Auxiliary Feedwater Pump 48 H Endurance Test Results, Per Sser (NUREG-0857).W/851224 Ltr
ML17299A902
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/24/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0857, RTR-NUREG-857 ANPP-34329-EEVB, NUDOCS 8512310150
Download: ML17299A902 (35)


Text

'r RECULAOIY INFORNATION DISTRIDUTI(SYSTEN (RIDE')

ACCESSION NBR: 8512310150 DOC. DATE: 85/12/24 NOTARIZED: NO DOCKET 0 FACIL: STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 AUTH. NANE AUTHOR AFFILIATION VAN BRUNT', E. Arizona Nuclear Power ProJect (Formerly Arizona Public Serv RECIP. NANE RECIPIENT AFFILIATION KNIQHTON Q. M. PMR Prospect Directorate 7

SUBJECT:

"Auxiliary Feedeater Pump 48 H Endurance Test Resultsi" per SSER (NUREQ-0857). N/851224 ltr.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED: LTR Submittal: Qeneral Distribution g ENCL + SIZE:

NOTES: Standardized plant. 05000529 RECIPIENT COP IES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NAME LTTR ENCL PNR-B PD7 PD 01 5 5 LIC ITR*iE 1 1 INTERNAL: ACRS 09 6 ADM/LFNB 1 0 ELD/HDS3 1 0 NRR BMR EB 1 1 NRR PNR-A EB 1 1 NRR PNR-B EB 1 NRR/DHFT/TSCB 1 1 NRR/DSRO DIR 1 1 NRR RBW B 1 NRR/GRAS 1 0 E~LE 04 1 1 RQN5 1 1 EXTERNAL: 24X 1 EQSQ BRUSKEi 8 1 1 LPDR 03 1 NRC PDR 02-, 1 1 NSIC 05 1 TOTAL NUNBER OF COPIES REQUIRED: LTTR 28 ENCL 25

I

'lf

~ II II Jl Xf' Q I 4 I I

'Il 4 45

- 4 wi,l jww VI I 0 P

44

~ 4

, 43k ff V,I; I

4 )'w I WI Jfl fw Jl I

J (I' RP I 4 "I wg , llx,( ff I

'VV tf X",ii 4 wx

VI 4

44 If 4 I 4 'll I ~ VX I E,I R w. 4,>-C, I',

~ 4

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA B5072-2034 December 24, 1985 ANPP-34329-EEVB/PGN-98.07 Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Deputy Director PWR Project Directorate II7 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-46)

Auxiliary Feedwater Pump 48 Hour E'ndurance Test File: 85-056-026

Reference:

Safety Evaluation Report'elated to the operation of Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (NUREG<857) dated November, 1981

Dear Mr. Knighton:

As required by Section 22.2 (II.E.l.l) of the above reference, please find attached the results of the auxiliary feedwater system (AVOWS) pump 48-hour endurance tests.

If you have any questions or require additional information, please contact Mr. W. F. Quinn of my staff.

Very truly yours, CUW E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/WFQ/PGN/dim Attachment cc: E. A. Licitra M. C. Ley R. P. Zimmerman A. C. Gehr

.. lad: D, CRUTCNPIELD (Ltr only) g EB (N JO!OISTON)

RSB (TIIONAS)

I $ EICSB (PARR). ~

FOB (II REOAN)

0, it 0 ~

0 0

Attachment to ANPP- 34329 ATTACHMENT Auxiliary Feedwater Pump 48 Hour Endurance Test Results 8512310150 851224 I PDR ADOCK 05000529 F PDR

Page 2

1) 2M-AFN-POl - Non-essential AFW pump 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance testing data:

a) Date of testing: July 2, 1985 through July 4, 1985 b) Bearing Temperatures The limits for each bearing temperature, along with the maximum obtained temperature are listed below:

AFN-TE-79 (Limit 190'F max) Max. 161'F AFN-TE-81 (Limi.t 190'F max) Max. 153'F AFN-TE-89 (Limit 200'F max) Max. 161 F AFN-TE-90 (Limit 200'F max) Max. 152'F AFN-TE-91 (Limit 200'F max) Max. 163'F c) Flow Data: Data was collected with a clamp on flowmeter on the recirculation line to the CST. The MITE used was a Controlotron Model 865580 and flow data recorded was about 280 gpm during the test.

d) Vibration Data: Data was collected using a hand held vibration meter and probe. The M&TE used was an IRD Model 8810. The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below:

Inboard bearing: .4 .6 mils Outboard bearing: .9 1.2 mils The 91PE-2AF01 48-hour endurance run demonstrated that 2M-AFN-POl remained within design limits with respect to bearing tempera-tures and vibration. The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded.

