 1B check valve SIA-V247 was tested in Section 8.1.6 and met the requirements of the Acceptance Criteria in Section 2.1.2. The RCS loop 2A check valve SIB-V217 was tested in Section 9.1.7 and met the requirements of the Acceptance Criteria in Section 2.1.3.

RCS loop 2B check valve SIB-V227 was tested in Section 8.1.8 and met the requirements of the Acceptance Criteria in Section 2.1.4.

1 I RCS loop 1 Hot leg check valve SIA-V522 was tested in Section 8.1.9 and met the requirements of the Acceptance Criteria in Section 2.1.5. RCS loop 2 Hoc leg check valve SIB-V532 was tested in Section 8.1.10 and met the requirements of the Acceptance Criteria in Section 2.1.6. l l Safety Injection Tank 2A Discharge Check Valve SIB-V215 was tested in l Section 8.2.5 and met the requirements of the Acceptance Criteria in l l Section 2.2.1. l l Safety Injection Tank 2B Discharge Check Valve SIB-V225 was tested in .

         ,iegg    g4m,                   -"T                  O%
                               , ahe-                      -g                                   4 M     I* -_ _U    " A
                       , . -                       -                       . - . . . -.   --. ,   ,_, -               _, - .-- ~. , . _     ,

Test Results Report

 ~

91HF-ISIO1 TCN 004 PAGE 6 0F 6 Section 8.2.6 and met the requirements of the Acceptance Criteria in Section 2.2.2. Safety Injection Tank 1A Discharge Check Valve SIA-V235 was tested in Section 8.2.7 and met the requirements of the Acceptance Criteria in Section 2.2.3. Safety Injection Tank 1B Discharge Check Valve SIA-V245 'was tested in Section 8.2.8 and met the requirements of the Acceptance Criteria in Section 2.2,.4 , F. CONCLUSION The test results have demonstrated that the Safety Injection Check V .ve s tested in this procedure successfully pass flow according to the design requirements. G. RtCOMMENDATIONS It is recommended that 91HF-ISIO1, Precore Safety injection Check Valves, be accepted as complete by TWG. l l l l l l l