2M-AFN-PO1 AUXILIARY FEEDWATER PUMP

AFN-TE-79 FREE END MOTOR BEARING 170 160 150 140 s 130 0

0 a 120 I

5I 110 C

100 I

80 70 I

60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TINE - Hours I HOUR RUN AFTER COOLDOWN 48 HOUR RUN

2M-AFN-P01 AUXILIARY FEEONATER PUMP AFN-TE-81 COUPLING END MOTOR BEARING 170 160 150 140 u 130 a 120 5 110 100 90 80 70 60 II 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TINE - Hours 1 HOUR RUN AFTER COOLDOIIN 48 HOUR RUN

C 2M-AFN-P01 AUXILIARY FEEDMATER PUMP AFN-TE-89 PUMP THRUST SEARING 170 160 150 140 u 130 0

o 120 I

EIJ 5 110 100 80 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE - Houcs I HOUR RUN AFTER COOLOOW 48 HOUR RUN

l' 2M-AFN-POl AUXILIARY FEEOWATER PUMP AFN-TE-90 PUMP COUPLING ENO JOURNAL BEARING 170 160 150 140 130 a

0 o 120 I

5 110 100 I

90 80 70 60 8 20 22 24 26 28 30 32 34 36 38 40 42 44 M

0 2 4 6 10 12 14 16 18 46 48 0 1 TINE Hour o 1 HOUR RUN AFTER COOLOOMN 48 HOUR RUN

2M-AFN-PO1 AUXILIARY FEEOWATER PUMP AFN-TE-91 PUMP FREE ENO JOURNAL BEARING

'l 170 160 150 140 g 130 120 I

5 110 100 I

90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE Hours 1 HOUR RUN AFTER COOLDOMN 48 HOUR RUN

Page 8

2) 2M-AFB-P01 Essential APW pump 48-hour endurance testing data:

a) Date of Testing: June 13, 1985 through June 15, 1985.

b) Bearing Temperatures - The limits for each bearing temperature, along with the maximum obtained temperature are listed below:

AFN-TE-80. (Limit 190'F max)  : Max. 151'F AFN-TE-82 (Limit 190'F max)  : Max. 149'F AFN-TE-86 (Limit 200'F max)  : Max. 162'F AFN-TE-87 (Limit 200'F max)  : Max. 161'F AFN-TE-88 (Limit 200'F max)  : Max. 148'F c) Flow Data: Data was collected using a clamp on flowmeter on the recirculation line to the CST. The METE used was a Controlotron Model fI65580 and flow data recorded was about 235 gpm during the test.

d) Vibration Data: Data was collected using a hand held vibration meter and probe. The ATE used was and IRD Model 8810. The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.

Inboard Bearing: .8 1.0 mils Outboard Bearing: .9 1.2 mils e) Pump room temperature and humidity data: Data was collected using a psychrometer to measure wet and dry bulb temperatures. From this data relative humidity was also calculated.

Temperature Range: 68'F - 73'F Relative Humidity Range: 52% 82%

The 48-hour endurance run demonstrated that 2M-AFB-P01 remained within design limits with respect to bearing temperatures and vibrations. The test data also showe'd that the pump room ambient conditions (temperature, humidity) did not exceed environmental qualification limits for safety related equipment in the room, The following plots made for the bearing temperatures versus time demonstrated that the design limits . were not exceeded. Plots were also made fo'r the pump room temperature and humidity data versus time.

2M-AFB-PO1 AUXILIARY FEEOMATER PUMP AFN-TE-BO FREE ENO MOTOR BEARING

+FOR THE FIRST 2.5 HOURS, A PROBLEN EXISTED WITH THE INPUT TO THE PLANT COHPUTER. OATh, AS SHOWN. IS NOT REPRESENTATIVE OF INITIAL STARTING TENPERATURES. SUPPLENENTARY DATA IS AVAILABLE IN APPENDIX E OF 91PE-2AFOI ~

160 ISD 140 a 130 a

a a 120 I

5 110 100 90 80 70 0 2 4 6 9 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 49 0 TIME - Hours I HOUR RUN AFTER COOl DOWN 49 HOUR RUN

O.

f

2M-AFB-POl AUXILIARY FEED>/ATER PUMP AFN-TE-82 COUPLING END MOTOR BEARING Oo (D

170 160 150 140 130 0

Ql c) 120 I

5 110 100 I

80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TIHE - Hours 1 HOUR RUN AFTER COOLOOVN 48 HOUR RUN

2M-AFB-P01 AUXILIARY FEEDWATER PUMP gq AFN-TE-86 PUMP FREE END JOURNAL BEARING s I e

e 170 160 150 140 g 130 ee 120 I

5 110 100 e

90 80 70 60 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 T1HE - Hours 1 HOUR RUN AFTER COOLOOWN 48 HOUR RUN

2M-AFB-PO1 AUXILIARY FEEDWATER PUMP AFN- TE-87 PUMP COUPLING END JOURNAL BEARING 170 160 150 140 g 130 0

a 120 I

5 110, 100 I

90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE Hours I HOUR RUN AFTER COOLDOWN 48 HOUR RUN

2M-AFB-P01 AUXILIARY FEEDWATER PUMP AFN-TE-88 PUMP THRUST BEARING 170 160 150 140 y 130 0

0 o 120 I

5I 110 100 90 80 70 60 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 M

TJME - Hours 1 HOUR RUN AFTER COOLOOWN 48 HOUR RUN

2M-AFB-PO1 AUXILIARY FEEDWATER PUMP ROOM ENVIRONMENTAL DATA 90 BO I

I H 70

)

w I-60 50 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE - Havro 48 HOUR RUN 90 P. 80 a

D

~

70 ORY BULB

o. 60 ~ WET BULB w

50 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE " Hovro 48 HOUR RUN

I

~ I

Page 15

3) 2M-AFA-P01 Essential AFW pump 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance test data a) Date of testing: July 12, 1985 through July 14, 1985, and July 19, 1985.

b) Bearing Temperatures The limits for each bearing temperature, along with the maximum obtained temperature are listed below:

AFN-TE-59 (Limit 200'F max) Max. 137'F (128.8'F)*

AFN-TE-60 (Limit 200 F max) Max. 115'F (126.7'F)*

AFN-TE-83 (Limit 200'F max) : Max. 167'F AFN-TE-84 (Limit 200'F max) : Max. 157'F AFN-TE-85 (Limit 200'F max) : Max. 166 F

  • Maximum values while using hand held contact pyrometer (M&TE) for bearing surface temperatures.

c) Flow Data: AFA-POl was run on minimum recirculation during the 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> run. Operations also used AFA-F01 to feed the steam generators while at the 565'F and 2250 psia test plateau.

d) Vibration Data: Data was collected using a hand held vibration meter and probe. The M&TE used was an IRD Model

/3350. The maximum vibration limits are 5 mils and the actual vibrations recorded during the test are listed below.

Inboard Bearing: .24 .46 mils Outboard Bearing: .35 .64 mils e) Pump room temperature and humidity data: Data was collected using a calibrated temperature and humidity meter (M&TE).

Temperature Range: 67.2'F to 80.5'F Humidity Range: 49.3% to 70.9/

The 48-hour endurance run demonstrated that 2M-AFA-P01 remained within design limits with respect to bearing temperatures and vibrati'on. The test data also showed that the pump room ambient conditions (temperature, humidity) did not exceed environmental qualification limits for safety related equipment in the room.

The following plots made for the bearing temperatures versus time demonstrated that the design limits were not exceeded. Plots were also made for the pump room temperature and humidity data versus time.

AJM:GEP:RLG:WHF:mg

~ .

2M-AFA-P01 AUXILIARY FEEO>lATER PUMP AFN-TE-59 TURBINE GOVERNOR ENO JOURNAL BEARING B EARING SURFACE TENPERATURE 170 H 8, TE USED WHILE AFN-TE-059 INOPERATIVE I

160 150 140 g 130 0

a 120 I

EU 5 110 100 90 8D 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TINE - Hours I HOUR RUN AFTER COOLDOWN 48 HOUR RUN

2M-AFA-PO1 AUXILIARY FEEOWATER PUMP Q ~

AFN- TE-60 TURBINE COUPLING ENO JOURNAL BEARING OCI lD 8 EARINC SURFACE TEHPERATURE 170 H L TE USED NIILE AFN-TE-060 INOPERATIVE 160 150 140 o 130 0

o 120 I

W 5 110 100 I

90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 I TIHE - Hours I HOUR RUN AFTER COOLDOW 48 HOUR RUN

O.

J y,

2M-AFA-P01 AUXILIARY FEEDWATER PUMP AFN-TE-83 PUMP FREE ENO JOURNAL BEARING

\

170 160 1SO 140 U.

s 130 a 120 I

IV 110 100 90 80 70 60 1 I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TlHE - Haves 1 HOUR RUN AFTER COOLDOMN 48 HOUR RUN

l' 2M-AFA-P01 AUXILIARY FEED>/ATER PUMP AFN-TE-84 PUMP COUPLING END 30URNAL BEARING

'7

~ ',

\

170 160

~

150 140 g 130 o 120 I

5 110 100 I~

80 70 6D 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TIME " Hours I HOUR RUM hFTER COOLDOWH 48 HOUR RUM

2M-AFA-PQ 1 AUXILIARY FEEQWATER PUMP AFN-TE-85 PUMP THRUST BEARING 170 160 150 140 130 0

a t.

o 120 I

110 100 90 80 70 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 1 TINE Hours 1 HOUR RUN AFTER COOLOOMN 48 HOUR RUN

VR 2M-AFA-PO1 AUXILIARY FEEOWATER PUMP ROOM

- ENVIRONMENTAL QATA

\

90 80 I

I H 70 y.

w 60 I-50 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 tIME " Hours 48 HOUR RUN 90 P. BO DRY BULB Cl 70 60 50 0  ? 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 tIME - Hours 48 HOUR RUN

0 I' V

J

\